5th GAS TRAIN PROJECT

PREQUALIFICATION QUESTIONNAIRE

FOR

ENGINEERING, PROCUREMENT

AND CONSTRUCTION (EPC)

BIDDERS Rev. Date Description 00 3-Nov-2012 01 02 03 04

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 2   

Table of Contents

Description Page No. 1.0 Introduction 3

2.0 Overview 5 3.0 Engineering, Procurement and Construction (“CONTRACTOR”)

Responsibilities 7

4.0 Pre-Requisite for Prequalification 9

5.0 Instructions to Companies Registering for Qualified Bidders List 10

Documents Required: CONTRACTOR Declaration 13

FACT SHEET 15 Attachment No. 1 Contractor Information 17 Attachment No. 2 Experience 21 Attachment No. 3 Resources 22 Attachment No. 4 Financial 29 Attachment No. 5 Project Execution 31 Attachment No. 6 Quality Management 33 Attachment No. 7 Health, Safety and Environment 34 Forms, Tables and Exhibits Form-1 : Experience World-Wide 35 Form-1.1 : Experience World-Wide Summary 38 Form-2 : Contractor Reference Inquiry 39 Form-3 : Contractor Safety Performance 41 Exhibit A : Minimum PQ requirement for Bidder 47

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 3   

1.0 INTRODUCTION

This prequalification procedure and attached documents are presented by Kuwait

National Petroleum Company (“KNPC” or “Owner”), for the purpose of establishing a

list (“Qualified Bidders List” or “QBL”) of qualified Engineering, Procurement and

Construction Contractors (“CONTRACTOR”) for the KNPC 5th GAS TRAIN Project

(“Project”) to be constructed in the State of Kuwait.

This project is to cater for associated gas and condensate from KOC gathering

centers at South East Kuwait (SEK), and north Kuwait (NK) oil fields. In addition,

existing refinery gases from SHU AGRP and MAA AGRP are also supplied to the GT5

facilities. Current/Future non-associated gas from the Jurassic and Dorra gas fields

are also considered in the design cases.

Submission of the required prequalification information by the CONTRACTOR shall in

no way bind the Owner to invite any of the CONTRACTOR submitting qualifications to

enter into any contract and shall also not bind the Owner to make any financial

commitment in connection with any individual projects within the overall Project.

The information contained in this document and attachments is strictly confidential

and all companies submitting for qualification are required NOT to divulge the

contents to any third party.

The Owner, likewise, shall treat information submitted by the CONTRACTOR as

strictly confidential and will not make it available to any third party except to its

Partners and/or Consultants where the Owner deems it appropriate and applicable.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 4   

The selection of companies to be compiled on the QBL shall be based on specific

selection criteria which is solely determined by Owner and shall be applied equally to

all CONTRACTORs responding to this letter. Final selection of contractors to be on

the QBL will be approved by Owner and shall be solely at Owners discretion.

Bid Basis: The EPC Package will be tendered on Lump Sum Turnkey basis and will

be issued by the Kuwait Central Tendering Committee (CTC).

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 5   

2.0 OVERVIEW

2.1 KNPC currently owns and operates three refineries in the State of Kuwait; Mina Al Ahmadi (MAA), Mina Abdullah (MAB), and Shuaiba (SHU) Refineries, all located along the coastal zone south of Kuwait city, and within approximately 10 kilometers distance apart overall.

2.1.1 The Fifth Gas Train Project at MAA Refinery is designed to process associated gas and condensate from KOC gathering centres at South East Kuwait (SEK), and North Kuwait (NK) oil fields. In addition, existing refinery gases from SHU AGRP and MAA AGRP are also supplied to the GT5 facilities. Current / future non-associated gas from the Jurassic and Dorra gas fields are also considered in the design cases.

2.1.2 GT5 will have a design capacity of 805MMSCFD gas and 106.3MBPD external condensate, in addition to the condensate produced in the NGL recovery section of the process. Product recoveries should be at least 75% Ethane, 97% Propane and 99% Butane.

2.1.3 GT5 shall be located at the south of GT4. Inside Battery Limit (ISBL) design of GT5 containing the main process units is to be a replica of the Fourth Gas Train (GT4) design; Outside Battery Limit (OSBL) design shall be based on the FEED developed by M/s AMEC.

2.1.4 Under OSBL of GT5, a Fuel Gas Treatment Unit (FGTU) with maximum operating capacity of 94MMSCFD is included to provide treated fuel gas for both GT5 and GT4. Amine solution (45wt% MDEA) is used to remove H2S in fuel gas.

A Sour Water Stripping Unit (SWSU) is provided to strip out H2S in sour water. The stripped H2S gas is sent to existing / future SRUs along with H2S from FGTU.

A Demineralised Water Plant is also provided to produce Demin water and Boiler Feed Water (BFW) for GT5.

The above OSBL units will be located adjacent to and south of the ISBL units inside GT5 block.

2.1.5 Under Utilities, GT5 shall be provided with a flare system for pressure relief and depressurizing. The flare will have an acid gas flare line flowing independently to the GT5 flare stack and a separate flare tip for this stream.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 6   

Other utilities to support the GT5 includes de-aerator, boiler feed water pumps, boiler feed water dosing system, HP and LP steam system, sea water cooling, closed cooling water system, closed cooling water chemical dosing, instrument and plant air system, nitrogen system, effluent system, waste water sump and pumps.

The GT5 DCS controls will be executed from Gas Plant Central Control Room (GPCCR). A fire alarm and protection system will also be provided for the GT5. It will be integrated with existing system at the GPCCR and Fire Station. There will be Fire Siren / Public address system in the plant area and in all buildings.

Electrical, Instrumentation, Civil & Structural works and Tie-ins with the existing facilities shall also be required for GT5.

2.1.6 Mixed phase feed gases received from KOC are separated in feed separator, compressed (by gas compressors driven by gas turbines) and cooled before routing to dehydration section. In dehydration section, moisture is removed. Traces of mercury is removed in mercury guard bed.

Natural Gas Liquid (NGL) is recovered from the feed gas which involves expansion of the gas through turbo-expander followed by distillation in a De-methaniser column.

The gas exiting De-methaniser column is cooled, compressed and then routed to ethane recovery unit (ERU) / fuel gas system.

The recovered NGL stream, condensate stripper bottom and LPG processed through a fractionation train consisting of three distillation columns in series: a De-ethaniser, De-propaniser and De-butaniser. The overhead product from De-ethaniser is Ethane (C2) and the bottom is fed to the De-propaniser. The overhead product from De-propaniser is Propane (C3) and the bottom is fed to the De-butaniser. The overhead product from De-butaniser is a mixture of normal and iso-Butane (C4), and the bottom product is Kuwait Natural Gasoline (KNG).

The Propane and Butane products are sub-cooled and then routed to respective product treatment units for removal of sulphur compounds viz., H2S. The purified Propane and Butane are cooled in a refrigerant cooler and sent for storage.

Propane refrigeration system shall be provided as the main cooling duty to liquefy C2 and heavier components and C3 / C4 storage. A deep refrigeration system also shall be provided for Propane product cooling down to -49 O F (-45 O C).

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 7   

3.0 ENGINEERING, PROCUREMENT AND CONSTRUCTION (“CONTRACTOR”) RESPONSIBILITIES

3.1 The CONTRACTOR’s scope of work for the Project shall be clearly stipulated in the

Tender documents.

3.2 The FEED prepared by consultants will be issued to the bidders and to be endorsed by

them. The important aspect of the design of the new system shall be to cause

minimum disturbance and to ensure that the operation of the existing system is not

stopped during implementation of the new design. Towards this extent, the new

facilities shall be completed and commissioned before the existing system is shut

down for the revamp works.

3.3 However, in general the scope of work for CONTRACTOR shall include, but shall not

be limited to the following:

3.3.1 Detailed engineering for the various units and facility segments as listed

above.

3.3.2 Prepare and issue Issued For Construction (IFC) drawings to site along

with illustrating all tie-ins to the existing utility and offsites facilities as

required.

3.3.3 Engineering, procurement, inspection, supply, transportation, unloading at

the Project site, construction, installation and testing of all new equipment,

machinery and materials including proprietary equipment and long lead

equipment in accordance with the contract documents and requirements.

3.3.4 Engineering, procurement, inspection, supply, transportation to the Project

site, unloading at site, installation and testing of all field instrumentation,

Control Systems, ESD and Electrical equipment.

3.3.5 Procurement, inspection, supply, transportation to the Project site,

unloading of capital, operational and startup spares (to include the supply

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 8   

of spares and special tools for the construction, pre-commissioning and

commissioning activities).

3.3.6 Liaison with KNPC and Kuwait statutory authorities regarding obtaining

any and all permits required in the execution of the Project.

3.3.7 Demolition of facilities including disposal of all debris and unusable

materials

3.3.8 Full and complete erection / construction, testing / inspection, and

mechanical completion of the plant.

3.3.9 Tie Ins to existing facilities, where required.

3.3.10 Preparation of the required detailed operating / technical manuals.

3.3.11 Supply and loading of first charge of oil and chemicals, as seen necessary.

3.3.12 Implement a quality management program to provide procedures for

engineering, procurement, construction and commissioning which meet

the Project and ISO 9001 quality system requirements.

3.3.13 Provide an inspection and quality management program which shall

ensure that all equipment and materials meet the requirements of the

project and that all construction activities are inspected and tested as

required by the quality management program.

3.3.14 Implement and comply with all local regulations on health, safety and

environment in the design and the execution of the works and maintain an

effective safety plan on site during construction, precommissioning,

commissioning and start-up of the projects.

3.3.15 Conduct HAZOP and other similar studies for the projects in association

with the chosen Licensors and Owner.

3.3.16 Implement and maintain an effective, well established and approved

planning system for the control and scheduling of all activities and

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 9   

development of reports to Owner in accordance with the requirements of

the Project.

3.3.17 Provide assistance and coordinate with Owner, Licensors, and Vendors

during commissioning, start-up and performance testing of plant.

3.3.18 Provide required services of vendor representatives and specialists for critical

or specialized activities during construction, precommissioning and

commissioning as deemed necessary by Owner.

3.3.19 Carry out any warranty or guarantee obligations during the maintenance

guarantee and / or warranty periods.

3.3.20 Provide Owner with all electronic files (computer files) of drawings and

documents of the plant.

3.3.21 Supply and erect materials or equipment and perform any engineering work

which is deemed necessary to fulfill any process and safety requirements or

environmental and governmental regulations.

3.3.22 Carry out the final EIA study, perform the necessary marine / environment

monitoring during the Project implementation and obtain K-EPA approval.

Contractor shall engage K-EPA approved consultant as advised by the

Owner.

3.3.23 FEED documents utilizes both SHELL DEPs and KNPC Engineering

Standards. Same logic shall be utilized for preparation of Engineering

documentation during Detailed Engineering.

4 PRE-REQUISITE FOR PRE-QUALIFICATION

4.1 Only those contracting companies that have successfully executed major EPC

Projects in Refinery, Petrochemical, Oil & Gas (New/Upgrade/Revamp Projects)

including GAS Projects worldwide over the past ten (10) years shall be considered.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 10   

4.2 Consortiums and / or Joint Ventures are acceptable, however the same will be

evaluated indivdually.

4.3 Please note, it is the Owner’s sole decision to determine whether or not the

prequalification information submitted by CONTRACTOR is acceptable.

Furthermore, it is the Owner’s sole decision as to whether or not a CONTRACTOR

submitting interest and information as specified in this document will be placed on

the QBL.

4.4 See Exhibit A for the Minimum Pre-Qualification Requirements for Bidder.

5 INSTRUCTIONS TO COMPANIES REGISTERING FOR QUALIFIED BIDDERS LIST

5.1 All documents, lists, certificates and information required from the company must be

in the English language.

5.2 All prequalification documents shall be treated with strict confidence by the Owner in

assessing the suitability of CONTRACTOR for the above mentioned work. Any

prequalification documents submitted after the closing date shall be disregarded.

5.3 It is important that all information requested be presented in an orderly and sequential

manner using the formats and tables attached to this inquiry document wherever

and whenever provided.

5.4 CONTRACTOR agrees that the Owner shall have the right to contact any reference

given by the CONTRACTOR in support of answers to this questionnaire.

5.5 CONTRACTOR shall complete the “Fact Sheet” and submit it with the questionnaire.

The Fact Sheet, although it contains some repetitive information, is a required

document for the screening process and shall be completed in its entirety. The Fact

Sheet shall be submitted by the CONTRACTOR.

5.6 CONTRACTOR must complete and answer each and every question, in full clarity,

in the same sequence as presented in the pre-qualification document. A company’s

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 11   

request for inclusion onto to the Qualified Bidders List will be subject to

disqualification if the documentation and information requested by Owner is not

submitted as stipulated, is not fully answered, or if any section is inappropriately left

blank in the forms or tables. Disqualification may also occur if, for any reason, cross

references given in these forms or tables are missing or incomplete, information or

documents requested documentation are shared, copied, compared, or discussed in

any way with other companies.

5.7 In the event prequalification information is not submitted in full clarity, Owner is under

no obligation to proceed with clarifications with the CONTRACTOR.

5.8 CONTRACTOR is requested to electronically complete the forms and tables included

or attached to these documents while maintaining the same format.

5.9 All information submitted by the CONTRACTOR must be accurate, clear and within

the context of the form submitted. Any information found to be misleading or

ambiguous shall be considered as void. Owner reserves the right to discard any

unclear information provided by the CONTRACTOR if found in doubt.

5.10 Contractor shall submit clearly in his PQ Application, all evidential documents

relevant to his experience in such particular field with all possible details such as;

Contract Value, Completion Certificates, Letters of Appreciations, Experience

World-Wide, Safety Records (minimum past Five Years), Claims & Suits, Latest

Three years Financial Audited Statements, Brief Scope of similar executed Projects

and Durations as well.

5.11 Owner will require that minimum twenty percent (20%) of the work (P + C) be

awarded to the local Kuwaiti contracting and/or supplier sector. CONTRACTORs

shall take this into account during the prequalification documentation preparation.

5.12 CONTRACTOR shall understand the Project descriptions and relevant contract conditions are exclusively for prequalification purposes only. The prequalification documents are not and should not be construed as an Invitation to Tender. Replies to the prequalification questionnaire are deemed to be without obligation whatsoever on the part of the Owner.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 12   

5.13 The Owner is under no obligation to prequalify any CONTRACTOR or to give reasons for either prequalifying or disqualifying any CONTRACTOR. The Owner is also under no obligation to proceed with the contract or invite a prequalified CONTRACTOR to submit a subsequent bid or to enter into any correspondence to this effect.

5.14 Responses to the prequalification questionnaire shall be submitted in two (2)

original, single bound documents completed in all respects and duly signed and stamped by the CONTRACTOR’s authorized person only . These must be submitted in sealed envelopes, marked “PREQUALIFICATION DOCUMENTS – KNPC SHFP” and addressed and sent to :

ITC Reception Desk, Room # 1A-046, 1st Floor, KNPC H.O., Ahmadi – Kuwait. Fax : 00965 23986262 (ITC, Secretary)

5.15 In addition to the above submitted bound copies and included in the same sealed envelopes shall be a CD / DVD that contains the files in a logical sequence of ALL submittal documents. These electronic files shall be in either MS Office Program(s) format (e.g. MS Word / Excel) or as a “PDF” file accessible by Adobe Reader 6.0.

5.16 Queries if any, regarding the Project or other information given herein, shall be

addressed to: Chairman, 5th GAS TRAIN Project PQ Committee Mina Abdullah Projects Building 1st Floor, Manager Projects II office P.O. Box 69, Safat Kuwait 13001 Fax: 00965 23280619 and/ or e-mail to : [email protected]

5.17 CONTRACTOR to complete, sign and submit the “CONTRACTOR

Declaration” on the following pages.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 13   

Pre-Qualification Questionnaire for CONTRACTOR

For 5th Gas Train Project

CONTRACTOR DECLARATION

To: Chairman, Internal Tendering Committee (ITC) KNPC Full Name of Contractor:_______________________________________________ We, the undersigned wish to participate in prequalification for CONTRACTOR for the Project to be established in the State of Kuwait and we warrant our competence to execute the entire work to the highest levels of professional standards. We also warrant that our presented answers are complete to the best of our knowledge and that the details submitted by us in these prequalification documents and all attached documents are true and accurate in every respect. We acknowledge that Owner has the discretion in selecting the qualified CONTRACTOR for its services, and shall not be required under any circumstances to assign or give reason(s) for disqualifying us, and that Owner decision in this regard is final and not subject to appeal and that we shall not enter with Owner or others into any correspondences or debates concerning this selection. We authorize Owner to investigate or verify any statement or information given in our prequalification document and that it is free to contact any person or any of our clients, banks, auditors, etc. to obtain any clarification related to the information given in this document. We declare that in case of award of contract to us, we shall fully comply with all rules, regulation and Health, Safety and Environment guidelines set forth by Owner or any other Government body in the State of Kuwait. We declare that we or any of our subcontractor or personnel required to work on this project, shall have no objection in signing secrecy agreement with Owner, if so requested. We declare that, if we are qualified (Short Listed) by Owner for its project we shall be committed to present our bid in reply to Owner’s Invitation to Bid procedure of this project.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 14   

We understand that Owner will not be responsible for payment of any expense which we may incur in the preparation and submission of the prequalification documents.

Name :

Signature and stamp:

Address :

Tele. No.:

Fax No:

E-mail Address:

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 15   

Fact Sheet

Notes:

1. Response to each question is mandatory. 2. Fact Sheet to be filled.

A. Your experience during the past five years with KNPC or affiliates. Please list the affiliate names, Contract No., Contract Duration and the scope of work performed.

B. Do you have experience in executing large jobs (greater than $ 400 MM) outside your

home country during the past 10 years.

Answer Check one Yes No

Please list the 3 largest contracts in last 10 years you have performed as a prime

contractor in an EPC capacity, including the contract amount.

C. Do you have experience in using SHELL DEPs for current / past EPC Projects

Answer Check one Yes

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 16   

No

D. Your bonding ability. Please state the bonding capacity of your company.

Answer Check one Below $100 million $100 million and above

E. Indicate the maximum value, in US Dollars, of an EPC contract outside your home

country that you are capable of executing.

Answer Check one $ 400 MM to $ 700 MM Over $ 700 MM

F. Construction Safety Record - Specify your Lost Time Accident Frequency for the

projects that Applicant has implemented over the last five (5) years, including the number of fatalities and the cause of death.

Answer Check one LTA rate of higher than 1.0 LTA rate of 1.0 or less

G. Your willingness to execute a Confidentiality Agreement regarding this work.

Answer Check one No Yes

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 17   

ATTACHMENT No. 1

Pre-Qualification Questionnaire for CONTRACTOR For 5th Gas Train Project

1.0 CONTRACTOR Information

1.1 Internet Website (If applicable)

1.2 Postal Information for any future Correspondence

1.2.1 Legal Name of CONTRACTOR (Company): 1.2.2 Country of origin:

1.2.3 Postal Address:

1.2.4 Telephone Number:

(Incl. Area Code)

1.2.5 Fax Number: 1.2.6 Visiting Address (If different than postal address)

1.3 Contact Personnel information for any future Correspondence

1.3.1 Name in Full: 1.3.2 Title:

1.3.3 E-mail Address:

1.3.4 Fax Number:

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 18   

1.3.5 Telephone Number:

1.4 Date of Business (Company) Establishment

Day Month Year

1.5 Type of Business

1.5.1 Public, Private, Partnership, Limited Liability, Un-Limited Liability, etc.

(Give Details) 1.5.2 Fields of Business Activities (Give Details)

1.5.3 Country of registration / Registration Number:

1.6 Affiliates / Associates / Subsidiary Companies

1.6.1 Name:

1.6.2 Address:

1.6.3 Name:

1.6.4 Address:

1.6.5 Name:

1.6.6 Address:

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 19   

1.7 Other Offices Worldwide

1.7.1 Legal Company Name:

1.7.2 Country:

1.7.3 Postal Address

1.7.4 Telephone Number:

(Incl. Area Code)

1.7.5 Fax Number:

1.7.6 Contact Person Name and E-mail Address:

(Repeat as required if more offices)

1.8 CONTRACTOR Profile

1.8.1 Provide the CONTRACTOR’s Organization Chart from the upper

hierarchy level to Managers level. Indicate Group or Division who will be responsible for execution of the EPC work and its management team.

1.8.2 Parent Company; state legal name and country of residence of direct parent company and the ultimate holding company, if any.

1.8.3 Change of Ownership; has there been any major change of Ownership of the establishment over the past five (5) years. If so, kindly provide details and if not, please affirm by “NONE”.

1.8.4 Affiliates / Associates / Subsidiary Companies; provide details in the form of a graphic representation to clearly identify each of the

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 20   

CONTRACTOR’s Affiliates / Associates / Subsidiary Companies and their interrelation to one another.

1.8.5 Stock Exchange; state on which stock exchange the CONTRACTOR shares and/or the shares of the parent and/or holding company are traded. If this is not applicable, please affirm by “NO SHARES ON STOCK EXCHANGE”.

1.9 Litigation / Arbitration / Disputes

1.9.1 Contractor is requested to inform whether its business, regardless of current company name, is presently or has ever been involved in any litigation or arbitration proceedings in relation to project work undertaken by EPC for a claim value exceeding (USD) $10 Million.

If so, kindly provide details and if not, please affirm by “NONE”.

1.9.2 Contractor is requested to inform whether its business, regardless of current company name, is presently in dispute with either clients or subcontractors/suppliers over unresolved contract claims or other matters for a claim value exceeding (USD) $10 Million.

If so, kindly provide details and if not, please affirm by “NONE”.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 21   

ATTACHMENT No. 2

Pre-Qualification Questionnaire for CONTRACTOR For 5th Gas Train Project

2.0 Experience

2.1 Has the CONTRACTOR carried out minimum three (3) full EPC scope

contracts with a value over $400 million for Refinery, Petrochemical or Oil & Gas Projects, worldwide (other than the Contractor’s home country) during the past the last ten (10) years that have been successfully commissioned or are expected to be commissioned during 2012.

If the answer to the above is positive, give reference of these Plants as per details given in Form (1). CONTRCATOR is requested to fill a separate form for each project. Furthermore, CONTRACTOR is requested to summarize all its experience data provided in Form (1) in Form (1.1).

2.2 Contractor’s Gas Projects handling experience, even if value less than $ 400 million shall additionally be given, similar to 2.1 above.

2.3 Client References – CONTRACTOR shall submit Form 2, Contractor Reference Inquiry, for three of CONTRACTOR’S most recent, relevant projects. Have them completed and signed by a client representative. Client representatives should keep the reference confidential and send them directly to KNPC at the address shown on the form.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 22   

ATTACHMENT No. 3 Pre-Qualification Questionnaire for CONTRACTOR

For 5th Gas Train Project 4.0 RESOURCES

3.1 Establishment

3.1.1 What is the total permanent manpower available within the CONTRACTOR’s organization for each of the following categories:

Permanently Employed With CONTRACTOR Having

Experience Category 20

Years 10-20

Years < 10

Years

Contracted Manpower TOTAL

CORPORATE Management Administrative Financial Sales

PROJECT Engineering - Process - Mechanical - Instrument - Electrical - Civil Project Control

(Planning, Contracting, Costing, Procurement)

CONSTRUCTION Constr. Manager Quality Control Quality Assurance Safety Administrative Field Engineering Field Procurement Constr. Supv.

Totals

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 23   

Note: Engineering and Construction personnel shall not be duplicated.

3.1.2 Does the CONTRACTOR have any established relationships or affiliations with specialist consultants and/or licensors of technology relevant to the proposed projects subject of this pre-qualification? If the answer is “yes”, kindly provide details and if not, please affirm by “NONE”.

3.1.3 CONTRACTOR is requested to provide information of EPC’s worldwide offices, indicating the activities and functions of each of these offices:

No Country Location

(Province) Sales Eng. Procur. Constr. Others

1

2

3

4

5

6

3.1.4 CONTRACTOR is requested to provide its typical Organization Chart for full

EPC type projects, having the same order of extent, including positions, disciplines and responsibility relationships. CONTRACTOR is also requested to clearly identify the project connected to the Corporation’s Organization Chart.

3.1.5 CONTRACTOR is requested to provide in the table below the details / histogram of the number of engagements that it is currently committed to and/or bidding for as of the year 2013 projected through year 2018 showing available manpower versus committed and projected.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 24   

Current Engagements (Manpower Availability)

No. Project Name/Location 2013 2014 2015 2016 2017 2018

Committed 1 Available Committed 2 Available Committed 3 Available Committed 4 Available Committed 5 Available Committed 6 Available Committed 7 Available Committed TOTAL : Available

In addition, Contractor is requested to provide the following information:

No Project Name, Location and Category

CONTRACTOR’s Role (E/P/C)

Number of Personnel Assigned

1

2

3

4

5

6

7

8

9

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 25   

3.2 Construction and Procurement Strategies

3.2.1 Procurement / Expediting Strategy and Organization

i) CONTRACTOR is requested to describe its strategy for the procurement, transportation to jobsite and subsequent erection of the major equipment items and the off-shore facilities.

ii) CONTRACTOR is requested to describe the organization responsible for

procurement and expediting and the strength of the organization and its location along with a brief description of the procurement methodology and the strategy for inspection and expediting.

iii) CONTRACTOR is requested to provide its current purchasing workload and

indicate whether expediting is carried out by buyers or specialists appointed for that purpose.

iv) CONTRACTOR shall describe current procurement strategy and envisioned

strategies to accommodate current market conditions as applied for the following disciplines:

- Concrete - Structural Steel - Piles - Machinery & Equipment - Piping - Electrical & Control Systems

v) CONTRACTOR shall describe strategies for freight movements and inland transportation to jobsite of major equipment items (i.e. Stacker, Reclaimer, Ship-loader, Off-shore items, packages, pumps etc.).

3.2.2 Material Management System

CONTRACTOR is requested to describe its Material Management System and how tracking delivery, projections, slippages and initiating expediting actions are carried out.

3.2.3 Craft Labor Resources :

Contractor is requested to provide Total Craft Manpower Curves and Peak Craft Manpower for each of the recent Projects for which Contractor has provided as relevant experience on FORM (1).

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 26   

3.2.4 Construction Management and Craft Supervision practices

For the Projects listed on FORM (1), provide the following breakdowns of your

Construction Management Staff and Craft Supervision as a percent of Total Craft Manhours reflected in 3.2.3 above:

a. Construction Management Staff as a % of Total Craft Hours (Site Manager

through Area and General Superintendents, including support Staff).

b. Craft Supervision as a % of Total Craft Hours (General Foremen through Craft Superintendents).

3.2.5 Construction Equipment and Heavy Lift Practices

1) Rigging/Heavy Lift Engineering Capability and Practices. Please indicate Contractor’s resources and practices regarding Rigging

Engineering and Heavy Lift Engineering/Planning as follows:

a. Please provide the Total Number of Permanent Construction Staff devoted to Rigging/Heavy Lift Engineering currently included in your Staffing Totals as provided in the resources listed in ATTACHMENT No. 3:

(i) Total Permanent Staff; Rigging/Heavy Lift Engineers/Supervisors

b. Please indicate Company Practices and Policies regarding

Rigging/Heavy Lift Engineering and Planning: (i) Company Policy requires formalized Rigging/Lift Engineering

for all lifts of _____Tons

(ii) Company Permanent Rigging Engineering Staff reviews and signs off on all lifts of ______Tons.

(iii) Where Construction Work is Subcontracted to Others,

Company Permanent Rigging Engineering Staff reviews and signs off on all lifts of _____Tons.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 27   

2) Construction Equipment Resources. Please indicate the following regarding Contractors Construction Equipment Resources:

a. Please indicate Mobile Construction Equipment Inventory of Contractor

as would be utilized on major Projects (similar to those listed on FORM (1) and the proposed KNPC 5th Gas Train Project:

Capacities Range

Contractor Owned

Subsidiary Provided

Contracted Local Supplier

1) upto 100 Ton 2) 125-300 Ton 3) 350-500 Ton 4) Over 500 Ton Jack-Up Barge Barge Crane Boats

b) Please indicate what was the Heaviest/Largest Lifts accomplished directly under the CONTRACTOR’s Supervision for Projects covered in Form-1:

Project Heaviest

Lifts (MT) Largest Lifts (T-T Length/Diameter)

1

2 3 4 5

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 28   

3.3. IT Support System.

3.3.1 CONTRACTOR is requested to list the planning and scheduling systems currently being used within its establishment.

3.3.2 CONTRACTOR is requested to list the hardware and peripheral equipment and software available to support its:

• Planning and scheduling systems. • Material management systems. • Document management systems. • IT communication systems.

3.3.3 CONTRACTOR is requested to explain its philosophy towards the application of software in engineering projects including data processing support and summarize the experience gained in employing CAD techniques directly in project related work.

3.3.4 CONTRACTOR is requested to list the hardware and principal peripheral equipment available for each of its CAD systems and the software available to support its CAD and Engineering procedures.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 29   

ATTACHMENT No. 4

Pre-Qualification Questionnaire for CONTRACTOR For 5th Gas Train Project

4.0 Financial

4.1 CONTRACTOR is requested to provide audited copies of its annual reports for the last three years, including balance sheets of profit and loss accounts after final auditing.

4.2 CONTRACTOR is to indicate if there have been any significant changes in its balance sheet for this current year with reference to last year’s audited balance sheet.

4.3 CONTRACTOR is requested to provide copies of any financial statements released to its shareholders or to the public subsequent to the publication of the latest audited accounts.

4.4 CONTRACTOR is requested to provide the following financial information for the past three (3) years in the table below. (All Values to be given in US. $)

No Description 2009(*) 2010(*) 2011(*) 1 Borrowed Capital 2 Net-Worth 3 Current Assets 4 Total Assets 5 Current Liabilities 6 Turn Over 7 Turn Over (Refining /

Petrochemical/Oil & Gas)

8 Turnover Engineering Design

9 Turnover Engg. Design (Refining / Petrochemical, Oil &

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 30   

Gas) 7 Gross Profits before

taxes

8 Gross Profits after taxes

9 Net profits Note (*): CONTRACTOR must indicate the end of financial year (If not

March ending) as appropriate.

4.5 CONTRACTOR is requested to provide the name(s) and address(es) of its bank(s) and other information as requested below;

Bank Name: Bank Address: Telephone No.: Fax. No.: Manager’s Name: (Repeat as required in case of additional banks)

4.6 CONTRACTOR is requested to specify the amount(s) (in US. $) of Tender and

Performance Bond(s) of its current undertaken projects. (Do not include any contract with a value less than US $ 100 million)

Project Name Tender (Bid) Bond US $

Performance Bond US $

Contract Value in US $

4.7 CONTRACTOR to provide current bonding capacity. 4.8 CONTRACTOR is requested to provide the name and address of its external

auditors used by it during the past five (5) years.

Auditors Name: Address: Telephone No.: Fax. No.:

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 31   

Contact Name: (Repeat as required in case of additional auditors)

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 32   

ATTACHMENT No. 5

Pre-Qualification Questionnaire for CONTRACTOR For 5th Gas Train Project

5.0 Project Execution

5.1 CONTRACTOR is requested to submit a summary of its proposed project

execution plan which shall include amongst others, overall execution strategy, project management & organization plan, handling of critical execution issues, project administration plan, project control plans, engineering plan, procurement and material management plan, quality assurance & quality control plan, construction plan, pre-commissioning, commissioning and start-up plan.

5.2 What are the types of work that the CONTRACTOR shall carry out

independently for the Project without subcontracting to others:

Category Activity By CONTRACTOR

By Others

Project Management All Engineering Process Mechanical Civil / Structure Off-shore Instrument Electrical Safety QA /QC Procurement All Construction Site Preparation Civil / Structure Off-shore Mechanical Electrical Instrument Inspection Safety Commissioning

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 33   

5.3 Where shall the CONTRACTOR typically carry out or cause to carry out the

following project functions:

Category Activity Main Office

Regional Office

Other Location

Project Management All Engineering Process Mechanical Civil /Struct. Off-shore Instrument Electrical Safety Drafting Procurement All

5.4 CONTRACTOR is requested to provide a summary of its subcontracting

practices and procedures indicating the methodology for selecting, awarding and administering subcontracts. Contractor to note that all subcontractors shall be selected from the Approved List of Contractors maintained by the owner.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 34   

ATTACHMENT No. 6

Pre-Qualification Questionnaire for CONTRACTOR For 5th Gas Train Project

6.0 Quality Management

6.1 CONTRACTOR is requested to state which Quality Management system the CONTRACTOR is accredited to and provide certified copy of such accreditation. CONTRACTOR is also requested to submit a summary (Table of Contents) of its latest quality plan implemented for a similar CONTRACT in Refinery or Petrochemical or Oil and Gas EPC project.

6.2 Does your quality management system accredited by international agencies

also cover Project Management, Engineering, Procurement and Project Execution? Submit proof of the same along with the procedures and methodologies used.

6.3 CONTRACTOR is requested to state when their last audit was done and to

submit a copy of the audit report of the quality assurance system carried out by third party.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 35   

ATTACHMENT No. 7

Pre-Qualification Questionnaire for CONTRACTOR For 5th Gas Train Project

7.0 Health Safety and Environment

7.1 CONTRACTOR is requested to submit details of their health, safety and environment performance by completing the attached Form 3, CONTRACTOR Safety Performance.

7.2 CONTRACTOR is requested to provide a summary of it’s safety program

including details of its safety training program for its employees and workers assigned to work sites and describe how the requirements of its policy are published and communicated to inform its personnel on health and safety matters.

7.3 CONTRACTOR is requested to elaborate on what type of first-aid and other

facilities are offered by the CONTRACTOR to its employees and workers on a working site.

7.4 CONTRACTOR is requested to elaborate on whether it carried out HAZOP

Studies, Environmental Practices and Environmental Program Involvement in the past on any Petrochemical, Refinery Projects or Oil & Gas Projects, and if so, provide details and copy of such studies and the procedures being followed by the CONTRACTOR for such studies and the methodology (arrangement) between the CONTRACTOR, Technology Licensor and Owner.

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 36   

FORM (1)

Experience – World-Wide

1- Project Name 2- Owner Name 3- Country & Location 4- Contractor’s Execution

Office. Note 1

5- Nature of Project

Yes No a- Grass Root b- Extension c- Revamp d- Debottle Neck e- Others (Specify)

6- Product Slate

Product Name Capacity KTPA a- b- c- d- e- f-

7- Licensed Technology

Licensor Name Process Unit a- b- c-

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 37   

d- e- f-

FORM (1) Experience – World-Wide (continued)

8- Project Total Value US. $ 9- CONTRACTOR’s Contract Value US. $ 10- Other CONTRACTOR’s earned Values US. $ 11- Type of Contract

Yes No

a- Lump Sum Turn Key b- Cost Plus c- Reimbursable d- Unit Rate e- Others (Specify) 12- Contract Start Date 13- Contract Scheduled End Date 14- Actual End Date 15- Actual Start-up Date 16- Number and type of Sub-Contracts

No. Sub-Contractor’s Name Scope of Service a- b- c- d- e- f-

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 38   

Note1 – Contractor to indicate the Legal Entity and office location that signed and executed the project being provided.

FORM (1) Experience – World-Wide (Continued)

17- Involvement in Licensed Technology

License CONTRACTOR’s Scope a- b- c- d- e- f-

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 39   

FORM (1.1) Experience – Worldwide

Summary

NO PROJECT DESCRIPTION OWNER NAME COUNTRY & LOCATION

PROJECT TOTAL VALUE

EPC CONTRACT

VALUE

CONTRACTOR SCOPE (E/P/C)

DATES (FROM

START TO END)

SUBCONTRACTED

SERVICES

1

2

3

4

5

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 41   

FORM (2)

Contractor Reference Inquiry

This section to be completed by EPC Contractor

Regarding _______________, who is attempting to prequalify for work associated with the Kuwait National Petroleum Company’s For 5th Gas Train Project , and who has cited your Company as a source of reference, please respond to the following:

Your response will remain confidential. Please complete the following details:

1. Project Description 2. Contractor Work scope 3. Contract Completion Date 4. Approximate Contract Value 5. Approximate Labor Hours

This section to be completed by Client Representative 6. Was Contractor the Main Contractor or a subcontractor? Main Sub 7. Did the Contractor perform the major elements of the

work without the use of subcontractors? Yes No

If not, what was the volume of work subcontracted? % 8. Contract Type (i. e. Lump Sum, Lump Sum, Unit Rate,

Reimbursable etc.)

9. Was the work performed by this Contractor on time, taking into account any awarded completion extensions?

Yes No

10. Did the Contractor implement satisfactory Quality Assurance and Control procedures?

Yes No

11. Did the Contractor implement satisfactory Safety Programs and Procedures?

Yes No

12. Would you consider awarding further work to this Contractor?

Yes No

13. Work Execution: Good Average Poor

Quality of Workmanship

Cooperation

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 43   

14. Commercial:

Good Average Poor

Commercial Relationship

Contractor attitude to claims

Invoicing Quality

15. COMPANY NAME

BY _____

TITLE/POSITION

DATE PHONE_____________________________________________________ EMAIL______________________________________________________

16. Completed forms should be sent to:

ITC Reception Desk,

Room # 1A-046, 1st Floor, KNPC H.O., Ahmadi – Kuwait.

Fax : 00965 23986262 (ITC, Secretary) (Note: Contractor after filling items 1 to 5 shall give this form to the client representative. Client representative shall fill items 6 to 15 and send the document (Form 2) directly to the address / Fax No. given in item 16 above)

Management Quality Quality of Field Supervision Labor Quality Sufficiency Labor Relations Safety Performance Reaction to Changes Planning Quality

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 44   

FORM (3)

Contractor Safety Performance

Injury and Illness Data Hours Year: 2007 2008 2009 2010 2011 Field:

a. Employee hours worked last three years: Total:

Provide the following data: 2007 2008 2009 2010

2011

No. Rate No. Rate No Rate No Rate No Rate

Injury resulting in fatality Total No. of fatalities x 200,000 Fatality Rate= _________________ Total Employee Hours

No. of Accidents resulting in Lost work day Cases (LWC) Total No. of LWC X 200,000 LWC Rate = ________________ Total Employee Hours

No. of accidents other than lost work Day Cases No. of Non-LWC X 200,000 LWC Rate = _________________ Total Employee Hours

Highest ranking safety/health/environment professional in the company: Title Telephone: Fax:

Do you have or provide: a) Full Time Safety/Health /Environment Engineer b) Full Time Site Safety/Health /Environment Engineer

Yes Yes

No No

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 45   

c) Full time Job Safety/Health/Environment Officer Yes No

Do you have a written Safety and Health Program? Does the program address the following key elements?

-Management commitment and expectation

-Employee participation

-Accountabilities and responsibilities for managers, Supervisors, and employees

-Resources for meeting safety & Health requirements

-Periodic Safety and Health performance appraisals for all employees

-Hazard recognition and control

Yes Yes Yes Yes Yes Yes Yes

No No No No No No No

Do you have written programs for the following: a) Hearing Conservation b) Respiratory Protection Where applicable, have employees been: Trained Fit Tested Medically approved c) Hazard Communication

Yes Yes

No No

Do your employees read, write and understand English/Arabic such that they can perform their job tasks safety without an interpreter? If no, provide a description of your plan to assure that they can safely perform their jobs.

Yes

No

Medical a) Do you conduct medical examination for:

- Pre-employment - Replacement job Capability - Pulmonary - Respiratory

Yes Yes Yes Yes

No No No No

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 46   

b) Describe how you will provide first aid and other Medical services for your employees while on site

Specify who will provide these services : _________________ c) Do you have personnel trained to perform first aid and

CPR?

Yes Yes

No No

Do you hold site safety and health meetings for: Field Supervisors Employees New Hires Are the Safety and Health meetings Documented?

Yes Yes Yes Yes

No Frequency_____ No Frequency_____ No Frequency_____ No

Personal Protection Equipment (PPE) a) Is applicable PPE provided for employees? b) Do you have a program to assure that PPE is Inspected

and maintained?

Yes Yes

No No

Do you have a corrective action process for addressing individual safety and health performance deficiencies?

Yes

No

Equipment and Materials: a) Do you have a system for establishing applicable health

Safety, and Environmental specifications for acquisition of Materials and equipment?

b) Do you conduct inspections on operating equipment (e.g. Cranes, Forklifts, and JLGs) by third party agencies eg? Lloyds BV etc

c) Do you maintain operating equipment in compliance with Regulatory requirement?

d) Do you maintain the applicable inspection and maintenance Certification records for operating equipment?

Yes Yes Yes Yes

No No No No

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 47   

Inspection and Audits a) Do you conduct Safety and Health Inspections? b) Do you conduct Safety and Health program audits? c) Are corrections of deficiencies documented?

Yes Yes Yes

No No No

New Hires Supervisors Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Safety and Health Orientation a) Do you have a Safety & Health Orientation Program for new hires and newly hired or Promoted supervisors? b) Does program provide instruction on the following:- New worker Orientation? -Safe Work Practices -Safety Supervision -Toolbox Meetings -Emergency Procedures -First Aid Procedures -Incident Investigation -Fire Protection and Prevention -Safety Intervention -Hazard Communication c) How long is the Orientation program?

Hours Safety & Health/Environment training

a) Do you now the regulatory safety health and Environments training requirements for your Employees?

b) Have your employees received the required Safety & Health and Environment training and retraining?

Yes Yes

No No

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 48   

c) Do you have as specific Safety & Health and Environment training program for Supervisors?

Yes No

Do you have an Environmental Management System? If yes, attach a copy of the policy.

Yes No

Have you obtained accreditation under any Standards/System viz ISO14001? If Yes, attach the relevant certificates.

Yes

No

Do you carry out Environmental Audit of your facilities? Please furnish the detail on frequency, internal/external and copy of the last audit.

Yes

No

Do you practice Environmental guidelines in storage of Hazardous chemical, Materials at site/facilities? If yes, furnish the code/standards of guidelines.

Yes

No

Do you take/adopt necessary precautions to control fugitive emissions form the site/facilities? If yes, furnish the methods/standards.

Yes

No

Do you practice Environmental guidelines/standards in manufacturing facilities to reduce the air emissions, water & solid waste at the source? If yes, brief the measures taken at your facilities.

Yes

No

Do you have procedures for taking appropriate actions to contain accidental spills/releases from the site/facilities? If yes, furnish the brief details.

Yes

No

Does your organization any time subject to enforcement action by statutory authorities for violating Environmental regulations? If yes, furnish the brief details.

Yes

No

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 49   

What is the percentage towards Environmental expenses on your annual turnover?

Yes

No

Are you aware of the prevailing environmental regulations in the state of Kuwait?

Yes

No

INFORMATION SUBMITTAL Please provide copies of checked ( √ ) item with the completed PQF: ____ Insurance Certificate (s) ____ Environmental Policy ____ Safety & Health Program ____ Accreditation Certification ____ Safety &Health Incentive Program ____ Environmental Audit Reports & Procedures ____ Hazard Communication Program ____ Environmental Training Program (Outlines) ____ Respiratory Protection Program ____ Procedure for spill control/fugitive emission ____ Housekeeping Policy ____ Accident/Incident Investigation Procedure ____ Unsafe Condition, Reporting Procedure, Control, etc. ____ Safety Inspection Audit Procedure or form ____ Safety & Health Training Program (Outline) ____ Example of Employee Safety & Health Training Records ____ Safety & Health Training Schedule (Sample)

Authorized Signature:________________________________

Name:__________________________ Date: _____________

5th GAS TRAIN PROJECT EPC CONTRACTOR PREQUALIFICATION QUESTIONNAIRE

KNPC 5th GAS TRAIN PQ QUESTIONNAIRE   KNPC‐5GTP‐PQ‐001 Rev. 00  

Page 50   

EXHIBIT “A”

Minimum Pre-Qualification requirements for Bidder. Total revenues no less than 1 billion US $ per year Experience of at least 3 Projects in last 10 years larger than 400 million US $ in Oil &

gas Industries. Net worth larger than 1.0 billion US $ Leader in HS&E. LTR less than .50 per 200,000 hours Workforce of at least 1,250 Engineers

(Revenues above shall be based on the highest revenue earned per year from amongst the last 5 years)