5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical Year Electrical Cost 40 Carpet 3 $5,200 41 42 Tile 4 $6,500 43 44 Tile 5 $6,500 45 46 47 48 49 Carpet 4 $5,200 Main Office Carpet 5 $5,200 Fire alarm *1 1-5 $75,000 (old) Brown Gym Reseal 2x 2,4 $7,000 Hoop cables 3 $5,000 Electrical panels 4,5 $18,000 (new) Flock Gym Reseal 3x 1,3,5 $10,500 Repairs 1 $10,000 Restrooms Tile walls 2 $30,000 Wrestling Room Library Carpet 5 $5,200 Career Center Replace 4 $16,000 Outside lights 2 $1,000 Caretaker Light Poles Safety *2 1-5 $12,500 Cinderblock Restrooms (Ballfield) Reseal 4 $3,000 - Replace 2 $10,000 Tile walls 2 $15,000 Rewire 3 $8,000 Item Totals $84,200 $94,000 $170,000 $50,000 $119,500 Notes *1 Fire Alarm wiring replaced annually *2 Light poles need safety devices installed (5 poles) Paint site inside and outside as needed $100,000 Concrete walks $10,000 Asphalt patch & reseal $170,000 Pool $20,000 Tennis Courts $75,000 Plumbing $25,000 Grand Total $917,700

5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 2

Calaveras High School

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

40 Carpet 3 $5,200

41

42 Tile 4 $6,500

43

44 Tile 5 $6,500

45

46

47

48

49 Carpet 4 $5,200

Main Office Carpet 5 $5,200 Fire alarm *1 1-5 $75,000

(old) Brown Gym Reseal 2x 2,4 $7,000 Hoop cables 3 $5,000 Electrical panels 4,5 $18,000

(new) Flock Gym Reseal 3x 1,3,5 $10,500 Repairs 1 $10,000

Restrooms Tile walls 2 $30,000

Wrestling Room

Library Carpet 5 $5,200

Career Center Replace 4 $16,000 Outside lights 2 $1,000

Caretaker

Light Poles Safety *2 1-5 $12,500

Cinderblock Restrooms

(Ballfield) Reseal 4 $3,000 - Replace 2 $10,000 Tile walls 2 $15,000 Rewire 3 $8,000

Item Totals $84,200 $94,000 $170,000 $50,000 $119,500

Notes*1 Fire Alarm wiring replaced annually

*2 Light poles need safety devices installed (5 poles)

Paint site inside and outside as needed

$100,000

Concrete walks

$10,000

Asphalt patch & reseal

$170,000

Pool

$20,000

Tennis Courts

$75,000

Plumbing

$25,000

Grand Total $917,700

Page 2: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 3

Gold Strike High School

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

1 Carpet 5 $5,200

2/Culinary

3/Weight Room Tile 1 $6,500

4/Computer Lab

Office Replace 5 $60,000

P1 Carpet 4 $5,200 Replace 2 $15,000 Replace 1 $18,000

Siding 1 wall, 1

wall board, door

hardware 1 $12,000

P2

Carpet/Floor

Repair 3 $5,200 Replace 2 $18,000 Siding 1 wall 2 $8,000

P3 Carpet 5 $5,200 Replace 3 $15,000 Replace 3 $18,000

Siding front wall, 1

wall board, door

hardware 3 $12,000

P4 Replace 4 $18,000

Siding back wall, 1

wall board 4 $10,000

Restroom Vinyl 2 $6,000 Replace 4 $10,000

Exterior Structures

Site Paint Exterior

Site Paint Interior

Item Totals $33,300 $30,000 $142,000 $42,000 $0

NotesPaint site inside & outside as needed

$30,000

Rebuild ramps for 2 portables

$4,000

Asphalt patch & reseal

$40,000

Concrete walks

$4,000

Plumbing

$6,000

Grand Total $331,300

Page 3: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 5

Jenny Lind Elementary

Room Floor Year Floor Cost HVAC Year Floor Cost Roof Year Floor Cost Wall Systems Year Floor Cost Electrical YearElectrical

Cost

MPR Office Replace 5 $16,000

MPR Kitchen Replace 5 $16,000

Library Carpet 4 $5,200 Replace 4 $18,000

Office Carpet 4 $5,200 Fire System Wiring 1-5 $40,000

Upper Courtyard

Bathrooms

Lower Courtyard

Bathrooms Vinyl 1 $6,500

Kid's Place Restrooms

Item Totals $102,700 $122,000 $98,000 $2,500 $40,000

NotesPaint entire site, inside & outside as needed

$40,000

Asphalt patch & reseal

$80,000

Concrete walks

$10,000

Waste Water Treatment Plants

$30,000

Plumbing

$15,000

Grand Total $540,200

Page 4: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 6

Mokelumne Hill Elementary

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

1

2

3

4

5 Replace

6 " 1 $35,000

7 "

8 Replace

MPR

Restrooms Vinyl 1 $6,000

9 Carpet 5 $5,200 Replace 1 $15,000

10 Replace 2 $15,000

Restrooms

Office Carpet 3 $8,000

Item Totals $19,200 $30,000 $35,000 $0 $0

NotesPaint entire site inside & outside as needed

$60,000

Asphalt patch & reseal

$60,000

Ladder access for MPR roof

$8,000

Plumbing

$4,000

Grand Total $216,200

Page 5: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 7

Rail Road Flat Elementary

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

1

2

3

4 Carpet 2 $5,200 Replace 1 $15,000 Replace 2 $18,000

5 Carpet 3 $5,200 Replace 2 $15,000 Replace 3 $18,000

6 Carpet 4 $5,200 Replace 3 $15,000 Replace 4 $18,000

7 Carpet 5 $5,200 Replace 4 $15,000 Replace 5 $18,000

MPR

MPR/Kitchen Replace 1-4 $60,000 Replace 1 $18,000 Dry rot exterior 3 $20,000 Panels 2,4 $16,000

Office Replace 5 $16,000

Library Replace 5 $16,000

Restrooms Vinyl 1 $6,000 Replace 1 $12,000

Item Totals $26,800 $152,000 $102,000 $20,000 $16,000

NotesNew Flagpole System

$5,000

Paint entire site inside & outside as needed

$60,000

Asphalt patch & reseal

$72,000

Concrete walks

$10,000

Plumbing

$4,000

Grand Total $467,800

Page 6: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 8

San Andreas Elementary

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

1A

1B

2

3

4 Replace 5 $15,000

5 Tile 5 $3,000

6 Tile 5 $3,000

7

8

Restroom Vinyl 4 $6,000 Stall panels 2 $5,000

K1 Carpet 2 $5,200 Replace 1 $15,000

K2 Carpet 2 $5,200 Replace 2 $15,000

K3 Replace 3 $15,000

9

10

11

12 Tile 4 $3,000

13 Replace 4 $15,000

14

15

16 Tile 3 $3,000

Restroom Vinyl 3 $6,000 Stall panels 4 $5,000

17 Replace Panel

18 " 3 $32,000 " 3 $12,000

19 Tile 5 $6,500 " " 5

20 Replace Panel

MPR Storage room tile 1 $10,000

Office

Library

Item Totals $50,900 $75,000 $32,000 $10,000 $12,000

NotesLadder access for MPR roof

$8,000

Asphalt patch & reseal

$48,000

Paint site inside & outside as needed

$50,000

Plumbing

$5,000

Grand Total $290,900

Page 7: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 10

Toyon Middle School

NotesPaint site inside & outside as needed

$60,000

Asphalt patch & reseal

$48,000

Concrete walks

$10,000

Waste Water Treatment Plant

$30,000

Kitchen

$400,000

Plumbing

$6,000

Grand Total $888,300

Page 8: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 12

Valley Springs Elementary

Room Floor Year Floor Cost HVAC* Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

Student Restrooms

MPR Replace 3-5 $64,000 Repair 3 $15,000

Library

Office Carpet 4 $16,000 Replace 5 $75,000 Fire System 2-5 $24,000

POD 2/Computer Lab Carpet 4 $16,000

POD 5/Music Room Carpet 1 $5,200

Computer Lab 1

Garage Wire system 1 $5,000

Item Totals $68,400 $85,000 $110,000 $15,000 $29,000

NotesPaint site inside & outside as needed

$60,000

Asphalt patch & reseal

$100,000

Concrete walks

$5,000

Kitchen 2-basin sink

$6,000

Plumbing

$6,000

Grand Total $484,400

Page 9: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 13

West Point Elementary

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

1 Carpet 1 $5,200 Siding

2 " 5 $15,000

3 Siding

4 Siding

5 " 4 $20,000

6 "

7 Siding

8 Siding

9 " 3 $10,000

Office Replace Overhang 1 $25,000

MPR Tile 4,5 $58,000 Exterior repair* 1 $50,000

Library Replace 4 $16,000

East Restrooms Replace 1 $4,000

West Restrooms Replace 1 $4,000 Tile replace 2 $6,000

P4/Storage Replace 5 $16,000

Alternative Replace 3 $16,000 Siding/trim 2 $5,000

Item Totals $63,200 $56,000 $25,000 $106,000 $0

NotesAsphalt patch & reseal

$75,000

*Paint site inside & outside as needed

$50,000

Concrete walks

$10,000

Resource Connection kitchen hoods

$8,000

Plumbing

$4,000

Grand Total $397,200

Page 10: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 15

District Buildings

Technology

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

Computer Replace 3 $50,000

Item Totals $0 $50,000 $0 $0 $0

Notes

Technology Total $50,000

Maintenance & Operations

Room Floor Year Floor Cost HVAC Year HVAC Cost Roof Year Roof Cost Wall Systems Year Wall Cost Electrical YearElectrical

Cost

IMC Lighting 1 $5,000

Curriculum Carpet 5 $18,000

Item Totals $18,000 $0 $0 $0 $5,000

Notes

M&O Total $23,000

District Buildings

Total $258,700

Page 11: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Deferred Maintenance Plan Page 2

Detail by Project Category

Project Category School 2015-16 2016-17 2017-18 2018-19 2019-20

Total Estimated

Cost

HVAC CHS $16,000 $16,000 $16,000 $16,000 $30,000 $94,000

HVAC GSHS $15,000 $15,000 $30,000

HVAC JLE $18,000 $18,000 $18,000 $36,000 $32,000 $122,000

HVAC MHE $15,000 $15,000 $30,000

HVAC RRFE $30,000 $30,000 $30,000 $30,000 $32,000 $152,000

HVAC SAE $15,000 $15,000 $15,000 $15,000 $15,000 $75,000

HVAC TMS $20,000 $20,000 $20,000 $16,000 $16,000 $92,000

HVAC VSE $10,500 $10,500 $16,000 $16,000 $32,000 $85,000

HVAC WPE $8,000 $16,000 $16,000 $16,000 $56,000

HVAC Transition $10,000 $10,000 $20,000

HVAC District Office $10,000 $10,000 $10,000 $10,000 $10,000 $50,000

HVAC Transportation $18,000 $18,000

HVAC Technology $50,000 $50,000

HVAC n/a M & O

HVAC Total $142,500 $159,500 $206,000 $165,000 $201,000 $874,000

Page 12: 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Departments/Main_Oper/5 Year Def Mai… · 5-Year Deferred Maintenance Plan Page 2 Calaveras High School Room Floor Year

5-Year Plan

Deferred Maintenance Program

List of school names with planned deferred maintenance projects:

Site Built

Calaveras High School 1953 2007

Gold Strike High School 1985 n/a

Jenny Lind Elementary 1992 n/a

Mokelumne Hill Elementary 1980 2000

Rail Road Flat Elementary 1950 1990 MPR

San Andreas Elementary 1955 2009 Classrooms

Toyon Middle School 1986 2011 2-story classrooms

Valley Springs Elementary 1947 2010 Upper classrooms

West Point Elementary 1975 2010 MPR

District Office Complex 1996 & 2001 N/A

Site Modernized