Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
1School Running Track
Proposed Area of Construction
Oak Meadow Park
All Season Sports Field
W 33rd Ave
W 37th Ave
Oak
Str
eet
Will
ow S
tree
t
Key features of the Eric Hamber SecondarySchool Seismic Replacement Project:
• Replacement school capacity - 1,700 students• School area - approximately 15,000 square
metr s
• Project construction start: January 2020• Project completion: fall 2022• Replacement school will be LEED® Gold certified or equivalent• Students will remain in the existing school during construction• Existing school will be used for temporary accommodation after the project is complete
VSB Property
The City of Vancouver is proposing to partner with VSB to add a 1,500 square meter childcare facility to the site. The 69-space facility would provide care to children ages 0 to 4
◦
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
2A
EXISTING SCHOOL
Current state (2019)
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
2BCurrent state (2020 - 2022)
EXISTING SCHOOL
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
2C
REPLACEMENT SCHOOL
FUTURE TEMPORARY ACCOMMODATIONS
Replacement school and temporary accommodation (2022 - 2030 estimated)
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
2D
EXISTING ALL-SEASON
FIELD
Final state (estimated 2030 - onwards)
FUTURE NEW FIELD
REPLACEMENT SCHOOL
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
3
Benefits of a replacement school:
• New, seismically safe space• 21st century student learning environments• Most cost effective whole-life option• Students remain in the existing school during construction• Adds temporary accommodation to facilitate future seismic projects• Shorter construction period compared to other options• Energy efficient facility with a healthy environment
Full replacement school (approved option)
HYDRANT
!"#$%"&!
!"#$%
Eric Hamber Secondary School ReplacementPublic Information Session
Vancouver Board of Education $SSURYHG Option���5HSODFHPHQW�6FKRROJanuary ��, 2019
3$33529(' OPTION - FULL REPLACEMENT SCHOOL
PROPOSEDNEW BUILDING
PROPOSEDPARKING
)8785(�1(:�75$&.
(;,67,1*�$//�6($621�
),(/'
%HQHILWV�RI�$SSURYHG�2SWLRQ�
• 1HZ�VHLVPLFDOO\�VDIH�VFKRRO• ��VW�&HQWXU\�VWXGHQW�OHDUQLQJ�HQYLURQPHQW• 7KH�PRVW�FRVW�HIIHFWLYH�RSWLRQ• 6WXGHQWV�UHPDLQ�LQ�WKH�H[LVWLQJ�VFKRRO�GXULQJ�FRQVWUXFWLRQ
• $GGV�WHPSRUDU\�DFFRPPRGDWLRQ�WR�IDFLOLWDWH�IXWXUH�VHLVPLF�SURMHFWV
• 6KRUWHU�FRQVWUXFWLRQ�SHULRG�FRPSDUHG�WR�RWKHU�RSWLRQV
• (QHUJ\�HIILFLHQW�IDFLOLW\�ZLWK�D�KHDOWK\�HQYLURQPHQW
FUTURE NEW FIELD
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
4
JUN. 2018
Projectapproval
Planning & procurement
process
Design andconstruction of replacement
school
Projectcompletion
OCT. - NOV. 2018 OCT. - NOV. 2018
OCT. - DEC. 2018 JAN. - SUMMER 2019
Project timeline (estimated)
Replacementschool opensSept. 2022
DEC. 2018
Public information
session
Online feedback
opportunity
Report backon public and
school feedback
JAN. 11 2019 JAN. 11 - JAN. 25 2019 SPRING 2019
Public engagement timeline
Public information session notice
provided to school and local
community
*School Advisory Group consists of students, teachers, parent representatives and staff.
School Advisory Group -
engagement(4 meetings)
Staff input oneducational
program and resource needs
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
5What is a Design-Build Project?
• Design-Build Agreement is a fixed-price, performance-based contractwith a design-build firm
◦ A design-build contract includes a Statement of Requirementsthat sets out the contractor's design and construction requirements
◦ VSB can require specific design and construction elements aspart of the contract (e.g. materials, locations, dimensions, etc.)
◦ As part of the contracting process, VSB is seeking innovative ideas
+ Innovations may be found through efficiencies in thedesign-build process, the functionality of the new building,through the construction methods used, and in the designand appearance of the new building
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
6What has happened to date?A series of user group sessions have been held. The user group includes teachers, school staff and students of Eric Hamber Secondary.
• Vision Gaming• Fact Finding• Site Tour Brief
• Kitsilano Secondary• UHill Secondary• Magee Secondary
Visioning session
• Debrief of site tours• Program discussion
Focus user groupsessions (Round 1)
Other Secondary School site tours
Focus user groupsessions (Round 2)
• Review draft• Capture additional
comments
Focus user group session (Round 3)
Increase knowledge, awareness, appreciation of, and respect for Indigenous histories, traditions and cultures through project
•
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
7What we heard:
Engagement sessions were held in October and November 2018 with Eric Hamber students, teachers, parent representatives and staffin a discussion about the vision for the replacement school.
• Equality in teaching spaces• Library Learning Commons, Gym and Multi-Purpose space form the heart of the school• Natural light and visual connections to exterior space are key• The new space must meet the needs of future students and staff
Key feedback topics included:
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
8• VSB needs your feedback to help inform the development of the functional program areas
for a replacement school. Each program area has unique space and size requirements.
Program areas include:• Library & Learning Commons•Counselling and International Education•Fine Arts (Art Studio, Ceramic Studio, Graphic Arts and Photography Lab, Dance Studio, DramaStudio, Music Rooms)
•Athletics (Gymnasium, Weight Room, Locker Rooms)•General Academics (Humanities, Languages and Math)•Science (including Science labs)•Applied Skills (Industrial Education, Home Economics, Business Education and Computer Labs)•Special Education
• We want to hear from you. Please complete the online feedback form at: govsb.ca/hamberseismic
We want to hear from you!
Eric Hamber Secondary School ReplacementPublic Information Session
January 11, 2019
9• VSB will review feedback from the public, school and School
Advisory Group to help inform the program area requirements of areplacement school for Eric Hamber Secondary.
• VSB will provide a summary of community feedback by Spring 2019
Next steps