)\ ,.00

----- '\, ,r' . r ----­

I.

IfONOKOWAI - 60203

ILAHAINA - tlO~J

PROJECT AREA

CJ 0

(,

,r---' '''-';'''0 .. _

HYDflCLOGIC l!:'1T3 - I!;LAND OF MA:JI

T

4829-04

/ /~./..-..,,-/

( (---­/

(/7 /~ / \ \ /' - '\ ... / ,0--' ~ '\

" "-

" "­"-

"­ , " "

II/Irelt

c CHECKLIST

~l Construction Permit ~ump Installation Permit

Water Use Permit Required Also ( - ti8ZCf-OLf) Well Name & Number MacJa fA ?OW{,\r r I(yy:.+ M -17 Island ~ APPlicant&1aili ~,J'(lG Co~J If~. Landowner_ .... Q'-~ _______ _ Consultant ----------------Date application received •••••••••••••••••••••••••

-~+r~--------

v Date acknowledged receipt/request more info ••••••• -~~-+~------

v/Datefilingfeedeposited ••••••••••••••••••••••••• -~~~~------

Application sent to following,;1 L B Date sent ~j:: Dr". rJdl'\j wll1t.r- r4Y1c.hg

Dept. of Health " L ?Ii> T-• •• 11 ~+e.J.,J.A.Tq- Br..v1Lh 'l. Q

v Offl.ce of HaWal.l.anArfal.rs 'l/) I

V Dept. of Hawaiian Home Lands

~' state Historic Preservation Div.

/Sierra Club Legal Defense Fund

~"~~¥ V' Maui Dept. of Water Supply

y

a e a ply ~~I:to,_wo~ ~B"#2~TOah\l) ~k-lr1s'~ ... .{K61~~pi)

Erio HiraRs/ L¥aRR MieQRs v VIV. OF AGu.At' C. US. (, <JI;ol&;'~

Comments received

v HlSfQ(l.lC. f'~fR.vltlt()N VIVI5/()N J IT Date agenda du~ •••••••••••••••••••••••.••••••••.•• ______________ __

Date submittal due ..............•••............... ______________ __

Date submittal sent to applicant ••••••••••••••••••• _______ _

Date application __ approved OR __ disapproved •••• ______________ __

Date applicant notified of decision ••••••••••••••• ----------------

Remarks: -----------------------------------------------~

D.-v Fo:::> ~ I)

ATLANTA, GA BOSTON, MA CHATTANOOGA, TN CHERRY HILL, NJ DENVER,cO HOUSTON, TX NEW YORK, NY WASHINGTON, DC MIAMI, FL PLEASANTON, CA

State of Hawaii

C OL Stone & Webster

Department of Land & Natural Resources Commission on Water Resource Management P.O. Box 621 Honolulu, HI 96809

ATTN: Charley Ice

WELL COMPLETION REPORT MAALAEA POWER PLANT WELLS WELL NO. 4829-04

FOUNDED 1889

ABU DHABI, UAE ALKHOBAR,SAUDIARABIA BANGKOK, THAILAND DAMMAM, SAUDI ARABIA KUALA LUMPUR, MALAYSIA KUWAIT CITY, KUWAIT MILTON KEYNES, ENGLAND JAKARTA, INDONESIA SEOUL,KOREA TORONTO, CANADA

October 18, 1996 J.O. No. 03366.05

We submit the enclosed permanent pump installation report for State Well No. 4829-04, Unit 17 Supply Well located at Maalaea Power Plant, Tax Map Key 3-8-05:25.

If you have any questions regarding this matter please call me at 242-5582.

Your cooperation has been greatly appreciated.

~~~C2 L.D. MCDaniel Site Construction Manager

CC: R.Jung-MECO M.Yuen-HECO

Stone & Webster Engineering Corporation Maalaea Project Office

Kihei Hawaii Tel: 808-242-5582 Fax: 808-242-8021

Address all correspondence to P.O. Box 1872, Kihei, Hawaii 96753-1872

(" '- ")

'" ~ () ·4 N

1) .., ,

(Check Appropriate Box)

Oate of Hawaii 0 COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

(OllJ'/1{t) WELL COMPLETION REPORT 3120196 WCR Form

o Well Construction )t (Permanent) Pump Installation Instructions: Please print or type and submit completed report within 30 days after wen completion to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. An as-built drawing of the weB and chemical analysis should also be submitted. For assistance call the Commission Regulation Branch at 587-()225, or 1-800-468-4644 Extension 70225.

1. State Well No.: 4 829 - 0 4 Well Name: Un i t 1 7 S 11 D D l'y We 1 1 Island:--IM.:LJa;L.II.L.1 I....i ___ _

2. Location/Address: M a a 1 a e a Power pIa n t Tax Map Key: 3 - 8 - 05 . 25

PART)< •••• ··.::.·.:.'.· .•.. : ..• :.:·.·:: .•.. ' .... · ..••.••. : .• : ....•.... '.'.: .... : ....• :.: .... : ...••... ' .. , .. : • .• ·.·W .•• '.:· .• ·.:.:.:· .• ·.E.··.·.··.LL .• •• .••. •.•.•• •. C .•. :.:·.O.·. N. S.··:··.T.··.·.R.·:·.':.U.····.'·.··:.O.·;.:·.··.T.:.·:.··.I.··.b.: •. ::.··:.N.··.:.·.· ... :.·;.·· •. ··.·R.·;.·:· .• ··.·EPO.··R.····:T.··.:.···.· •. : ...... • •• ;.t.·:.·····:·:.;::;·L:,.;:; .•.•..•.•......•.•...•..•..•.•.•...•.•.•......•.• 11 > ............•.• )}

3. Drilling Company: ___________________ _ 4. Name of driller who performed work: _____________ _ 5. Type of rig/construction: ______ -:-__________ _ 6. Date(s) Well Construction and pump tests (if any) completed: ____ _ 7. GROUND ELEVATION (referenced to mean sea level, msl): ft.

Well Bench Mark (descriptionllocation): Elevation(msl): ft. 8. DRILLER'S LOG: Please attach geologic log (if available or if required by permit)

Depths (ft.) Rock Description, Water Level, Dates, etc. Depths (ft.) Rock Description, Water Level, Dates, etc.

_to__ _____________ __to _____________ _ __ to _________ ~ __ --- __ to _______________

1 (If more space is needed, continue on back.)

9. Total depth of well below ground: ft. 10. Hole size: inch dia. from ft. to _____ ft. below ground

_____ inch dia. from ft. to fl below ground _____ inch dia. from ft. to ~- ~. belo~~ound

11. Casing installed: in. 1.0. x in. wall solid section to ft. below5.W0und ··.~.iJ ____ in. 1.0. x in. wall perforated section to ft;.;below~toundn

Casing MateriaVSlot Size: ' Nt ) - .,

Grouted from ft. below ground to ft. below ground Gravel packed from ft. below ground to ft. below gibund

12. Annulus:

.: ...... 13. Initial water level: ft. below ground. Date and time of measurement: _....;;,.._--';"' __ _ 14. Initial chloride: ppm Date and time of sampling: _~.;..:....._.' _--IoQ ___ _

15. Initial temperature: OF Date and time of measurement -7-----:------16. PUMPING TESTS: Reference Point (R.P.) used: • which elevation is ft.

(1) Step-Drawdown Test Date (2) long-term Aquifer Test Date ___ _ Start water level ft. below R.P. Start water level _____ ft .. below R.P. End water level ft. below R.P. End water level _____ ft .. below R.P.

17. Aquifer Pump Test Procedures data & graphs (1/9/96 LTAT Form) attached? _ Yes _ No 18. As-built drawings attached attached? _ Yes _ No 19. Other remarks/comments: (On back o( this form)

Well Drilling Contractor (print) ___________ C-57 Lie. No. ___________ _

Signature Date ___________ _

Surveyor (print)

Signature

Applicant (print)

Signature

Lie. No. _______________ _

Date ___________ _

Date

3120196 WCR Form

I 20. Pump Installation Company: H 0 \01 a rc;1 Eng joe e r s & Con s t r U C. tor IS, Ltd. 21. Name of person perfonning work: V 1 nee Lan 0 s a 22. Date Pump Installation Completed: -,,-1 ,,;;,,0.:.,/...;;.0..;,4..:.../...;;.9..,;;.6 ________ -

23. PUMP INSTALLATION: Pump Type, Make, Serial No.: Sub mer sib 1 e, J 0 h n s ton Capacity: 2 0 0 gpm

Motor type, H.Pi; Voltage, rpm: 3 - p bas e. 20 H P, 4 6 0 V , 3 5 0 0 RPM Depth of Pump Intake Setting 60ft. below F 0 u n d a t i owhich elevation is 1 4 • 88ft Depth to bottom of air1ine N A ft. below , which elevation is ft Pumping Head is 2 25ft. Type of flow meter: 0 r i fie e which measures in . G PM

24. As-built drawings attached attached? _ Yes ..! No 25. Other remarks/comments: (See below)

Pump Installation co~tractor rint) How a rd Engr. & Con s te-57 Uc. No. 1t/c.tSGJ' C 57A /I!» ~- /1 LTD. 9/26/96 Signature . r y/ ""'0'-- Date ____________ _

Applicant (print)

Signature

8.{cont'd) DRILLER'S LOG (cont'd):

Water Level Depth (ft.) Rock Description, Remar1<s, Dates (ft.) ___ to __________________________ __ ____ w ____ __________________ __ ____ w ___ ___________________ __ ____ to ________________________ __ ___ w ____ _____________________ __ ____ w __________________________ __ ____ w __________________________ __ ____ w __________________________ __

Date _l_O-,-I_' B~/_q_Ct~ ___ _

Water Level Depth (ft.) Rock Description, Remarb. Dates (ft.) ____ w ____ ___________ _ __ __ w ____ ___________ _ __ __ w _______________ _ __ __ w ____ ______________________ __

to -- -- ------------------to -- -- ---------------to -- -- --------------------to -- -- ------------------

/

BENJAMIN J, CAYETANO GOVERNOR OF HAWAII

0, o

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT P. O. BOX 621

Mr. L.D. McDaniel Maui Electric Company

HONOLULU, HAWAII 96809

SEP 30 1996

210 West Kameharneha Avenue P.O. Box 398 Kahului, Hawaii 96732

Dear Mr. McDaniel:

Pump Installation Maalaea Power Plant Well M-17

(Well No. 4829-04)

MICHAEL D. WILSON CHAIRPERSON

ROBERT G. GIRAlD DAVID A. NOBRIGA

LAWRENCE H. MilKE RICHARD H. COX

HERBERT M. RICHARDS. JR.

RAE M. LOUI, P.E. OEP\/TY

We have received the well completion report for this well, and accept it as com' , ~te. The pump test results support installation of the permitted 200 gpm pump.

Enclosed is a copy of our most recent Well Completion Form for your use. Upon completion of pump installation, please complete Part II, side 2 of the form in accordance with the conditions of your permit. Please note that this report should be submitted within 30 days of the installation of the pump.

If you have any questions, please call Charley Ice at 587-0251 or toll-free at 984-2400, extension 70251.

CI:ss Attachment

Sincerely,

RAE M. LOUI Deputy Director

ATLANTA, GA BOSTON, MA CHATTANOOGA, TN CHERRY HILL, NJ DENVER, CO HOUSTON, TX NEW YORK, NY WASHINGTON, DC

MIAMI, FL PLEASANTON,CA

State of Hawaii

o 0 Stone & Webster

Department of Land & Natural Resources Commission on Water Resource Management P.O. Box 621 Honolulu, HI 96809

ATT: Charley Ice

WELL COMPLETION REPORT MAALAEA POWER PLANT WELLS WELL NO. 4829-04

FOUNDED 1889

ABU DHABI, UAE AL KHOBAR, SAUDI ARABIA BANGKOK, THAILAND DAMMAM, SAUDI ARABIA KUALA LUMPUR, MALAYSIA KUWAIT CITY, KUWAIT MILTON KEYNES, ENGLAND JAKARTA, INDONESIA SEOUL, KOREA TORONTO,CANADA

September 5 1996 J.q~s=No. ~66.05

r1 ::0 -"0 in

J en <.;;..,

..

We submit the enclosed data to supplement report for well permit no. 4829-04. This believe will complete the application.

the well completion additional data, we

Enclosed are the following documents as required by the permit:

,/Certified elevation

lAs-built sectional drawing of the well

JPlot plan and map of well location

JComplete pumping record and water quality data

We apologize that this information was excluded with the original submittal.

If you have any questions regarding this matter please call me at 242-5582.

Your cooperation is greatly appreciated.

~~~=-_s;;? L.D. McDaniel Site Construction Manager

CC: R.Jung-MECO M.Yuen-HECO

Stone & Webster Engineering Corporation Maalaea Project Office

Kihei Hawaii Tel: 808·242·5582 Fax: 808·242·8021

Address all correspondence to P.O. Box 1872, Kihei, Hawaii 96753-1872

.. o

WATER QUALITY ANALYSIS

PERMIT No. 4829-04

- 9-04,-1 996 1 1 : 34.AI'1 FROM S WEe DENVER 303 741 7040

r \

,.... I' \ .

Maw EIec:tric Company, IDe. Maalaea Unit 17 Supply Well

Parameter mg/I Total Dissolved Solids 1660 Chloride 640 Pluoride 0.156 Phosphorus 0.135 SUica (Si) 18.9 Silica (as Si~) 49.2 Sulfate 106 Alkalinity (as Cac~) 183 Aluminum '<0.1 Barium <0.1 Antimony <0.1 Be!yUium <0.005 Cadmium <0.005

Total Diss. Solids * 1000 Chloride * 306 Total Diss. Solids ** 1630 Chloride .... 654

Data from Brewer Environmental Industries. Inc. - ADalyses dated July 31, 1996 and August 5, 1996

Parameter ~ Calcium 37.1 Iron <0.02 Magnesium 47.4 Molybdenum <0.03 Nickel <0.03 Potassium 24.S Sodium 502 Silver <0.01 Vanadium <O.OS Zinc 0.02 AIsenic <0.003 Lead <0.002 Selenium <OJ)03 Chromium <0.01 Cobalt <0.02 Copper <0.02 Strontium 0.4 Nitrate 4.86 Nitrite <0.01

.. Sample taken at ~e beginning of the pump test. ** Sample taken mid·w~y through the pump test.

/

P.2

9-04-1996 11: 35AM FROM S WEe DENVER 303 741 7040

~

pace Analytical

o Pace AnalytiCal Servi:es. tie. 14SS McOoweII BIVI1. Hortt. Stile D

PeIaIwna. CA 948S4

f Tel: 707·792·1865

Fax: 701·792-0342

\

August os, 1996

Mr. Charles Williams SCOM & Webster Eng. Corp. P.O. Box 5406 Denver, CO 80217

RE: PACE Project Number: 706145 r. CUent Project~: Stone & Webster Eng. Corp . . \ .

Dear Mr. Williams:

~osed are the results of analyses for sample(s) received on July 20, 1996. If you have any questions concerning this report, please feel free to cxmtact me.

Sincerely,

.,( "" David A. Pichette ~ Project Manager

BDclosures

REPORT OF LABORATORY ANALYSIS This ~ Shall net be IfJI)I'CiIduced except in full.

9-04-1 996 1 1 : 3SA/v1

• • FRQv1 S W

,'" '-

E C DENVER 303 741 7040 P.4

o pace Analytical'

Pace AnIJybI SeIviaes. Inc. 1~ McDowell BM1 Nor1h, SuIte D

Petaluma. CA 94954

stone & uebster lng. Corp. P.D. loll 5406 1IerMr. to 80217

Attn: Mr. CUrl., "illi .. f'hane: (303)741 ·768T

fii SMple liD: liiiiOO8O

PAC( Project lUllber: 706145

Tel: 707·792·1865 Fell: 707·792.()3.42

Client Pro;cet ID: Stane .. Webster Ens. eorp.

Date Col'evled; 07/'7/96 ClI.n: ... ,. 10: "17 SiUPPLY IELL·ST~T TOIIC' Date Rec:eiYed: 07/20~

P .. _ers Results unttt Nl ANlY2ed Method jnatyst CA. FaotnotH ---···.···. ______________ 4.* ••• __ ---- .. --.. - ._._. __ .. -.. __ ..... . ... _ ... ••.••............. - .. -_ ...... ........ "' .. _ . • eMIIistry

Totel Dfaaolved Sol ids Tat.1 Dissolved solids '000 IIIIL

Cblorlde(Mercuric _itrate) 5 D7/Z4196 EPA 160.1 IJI)

Chlorfde J06 ..,L 5 orml96 EPA 325.3 UD

: ..

r' . \

REPORT OF LABORATORY ANALYSIS ThIe AiIpCIft shaI not bit r.prOduced. except in full.

9-e4-1996 11 :36AM . . FRCJv1 S WEe DENVER 303 741 7040

.... ""'" '-'

P.s

pace Analytical Pact AnaIytic:at SeM:les. n:.

1455 MtDoweII Blvd. North. Suitt D PebIuma. CA 94954

P4CE ~l. No: 7U669098

DAYE: 08105196 'AGI!: 2

PACE Projeet NUIIba,.: 706145 Clieot proJeet ID: StClfle & IIebiIt"' Et1t. Corp.

O.le Collected: 07/'719~ CLient Sample 10: "'7 SUPPLY Wll-MID TlI5/1:1 . Date Rac.iWld: t1112OJ96

P.r_ten! Results lfttu Pll AMtYJ:ed ... thod .,.lyat ~ Footnotes . --.---------... ---------.. ~ ..... .. _-_ ... _- .......... . .......... . __ ._._. .. __ ....... _------- ._----_ ... --------.-Uat CI.istry

TotDl Di.solved solids toUl DIMolved Colf_ '630 1118/l S 07124196 EPA 160.1 LID

Chtoride(Mc~tc IltrateJ attorlde 6S4 ."l 5 at/'l9196 EPA 125.3 UD

r

.: ...

.f .. r·· \

REPORT OF LABORATORY ANALYSIS ThIs Mpart stall not be .. produced. except in fuI~

• ...-.. ............. '.. • • t' ..... "' ••• __

9-04-1996 11 :36AM FRCJv1 S WEe DENVER 303 741 7040 P.6

C o pace Analytical

Pact An~ytA SeMces. IrK:. 1455 McDowell Blvd. North. Suite 0

Petaluma. CA 94954 "All: 707-792·1865

Fax: 707-792-0342 r Ir \ ..

70669106

01\1£ a 08/05/96 PAGE: 3

PACE Projeet .. ...mer: 706145 Client Projcgt If): StOlle" v.b$tfl' Ina. cerp.

oete collected: 0'118196 PACE SaqJle 1Ir;a; Client Supte Uh .17 SUPPLY ~LL.TDSICL/F/T.PKO Date ~iwd, D7/2O/96

hr.neter. _4 ..... __ •••••• _ •••• ___ ... ___ •••••

Wet a.i.try Taca' Di.solved SOll~

Tota' DfaaolWid SOUds Cblorfde(MerCUric Nitrate)

Chlott. nUl:N'fde "uor;'. PhOaphorus, Total

I'hosi;ahorus

r \.

~ I·

'..

""lIlti unit$ PAL -..lyzecl Method ........... ... _-_ ... _.------_ . ._._---- --.. ~.-.-.---.. ---. 1660 l1li/1. 5 OTJ24t96 EPA 160.1

640 IIIIIIL , OT/29(96 IPA J2S.)

0.156 IIW/L 0.1 08I0Z196 EPA ,40.2

O.1~ IIIDIL 0.05 08I0Z196 EPA 365.2

REPORT OF LABORATORY ANALYSIS _ ~~sh:IIIlKIt.,. ~~ ~in.U.

AMlY$1: CASt Foatnot:a ___ a_a_ea. . ..........

UID

LIlt»

ALI: 16914 ... -1.

Nfl 772'5·14·0

f ,.

5re4-1996 11 :37AM FROM S WEe DENVER 303 741 7040

".. ., eace Analytical

P.7

Pace ~yticaI Servioes. R. 1455 McDowell Blvd. North. Suite D

Petaluma. CA 94954 'M 707·792·18M

Falc 70T·792-0342

DATE: 08/05196 p~: ,

PACE Project MI.IIIber': 706145 r;ltenc 'roJ~'t ,D: St_ • W"b:Jtcr If1If. Cotp.

7ii691~ Date COllected: WI1W96 PAC! SlIIIple No: t:l ftllt Saap\. ID: .. ,7 IUlPLY &lELL/S04/SIC12/11lI,.1. Oat. Rcnfvcd; ,"f2Dm

leeules Units PiL Anal yz.cd Method -.......... _-_._-_ .. __ .......... _-_... .. __ ... _-- ..... ---.. - -........... ............... ._-_ .. _ .. _ .......... . Metela

.... ls. JCP ISUaan UWoo Date Dlgestm

Vet Ch."ry IUtfate, furbtdl .. trie

Sulfate 106 .lbU"f ty. • fc.rbanate

AllullfnttV.flfc"""te (C;.ca;sJ 313

r: '.

L/l/L 500

taiL 50

eoIl ,

{1'f130196 07/lD/96

0BJ01/96

07/30/96

-..

~PA 6010

EPA m.4

EPA 310.1

REPORT OF LABORATORY ANALYSIS 1lW ~1IhIII not " reprodI,icIId. uc.pt in full,

..... -.... . .... --_ ..

SMa 7440-21-3

AU:

LMD

,SHiM-1996 11 :37AM . . FROvISWEC

""..., \w'-

DENVER 303 741 7040 P.B

o eaee Analytical

II

Paca Analytical Servlce9. InC. 1455 UcDcMel Blvd. North. Sule D

Felakma. CA 94954

PA~TeR fOOTNOTes

lID ~ Oetected Me lot C.lcul.,c Pll PACE Reporting lt~it

"..... , -,

1'-'. t __ _

Tel: 707·792·1865 Fax: 701-792-0342

DATE: Da!f15/96 p.= 5

PACE PruJeot NI.IIIIIar: 706145 Client Projeot Uh $tOM .. webster Eng. corp.

I

REPORT OF LABORATORY ANALYSIS Thil report IIf1aJI lilt till nIpRXIIxiad. ~ in full.

9-04-1996 11 :38AM FROM S WEe DENVER 303 741 7040

o Pa~e Analytical

r \ ..

CIUAlITT COIITROL DAfA

o P.s

Pace Analytical SeMces- InC. 1455 MtOoweII8tvc:1. North. Suite D

Petalurnil. eta. 94954 vsq

1W: 707·792.1865 Fax: 707.792-0342

Stane • VcbItcr Ins. C;arp. P .D. BoX 5406

~c;E Pro'eGt .Llltlcr: 706145 C;l tent Pl"'Oj.et ,D: Stene & webster ent. Corp.

Oermn-. c;o 80211

Attn: "I". Charlea Wit IiBIIS Phone; (303)74"-'687

CIt: Batch MeU1od: IPA 365.2 IC .. tch 10: '6050 an.lY*t, ... tltod: EPA 365.2 ~i.ted PACe S-.:Ra: 70&69106

Arwtysil DescripUOI'I' PbDlphorus, Total

"'HOD IUM": 706717z7 AUOCtated PACE .aqKe.:

Method Il ..

hr_te,. UnitsllauL t PRL FoDtnot .. ... _-_ .... __ ....... __ .... _---. . ....... _- ... _---.-. . .... __ ... . ..... __ .. ..,L G.0810 0.05

Ilatr1x spike $pike!! Spike

r c SP11Ii= 106689Z6

'a eel" Ufttts 7D662O'O tone. Ratllt X ~ Footnotes .----------------............. ---------- ~ .. ___ .. _ ..... 4_. ___ .. __ ....... _ .~~-------D.477

UlCltAYOItY COiITIt01. SAMPIZ , !.tSD; 7066&900 70668918 tplke LC:S

, ..... tel" ~tb Cone. Result .. _-..................•.•. __ .. ---------- --.. _-- ----------IIIJ/L 1 0.904

UllaRATORT COITRDL SAMPt.£ " "(;$I): 70678768 10678776 Spfte LCS

'-r .. ter unit. Cane. lault •••••••······ •• ·······_ •• 4.... . ........ ~ 1 0 ••

1.5 102

Splice LCsD IDee lesult

---------- ~~ .. ------ --....... . 99 0.976

Spfke LCSD I lee Result

91 .0.962 #'

98 1

Spike IILf) X Rec RPO FootI'IOtn

96 Z

REPORT OF LABORATORY ANALYSIS Thit iaoort shaD nat be JlllXDduc:ed. IIXCIICIt in III.

/

9-04-1996 11 :38AM FROM S WEe DENVER 303 741 7040 . , " ..... \ ~

pace, Analytj'cal

r· , .. IilW.ITJ IDTRDL DATA

o Pace AnalytIcal s.~. Ine. 1455 McDowall BIYd. fbth. SUiIe 0

PeaNna. CA 94954

Tel: 707-792-UIG5 Fax: 707·N2.()342

Dl\U; 08JCJ:i196 '-AGE: 7

PAC:E 'roj~t .udzr. 706145 Cl lent Project Ills St_ & Webster Ing. tGrp.

~u; DUP1.ICATE: '1066a934

Paraaeter lInit, D"".

7066ZDtO Rti$I,Il t IPD Footnotes -.. _--_ .... --------.... __ ..... ~~ .. ---... . ..... -... .......... . ........ . Phasphona IVI" 0.477 0.463 ;,

r'

./

REPORT OF LABORATORY ANALYSIS TtlI.1IIPOl't "*' not .. ..-odUClld. tIlIC8I)t in 1\11,

9-04-1996 11 :39AM . . FRCJvI S WEe DENVER 303 74.1 704.0

~ t""I

P. 11

Pace Analytical Pace Analyticaf 5eNICeS.1nc.

14S5 McDoweIIBlw!. North. Suite 0 PeIaUna, CA 949S4

r, .' '\,

Stene , Wlbal:.r Eng. Corp. P.O. Bal 5406 Oenwwr. CO 102'7

Attn: Mr. Charl •• WilLIam. lIbont: (5031141-1687

DC latch Jlh 16D95 AMlpia IIcthocl: IPA 160.1 Auaciated PAee s.pt .. 1

.. f"'HQI) ILAI&: 16670633 A$SOOi.'Ced PACE laniptes;

p .... e.,. -.......... -... ~-.. --.. --~ .. --Tatal OiNCILved Sol Ids

r DLlPLIcAiit 7067064,

.er ••••••••••• __ ••• * •• _-----••• _. Tgt.' DfaaoLved SolidS

.r. \

7IM908o

~1:S ........ _--..,L

Units -.-.-.. -~.-""L

ClJALITY alNTRCII.. DATA

Tel: 707·792·1885 Fax: 707·792-0342

DA,Tf; 08105196 PA;,CE: a

PACE Prgject IYIIbor: ?V614S Client Project IDl Stone' webster h. Corp.

QC '.1:= Method: epA 160.1 Date of latch: 01/15/96 Analysis DescriptlClh: Total Dissolved Solids ~ 711669'~

~909a 7D669'06 Method 'l_ 'auLt PRl -------.. -.. -.. _-------

II) 5

01.4). 706701St RMUlt ........... ----------Z4ZO 2450

faDtnotes ..-.. ---_.

IPD

1

-.

Footnota .. __ ......

• E

I

REPORT OF LABORATORY ANALYSIS Tbia I1IpQIt IhaII not be reproduc:ecI. oxaDpt in full,

9-04.-1 996 11: 39AM FROM S WEe DENVER 303 74.1 704.0

o pace ·AnaJytical

CIlALJTr CDlfTROl DATA

P.12

Pace Ana1ytica15eNileS. In:. 1455 t.1cDawe118Nd. Nonh. SUI. 0

Petal~. CA 94954

Tel: 707·792-1865 F~ 101~792-0342

Stanc • Vater lng. corp. P..G, Box 5'06

PAtE projeet Nud:ler: 706145 CU~t 'rojcc~ lP: St~ & llebster Ene, Corp.

D~. co 80217

Attn: Mr. a.arles WHU ... ,.,.., (303)141·1687

QC latch 10: 16116 ... lysfs lIet1tod: EPA 325.3 AMOciated PAC!I; ... ~c.;

IIE11Q) 8u.uc: 7ili7SZ44 AUactated PAC! a ••• :

QC lateb Ml!!thod: !PA 325.3 Anal\lS;. Oesc:riptialu CIItarhlcCMeNU"ic Nitrate)

70669098 ?Oe69106

70669G1O ~9098 7'11660106 ltethod 1''-

P.r8lleter ~tt. leaul t IIIU. FOotnotes ------------------------------ .-_._----- ---...... - ••.......• . .. -.-----Chlef'ide

r,~plr.J: 70615151

,. ~er

II) 1

Ratrix spike $pike

706629Ol Cane. '..at t Spike Z tee footnotes ---_ .. __ ........... _ ..... -._.. _ .... _---- --...... -~ ------- ---------- *.... . .... -----

Qllorfcle IIIIL 92.7 tDO 190 91

7061528:i $pil(e $pike LCS !pSt- u:sD ~ Cere. IHU~' 1Rec: Re,ult Zicc .PO Par..e.er units --.. ~ .........••.•...••. -..... ..-..•.... .. _-..... -....... ----_ ..... . ..........

Chlarfde IIIIIIL 100 99.7 100 100 100 0

SAIIPU DUPI.1~lE: 70675269 .

""t" faotnotes .. -.. -.... ~ •......•.• -~ ........ . n.7 n.z J -

REPORT OF LABORATORY ANALYSIS ",. report 8IlI11 not be rapraduc:ecl. p;ept in full.

D •• of satolu W/Z9J96

Footnotes . ..........

f

, 9-04-1996 11 :41 AM FROM S WEe DENVER 303 741 7040

C pace Anabttical

r &fAUlT CONTROL tlATA

o P. 1

Pact Analytical Set\1ces. Inc. 1455 McDoNell Blvd. North, Suite D

PelaUma. CA $4954

Ttl: 701·192·1865 Fax: 701·792.0342

DAJt: 08105/96 p~: 10

8t_ , Webster &nt, Corp. P.O. lOX 5~

PACE 'rOject N~: 1061" Client praject JD. st_ , Vtbater lng. c:orp.

Oen-r. CO 80217

~ttnl IIr. Charles YUti .. Pb~ (3QJ)741-76B7

QC I.t~ IP: '6181 AnaLysis Method: EPA 6010 ~1CICri aced PACi halpl ...

IlATIIX SPIICEI 1067mZ

1D669122

Units

CIC Batch Method: EPA 3010 ..,.lysis Description: "culls., rc:p

*tl'tx Spike Spi Ice Spit.

70669122 Cone. ReauLt S ue footnotes ......... --------------------- ---------- ---------- ------- ..... ----- --_.. . ... -~--~. IIUcon 11900 2DOOO 374110 93

1,AIIURATURT COMTROL UMPt.E I LCSOs 7OOm16 tDA77U4 Spike Spike Lei Ipllce LCSD D .. cone. RM&ll~ saec Result Xlec RPO ,.....car unita ;, .• _--_ ........ -.. -••••• _._- ;-,;j~------ ------- ---------- ... _ ...... .... -...... 2DOOO 19400 '17 19700 98

\

MMPLI OUPLICATE. 70677240

units 7a6691ZZ ~. Rault footnote$ .• _ ... __ ...................••• . .••• ~a._. • .••••.•• ~ ._ ..•••. ~. _._ .. __ ._.

siUoan UJlL 18900 18400 :s

.. • -

1

REPORT OF LABORATORY ANALYSIS ThIs report ehat not be reprodueed, except In ~I.

Date of •• tela: 0113D196

Footnote. -_ .••.....

· 9-04-1 996 11: 42A/v1 FR(]I.1 S WEe DENVER 31213 741 71214.121 P.2

o pace Analytical

Peae Analytical SeMces. Inc. 1455 MGOCJN8I Blvd. Nolth. SUile 0

PetakJma. CA 94954 T":11JT~1865

Fax: 7D7-792~2 r Stene & Uebater Ena. Corp. It.D. lax 5406 Dcm'II!r. CO ma,7

Attn: Mr. ~r(es Vlllf ... fib_I (303)741-7687

GC .. ten ID& '611". hl.,.t. Retttocl: EPA S10.1 ~I.ted PACe s-pt,es:

SAAPLI DUPLICATE: 70675525

unite

CllJMITT rDlTRDL DATA

.c l.tI:.lh Hett.od: EPA 310.1

DATEI OI/OS/96 NGE:11

PACE Project N~: 706145 Client project 10; Stone' Webster 1'",. CQrp.

Date of Batch: OT/!JJ/96 ANlysis Desuiptilln: Alalinity, Blear-borate

!)Up. M665484 Resut t

-~·.~-·--··-·-·.-.--.4~ •. 4.... . .. _ .. __ ._ _. __ ...... . ......• __ 148 150 1

(. \

~.

REPORT OF LABORATORY ANALYSIS 11IIa I'8DOIt IIhaII not be MDraduoed. eXCIIIPt in tttI,

9-04-1996 11: 42AM FRCJv1 S WEe DENVER 303 741 7040

o pace Analytjcal

QUALl'\'Y CONTROl. DATA

o P.3

P$ce Analytical SerWa. Inc. 1455 McDcwaII BMI. -Ncx1h. Suite 0

PetaIuna. CA 94954

Tel: 701·792·1866 Fax: 701-792..Q342

It_ , Wellcter lEns. c;orp. P.O. IOJI 5406

PACI Proj.ct Nunbet': 706165 C:l tent ProJ~t lD: Stone .. "a.ter Ens. eorp.

Denver, co 10217

IIttn: Mr. ct..rla "IlU_ rbane: (303)741,7687

ac latcll ID: 1Q74 ana'ysls ... tIIDCI: OA 315.4 ARKI.1:ed PACE '-teen

IlETIiiI lUll": 70679584" , Associated PIIC! s~tea:

70669122

tIC latch "ethod: EPA S75.4 AnII'ysts Oeseriptian: sulfate. rurbfdimetric

IIettIocI Il ...

Par_er ~ta Reeut t PIt. footnOtes

II) 5

MIIttht

Units Sptte Spite

1UM91Z2 cone. Il..ult ..... --......•.... __ . ____ . ___ . ..----.. -- .-4 ........ _. __ ._ _ __ ..•.••.. -.-- ...•.•.... Sulfate 106 ZOO lZD 107

UIKlUTORY COXTROl SAMPLE , lellh 70&70618 70679626 Spib Spfte LCS Spike LeSD D~

'~e" units I:a¥. Rewtt Slee RHult IRee ItPO ............................... -----_._ .. .-.~ .. ---------.. .... -........ ..... _ ....

20 20.1 101 20.2 101 0

UIPl.E DUPLICATE: 70619600

Parallet." I&'\lt. 7'0669122 -....... ---_ ....... -... -...... -......... .......... . .... _.... . ........ .

REPORT OF LABORATORY ANALYSIS ThIa raoart shall not be .. arc:xSuoed. exoNt in fuJI.

Date of .. tell: 1J8I01196

'oot...,t~ _ ........ -

/

9-04-1996 11 :45AM FROM S WEe DENVER 3037417040 P.7

r

. AUG-e6-143516 14= 53 FRCI1,O 10 . PACE PEI~ .... ~

page ADal¥thim.

J.IFU!PI! ... V!S RI!9!!'!

Q,QIIT IAMI: PAtS ~me.v.-.... ClU.1FOllMtA (KTAUMlJ """lUI: '411 ....... L a • ..-.. STE ,

ftil .... CA.'" anartacc __

1iIUIIU ID: tnT IUPPLT BI. ............ ~~--

PaIt:itlJlflllj SlnllaLIIC. PCiIIaiIi ,..... ~1XT7051I

~06.1tH IIprt IkJ.I ... ..

c.tiCMt A .... ,

IlII' CUIll1'S an, D5SJ fACE rmascr, INSJ5

PACE QJm. fi2lI61r P'... to: 'dIIAL

.1II~ ..... .n .ewrEDa, a-M.-N fIIIINGT _; .... tfw,...

.......... • ...... --.-.·-··--... -------..... _ ....... ~P ....... - •• - .... -----.......... • .... ...-· .... ~ .... • ......... ....-._-

- . ..-._ . .---_.................. . _ ... _ ..... .-.... -----.. ... - .. -....--... .. -.....-......... _.... ---.----, MUI ZIMI 1-4_ 5_ 6 jtMI , »SI . .., . ,..,

111 III1f 11 MV 12 NIIM 11 Mal _. 15 ...

~­... 'IP MfA 10 ~ 11 ..-22 JaIl

" ...

A"""",,,, CAL) .... -. .... , CIa) "'''''. fOUl CO) ..-,l\''''~ , ... c., CIIIIIJt .... fvhl CccD ca&ef .... tDtal (C8) I ...... Total (fit) ............ T~CIfI) ..... ,..... T,*t., IlcDl" t.tal orf) .......... r.w. CIC)

..... ''-' OItIJ S" .. , retm cq,

....' .... tonlM 11-. t*L an) ANMi .. tote\ c.aJ LIId. ... leftl ft'b, "l ... ~ lab, ,Ie, Chrwi-. , .. , (cr)

~l'f f.- Ce.) CCIJIIIr, T6tal Cal) "'{ca. lcal (II")

-•

REPORT OF LABORATORY ANALYSIS 'INI"PCIRIIIII.W'", J t, _ .. ,Un II,

... e.wriIIIn .... "p..~BlMlll.tM.

, t t , 1 1 t t , ,

to 10 t t 'I 1 1

"

1 t , ,

~ a.1 IlIA . c 0.1 IIIfIL elL1 ..aIL c...., IIWL

oC ... IIIIJIL 11.1 ...

ee .. IlIA IiId .....

.. e.is -.II. cO.&ll .....

a..J -.JL -IIOIt. oCt ... .... c .... II8IL ... IIfJII, c," IIIIJIL

-co._ ..,.. c •• _ IIIIfI, c ,AI -.no ~._R IIIiIfL c •• R .." ..

, ... alii.

9-04.-1 996 11: 4.3AM FROM S WEe DENVER 303 74.1 7040

~ ~

pace Analytical ..

r

Stone & iIebIter e",. COrp. P.O. to. 5406 Denver. co 80217

Attnl Itr. Charl .. VilU .. PflatIe: (303)741-7687

cae latell ID: 16106 _(-pt. ftethods EPA 340.2 At.uciated PAeI ",lHt

IlEra IWK; t06a096Z Maociated pAC( ",l __

GlJAl.lTY CONTIlOl DAfA

ac latch Jlethad: EPA 34Q.Z Analysis Description: FlUOf'ide

7D669106

70669106 McrtIIoc:I BLank

' ... .ew:er Untt. leMllt paL fOOtnotes

fluoride 0.1

... trix Iptte Spite Spitlt

~Itc Ya669'06 CGnG. ~lt "Itec: Footnotes •• __ • __ .••••••.•••••..•... _... •. ___ •• ~.. _ .••••••••.... __ . __ ••.•••.... ___ __._.e·_·-fluoride O.t56 2.5 z • ., 98

UlKltATDlY CONTROl SAMPlE & LC:SO: 1D680996 7b6lto02 Spike Spike Les Spike LC:SD DI4a Cane. Result IRec RHUlt IRec RPD 'at'-.letet Urd ts .... __ . . ......... .... _--......... --_.. . ......

Fl~ridt MIlL 2 t.en 96 1.93 96 0

IMPLE DUPLICATE: 1U6IWU ~.

7D669106 Result Icmtnotes

FIUDride -.JL 0_'56 0."7 .) ..

REPORT OF LABORATORY ANALYSIS This rapoft shall not be recwoduced. em:apt in t.l1l.

P.4

Pace Analylfcal s.moes. fnc. 1455 McDcMeI BiYd. NolItI. Sule D

Petaluma. CA 94954

Faotnotes _ .......... -

Tel: 7OT-m·1865 Am: 707-7'92-0042

9-04-1996 11 :43AM FRCJv1 S WEe DENVER 303 741 7040 p.e

pace Analytical

ClUAI.lTY coa~1. DAfA PARNETER FOOTNOTES

o· Pace AnalytiCal seMc:es.. Inc. 1455 tttOoweIl Blvd. NorU1. SUite D

Pe!iNna. CA 94954

Ttl: 707·792·1885 F.: 7OT-792..Q342

~Tf; 05/05196 p~: 14

PAC! Project 1I1.IIIber: 706145 Clfatlt project 10; SbWIe & uebArer 1;00. corp.

1'h. GLaUtv Ctlfttr ... l '-Pte FiNil _dUU:~ Hated above hlYe been rounded to ... flect en IIJIPI'OPrtate ....... of .i,"ifi~t fi~. Consistent with IPA tutdeUnes WInIUrIded cClnClIlntrations have bet!I't used to C:81culate " Rec ... IPD values. m !lot Detected Me lid Calculable PRL ~~ a~ttpg Limit RPO Releth,. 'ercen1: Otff.~

r

:: ..

REPORT OF LABORATORY ANALYSIS This ...,on ehaII net be 1'IIPf'OCIUced. a:ept in full,

8flEWEREtMRO"MlNTAL UIORATCIUES til P.u:l'1CSl'MR HONClUW.H,\.'NAII ...,7

__ , __ TEI.:I8CM)IO".81 FAX:IIOIIa2·loI.

CHAIN OF CUSTODY & ANALYSIS REQUEST PURQlASE DRDER 110.

~ME _________________________ ___

FIAt.! __________________ _ AD~E§ __________________________ __

-"';1(d:::'«.4:!J::C_-=- STATI!! ~ CIlY _________ Sf ATE ___ ZIP _-'--___ ';'I5"Ml'LI~ FAXCVO ;rf~- ~f'P . PHONE FAX

_ .. ----.----

o

9-04.-1 996 11: 45AM FROM S WEe DENVER 303 741 7040 P.B

P.~

Pet AIIIIJJIIaII SIIftIIQII, InC. _Gad __

r \

1"". \

eace Ana'¥1ical

!3IlWEJI!B- III!O!!!ATlCIN

ftJdln. 1X 77QSa , 1111: 1fS.4eI.1I1D rae",.·' ............

~IILI toDA". -~ .......

..----_.-..------- ._-------.. -............ ----............ _ .. -.............. -.-----_ ...... , .. .... --....... .............. PIEJ'tRlTICli ~ ......... -. • ............. --~ IIULIIII ........... --• .... , .......

_ ...... _.~ ... - ............. a .................... __ .......... .......--__ .. ..---.----.............. ____ ~-- III .. UIIIt.e lD' In' IIM.W' .u. .-wIG, ....

, MIll .. GQI tPoilD'JaA. a-a-96 1Z15 UIC .... IA ........ l1'li ccr ~ I- ~ .. 1'-!l"" zs· ... __ mS LAC ""ttl ...... -f6ZD13 a;;.a tDIIIEJ

~- 8CM -- 19-I01aa 2!hltl.-w. ·'215 PIC 'IIJooaII1IA ....... ." c;oa ...-£- ... ... """M 25-..... t215 U!C .... M ...... ... IID'II CIIP.I .... S.DI .. GII6 lH1HD\ Z!HULoof6 'IZD lK ..,oa ...... ata ... ,... 6 .. .. GIll 1"'1. II-A • .,J LaC "...,OA Zf-.. --_ cc.a ,..... " 118

6S6H 6SW "~301M 25 __ "" 1215 UtI; 1...-s11A ...... 2IIJ1! ~ tDIIEI' .... 8416 ... '''!DlOA. zs-a-H t21S uc 1N01OA 2I-a .. _ ma ....... , II!fIII SIll 654B 1~ 2S-.lUL"'" 1215 ur: ~ .......... 'CCi .....

10 .. .... ... """IA ....... ms \R ~ a-a .. 1DD ca 1IIDIiT 11 ... -..at. 6SW ,0-.," 25-.... 12.15 1.IC "..1D 31 ..... _ ... ... 11 ..... ... 6!IiGItt '9-!DIM 2!-.IUL.of& 1Z1S UI: t9-l'I'J'V "-96 'IN D A ...-13 MIll -- .. 1,...'" D-M.-?t1it' 1,IIC 1PotG1_ ' ........ ., CCI ..,. '14 loW .. -- ' .. :IIlM Z:S ...... U1S pc ..". • ..... ." c:w ,.... 15 ... .. -- ,....01\ Z5-.M-f6 U1S LDC lJIooIG1a ........ arns IIMJ tIIIIIIiT . ..., au 65Q6 19-1aIlA 1!hIUL." 1Z1S IDe ftJooI01Q1l. .... zoa = tOaIIEr a MIll ... ... ".. ... aa u .... ms &.DC: ... ,a.. ........ 8tJ ecJ teaa II .. ... -- 19'-lGtaa ..... L .. ms abC """"tM ........ a CCI tIDn' 6f AW fSRI .", '''.,t.l 11·.111.. .. 12'15 LDC 'IP-CIGl ......... ,as .M MIld' ,. .,. aa 6IMD ',,":mma ZS ..... "'" 1110 "'" ,.,7U1

..... ""_ La "..,.

17 &A&a aD .us ,.,.. 'III6oa ZS-M. "'0 ~, .~ 31· ... ·,.'_ La ~ 'If .. MID ... 1~ ""1'T'O :ra ........ ,,~ III .a5II!1

" ..... L'tm!!n 1t!!f!!f!f1C:e

" IIPA-l' .. ' Ke'dIadIJ fw. htL-m., .. Uti ....... Jrd .... "ow. 1P16.-.d..-

.: ..

REPORT OF LABORATORY ANALYSIS 11D .................. , ..... nM wIhIut .. ___ tlP.-~ ....... _

9-e4-1996 11: 46AM FR(]vI S WEe DENVER 303 741 7040

Pace Analytjcal d

r \

P.9

P.~

.... ..., ..... 1IIc. toO ..... .. IbIIIIIIrI. 1X 17a58

~a6. ""' atpart ..... --c.nCIft ..... t

-.-......... ....... -.-._ ......... ----_ .......... ---_ ................. -_-.. .. ....--..... --_ ..... --.. --~ ..... .-..-------

IA1'CI tICh 6!i4U ~ .. II:nI5CK ... .....LtIM .... OIl' tta.s • .... , 6SG5 .... ..- IID'BII

lAM ~o.t""~ , • .0 • .... N .... t18. Tota\ (SO) .d IMTCllIIOI 65416 .-..£IGI a;nsae .. tlt.-p 1Gbl CAr) ...

IUIUI A_ .... r .... CAu f7..a .... ...... ,ota, , .. , I5.S' - e.rm~r ... _, ... -- C8IcI .... lacal (CO • tILS

r II:IN ~fOcal(_ " .. ,.. calt.. taul CO.) B.s .. ............ fOQIl CCl") .... IIIIN 1!aJII»r" tea!L CCtIJ ,..4

., .. ' ..... flmIlOO) tf.a • MI ...... -, ,.,'" CIC) 91.5 ,.. .......... , ..... CJI/P 1o..a .. ........ 1'_'OIOJ PloS - ""w. T •• ~., ... .- 11*'. T.-L CRt' • .6 .., And....,. 1oCe\ C., fJ.O AW ......... 1otal "'J ".9 ... tiM, Tot.' CZn) 1S.9 -.-- flS7U MRI..-: IIJ7J01:s

'-* stnnt .... l",~ ,~ _02 r

REPORT OF LABORATORY ANALYSIS ,.....,., .......... ' __ ..,.1nU.

wIIIIII&ttI. ..... CiCIMMl" .. .....,... ....... 1Ic.

9-04-1996 11: 46AM FROM S WEe DENVER 303 741 7040 P.10

P.~ ............ ...... ",.,. r

r

r \

pace Anab(tiCII ~lXnosa

........ ..". ......-.: tv.; tfJOSSQP ....... ,,... .

..... _-...... ----.--.--_._---._---_._._ .. ---_._ ....... -........ ..--.... ..--....-....... --.-------. ,.. ... II1EIIIIUTICII .... , lIUT ...... ---.... ....... ~--.-.. -..... ----.-.---~.~ ........ -. .... ~---....... - .............. .~ ............. .--. MTCII mt 65e ...... ~ IIJ7aICI5 .... ...... 1.mI t.awd em c 1.1112 .wL

UftI •• 65Q5 . ..u_ IIDZH1

MIl ~a. ,oe.t (At) 41"- ... - .... __ lObI. ($v) ~ • .-s . ...,.,

IAD..- 6MI6 .-u.1IOI ~

MIll IU ... r .. ~) ct.cn IIIIL ... ......... ,ct1:IIl CAn cl.I WI. .". hrf .. ,.-1 eta) ct.1 MIt. MIll ... "U'Wtr '*l , .. , co.'" ... II:#Il CilIa'''' tGtat C~ c I.t .... "., ~ .... Totat (CeQ ....... l1li4 .... QIIIeL" TnI' COO, ..... .... ". ctw-..... fatat (Cr' c 1.11 ..,.,. MIll CWM'. Total eM cloa "IIOIL ..., I ..... "Iota" <r., .0.12 tIIA MIl ....... total. cc) co., ..,.. ... ...... .. 'obIl ClIo) .. I.t ... .... II1II ...... T6fal (RD' c .... IIWL .. SodIwr. 1'dIIl CD) 4'1 ... MW NI ..... feW om co.a -sA .. Anlt...." ,., ~) c 1.1 IIfA IIIIfI ........ ,-., (V) co. • ..... MIll ~ .... , .... "", cD .. " ...

MlClIa. am ......., ~ .., ~I'" , .... cSr) cL1 ..n. . .. -

I

REPORT OF LABORATORY ANALYSIS 'INa ......... nat_ lijICucltJM.IIIIIIIIIIt"''''

.... Iba ... ~."a:r-~---.IK.

9-04-1996 11 :47AM

A.G-e6-1~ 14=55

FROM S WEe DENVER 303 741 7040

TO PACE PElC)R

bee Anabrtlcal •

P. 1 1

P .1Ir!I6I'II06

,..Mat,'bI~ IIIC. _Gallfd-... IbIIIm 'DC""

r· '..

r-I ,

r •

. .... , .. ",. bPIr't 1II:f. = «ID53tStJP -.... f.-' ... '

.-.---..... ...... ----.. --.-.-..... --------... -.............. ---............. -~ ..... -..... - ........ -~ .................... -....... . 1UT IXIDI!

C8mtllAL .... T

_I IJIII

III IDIA.l ..... ---...... .-... ........ ..-.......... _ .. ..------_ .. - .......... -_ ...... - ........ -................ -........... -.----...... -

mar IlOl am MI!'E lOr IIGZI)56 ... LtIIII ....... a.-l QIbt ~ .. - .. - ..... ..0 urtIlDI esas SIUIIItE 10: ~ .. ..... , 'ota' ca.:. C I" CI .. -an. ... , ....

MIA w ...... latal , .. , CUIOS ct.a ... O.tIS • as.,1 • __ WI, Of • -.tMa Ip1IDt tndlcma _ ill _II» .f •• trlx ... ,. ... IICe.

"'a ...... d e. .... imnd In __ Witl ...... ~

.a:.ID: aM ...... 11M II1I2I56 .. '"-In.. Tot.l CA.\) 411.1 c 0.1 IIIIL '.9 ".1 - __ .. t .... (Ie) co., C G.l 1M- 1.7 ts.D - .. ...,. T .. ' a.J C8., c t.1 IW&. ,.s to.O - t.rrt'-' 'ata' C.., ct.. e e.eos ... _. ... fO.D ",. CIIIId.... Jotlil CQO cO._ c '.Da15 ..,., - ... ... ... ". Calctutr To.L (ta) Jr.' B.I ..,.. 1..1 . sa.s ".0 AJIIr 1--. Total (Fw) C I •• "t.D .,.. " lAS ... .0 ... ....... .., TOCIIL eKe) 47.& ".I ... 1-1 ... ,... - .....,...,..., ,_1 CKo) cLIS c 0.111 ... . ..- ..0 .. .'_l, T~ 'In CI.GS ~ .. a .. IL lAS .... ., ~t ... TOtaL eEl .. , ,..1 tIIA. '.2 .. .6 1OII.s .... SOdf-. T*' C.., SA - 1IIfIl •• 0 . ..

• ........ ~ • ., ef ., Mat,rc- pnniIftted K'I::Ia'ft& dl!tMminathlh err 'lite ..ttiX ., .. ft!cOW!ry. .., 8nver. 1II1II\ CAlI) co.l1 c 0.01 ...,.. ••• 0.19 95.0

AW v..H~''''LM ..... - co •• IIIIIL .. - a.G lIl.a AIIIII J'-. ,.\ QrI) UZ La IIIIJI&. ,.G v •• ., to .. IaIU car-i-. T.tIL ten c ... ., • a.1t ..,&. e.u fO.a .., CIIIII& f, TatIIl (Cg) cl.R ..... 12 .,n. IA1 •• 0 MW ea,,-, ,.-., COol) cO.1Z .c LR IIIL eM ft., --

"'"" IIDI fTRZr ..

UIPU .. ~ ,.., SVOrcf ... TClQL CSr) U 0.4 O.G ZA ....

REPORT OF LABORATORY ANALYSIS lNa"lIUIInatblskU ....... o;eptlnl&

... _.a ................ -----. .................. ......." ....

N -

()

w ~

(I)

~ m. -f. . .

SNOIJ.:)flI:l.1SNI HOd :lOIS 3stt3AElH BaS

l . ., .••• • :::r prj - r:-6b (. /fi/:) iii

·cw palOid ad

... iliUltH ~ .~d. \1' : •• , . I t

'ONluag,dd i.' .1

.. ~;1' .1tt..:7.J.,." •.• ; . r •• :.' J I. I I :0.1111 .. : I. ~ ~l.!

IJ ;'7) PIfil'8) ::OlliiidiY .J: ..... '. :11 . <t .,r-»'t.tP. ~I~ ~ .?>i7Pt {/"1I'.I~([JI/.( J,r~1

" .. ' .... ,idQ,?11'''} i I slid.

, ..,., • 9-04-1996 11: 48AM FROM S WEe DENVER 303 741 7040

.- :::; 0 BAElNER

roo ENVIRDNMEN'1'AL INDUSTRIES. INV.

LABORATORY ANALYSIS REPORT Environmental Laboratories Division

o'

CLIENT: Stone & Webster Engineering Corporation· P.O. Box 5406 Denver, CO 80217 JOB NUMBER: E6071805

A 1TN: Charles Williams PROJECT NAME: Maalaea Unit 17

CHent 10#: M17 Supply Well _

Lab Sample 101: N6

METHOD

DATE;

MatriX:

July 31, 1996

Water

Daternme Sampled: 01/18f96 CD 08:eO 07/1B196° CD 12:35 Date/Tlme Received:

ANALYSIS LOWER UMIT

ANALYSIS NUMBER RESULT UNIT DATE OF DETECTiON

Nitrate .. N

Nitrite - N

353.2

3S4.1

4.86

NO

mglL

mg/l

07118196

CTI/19196

0.15

0.01

r

-..

Note : The results for the remaining analyses wl1l be sent directly from tne teaming laboratory In northem California. :J

r NO:: Not Detectable Above the Lower UmIt of Detection. / J .4 J ..... ~LAlDRA1QRES Approved by. ~<c... N ~'-31' AIOAC S1'II&T MONOlUW. HI IIIllt ~~SY~AAt PAGE 1 OF 1

....

Chuck Williams

WAYNE I. ~, ENGThffiER P.O. BOX 884

WAILUKU, HA WAll 96793 PHONE: 242-5868 FAX: 242-5865

August 2, 1996

Stone & Webster Engineering 7677 E. Berry Avenue Englewood, California 80111-2137

Dear Chuck:

Re: Supply and Injection Well Data

The attached report completes the information requested. Please call me should you have any questions.

WIA:sp Enclosure

Sincerely,

A'~-.d-~. Wayne I. Arakaki, P.E.

,.

SUPPLY DATA

1. SCREEN

A. Type:

B. Manufacturer:

C. Material:

D. Length:

E. Setting:

F. Installation:

2. FILTER PACK

A. Source:

B. Gradation Curves:

c o

Dual wall well screen (10")

Pre-Pac

Stainless Steel SS304

30 feet

Slot 0.125", Rod 0.29", Wire 0.215", ASTM F480 FL THD

The screen and well casing were welded together and lowered into the well shaft, section by section. This was done with the drilling rig. After the screen and casing were in place we checked to see if it was plumb then started to backfill. Plumb measurement taken did not deviate not more than 118 inch.

Hawaiian Cement

(see attached)

C. Method of Installation: Hand shovel

D. Composition: Fractured rock with max size 3/4 inch

E. Volume Used: 1.8 cubic yards

F. Depth to Top of Filter 102 feet below top of casing 18.83 M.S.L. Pack from Ref. Point:

G. Method of Separation Sand pack and bentonite from Grout:

,', /" ~.

o

3. GROUT

A. Volume Used: 4.4 cubic yards

B. Composition: Water/cement ratio 1: 1 with approximately 2 percent of bentonite.

C. Method of Installation: A 112" pvc pipe was lowered to the grout section. Grout mix was then pumped and slowly raised to 20 foot section. It was then left to be cured for two days before another 20 foot section was grouted.

4. DEVELOPMENT

A. Method:

B. Duration:

C. Dates:

Test was done by a deep turbine well rated at 8 H.P. We pumped at a rate of 100 gallons per minute.

Pump test was done for 24 hours.

July 17 to 18, 1996.

5. LONGITUDE AND LATITUDE (From Survey) (See Attached) Ground Elevation (From Survey) (See Attached) Top of Casing (From Survey) (See Attached)

WELL TEST DATA

Pump Used In Test

Type: Manufacturer: Model No. HP Capacity: Depth of pump intake

Bow Rate

Submersible Pump Franklin

2366166020 8HP

360 gallons per minute 125 feet

Method of Measurement - Bow Meter Starting Reading - 7639300 Final Reading - 7896790

...

Water Leyel (Tested Well)

Measuring Point - Top of casing Method of Measurement - Measuring tape with sensor Static - 5.33 M.S.L. Timed Measurements - (see attached)

Duratjon

Pumping - 24 hours Recovery - 1 to 3 days Existing Supply Well(s) - (record when pump(s) starts and stops)

• • , (

o WA YNE. I. ARAKAKI, ENGINEER

r P.O. BOX 884

WAILUKU, HA WAn 96793 PHONE: 242-5868 FAX: 242-5865

Maui Electric Company, Ltd. Water Resources Development Driller's Log April 9, 1996

April 10, 1996

Soil Type - Kealia Silt Loam - This soil is poorly drair.ed and has a high content of salt. The surface layer is dark reddish brown silt loam about 3 inches thick. Below this are stratified layers of silt loam and fine sandy loam. The subsurface layers are dark reddish brown to dark reddish gray in the upper pan and dark grayish brown to black near the zone of the water table.

Water Well" A" r\\ 11-/ 4 (i)':-q - (, A

Supply Well - 17" Bore Hole 0' surtace

68' mixture of soi I & sand 45' nock

3' cinder 11' nock 5' cinder 8' nock Tcinder ~' rock

150' Total Depth

0' 68'

113' 116' 127' 132' 140' 147' 1"0'

--

( ( ~

t ,-., 0 ;"V'rrOTO'.:J '..,I

I ~ 1 ~ r

~ .... l O:l ..

~ UlN 5-~Uo

i l ~ :l

l~ 1) t- \$" . n -ll '2

~S Q) :z '1 ... ! ~ 3 'i-U1

0' ~ J()"" l1N "1~

} n i 4 1 ~ ~ ~ C - ::

ui ti ~ -i --

-

"1

I-

~ -

.s-

Ci) -J.. _. t-'4\ ~ III

<f ~ ~ ,

O:l ~ 2~

.', ...,... ':.

Q 1

~ \J

WELL #A (#1) SUPPLY WELL ELEVATION = 18.83 M.S.L. TOP OF CASING

Dare ~ MSL GEM

7/17/96 8:40 A.M. 5.33 180 8:30 4.98 180 9:00 4.98 180 9:10 4.98 180 9:20 4.97 180 9:30 4.96 180 9:40 4.96 180 9:50 4.95 180

10:00 4.95 180 1:00 P.M. 4.97 180 6:30 4.97 180

11:00 4.93 180 7/18/96 1:00 A.M. 4.94 180

3:00 4.95 180 5:00 4.96 180 6:00 4.97 180 8:40 4.98 180 8:58 5.03 180

7/18/96 8:58 5.03 Shut Down 30 sees. 5.23 0 -8:59 5.33 0 9:00 5.33 0 30 sees. 5.28 0 9:01 5.28 0 30 sees. 5.31 0 9:02 5.30 0 -30 sees. 5.29 0 9:03 5.28 0 30 sees. 5.29 0 9:04 5.28 0 30 sees. 5.29 0 9:05 5.29 0 30 sees. 5.28 0 9:06 5.29 0

/ .. 6 6 State of HawaII COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

WELL COMPLETION REPORT

1. STATE WEll. NO. 4829-99 WEll. NAME .]n;~1;nw:jikup ISLAND __ H_a,-u.nl __ ~ __ 2. LOCATION: Address Kihei Road, Haalaea Tax Map Kay 3-B-oS: 25 3. DRIWNG OR PUMP INSTAllA1l0N CONTRACTOR David Pico Cesspool DiaSing 4. CONTRACTOR'S C-S7 UCENSe NUueER ABC - 11912 6. NAME OF ~RIu.ER WHO PERFORMED WORK Dayid Pi Cn 8. TYPE OF RIG/CONSTRucnON ..:R=:o:.:::t~ar~y~ ________ _ 7. DATE OF WEU. DRIWNG' COMPLETION -July· 15, i996 ' . 1 i'"""7, I ::r

l,' t:­

(NOTI: Repor1 /IIUIIl",.w1lllltd ~ ~.". .'.Hi _. /( I [

8. GROUND ElEVATION (msI) 15.3 It . Top of DriI1ng Platform (msI) 18.lp It Height ci Dilling Platform above Ground lUliace ' 1 • .5 3 fl Bench Mark and Method Used to DetermIne Groun:i Elevation USGS Benc;h Mark 7 ft.

9. DRIllER'S LOG: w*, l.avtI (elevation at existing bldg. flooW .. I..rt. Dep4h (ft.) Ib* 0M0rIptI0c .. Aenwb. DIUI (tl.) Depth (ft.) ~0Mcr~utca. DIll-. (ft.)

o to 68 soH & sand 5.3 -: ~ . ; - ,...'-, .::::: . C? ;7

~to 213 rock 5.3'· _to_ ,- > 3 - to c: ;; l.l.1.- to 11 6 cinder 5. _ _ f'( 0- c-..,

116' 10 127 solid blue rock 5.3 _to_ ~ .. u" _) 122- to ) 32 . cinder ..5.3.. __ to _ ',- ... ; (.0,

" to ~ .. ", ,-..-.- (If mo.. ~ Ii needed. ~ on ~ --'.>';-,. - ...... ,,----.-.... -

10. TOTAL DEPTH OF WEll BElOW GROUND 130 ft. :~~ ~ 7J =' 11. HOLE SIZE: 17 1/2 Inch dla. from 0 It. to g.:3jf .a. below ground

:q ____ Inch die. from ft. to ____ '"If belCM ground

........ ____ Inoh dla. from It. to fl below CJOUIld

12. CASING INSTALlED:10 h.I.D. X 0.3 In. waJllOIId tedIon to 100 It below ground

~-")~O ~In. I.D. X 0 • 1 J 5 In. waI perforated aectlon to 130 It. below ground Type d perforation wire wrapped screen

13. ANNUWS~' • Groured from 0 ft. bekM grotJnd to 85 ft. below ground

Gravel ~ 85 It. bebN grot.I1d to J 30 It. below ground ? ""'.,'" 14. INI11AL WATER lEVEL 5.3 .. ' It.~. Date ... time of meuurerner4 _~_/ 1-.~_/!._6. __ _

15. INrnAl. QilORIDE. 1 G/L· ppm Date and ttme of umpIlng 7/17/96

16. INmAl TEMPERATURE 78·' Dare w time of sampling 7/17/96

17. OATE OF PUMP INSTAUATlON .. ' 1717/96 . (test only) 18. PUMP INSTALLATION:

Pump Type. Make. Serial No. Franklin Pump #2366166020

Motor type. H.P .• Voltage. rpm 8 H.P. 220 volts Depth ci Pump InlaJce SettIng 12 s--~ft.~beI~CM-·';;'t:""'o-p-o""'f --.-Wh-Ich-';;-G\tatJon---"--1-8-. 8-3---

Depth ci bottom d aJrflne It. bdow Ci'iTng--:YmIch elevation Is Pumping Head fa 125 fI. -----

. 19. PUMPING TESTS: Reference Poh (A-P.) used; top 0 f D '· eftsiftg , which elQYadon Is _18;";;'.;,.8;;,.,3&,.."..._ ........ ...-

ata ,1117196 , Date Start water level 13.5 It. beIcM R.P. Stan ~wat-~.~IiVr-.. ~ It btlow R.I End MIter laval 13.9' It. below R.P. End watll' laval -----ft. below R. Depth af wei .. below R.P. ~ 01 wei It. bela-II R. ~ AIM Draw. a. Temp. BIPMd Aut

TImt ~, lfG" down (ft., .,.,..., it 1"..,. ~). fopm, 8: 40 to: 9: 00 O. 35 .l.l.i.QQ ~ --1.:..Q,0 180

.9..:.OD.. III 9; 30 ] 80 8 ~.s 18 -1..:.IlO to 5' 00 180

..9..iJ!J.. to 11 :00 .180 _:40: 78...5.;JW 10 J.L.Q,O 180 - 10 ..a:.ao ~ 1 .00 180 "'--- 10 ~ _ __ ...l..tQ.Q to ~O 180 _10_ ~., 9'00 180

(If I1'ICn IPIOe ...... t.d. ~ an b.dc.)

~-­down {IL' 0.30 0.35 0.35 o 35 0.35 o 40

a. {ppm'

Contractor (print)

Signature LatItude 20 48 17

;; ... ==. LongItude 156 29 44

IF WELL NO 4829 -04

• I •• ". . . , " '~ \I

I I

o o state of HawaII COMMISSION ON WATER RESOURCE MANAGEMENT Department 01 Land and Natural Resources

WELL COMPl.ET10I't REPORT

Maalaea Backup

~ ~~l\~:':-:.l~~~:i Ro~=a~t"jeotjOD Well #B (2) T""=~ J~8~fi5:2S"--ORIWNG OR PUMP 'NSTAUAll0N CONlAAClOA David Pico Cesspool DiSsing 3.

4. 8. 6. 7.

CONTRAOTOR'S 0.57 UCENSe NUMBER ABC - 11912 NAME OF DRIUER WHO PERFORMED WORK Dayid Pi CO TYPE OF RIG/CONSTRUCTION ...;R~o~t~a~ry~ _________ -DATE OF Well. DRIWNG' COMpurrlON -=J;.;;.ul;;.ly __ 15~ .... 1_9_96;;;..,-. ___ _ (NOl1: Reoor1 muot bt iWmattd wItM ~ .,. .,-.w. datI1-

8. GROUND ElEVATION (msI) 13 • 80 . It. Top 01 Driling Platform (msI) 18.D3 It Height d Drltlng Platform above Ground $Uliace 4 .23 . . tt. Benoh Mark and Method Used to Detennlne Groun:l EJavation USGS benc;h mark 7 .ft.

9. DRlu.ER'S LOG: WdII LaveI (elevation at existing bldg. fl 00 W .. Level

Depth (ft.) R)dc o..c.lptIon. RMntMb. DIdM (tL) Depth (ILl ft)c:k ~.pt'cn. AMnIib. 0.. (ft.) o to 55 sand & soil tD .. -" -::OCt;: c..-:J ~10 127 rock __ tD_ :T,:,,:~~;,:, ~O --.....; m-: l%~ ~~~~er _ta_ ,-' ~ f1' '1'1 ---l,g.L to 195 . cinder ==:== ~;~:-::f ;;'~ ---.~ tD 231 rock to ...., ---

(If ~ ep.ce Ii Iweded. ;;;;u. on bade., ... ~"'O ::: l'

10. TOTAl DEPTH OF well BELOW GROUND 225 ft.. ;~: -, 11. HOLE SIZE: 12" Inch dla. from 0 ft. to 225 ;:':~;~ beI~ ground

_____ Inch dla. from It. to ~i ~It. below ground _____ Inoh dla. from It. to fl below ground

12. CASING INSTALLED: . 8 In. I.D. X Sch 80 In. wall solid teetIon to 195 fl below ground 8 In.I.D. X Sch 80 c In. waI perfonltGd secUon-to--2-2-5-1t below ground

Type of PerforatJon wire wrapped screen 13. ANNUWS:' • Grourad from 0 ft. below grotI1d to 185

Gravel packed from 1 85 It. beIoN ground to _ ,25 fl below ground It. below ground

14. INmAL WATER lEVEL . _ 220 ft.. below ground. Date IU1d time of measurement March 4. 1996 15. INITIAL CHLORIDE, 6t)50 MG/L ' ppm DatI and ttme of sampling March 5,'41996 16. INmAl TEMPERATURE 8Q ·F Dala.uvJ time of tamPing March 5. 1996 17. DAte OF PUMP INSTAU.All0N Injection Well

18. PUMP INSTAUAll0N: Pump Type. Make. 88fta1 No. _________ ~ __ Capacity ___ gpm

MOlor type. H.P .• Voltage, rpm Depth of Pump Intakl SeIlIng ____ It. belCM' _----. which elevation Is ft Depth'of bottom of airline It. bdow • which elevation Is .----- It.

Pumping Head Ia It. 19. PUMPING TESTS: Ref.enc. Pollt (R.P.) used' top of

O '. "O-ettsi"R

• which elqvadon Is 18. 03 It *_ 41-

ate Zl8.(9Cw~ 7/9/96 ate SEnd tart .. ~~._-t 5: 3L It below R.P. Stan "WId~~.-'Ir-fN-"~ ______ ft bulow R.P.

___ ...... 5 .20 ft. below R.P. End watll' IevtI Depth c:j wei 2 It below R.P. . 25 It below R.P. DGI'Ih 01 wei ft. below R.P.

ElIPMd Aatt Draw. a. TtrnP. BlONd nm. ftOurt) ~, dOwn (ft., (ppm) 8- r: T'.mt ~,'

4:10 D', 200 0 0 6:00 tD A.D2- '" 20D 1 .27 80 rrrs- to -4..&l.L 10 200 i . 33 80 s:mr to -

~:. ~ee ' r:8~ R8 18:2R:== 4;40 to 20D 1.03 80 12a.L. tD-

tM mo.-. 8pace ..... t.d. co.....,. on -.;;;:;

RIlla

'"'"'I 200

~88 200 200 200

lid.

0: ... down ,..,

1.08 1,08 1.08 1.08 1.08 1.08

a. (ppm'

T .... p, '. F

80 80 80 80 80 80

Contractor (print,

Signature -----------------------

DatI •

i

--, ,

o o State of HawaII COMMISSION ON WATER RESOURCE MANAGEMENT Department of land and Nalural Resouroes

WELL COMPl.ETION REPORT

IfQtrvdIona: Pteue Pilot or ~ Mel .. boil ~ report VriUlIn 30 ~ at .. wei COIT()Iation kJ d-o ~n on Wtc\of Resooroe M~ P.O • .Box 621. HonolUlu. H ..... K809. An a-bull cbMn(I of hwol and dlenicIIIllMIytIe .hould ~ be IUbnmed. I=« ~ cell h eoc.nliosbn ~n Branch .. 0I7~

'Raalaea Backup 1. STATE weLL NO. UM~!,2~2A: . WELL NAMe Injection Well IIc (3) ISlAND Haul 2. LOCATION: Address Kihei Road, Maalaea TmdAap Kay J-B-OS: 25 3. ORIWNG OR PUMP INSTAUATlON CONTRACTOR David Pico Cesspool Digging 4. CONTRACTOR'S 0.57 UCENSe NUMBER ABC - 11912 6. NAME OF DRIu.ER WHO PERFORMED WORK David Pica 6. TYPE OF RIG/CONSTRUCTION ... R~o~t~a~ry~ ______ ---:-~:---___ _ 1. DATE OF WEll DRIWNG' COMPLETION July 15, 1996

(NOl1: Report IIIUGt bl Mlbmltld IMIIM 30 .". alter ~ dati1

8. GROUND ElEVATION (msI) 13.35 fl Top of Driling Platform (msJ) 18.35 It. Height d Drillng Platform above Ground SUliace 5 • 00 It. _

Bench Mark and Method Used to Determine Groun:t 8avatlon lISGA bench mrgit 7 ft. 9. DRIlLER'S lOG: Water a..v.I (elevation at existing bldg. flooW .. l.ev.r

Depth (fL) Rode DetcrfptIoc .. RN1wb. DIdeI (ft., Depth (ft., ~ o..cr'~. RMnutca. oc.. (ft.) o to 61 sand & soil 10 . : ... '. ;: ~to 139 rock __ 10_ ::-~~

t , C·)

l..l2-. to 157 cinder _ 10 _ • 157 to 186 rock _ to _ .. - f"! ;0 __ _ ~ to 213 red dirt & cinder __ to _ ".';; t '--11 __ _ 213 to 235 rock _ 10_ .•. '~ ~;. __ _

(If more IC** Je needed. COffin ... on badf.) '\

10. TOTAl DEPTH OF WEll BElOW GROUND 225 fl '-:"'0, 11. HOLE SIZE: 1? Inch dla. from 0 ft. to 225 :.,;;: .'~ belOW grou~

------,1 ........... 1 · .. ,l _____ 'nch dla. from ft. to ::: .. 1t. beIaw ground

. Inch dla. from fl to ft. belOW ground 12. CASING INSTAU.ED: .

8 In. I.D. X Sch 80 In. wall soUd MdIon to 195 8 b In. 1.0. X Sch 80 , In. waI perforated aecUon to .lQ

ft. below ground ft below ground

Type d Perforation wire wrapped screen 13. ANNUWS:' • Groured from 0 ft. below ground to 185 ft. below ground

Gravel packed from ~5 It. beIoN ground to_ 225 It below ground

14. INITlAL WATER lEVEL . 2-20 fL below ground. Date tJnd time of measurement M~rch 4, 1996 15. INITIAL CHLORIDE. 6250 MGh' ppm Data and time of sampling March 5, 19'9r--16. INmAl TEMPERATURE 83 ·F Dala;Jnd time of sampling March 5, 1996 17. DATe OF PUMP INSTAUATlON 'injection well 18. PUMP INSTALlATlON:

Pump Type. Make. Serial No. _~N~/A~ ______ ~ __ Capacity gpm Motor type, H.P., Voltage. rpm • Depth 01 Pump Inlalca SeIlIng It. belCM' , Which el8\IatJon Is ft Depth 01 bottom d aJrtlne fl bdaw • WhIch elevation Is _, ft. Pumping Head .. It

19. PUMPIN~ TESTS: Rafar8nce Paid (A-P.) used;:~ • which elovatJon Is 18. 3;;'~~L fl Date 7/.10 .;. ]j11/96 Dale Start water leY" 5.40 ft. below R.P. Start -wat'""'!~.,.-'Ir-flV-"~ fl btfIow A.P. End MIter laval 5 :60 It. below A.P. End water level fl below R.P. Depd1 of wei 225 It below R.P. Depth of wei It. belO"l R.P.

ElaQw.i Patt Draw. 0. TtrnP. ~ AUI llmt (hourt) {gpmJ down (ft.) (ppm) • F 1"..,. ..... , . fopm,

6:00 D ~ 200 GPM" 0 80 10 6T05 ta 200 GPM 1.50 80 -.,,-~ to 2DO.GrM· ..1.40 ~g == 10== ---~ 10 ;wQ ePM ..J 30 §Q D ~IO~W·~_ 1.30 80 :=10== 2.:.£lLl.. 10 _ 2nD GPM 1 .30 80 _ lit _ _ __

(If rnot-.Ipaoe .. nMlNd. CIa ........ an a.."

Renna~: Draw down is measured from original water level. (It ~. ipaoe Ii n0t02td. ootiJiUi on bide.)

0: ... down ,..,

a. (ppm)

tern". '. F

Contractor (print) Tid. __________ ~_

Signature Dol. I

.. -WAYNE I. ARAKAKI, ENGleR

P.O. Box 884 . WAILUKU, HAWAII 96793

Phone 242·5868 FAX 242-5865 I JOB NO.

ATTENTION

TO ~HHISS(()N 011/ 11//Irpg, Rf:S()ClRCe RE:

,Po. /3 CJX (; 2/

??,(1., \ ... '.' .' ,'~

'; 'C'.:' "j"

WE ARE SENDING YOU 0 Attached 0 Under separate cover via _________ the folioWirig' items:-o .' . ~."., ,... ,,'

o Shop drawings o Prints C Plans o Samples o s'p~ci1icationlf·

,.,'01

, :\ , )

.... ~

c _________________ ~~~+;~:~;--~~~~~--'.''''''.' '.'\

o Copy of lEtter [] Change order

COPIES DATE NO. DESCRIPTION

'0 /AlE:z.-t C-t\~ ~ t-E=17'ut<J ~drL+-,

I I (j1J- /592-4 I

I

I i 48 .2Jj -eJ 4-i f

i i I

!

THESE ARE TRANSMITIED as checked below:

::::J yr approval

£ For your use

o As requested

C For review and comment

Approved as submitted

Approved as noted

Returned for corrections

[] FOR BIDS OUE ___________ 19 __ _

, /

-2 I /J /cdio/J bJ~~ '-'

Resubmit __ copies for approval

Submit __ copies for distribution

[J Return __ corrected prints

PRINTS RETURNED AFTER LOAN TO US

REMARKS _______________________________________ __

COpy TO ___ _

I I

Elevation at top of casing 1Ul ft. M.S.L.

Cement Grout 85 Ft.

Rock Packing _4..l.:5~_ Ft

Hole Diameter 17.5 In.

Total Depth 130 Ft.

AS BUILT WELL SECTION

PERMIT NO. 4829-04

i

~~Yt · ~~ Ground Elev .. u..l.ft. M.S.L.. ~! ~

~ ... , t . ~ t'

.' , : f ,r , \01

f' i' , f

\' ,

J

.i , l-.. , . ",

'. , , : , , . ,

.

" -, " " • ~I

~ ,

" ()

~

· . ". '. .--· -

" · .~ .. · . .... '~

... " 1. . · ... "

":I.'

· ", ,',

· . ~

, · .-,

-~ ,~

()

.,. " • ,

r II, , " ~t

r

Solid Casing: Material ASTM 304 SS Length 100 Ft. Diameter lOIn Wall Thickness..Q.3D In.

Casing Screen Material ASTM 304 SS Length 30 Ft.

o NEWCOMER· LEE LAND SURVEYORS, INC.

00

1498 Lower Main Street, Suite -D- • Wal1uku, HI 96193-1931 • Tel: (808) 244-8889 • Fax: 244-8422

CERTIFICATION LETTER

17 July 1996

WA YNE I. ARAKAKI ENGINEER P.O. Box 884 Wailuku. MauL HI 96793

RE WELL LOCATIONS AND ELEVATIONS

AT MAALAEAPOWER PLANT TMK:(2) 3-8-005: PORTION 025 WAlKAPU, MAUl. HAWAII

PROJECT: 96-3843

On April 23. 1996. the wells at the Maalaea Power Plant were surveyed by a survey crew under my direction and the Latitudes. Longitudes and Elevations for the individual weifs are as follows:

""2>'2..'\ - 0'2-WELL NO.1 Latitude = 2048-17.0

~'Z,.~ , Q~ WELL NO.2

ktl1.<.t ... o4-WELL NO.3

Longitude = 156-29-43.9 Elevation = 18.83 MSL

Latitude = 2048-15.2 Longitude = 156-29-43.1 Elevation = 18.03 MSL

Latitude = 20-48-14.8 . Longitude = 156-29-43.0 Elevation = 18.35 MSL

These elevations (to the top of the pipe casing) are based on USGS Benchmark "U.S.G.S. 7 RESET." It should be noted that compliance with elevation certification reqUIres the use of such a benchmark. The undersigned hereby certify these elevations as being the true elevations at the time of this survey.

NEWCOMER-LEE LAND SURVEYORS, INC. A Hawaii Corporation

BRUCE R. LEE Licensed ProfeSSional Land Surveyor Certificate No. 5983-LS

-

c o

WELL LOCATIONS PER DRA WING 95040

WELL PERMIT NUMBER DRAWING COORDINATES DATA REFERENCE

;, 4829-02 N. 988.00, E. 1490.00 Unit 14 supply well

t'l.- 4829-03 N. 900.00, E. 1500.00 Spare well

~?:1 4829-04 N. 900.00, E. 1552.00 Unit 17(well A or 1)

,1111'- ,~

FROM: ~ IQ;, lli.!L.

R.LOUI J. UWAINE F. CHING S. SUBIA K. YODA

SURVEY BRANCH.

~ 4-E.HIRANO G.BAUER R. HARDY N. FUJII M.OHYE I. KUNIMURA

", /,?, '" \ C( ~ISSION ON WATER RESO}J~~ MANAG£NT

DATE: 'l?JO ( 1"-'; SUSPENSE DATE: ______ _

IQ;, INIT:

REGULATION BRANCH

4=

E.SAKODA D.HIGA L. NAKAMA C.ICE R. JINNAI S. SWANSON

PLANING BRANCH

S. EDMUNDS L. MIZUNO

EQ&

APPROVAL SIGNATURE INFORMATION

PLEASE:

See Me Review & Comment Take Action Type Draft Type Final File Xerox __ copies

02195

o o STONE & WEBSTER ENGINEERING CORPORATION

MAALAEA PROJEa{.oFFfc'E .-- .,

KIHEI, HAWAII

ADDRESS ALL CORRESPONDENCE TW..o'~R~ 1~~. KIH~ ~ 91>75t-"«72

TELEPHONE: 808242-5582 ,'" ;.,Jv, <Jv FAX:~Oe 24 -8'd21

BOSTON CHATIANOOGA CHERRY HILL. NJ CHICAGO DAllAS DENVER fT. lAUDERDALE HOUSTON

RaeM. Loui Deputy Director Dept. Of Land & Natural Resources P.O. Box 621 Honolulu, HI 96809

Notice of Start of Construction Maalaea Power Plant M-17 Well Well No. 4829-04 Maui Electric Company. Ltd.

Dear Mr.Loui

, ' ' ..

/', ~ . '. ,

\ t·

NEW YORK PORTLAND. ME PORTLAND. OR RICHLAND. WA RICHMOND. VA SAN FRANCISCO TAMPA WASHINGTON. D.C.

October 27, 1995 J.O. 03366.05

This letter is issued on the behalf of Maui Electric Company, Ltd. (MECO) to notify you that construction of the Maalaea M-17 supply well is to start on October 30, 1995. This well is well number 4829-04.

If you should have any questions regarding the construction of this well please contact myself or Mr. Rodney Jung ofMECO as 879-2356.

L.D. McDaniel

Site Construction Manager

BENJAMIN J. CAYETANO GOVERNOR OF HAWAII

c

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Thomas J. Jezierny Maui Electric Company 210 West Kamehameha Avenue P.O. Box 398 Kahului, Hawaii 96732

Dear Mr. Jezierny:

P.O. BOX 621

HONOLULU. HAWAII 96809

MAR 3 I 1995

Maalaea Power Plant M-17 Well (Well No. 4829-04)

We have received your request for a six-month extension of the start date for construction of this well, permitted on November 1, 1994.

By this letter, the start date is extended to November 1, 1995. Completion of construction under this permit is required by November 1, 1996.

Sincerely,

r (}wilt T (J.k. r y : RAE M. ~~UI , Deputy Director

CI:ss

MICHAel D. WILSON CHAlRP£RSON

ROBERT S. NAKATA ROBERT G. GIRALD DAVID A. NOBRIGA LAWRENCE H. MilKE

RAE M. LOUI. P.E. DEPIITY

Maul Electric Company, Ltd. • 210 West Kamehameha Avenue. PO Box 398 • Kahului, Maui, HI 96732-0398. (808) 871-8461

C C

Thomas J. Jezierny President

Ms. Rae M. Loui, Deputy Director Hawaii Department of Land and Natural Resources P.O. Box 621 Honolulu, HI 96809

Dear~-Subject: Maui Electric Company, Limited

March 6, 1995

Well Construction/Pump Installation Permit

..-.~ .~. :--: ;-

Maalaea Power Plant M-17 Well (Well No. 4829-04), Maalaea, Maui

Attention: Mr. Ed Sakoda

Maui Electric Company, Ltd. is requesting a variance to Item 8 of the Standard Well Construction/Pump Installation Permit Conditions for our Maalaea Power Plant M -17 Well (Well No. 4829-04). Please extend the grace period from six (6) months to twelve (12) months. We will not be able to start construction prior to our receipt of the Special Management Area (SMA) Permit. The SMA Permit Application has been contested. As a result, the well construction and pump installation will be delayed a few months.

If you have any questions about this request for a change in well construction/pump installation, please contact Mr. Kenji Kusaka of Hawaiian Electric Company, Inc. (HECO) at (808) 543-7541.

cc: E. Reinhardt K. Kusaka

An HEI Company

Sincerely,

·f

.. o Hawaiian Electric Company, Inc.· PO Box 2750· Honolulu, HI 96840·0001 ."'-.

~ . ~~1 "il~""

Maalaea 17 S:)· f:L GENPP6-4

YAIG

December 1, 1994

'Y • .. \",') ".

Mr. Keith W. Ahue, Chairperson Commission on Water Resource Management P.O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Ahue:

Subject: Well Construction and Pump Installation Permits Maalaea Power Plant Backup Well, Well No. 4829-03 Maalaea Power Plant M-17 Well, Well No. 4829-04 Maui Electric Company, Ltd

Enclosed are the following:

Original$. 12E.S,CR/fIlQfJ. 1 Well Construction and Pump Installation Permit for

Maalaea Power Plant Backup Well, Well No. 4829-03 1 Well Construction and Pump Installation Permit for j

Maalaea Power Plant M-17 Well, Well No. 4829-04

These are transmitted as checked below:

x As requested. For your information/files. For your review and comments. Please provide comments by _______ _

Remarks: Enclosed are originals of the Well Construction and Pump Installation Permits for Maalaea Power Plant Backup Well (Well No. 4829-O3) and Maalaea Power Plant M-17 Well (Well No. 4829-04); signed by Maui Electric Company, Ltd ..

If you require any additional information, please feel free to contact Ms. Dana White of Stone & Webster Engineering Corporation at (303) 741-7324 or me at (808) 543-7541.

kck Enclosures

cc: S. Kiyonaga, Maui Electric Company, Ltd. D. White, Stone & Webster Engineering Corporation

An HEI Company

Sincerely,

t4e.~ Kenji C. Kusaka Project Manager

... ,

JOHNWAIHEE GOVERNOR OF HAWAII

KEITH W. AHUE CHAIRPERSON

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621

HONOLULU, HAWAII 96809

WEIJ. CONSTRUCTION AND PUMP INSTALlATION PERMIT

for

Maalaea Power Plant M-17 Well (Well No. 4829-04)

Maalaea. Maui

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS lNG, ESQ. ROBERT G. GIRALD

DAVID NOBRIGA

RAE M. LOUI, P.E. DEPUTY

TO: Maui Electric Company, Ltd. P.O. Box 398 Kahului, HI 96732

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled 'Water Use, Wells, and Stream Diversion Works", your application to construct, test, and install a 200 gpm pump in Maalaea Power Plant M-17 Well, Well No. 4829-04, is approved subject to the following conditions:

1.

2.

3.

4.

5.

STANDARD WELL CONSTRUCTION/pUMP INSTALlATION PERMIT CONDmONS

The Commission on Water Resource Management (Commission), P.O. Box 621, Honolulu, HI 96809, shall be notified, in writing, before any work authorized by this permit commences.

The well construction/pump installation permit shall be for construction, testing, and installation of a 200 gpm capacity, or less, pum,P in the well, as determined by the pumping test results. The applicant shall subInlt to the Commission the test results and proposed permanent pump information, based on the test, for approval by the Chai..rperson.

The proposed use(s) shall not adversely affect existing or future legal uses of water in the area,includin~ any surface water or established instream flow standards. This permit or the authonzation to construct and pump water from a well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage shall be measured on a monthly basis and reported to the Commission.

The following shall be submitted to the Commission within thirty (30) days after completion of work:

o 11 _

.' \ c WELL CONSTRUCTION AND PUMP INSTALLATION PERMIT Well No. 4829-04

a. Well completion report. /'

Page 2

b. Elevation (referenced to mean sea level, msl) survey by a Hawaii-licensed surveyor. As-built sectional drawing of the well. c.

d. e.

Plot plan and map showing the exact location of the well. Complete pumping test records, including time, pumping rate, drawdown, chloride content, and other water quality data.

6. The applicant shall comply with all applicable laws, rules, and ordinances.

7. The well construction/pump installation permit application and staff submittal approved. by the Commission at its October 19, 1994 meeting are incorporated into the pernut by reference.

8. The well construction/pump installation permit may be revoked if work is not started within six (6) months after the date of issuance or if work is suspended or abandoned for six months. The work proposed in the well construction/pump installation permit application shall be completed within two years from the date of permit approval.

Date of Issuance

I have read the conditions and terms of this permit and understand them. I accept and agree to meet these condit~0/;i as a prerequisite and underlying condition of my ability to proceed. ..Ji Applicant's Signature: ~,' Date: / / df/1y Printed Name: Thomas J. Jrunern

Firm or Title: ___ p_r_e_s_i_d_e_n_t....;':....-M_a_u_i_E_l_e_c_t_r_i_c_C_o_m __ p,,--a_n ... Y...;.,_L_i_m_i_t_e_d __

Please sign both copies and return one copy of this permit to the Commission and retain a copy for your record.

cc: USGS Department of Health

Safe Drinking Water Branch Ground Water Protection Program Wastewater Branch

Maui Department of Water Supply

JOHNWAIHEE GOVERNOR Of HAWAU

o

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621

HONOLULU, HAWAII 96809

WELL CONSfRUCTION AND PUMP INSTALlATION PERMIT

for

Maalaea Power Plant M-17 Well (Well No. 4829-04)

Maalaea, Maui

KEITH W. AHUE CHAIRPERSON

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS ING. ESQ. ROBERT G. GIRALD

DAVID NOBRIGA

RAE M. LOUI, P.E. DEPUTY

TO: Maui Electric Company, Ltd. P.O. Box 398 Kahului, HI 96732

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled 'Water Use, Wells, and Stream Diversion Works", your application to construct, test, and install a 200 gpm pump in Maalaea Power Plant M-17 Well, Well No. 4829-04, is approved subject to the following conditions:

1.

2.

3.

4.

5.

STANDARD WEll. CONSfRUCTIONtpUMP INSTALlATION PERMIT CONDmONS

The Commission on Water Resource Management (Commission), P.O. Box 621, Honolulu, HI 96809, shall be notified, in writing, before any work authorized by this permit commences.

The well construction/pump installation permit shall be for construction, testing, and installation of a 200 gpm capacity, or less, pumy in the well, as determined by the pumping test results. The applicant shall subInlt to the Commission the test results and proposed pennanent pump information, based on the test, for approval by the Chairperson.

The proposed use(s) shall not adversely affect existing or future legal uses of water in the area, includin~ any surface water or established instream flow standards. This permit or the authonzation to construct and pump water from a well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage shall be measured on a monthly basis and reported to the Commission.

The following shall be submitted to the Commission within thirty (30) days after completion of work:

./ - ~ , , . o WELL CONSTRUCTION AND PUMP INSTALLATION PERMIT Well No. 4829-04

Page 2

a. Well completion report. b. Elevation (referenced to mean sea level, ms!) survey by a Hawaii-licensed

surveyor. c. As-built sectional drawin,& of the well. d. Plot plan and map shOWIng the exact location of the well. e. Complete pumping test records, including time, pumping rate, drawdown,

chloride content, and other water quality data.

6. The applicant shall comply with all applicable laws, rules, and ordinances.

7. The well construction/pump installation permit application and staff submittal approved. by the Commission at its October 19, 1994 meeting are incorporated into the penrut by reference.

8. The well construction/pump installation permit may be revoked if work is not started within six (6) months after the date of issuance or if work is suspended or abandoned for six months. The work proposed in the well construction/pump installation permit application shall be completed within two years from the date of permit approval. '

KEIrn W. AHUE, ChaIrperson Commission on Water Resource Management

NOV - I 1994

Date of Issuance

I have read the conditions and terms of this permit and understand them. I accept and agree to meet these conditions as a prerequisite and underlying condition of my ability to proceed.

Applicant's Signature: ____________ Date: ______ _

PrintedName: _____________________________________ _

FhTnorTicle: ______________________________________ __

Please sign both copies and return one copy of this permit to the Commission and retain a copy for your record.

cc: USGS Department of Health

Safe Drinking Water Branch Ground Water Protection Program Wastewater Branch

Maui Department of Water Supply

J..

o o

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT

Department of Land and Natural Resources Honolulu, Hawaii

October 19, 1994

Chairperson and Members Commission on Water Resource Management State of Hawaii

Approved by Commission on Water Resource Management at the meeting held on

fO(IQ 19t Honolulu, Hawaii

Gentlemen:

Maui Electric Company, Ltd. Application for a

Well Construction/Pump Installation Permit Maalaea Power Plant M-17 Well (Well No. 4829-04). Maalaea. Maui

Applicant:

Maui Electric Company, Ltd. P.O. Box 398 Kahului, HI 96732

Landowner:

Same

Action Requested: Permission to construct, test, and install a 180 gallons per minute (gpm) pump in Maalaea Power Plant M-17 Well (Well No. 4829-04) for industrial use. The proposed amount of use is 200,000 gallons per day (0.200 mgd).

Well Location/Tax Map Key: The proposed well will be located near Maalaea, Maui at Tax Map Key: 3-8-05:25 (see attached).

Well Description:

Ground elevation: Casing diameter: Solid casing depth: Perforated casing depth: Total depth: Pump capacity:

14 ft. 10.75 inches 100 ft. 130 ft. 130 ft. 180 gpm

Agency Review: The application has been sent to the Maui Department of Water Supply, the State Historic Preservation Division, the Office of Hawaiian Mairs, and to the State Departments of Health and Hawaiian Home Lands for review. There have been no objections to the project.

Analysis: The well is expected to develop brackish to salt water. No adverse effects are expected.

Water Availability: The well will be located in the alluvial aquifer of the Central Sector, Kahului Aquifer System of Maui. The alluvial aquifer is a separate aquifer from the basal aquifer. Since the well will develop water from the alluvial aquifer, it will have no adverse effects on the basal aquifer.

RECOMMENDATION:

That the Commission on Water Resource Management (Commission) approve the issuance of a well construction/pump installation permit for the Maalaea Power Plant M-17 Well, subject to the conditions listed below.

Agenda 1 ITEM 9

o o

r .. o o

Chairperson and Members Commission on Water Resource Management October 19, 1994

STANDARD WEll CONSTRUcnONIPUMP INSTALLATION PERMIT CONDmONS

1. The Commission shall be notified before work commences.

2. The well construction/pump installation permit shall be for construction, testing, and installation of a 180 gpm capacity, or less, pump in the well, as determined by the pumping test results. The applicant shall submit to the Commission the test results and proposed permanent pump information, based on the test, for approval by the Chairperson.

3. The proposed use(s) shall not adversely affect existing or future legal uses of water in the area, including any surface water or established instream flow standards. This permit or the authorization to construct and pump water from a well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

4. The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage shall be measured on a monthly basis and reported to the Commission.

5. The following shall be submitted to the Commission within thirty (30) days after completion of work:

a. Well completion report. b. Elevation (referenced to mean sea level, ms!) survey by a Hawaii-licensed

surveyor. c. As-built sectional drawing of the well. d. Plot plan and map showing the exact location of the well. e. Complete pumping test records, including time, pumping rate, drawdown,

chloride content, and other water quality data.

6. The applicant shall comply with all applicable laws, rules, and ordinances.

7. The well construction/pump installation permit application and staff submittal approved by the Commission at its October 19, 1994 meeting are incorporated into the permit by reference.

8. The well construction/pump installation permit may be revoked if work is not started within six (6) months after the date of issuance or if work is suspended or abandoned for six months. The work proposed in the well construction/pump installation permit application shall be completed within two years from the date of permit approval.

Attach.

APPROVED FOR SUBMITIAL:

6~E~~

Respectfully submitted,

RAE M. LOm Deputy Director

2

Q

'\,

\ \,-)

(..-.. ---.,"------_ .. . '---09-___ --_____ --________ / 1

vO-6GBv

, .I

/"i / /'

V31::1V l03rOl::ld

JOHN W AIIIEB GOVERNOR OF HAWAII

TO:

FROM:

SUBJECT:

UrI'll ABVK, CIIAIlU'ERSON SOARD OF LAND AND NATURAL RESOURCES

DEPlITIES

JOHN P. KEPPELER " DONA L HANAIKE

AQUACULTURE DEVELOPMENT PROGRAM

p 2: 3- AQUATIC RESOURCES 8 CONSERVATION AND

DEPARTMENT OF LAND AND NATUMLRESOURCES ENVlIIONMENTALAFfAlRS '., - '.:. • CONSERVATION AND

STATE HISTORIC PRESERVA nONDNI$IO.N: RESOURCES ENFORCEMENT 33 SOUTH KING STREET. 6TH FLOOR -

HONOLULU. HAWAII 96813

September 16, 1994

Rae M. Loui, Deputy Director Commission on Water Resources

"' ,:

CONVEYANCES FORESTRY AND WllDUFE HISTORIC PRESERVATION

DIVISION LAND MANAGEMENT STATE PARKS WATER AND LAND DEVELOPMENT

LOG NO: 12738 DOC NO: 9409KD12

Don Hibbard, Administrator ~ State Historic Preservation Division

Historic Preservation Review of a W Construction and Pump Installation Permit for Maui Electric Company Well No. 4829-04 Waikapu, Wailuku District, Maui TMK: 3-8-05: 25

Maui Electric Company proposes to construct. a new well and pump within the Ma'alaea power generating plant. The well site is adjacent to the proposed power plant expansion area.

An archaeological and paleoenvironmental study of the proposed power plant expansion area has been completed by the applicant (Archaeological Inventory Survey and Paleoenvironmental Investigations at Ma'alaea Power Plant, Maui Electric Co., Ltd., Waikapu Ahupua ' a, Ma ' alaea, Maui, J. S . Athens, J . V . Ward, M. Tomonari-Tuggle 1994) . A draft of the report has been reviewed by our office and the work was found to be acceptable.

No evidence of subsurface historic sites was identified during the inventory survey. The surface area at the proposed well site and in the immediate vicinity of the well has been previously impacted by the existing power plant construction.

Based on the present land use and on subsurface findings of the archaeological survey, it appears unlikely that historic sites will be impacted by the proposed well. We believe the construction activities for this project will have "no effect" on historic sites.

KD~ jen

\

JOHNWAIH£E _01_ STATE OF HAWAII

KEITH W. AHUE --DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS ING. ESQ.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.o.IOXIII

ROBERT G. OIRALD DAVID NOBRIGA

RAE M. LOUI, P.E.

HONOL.UW. ........

REF:WRM:SS AUG 30 1994

TO: Honorable Hoaliku L. Drake, Director Department of Hawaiian Home Lands

Mr. Clayton H.W. H~airmaD arid Trustee At Large Office of Hawaiian •

FROM: .9.JKeith W. Ahue, Chairperson ~ J~ Commission on Water Reso~e Management

SUBJECT: Well Construction and Pump JmtpDation Permit Applications

DIPVIY

Please review the following ~ applications pursuant to your area of concern and submit your comments to us by - SEP 30 1994 • .

Island Well Name Well No. AI!Rlication Tvoe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 Well

Should ~uha'Ve any, questipns,pl~eontact the Commission on Water Resource Management staff at 587-0225.

Ene.

Response:

fHe have no objections ot subject to our regulatory authority and permit

( Comments attached () Additional information requested () Extended review period requested

ContactP~/5 ~//e~n.ivtF Signed: ,(J ~ 7---e-

... : ......

". ~-,

,,,.,, I ..... .)

.'"" c.?

h ,9~" /9~S-":: Pone: ". ,,'. :.- '\

Date: tJ9~1-7t~· '.".,': '" en

....... - .-\, ~/ - AUG 3 1 19940/'

JOHNWAIHEE GOVERNOR OF HAWAII

SEP I 2 :994

KEITH W. AHUE CHAIRPERSON

STATE OF HAWAII All-: tv..-L. OR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS lNG, ESQ.

DEPARTMENT OF LAND AND NATURAL RESOURCES GK"'--ROBERT G. GIRAlD

DAVID NOBRIGA

COMMISSION ON WATER RESOURCE MANAGEMENT \1 P.O. BOX 621

HONOLULU. HAWAII 96809

RAE M. LOUI, P.E. DEPUTY

Mr. Thomas Arizumi, Chief Environmental Management Division State Department of Health Five Waterfront-PIaZa-~ 500 AlaMoana Blvd., Suite 250. Honolulu, Hawaii 96813 )

A', Mr • Tulang I ttn: . Denms J . -,

, .... "" Dear Mr. Arizumi:~ ~ .. ;.; .• ;;= ..... :::----<'"

AUG 30 1994

~r-D \.~ ..

Well Construction and Pump Installation Permit Applications

Please review the following permit applications pursuant to your area of concern and submit your comments to us by S EP 3 Q 1994 •

Island Well Name Well No. Application Tvoe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 Well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Enc.

~ -- l'

Nl

Responsvr We hav~ no objections f'{laU ~t. tt-tmclut1 -. up{ 'E e}(([;ryiM h~ F 1. T (l Not subject to our regulatory authonty and penmt 1m {MN '-f-it;~ () Comments attached . () Additional information requested () Extended review period requested

Conta~i' Lor!~ :;)!jal-V Signe . -W;..;:;........;~~----------

Phone: !£Jt & /;)-7 D Date: -t-1......r....-/0..;;;...---L..Cf.-+-'1_

-"" ". . \,.

iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii£ ~ IWS DATA PROFILE --- COUNTY OF MAUl ~

aiiiiiiiiiiiiiiiee~eieiieeiiiiiiiiiiiiiiiiiiiiiiii¥ TMK # :!3 .... 08~OOS:.025 f FILE #: 675 ". . . '

OWNER: MAALAEA POWER PLANT LOT LOCATION: N KIHEI RD MAALAEA

SUBMIT DATE: REVIEWED BY: SYSTEM APP'D

********** DATES 10/19/90 TK

DATE: 04/06/92

********** PLAN APPROVAL DATE: 02/26/92 INSPECTION DATE: 03/22/92

***** TECHNICAL DATA ***** TREATMENT TYPE; SEPTIC TANK DISPOSAL Via: FILTER USE FOR: COMMERCIAL DESIGNED BY: STONE & WEBSTER PERCOLATION: 0 min/in CAPACITY: 0 gal.

PRESS ANY KEY TO CONTINUE.

iiiiiiiiiiiiiiieeeeeeeeeeeeeeeeeeeeeeeeeeieeieeiii£ ~ IWS DATA PROFILE --- COUNTY OF MAUl ~ aeeeeeeeeeeeeeee~~;eee,e,e.eeeeeeeeeeeeeeeeeeeeeeeeeee¥

TMK I L\~,':-09-002: 00ll'FILE I: 3145 OWNER: LANAI LAND FILL /SOLID WASTE DIV.

LOT LOCATION: KAUMALAPAU HWY LANAI

SUBMIT DATE: REVIEWED BY: SYSTEM APP'D

********** DATES 06/01/93 RT

DATE: / /

********** PLAN APPROVAL DATE: 06/25/93 INSPECTION DATE: / /

***** TECHNICAL DATA ***** TREATMENT TYPE: SEPTIC TANK DISPOSAL Via: TRENCH USE FOR: C/O FELIX DESIGNED BY: HARDING LAWSON ASS PERCOLATION: 0 min/in CAPACITY: 0 gal.

PRESS ANY KEY TO CONTINUE.

JOHNWAIHEE GOVERNOR OF HAWAII

STATE OF HAWAII

KEITH W. AHUE

CHAIRPERSON

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS lNG, ESO.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

ROBERT G. GiRALD DAVID NOBRIGA

P.O. BOX 621

HONOLULU. HAWAII 96809

RAE M. LOUI. P.E. DEPUTY

AUG 30 1994 RECEIVED Mr. Thomas Arizumi, Chief

Environmental Management Division State Department of Health

SAFE DRINI\~;JG WATER BRANCH Five Waterfront Plaza 500 Ala Moana Blvd., Suite 250 Honolulu, Hawaii 96813

Attn: Mr. William Wong /'

Dear Mr. Arizumi:

Ii .. ' L !~.

Well Construction and Pump Installation Pennit Applications

please review the following permit aw1ications pursuant to your area of concern and submit your comments to us by SEP 3 0 i994 •

Wmd Well Name Well No. Application Tvoe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Enc.

.'_ " f. _______________________________________________________________ ~r~··'--~'., f'\' t

Response· ~ We have no objections {) Not subject to our regulatoxy authority and permit () Comments attached () Additional information requested () Extended review period requested

Contact Person: g//! {((/oAf

Signed: &rtf aut

'··-r1·

1: .. ,

.•... c....:>

Phone: '5"tZ¥"Z'5K

'"1 )

Date: -...:..,9A~I9~~~--

TO:

FROM:

SUBJECT:

o DIV!SION OF AQUATIC RESOUR

01 CTOR >< Sus~nsa Oat~:

.,..9!111 FISHr.f1IES Crall Reply

AOI>€:S/ENV X Reply Olrect

-:~

~ State of Hawaii

DEPARTMENT OF LAND AND NAWRAL RESOU

AQ3.::CP,'N

le~:S

/ r.omment:i

1"!or;"8~Or.

fo"lo Act & File

o o

~"nSTICS fl~tUl'nto. Commission on Water Resource Managemen Honolulu, Hawaii tt!'c I! C'J2'~ [l).

AUG 30 1994

Dr. Don Hl1>bard, Director Historic Preservation Program

~ Mr. Henry M. Sakud~ Administrator _ Division of Aquatic Resources _

Rae M. Loui, Deputy Directo Commission on Water Resour e M

, . £l.' !':t.1!O~. ___ ~_'.::"':;,'=k>. __ _

~1-,-":.~_~_+- ___ _ Of·'l([ 'oJ'~ --;.!=-r-----:~-;;;;;;- -! 14 -f Jle~

RECEIVED

AUG 3 0 1994 Well Construction and Pump I tallation Pennit Applications

Di\l. of AquatiC fteSOU[CeS

Please review the following permit applications pursuant to your area of concern and submit your comments to us by SEP 15 1994 .

Island Well Name Well No. Application Tvoe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 well cmd Pump

Lanai Lanai Well 5 4852-02 well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Enc.

Response:

~ ( ) ( ) ( )

We have no objections Not subject to our regulatozy authority and permit Comments attached Additional infonnation requested Extended review period requested

comact?= Signed:~ /1-...;5fl!.. 12_

Phone: __ ~~ ________ _

Date: cliff

\ ".,,0-

JOHNWAIHEE OO\/EANOII OF_All

r~ r: .-, -;- ,', :-, KEITH W AHUE

"~"ij'6:\;~' L;~;'~{i'~ DR:' PuER SYBINSKY

STATE OF HAWAII A,r," 'JJ (} R~ERTS.NAKATA uu .J J ot~~f:'I~a.

DEPARTMENT OF LAND AND NATURAL RESOURCES DA~~~RlGA COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621 RAE M. LOUI, P.E. DEI'UTY

HONOLULU. HAWAII 968011

REF:WRM:SS AUG 30 1994

TO: Honorable Hoaliku L. Drake, Director Department of Hawaiian Home Lands

Mr. Clayton H.W. Hee, Chairman and Trustee At Large Office of Hawaiian Affairs

FROM: ~Keith W. Ahue, Chairperson ~ J~ Commission on Water Resomre Management

SUBJECT: Well Construction and Pump Installation Permit Applications

. Please review the following p~etP~a. pursuant to your area of concern and subIDlt your comments to us by . ~

~ ~~ ~. ~~~~ Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and well and purilP)

Maui

Lanai

Maalaea Power Plant M-17

Lanai Well 5

5529-03, 04 .' <.~\

4829-04 Well and, punip~

4852-02 Well -0

Should you have any questions, please contact the Commission on Water Resource' Management staff at 587-0225. '., . ~

Enc.

R'2sponse:

~ We have no objections () Not subject to our regulatory authority and permit ~ Comments attached (see conments to your right) () Additional information requested () Extended review period requested

(.1'

Conunents: Waielru Wells may affect :rnHL rights; standard permit conditions

~~~~~~~~~Ailiri-=·~n~i~s_tr~a~t~o_r.,~~~ Phone:5~8~6_-3~8~3~7 ________ ~apply.

Signed: Planning Office Date: 9/'/9(. ~~~~~~~~~7P~~~------------------- ~I

JOHNWAIHEE OOYEANOA OF HAWAII

o

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Stanley K. Kiyonaga Maui Electric Company, Ltd. P.O. Box 398 Kahului, Hawaii 96732

Dear Mr. Kiyonaga:

P.O. BOX 621

HONOLULU. HAWAII 86800

AUG 30 1994

We have received your application and filing fee for a permit to construct and install a pump in Maalaea Power Plant M-17 (Well No. 4829-04) at Maalaea, Maui, (TMK: 3-8-05:25). We are reviewing the application for completeness.

Should you have any questions, please call the Commission on Water Resource Management staff at 587-0225.

ES:ss

Sincerely,

M. LOUI Deputy Director

KEITH W. AHUE CHAlRPE..-

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS ING. ESQ. ROBERT G. GIRALD

DAVID NOBRIGA

RAE M. LOUI. P.E. DEPUlY

JOHNWAIHEE

OOIIEANOR OF HAWAII

KEITH W. AHUE

ClWAPEASON

j

STATE OF HAWAII

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS ING. ESQ.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

ROBERT G. GIRALD DAVID NOBRIGA

P.O.80X821

HONOLUW. HAWAII lI68OII

RAE M. LOUI. P.E.

Mr. Thomas Arizumi, Chief Environmental Management Division State Department of Health Five Waterfront Plaza 500 Ala Moana Blvd., Suite 250 Honolulu, Hawaii 96813

Attn: Mr. Dennis Tulang

Dear Mr. Arizumi:

AUG 30 1994

Well Construction and Pump Installation Pennit Applications

DEPII1Y

Please review the following permit applications pwsuant to your area of concern and submit your comments to us by SEP 30 19P4 •

Island Well Name Well No. Application TvDe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Ene.

Response: () We have no objections () Not subject to our regulatory authority and permit () Comments attached () Additional information requested () Extended review period requested

ContactP~on: ______________________________________________________________ __

Signed: _________________ _

Phone: __________________ __

Date: __________________________ _

o JOHNWAIHEE ~OF_

KEmtW.AHUE

~-

j

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O. BOX 621

Mr. Thomas Arizumi, Chief Environmental Management Division State Department of Health Five Waterfront Plaza 500 Ala Moana· Blvd., Suite 250 Honolulu, Hawaii 96813

Attn: Mr. William Wong

Dear Mr. Arizumi:

HONOLULU. HAWAII lI68OII

AUG 30 1994

Well Construction and Pump Installation Pennit Applications

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS lNG, ESQ. ROBERT G. GIRALD

DAVID NOBRIGA

RAE M. LOUI, P.E. DEPU1Y

. Please review the following p~~lkatiB.PS pUISuant to your area of concern and submit your comments to us by -U18~'-t •

I~lsmg Well Name Well No. Application Tvos:

Maui Waiehu Golf Comse Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 well and Pump

Lanai Lanai WellS 4852-02 Well

Should you have any questions, please contact the Commission on Water Resource Management siatf at 587-0225.

ES:ss Enc.

Response: () We have no objections () Not subject to our regulatory authority and permit () Comments attached () Additional infonnation requested () Extended review period requested

ContactP~on: ____________________________________________________ ___

S~ed: ________________________________ _

Phone: ______________ _

Date: ______________ __

c o JOHNWAIHEE

OOYEANOfIOF HAWAI

KEITH W. AHUE -..-

J

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.o.8OX121

REF:WRM:SS AUG 30 1994

TO: Honorable Hoaliku L. Drake, Director Department of Hawaiian Home Lands

Mr. Clayton H.W. Hee, Chairman and Trustee At. Large Office of Hawaiian Affairs

FROM: .£rJKeith W. Ahue, Chairperson ~ J~ Commission on Water Reso~e Management

SUBJECI': Well Construction and Pump Installation Pennit Applications

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS ING. Esa. ROBERT G. GIRALO

DAVID NOBRIGA

RAE M. LOUI, P.E. DEPUTY

Please review the following permit applications pursuant to your area of concern and submit your comments to us by SEP 3 0 1994 •

Island Well Name Well No. Application Type

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 Well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

Ene.

Response:

() We have no objections () Not subject to our regulatory authority and permit () Comments attached () Additional information requested () Extended review period requested

ContactPerson: ______________________________ ___

Signed: __________________________________ __

Phone: ______________ _

Date: ______________ _

TO:

FROM:

o

State of Hawaii DEPARTMENT OF LAND AND NA11JRAL RESOURCES

Commission on Water Resource Management Honolulu, Hawaii

AUG 30 1994

Dr. Don Hibbard, Director Historic Preservation Program

Mr. Henry M. Sakuda, Administrator Division of Aquatic Resources

Commission on Water Reso M gement

SUBJECT:

Rae M. Loui, Deputy Direct~ ,

Well Construction and PumP I tallation Pennit Applications

Please review the following permit applications pursuant to your area of concern and submit your comments to us by SEe 15 19Q4 •

Island Well Name Well No. Application Tvoe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

j Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 Well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Enc.

Response:

() We have no objections () Not subject to our regulatory authority and permit () Comments attached () Additional information requested () Extended review period requested

Contact Person: ______________ _

Signed: _________________ _ Phone: -------Date: _______ _

JOHNWAIHEE 00VE1INOfI0f' _

STATE OF HAWAII

KEIlli W. AHUE

~--

DR. PETER SYBINSKY ROBERT S. NAKATA

J. DOUGLAS ING. ESQ.

DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

ROBERT G. GIRALD DAVID NOBRI,GA

P.O. 80X 621

HONOLULU. HAWAII lI68OII

RAE M. LOUI, P.E.

Ms. MaIjorie Ziegler Sierra Club Legal Defense Fund, Inc. 223 South King Street, Suite 400 Honolulu, Hawaii 96813

Dear Ms. Ziegler:

AUG 30 1994

Well Construction and Pump Installation Permit Applications

DEP\nY

Please review the following permit ..iU>.plications pursuant to your area of concern and submit your comments to us by ~EP 30 1994 •

Island Well Name Well No. Application Tvoe

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

j Maui Maalaea Power Plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 Well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Ene.

Sincerely,

M. LOU! Deputy Director

Response: () We have no objections () Not subject to our regulatory authority and permit () Comments attached () Additional information requested () Extended review period requested

ContactPerson: ________________________________________________________________ __

Signed: ____________________________________ ___

Phone: ______________ _

Date: ________________________________ ___

o JOHNWAIHEE

OOVEfINOIIOF_

KEITH W. AHUE -

J

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P.O.8OX8Z1

Mr. David Craddick, Director Department of Water Supply County of Maui 200 South High Street Wailuku, Hawaii 96793

Dear Mr. Craddick:

HONOUJUI, HAWAII tI88DII

AUG 30 1994

Well Construction and Pump Installation Pennit Applications

DR. PETER SYBINSKY ROBERT S. NAKATA

J .... ~OUGLAS ING. ESQ. ROBERT G. GIRALD

DAVID NOBRIGA

RAE ".lOUI, P.E. DEPVIY

Please review the following permit applications pursuant to your area of concern and submit your comments to us by SEP 3 ('J IQO,1 •

Island Well Name Well No. Application Type

Maui Waiehu Golf Course Wells 1 to 4 5530-03, 04 and Well and Pump 5529-03,04

Maui Maalaea Power plant M-17 4829-04 Well and Pump

Lanai Lanai Well 5 4852-02 Well

Should you have any questions, please contact the Commission on Water Resource Management staff at 587-0225.

ES:ss Enc.

Sincerely,

M. LOUI Deputy Director

Response: () We have no objections () Not subject to our regulatory authority and pennit () Comments attached () Additional infonnation requested () Extended review period requested

ContactP~on: ______________________________ ____

S~ed: ____________________________________ ___

Phone: ______________ _

Date: _______________ _

· Maui Electric Company, Ltd .• 210 West Kamehameha Avenue· PO Box 398· Kahului, Maui, HI 96732-0398 • (808) 871-8461 o 0, cr)J

Mr. Ed Sakoda Commission on Water Resource Management Department of Land and Natural Resources P.O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Sakoda,

Subject: Maalaea Well Construction and Pump Installation Permit Applications - units 17, 18 and 19

<) , :;'\

-""\'

Enclosed are Maui Electric Company, Ltd.'s (MECO) applications and filing fees for a well construction permit and a pump installation permit for our Maalaea Power Plant. This well is to be located at 3890S, 4300E (See Figure 2) and is needed for the proposed expan­sion at Maalaea.

Stone & Webster Engineering Corporation (SWEC) has prepared these applications for MECO. Should you have any questions about this well or pump, please contact Ms. Dana White of SWEC at (303) 741-7324 or Mr. Kenji Kusaka of Hawaiian Electric Company, Inc., at 543-7541.

kck

Enclosures

xc: E. Reinhardt, ME CO N. Shinyama, MECO K. Kusaka, HECO D. White, SWEC

An HEI Company

Sincerely, a ' rSLn~ '-~~. Kiyona~~ Production Manager

o

MAUl ELECTRIC COMPANY, LTD. p.o. Box 398 Kahului, Maui, Hawaii 96732

DATE

8/1/94

PAY

TO THE ·DEPT. OF LAND & NATURAL RESOURCES ORDER

OF

11-0 It Ita b ~ f"~ t 2 ~ ~o ~o 2B': <_ •• co'

CHECK NO.

.. 44866

KAHULUI BRANCH BANK OF HAWAII

PUMP INSTALLATION PERMIT FEE 8 UNIT M-17.

94

,

o "

..

59-102 1213

44836

AMOUNT

$25.00

MAUl ELECTRIC CO .• LTD.

KAHULUI MAUl

25 po

GA W3140190 (5 )

o

MAUl ELECTRIC COMPANY, LTD. p.o. Box 398 Kahului, Maui, Hawaii 96732

PAY

TO THE ORDER

OF 'DEPT OF LAND AND NATURAL

RESOURCES

DATE

8/1/94

11·0 ...... 855["-: f.-: J. 2 J. 30 J.O 281:.· L~~J (. -

CHECK NO.

44855

o 59-102

1213

44855

AMOUNT

$25.00

MAUl ELECTRIC CO .• LTD.

KAHULUI BRANCH BANK OF HAWAII KAHULUI MAUl

WELL CONSTRUCTION PERMIT FEE UNIT M-17.

8 1 94 25 ~O

GA W3140190 (5 )

o State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT o Well Construction or [..J] Pump Installation

Instructions: Please print in ink or type and send completed application with attachments to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-refundable filing fee of $ 25.00 payable to the Dept. of Land and Natural Resources. The Commission may not accept incomplete applications. For Assistance, call the Regulation Branch at 587-0225.

1. APPLICANT: (May be a, b, or c, but all must be filled in) (a) Well Owner (b) Land Owner Firm/Name Maui Electric Company, Ltd. Firm/Name Maui Electric Company, Ltd. Contact Person Stanley K. Kiyonaga 871-8461 Contact Person Stanley K. Kiyonaga , .. : .. :::~. 871-8461

GO Address P.O. Box 398 ~ress P.O. Box 398 . ~::,.:\..... .' ·i) Kahului, Maui, HI 96732 Kahului,Maui, HI 9$1;2 \'

(c) CONTRACTOR: 'COi';, Firm/Name To be named later Contractor's C-57 License No.' To be given later Address

2. WELL NAME:

LOCATION/ Maalaea Power Plant

Address North Kihei Road, Maalaea, Maui

"t2

... Island.: M~

Tax Key Map: 3-8-05: 25 (Attach a USGS map, scale 1" = 2000', and a property tax map showing well location referenced to established property boundaries.)

3. (a) PROPOSED WORK: [~ Drill New Well o * Alter Location

) \ " \

o Modify Existing Well o Redrill o Deepen o * Abandon/Seal

o Install New Well o Replace Pump o Modify Pump

(* Be sure to complete and submit well abandonment report upon completion of work.)

(b) WELL TYPE: DOug 0 Bored 0 Driven [~ Drilled 0 Radial

Is this well a part of a battery of wells? 0 Yes [" I No

(Briefly describe and fill in the diagram on the back of this form.)

4. PROPOSED PUMP INFORMATION: Rated Pump Capacity: 170 gallons per minute --'-'-'-----

Pump Type:

o Deep Well Turbine

["1 Submersible

o Centrifugal

5. PROPOSED USE:

Motor:

o Rotary o Propeller o Diesel

o Rotary-Displacement o Reciprocating o Gas

o Rotary-Gear o Impulse [~ Electric, rated horsepower of 15

o Municipal (including hotels, stores, etc.)

o Domestic (individual, noncommercial water systems)

o Irrigation (Crop)

o Military

["1 Industrial

o Other (explain)

State Land Use District: [~Urban 0 Agriculture 0 Rural

County Zoning (Describe) Industrial Use (Heavy Industrial)

o Conservation

(If more space is needed, continue below under remarks, explanations.)

6. (a) PROPOSED AMOUNT OF WITHDRAWAL: 200,000 gallons per day (b) METHODS OF FLOW ["1 Flow-meter 0 Open-pipe 0 Orifice Plate 0 Weir

MEASUREMENTS:

7. PENDING ACTIONS: o CDUA [~ SMA o EIS [~EA ["1 NONE [~ Other (explain)

8. REMARKS, EXPLANATIONS: Well is to be supply water for the operation of the new units 17, 18, and 19 to be constructed.

Units 17, 18, and 19 will be a 58 - MW dual-trained combined-cycle combustion electric generating power plant. A list of permits is attached.

(If more space is needed, continue on back)

Note: Signing below indicates that the applicant understands that, if the permit requested is granted by the Commission on Water Resource Management, the proposed work is to be completed within two (2) years of the approval date. In addition, the contractor shall submit to the Commission a well completion report, well abandonment report, or both, within 30 days after the completion date of the permitted work. The applicant also understands that monthly water use data shall be submitted to the Commission. The applicant further understands that approval of the proposed permit shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

Well Owner Maui Electric Company Landowner Maui Electric Company Contractor

Signalure ~ ~ ~~SignaIUre~ =f>;'=l ~ Signalure Date <if A J 4 Date % 4- 7 q a. Date

t ;

For Official Use Only: Date Received Date Accepted Field Checked by Date

Longitude latitude

Aquifer System Name . State Well No.

6124/92 WCR Form

, '\ c

Briefly describe the proposed work:

The well bore will be advanced with the appropriate drilling method to a total depth of at least 130 feet. The well will be screened over the bottom 30 feet of the well bore. The well will be developed and tested at a withdrawal rate of at least 180 gallons per minute (gpm). Solid stainless steel "tasing and cement grout will be extended to the top of the gravel pack. Water samples will be collected during the well test.

PROPOSED SECTION OF WELL

Elevation at top of casing 16 ft .• ms!. ~ ..... -""'1

_---- Ground Elevation 14 ft., ms.

Cement Grout ..Jill.. ft.

Hole Diameter ~ in.

Total Depth .n1L ft.

Rock Packing ~ft.

Solid Casing: Material Slmnl~~~ Steel Length 100 ft Diameter lQ.1~ in. Wall Thickness Q.~QS m.

Casing: !Xl Perforated / / Screen Material Stainless Steel Length 30 ft Diameter 10.75 iJ Wall Thickness 0.365 iJ Opening 82 sq. inJL.J

Open Hole: (none) Length ..JL ft. Diameter _0_ in.

* Approximate elevation at time of filing application. Final elevation ~msl) by a surveyer licensed by the State must be submitted at stan of constructlon.

Source: USGS.MA'aJaea Quadrangle. Island of Maul. 1983 ENVIRONMENTAL ASSESSMENT Prepared by: 8elt Collins HawaII

~ 0 500 1000 2000 4000

NORTH SCALE IN FEET

M0294025d

60

r c a n e F

· • • ~ • " • • • • • • . ~

e

• • • • • \I \I \I

• • II

" \I \I \I II \I \I

d

'\ . ......... .

:::.::: .:;.;:::.~~"?-:-

Figure 1 AREA MAP

MA-ALAEA GENERATING UNITS 17. 18 & 19 MAUl ELECTRIC COMPANY. LTD.

February 1994

. ..

o

o

. .. .. ~ Co

\ ~

TAX MAP KEY

o

~

o

. " .' ,

~ -4 ..... ;

~ .. /' :' m ,",' ,

. z ~.J';,:" 11: ~ ~ ~ti ,',' ~: ~ 'f'..... to: ,',1' i,'

. ~ ... -;.":, . . , " " , . . , . . , , . .

" " , . . , . ~' " : . .:.tJi.. .'~ , v. ~ . ~" " , "', '. ,I' .,' t1& ... <> .. , . . , . . .

,,' ,I' "" " .,'

MD5I4CXI2a

SCALE: I" = 366'

~~ ~~/"''' -V(j~

4

PORTION TO BE REZONED

1"olq,,,,

2ND DIVISION 3·8·05 PORTION 25 AKEA

2.5l5ACRES

M0584OCl2c

Figure 2 TAX MAP KEY, 2nd Dlv. 3-8-05 Portion 25

MA'ALAEA GENERAnNG UNIT8 17. 18. & 111 MAUl ELECTRIC COMPANY. LTD.

March 111i4

. . \ . c

Major Permits And Review Processes For Ma'alaea Generating Units 17, 18 & 19

PERMIT AGENCY

PUC Expenditure Approval State Public Utilities Commiuion

New Covered Soutee Pennit State Department of Health -.I

Prevention of Significant Deterioration (Air Quality) EPA/State Department of Health

Special Management Area Pennit Maui County Planning Commission

Zoning Change Maui County Council

Section 401 Water Quality Certification State Department of Health

Section 404 U.S. Army COrpl of Engincen

Stream Channel Alteration Pennit State Commission on Water Resources Management

Underground Injection Control - Pennit to Construct/Pennit to Operate State Department of Healthl Environmental Protection Agency

Coastal Zone Management Assessment Office of State Planning

Well Construction Pennit State Commission on Water Resources Management

Pump Installation Pennit State Commission on Water Resources Management

Water Use PennitlWater Use Certificate State Commission on Water Resources Management

Spill Prevention Control and Countermeasures (SPCC) Plan U.S. Environmental Protection Agency

Oil Spill Contingency Plan Maui County Planning Department in Consultation with U.S. Fish and Wildlife Service, Department of Land and Natural Resources, and State Department of Health

Facility Response Plan U.S. Environmental Protection Agency

Building Pennit, including Electrical. Plumbing, etc. Maui County Department of Public Works. Land Use and Code Administration

HYAC State Department of Health

Grubbing, Grading, Excavation and Stockpiling Permit Maui County Department of Public Works, Land Usc and Code Administration

Septic System State Department of Health

Above Ground Tank: Installation Permit State Department of Health. Maui County Planning Department

FAA - Construction in Navigable Air Space Federal Aviation Administration

NPDES Storm Water Permit State Department of Health

NPDES Storm Water Permit SWPP Amendment State Department of Health

Boiler Installation Permit State Department of Labor and Industrial Relations

Combustible and Flammable Liquid Tank: Installation Pennit Maui County Fire Department

.. Soun:e: HECO. CoaalnlCtiOll tmeI Environm ... ta1 Permita Meco W'alaea Unil 17. November 8 1993.

~- , o

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT Well Construction or l"l Pump Installation

Instructions: Please print in ink or type and send completed application with attachments to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-refundable filing fee of $ 25.00 payable to the Dept. of Land and Natural Resources. The Commission may not accept incomplete applications. For ASSistance, call the Regulation Branch at 587-0225.

1. APPLICANT: (May be a, b, or c, but ill! must be filled in)

(a) Well Owner (b) Land Owner

Firm/Name Maui Electric Company, Ltd. Firm/Name Maui Electric Compan~, Ltd. Contact Person Stanley K. Kiyonaga 871-8461 Contact Person Stanley K.Kiyonag~" '. 871:,~61

GO Address P.O. Box 398 ~ress P.O. Box 398 ':;'; "\ Kahului, Maui, HI 96732 Kahului, Maui, HI 9$ia2)

(C) CONTRACTOR: CO

Firm/Name To be named later Contractor's C-57 License No. To be given lat~r Address oJ.:.. ' \

,5 *

2. WELL

NAME:

LOCATION/ Maalaea Power Plant Island:

Address North Kihei Road, Maalaea, Maui Tax Key Map: 3-8-05: 25 (Attach a USGS map, scale 1" = 2000', and a property tax map showing well location referenced to established property boundaries.)

3. (a) PROPOSED WORK: [..Jj Drill New Well o * Alter Location

o Modify Existing Well o Redrill o Deepen o * Abandon/Seal

o Install New Well o Replace Pump o Modify Pump

(* Be sure to complete and submit well abandonment report upon completion of work.)

(b) WELL TYPE: DOug 0 Bored 0 Driven [..Jj Drilled 0 Radial

Is this well a part of a battery of wells? 0 Yes [" I No

(Briefly describe and fill in the diagram on the back of this form.)

4. PROPOSED PUMP INFORMATION: Rated Pump Capacity: 170 gallons per minute

Pump Type: Motor:

0 Deep Well Turbine 0 Rotary o Propeller o Diesel

["J Submersible 0 Rotary-Displacement o Reciprocating o Gas

o Centrifugal o Rotary-Gear o Impulse [..Jj Electric, rated horsepower of 15

5. PROPOSED USE: o Municipal (including hotels, stores, etc.)

o Domestic (individual, noncommercial water systems)

o Irrigation (Crop)

o Military

["J Industrial

o Other (explain)

State Land Use District: [..Jj Urban 0 Agriculture 0 Rural

County Zoning (Describe) Industrial Use (Heavy Industrial)

o Conservation

(If more space is needed, continue below under remarks, explanations.)

6. (a) PROPOSED AMOUNT OF WITHDRAWAL: 200,000 gallons per day

(b) METHODS OF FLOW [..Jj Flow-meter 0 Open-pipe 0 Orifice Plate 0 Weir

MEASUREMENTS:

PENDING ACTIONS: o CDUA [..Jj SMA o EIS [..Jj EA ["J NONE [..Jj Other (explain) 7. 8. REMARKS,EXP~NATIONS:_W_e_II_~_t_O_be_s_u_p_p_~_wa_t_e_rf_o_rt_h_e_~_e_ra_ti_o_n_~_t_~_n_e_w_u_n_b_17_,_1_~_a_n_d_19_~_b_e_c_oo_s_~_ct_ed_._~

Units 17,18, and 19 will be a 58 - MW dual-trained combined-cycle combustion electric generating power plant. A list of permits is attached.

(If more space is needed, continue on back)

Note: Signing below indicates that the applicant understands that, if the permit requested is granted by the Commission on Water Resource Management, the proposed work is to be completed within two (2) years of the approval date. In addition, the contractor shall submit to the Commission a well completion report, well abandonment report, or both, within 30 days after the completion date of the permitted work. The applicant also understands that monthly water use data shall be submitted to the Commission. The applicant further understands that approval of the proposed permit shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

Well Owner Maui Electric Company Landowner Maui Electric Company Contractor

Signature~ ~~--Signatu,% ~~c-Signature Date ~ 47 qA:' Date ~ Z q4- Date • For Official Use Only: Date Received Date Accepted Field Checked by Date

Longitude latitude

Aquifer System Name State Well No.

6124192 WCR Form

o o

Briefly describe the proposed work:

The well bore will be advanced with the appropriate drilling method to a total depth of at least 130 feet. The well will be screened over the bottom 30 feet of the well bore. The well will be developed and tested at a withdrawal rate of at least 180 gallons per minute (gpm). Solid stainless steel "tasing and cement grout will be extended to the top of the gravel pack. Water samples will be collected during the well test.

PROPOSED SECTION OF WELL

Elevation at top of casing 16 ft., ms!. .. ...--..,

_____ Ground Elevation 14 ft., Iru

Cement Grout ..Jill... ft.

Hole Diameter ~ in.

Total Depth ..llO-. ft.

Rock Packing 20..- ft.

Solid Casing: Material Stainless Steel Length 100ft Diameter 10.75 in. Wall Thickness 0.365 ID.

Casing: !XI Perforated / / Screen Material Stainless Steel Length 30 f Diameter 10.75 Wall Thickness 0.365 i Opening 82 sq. in.lL.

Open Hole: (none) Length ..JL ft. Diameter _0_ in.

* Approximate elevation at time of filing application. Final elevation ~msl) by a surveyer licensed by the State must be submitted at start of constrUcnon.

Source: USGS, MA'aiaea Quadrangle, Island of Maul, 1983 ENVIRONMENTAL ASSESSMENT

~ Prepared by: Belt Collins Hawaii

~ 0 500 1000 2000 4000

NORTH SCALE IN FEET

M0294025d

" • .'- . ~ •

. --., ,," '- ..... ~~ , r

, -...., '" " - ..... J ",'

• ~ ~ . • .. ..

~.

• • • • • u

" ~ • \\

• • " " • • • 1\

" "

'\.

Figure 1 AREA MAP

MA'ALAEA GENERATING UNITS 17, 18 & 19 MAUl ELECTRIC COMPANY, LTD.

February 1994

o

o

o

TAX MAP KEY 2ND DIVISION 3·8·05 PORTION 25

MOO94Ql2c

o

SCALE: I" = 366'

PORTION TO BE REZONED

AREA Z.5l5ACRES

Flgwe2 TAX MAP KEY, 2nd Dlv. 3-8-05 Portion 25

MA'ALAEA GENERAnNG UNrre 17, 18, & 18 MAUl ELECTRIC COMPANY, LTD.

M.rch18M

· ".. ..

o o

Major Permits And Review Processes For Mi'alaea Generating Units 17, 18 & 19

PERMIT AGENCY

PUC Expenditure Approval State Public Utilitiel Colllllliuion

New Covered Soutee Permit State Department of Health >I

Prevention of Significant Deterioration (Air Quality) EPA/State Department of Health

Special Management Arca Permit Maui County Planning Commialion

Zoning Change Maui County Council

Section 401 Water Quality Certification State Department of Health

Section 404 U.S. Army Corps of EngineeR

Stream Channel Alteration Permit State Corrunission on Water Resources Management

Underground Injection Control - Permit to Construct/Pennit to Operate State Department of Healthl Environmental Protection Agency

Coastal Zone Management Asscssment Office of State Planning

Well Construction Permit State Corrunission on Water Resources Management

Pump Installation Permit State Corrunission on Water Resources Management

Water Use PennitiWater Use Certificate State Corrunission on Water Resources Management

Spill Prevention Control and Countermeasures (SPCC) Plan U.S. Environmental Protection Agency

Oil Spill Contingency Plan Maui County Planning Department in Consultation with U.S. Fish and Wildlife Service, Department of Land and Natural Resources, and State Department of Health

Facility Response Plan U.S. Environmental Protection Agency

Building Permit, including Electrical, Plumbing, etc. Maui County Department of Public Works, Land Use and Code Administration

HVAC State Department of Health

Grubbing, Grading, Excavation and Stocle:piling Permit Maui County Department of Public Worle:s. Land Use and Code Administration

Septic System State Department of Health

Above Ground Tanlc: Installation Permit State Department of Health. Maui County Planning Department

FAA - Construction in Navigable Air Space Federal Aviation Administration

NPDES Storm Water Permit State Department of Health

NPDES Storm Water Permit SWPP Amendment State Department of Health

Boiler Installation Permit State Department of Labor and Industrial Relations

Combustible and Flammable Liquid Tanle: Installation Permit Maui County Fire Department

.. SotIn!e: HEeO. COIIIttuctiOll IIDd EnvirODm ... tal Permill Meeo Ma'alaea Unit 17. November 8 1993.

o o State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT o Well Construction or Nl Pump Installation

Instructions: Please print in ink or type and send completed application with attachments to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-refundable filing fee of $ 25.00 payable to the D,ept.: of Land and Natural Resources. The Commission may not accept incomplete applications. For Assistance, call the Regulation Branch at 587-0225::: . ;}

1. APPLICANT: (May be a, b, or c, but all must be filled in) '''r~::,. \ (a) Well Owner (b) Land Owner:" ) Firm/Name Maui Electric Company, Ltd. Firm/Name Maui Electric CompantCf..td. Contact Person Stanley K. Kiyonaga 871-8461 Contact Person Stanley K. Kiyonaga 871-8461 Address P.O. Box 398 ~ress P.O. Box 398 '::1::?

Kahului, Maui, HI 96732 Kahului, Maui, HI 96732. (c) CONTRACTOR: . ,,~., Firm/Name To be named later Contractor's C-57 License No. To be givel! later Address

2. WELL NAME:

LOCATION! Maalaea Power Plant

Address North Kihei Road, Maalaea, Maui

Island: Maui

Tax Key Map: 3-8-05: 25 (Attach a USGS map, scale 1" = 2000', and a property tax map showing well location referenced to established property boundaries.)

3. (a) PROPOSED WORK: [..J] Drill New Well o * Alter Location

o Modify Existing Well o Redrill o Deepen o * Abandon/Seal

o Install New Well o Replace Pump o Modify Pump

(* Be sure to complete and submit well abandonment report upon completion of work.)

(b) WELL TYPE: DOug 0 Bored 0 Driven [..J] Drilled 0 Radial

Is this well a part of a battery of wells? 0 Yes [" I No

(Briefly describe and fill in the diagram on the back of this form.)

4. PROPOSED PUMP INFORMATION: Rated Pump Capacity: 170 gallons per minute -------Pump Type:

0 Deep Well Turbine

["I/] Submersible

0 Centrifugal

5. PROPOSED USE:

Motor:

0 Rotary 0 Propeller 0 Diesel

0 Rotary-Displacement o Reciprocating 0 Gas

0 Rotary-Gear o Impulse [..J] Electric, rated horsepower of 15

o Municipal (including hotels, stores, etc.)

o Domestic (individual, noncommercial water systems)

o Irrigation (Crop)

o Military

["I/] Industrial

o Other (explain)

State Land Use District: ["I/] Urban 0 Agriculture 0 Rural

County Zoning (Describe) Industrial Use (Heavy Industrial)

o Conservation

(If more space is needed, continue below under remarks, explanations.)

6. (a) PROPOSED AMOUNT OF WITHDRAWAL: 200,000 gallons per day (b) METHODS OF FLOW [..J] Flow-meter 0 Open-pipe 0 Orifice Plate 0 Weir

MEASUREMENTS:

PENDING ACTIONS: o CDUA [..J] SMA o EIS [..J] EA ["I/] NONE [..J] Other (explain) 7. 8. REMARKS, EXPLANATIONS: Well is to be supply water for the operation of the new units 17, 18, and 19 to be constructed.

Units 17, 18, and 19 will be a 58 - MW dual-trained combined-cycle combustion electric generating power plant. A list of permits is attached.

(If more space is needed, continue on back)

Note: Signing below indicates that the applicant understands that, if the permit requested is granted by the Commission on Water Resource Management, the proposed work is to be completed within two (2) years of the approval date. In addition, the contractor shall submit to the Commission a well completion report, well abandonment report, or both, within 30 days after the completion date of the permitted work. The applicant also understands that monthly water use data shall be submitted to the Commission. The applicant further understands that approval of the proposed permit shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

Well Owner Maui Electric Company Landowner Maui Electric Company Contractor ~ .

Signature~~---Signature~ ~ Signature Date _ ~A- Date ~ ~ Date

For Official Use Only: Date Received Date Accepted Field Checked by Date

Longitude latitude

Aquifer System Name State Well No.

6/24/92 WCR Form

c o

Briefly describe the proposed work:

The well bore will be advanced with the appropriate drilling method to a total depth of at least 130 feet. The well will be screened over the bottom 30 feet of the well bore. The well will be developed and tested at a withdrawal rate of at least 180 gallons per minute (gpm). Solid stainless steel };asing and cement grout will be extended to the top of the gravel pack. Water samples will be collected during the well test.

PROPOSED SECTION OF WELL

Elevation at top of casing If2 ft., InS!. .. --...

Ground Elevation 14 ft., m~

Cement Grout ~ft.

Hole Diameter -.lQ... in.

Total Depth ...urL ft.

Rock Packing .2ll-. ft.

Solid Casing: Material Stainless Steel Length 100 ft Diameter lQ,1~ in. Wall Thickness 0.~f2~ In.

Casing: !XI Perforated I / Screen Material Stainless Steel Length 30 f Diameter 10.15 i Wall Thickness 0.3f25 i Opening 82 sq. in./L.:

Open Hole: (none) Length -iLft. Diameter .-iL in.

* Approximate elevation at time of filing application. Final elevation ~msl) by a surveyer licensed by the State must be submitted at stan of constructlon.

Source: USGS,MA'aJaea Quadrangle,lsland of Maul,1983 ENVIRONMENTAL ASSESSMENT

~prepared by: Belt Collins HawaII

o SOO 1000 2000 i

4000

NORTH SCALE IN FEET

M0294025d

• • .. • • • , , • •

r c

.. +~ 10 ~ ~",.~".~;.

a

) ~Z

:

I I'

" n e F

.. ~~,. .Jr-.. ~-~ .. - .. _ .. -. ,;S .. p~ ....- •• ..-.. • •

" • • " ~ • • ~ " • ~ • .. e

• • • • • ~ • ~

• \\

\\ \\

• \\ II \\

" " ,I II

d S

~:lI ,..... \ \

•• •• fill"'" ". ~ .. p 0 n dNa t ion a' ;:0 ",\1 + .. ""

, I d I·,........ + .. f 'e ......... .. ....

.I I? e, -\ '\ v n. I' ~ .. \\

19 \ \ . ~ . '\ \ \="

Figure 1 AREA MAP

MA-ALAEA GENERATING UNITS 17, 18 & 19 MAUl ELECTRIC COMPANY, LTD.

February 1994

#

o

o

..

• ~

TAX MAP KEY

o o

~ . . , .' , •• I' ... . ~ ~ . ~ 21 .':' :

'. , c ~ .'.' tJ: m .. V.... 'Ii'

• Z .. ti .'.' ... : ~ ~ ~".' 'D, i' // _~ , .. :,.. 11:,'

-~ .. ' .' : .... ' , .......... " . . . .... ,# , . . , . . , . .: ,.' .-; : ...... . .. . .4> •• ' .;;'P ..

'" •• ' •• ~", :,....A'.. • • or , .. ' , .. . . . . .. /~~.,/

.... " . . .. , .. " ..

MCISI4CIQ2a

SCALE: I" = 366'

~~ ~~l~~ -VCl~

4

PORTION TO BE REZONED

ro Iff,.,

2ND DIVISION 3-8-05 PORTION 25 AllEA

1.525 ACRES

M0594OCl2c

Figure 2 TAX MAP KEY, 2nd Dlv, 3-8-05 Portion 25

MA'ALAEA GENERAnNG UNrr. 17, 18, & 111 MAUl ELECTRIC COMPANY, LTD.

M8rch 1884

• c o

Major Permits And Review Processes For Ma' alaea Generating Units 17, 18 & 19

PERMIT AGENCY

PUC Expenditure Approval State Public Utilitiea ColDDliuion

New Covered Sotmle Pennit State Department of Health ~

Prevention of Significant Deterioration (Air Quality) EPA/State Department of Health

Special Management Area Pennit Maui County Planning Cornmiuion

Zoning Change Maui County Council

Section 401 Water Quality Certification State Department of Health

Section 404 U.S. Army COrpl of Engineen

Stream Channel Alteration Pennit State Commission on Water Resources Management

Underground Injection Control - Pennit to ConstructlPennit to Operate State Department of Healthl Environmental Protection Agency

Coastal Zone Management Assessment Office of State Planning

Well Construction Pennit State Commission on Water Resources Management

Pump Installation Pennit State Commission on Water Resources Management

Water Use PennitlWater Use Certificate State Commission on Water Resources Management

Spill Prevention Control and Countermeasures (SPCC) Plan U.S. Environmental Protection Agency

Oil Spill Contingency Plan Maui County Planning Department in Consultation with U.S. Fish and Wildlife Service, Department of Land and Natural Resources, and State Department of Health

Facility Response Plan U.S. Environmental Protection Agency

Building Pennit, including Electrical, Plumbing, etc. Maui County Department of Public Works, Land Use and Code Administration

HVAC State Department of Health

Grubbing, Grading, Excavation and Stockpiling Pennit Maui County Department of Public Woric:s, Land Use and Code Administration

Septic System State Department of Health

Above Ground Tanlc: Installation Pennit State Department of Health, Maui County Planning Department

FAA - Construction in Navigable Air Space Federal Aviation Administration

NPDES Storm Water Pennit State Department of Health

NPDES Storm Water Pennit SWPP Amendment State D~partment of H~alth

Boiler Installation Pennit State Department of Labor and Industrial Relations

Combustible and Flammable Liquid Tank Installation Pennit Maui County Fire Department

.'

Scun:e: HECO. Coaatrw:tion smcI EDvinxlmealai Penni" Meco Mi'alaea Unit 17. November 8 1993.

o State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT [..J] Well Construction or 0 Pump Installation

Instructions: Please print in ink or type and send completed application with attachments to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-refundable filing fee of $ 25.00 payable to the Dept. of Land and Natural Resources. The Commission may not accept incomplete applications. For Assistance, call the Regulation Branch at 587-0225.

1. APPLICANT: (May be a, b, or c, but all must be filled in) (a) Well Owner (b) Land Owner Firm/Name Maui Electric Company, Ltd. Firm/Name Maui Electric Company, Ltd. Contact Person Stanley K. Kiyonaga 871-8461 Contact Person Stanley K. Kiyonaga 871-8461

CO< Address P.O. Box 398 ~ress P.O. Box 398 Kahului, Maui, HI 96732 Kahului, Maui, HI 96732

(C) CONTRACTOR: Firm/Name Address

To be named later Contractor's C-57 License ~o. f:~:~e given,dater \ ",,"

... ·;l

os , t

2. WELL LOCATION! Maalaea Power Plant Island: ::1Y1aui NAME: 25 ·1

" ',3 Address North Kihei Road, Maalaea, Maui Tax Key Map: 3-8-05: 25

(Attach a USGS map, scale 1" = 2000', and a property tax map showing well location referenced to established property bounda2§.)

3. (a) PROPOSED WORK: [v'] Drill New Well o * Alter Location

o Modify Existing Well o Redrill o Deepen o * Abandon/Seal

(b) WELL TYPE:

o Install New Well o Replace Pump o Modify Pump

(* Be sure to complete and submit well abandonment report upon completion of work.)

o Dug 0 Bored 0 Driven

Is this well a part of a battery of wells?

[v'] Drilled

DYes

o Radial

[""J] No

(Briefly describe and fill in the diagram on the back of this form.)

4. PROPOSED PUMP INFORMATION: Rated Pump Capacity: 170 gallons per minute Pump Type:

0 Deep Well Turbine

[v'] Submersible

o Centrifugal

5. PROPOSED USE:

Motor:

0 Rotary o Propeller o Diesel

o Rotary-Displacement o Reciprocating o Gas

o Rotary-Gear o Impulse [v'] Electric, rated horsepower of 15

o Municipal (including hotels, stores, etc.)

o Domestic (individual, noncommercial water systems)

o Irrigation (Crop)

o Military

[v'] Industrial

o Other (explain)

State Land Use District: [v'] Urban 0 Agriculture 0 Rural

County Zoning (Describe) Industrial Use (Heavy Industrial)

o Conservation

(If more space is needed, continue below under remarks, explanations.)

6. (a) PROPOSED AMOUNT OF WITHDRAWAL: 200,000 gallons per day (b) METHODS OF FLOW [v'] Flow-meter 0 Open-pipe 0 Orifice Plate 0 Weir

MEASUREMENTS:

7. PENDING ACTIONS: o CDUA [v'] SMA o EIS [v'] EA [v'] NONE [v'] Other (explain)

8. REMARKS, EXPLANATIONS: Well is to be supply water for the operation of the new units 17, 18, and 19 to be constructed.

Units 17, 18, and 19 will be a 58 - MW dual-trained combined-cycle combustion electric generating power plant. A list of permits is attached.

(If more space is needed, continue on back)

Note: Signing below indicates that the applicant understands that, if the permit requested is granted by the Commission on Water Resource Management, the proposed work is to be completed within two (2) years of the approval date. In addition, the contractor shall submit to the Commission a well completion report, well abandonment report, or both, within 30 days after the completion date of the permitted work. The applicant also understands that monthly water use data shall be submitted to the Commission. The applicant further understands that approval of the proposed permit shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

Well Owner Maui Electric Company Landowner Maui Electric Company Contractor

Signature ~"'1~ Signature ~~~~Signature Date 1> 4, q 4- Date ~ Cj 4 Date

For Official Use Only: Date Received

Date Accepted Field Checked by Date

Longitude latitude

Aquifer System Name State Well No.

6124/92 WCR Form

o o

Briefly describe the proposed work:

The well bore will be advanced with the appropriate drilling method to a total depth of at least 130 feet. The well will be screened over the bottom 30 feet of the well bore. The well will be developed and tested at a withdrawal rate of at least 180 gallons per minute (gpm). Solid stainless steel'iasing and cement grout will be extended to the top of the gravel pack. Water samples will be collected during the well test.

PROPOSED SECITON OF WELL

Elevation at top of casing 16 ft., msl. ~ ,..-.-..,

_----- Ground Elevation 14 ft., IDS

Cement Grout ...£Q.. ft.

Hole Diameter ~ in.

Total Depth ~ft.

Rock Packing .2Q... ft.

Solid Casing: Material Sli!inle~s Steel Length 100 ft Diameter 1Q,25 in. Wall Thickness Q.J6S m.

Casing: !Xl Perforated / / Screen Material Stainless Steel Length 30 fl Diameter 10.75 iJ Wall Thickness 0365 iJ Opening 82 sq. in./L.l

Open Hole: (none) Length ~ft. Diameter _0_ in.

* Approximate elevation at time of filing application. Final elevation ~msl) by a surveyer licensed by the State must be submined at stan of construcnon.

S u g a -.. .. .. • ... ,

i;.1

F

• + . .. h + • • ....

Source: USGS, Ma'a1aea Quadrangle, Island of Maul, 1983 ENVIRONMENTAL ASSESSMENT Prepared by: Belt Collins HawaII

~ 0 500 1000 2000 4000

NORTH SCALE IN FEET

M0294025d

60 )

• -' ~7 \' • . . . : \I \ \I

\I

". :

C a n e F

" • • • • ~ • ~ • • • • • " \I

" • " " • \I

\ II

e

, • \I

\I \I \I \I II \I \I

d S

..0 II

"

Figure 1 AREA MAP

MA'ALAEA GENERATING UNITS 17, 18 & 19 MAUl ELECTRIC COMPANY, LTD.

February 1994

o

o

...

TAX MAP KEY

o o

~ . " .' , •• I' ~ -4 ,:.~ • .:

:II .':' " C .'.' l!I' m "J':.,. ",.,'

. Z "ti .',' _,' .. ~ ~.'-- ... , i· .-:.' _ii,' , I G:'. . . ,

-~ ".,::.".:' ' . ,

,I' ,,' " . . , . , , . .' ,. " .ati,· ,'~ , ' ',., , ~4>/,'A ~ .... ' .--t1' _

' . ,I' " . ,

,,/~~,,/ . . . , , , "", ,

MOSMal2a

SCALE: I" = 366'

~~ ~~l~.t

1I1t~ 4

PORTION TO BE REZONED

rOlq,fII

2ND DIVISION 3·8-05 PORTION 25 AREA

2.52.5 ACRES

M05Q4OQ2c

Figure 2 TAX MAP KEY, 2nd Dlv. 3-8-05 Portion 25

MA'ALAEA GENERAnNG UNrra 17. 18, & 18 MAUl ELECTRIC COMPANY. LTD.

M8rch 1884

o o

Major Permits And Review Processes For Ma'alaea Generating Units 17, 18 & 19

PERMIT AGENCY

PUC Expenditure Approval State Public Utilities Commiaaion

New Covered Soutee Permit State Depan.ment of Health '""

Prevention of Significant Deterioration (Air Quality) EPA/State Department of Health

Special Management Arca Permit Maui County Planning Commiaaion

Zoning Change Maui County Council

Section 401 Water Quality Certification State Department of Health

Section 404 U.S. Army Corps of Engineen

Stream Channel Alteration Permit State Commission on Water Resource. Management

Underground Injection Control - Permit to Construct/Permit to Operate State Department of Healthl Environmental Protection Agency

Coastal Zone Management Assessment Office of State Planning

Well Construction Permit State Commission on Water Resources Management

Pump Installation Permit State Commission on Water Resources Management

Water Use PermitlWater Use Certificate State Commission on Water Resources Management

Spill Prevention Control and Countermeasures (SPCC) Plan U.S. Environmental Protection Agency

Oil Spill Contingency Plan Maui County Planning Depan.ment in Consultation with U.S. Fish and Wildlife Service, Department of Land and Natunl Resources, and State Department of Health

Facility Response Plan U.S. Environmental Protection Agency

Building Permit, including Electrical, Plumbing, etc. Maui County Department of Public Works. Land Use and Code Administration

HVAC State Department of Health

Grubbing, Grading, Excavation and Stockpiling Permit Maui County Department of Public Works, Land Use and Code Administration

Septic System State Department of Health

Above Ground Tank Installation Permit State Department of Health, Maui County Planning Depan.ment

FAA - Construction in Navigable Air Space Federal Aviation Administration

NPDES Storm Water Permit State Department of Health

NPDES Storm Water Permit SWPP Amendment State D~partment of Health

Boiler Installation Permit State Department of Labor and Industrial Relations

Combustible and Flammable Liquid Tank Installation Permit Maui County Fire Department

Sourc~: HECO. COIlIttuctioa and Environmental Permi .. Meco Mii'alaea Unit 17. November 8 1993.

o o State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT [j] Well Construction or 0 Pump Installation

Instructions: Please print in ink or type and send completed application with attachments to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-refundable filing fee of $ 25.00 payable to the Dept. of Land and Natural Resources. The Commission may not accept incomplete applications. For Assistance, call the Regulation Branch at 587-0225.

1. APPLICANT: (May be a, b, or c, but all must be filled in)

(a) Well Owner (b) Land Owner

Firm/Name Maui Electric Company, Ltd. Firm/Name Maui Electric Company, Ltd. Contact Person Stanley K. Kiyonaga 871-8461 Contact Person Stanley K. Kiyonaga 871-8461 Address P.O. Box 398 ~ress P.O. Box 398

Kahului, Maui, HI 96732

(c) CONTRACTOR: Firm/Name Address

To be named later

Kahului, Maui, HI 96732

Contractor's C-57 License No. q;c1'be given later

c:::? 2. WELL

NAME:

LOCATION! Maalaea Power Plant Island: Maui

Tax Key Map: . 3-8-~ 25 Address North Kihei Road, Maalaea, Maui

(Attach a USGS map, scale 1" = 2000', and a property tax map showing well location referenced to established property bovndaries;L...

~::>

3. (a) PROPOSED WORK:

(b) WELL TYPE:

[..J) Drill New Well o * Alter Location

o Modify Existing Well o Redrill o Deepen o * Abandon/Seal

o Install New Well o Replace Pump o Modify Pump

(* Be sure to complete and submit well abandonment report upon completion of work.)

o Dug 0 Bored 0 Driven [..J) Drilled

Is this well a part of a battery of wells? 0 Yes

o Radial

[..J) No

(Briefly describe and fill in the diagram on the back of this form.)

4. PROPOSED PUMP INFORMATION: Rated Pump Capacity: 170 gallons per minute Pump Type: Motor:

o Deep Well Turbine o Rotary 0 Propeller o Diesel

[..J) Submersible o Rotary-Displacement o Reciprocating o Gas

0 Centrifugal o Rotary-Gear o Impulse [..J) Electric, rated horsepower of 15

5. PROPOSED USE: o Municipal (including hotels, stores, etc.)

o Domestic (individual, noncommercial water systems)

o Irrigation (Crop)

o Military

[-J) Industrial

o Other (explain)

State Land Use District: [..J) Urban 0 Agriculture 0 Rural

County Zoning (Describe) Industrial Use (Heavy Industrial)

o Conservation

(If more space is needed, continue below under remarks, explanations.)

6. (a) PROPOSED AMOUNT OF WITHDRAWAL: 200,000 gallons per day (b) METHODS OF FLOW [..J) Flow-meter 0 Open-pipe 0 Orifice Plate 0 Weir

MEASUREMENTS:

PENDING ACTIONS: o CDUA [..J) SMA o EIS [..J) EA [-J) NONE [..J) Other (explain) 7. 8. REMARKS,~P~NAnONs:_w_e_II_~_~_be_s_u_p_~_y_wa_t_e_rf_o_rt_h_e_~_e_ra_ti_oo_~_t_~_n_e_w_u_n_b_17_,_1_~_a_n_d_1_9_~_b_e_c_oo_s_~_c_t_ed_._~

Units 17, 18, and 19 will be a 58 - MW dual-trained combined-cycle combustion electric generating power plant. A list of permits is attached.

(If more space is needed, continue on back)

Note: Signing below indicates that the applicant understands that, if the permit requested is granted by the Commission on Water Resource Management, the proposed work is to be completed within two (2) years of the approval date. In addition, the contractor shall submit to the Commission a well completion report, well abandonment report, or both, within 30 days after the completion date of the permitted work. The applicant also understands that monthly water use data shall be submitted to the Commission. The applicant further understands that approval of the proposed permit shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

Well Owner Maui Electric Company Landowner Maui Electric Company Contractor

Signature~~~~Signatur~"1~ Date <g 4 94 Date g A- CJA

Signature

Date

For Official Use Only: Date Received Date Accepted Field Checked by Date

Longitude

latitude

Aquifer System Name

State Well No. 6124/92 WCR Form

c o

Briefly describe the proposed work:

The well bore will be advanced with the appropriate drilling method to a total depth of at least 130 feet. The well will be screened over the bottom 30 feet of the well bore. The well will be developed and tested at a withdrawal rate of at least 180 gallons per minute (gpm). Solid stainless steel "iasing and cement grout will be extended to the top of the gravel pack. Water samples will be collected during the well test.

PROPOSED SECTION OF WELL

Elevation at top of casing 16 ft .• msl. ...... - ...

_____ Ground Elevation 14 ft.. InS

Cement Grout ....&L ft.

Hole Diameter -1.Q.... in.

Total Depth ...1.l{L ft.

Rock Packing .2Q... ft.

Solid Casing: Material Stmnle~~ St~~l Length 100 ft Diameter lQ,Z~ in. Wall Thickness 0.3Q~ In.

Casing: !Xl Perforated / / Screen Material Stainless Steel Length 30 fl Diameter 10.75 iJ Wall Thickness 0365 iJ Opening 82 sq. in.ILJ

Open Hole: (none) Length --.-!L ft. Diameter _0_ in.

* Approximate elevation at time of filing application. Final elevation ~msl) by a surveyer licensed by the State must be submitted at sran of construcnon.

Source: USGS,Mil'alaea Quadrangle, Island of Maul, 1983 ENVIRONMENTAL ASSESSMENT

~prepared by: 8elt Collins HawaII

o 500 1000 2000 4000 ~~~~iiiiiiiiiiiiiiiiiiliil

NORTH SCALE IN FEET

M0294025d

) · • • • • • • ~ " " - ~z ~

" • \I

• \I • " • : ~ \I \I \I \I

" \I

\I \ • II • ~ \I \I • " ~. : \ ~

c a n e F e d S .. .." \ .... 2'4> • • "'.!\. • " .•• ~ _-e"",

~~ ~, -<$-;"'~ ... ~ : s ~ ~ #o~~ .; ""

~ 19:",,"" \: • • • • ~ 10 ~ -:;'S"':=:::=:::::; ~ \ :

... l:- J.- . • ... o::J::JfS-::: •• -,-- •• _ •• _ •• -. ~ •

-:::s.fll.t::- ___ •• .,..... • • \ \ ~ .. .........- ~ \ .

p 0 n dNa t ion a , "W:,'~"'v~ '\ I d I' '...... ~ ..

I 'e ............ .. / /:Ie~ •• ,'~' r. ' , " \I

,.... : .., n. " 'j t::1' • \\ -, CSl .," ...... ..... \

'\,

. " . " \ "="

Figure 1 AREA MAP

MA'ALAEA GENERATING UNITS 17, 18 & 19 MAUl ELECTRIC COMPANY, LTD,

February 1994

o

o

o

.•

TAX MAP KEY 2ND DIVISION 3-8-05 PORTION 25

o

MOS4IXI2a

SCALE: I" = 366'

PORTION TO BE REZONED

AREA l.5l5ACRES

Figure 2 TAX MAP KEY, 2nd Dlv. 3-8-05 Portion 25

MA'ALAEA GENERATlNG UNrre 17, 18, , 111 MAUl ELECTRIC COMPANY, LTD_

Merch 1884

.. o o

Major Permits And Review Processes For Ma'alaea Generating Units 17, 18 & 19

PERMIT AGENCY

PUC Expenditure Approval State Public Utilities Commiuion

New Covered Soutee Permit State Department of Health ,.. Prevention of Significant Deterioration (Air Quality) EPA/State Department of Health

Special Management Arca Permit Maui County Planning Commiuion

Zoning Change Maui County Council

Section 401 Water Quality Certification State Department of Health

Section 404 U.S. Army Corps of Engineers

Stream Channel Alteration Permit State Commission on Water Resource. Management

Underground Injection Control - Permit to Construct/Permit to Operate State Department of Healthl Environmental Protection Agency

Coastal Zone Management Assessment Office of State Planning

Well Construction Permit State Commission on Water Resources Management

Pump Installation Permit State Commission on Water Resources Management

Water Usc PermitlWater Use Certificate State Commission on Water Resources Management

Spill Prevention Control and Countermeasures (SPCC) Plan U.S. Environmental Protection Agency

Oil Spill Contingency Plan Maui County Planning Department in Consultation with U.S. Fish and Wildlife Service, Department of Land and Natural Resources, and State Department of Health

Facility Response Plan U.S. Environmental Protection Agency

Building Permit, including Electrical, Plumbing, etc. Maui County Department of Public Works. Land Use and Code Administration

HVAC State Department of Health

Grubbing, Grading, Excavation and Stockpiling Permit Maui County Department of Public Works, Land Use and Code Administration

Septic System State Department of Health

Above Ground Tank Installation Permit State Department of Health, Maui County Planning Department

FAA - Construction in Navigable Air Space Federal Aviation Administration

NPDES Storm Water Permit State Department of Health

NPDES Storm Water Permit SWPP Amendment State Department of Health

Boiler Installation Permit State Department of Labor and Industrial Relations

Combustible and Flammable Liquid Tank Installation Permit Maui County Fire Department

.'

SOllru: HECO. Coaatnlcti"" IIDd Environmental Permita Meeo Ma'alaea Unit 17. November 81993.

o o ~tate of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources

APPLICATION FOR PERMIT Well Construction or 0 Pum Installation "j'

Instructions: Please print in ink or type and send completed application with attachments to the Commission on Water Resourel! ,Manage. r,t, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by a non-refundable filing fee of $ 25.00 payatiletothe De~"'eJ Land ar:iJ~atural Resources. The Commission may not accept incomplete applications. For Assistance, call the Regulation Branch at·587.Q225. \'i'.! . )', 1. APPLICANT: (May be a, b, or c, but all must be filled in) 0" . \

(a) Well Owner (b) Land Owner . \' \ Firm/Name Maui Electric Company, Ltd. Firm/Name Maui Electric Com. an , t:; ,)

Contact Person Stanley K. Kiyonaga 871-8461 Contact Person Stanle K. Ki onaa 1-8461 GO Address P.O. Box 398 ~ress P.O. Box 398' > .......

Kahului, Maui, HI 96732 Kahului, Maui', HI S6732 c;? (C) CONTRACTOR: Firm/Name Address

To be named later Contractor's C-57 License No. To be given later

2. WELL NAME:

LOCATION! Maalaea Power Plant

Address North Kihei Road, Maalaea, Maui

Island: Maui

Tax Key Map: 3-8-05: 25 (Attach a USGS map, scale 1" = 2000', and a property tax map showing well location referenced to established property boundaries.)

3. (a) PROPOSED WORK: [~ Drill New Well o * Alter Location

o Modify Existing Well o Redrill o Deepen o * Abandon/Seal

(b) WELL TYPE:

o Install New Well o Replace Pump o Modify Pump

(* Be sure to complete and submit well abandonment report upon completion of work.)

o Dug 0 Bored 0 Driven [~ Drilled

Is this well a part of a battery of wells? 0 Yes

o Radial

[-VI No

(Briefly describe and fill in the diagram on the back of this form.)

4. PROPOSED PUMP INFORMATION: Rated Pump Capacity: 170 gallons per minute Pump Type:

0 Deep Well Turbine

[~ Submersible

o Centrifugal

5. PROPOSED USE:

Motor:

o Rotary o Propeller o Diesel

o Rotary-Displacement o Reciprocating o Gas

o Rotary-Gear o Impulse [~ Electric, rated horsepower of 15

o Municipal (including hotels, stores, etc.)

o Domestic (individual, noncommercial water systems)

o Irrigation (Crop)

o Military

[..J) Industrial

o Other (explain)

State Land Use District: [..J) Urban 0 Agriculture 0 Rural

County Zoning (Describe) Industrial Use (Heavy Industrial)

o Conservation

(If more space is needed, continue below under remarks, explanations.)

6. (a) PROPOSED AMOUNT OF WITHDRAWAL: 200,000 gallons per day (b) METHODS OF FLOW [~Flow-meter 0 Open-pipe 0 Orifice Plate 0 Weir

MEASUREMENTS:

PENDING ACTIONS: o CDUA [~ SMA o EIS [~EA [..J) NONE [..J) Other (explain) 7. 8. REMARKS, EXPLANATIONS: Well is to be supply water for the operation of the new units 17, 18, and 19 to be constructed.

Units 17, 18, and 19 will be a 58 - MW dual-trained combined-cycle combustion electric generating power plant. A list of permits is attached.

(If more space is needed, continue on back)

Note: Signing below indicates that the applicant understands that, if the permit requested is granted by the Commission on Water Resource Management, the proposed work is to be completed within two (2) years of the approval date. In addition, the contractor shall submit to the Commission a well completion report, well abandonment report, or both, within 30 days after the completion date of the permitted work. The applicant also understands that monthly water use data shall be submitted to the Commission. The applicant further understands that approval of the proposed permit shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

Well Owner Maui Electric Company Landowner Maui Electric Company Contractor

Signature ~ ~""1"-1~Signatur~ 9""'~,:::::\ ~Signature Date ~a. I C-j 4- Date 15 4/ q 4 Date

For Official Use Only: Date Received Date Accepted Field Checked by Date

Longitude

latitude

Aquifer System Name State Well No.

6/24/92 WCR Form

o o

Briefly describe the proposed work:

The well bore will be advanced with the appropriate drilling method to a total depth of at least 130 feet. The well will be screened over the bottom 30 feet of the well bore. The well will be developed and tested at a withdrawal rate of at least 180 gallons per minute (gpm). Solid stainless steel '\:asing and cement grout will be extended to the top of the gravel pack. Water samples will be collected during the well test.

PROPOSED SECTION OF WELL

Elevation at top of casing 16 ft., msl. .. ....--..,

Cement Grout ~ft.

Hole Diameter J.2.... in.

Total Depth ..U!L ft.

Rock Packing .2Q.... ft.

Ground Elevation 14 ft., Ill!

Solid Casing: Material Stainless Steel Length 100ft. Diameter 10.75 in. Wall Thickness 0.365 In.

Casing: !XI Perforated / / Screer: Material Stainless Steel Length 30 f Diameter 10.75 Wall Thickness 0.365 i Opening 82 sq. in./L.

Open Hole: (none) Length ---1L ft. Diameter .--lL in.

* Approximate elevation at time of filing application. Final elevation ~msl) by a surveyer licensed by the State must be submitted at stan of construcnon.

Source: USGS,.MA'aJaea Quadrangle, Island of Maul, 1983 ENVIRONMENTAL ASSESSMENT

~ Prepared by: Belt Collins HawaII

~ 0 500 1000 2000 4000

NORTH SCALE IN FEET

M0294025d

· • • .. • II • • •

• • • • • " II

• • • " \I

\I

" • • • " ,I

II

e F

• .. e d . -" \ .... ..-

: •• ",.1). "" ... ~ -~""

: ~'~1l--\~ to : s~,:sP~.' ; ""

191 ss:.'s \ • . " . • •

--'-.... '.......... ,'\ ..

- .... J

\ : . . '. . \

" " S

..0 II

"

'\.

Figure 1 AREA MAP

MA'ALAEA GENERATING UNITS 17, 18 & 19 MAUl ELECTRIC COMPANY, LTD.

February 1994

I

o

o

o

TAX MAP KEY 2ND DIVISION 3-8-05 PORTION 25

M0594OO2c

o

SCALE: I" = 366'

PORTION TO BE REZONED

AREA 2.525 ACRES

FlgW"e2 TAX MAP KEY, 2nd Dlv. 3-8-05 Portion 25

MA'ALAEA GENERAnNG UNrra 17, 18, & 111 MAUl ELECl'RIC COMPANY, LTD_

March 111114

o o

Major Permits And Review Processes For Ma'alaea Generating Units 17, 18 & 19

PERMIT AGENCY

PUC Expenditure Approval State Public Utilities Commiaaion

New Covered Soun!e Pennit State Depattment of Health ~

Prevention of Significant Deterioration (Air Quality) EPA/State Department of Health

Special Management Area Pennit Maui County Planning Commiaaion

Zoning Change Maui County Council

Section 401 Water Quality Certification State Department of Health

Section 404 U.S. Army Corps of Engineers

Stream Channel Alteration Pennit State Commission on Water Resources Management

Underground Injection Control- Pennit to ConstructiPennit to Operate State Department of Healthl Environmental Protection Agency

Coastal Zone Managemcnt Assessment Office of State Planning

Well Construction Pcnnit State Commission on Water Resources Management

Pump Installation Pennit State Commission on Water Resourccs Managcmcnt

Water Use PennitlWater Use Certificate State Commission on Water Resources Management

Spill Prevention Control and Countermeasures (SPCC) Plan U.S. Environmental Protection Agency

Oil Spill Contingency Plan Maui County Planning Department in Consultation with U.S. Fish and Wildlife Service, Departmcnt of Land and Natural Resources, and State Department of Health

Facility Response Plan U.S. Environmental Protcction Agency

Building Pennit, including Electrical, Plumbing, etc. Maui County Departmcnt of Public Works, Land Use and Codc Administration

HVAC State Departmcnt of Health

Grubbing, Grading, Excavation and Stockpiling Permit Maui County Department of Public Works, Land Use and Code Administration

Septic System State Department of Health

Above Ground Tank Installation Permit State Department of Health, Maui County Planning Departmcnt

FAA - Construction in Navigable Air Space Federal Aviation Administration

NPDES Storm Water Pennit State Department of Health

NPDES Storm Water Pennit SWPP Amendment State D~partment of Health

Boiler Installation Permit State Department of Labor and Industrial Relations

Combustible and Flammable Liquid Tank Installation Pennit Maui County Fire D~partment

Soun:.: HECO. c .... tructioa and Environmental Permi .. Meco Mii'alaea Unit 17. November 8 1993.