OnlineClassifiedPortal.com
4.1 Requirement Specification
4.2 Feasibility Study
4.3 Risk nalysis
4.4 !ife Cycle "odel
4.# $ffort %istribution %ia&ram
4.' (ask %ependency %ia&ram 4.) Pro*ect Sc+edule
22
8/12/2019 4.System Planning
2/12
OnlineClassifiedPortal.com
Requirements of client describe as follo,-
System s+ould proide secure and accurate data.
System s+ould easy to operate.
System s+ould proide information related to firm.
Guest-Site:
System s+ould display different Classifieds/ads ,it+ detail
information i.e. actiated by admin.
System s+ould proide facility to re&ister t+emseles as user
or adertiser.
System s+ould proide facility to searc+ particular classified
,it+ detail information.
System s+ould proide facility to &uest user to &ie t+emie, related to site as a feedback.
System s+ould proide company information0 policy0 etc.
User-Site:
System s+ould display different classified/ads ,it+ detail
information i.e. actiated by admin.
System s+ould proide facility to send query to adertiser for
particular classifieds/ads.
System s+ould enable to &et response from adertiser for
t+eir query.
System s+ould proide facility to searc+ particular classified
,it+ detail information.
System s+ould proide facility to sae particular
classifieds/ads as per t+em c+oice.
System s+ould proide facility to update user personal profile
and pass,ord.
System s+ould proide facility to &ie t+em ie, related to
site as a feedback.
23
4.1 Requirement Specification
8/12/2019 4.System Planning
3/12
OnlineClassifiedPortal.com
Advertiser-Site:
System s+ould proide a facility to purc+ase a ne, sc+eme
as per t+em c+oice for upload classifieds/ads. System s+ould proide facility to upload t+eir classifieds/ads
in different sc+eme accordin& to different display format
aailable and mana&e t+em classified as per t+eir
requirement.
System s+ould enable to receie query from user for
particular classifieds/ads and &ie t+em response.
System s+ould proide facility to searc+ particular classified
,it+ detail information.
System s+ould proide facility to update user personal profile
and pass,ord.
System s+ould proide Sc+eme led&er t+at contain current
status of sc+eme and classifieds/ads upload in different
sc+eme.
System s+ould proide remainder related sc+eme status i.e.
sc+eme epiry and epiry point.
System s+ould proide facility to &ie t+em ie, related to
site as a feedback.
Admin-Site:
System s+ould proide follo,in& information to dmin.
Re&istered user information
dertiser information and t+ose sc+emes0 and
classifieds/ads information.
Feedback information
System s+ould proide facility to mana&e follo,in& database
entry to admin.
Sc+eme master
Price master
Cate&ory master Subcate&ory master
City
State
Country
Policy
dmin account master
System s+ould enable to actie /approe follo,in& request
Sc+eme request
Classifieds/ads request
System s+ould proide facility to upload and mana&eclassifieds/ads be+alf of adertiser.
24
8/12/2019 4.System Planning
4/12
OnlineClassifiedPortal.com
System s+ould proide Sc+eme led&er of particular adertiser
t+at contain current status of sc+eme and classifieds/ads
upload in different sc+eme.
System s+ould proide facility to searc+ particular classified
,it+ detail information.
Feasibility study plays ery important role in t+e deelopment of any
system0 but ,+en it is t+e case of deelopment of any soft,are t+en its importance
increases muc+ more because in t+e case one s+ould be ery clear about aailability
of t+e time and resources. efore startin& t+e deelopment of t+e soft,are ones+ould &ie considerable amount of time for feasibility study because t+e successful
completion of pro*ect depends upon feasibility.
(+e feasibility of our pro*ect +as been *ud&ed on t+e basis of time0
tec+nolo&y0 resources aailable and pro*ect len&t+.
Time:
(+is pro*ect takes at least # mont+ to be completed if ,e take +elp of
reused components ot+er,ise it ,ill take ' mont+s to be completed.
e ,ill not make use of components and t+erefore ,ill be able to
complete t+e pro*ect in ' mont+s. (+us accordin& to time t+e feasibility is not
t+at ri&+t.
Technology:
(+e necessary tec+nolo&y0 i.0 front5end deelopment tool0 back5end
database tec+nolo&y and arious ot+er tools namely installation tools0 etc. for
deelopin& t+e system0 are already aailable ,it+in t+e or&aniation. So t+is
problem is feasible.
Resources:
e need &ood kno,led&e soft,are en&ineers and practitioners. e need
6et connection.
e +ae all t+e resources in t+e desired amount.
Project Size:
(+e Pro*ect sie mi&+t be aboe 1#777 !OC. (+is is *ust t+e rou&+assumption because ,e don8t +ae any basis of t+e past pro*ects.
2#
4.2 Feasibility Study
8/12/2019 4.System Planning
5/12
OnlineClassifiedPortal.com
(+us t+e pro*ect oerall feasibility is normal and t+erefore ,e +ae
undertaken t+is pro*ect.
it+ t+e deelopment of t+e soft,are0 ,e +ae defined some proactie
risks before tec+nical ,ork initiated. (+is part of documents includes t+e risk
mana&ement step.
91: Risk : Unrealistic Deadline
Proaility : !"#
$m%act : &igh
Descri%tion:
ecause of t+e s+ort duration and lar&e system t+ere is
Probability not to complete t+e pro*ect ,it+in deadline.
'ontingency Plan:
From t+e startin& day of t+e pro*ect0 ,e +ae ,orked +ard and
ery speedily to complete t+e pro*ect ,it+in deadline.
()* Risk : 'ustomer +ill change re,uirements
Proaility : "#
$m%act : &igh
Descri%tion:-
(+e customer ,ill c+an&e t+e requirements ery frequently as
t+e pro*ect be&ins. So0 ,e +ae probability no to complete t+e pro*ect as
t+e customer required.
'ontingency Plan:
From t+e past pro*ect0 ,e +ae kno,led&e about it. So ,e
interact ,it+ customer eery time ne, ,ork be&ins and conduct F(R ;
reise t+e ,ork as t+e customer requires.
2'
4.3 Risk nalysis
8/12/2019 4.System Planning
6/12
OnlineClassifiedPortal.com
(.* Risk : Develo%ers $ne/%erienced
Proaility : !"#
$m%act : &igh
Descri%tion:
ell deelopers of t+e soft,are are ineperienced of t+e .6$(
enironment. So0 t+ere is probability not to complete t+e pro*ect.
'ontingency Plan:
From t+e startin& day of t+e pro*ect0 ,e +ae ,orked +ard and
,e referred t+e books and also take t+e &uidance of t+e intelli&ent to
complete t+e pro*ect.
Technical Risk
01 2anguage Di33iculties
(+e familiarity ,it+ t+e front5end lan&ua&e is illustrated in t+is risk.
(+e reasons be+ind t+is risk are as follo,s-
(+e Pro*ect is mandatory built .6$( platform. Since t+is lan&ua&e is
ne, to t+e pro&rammers0 t+e pro&rammers mi&+t face somedifficulties.
s no one from t+e pro&rammers is partially familiar ,it+ t+is
platform0 some functionalities mi&+t not considered in
implementation or some functionalities mi&+t not ac+ieed
completely.
)1 S%eci3ication amiguity
(+e compleity of t+e requirements or inappropriate understandin& is
included in t+is risk. (+e reason be+ind t+is risk is as follo,s-
(+e specification of t+is pro*ects little profound and +ard to identify.
2)
8/12/2019 4.System Planning
7/12
OnlineClassifiedPortal.com
.1 Technology Unkno+n
(+e risk is concerned ,it+ t+e unrealied tec+nical conditions.
(+e reasons be+ind t+is risk are as follo,s-
(+e platform ,e s+ould be ,orkin& on is client5serer enironment0
,+ic+ is introduction to all of us.
(+e lack of conceptual implement on t+is kind of enironment is
ne,.
The 3ish one diagram de%icting risks o3 our %roject
So3t+are Risk 4anagement Plan
1 i&+li&+t risk5item status in mont+ly pro*ect reie,s.
Compare ,it+ preious mont+8s rankin& status
#
8/12/2019 4.System Planning
8/12
OnlineClassifiedPortal.com
(+e Online Classified Portal pro*ect requires frequent user interaction.
For t+at reason0 our first c+oice included t+e Prototype model. >o,eer0 ,e +ad
doubts about t+e prototype model0 and t+erefore ,e concluded to use t+e Spiral
"odel. (+e risk5based approac+ of t+e Spiral "odel is si&nificant to t+e
deelopment of t+is prototype0 and it ,ould also +elp select an establis+ed lifecycle
model or determine a different model constructed from arious p+ases of ot+erlifecycle models. fter re&ular reie,s0 ,e decided t+at t+e best approac+ ,as to use
a +ybrid model t+at ,ould implement t+e risk mana&ement of t+e spiral model alon&
,it+ t+e incremental model0 ,+ic+ is a miture of t+e prototype model and t+e linear
sequential model. Currently0 t+e pro*ect reoles around t,o establis+ed sta&es-
Requirement nalysis and Prototype %eelopment. boe fi&ure s+o,s t+e life
cycle for t+e deelopment process as ,ell as entry and eit criteria for t+e different
p+ases of t+e pro*ect.
2@
4.4 !ife Cycle "odel
8/12/2019 4.System Planning
9/12
OnlineClassifiedPortal.com
Project Planning: 2 to 3 A
Re,uirement Analysis: 17 to 2# A
Design: 27 to 2# A
'oding: 1# to 27 A
Testing 6 Deugging: 37 to 47 A
37
(estin& and
%ebu&&in&
nalysis 937547A:
nd
%esi&n
9475#7A:
Codin&
91#527 A:
4.# $ffort %istribution
8/12/2019 4.System Planning
10/12
OnlineClassifiedPortal.com
%eliery Confirmation
7ote:e prepare documentation of eery P+ase.
31
Re,uirements
Analysis
Re,uirements
Gathering
8stimation Scheduling
Testing
'oding 9
$ntegrating
4odule
Designing
4.' (ask %ependency %ia&ram
8/12/2019 4.System Planning
11/12
OnlineClassifiedPortal.com
ork reakdo+n Structure
8/12/2019 4.System Planning
12/12
OnlineClassifiedPortal.com
(ime line