16
50 and 80 Series: timber bi-fold door hardware SUPERIOR ENGINEERING

50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

50 and 80 Series: timber bi-fold door hardware

Superior engineering

Page 2: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

CONTENTS50 SeriesComponents 4

Configuration 5

Installation 6

80 SeriesComponents 8

Configuration using jamb hinges 9

Installation using jamb hinges 10

Configuration using jamb pivots 12

Installation using jamb pivots 13

2 › www.schlegel.com

Page 3: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.com › 3

Schlegel: providing superior bi-fold door hardware

Schlegel manufactures a complete range of bi-fold door hardware, engineered to the highest standards with an excellent tracking system designed to ensure years of trouble-free service.

The Schlegel 50 and 80 series bi-fold systems reduce assembly time for both the fabricator and the installer by using fewer components that are designed to fit as a complete system.

Utilising aluminium tracks prevents excessive flex meaning the doors run smoothly and longer spans can be achieved with multiple door configurations.

Completed by the superior weathersealing technology of the Aquamac 21 and Aquamac 109, offering the best acoustic and thermal performance on the market today.

Designed and manufactured in New Zealand, the Schlegel 50 and 80 series bi-fold systems are fully compliant with the requirements of NZS 4211/AS2047 as tested and when used in the JMF Door systems.

Page 4: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

4 › www.schlegel.com

50 Series: bi-fold timber door hardware

nSuitable for panel weight of up to 50 kg

nSuitable for panel heights up to 2.7 metres

nMinimum panel thickness 40 mm

nSuitable for panel widths up to 0.85 metres

nHeight adjustable by +/- 5 mm

A

A

B

D

C

C

E

F

Mid Pivot SetMid HingeLeading Pivot SetMid Hinge with HandleTop trackBottom track

A

B

C

D

E

F

Page 5: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.com › 5

Schlegel can provide you with the tracks and hardware necessary to assemble the bi-fold doors. Simply choose your door configuration, see below.

Overall rebate size

P1 P2 P3

50 Series configuration

4 8

4 4 4

4 4

4 4 4 8

4 4 4

4 8 4

4 4 4 4 4

4 4 4 4

4 4 4 4

4 4 4 4 4 4

4 4 4 4 4

4 4 4 8 4

4 4 4 4 4

4 4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4 4 8

4 4 4 4 4 4 4

4 4 4 4 4 8 4

4 4 4 4 4 4 4

4 4 4 48 4 4

4

4

4

4 4

4

4

4 4

4

4 4

4 4

4

4 4

4 4

4 4

4

4 4

4 4

4 4

4

4 4

4 4

4 4

4 4

P1 = rebate/2 - 14 1x Leading Pivot Set (#11110) 5x Mid Hinge (#11160)P2 = rebate/2 - 2 1x D Handle Mid Hinge (#11162)

P1, 2, 3, 4 = rebate/4 - 5 1x Mid Pivot Set (#11100) 9x Mid Hinge (#11160) 1x D Handle Mid Hinge (#11162)

P1,2,3,4,5 = rebate/5 - 5 2x Mid Pivot Set (#11100) 9x Mid Hinge (#11160) 2x D Handle Mid Hinge (#11162)

P1,2,3,5 = rebate/5 - 9 1x Mid Pivot Set (#11100) 11x Mid Hinge (#11160)P4 = rebate/5 + 5 1x Leading Pivot Set (#11110) 2x D handle mid hinge (#11162)

P1,2,3,5 = rebate/5 - 9 1x Mid Pivot Set (#11100) 11x Mid Hinge (#11160)P4 = rebate/5 + 5 1x Leading Pivot Set (#11110) 2x D Handle Mid Hinge (#11162)

P1,2,3,4,5 = rebate/6 - 7 2x Mid Pivot Set (#11100) 11x Mid Hinge (#11160)P6 = rebate/6 + 6 1x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6 = rebate/6 - 5 2x Mid Pivot Set (#11100) 12x Mid Hinge (#11160) 2x D Handle Mid Hinge (#11162)

P4 & P5 = rebate/6 + 2 1x Mid Pivot Set (#11100) 13x Mid Hinge (#11160)P1,2,3,6 = rebate/6 - 9 2x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6 = rebate/6 - 5 2x Mid Pivot Set (#11100-1) 12x Mid Hinge (#11160) 2x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6,7 = rebate/6 - 5 3x Mid Pivot Set (#11100) 12x Mid Hinge (#11160) 3x D Handle Mid Hinge (#11162)

P6 = rebate/7 + 6 2x Mid Pivot Set (#11100) 14x Mid Hinge (#11160)P1,2,3,4,5,7 = rebate/7 - 6 1x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P6 = rebate/7 + 6 2x Mid Pivot Set (#11100) 14x Mid Hinge (#11160)P1,2,3,4,5,7 = rebate/7 - 6 1x Leading Pivot Set (#11101) 3x D Handle Mid Hinge (#11162)

P4 = rebate/7 + 6 2x Mid Pivot Set (#11100-1) 14x Mid Hinge (#11160)P1,2,3,5,6,7 = rebate/7 - 6 1x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P8 = rebate/8 + 6 3x Mid Pivot Set (#11100) 14x Mid Hinge (#11160)P1,2,3,4,5,6,7 = rebate/6 - 6 1x Leading Pivot Set (#11110) 4x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6,7,8 = rebate/8 - 4 3x Mid Pivot Set (#11100) 15x Mid Hinge (#11160) 3x D Handle Mid Hinge (#11162)

P6 & 7 = rebate/8 + 4 2x Mid Pivot Set (#11100) 16x Mid Hinge (#11160)P1,2,3,4,5,8 = rebate/8 - 8 2x Leading Pivot Set (#11110) 4x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6,7,8 = rebate/8 - 4 2x Mid Pivot Set (#11100) 15x Mid Hinge (#11160) 1x Mid Pivot Set (#11101) 3x D Handle Mid Hinge (#11162)

P4 &5 = rebate/8 + 4 2x Mid Pivot Set (#11100-1) 16x Mid Hinge (#11160)P1,2,3,6,7,8 = rebate/8 - 8 2x Leading Pivot Set (#11110) 4x D Handle Mid Hinge (#11162)

P1 = rebate/3 - 5 1x Mid Pivot Set (#11100) 6x Mid Hinge (#11160)P2 = rebate/3 - 5 1x D Handle Mid Hinge (#11162)P3 = rebate/3 - 5

P1 = rebate/3 - 9 1x Leading Pivot Set (#11110) 8x Mid Hinge (#11160)P2 = rebate/3 + 3 1x D Handle Mid Hinge (#11162)P3 = rebate/3 - 9

P1 = rebate/4 - 9 1x Mid Pivot Set (#11100) 8x Mid Hinge (#11160)P2 = rebate/4 - 9 1x Leading Pivot Set (#11110) 2x D Handle Mid Hinge (#11162)P3 = rebate/4 - 9P4 = rebate/4 + 3

P1 = rebate/4 - 12 2x Leading Pivot Set (#11110) 10x Mid Hinge (#11160)P2 = rebate/4 + 0 2x D Handle Mid Hinge (#11162)P3 = rebate/4 + 0P4 = rebate/4 - 12

Panels

2

3

2+1

4

3+1

2+2

5

4+1

3+2

6

5+1

4+2

3+3

7

6+1

5+2

4+3

8

7+1

6+2

5+3

4+4

Seal gaps Panel size calculations(including seal gaps)

Hardware configurations(for panels up to 2.1m high)

Page 6: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

Level

Square

Plumb

1

3

5 6

Install the frame ensuring it is square, level, plumb and free of twist.

Screw top track to frame with 10g CSK screws at 100 mm centres for each panel, then at 300 mm centres.

4

6 › www.schlegel.com

50 Series installation

Fix bottom track with 8g CSK screws 100 mm from ends and at 400 mm centres – fully bed screws in sealant. Seal under track. Provide sill track drainage.

Insert Aquamac 21 weatherseal.

Top leading pivot

Bottom leading pivot

Bottom middle

pivot

Top middle

pivot

Clean track thoroughly.

Next install hardware in correct orientation using the notch cut earlier.

Mortise leading panel hinge blades to centre of panels. Mortise is 135(L) x 22(W) x 14(D) mm.

100

100

100

100

100

300

300

2

Cut 80 mm off the end of the top track, for installing and maintaining hardware.

80

Page 7: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

7 8

Mortise mid panels 100(L) x 28(W) x 3.0(D) mm, 10 mm in from the top and bottom of the panel.

Load up and fix end panel to jamb via hinges.

www.schlegel.com › 7

9

11

10

Ensure the panel is square, pack hinges ifnecessary.

Adjust top hanger by lifting door from bottom (to take the weight), then remove the screws of the bottom hinge block, use M8 spanner to set height.

Fit subsequent panels and align door by adjusting alltop hangers.

Top jamb hinge

Bottom jamb hinge

Top mid roller

Bottom mid guide

Mid hinge

Mid hinge with D handle Top leading

roller

Bottom leading guide

12

Complete four panel installation by inserting Aquamac 21 to frame and Aquamac 109 to edges of the door leaves.

Page 8: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

8 › www.schlegel.com

80 Series: bi-fold timber door hardware

nSuitable for panel weight of up to 80 kg

nMaximum of 8 panels

nSuitable for panel heights up to 3.3 metres

nMinimum panel thickness 40 mm

nSuitable for panel widths up to 0.95 metres

nHeight adjustable by +/- 5 mm

nPivot or hinge to frame option

A

A

B

B

C

E

D

D

F

G

Jamb Pivot SetMid Pivot SetMid HingeLeading Pivot SetMid Hinge with HandleTop trackBottom track

A

B

C

D

E

F

G

Page 9: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.com › 9

Schlegel can provide you with the tracks and hardware necessary to assemble the bi-fold doors. Simply choose your door configuration, see below.

Overall rebate size

P1 P2 P3

80 Series configuration using jamb hinges

4 8

4 4 4

4 4

4 4 4 8

4 4 4

4 8 4

4 4 4 4 4

4 4 4 4

4 4 4 4

4 4 4 4 4 4

4 4 4 4 4

4 4 4 8 4

4 4 4 4 4

4 4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4 4 8

4 4 4 4 4 4 4

4 4 4 4 4 8 4

4 4 4 4 4 4 4

4 4 4 48 4 4

4

4

4

4 4

4

4

4 4

4

4 4

4 4

4

4 4

4 4

4 4

4

4 4

4 4

4 4

4

4 4

4 4

4 4

4 4

P1 = rebate/2 - 14 1x Leading Pivot Set (#11110) 5x Mid Hinge (#11160)P2 = rebate/2 - 2 1x D Handle Mid Hinge (#11162)

P1, 2, 3, 4 = rebate/4 - 5 1x Mid Pivot Set (#11100) 9x Mid Hinge (#11160) 1x D Handle Mid Hinge (#11162)

P1,2,3,4,5 = rebate/5 - 5 2x Mid Pivot Set (#11100) 9x Mid Hinge (#11160) 2x D Handle Mid Hinge (#11162)

P1,2,3,5 = rebate/5 - 9 1x Mid Pivot Set (#11100) 11x Mid Hinge (#11160)P4 = rebate/5 + 5 1x Leading Pivot Set (#11110) 2x D handle mid hinge (#11162)

P1,2,3,5 = rebate/5 - 9 1x Mid Pivot Set (#11100) 11x Mid Hinge (#11160)P4 = rebate/5 + 5 1x Leading Pivot Set (#11110) 2x D Handle Mid Hinge (#11162)

P1,2,3,4,5 = rebate/6 - 7 2x Mid Pivot Set (#11100) 11x Mid Hinge (#11160)P6 = rebate/6 + 6 1x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6 = rebate/6 - 5 2x Mid Pivot Set (#11100) 12x Mid Hinge (#11160) 2x D Handle Mid Hinge (#11162)

P4 & P5 = rebate/6 + 2 1x Mid Pivot Set (#11100) 13x Mid Hinge (#11160)P1,2,3,6 = rebate/6 - 9 2x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6 = rebate/6 - 5 2x Mid Pivot Set (#11100-1) 12x Mid Hinge (#11160) 2x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6,7 = rebate/6 - 5 3x Mid Pivot Set (#11100) 12x Mid Hinge (#11160) 3x D Handle Mid Hinge (#11162)

P6 = rebate/7 + 6 2x Mid Pivot Set (#11100) 14x Mid Hinge (#11160)P1,2,3,4,5,7 = rebate/7 - 6 1x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P6 = rebate/7 + 6 2x Mid Pivot Set (#11100) 14x Mid Hinge (#11160)P1,2,3,4,5,7 = rebate/7 - 6 1x Leading Pivot Set (#11101) 3x D Handle Mid Hinge (#11162)

P4 = rebate/7 + 6 2x Mid Pivot Set (#11100-1) 14x Mid Hinge (#11160)P1,2,3,5,6,7 = rebate/7 - 6 1x Leading Pivot Set (#11110) 3x D Handle Mid Hinge (#11162)

P8 = rebate/8 + 6 3x Mid Pivot Set (#11100) 14x Mid Hinge (#11160)P1,2,3,4,5,6,7 = rebate/6 - 6 1x Leading Pivot Set (#11110) 4x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6,7,8 = rebate/8 - 4 3x Mid Pivot Set (#11100) 15x Mid Hinge (#11160) 3x D Handle Mid Hinge (#11162)

P6 & 7 = rebate/8 + 4 2x Mid Pivot Set (#11100) 16x Mid Hinge (#11160)P1,2,3,4,5,8 = rebate/8 - 8 2x Leading Pivot Set (#11110) 4x D Handle Mid Hinge (#11162)

P1,2,3,4,5,6,7,8 = rebate/8 - 4 2x Mid Pivot Set (#11100) 15x Mid Hinge (#11160) 1x Mid Pivot Set (#11101) 3x D Handle Mid Hinge (#11162)

P4 &5 = rebate/8 + 4 2x Mid Pivot Set (#11100-1) 16x Mid Hinge (#11160)P1,2,3,6,7,8 = rebate/8 - 8 2x Leading Pivot Set (#11110) 4x D Handle Mid Hinge (#11162)

P1 = rebate/3 - 5 1x Mid Pivot Set (#11100) 6x Mid Hinge (#11160)P2 = rebate/3 - 5 1x D Handle Mid Hinge (#11162)P3 = rebate/3 - 5

P1 = rebate/3 - 9 1x Leading Pivot Set (#11110) 8x Mid Hinge (#11160)P2 = rebate/3 + 3 1x D Handle Mid Hinge (#11162)P3 = rebate/3 - 9

P1 = rebate/4 - 9 1x Mid Pivot Set (#11100) 8x Mid Hinge (#11160)P2 = rebate/4 - 9 1x Leading Pivot Set (#11110) 2x D Handle Mid Hinge (#11162)P3 = rebate/4 - 9P4 = rebate/4 + 3

P1 = rebate/4 - 12 2x Leading Pivot Set (#11110) 10x Mid Hinge (#11160)P2 = rebate/4 + 0 2x D Handle Mid Hinge (#11162)P3 = rebate/4 + 0P4 = rebate/4 - 12

Panels

2

3

2+1

4

3+1

2+2

5

4+1

3+2

6

5+1

4+2

3+3

7

6+1

5+2

4+3

8

7+1

6+2

5+3

4+4

Seal gaps Panel size calculations(including seal gaps)

Hardware configurations(for panels up to 2.1m high)

Page 10: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

10 › www.schlegel.com

Level

Square

Plumb

1

3

5 6

Install the frame ensuring it is square, level, plumb and free of twist.

Screw top track to frame with 10g CSK screws at 100 mm centres for each panel, then at 300 mm centres.

4

Fix bottom track with 8g CSK screws 100 mm from ends and at 400 mm centres – fully bed screws in sealant. Seal under track. Provide sill track drainage.

Top leading

pivot

Bottom leading

pivot

Bottom middle pivot

Top middle pivot

Clean track thoroughly.

Next install hardware in correct orientation using the notch cut earlier.

Mortise panel hinges to edge of panels. Mortise is 100(L) x 28(W) x 3.0(D) mm.

100

100

100

100

100

300

300

80 Series installation using jamb hinges

Insert Aquamac 21 weatherseal.

2

Cut 80 mm off the end of the top track, for installing and maintaining hardware.

80

Page 11: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.com › 11

7 8

Mortise panel hinges continued.

Load up and fix end panel to jamb via hinges.

Top jamb hinge

Bottom jamb hinge

Top mid roller

Bottom mid guide

Mid hinge

Mid hinge with D handle Top leading

roller

Bottom leading guide

9

11

10

12

Ensure the panel is square, pack hinges ifnecessary.

Adjusting top hanger by lifting door from bottom then turn screw with allen key.

Fit subsequent panels and align door by adjusting alltop hangers.

Complete four panel installation by inserting Aquamac 21 to frame and Aquamac 109 to edges of the door leaves.

Page 12: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

12 › www.schlegel.com

Overall rebate size

P1 P2 P3

80 Series configuration using jamb pivots

4 8

4 4 4

4 4

4 4 4 8

4 4 4

4 8 4

4 4 4 4 4

4 4 4 4

4 4 4 4

4 4 4 4 4 4

4 4 4 4 4

4 4 4 8 4

4 4 4 4 4

4 4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4

4 4 4 4 4 4 4 8

4 4 4 4 4 4 4

4 4 4 4 4 8 4

4 4 4 4 4 4 4

4 4 4 48 4 4

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

8

P1 = rebate/2 - 10 1x Jamb Pivot Set (#11170) 2x Mid Hinge (#11160)P2 = rebate/2 - 10 1x Leading Pivot Set (#11150) 1x D Handle Mid Hinge (#11162)

P1 = rebate/3 + 1 1x Jamb Pivot Set (#11170) 3x Mid Hinge (#11160)P2 = rebate/3 - 11 1x Mid Pivot Set (#11140) 1x D Handle Mid Hinge (#11162)P3 = rebate/3 - 11

P1 = rebate/3 - 8 2x Jamb pivot set (#11170) 2x Mid Hinge (#11160)P2 = rebate/3 - 8 1x Leading Pivot Set (#11150) 1x D Handle Mid Hinge (#11162)P3 = rebate/3 - 8

P1 & P4 = rebate/4 - 1 1x Jamb Pivot Set (#11170) 5x Mid Hinge (#11160)P2 & P3 = rebate/4 - 13 1x Mid Pivot Set (#11140) 2x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 = rebate/4 + 2 2x Jamb Pivot Set (#11170-1) 3x Mid Hinge (#11160)P2,3,4 = rebate/4 - 10 1x Mid Pivot Set (#11140) 1x D Handle Mid Hinge (#11162)

P1, 2, 3, 4 = rebate/4 - 8 2x Jamb Pivot Set (#11170-1) 4x Mid Hinge (#11160) 2x Leading Pivot Set (#11150-1) 2x D Handle Mid Hinge (#11162)

P1 = rebate/5 + 4 1x Jamb Pivot Set (#11170) 6x Mid Hinge (#11160)P2,3,4,5 = rebate/5 - 8 2x Mid Pivot Set (#11140) 2x D Handle Mid Hinge (#11162)

P1 & P4 = rebate/5 + 1 2x Jamb Pivot Set (#11170-1) 5x Mid Hinge (#11160)P2,3,5 = rebate/5 - 11 1x Mid Pivot Set (#11140) 2x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 = rebate/5 + 3 2x Jamb Pivot Set (#11170-1) 5x Mid Hinge (#11160)P2,3,4,5 = rebate/5 - 9 1x Mid Pivot Set (#11140) 2x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 & P6 = rebate/6 + 2 1x Jamb Pivot Set (#11170) 8x Mid Hinge (#11160)P2,3,4,5 = rebate/6 - 10 2x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 = rebate/6 + 4 2x Jamb Pivot Set (#11170-1) 6x Mid Hinge (#11160)P2,3,4,5,6 = rebate/6 - 8 2x Mid Pivot Set (#11140) 2x D Handle Mid Hinge (#11162)

P1 & P4 = rebate/6 + 1 2x Jamb Pivot Set (#11170-1) 7x Mid Hinge (#11160)P2,3,5,6 = rebate/6 - 11 1x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162) 2x Leading Pivot Set (#11150-1)

P1 & P6 = rebate/6 + 2 2x Jamb Pivot Set (#11170-1) 6x Mid Hinge (#11160)P2,3,4,5 = rebate/6 - 10 2x Mid Pivot Set (#11140-1) 2x D Handle Mid Hinge (#11162)

P1 = rebate/7 + 5 1x Jamb Pivot Set (#11170) 9x Mid Hinge (#11160)P2,3,4,5,6,7 = rebate/7 - 7 3x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162)

P1 & P6 = rebate/7 + 3 2x Jamb Pivot Set (#11170-1) 8x Mid Hinge (#11160)P2,3,4,5,7 = rebate/7 - 9 2x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 = rebate/7 + 4 2x Jamb Pivot Set (#11170-1) 8x Mid Hinge (#11160)P2,3,4,5,6,7 = rebate/7 - 8 2x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11151)

P1,4,7 = rebate/7 + 1 2x Jamb Pivot Set (#11170-1) 8x Mid Hinge (#11160)P2,3,5, 6 = rebate/7- 11 2x Mid Pivot Set (#11140-1) 3x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 & P8 = rebate/8 + 3 1x Jamb Pivot Set (#11170) 11x Mid Hinge (#11160)P2,3,4,5,6,7 = rebate/6 - 9 3x Mid Pivot Set (#11140) 4x D Handle Mid Hinge (#11162) 1x Leading Pivot Set (#11150)

P1 = rebate/8 + 5 2x Jamb Pivot Set (#11170-1) 9x Mid Hinge (#11160)P2,3,4,5,6,7,8 = rebate/8 - 7 3x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162)

P1,6 = rebate/8 + 3 2x Jamb Pivot Set (#11170-1) 10x Mid Hinge (#11160)P2,3,4,5,7,8 = rebate/8 - 9 2x Mid Pivot Set (#11140) 4x D Handle Mid Hinge (#11162) 2x Leading Pivot Set (#11150-1)

P1 & 8 = rebate/8 + 3 2x Jamb Pivot Set (#11170-1) 9x Mid Hinge (#11160)P2,3,4,5,6,7 = rebate/8 - 9 3x Mid Pivot Set (#11140) 3x D Handle Mid Hinge (#11162)

P1,4,5,8 = rebate/8 + 0 2x Jamb Pivot Set (#11170-1) 10x Mid Hinge (#11160)P2,3,6,7 = rebate/8 - 12 2x Mid Pivot Set (#11140-1) 4x D Handle Mid Hinge (#11162) 2x Leading Pivot Set (#11150-1)

Panels

2

3

2+1

4

3+1

2+2

5

4+1

3+2

6

5+1

4+2

3+3

7

6+1

5+2

4+3

8

7+1

6+2

5+3

4+4

Seal gaps Panel size calculations(including seal gaps)

Hardware configurations(for panels up to 2.1m high)

Page 13: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.com › 13

80 Series installation using jamb pivots

Level

Square

Plumb

1

3

5

4

Install the frame ensuring it is square, level, plumb and free of twist.

Screw top track to frame with 10g CSK screws at 100 mm centres for each panel, then at 300 mm centres.

2

Cut 80 mm off the end of the top track, for installing and maintaining hardware.

Fitting jamb pivot, drill and tap two M5 holes in thecentre of bottom track as shown. Install bottom jambpivot block. Seal fixing screw holes.

Fix bottom track with 8g CSK screws 100 mm from ends and at 400 mm centres – fully bed screws in sealant. Seal under track. Provide sill track drainage.

100

100

100

100

100

300

300

80

7759

6

Top leading

pivot

Top jamb pivot

Bottom leading

pivot

Bottom jamb pivot

Bottom middle pivot

Top middle pivot

Clean track thoroughly. Next install hardware through gap left by track, then use jamb pivot to hold small piece of track in place while screwing.

Insert Aquamac 21 weatherseal.

Page 14: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

14 › www.schlegel.com

8

109

7

Mortise panel hinges cont.

Adjust the top and bottom pivots to square the panel.

Load up and fix end panel to jamb via hinges.

Mortise panel hinges to edge of panels. Mortise is100 x 28 x 3.0 mm.

20

20

20

20

80 Series installation using jamb pivots

Page 15: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.com › 15

1211

Adjust the height of the pivot panel by adjusting thetop pivot.

Adjust pivot panel continued.

Adjust Vertically1. Loosen lock nut2. Adjust shaft with

allen key3. Tighten lock nut

13

Fit subsequent panels and align door by repeatingsteps 10, 11 and 12 for all top hangers.

Top jamb pivot

Bottom jamb pivot

Top mid roller

Bottom mid guide

Mid hinge

Mid hinge with D handle Top leading

roller

Bottom leading guide

14

Complete four panel installation by inserting Aquamac 21 to frame and Aquamac 109 to edges of the door leaves.

Page 16: 50 and 80 Series: timber bi-fold door hardware · 50 Series: bi-fold timber door hardware n Suitable for panel weight of up to 50 kg ... necessary to assemble the bi-fold doors. Simply

www.schlegel.comJun 13 | V1 | BiF

Care has been taken to ensure that the contents of this publication are accurate, but Schlegel and its subsidiary companies do not accept responsibility for errors or for information that is found to be misleading. Suggestions for, or description of, the end use or application of products or methods of working are for information only. All dimensions are in mm and are nominal. Schlegel reserve the right to change specification without prior notice.

Schlegel’s names and logos and all related trademarks (including ‘SCHLEGEL’ and ‘SCHLEGEL Red Square Logo’), trade names, and other intellectual property are the property of Schlegel Acquisition Holdings Limited trading as Schlegel International and cannot be used without its express prior written permission. All rights reserved.

nBronze finish on stainless steel That’s right we can offer a bronze finish on our stainless steel hinges and components, please enquire for price and availability

n316 stainless steel option Does your customer require 316 Stainless steel? This is now available to order and a lead time applies

nWindlock option for bi-fold windows We now have a Windlock option when using the 50 Series leading panel gear. This option allows the bi-fold to be locked in a semi-open position along the length of its travel, when your customer requires the bi-fold to be open slightly for ventilation purposes but does not require it to be fully open

nRequire even bigger and heavier panels than we offer on the 50 and 80 series bi-fold Then you require our 175 series bi-fold for panels up to 175 kg in weight and 5 metres in height this will cover most other requirements that you may need. Please enquire for details

Watch this space, we have other exciting options becoming available to enhance our bi-fold systems in the near future.

Further enhancementS alSo available…