5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

Embed Size (px)

Citation preview

Page 1: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

5 May 2008

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

TEAM TINKER

OKLAHOMA CITY AIR LOGISTICS CENTER

Tinker Aerospace Complex (TAC)

Page 2: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

2

Overview

• GM Plant– 3.8 M sqft of industrial/admin/storage space– 430 Acres– Ceased operations in 2006

Page 3: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

3

GM Plant

Page 4: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

4

TAC Future

• If GM property is made available for AF use:

• Stand-up initial production shops (FY 09)– Software Maintenance (B3333, B2122)– Commodities Maintenance (B2101, B3705, B2121)– Propulsion Maintenance (RNT workload)

• Continue relocation efforts for next 5 – 10 years

Page 5: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

5

Benefits

• Improve work environment

• Vacate and potentially demolish buildings– Airfield clear zone– Structurally deficient & energy inefficient

• Environmental bonus (land fill gas & noise contour)

• Capability to accept future workloads

• Reduce MILCON construction requirements

Page 6: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

6

Facilities Impacted(69 Bldgs = 2.2M SF)

CZ

CZ

CZ

CZ

Clear Zone

Deficient

Ramp Space for New Mission

..

.

.

.

.

.

.

.

.

.

.

.

.

....

.

.….

.

.

Page 7: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

7

MILCONS Avoided ($M)

Software Support $15

Sheet Metal Phase 1 $37

Engine Test Cells Phases $76

Sheet Metal Phase 2 $57

Corrosion Control $39

Aircraft Accessories $47

Electronic & Cable $15

Fabric Support $7

Oxygen Comp Support $15

Industrial Services $8

Building Replacement $65

Facility For New Engine Workload $82

Total (Base Year 06 Dollars) $463

Page 8: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

8

Potential New Workload

Joint Strike Fighter(Engine / Commodities)

F117

C-17 Globemaster III Engine

F119

F-22 Raptor Engine

(Jet Engine Intermediate Maintenance)

AE3007(Global Hawk Engine)

AE2100(C-130J Engine)

KC-X(Aircraft / Engine)

Page 9: 5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)

TEAM TINKER