5-Juan-Carlos-Gonzalez Pmo v4 vs v5

Embed Size (px)

Citation preview

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    1/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    1

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    2/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    2

    Misin

    Requerimientos de alto nivel

    Supuestos

    Restricciones

    Entregables:

    CAPITULO 1-12

    Revisiones QC

    Anverso y Reverso

    OBS

    Criterio de finalizacin

    Calendario del Proyecto

    Detalle de Hitos

    Diagrama de Flujo de Datos / Informacin

    Regla fundamental de los ITTOs

    PMBOK V5 vs. PMBOK V4

    AGENDAAGENDA

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    3/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    3

    30-Nov-12 3

    La tarea del equipo de proyectos es actualizar y mejorar laGuide to the Project Management Body of Knowledge

    (PMBOK Guide)Fourth Edition

    Misin

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    4/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    4

    La actualizacin deber:

    1. Proveer informacin en Administracin de Proyectosque sea clara, completa, relevante, y en generalreconocida como una buena prctica en la mayora

    de los proyectos, la mayora de las veces.

    2. Reposicionar el Captulo 3 (El estndar del PM) comoun apndice/anexo.

    3.Alinearse con la ISO 21500 y manejar las relacionesentre los dos estandares.

    Requerimientos de alto nivel

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    5/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    5

    La actualizacin deber:

    4. Ser consistente con

    El Standard del Program Management Tercera Edicin El Standard del Portfolio Management Tercera Edicin

    OPM3 Tercera Edicin

    5. Asegurar que la terminologa contenida en el PMI Lexiconsea representada en forma consistente e idntica en elestndar

    Requerimientos de alto nivel

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    6/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    6

    Supuestos

    El desarrollo de la ISO 21500 se alinear con los

    cronogramas de actualizacin permitiendo manejarlas relaciones entre los dos estandares

    Aunque los contenidos necesitan actualizacin, losconceptos y las estructuras del estndar actualson vlidos y no necesitan un retrabajo importante.

    Todos los esfuerzos sern hechos buscandoparticipacin global y una representacinbalanceado de todos los sectores.

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    7/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    7

    Restricciones

    El Exposure Draft, las aprobaciones, ediciones, yprocesos de publicacin tiene plazos y el proyecto ser

    fuertemente controlado para que cumpla los

    cronogramas.

    La cantidad de pginas no debe exceder las 500;el cuerpo del Estandar (actualmente el cpitulo 3) nodebe exceder las 50 pginas.

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    8/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    8

    Entregables: CAPITULO 1-12

    Comentarios Revisados/adjudicados 4th Ed & post 4th

    Ed

    Recomendacin Inicial alineacin ISO 21500

    Esquema Comentado Actualizado

    Contenido Borrador Inicial

    Revisin Interna del Borrador

    Comentarios Revisados/adjudicados finales 4th Ed

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    9/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    9

    Entregables: CAPITULO 1-12 Recomendaciones Finales - alineamiento ISO

    21500

    Contenido Finalizado del Exposure Draft (ED)

    Recomendaciones del ED Adjudicado

    Borrador Final PMBOK Guide Fifth Edition

    Votacin final del Comit Central (Core Committee )

    PMBOK G id Fifth Editi d t

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    10/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    10

    QC 1 Comentarios Diferidos

    QC 2 Borrador Inicial &

    recomendaciones ISO

    QC 3 Borrador final (ED)

    QC 4 Revisin final

    Entregables: Revisiones QC

    PMBOK G id Fifth Editi d t

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    11/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    11

    Prefacio e introduccin

    Apndices

    Glosario

    Entregables: Anverso y Reverso

    PMBOK G id Fifth Editi d t

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    12/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    12

    Comit Central (Core Committee)

    PMBOK G id Fifth Edition pdate

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    13/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    13

    Content Working Groups

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    14/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    14

    Internal Review Working Groups

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    15/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    15Presentation Title

    Criterio de finalizacinLa obra se completa cuando:

    Todos los comentarios delED han sido adjudicados

    Las lecciones aprendidashan sido completadas

    Y cualquier informacin

    adicional requerida por el

    Administrador de Proyectos se

    ha completado.

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    16/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    16

    PMI is a registered trade and service mark of the Project Management Institute, Inc.2010Permission is granted to PMI for PMI Marketplace use only

    2010Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Review Fourth Edition Comment

    2011Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Draft Init ial Content

    Independent Internal Review

    Draft Exposure Draft Content Prepare Exposure Draft

    2012

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Exposure Draft Adjudication Finalization

    Final Draft Submitted to PMI

    PMBOK Guide Fif th Edi tion published

    Calendario

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    17/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    17

    Congratulations on your selection to the Content CommitteeContent Committee

    for the PMBOK Guide (R)for the PMBOK Guide (R) -- 5th Edition5th Edition -- Chapter 7Chapter 7 --Project Cost Management.Project Cost Management.

    On behalf of the PMBOK Guide (R) - 5th Edition Core Team,I would like to welcome you to this important committee.

    1717--0808--1010

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    18/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    18

    2727--1010--1010

    Dear team,

    I've spent some time trying to enhance somehow the spreadsheet sent by

    Juan Carlos, but I must confess, It was impossible !

    The only way I can make some changes is, maybe to change the fonts or thecolor !!!

    The information is very well structured and covers the formulas and the

    needed explanations in a very clear and easy-to-understand way !

    So, I give up and let the file as Juan Carlos sent it !

    Regards,

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    19/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    20/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    20

    0404--1111--1010

    EV tables

    Juan Carlos,

    Attached are two versions of your Earned Value Table.

    Because I would like to use your table in a program that I teach, I continued to edit

    it (and to put your name as original author at the top).

    May I have your permission to use this table in my PMP Prep program?

    Thanks again for sharing the original table. I think both our Chapter 7 and my

    students will be better off because of your table.

    Regards,

    Jack

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    21/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    21

    0707--1212--1010

    PMBOK(R) Fifth Edition - Team Communication

    Congratulations, Team!

    In discussions with Dave and Joe, we can confidently state that we have made

    substantial progress on a much improved, updated version of the PMBOK Guide.

    In our experience, we believe we are setting a new benchmark when it comes to pace,

    thoroughness, and productivity for PMI Standards teams. Specifically:

    Great effort in completing the review of the Fourth Edition comments

    o 749 Fourth Edition deferred comments

    o 226 Fourth Edition post publication comments

    o 975 total comments reviewed/adjudicated

    o Total of 508 of these comments were accepted or accepted with modification forinclusion in the Fifth Edition update

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    22/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    PMBOK Guide Fifth Edition update

    22

    0707--1212--1010

    New structure recommendation submitted for PMBOK Guide Fifth Edition to include:

    o Separating Project Stakeholder Management from Communications into a newchapter specifically dealing with stakeholder expectations

    o The current PMBOK Guide Fourth Edition chapter 3 is being moved into anappendix in the PMBOK Guide Fifth Edition and is being re-titled to The Standard for

    Project Management of a Project

    o A new Chapter 3 will be developed intended to bridge the content between chapters1 & 2 and the knowledge area chapters

    o Three new planning processes - Plan Scope Management, Plan ScheduleManagement, Plan Cost Management

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    23/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    p

    23

    1010--0303--1111

    Re: Chap 7 - suggestion of Cost Management Plan

    Dear Chap 7 Team,

    We have approved all the changes except for the Kishan proposal forthe definition of 7.1.3.1 Cost Management Plan. Manuela and Carlos

    have note yet voted.

    Juan Carlos has a last-minute, but interesting, suggestion to rename process"7.3 Determine Budget" to "7.3 Determine Cost Baseline."

    I have not made up my mind about that, but I will vote TOMORROW MORNING.!

    Please vote on Kishan's suggestion and on Juan Carlos' suggestion by

    NOON (Eastern Standard Time). Absent ballots will be voted with the majority vote.

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    24/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    p

    24

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.ar

    7.3 Determine Budget7.3 Determine Budget

    The process of aggregating the estimated costs of individualactivities or work packages to establish an authorized cost

    baseline

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    25/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL

    p

    25

    1111--0303--1111

    In regards to extra time: From the Core Team meeting yesterday we were

    pressed on keeping the milestone for submitting the final draft of the revised

    chapter today. They would not be interested in our taking additional time for

    changing a process name ("7.3 Determine Budget" to "7.3 Determine Cost

    Baseline.") at this time.

    I cant tell you why the process was called Determine Budget (other than for

    the Fourth Edition we used Verb/Noun to rename processes) and not develop

    cost baseline in the first place. In the 2000 version it was Cost Budgeting

    and the only output was the Cost Baseline. I think budget is a term that

    most people recognize and budget is commonly used, hence it was used inthe PMBOK Guide. Budget is also related to other PM terms such as BAC,

    and the old terms BCWP, and BCWS.

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    26/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 26

    0505--0808--1111

    All,

    Congratulations!

    I wanted to let everyone know weve received approval of our recommendedBaseline2 changes for the PMBOK Guide Fifth Edition update. We receivedthis approval with the feedback that the Standards MAG found the baseline2

    recommendations reasonable and well considered. This is a significant

    accomplishment and I wanted to take time to thank everyone for the hard work putforth in getting us to this point. If you have not reviewed the Baseline2

    recommended changes, these can be found on the Kavi site under the PMBOK

    Guide 5th Edition group (link:

    http://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/334

    7/latest). This approval gives us the go ahead to finalize the content for the update

    and incorporate all of the recommended changes put forth in our Baseline2.

    Dave Violette, PMP

    Chair PMBOK Guide Fifth Edition Update Committee

    PMBOK Guide Fifth Edition update

    http://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latesthttp://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latesthttp://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latesthttp://standards.pmi.org/apps/org/workgroup/pmbok_guide_5th/download.php/3347/latest
  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    27/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 27

    1717--1010--1111

    [[PMI Standards]pmbok_guide_5th] [PMBOK5] Another milestone met!

    Congratulations to the entire team!

    This morning the Fifth Edition update met another major milestone. Weve turned overthe draft of the Fifth Edition update to PMI for final clean-up/compilation to hand

    over to the PMI Standards MAG. Over the next 2-3 weeks, the PMI editorial staff will do

    one last editorial review and compilation of the document. After that it goes to the PMI

    Standards MAG for their review and vote on whether the draft is ready to move to theExposure Draft stage. We should hear back from the MAG regarding by early

    December whether there are any adjustments needed for the draft text prior to finalizing

    the document for Exposure Draft.

    Dave Violette, PMPChair PMBOK Guide Fifth Edition Update Committee

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    28/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 28

    1717--1010--1111

    [[PMI Standards]pmbok_guide_5th] [PMBOK5] Another milestone met!

    Our next big milestone is to get our glossary finalized. With the Exposure Draft for

    the PMBOK Guide Fifth Edition, we will also be exposing the glossary

    terms. Reviewers for the Exposure Draft wil l be given the opportunity to comment

    on terms contained within the glossary.

    To reach this milestone, each chapter working group needs to review the Fourth Edition

    glossary to ensure all of the definitions needed to support the Fifth Edition areincorporated into the glossary. The glossary should contain the following types of terms:

    Definitions for each Knowledge Area

    Definitions for each Project Management Process Group Definitions for each Project Management Process

    Definitions for each Project Management Process Input, Tool & Technique, and

    Output

    Other terms used in the text of the Fifth Edition update that need to be defined in

    context of their usage in the Fifth Edition

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    29/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 29

    Dear Chap 7 Team,

    You probably know that the PMBOK 5th Review Draft will be out in February for

    comments and that we will have 5 weeks from March 20, when comments close, untilApril 28, when we must have "adjudicated" ever comment on our Chapter.

    So it seems like a wise thing to make a point of *carefully reading our Chapter 7*

    when it comes out in the draft.

    if we have a lot of comments we may want to divide them among ourselves.

    if we do divide them, we may each want to be a specialist in a part of the chapter.

    So after you read Chapter 7, please consider what part you might want to handle

    comments on.

    For example, i'd be willing to do all the earned-value questions that occur in 7.4.2

    Control Costs: Tools and Techniques.

    Regards,Jack

    1717--0101--1212

    Getting Ready to Work

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    30/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 30

    2323--0202--1212

    Chapter 7 PMBOK News

    Dear Chap 7 Team,

    Some other interesting news.

    1. It looks like our Chapter will have only about 1our Chapter will have only about 1--200 comments200 comments.

    2. After we vote individually, we will be able to discuss our votes as a team.

    So...rest up and get ready for the end of March. Happy to answer any

    questions

    that you have.

    Regards,

    Jack

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    31/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 31

    1818--0606--1212

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    32/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 32

    1919--0909--1212

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    33/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 33

    1212--1010--1212

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    34/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 34

    WORKFLOW DE REPORTES

    4.3 Dirigir y Gestionar laEjecucin del Proyecto

    4.4 Supervisar y Controlarel Trabajo delProyecto

    4.5 Ejecutar ControlIntegrado deCambios

    10.5 Informar elDesempeo

    (ReportPerformance)

    Informacin del Rendimiento(Performance Reports)

    Informacin del Rendimiento del Trabajo(Work Performance Information)

    8.2 Realizar elAseguramiento de

    la Calidad

    PMBOK Guide Fifth Edition update

    Datos (Data): o materia

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    35/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 35

    ( )

    prima, que est compuesta

    de mensajes o smbolos sin

    procesar

    Informacin (Information): que proviene del anlisis de un conjunto de datos

    Conocimiento (Knowledge): este proviene del proceso de interpretacin dela informacin en trminos de experiencia y reflexin

    abidura (Wisdom): la capacidad de tomar la mejor decisin posible basada en elonocimiento, informacin y datos disponibles

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    36/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 36

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    37/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 37

    Se establecieron reglas bsicas en el orden y detalle de la informacin con ITTOs

    de la Quinta Edicin del PMBOK Guide

    Son Entradas todos los documentos que sean claves para el proceso.

    En las Salidas, los documentos se referencian cuando son creados como Salida.

    A partir de all se referencian como Project Document Updates en la Salida, y se

    describen en la narrativa del captulo.

    Los Planes Subsidiarios y las Lneas Base se listan primero.

    Los Factores Ambientales y los Activos de los Procesos de la Organizacin se listan al

    final.

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    38/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 38

    Se establecieron reglas bsicas en el orden y detalle de la informacin con ITTOs

    de la Quinta Edicin del PMBOK Guide

    Si los Planes Subsidiarios y las Lneas Base se usan como una entrada fundamental

    en el proceso, entonces se explicitan.

    Para los procesos que crean un Plan Subisidiario, el Project Management Plan se

    lista como una entrada clave.

    En la Salida los Planes Subsidiarios y las Lneas Base se agrupan como ProjectManagement Plan Updates, y se describen en la narrativa del captulo.

    Procesos de Control

    La Entrada clave es el Project Management Plan, ms que el Plan Subsididario.

    Y la Salida es Project Management Plan Updates ms que una actualizacin al Plan

    Subsidiario especfico.

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    39/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 39

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    40/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 40

    Se expandi el

    universo deStakeholders,

    incluyendo

    explicitamenteahora a los

    llamados

    "Operational"OperationalStakeholders"Stakeholders"

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    41/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 41

    PMBOK V5 vs. PMBOK V4

    Grupos de

    Procesos

    PMBOK V5.0 PMBOK V4.0 Diferencia

    Inicio 2 2 0

    Planificacin 24 20 + 4

    Ejecucin 8 8 0

    Monitoreo &

    Control

    11 10 + 1

    Cierre 2 2 0

    Total 47 42 + 5

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    42/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 42

    PROCESOS

    PMBOK V5 vs PMBOK V4

    rea de Conocimiento Entran Salen Delta

    Integracin

    Alcance PLAN SCOPE MANAGEMENT + 1

    Tiempo PLAN SCHEDULE MANAGEMENT + 1

    Costo PLAN COST MANAGEMENT + 1

    Calidad

    Recursos Humanos

    Comunicaciones

    MANAGE COMMUNICATIONS

    CONTROL COMMUNICATIONS

    IDENTIFY STAKEHOLDERS

    DISTRIBUTE INFORMATION

    MANAGE STAKEHOLDER

    EXPECTATIONS

    REPORT PERFORMANCE

    -2

    Riesgos

    Adquisiciones

    Interesados

    IDENTIFY STAKEHOLDERS

    PLAN STAKEHOLDERS MANAGEMENT

    MANAGE STAKEHOLDERS ENGAGEMENT

    CONTROL STAKEHOLDERS ENGAGEMENT

    + 4

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    43/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 43

    Integration ManagementIntegration Management4

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    44/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 44

    Scope ManagementScope Management5

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    45/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 45

    Time ManagementTime Management6

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    46/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 46

    Cost ManagementCost Management7

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    47/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 47

    Quality ManagementQuality Management8

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    48/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 48

    Human Resource ManagementHuman Resource Management9

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    49/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 49

    Communications ManagementCommunications Management10

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    50/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 50

    Risk ManagementRisk Management11

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    51/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 51

    Procurement ManagementProcurement Management12

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    52/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 52

    Stakeholder ManagementStakeholder Management13

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    53/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 53

    Si viene estudiando con la/s

    versiones bibliogrficas actuales, rinda

    antes de las fechas indicadas.

    Si decide rendir antes de esas

    fechas, asegrese de solicitar su

    puesto con suficiente anticipacin (esde esperar una demanda mayor a la

    usual para esas fechas.

    Gestione el r iesgo de Tiempos, yanticipe lo ms posible su inscripcin

    PMP 31/Julio/2013

    CAPM 31/Julio/2013

    PMI-SP 31/Agosto/2013

    PMI-RMP 31/Agosto/2013

    PgMP 31/Julio/2013

    PMP y otras certif icaciones Cambio de Fechas

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    54/55

    PemepPemepProyectosProyectos

    www.pemepe.com.arwww.pemepe.com.arJuan Carlos Gonzlez, PMP, ITIL 54

    PMBOK Guide Fifth Edition update

    PMBOK Guide Fifth Edition update

  • 8/10/2019 5-Juan-Carlos-Gonzalez Pmo v4 vs v5

    55/55

    PMBOK Guide Fifth Edition update

    Muchas gracias a

    todos por su

    atencin