15S
5S Basics
5S5S
25S
8 WASTES8 WASTES• DDefect / Correction• OOverproduction• WWaiting• NNot utilizing employee talents• TTransportation / material movement• IInventory• MMotion• EExcessive processing
35S
PPBPPB(Monthly)(Monthly)
COBCOB(Daily)(Daily)
Visual Factory-Information Visual Factory-Information Gathering/OrganizationGathering/Organization
PABPAB(Hourly)(Hourly)
Information CenterInformation Center(Plant-wide Reporting)(Plant-wide Reporting)
FromEach Department
Department ReportingDepartment Reporting
PABPAB = Process Analysis BoardCOBCOB = Certified Operation BoardPPBPPB = Process Performance Board
45S
SortSort
StraightenStraighten
ShineShine
StandardizeStandardize
SustainSustain
55S
65S
75S
85S
95S
105S
There are basically three different types of workplaces...
115S
125S
135S
145S
155S
165S
175S
1S
4S
3S
2S
5S
Sort
Straighten
Shine
Standardize
Sustain
185S
195S
205S
1SSort
• Segregate What Is Needed, Needed Later, and Not Needed• Discard What Is Not Needed•Segregate Needed Items By Frequency of Use
215S
Where to PerformWhere to Perform
225S
235S
245S
C E N G-
L E-
X X X
(--
)
File completed Tag at ____________
5S -
-- R
ED
TA
G
En
ter
#
in
box
En
ter
#
in
box
En
ter
#
in
box
Item Name &/or Description:
Department: Value per Item:
Classification: 1. Raw Material2. Work-in-Process3. Component4. Finished Product
5. Machine / Equipment6. Mold / Jig7. Tool / Fitting8. Other______________
Reason: 1. Unnecessary2. Defective3. Leftover Material
4. Unknown5. Other______________
Action: 1. Eliminate2. Return3. Move to Red Tag Storage 4. Other_______________
Completed:
Tag Attached:
Year_____ Month_____ Day____
Action Taken:
Year_____ Month_____ Day_____
255S
Sort
265S
275S
285S
295S
2S
Straighten
305S
315S
Small Crescent Wrench
Small Claw Hammer
Flat Tip Screwdriver
Large Crescent Wrench
Large Claw Hammer
325S
335S
345S
355S
Stage 1Stage 1 Stage 2Stage 2 Stage 3Stage 3 Stage 4Stage 4
365S
375S
Before
After
385S
Before
After
395S
Before
After
405S
Before
After
415S
425S
3S
Shine
435S
Why Shine?
445S
455S
465S
475S
Shine Targets
485S
495S
5S Assessment
Score Sheet
5S Observed Condition Improvement Action
0
Storage of cleaning equipment: All cleaning equipment stored in a neat manner; handy and readily available when needed
0
Items on floor: Work-in-process, tools and any other material are not left to sit directly on the floor. Large items such as tote boxes are positioned on the floor in clearly marked area, identified by painted or taped lines.
0
Storage and arrangement:: Boxes, containers, and materials are always stored neat and at correct work angles convenient to the operators where appropriate. When items are stacked evenly or in a manner that would not cause them to toppling over. Storage areas are provided for all necessary items at POUS (Point-Of-Use Storage). No items are placed on top of machines, cabinets, and equipment. Unidentified items can not lean against walls or columns.
0
Operating equipment/machinery: Each piece of equipment/machinery has guards and deflectors that prevent debris from falling uncontained to the floor.
0Document storage: Only documents necessary to the operation are stored at the workstations and are stored in a neat and orderly manner.
0Tool and gauges arrangement: Tools, gages and fixtures are arranged neatly and stored, kept clean and free of any risk of damage.
0
Workbench and desk control: Kept free of objects including records and documents (unless in use). Tools and fixtures are clean and placed in their proper location.
0
Information boards: PPB, COBs, and PABs are arranged in a neat and orderly manner. No outdated, torn, or soiled documents are displayed
0
Emergency access: Fire hoses and emergency equipment are unobstructed and stored in a prominent easy-to-locate area with proper identification. E-Stop switches and breakers are marked or color-coded for immediate visibility.
0
Aisle ways marking: Aisles and walkways are clearly marked and can be identified at a glance; lines are straight and at right angles where appropriate with no chipped, worn floor marking.
0
Equipment maintenance: Controls of machines are properly labeled. Critical points for daily maintenance checks are clearly marked. Equipment check sheets are clean, neatly displayed and completed daily.
0
Tool and gauges convenience: Tools, gages and fixtures are arranged so they can be easily accessed when needed. 0Shelves and benches arrangement: Arranged, divided and clearly labeled it is obvious where things are stored; status and condition is recorded
0
Equipment cleanliness: All machines and equipment are kept clean by routine daily care. 0Floor cleaning: All floors are clean and free of debris, oil and dirt. Cleaning of floors is done routinely -- daily at a minimum—posted schedule.
05S control and maintenance: There is a disciplined system of control and it is maintained at the highest possible level. It is the responsibility of every one to maintain this system and environment. Documentation exist indicating cleaning responsibility for each team member in the work area.
0
So
rt
· Remove unneeded equipment, tools, furniture, etc. · Provide information on department PPB· Review excess inventory, supplies, parts, or materials · Identify existence of safety hazards (water, oil, chemical, machines, extension cords, etc.)
{Enter Location here}Location Being Audited: (place cursor in red corner for INSTRUCTIONS)
To-Do Items
Remove unnecessary items. All items not required for performing operations are removed from the work area. Only tools and products are present at workstation
· All team members have had 5S training· Daily 5S actions performed· Place all personal belongings stored in a neatly maintained location · Job aids are current and readily accessible· Routine 5S Implementation Audit is performed until sustained
Aisle ways maintenance: Aisles are always free of materials and obstructions; nothing is placed on the lines and objects are always placed at right angles to the aisles where appropriate.
0.00Legend: <2 (RED) 2 to 4.75 >4.75 (GREEN)
Equipment painting: All machines and equipment are neatly painted; equipment cleaning schedule developed and posted for each major piece of equipment.S
hin
eS
tan
da
rdiz
eS
usta
in
Document control: All documents are labeled clearly as to content and responsibility for control and revision. Obsolete
Str
aig
hte
n
· Floors, walls, stairs, and surfaces are free of dirt, oil and grease· Equipment is kept clean and free of dirt, oil, and grease· Cleaning materials are easily accessible· Lines, labels, signs, etc. are clean and not damaged· No other cleaning problems (of any kind) are present
0
0
0
· Correct location for items are identified· Items are placed in their correct locations· Aisle ways, workstations, equipment locations are indicated· Items are put away immediately after use· Inventory or WIP height and quantity limits are obvious
· Necessary information is visible· All standards are known and visible· Checklists exist for all cleaning and TPM maintenance jobs· All quantities and limits are easily recognizable· All necessary items can be located in 30 seconds
5S Implementation Audit Score =
505S
515S
525S
It is important that It is important that we establish the we establish the
first 3S before we first 3S before we progress to the progress to the
next 2S.next 2S.
535S
545S
4SStandardize
555S
565S
575S
585S
5SSustain
595S
605S
January 2007 June 2007
615S
625S
635S
?
645S
655S
Now, what would you do?
665S
675S
685S
695S
705S
RememberRemember55 SS
1S
4S
3S
2S
5S
Sort
Straighten
Shine
Standardize
Sustain