    Cairn Energy India PTY Ltd

    BSPL Project - Barmer to Salaya Pipeline

    CALCULATION

    Allowable Bend Radius 52893.0324" Oil Pipeline 03-P-2-009

    1 of 4

    DOCUMENT No OFFICE CODE PROJECT No AREA DIS TYPE NUMBER05 5893 03 P 2 009

    01 21.05.07 Issued For IDC PD JC PD BS CEIL

    REV DATE DESCRIPTION BY CHK ENG PM Client

    PROJECT NO.

    REF

    No OF SHEETS

  • 8/10/2019 49460466 Bending Stress Calculations

    2/4

    Allowable Elastic Bend Radius Calculation

    From simple bending theory:

    R

    Note:This calculation considers preliminary principal direction stressonly. In the presence of shear or torsion, FEA will be required.

    External diameter, D, ( mm ) 609.6

    Wall thickness, T, ( mm ) 11.1

    Corrosion allowance, ca, ( mm ) 0

    Milling tolerance, m, ( % ) 5

    Internal pressure, P, ( Barg ) 90

    Specified minimum yield stress, SMYS, ( N/mm 2 ) 448

    Poisson's ratio, p_r, ( - ) 0.3

    Young's modulus, E, ( N/mm 2 ) 206000

    Temperature range, DT, ( Degree C ) 75

    Expansion rate, , ( m/m/C) 0.0000117

    Combined stress analysis case: Von Mises equivalent stress

    Design case Installation Unrestrained Restrained

    Safety factor - must be less than or equal to 1, ( - ) 1 0.9 0.9

    Allowable stress, allow, ( N/mm2 ) 448.00 403.20 403.20

    Hoop stress, ( N/mm 2 ) - 260.14 260.14

    Resultant longitudinal stress, ( N/mm 2 ) - 130.07 -102.72

    Sum of Hoop and Longitudinal 390.21 157.42

    Tresca equivalent combined stress, ( N/mm 2 ) - 260.14 362.86

    Equiv = Von Mises combined stress, ( N/mm 2 ) - 225.29 323.96

    Ratio of Equivalent to SMYS 0.50 0.72

    Allowable bending stress, ( N/mm 2 ) 448.00 177.91 79.24

    Allowable bend radius, R, ( m ) 140.15 352.92 792.36

    21 Revised to Suit 800m Bending Radius 19/05/2007 P Doc Jat Chohan P Doc0 Issued for internal check 01/05/06 P Doc GM P Doc

    Rev Revisions Date Drawn Chkd Appd

    Cairn Energy Calculated Bend Radius 05 2893 03 P 2 009 (001)

    allow

    ED R

    2

    =

    03-P-2-009 Rev 01 - 24 inch Crude Oil Allowable Bend Radius HDD Pipelay.xls page 2 21/05/2007 14:04

  • 8/10/2019 49460466 Bending Stress Calculations

    3/4

    Horizontal Directional Drill Calculation

    Pipe Material Characteristics

    R Mat. Q (Kg/m3) E (N/mm2)Polycarb 1200 24100

    AL 2690 75000

    CS 7830 206000

    SS 7987 195000

    Titanium 4500 110000Monel 8800 195000

    Copper 8910 124000

    Pulling stress, from Force/Area From simple bending theory:

    External diameter, D, ( mm ) 609.6

    Wall thickness, T, ( mm ) 11.1

    Friction Factor in soil, f, ( - ) 0.5

    Length of pull for crossing, L pull , ( m ) 600

    Pipe material density, ( kg/m 3 ) 7850

    Specified minimum yield stress, SMYS, ( N/mm 2 ) 448

    Youngs modulus, E, ( N/mm 2 ) 206000

    Radius of pipe, r, ( mm ) 304.8

    Uncorroded weight of pipe, w tot, ( N/mm ) 1.61

    Cross sectional area of pipe, A, ( mm2 ) 20870.70

    Pulling stress, pull , ( N/mm2 ) 23.10

    Allowable bend radius stress, allow =( 0.9 SMYS ) - pull, ( N/mm2 ) 380.10

    Allowable bend radius, R, ( m ) 165.19

    21 Revised to 800m allowable bend radius 19/05/2007 P Doc Jat Chohan P Doc0 Issued for internal check 01/05/2007 P Doc GM P Doc

    Rev Revisions Date Drawn Chkd Appd

    Cairn Energy Horizontal Directional Drill 05 2893 03 P 2 009 (002)

    allow

    Er R

    =

    A

    L fw pu llto t pu ll

    =

    03-P-2-009 Rev 01 - 24 inch Crude Oil Allowable Bend Radius HDD Pipelay.xls HDD page 3 21/05/2007 14:04

  • 8/10/2019 49460466 Bending Stress Calculations

    4/4

    Laying analysis Calculation

    Top of Trench

    Laying CrainR Pipeline

    Trenchfloor

    From simple bending theory:Note:This calculation considers preliminaryprincipal direction stress only. In theprescence of shear or torsion, FEA will be required.

    External diameter, D, ( mm ) 609.6

    Wall thickness, T, ( mm ) 11.1

    Corrosion allowance, ca, ( mm ) 0

    Milling tolerance, m, ( % ) 5

    Specified minimum yield stress, SMYS, ( N/mm 2 ) 448

    Poissons ratio, p_r, ( - ) 0.3

    Youngs modulus, E, ( N/mm 2 ) 206000

    Moment of inertia I, ( mm4 ) 934812877.3

    Imposed load, (N) 125000

    CSA, (mm 2) 20870.70

    Safety factor - must be less than or equal to 1, ( - ) 1

    Allowable stress, allow, ( N/mm2 ) 448.00

    Resultant longitudinal stress, ( N/mm2

    ) 5.99

    Allowable bending stress, ( N/mm 2 ) 442.01

    Allowable bend radius, R, ( m ) 142.05

    Bending moment, ( Nm ) 1355634

    21 Revised to accommodate 800m allowable bend radius 19/05/2007 P Doc Jat Chohan P Doc0 Issue for Internal Check 01/05/07 P Doc GM P Doc

    Rev Revisions Date Drawn Chkd Appd

    Cairn Energy Construction Bend Stress 05 2893 03 P 2 009 (003)

    allow

    ED R

    2=

    R

    EI M =