Company Presentation

Istanbul Ulasim

1

Istanbul City

2

Istanbul

Area Total area: 5.343 km2

The city from north to south: 45 km, east

to west: 165 km

5.343km2

Demography & History Population of 14.3 million,

A history of 8.500 years

Strategic Location Along the historical Silk Route

Trans-continental city

3

Transportation Statistics

4

Million

Daily trips

Million

Population

New vehicles

Added to the roads

everyday

14. 3 27 600 1.4 Million

Daily trips between

continents

Mega Projects in Istanbul

The 3rd B. Bridge

8 Lanes of motorway 2 Rail Lines 2012-2015

The 3rd Airport

150 million passenger Operation rights for 25

years € 22 billion

Marmaray

Bosporus Strait Rail Transit Project

Overall Length 76 km Tunnel 13.6 km pphpd 75.000 $ 2.5 -3 billion

The Eurasia Tunnel

Bosporus Road Crossing Project

14.6-km route including a 5.4-km twin-deck

tunnel BOT -$ 1.3 billion

The Istanbul Canal

The artificial sea-level waterway

Connects the Black Sea to the Marmara

Sea ~$10 billion

5

Istanbul Ulasim

6

Operational Services

129 km network 650 railway cars

139 Stations Underground, viaduct, tram

9 Railway Lines 4 Metro

1 LRT, 3 Tram

1 Funicular 2 Cable Lines

1.75 million Ridership

7

Network Map

Lines in the Network; Metro, tram, commuter rail , Tunnel, nostalgic tram and BRT 8

Lines under Operation

metro 25,27 km

23 stations 400.000 pax/d

105 vehicles

(since 1989)

metro 25.04 km

16 stations 400.000 pax/d

124 vehicles

(since 2000)

metro 15.9 km

11 stations 50.000 pax/d

80 vehicles

(since 2013)

metro 21.7 km

16 stations 250.000 pax/d

144 vehicles

(since 2012)

tram 19.3 km

31 stations 380.000 pax/d

92 vehicles

(since 1992)

tram 2.6 km

10 stations 2.000

pax/d 6

vehicles (since 2003)

tram 15.4 km

22 stations 125.000 pax/d

72 vehicles

(since 2007)

Funicular 0.65 km

2 stations 40.000 pax/d

4 vehicles

(since 2006)

Cable car 0.38 km

2 stations 4.000

pax/d 4

cabins (since 2005)

Cable car 0.35 km

2 stations 1.000

pax/d 4

cabins (since 1993)

Current, 129 km

metro 3,3 km

4 stations 25.000 pax/d (since 2015)

LRV İSTANBUL 9

RTE 2 Rotem 34

Siemens-Duewag 32

Fleet

LRV ABB 105

Metro Alstom 32 Rotem 92

Metro Alstom 80

Metro CAF 144

LRV-Tram Bombardier 55

Alstom 37

LRV-Tram 4

Funicular Garaventa 4

Cablecarİeitner 4

Cablecar Poma 4

650 Vehicles

10

Existing Network

Railway Projects in Istanbul

12

PROJECTS UNDER CONSTRUCTION

13

LINE SYSTEM TYPE LENGTH KM # OF STATIONS CAPACITY

1 ÜSKÜDAR-ÜMRANİYE-ÇEKMEKÖY METRO 19,60 16 55.000 pphpd

2 KARTAL - KAYNARCA METRO 3,80 3 70.000 pphpd

3 MECİDİYEKÖY- MAHMUTBEY METRO 17,5 15 70.000 pphpd

4 KİRAZLI - BAKIRKÖY METRO 9 9 70.000 pphpd

5 MARMARAY COMMUTER RAIL 63,5 37 70.000 pphpd

TOTAL 110,7 80

PROJECTS UNDER CONSTRUCTION

14

MARMARAY 63,5 km

ÜSKÜDAR- ÇEKMEKÖY METRO LINE

19,6 km

MECİDİYEKÖY-MAHMUTBEY / METRO LINE

17,5 km

KARTAL-KAYNARCA METRO EXTENSION

3.8 km

BAKIRKÖY-KİRAZLI METRO LINE

9 km

PROJECTS UNDER CONSTRUCTION

15

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

• Stations Number : 15 Stations • Line Distance : 17.5 km • System Capacity : 70.000 pphpd • Signalling System : GoA4-Driverless • Minimum Headway : 90 sec. • Platform Length : 180 m for 8 cars train • Power System : 1500 V DC – Rigid Catenery System • Train Number : 300 cars - Driverless (75 trains

including for extension)

16

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

• Depot Area : 150.000 m2 • Work shop Area: 20.000 m2 • Control Center: 400 m2 in Depot Area • PSD : Each stations will have Platform Screen Doors

17

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

• STATUS OF PROJECT : Project has been tendered in two stages; • First stage has civil works • Second Stage has finishing works and

Electromechanical works with Testing and Commissioning.

18

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

FIRST STAGE OF PROJECT : • Project Time : 3 Years (from 1.1. 2014) • Project Cost : 280 milyon € • 15 stations (13 stations in tunel, 2 stations on

viaduct) and Depot area civil works • 31.000 m tunel with TBM and NATM method • 1.500 m viaduct

19

TBM TUNEL WORK

TBM Tunel Section : Between Akşemsettin- Mahmutbey

NATM Tunel Section : Between Akşemsettin- Mecidiyeköy

TBM Numbers : 3

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

21

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

• WORK PROGRES IN APRIL 2015 STATIONS % 20 TUNEL % 10 VIADUCT % 6

22

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

SECOND STAGE OF PROJECT: This stage has including finishing works and Electromechanical works. • Project Newly Tendered (in April 2015) it will

start in June 2015 • Project Time : 3 Years • Project Cost: 369.000.000 €

23

M7 MECİDİYEKÖY- MAHMUTBEY METRO LINE

• Total Project Cost: 649 milyon € + 150 milyon € (for trains) = 800 milyon € • We plan to start with passenger operation at

the beginning of 2019

24

ISTANBUL’S FIRST GoA-4 METRO LINE

25

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY

METRO LINE

– CONSTRUCTION – 2 DIFFERENT CONTRACTS: 1- Civil Works + ElectroMechanical Works Construction 2- Rolling Stocks Delivery

– CONSULTANCY –

2 DIFFERENT CONTRACTS: 1- Civil Works + ElectroMechanical Works Consultancy 2- RS Consultancy (by ISTANBUL ULASIM)

26

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY METRO LINE

SOME FIGURES of CIVIL & E&M WORKS • Tendered: 15.Sept.2011 • Project Time: 38 Months (from 20.Mar. 2012)

+ 24 Months Warranty Period (includes operation & maintenance spv.)

• Project Cost: 563,9 milyon € (Civil Works + E&M Works) [Total Cost (including RS): 563,9 + 119 (RS) = 683 million €.]

• Opening (due to contract): 20.May.2015 • Revised opening date: 20.Sept.2016 (+16 months) • Totally underground system

27

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY METRO LINE

28

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY METRO LINE

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY METRO LINE

• Stations: 16 Passenger Stations • 1 depot, 1 workshop, 2 OCC (main & back up) • Line Distance: 19.6 km • System Capacity: 55.000 pphpd • Train Control System: GoA4 – UTO Driverless • Minimum Headway: 90 sec. (Operational) • Platform Length: 140 m for 6-car trains • Power System: 1500 V DC – Rigid Catenery System • Max. Operating Speed: 80 km/h

29

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY SOME FIGURES of ROLLING STOCKS

• Rolling Stocks: 126 cars (21 trains) will be supplied by Mitsubishi (Sub-Contractor is Spanish CAF) • Fleet Size: 126 cars (21 sets of 6-cars: M-M-T-T-M-M) • RS Cost: 119 million Euro (0,95 million € per car) • Length of train: 128,88 m. (6-car) • First car delivery: 05.Dec.2016 • Last car delivery: 02.Oct.2017 (totally 11 months) • Passenger Capacity: 1628 (AW3) • Dimensions (w x h x l): 3024mm, 3910mm, ~21,5m)

30

31

• Depot Area: 180.000 m2 (Shared by other metro line) • Work Shop Area: 16.000 m2

DIFFICULTIES in M5 LINE: • DEPOT is a MUTUAL DEPOT AREA

Will be shared by 2 metro line: 1- UUC (Uskudar-Umraniye-Çekmeköy Metro Line) 2- DB (Dudullu-Bostancı Metro Line)

• FIRST GoA-4 METRO OPERATION IN ISTANBUL (ALSO IN TURKEY)

1- Must be decided to the Operational Concept (Normal Mode, Degraded Mode and Emergency Mode) 2- 60 days Trial Run will be enough or not ?

32

M5 USKUDAR-UMRANIYE-ÇEKMEKÖY METRO LINE

Some Draft Pictures from M5

33

PSD’s will be Half Height PSD’s (160 cm)

First Sketchs of RS cars.

Thank you….