$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014. City of Lake Elmo Request. $4 million dollars of state bonding funds to provide clean, potable water to homeowners in the I-94 corridor – 42% of project costs; - PowerPoint PPT Presentation
Citation preview
$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline
February 2014
City of Lake Elmo Request
$4 million dollars of state bonding funds to provide clean, potable water to homeowners
in the I-94 corridor – 42% of project costs;
The City of Lake Elmo will bond for $5.5 million
The project provides the correct pressure and clean hydraulics to serve taxpayers that are
currently on PFC adulterated wells and new growth mandated by the Met Council
Regulatory Squeeze
Lake Elmo Mandated Growth
Lake Elmo PFC Water Adulteration
30% of the Lake Elmo Water Aquifer is adulterated with PFCs and metabolites
Well #3 hovers at the health standard for acceptable PFC levels and has tested above in the last 18 months
Drilling a well on the I-94 Corridor may pull contaminated water across the ground water divide.
PFCs are persistent and bio-accumulativeMDH has reported PFCS MAY cause significant
health risks and suggested the transmission of untreated water from the northeast is prudent
PFCs
Interconnect to Mississippi
Interconnect to St. Croix
Re-a
ppro
pria
tion
of T
otal
Thank You for Your Consideration