4J BOND UPDATE: NORTH REGION PROGRAM MOVES
Eugene School Board Meeting • December 4, 2019
PLAN FOR TONIGHT
Overview: Roles & responsibilities Role of board, district, school
Background: Bond & program moves Bond development process Plan for construction and program moves
Next time (Dec. 18): Details & next steps School facility, operations and communication plans
ROLES & RESPONSIBILITIES
SCHOOL BOARD Policy & direction decisions such as: Direct superintendent to begin development of bond plan • Listen to community input • Approve final bond package • Refer bond to be placed on ballot • Authorize large expenditures and contracts
SUPERINTENDENT / DISTRICT TEAM System & structure decisions such as: Program locations • Building designs • Facility renovations • Staffing levels • School start and end times • Resources, guidance and supports
SCHOOL ADMINISTRATOR / SCHOOL TEAMOperational & instructional decisions such as: Staff placements • Room assignments • Class schedules • Lunch and recess schedules • Locker assignments • Student behavior expectations and education • School climate • Staff collaboration, etc.
BACKGROUND: BOND PLANNING
SPRING2017
SUMMER2017
FALL2017
WINTER2017–18
SPRING2018
SUMMER2018
FALL2018
WINTER2018–19
SPRING2019
SUMMER2019
FALL2019
WINTER2019–20
SPRING2020
SUMMER2020
Preliminarypre-bonddiscussionsw
ithboard
Preliminarypre-bondplanning
Continuedboarddiscussions
Communityengagem
ent&bondplanning
Meetingsw
ithprogramsthatw
ouldmove
Finalboarddecisionsonbondpackage
Bondapprovedby67%yesvote
Meetingsw
ithaffectedprograms
School-specificplanningprocessesMeetingsw
ithaffectedprograms
School-specificplanningprocesses
School-specificplanningprocesses
Programsm
oveandconstructionbegins
Preliminarypost-bondplanning
Meetingsw
ithaffectedprograms
Preliminarypost-bondplanning
Meetingsw
ithaffectedprograms
Meetingsw
ithaffectedprograms
TIMELINE OVERVIEW
School building ageMost of 4J’s schools are 50+ years old.• Nearly all were built during the Baby Boom. Some are
even older. • Some are approaching the end of their useful life. • Old buildings are inefficient / costly to heat and cool. • They require many repairs.
Older schools were designed for an earlier era. • They don’t support modern teaching and learning. • They don’t easily integrate modern technology that is critical today.• They were not designed with school security in mind. • Schools built today are more secure, more sustainable, and are designed differently because teaching and learning are different.
School building condition
FacilityAssessment:PercentageofReplacementCost
FromlegacyslidesFall2017
Adam
s(19
49)
Awbrey
Park(1
967)
Holt
(200
4)
CamasRidge(1
949)
Chávez(2
004)
Edgewoo
d(196
2)
Ediso
n(192
6)
Gilham
(196
6)
Howard(201
6)
McCornack
(196
8)
RiverR
d/Camino(2017)
Sprin
gCreek(196
4)
TwinOaks(
1958
)
Willa
gillespie
(1925–2012)
Buen
aVista(196
0)
Charlemagne
(195
9)
Corridor&YG
(196
1)
Family&Chine
se(1
963)
Arts&Tech
Academ
y(2017)
CalYou
ng(2
006)
Kelly(1
945)
Kenn
edy(196
5)
Madiso
n(200
5)
Mon
roe(196
5)
Roosevelt(
2016
)
Spen
cerB
utte(1
960)
Churchill(1
966)
NorthEugen
e(195
7)
Sheldo
n(196
3)
SouthEu
gene
(195
3)
FromlegacyslidesFall2017
Enrollment & capacity*Ad
ams(
47,667
sf)
Awbrey
Park(5
6,94
7sf)
Holt
(67,38
9sf)
CamasRidge(4
1,32
7sf)
Chávez(6
6,94
0sf)
Edgewoo
d(36,71
9sf)
Ediso
n(42,19
5sf)
Gilham
(82,56
5sf)
Howard(83,67
9sf)
McCornack
(54,93
3sf)
RiverR
d/Camino(62,188sf)
Sprin
gCreek(41,38
7sf)
TwinOaks(
35,198
sf)
Willagillespie(57,50
0sf)
Buen
aVista
(45,91
1sf)
Charlemagne
(40,83
7sf)
Corridor&YG(44,34
9sf)
Family&Chinese
(23,562sf)
*“Capacity”isnotamaximumenrollmentnumber.Itisabuildingusageestimatecalculatedbasedonfactorssuchasthenumberofclassrooms,targetnumberofstudentsperclassroomandaschedulingutilizationfactor.Methodologiesfordeterminingcapacityvarybetweendistrictsand alsobetweengradelevels.
Enrollment & capacity*
FromlegacyslidesFall2017
Arts&TechAcad(97,000sf)
CalYou
ng(90,34
1sf)
Kelly
(112
,356
sf)
Kenn
edy(89,05
7sf)
Madiso
n(86,95
3sf)
Mon
roe(87,40
1sf)
Roosevelt(
97,300
sf)
Spen
cerB
utte
(82,41
4sf)
Churchill
(245
,538
sf)
NorthEugen
e(214
,767
sf)
Sheldo
n(231
,748
sf)
SouthEu
gene
(310
,831
sf)
*“Capacity”isnotamaximumenrollmentnumber.Itisabuildingusageestimatecalculatedbasedonfactorssuchasthenumberofclassrooms,targetnumberofstudentsperclassroomandaschedulingutilizationfactor.Methodologiesfordeterminingcapacityvarybetweendistrictsand alsobetweengradelevels.
FromlegacyslidesFall2017
Previous bond investments: New school buildings
ChurchillRegionChávezElementarySchool– 2004Arts&TechnologyAcademy– 2017
SouthEugeneRegionRooseveltMiddleSchool– 2016
SheldonRegionCalYoungMiddleSchool– 2006HoltElementarySchool– 2004
NorthEugeneRegionMadisonMiddleSchool– 2005
HowardElementarySchool– 2016RiverRoadElementarySchool– 2017
School construction considered:
NewelementaryschoolatCoburg&KinneyLoop
EdisonElementaryNewschoolbuilding
WillardElementary
Installpre-fabfacility
CamasRidgeElementaryNewschoolbuilding
GilhamElementaryExpandcapacity
Considerpartialpreservation
Fullyrenovateoldschoolbuilding
NorthEugeneHighSchool NewschoolbuildingwillrequireCorridorandYujin Gakuen torelocate Phasedrenovation/reconstructioninplace
OVERVIEW: PROGRAM MOVES
School programs on the move:
CorridorConstructionofnewNEHSbuilding
MovetoNorthEugeneinsummer2020Futurelocation:KellyorNorthEugenesite
Yujin GakuenConstructionofnewNEHSbuildingMovetoKellyinsummer2020
Futurelocation:KellyorNorthEugenesite
ChineseImmersionGrowingprogram• Installedmodularin
summer2019• FuturelocationdecisionTBD
ECCOAlternativeHSProgramLCCleaseended• Constructedspaceatdistrictofficesiteinsummer2019
EdisonConstructionofnewbuilding
MovetoWillardinsummer2020Futurelocation:NewbuildingatEdisonsite
CamasRidgeConstructionofnewbuilding
MovetoWillardinsummer2022Futurelocation:NewbuildingatCamassite
Options considered include:
● NorthEugeneHighSchoolrenovationorphasedreconstructioninplace
● NewSheldonregionelementaryatKinneyLoop(templocationoption)
● RelocationoutsideofNorthregion
● Co-locationatotherNorthregionschools
● Co-locationofYGatKelly
● Co-locationofCorridoratNEHS
North Eugene High School site
CorridormovestoNEHS2020
YujinGakuenmovestoKelly2020
NEHSmovesto
newbuilding2023
NorthEugenebuilding
availableforfutureuse2023– 2024
● Staffandparentengagement2018–ongoing
● Programlocation withinbuilding
○ Twoconceptualspaceoptionsdiscussedinspring2019
○ Draftsiteplansdevelopedsummer2019
○ Optionsreviewed,staff &familyinputsoughtinfall2019
○ DecisioninearlyOctober2019
● Designprocessforprogramrelocation
○ Designcompleteearly2020
○ Bidding1stquarter2020
○ Constructionoversummer2020
● MovecoordinationforNorthclassroomsandCorridorstaff
Summer 2020: Corridor move-in
Corridor Elementary move to North Eugene High School
Corridor move to North Eugene: Space concepts
Option1
Option2
● Staffandparentengagement2018–ongoing
● Programlocationwithinbuilding
○ Twoconceptualspaceoptionsdiscussedinspring2019
○ Draftsiteplansdevelopedsummer2019
○ Optionsreviewed,staff&familyinputsoughtinfall2019
○ DecisioninearlyOctober2019
● Designprocessforprogramrelocation
○ Designcompleteearly2020
○ Bidding1stquarter2020
○ Constructionoversummer2020
● MovecoordinationforKellyclassroomsandYGstaff
Summer 2020: Yujin Gakuen move-in
Yujin Gakuen move to Kelly Middle School
Option1
Yujin Gakuen move to Kelly: Space conceptsOption2
LOOKING BACK & LOOKING AHEAD: STAKEHOLDER COMMUNICATION AND NEXT STEPS
MAY2018
SEPT2018
OCT2018
NOV2018
DEC2018
FEB2019
MAY2019
SEPT2019 WINTER–SPRING2020
SUMMER2020
BoardWorkSession
Programsm
oveandconstructionbegins
STAFF, PARENT & PUBLIC COMMUNICATION
YGParentMeeting
KellyParentEmail
YGStaffMtg
&Survey
KellyStaffMtg
&Survey
KellyStaffMeeting
YGStaffMeeting
YGParentMeeting
KellyParentMeeting
VotersApproveBondM
easure
JAN2019
KellyStaffMeeting
YGParentMeeting
YGStaffMeeting
KellyParentMeeting
BoardItemforInfo
YGTourofKelly
YGStaff&ParentM
tgs&Surveys
KellyStaff&ParentM
tgs&Surveys
OCT2019
YGStaff&ParentEm
ailKellyStaff&
ParentEmail
BoardItemforInfo
NOV2019
YG&KellyForm
ingTransitionTeam
s
DEC2019
TransitionTeamsBeginW
orkBoardW
orkSessions
ONGOING:Regularupdatestostaffandparentsatleastmonthlyinmeetingsandemailcommunicationsas
planningprogresses
BoardItemforInfo
BoardWorkSession
BoardItemforInfo
STANDBY:Planning&designforYG&Corridor
programmovestobegininfall2019,
schoolsmovein2020
ONGOING:Regularupdatestoschoolboardasplanningprogresses
REFOCUS:Localoptionlevyrenewalandelementaryschool
bondrebuildplanning
NEXT STEPS — Short-term
• Transitionplanningwithschoolstaffandparentleadership
• Spaceplanningandbuildingrenovationdesignwitharchitects
• Preparesuitablespace• Playground• Right-sizedfacilities• Separateentryfordropoffandpickup• Classroomandotherspacerenovations
• Moveinsummer2020
NEXT STEPS — Long-term
• Visionforfutureofeachschool• Planforfutureschoollocation• Kelly&NorthEugenebuildingsavailable
• Plan,renovate,andmove
December 18 Work SessionDiscussfacility&operationsplanningincluding:• Buildinglogistics• Classroomcounts
• Currentandprojectedenrollment
• Otherfrequentlyaskedquestions
Coming next: Schools
Kelly • Staffmeeting12/4(today)• Sitecouncil12/11(combined)• Transitionteam12/12• Parentmeeting12/17
Yujin Gakuen• Sitecouncil12/11(combined)• Transitionteam12/12• Parentmeeting12/12• Staffmeeting12/13• Principalcoffee12/17
Coming next: Board