510 Open Exam C, Rev8

Embed Size (px)

Citation preview

  • 8/11/2019 510 Open Exam C, Rev8

    1/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 1 of 13

    281-330-9542 www.DTM-Enterprises.org

    Questions 1 to 35 are OPEN BOOK and simulate the first half of the actual exam.

    1. A welder has welded a performance test coupon in the 6G position; his coupon will be required to pass;

    1. 2 bend tests.

    2. 4 bend tests.

    3. 8 bend tests.

    4.

    6 bend tests.

    2. For a hole type IQI that has the designation number 15 the essential 2 T hole diameter must be;

    1. 0.060

    2. 0.0303. 0.015

    4. 0.045

    3. In the pulse echo contact method of measuring thickness the velocity of the material being measured is a function of the

    materials physical properties and is usually assumed to be a constant for a ________________.

    1. its entire thickness2. given class of materials

    3.

    all ferrous materials4. all non-ferrous materials.

    4. When an examination to the requirements of Section V is required by the Code of construction it is the;

    1. Responsibility of the plant inspector to establish nondestructive examination procedures.

    2. Responsibility of the plant quality department to establish nondestructive examination procedures.

    3. Responsibility of the examiner to establish nondestructive examination procedures.

    4. Responsibility of the installer, fabricator or manufacturer to establish nondestructive examination procedures.

    5. A welding procedure is being qualified for use with a vessel that will require impact testing; the coupon will be 4 inchesthick. How many Charpy specimens will be required total?

    1. 9

    2.

    63. 3

    4. 12

    6. A vessel was placed in service on 1/15/60 with an original wall thickness of .875". It lost wall at an average rate of .005"

    per year until 1/15/75. Service conditions have changed and this inspection, 1/15/96 the vessel has a present wallthickness of .630". The previous thickness 5 years ago was .789". If the present rate of corrosion continues and the

    retirement thickness is .525", what will be the retirement year of the vessel?

    1. First quarter of 1997.

    2. Second quarter of 1999.3. Second quarter of 2001.

    4. Last quarter of 1999.

    7. A vessel is marked RT-3 this indicates that all welded joint efficiencies will be taken from Column B of table UW-12.The vessel contains only Type 1 welded joints so all welds will have an E of?

    1. .902. .85

    3. .70

    4. .65

  • 8/11/2019 510 Open Exam C, Rev8

    2/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 2 of 13

    281-330-9542 www.DTM-Enterprises.org

    8. A vessel is to be pneumatically tested to a pressure of 172.7 psi and this pressure has been adjusted for a stress ratio of

    1.1666. The pressure which the vessel should be inspected at will be;

    1. 104.6 psi.

    2. 125.6 psi.3. 157.0 psi.

    4. 97.1 psi.

    9. Densitometers shall be calibrated at least every ____ days during use.

    1. 30

    2. 1203. 90

    4. 45

    10. A vessel shells governing thickness has been determined to be 4.5, it is mandatory that it be subjected to CharpyImpact testing if it operates at a temperature of less than ___ oF.

    1. 1002. 212

    3.

    1204. -55

    11. Local PWHT per API 510 specifies that the area to be heat treated shall extend for a given distance from the weld. Whatwould be the distance required for the local PWHT of a 10 inch .500" thick nozzle in a 3 inch thick shell?

    1. 12 inches in all directions.

    2. 3 inches in all directions.3. 1 inch in all directions.

    4. 6 inches in all directions.

    12. When averaging a vessels corrosion over an area in which circumferential stress governs, the corrosion must be

    averaged using ;

    1. An 8 diameter circle.2. The diameter of the vessel.

    3. The most critical element in the corroded area.

    4. The longitudinal weld involved.

    13. A vessel has pitting in a small area; the area will fit in an 8 inch diameter circle with its center at the deepest pit. The

    shell course has a minimum thickness of .740". The pits within the circle are more than 2 inches apart in any straight

    line with the following depths;

    #1 .385 #2 .301" # 3 .235" # 4 .287", this area cannot be ignored because;

    1. The pits are too many in number.

    2.

    The pits are too close together.3. The square inches of the pits exceed 7 square inches.

    4. One of the pits is too deep to allow averaging.

    14. Name two types of water heaters.

    1. Gas Fired and Electric.2. Floating Head, U-Tube, and Fixed Tube Sheet.

    3. Fixed Tube Sheet and Floating Tube Sheet.

    4. Fixed Tube Sheet and Process Water Reheater.

  • 8/11/2019 510 Open Exam C, Rev8

    3/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 3 of 13

    281-330-9542 www.DTM-Enterprises.org

    15. While inspecting a vessel you discovered the cylindrical shell has corroded externally to a present thickness of .498" in

    thickness at its thinnest point. The vessel's corroded outside diameter is 95.82" and its material has an allowable stress of

    13,800 psi at 750 oF. The vessel shell is seamless and it has met the spot radiography requirements listed in UW-12(d).

    What will be the MAWP of the vessel?

    1. 71.87 psi

    2. 143.5 psi

    3.

    144.0 psi4. 83.45 psi

    Answer the following questions about the attached WPS and PQR (pages 5 to 8)from Sloppy Welding Company. Consider

    both the WPS and its supporting PQR when answering the questions.

    16. (WPS) QW-402 Joints The following is true;

    1. There are no mistakes.2. The retainers have not been addressed.

    3. The retainers and the joint design have not been addressed.

    4. The joint design has not been addressed.

    17. (WPS) QW-403 Base Metals the following is true;

    1. The specification of the material has not been addressed and that is a mistake.

    2. There are no mistakes.3. In this category the fillet weld specifications needs to be addressed.

    4. In this category the pipe diameter needs to be addressed.

    18. (WPS) QW-404 Filler Metals There is no need to address the Flux Trade name because it applies to the followingprocess and not this one;

    1. SAW2. SMAW

    3. GTAW

    4.

    PAW

    19. (WPS) QW-406 Preheat There (is/is not) a mistake because;

    1. Interpass temperature has not been addressed.

    2. Every thing required has been addressed.3. Preheat maintenance is required for P No. 3 materials.

    4. Preheat maintenance is never required for P No. 3 materials.

    20. (WPS) QW-409 Electrical; what process below requires the tungsten electrode size to be filled in?

    1. SMAW

    2. GTAW

    3.

    SAW4. This term is undefined in Section IX.

    21. (WPS) QW-410 In this box for the GMAW process the following information can be left out;

    1. Type of weld bead string or weave.

    2. Orifice or gas cup size.3. Contact tube to work distance.

    4. Tungsten electrode diameter.

  • 8/11/2019 510 Open Exam C, Rev8

    4/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 4 of 13

    281-330-9542 www.DTM-Enterprises.org

    22. When an owner-user chooses to conduct a RBI assessment, it must include a systematic evaluation of both the likelihood

    of failure and the associated consequence of failure. This likelihood of failure assessment should be repeated whenever

    what happens?

    1. Each time equipment or process changes are made.2. After it has been in service for 5 additional years.

    3. If operations reports any significant upset in the unit.

    4.

    Each time equipment or process changes are made that could significantly affect degradation rates or causepremature failure of the vessel.

    23. Preheat and controlled deposition welding, as described in 7.2.3.1 and 7.2.3.2, may be used in lieu of postweld heat

    treatment (PWHT) where PWHT is inadvisable or mechanically unnecessary. Which of the following describes thecircumstances where an alternative to PWHT is allowed?

    1. Preheating when notch toughness testing is not allowed and when notch toughness testing is allowed.

    2. Preheating when notch toughness testing is not required and when notch toughness testing is required.3. When the pressure vessel engineer has approved the technique or the API 510 A.I. has approved this method.

    4. Preheating method when notch toughness testing is not required and controlled deposition welding when notch

    toughness tests are required.

  • 8/11/2019 510 Open Exam C, Rev8

    5/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 5 of 13

    281-330-9542 www.DTM-Enterprises.org

  • 8/11/2019 510 Open Exam C, Rev8

    6/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 6 of 13

    281-330-9542 www.DTM-Enterprises.org

  • 8/11/2019 510 Open Exam C, Rev8

    7/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 7 of 13

    281-330-9542 www.DTM-Enterprises.org

  • 8/11/2019 510 Open Exam C, Rev8

    8/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 8 of 13

    281-330-9542 www.DTM-Enterprises.org

  • 8/11/2019 510 Open Exam C, Rev8

    9/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 9 of 13

    281-330-9542 www.DTM-Enterprises.org

    24. According to Section VIII the minimum NPS for a liquid relief valve is;

    1. NPS 1

    2. NPS

    3. NPS 7/84. NPS

    25. What temperature shall be used when calculating a pressure vessels MAWP?

    1. Nominal.

    2. Maximum that it can obtain by design.

    3. Average through wall temperature.4. The average temperature experienced over the entire vessels design.

    26. Which of the following explains the closest that two isolated un-reinforced openings can be to each other withoutreinforcement calculations being required?

    1. 4 times their diameters.2. 3-1/2 times their diameters.

    3.

    The sum of their diameters.4. There is no such requirement.

    27. The required diameter of tell-tale holes for re-pads is?

    1. Maximum NPS .

    2. Minimum NPS .

    3. Minimum NPS .4. Maximum NPS

    28. While inspecting a torispherical head it was discovered to have some severe corrosion and must be evaluated forcontinued service. This corrosion occurs at a radius 33.256" from the exact center of the head. The shell diameter of the

    vessel the head is attached to is 7'-0". To evaluate this head for continued service what is the greatest distance from the

    center that the corrosion can be and still be allowed to use the formula for spherical shells given in Section VIII Div. 1 ofthe ASME Code?

    1. 67.2"

    2. 48.0"

    3. 33.6"4. 84.0

    29. If the head in problem number 28 corrosion cannot be evaluated using the spherical formula for shells, what shall bedone to evaluate it for continued service?

    1. Use finite element analysis.

    2. Average the corrosion over the area in an 8-inch diameter circle.

    3.

    Use the formula from UG-32 for torispherical heads.4. Call in a pressure vessel engineer per the API 510 Code.

    30. The minimum throat dimension for a fillet weld as shown in Fig. UW-16 (c) of Section VIII Div.1 for a 1" thick nozzle

    joined to a 2" thick head is;

    1. .530"2. .750"

    3. .250"

    4. 1.00

  • 8/11/2019 510 Open Exam C, Rev8

    10/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 10 of 13

    281-330-9542 www.DTM-Enterprises.org

    31. A wire type IQI is to be used in lieu of a hole type for a single wall source side radiograph, the thickness of the material

    to be radiographed is 2.250" thick. What is the diameter of the wire that must be used to evaluate the image quality of

    the radiograph?

    1. 62. 8

    3. 10

    4.

    12

    32. The geometric unsharpness limitation for a material to be radiographed which is under 2" thickness is;

    1. 0.030"2. 0.020"

    3. 1.0"

    4. 0.0020

    33. The inside surfaces of a vessel's shell have corroded down to a minimum thickness of .369". The original thickness was

    .500". The vessel's new and cold inside diameter was 96 inches. What will be the internal dimension used to calculate

    the vessel's MAWP?

    1.

    96.262".2. 48.0".

    3. 96.0".

    4. 48.131".

    34. Thickness measurement instruments are divided into groups which are _________________.

    1. Flaw detectors with CRT readout, Flaw detectors with CRT and direct readout, and Flaw detectors with directreadout

    2. Flaw detectors with direct and CRT readout

    3. Flaw detectors with CRT or Flaw detectors with direct readout4. All flaw detectors are direct read out, one has a meter the other has a CRT display

    35. What is the remaining life of a vessel corroding at a rate of 0.017 inch per year when the last inspection measured 0.638inch and the minimum required thickness is 0.513 inch.

    1. 4 years.

    2. 10 years.

    3. 6.34 years.4. 7.35 years.

  • 8/11/2019 510 Open Exam C, Rev8

    11/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 11 of 13

    281-330-9542 www.DTM-Enterprises.org

    ANSWERS

    ANSWER LOCATION OF ANSWER

    1. 2 IX QW- 463.2 (d) & (e)

    2. 2 V ART 2 TABLE T-233.1

    3. 2 SE-797.2 4.3

    4. 4 V ARTICLE. 1 T-150(b)

    5. 1 VIII UG-84 (3 sets x 3 specimens = 9)

    6. 2 API 510 6.4

    7. 2 UG-116 AND TABLE UW-12

    8. 3 VIII UG-100 (d)

    9. 3 V Art 2 T-262.1

    10. 3 UCS-66(a)(1)(d)

    11. 4 API 510 7.2.5(d)

    12. 3 API 510 5.7(a) Second a

    13. 4 API 510 5.7(b) Second b

    14. 2 API 572 A.2.7

    15. 3 VIII APPENIX 1 R o Calculations

    16. 2 IX QW-25517. 2 IX QW-255

    18. 1 IX QW-254

    19. 2 IX QW-255

    20. 2 IX QW-256 box QW-409.12

    21. 4 IX QW-255

    22. 4 API 510 6.2

    23. 4 API 510 7.2.3

    24. 4 VIII UG-128

    25. 2 VIII UG-20 (a)

    26. 3 VIII UG-36 (c) (3)(c)

    27. 1 VIII UW-15 (d)

    28. 3 API 510 5.7(e)

    29. 3 API 510 5.7(e)

    30. 3 VIII UW-16 NOMENCLATURE

    31. 4 V ARTICLE 2 TABLE T-276

    32. 2 V ARTICLE 2 T-274.2

    33. 4 UG -27 AND TEXT BOOK

    34. 1 SE-797.2 6.1

    35. 4 API 510 6.4

  • 8/11/2019 510 Open Exam C, Rev8

    12/13

  • 8/11/2019 510 Open Exam C, Rev8

    13/13

    Open Book API 510 Practice Exam C

    Rev. 8 10/06 DTM Enterprises Technical Training Division Page 13 of 13

    281-330-9542 www.DTM-Enterprises.org

    15. From Appendix 1:tRo

    SEtP

    4.0

    t = 0.498

    E = 1.0

    Ro = 95.82/2 = 47.91S = 13,800

    P = ?

    28. API 510 5.7(h)

    Diameter = 80% of Shells Diameter0.80 x 84 = 67.2

    Greatest distance must be with a radius not more the 67.2/2 = 33.6

    30. tc= not less than the smaller of or .707

    t min=

    .707 x .750 = .530

    Lesser of .250 or .530Use .250

    33. 96/2 = 48 Radius 48 + (.500-.369) = 48.131

    Wall loss

    35. t actual- t required= .638 - .513 = .125 Remaining Corrosion Allowance = .125

    Remaining Life = t actual - t required = .125/.017 = 7.35 yearsCorrosion Rate

    )498.4.0(91.47

    498.0.1800,13

    x

    xxP

    )498.4.0(91.47

    498.0.1800,13

    x

    xxpsi04.144

    7108.47

    4.6872