Upload
jota
View
214
Download
1
Embed Size (px)
DESCRIPTION
land survey
Citation preview
DATA ANALYSIS & RESULT
3.1 Raw and processed data
The data collection is using automation survey concepts which is all the measurement data
recorded in Leica Total Station.
In CDS software, it’s create many junction files when opens a New job. All the files
must be stored in a specified folder. So that, it enables the user to move the folder to another
directory witout misplacing the files.
3.1.1 Create a new job
Starts CDS from the Programs Menu
Pull down “File” menu then select “New”
Click “New Job”
8
Create new folder in specified directory
3.1.2 Transfer Raw Data from Leica Total Station
Pull “Entry”, “Data Collector”, “Collect Raw Data”
9
3.1.3 Open the stadia files
Pull “Entry” then click “Electronic stadia”
Tick “Stadia” then “browse” to find stadia file, then click “ Open Existing”
10
3.1.4 Calculate Coordinates and Heights
Pull “Options” then click “Show Coordinates”
3.1.5 Show topography details graphically
Pull “Options” then click “Store Data in Database”
11
Tick “All” then click “OK”. After that, Press shortcut key “Z” & “E”
Click “Layers” then justify
12
RESULTS : Layer modes in height layer
RESULTS : Layer modes in Codes layer
13
3.2 Engineering plan
3.2.1 Export to drawing format
Pull “File” then click “ Plot Parameters”
Justify “Sheet Details”, “Point Param”, “Point Selection”, “Reset”, “All”, so on
14
3.2.2 Export to *dwg Format
Pull “File” then click “Export DWG”
Click ‘Yes” to open the drawing in AutoCAD
Below is the topography details in AutoCAD drawing. Then the next step is to edit
and produce Engineering plan.
15