Upload
rokas-ostasevicius
View
221
Download
3
Tags:
Embed Size (px)
DESCRIPTION
4th semester drawings
Citation preview
8
8
9
9
G
G
10
10
H
H
85
961
1200
1200
1200
1200
1200
1200
1200
1200
85
961
1200
1200
1200
1200
1200
1200
1200
1200
1
1
3
3
A AC
C
2
2
B B
D
D
1200
1200
1200
1200
1200
1200
1200
827
1200
1200
1200
1200
1200
1200
1200
803
85
85
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Multy storey housing
Rokas Ostasevicius
04/25/12
AN-X1(210 05)001
41
TYPE CITY
1 : 100Deck elements apartment 2
1 : 100Deck elements apartment 1
Apartment 1:200 mm deck elements from EXPAN11 Standard width elements, supported edges are cut in angle.5 Elements are with cutings - not standard.Hanger is necessary to have an oopening for shaft.Also, cast in site concrete has to be used to cover a small openingwhich was made to avoid not standard deck elements.
Apartment 2:200 mm deck elements from EXPAN13 Standard width elements, supported edges are cut in angle.5 Elements are with cutings - not standard.Hanger is necessary to have an oopening for shaft.Also, cast in site concrete has to be used to cover a small openingwhich was made to avoid not standard deck elements.
1
1
3
32
2
168
B B
E8E8
E8E8
E9E9
E9E9
401
00
3349
108 258 150 40108
148
3468
5895
18
100
20
5733
166
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 20
Multi-Storey Social Housing
balcony analysis - plan
Rokas Ostasevicius
06/21/12
AN-X1(210 03)001
41
TYPE CITY
AN-X1(210 03)001
1 : 20Detail balcony plan
VV
9
20
100
11016 25 139
39
191
39 168
158 12
200
215
50
50
50 3749
120
52
52
57
297
18
5
49 158 12
79
76
45
Ventilat
ed
1. Balcony railing with the glass2. Balcony slab 300mm thick3. "Skyframe" sliding glass wall, 158mm thick frame, tirpple glazed4. Galvanized steel flashing.5. Elastic seal around the window with a backtop 12mm6. Battens 59x139 mm, to fix the wind board7. Custom steel bracket to fix the glass wall, upper and lower.8. Ventilation gap9. Glued Aliuminium profile to hide the joint10. Aluminium panel to close the construction but with a gap to ventilate that
1.
2
3
4
164
5
6
Measurements are in mm.The aim if this detail, is to show that balconyand the building are liek two separatedconstructions, because they are seperated bythe gap.
7
8
10
35
10
16538 361 38
300
Flooring11.Parquet12. Soft material13. Plywood14. "Wirsbo" floor heating system15. 100mm insulation to keep the heat not going to apartment below16. Floor joists17. Wedges to level up the wooden floor18. Impact sound insulation19. Balcony drain
10
111312
14
15
16
17
18
19
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 5
Multi-Storey Social Housing
Balcony - balcony to window Section
Rokas Ostasevičius
05/30/12
AN-X5(2ET)001
41
TYPE CITY
AN-X5(2ET)001
1 : 5Apartment balcony section
7
Wall TiesThe outer and the inner leaf shall be connectedby the use of wall ties in order to ensure thecombined resistance to wind load. Corrosionproof wall ties shall be used e.g. stainless steelor tin bronze wire in a number equalling atleast 4-6 ties per m2 wall. 4mm ties are used theycan be inserted at intervals of 0.5m in everysixth course. The distance between ties shouldnot exceed 0.6 m. Below the top courses tworows of ties should be inserted at intervals of0.3 m. Furthermore an extra row of wall tiesshould always be placed at intervals of 0.3 malong the edge of all openings e.g. windows.
3
3
180
158
10840
180
40108
145
108
40
158
20
20
99.00°
99.00°
99.00°
99.00°
81.00°
81.00°
187
28
100
17
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 5
Multi-Storey Social Housing
Balcony - top window fixing
Rokas Ostasevičius
05/24/12
AN-X5(2ET)002
41
TYPE CITY
AN-X5(2ET)002
1 : 5Detail window to wall
Add documentationabout DPM
Curtain wall by SkyframeSky-Frame 3 was developed for properties where extremely highdemandsare made of the thermal insulation. This system operates with54 mm thick triple glazing. The additional stability o f its glasspanels means that it can withstand stronger winds. The success of thisdevelopment was confirmed by the certification as first metalMINERGIE® sliding window.
Sound insulation capability: tested up to 44 dB
Opening type:
1.
1. Internal load bearing concrete wall 180mm2. White wall paper3. Elastic joint 12mm with a back stop4. Custom made wood batten, bolted to the wall5. Fiber cement board 20 mm6. Custom steel bracket7. Insulation 180mm8. "Skyframe" sliding glass wall9. Steel support which is holding the outside and inside concrete wall10. Dark brick11. External concrete wall12. Downpipe diameter 90 mm
2.
3.
4.
5.
6.
7.
6.
8.
9.
9.
10.
11.
12.
10
lVlV
28518 30 66 12 405 12 64 27 26
15
85
9207
660
15
69
15
40
44
15
45
126 50 124
15
15
15 20 15
15
85
6
54 51
15 20 15
300
300
180 126 50 124 180
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 5
Multi-Storey Social Housing
Balcony - columns
Rokas Ostasevičius
05/25/12
AN-X5(2ET)003
41
TYPE CITY
AN-X5(2ET)003
1 : 5Balcony slab fixing column
1. Concrete column which supports the delta bea,2. Custom delta beam which supports apartment balcony3. Cast on site concrete4. Elastic joint with a back stop5. Concrete balcony slab6. Gap for movement of the slab
1
2
34
5
6
Already with a beam
1
llllll
22
wall ties
66
15
45
15
255
15
108 40 180 40 108
101510521210 15 10 60 12
15
202
14
85
15
12
14
85
15
12
92 108 40 180 39 108 93
160
2
34
5
6
7
8
910
X
X
X - fixed point
- allows movement to shown directions
X
X
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
Asindicated
Multi-Storey Social Housing
Balcony - beam on the wall
Rokas Ostasevičius
05/30/12
AN-X5(2ET)004
41
TYPE CITY
AN-X5(2ET)004
1 : 5Balcony slab fixing
1 : 50Detail movement of the slab
Wall TiesThe outer and the inner leaf shall be connectedby the use of wall ties in order to ensure thecombined resistance to wind load. Corrosionproof wall ties shall be used e.g. stainless steelor tin bronze wire in a number equalling atleast 4-6 ties per m2 wall. 4mm ties are used theycan be inserted at intervals of 0.5m in everysixth course. The distance between ties shouldnot exceed 0.6 m. Below the top courses tworows of ties should be inserted at intervals of0.3 m. Furthermore an extra row of wall tiesshould always be placed at intervals of 0.3 malong the edge of all openings e.g. windows.
1. Concrete wall element 180 mm2. Custom delta beam which supports apartment balcony3. Cast on site concrete4. Elastic joint with a back stop5. Concrete balcony slab6. Gap for movement of the slab7. Gap between brick and concrete, because materials move separately.8. Danish brick9. Flaps already with delta beam10. Distance brick
Wall tie
2
2
90.00°90.0
0°
158
158
140
120
1
180
178
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 5
Multi-Storey Social Housing
Balcony - connection between two windows
Rokas Ostasevičius
06/18/12
AN-X5(2ET)005
41
TYPE CITY
AN-X5(2ET)005
1 : 5Detail between two windows
1. White wallpaper2. Loadbearing concrete wall, 180 mm3. Custom steel bracket to fix the windows4. Insulation 150mm5. "Skyframe" sliding glass wall6. Aluminium profile
2
3
4
6
6
8
lVlV
1
164
15
135
276
15
104
30
163
126 50 124
15 20 15
25
59
25
15
275
15
15
69
15
126 15 20 15 124
200
78
76
46
415
15
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 5
Multi-Storey Social Housing
Balcony- section between two beams
Author
06/19/12
AN-X5(2ET)006
TYPE CITY
AN-X5(2ET)006
Section beam to wall
1, Neoprene - reduce the impact sound (between beam and hanger)2. Internal load bearing wall, 180 mm3. Delta beam 290 mm high, 3.5 m long. Filled with concrete4. Concrete columns5. Steel hanger to support the end of the delta beam6. Aluminium profile7. Insulation8. Walls 180 mm, reinforced concrete element, loadbearing9. Aluminium profile
3
4
4
5
7
9
WCSI
Drain pipe with showen directio of the flowDrainRainwater pipeWastewater pipe (if inside the basement it goes next to the ceiling).Wastewater pipe under the basement floorPump to higher levelA spot where the pipe goes down to a stated level.
apartment 4 pipe rom the shaft
apartment 3 pipe rom the shaft
apartment 2 pipe rom the shaft
apartment 1 pipe rom the shaft
apartment 5 pipe rom the shaft
1613
1500
1500
Wastewater pipe
Depth of the pipeFrost free depth 750 mm frost free depth.
SlopeMin. slope 20 ‰ (without calculations)Min. slope 12 ‰ after first toilet (without calculations)
Gully sizeCleaning gully 425 mm, is easier to clean.
PipePVC pipe Ø110 mm
FD
Rainwater pipe
Depth of the pipeFrost free depth 750 mm.
SlopeMin. slope 10 ‰ rain water pipes after first sand catch
Gully size315 mm if there are several runs
PipePVC pipe Ø110 mm
inwater pipe
Depth of the pipe750 mm next to a not heated buildingThe highest bottom level should be atleast 0.3 m below the construction partto be drained.
Slope3-5‰
Gully sizeØ315
PipePVC pipe min Ø70 normally Ø80
Crossing the foundationDrain pipes should not cross foundationsat an angle greater than 45°. It is,however, okay to cross at 45° - thisoften saves a lot of excavation andmaterial.
Sewer and rain water pipes crossingAt least 0,2 m distance betweenrainwater and wastewater pipes thatcross.
36.75
36.50
35.75
35.50
1608
WMWM
35.40
35.40
CL 38.00BL 35.01
36.70 36.70
CL 38.00BL 36.57
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Sewer foundation
Rokas Ostasevicius
06/11/12
AN-01(305)001
41
TYPE CITY
AN-01(305)001
1 : 100Sewer foundation
-
E1E1
E1E1
E2E2 E2E2
1500
600
600
1500
1500 600
5530 800 4066
2124
2787
800
2123
2787
800
1162
800
1500
1392
1558
50 400
3875
400
4730
800
4065
800
600
2164
800
2887
800
4505
800
4289
800
6871
800
1500
600
12264
600
1500
4600
1500
600
12139
600
1500
4600
800
50
E6E6
E6E6
E7E7
E7E7
E8E8
E8E8
E9E9
E9E9
metal sheeting
0
12220.8
22311.5
2
33718.6
6
50141.2
5
0
18094.84
0
12758.82
0
4471.05
0
1192.37
14100
17268
2885 800
1280
1280 14029
300
3104
4400
1346
4
600
1866
1500
1000
400
1265
400
1000
1500
3333
600
600
1226
4
600
1280
12264
1500
1000400
1521
4001000
1500
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Excavation plan
Rokas Ostasevičius
06/17/12
AN-01(2ET)005
41
TYPE CITY
AN-01(2ET)005
1 : 100
Excavation plan
Column foundationThe distance between balcony columns is c/c 5000mmThe Distance between balcony column foundation is 1280mmAll foundation for the columns is the same 320x320 and 900mm deep.
Ramp & external staircase to entranceRamp foundation is 200 mm wide and 900 mm deep.Staircase foundation is under the first step 312x2000 mm and 900 mm in depth.
External foundation400x600 mm reinforced concrete.
Internal foundation400x800 mm reinforced concrete.Metal sheeting
The foundation in the right side of the building is deeperbecause of the basement. The depth of the excavation is 3.3 m.To avoid the excavation going out of the plot metal sheeting is needed.It can be suported by rakers or hammered into the soil.
Slope & working spaceTo safeguard against a hazardous collapse, you can create a slopedface in which the sides take the shape of steps with an incline of 1:2(1 across and 2 up). In the case of excavation depths in excess of 5 m,the slope must have an incline of 1:1. The depth of our faudation is 4.8m , andthe elevator is even deeper 6.3 m, we decided to stay on the safe side andmake the slope 1:1.
The work area must be at least 1 m wide (measured at kneeheight). The bottom of the open excavation must be flat and even sothat people can work properly there. If necessary, put down a layerof road construction gravel.
All the measurements are in mm.
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
-
-
-
014
46
7
5
3
12
58880
113500
66483
31617
34866
23144
34448
30908
88500
15991
19825
23064
43914
41059
28527
31099
29214
34401
37760
17000
20300
22005
29479
30252
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Execution bores
Rokas Ostasevičius
06/16/12
AN-01(2ET)006
41
TYPE CITY
AN-01(2ET)006
1 : 100
Excavation - bores
The site is devided into 7 areas. Each bore has it`s own area.
All the measurements are in mm.
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
UP
UP
-
1
1
3
3
A AC
C
5
5
7
7
8
8
9
9
12
12
G
G
11
11
10
10
2
2
4
4
6
6
EL4
EL4
EL2
EL2
EL1
EL1
EL3
EL3
E
E
B B
D
D
F
F
H
H
8647
4385
150
1533150
804
912
319
2350
2174
122
6116
3776
159 912638
912820
912717
912739
912639
912 265
200
279
16774
7764
1310
016970
200
4074
120
1840
120
2035
912
3484
200
1786
120
1818
180
4469
2646
180
182
1679
120
1550
120
1480
180
1581
120
1630
120
1431
200
3114
1313
1619
200
120
6420
3477
200
1626
120
1531
120
1360
120
1300
120
1348
120
1330
120
1460
120
1790
200
4723
180
5387
182
1379120
1540
180
1519
120
200
4932
1100
1850
1100
3557
200
200
912
664
912
949
912
1049
912
540
1874
180
1528
912
775
912721
912
800
912
888
888
180
310
1200
340
150
1800
150
150
150
area A
area B
area C
area D
area E
area F
area G
area H
area I
area J
area K
1852
All the measurements in mm.
All basement walls are prefabricated concrete elements.Areas from F to K for the concrete calculation are the apartmentsin the ground floor. The floor are cast in site there because there is no basement.
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Execution basement
Rokas Ostasevičius
06/18/12
AN-01(2ET)002
41
TYPE CITY
AN-01(2ET)002
1
1
3
3
A AC
C
5
5
7
7
8
8
9
9
12
12
G
G
11
11
10
10
2
2
4
4
6
6
EL4
EL4
EL2
EL2
EL1
EL1
EL3
EL3
E
E
B B
D
D
F
F
H
H
1A
2A
3A
4A 5A
6B
7B
8B
9B10C
11C
12C
14C
13D
16D
15D
18D
17D
19D
23E
20D
21E
22E
24E
25F
26G
27H
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Execution blinding layer plan
Rokas Ostasevičius
06/18/12
AN-01(2ET)004
41
TYPE CITY
AN-01(2ET)004
DN
DN
DN
DN
-
-
014
E1E1
E1E1
E2E2 E2E2
46
7
53
1
2
1120
10892
6388
6393
106586398
6836
13
61
5
20
52
0
20
463
13
617
1197
2051
4
1219
1200
1198
1132
14119
10633
2045
4
1361
7
90.0
0°
150
1192
150
438
5
E3E3
E3E3
E4E4
E4E4
30.9
0°
58880
11
35
00
66483
88
50
0
E6E6
E6E6
E7E7
E7E7
E8E8
E8E8
E9E9
E9E9
18.00°18.00°
18.00°
162.00°
162.00°
161.63°
162.00°
162.00°
162.00°
81.0
0°
11108
14112
81.0
0°
9033
0
9300
0
15625.68
40847
34
81
7
7970
081
46
.38
0
14
50
.42
0
35076.05
9000
E10E10
E10E10
E11E11
E11E11
E12E12
E12E12
E13E13
E13E13
0
1287.34
UP
UP
19961
12048
6532
162.00°
6249
18.00°
18.00°18.00°
162.00°
157.00°
198.00°
163.22°
200.57°
199.51°
198.19°
0
1005.04
12958.03
14250.79
0
10324.35
0
4157.44
0
1005.04
0
1158.8
4
6070.7
1
11459.
41
21031.
09
28966.
13
36548.
62 0
22570.66
6308
0
66
53
.13
64.28°
4481
4535
3184
150
1523
1300
18
17
1
34.06°
84
27
13
00
14398
1010013438
6218 3312
8315
0
36
76
2.9
6
84.1
3°
89.87°
1215
2
1995
7
12216
19957
19
953
12
027
10083
10097
10240
12
17
8
0
1005.04
95.87°
81.10°
81.10°
0
1000
0
1000
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Execution plot
Rokas Ostasevičius
06/18/12
AN-01(2ET)003
41
TYPE CITY
AN-01(2ET)003
4827 800 4066
4730
800
4065
800600
600
12264
600
2885 800 2124
3296
800
4730
2787
800
1258
2787
8002123
600
1226
4
600
800
800
600
12264
600
6774
6433
400
1265
400
4366
600
400
1581
400
800
4505
800
4289
2164
800
2887
800
600
400
1158
400
387
5
400
878
6
400
1158
4165
800
4731
2582
800
2367
2889
600
12139
600
800
600
800
600
12139
600
1
2
3
4
5
6
9
8
7 10
11
12
13
14A
15
16
17
18
19
20
21
22
23
24
25
14
26
800
50
E6E6
E6E6
E7E7
E7E7
E8E8
E8E8
E9E9
E9E9
1307
28
29
27
1590
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
UNIVERSITY COLLEGESCHOOL OF TECHNOLOGY AND BUSINESS -
1 : 100
Multi-Storey Social Housing
Execution foundation plan
Rokas Osevičius
06/18/12
AN-01(2ET)001
41
TYPE CITY
AN-01(2ET)001
Concrete for foundation
Foundation for columnsIs cast on site reinforced concrete.All the column foundations are 320x320mm and900 mm deep. Distance between these foundations is500 mm c/c and the distance between the building thefoundation is 1280 mm.
Ramp foundationCast in site reinforced concrete strip foundation.200 mm wide and 900 mm deep.
Entrance stair foundationSmall foundation under the first step.Cast in site concrete 315x2000 mm, 900mm deep.
Externa lstairscase to basementCast in site reinforced strip foundation400x400 mm.
External foundationCast on site reinforced concrete strip foundation400x600 mm.
Internal foundationCast in site reinforced concrete strip foundation400x800 mm
"Stepping foundation" foundationThe connection between foundation in the basementand the ground floor is made with "step" foundation. Figure 9.
6/20/2012
12:29
Project: Multy storey building - calculations for soil work Sags nr.: 17.06.2012
Date: 20.06.2012
Hour: 12:29
Group: 2 Calculated by: Rokas
Item nr./code Text Quantity Unit Amount Price
Machinary kr.
Crane: Liebherr 34 K radius 33m, rent. 5.0per/month 8000.00 40,000 kr.
Mounting 1.0 pcs 3000.00 3,000 kr.
Dismouting 1.0 pcs 3000.00 3,000 kr.
Driver 864.0 per/hour 325.00 280,800 kr.
Crane Liebherr 26 K.1 radius 26m, rent. 5.0per/month 7800.00 39,000 kr.
Mounting 1.0 pcs 2800.00 2,800 kr.
Dismouting 1.0 pcs 2800.00 2,800 kr.
Driver 864.0 per/hour 325.00 280,800 kr.
Truck SCANIA, rent & driver, 10 trucks 9,270.0 per/hour 795.00 7,369,650 kr.
Big excavator: CAT 324, rent & driver, 2 Excavators 160.0 per/hour 750.00 120,000 kr.
Small excavator: Bobcat 444, rent & driver, 1 excavator 3.0 per/hour 750.00 2,250 kr.
Buldozer: CAT D6, rent & driver, 1 bulldozer 5.0 per/hour 760.00 3,800 kr.
kr.
Soil kr.
Soil to depot 15,581.5 m3 10.00 155,815 kr.
Backfill SAND 1,753.0 m3 35.00 61,355 kr.
Backfill GRAVEL 98.9 m3 85.00 8,408 kr.
kr.
Concrete kr.
Foundation external internal 126.2 m3 1700.00 214,540 kr.
Dlinding layer 50mm 9.0 m3 1700.00 15,300 kr.
Cast in site concrete floor, 100 mm 62.0 m3 1700.00 105,400 kr.
Total incl. VAT 8,708,718.50kr
1 af 1