SHEETNUMBER

SHEET TITLE PAGENUMBER

GENERAL SHEETS1332-G000 COVER SHEET 11332-G001 ARCHITECTURAL ABBREVIATIONS AND SYMBOL LEGEND 21332-G002 LIFE SAFETY PLAN AND CODE ANALYSIS BASEMENT 31332-G003 LIFE SAFETY PLAN AND CODE ANALYSIS FIRST FLOOR 41332-G004 PHASING PLAN 5

ARCHITECTURAL SHEETS1332-AD100 ARCHITECTURAL DEMOLITION PLAN BASEMENT 61332-AD101 ARCHITECTURAL DEMOLITION PLAN FIRST FLOOR 71332-A100 BASEMENT FLOOR PLAN 81332-A101 FIRST FLOOR PLAN 91332-A501 DETAILS 101332-A601 DOOR DETAILS 11

INTERIORS SHEETS1332-I100 INTERIOR FINISH SCHEDULE AND PLAN BASEMENT 121332-I101 INTERIOR FINISH SCHEDULE AND PLAN FIRST FLOOR 13

MECHANICAL SHEETS1332-H001 MECHANICAL SYMBOLS AND ABBREVIATIONS 141332-HD101 AC AND VENTILATION PLAN FIRST FLOOR - DEMOLITION 151332-H100 AC AND VENTILATION PLAN BASEMENT 161332-H101 AC AND VENTILATION PLAN FIRST FLOOR 171332-PD100 ABOVE GROUND PIPING PLAN BASEMENT - DEMOLITION 181332-PD101 ABOVE GROUND PIPING PLAN FIRST FLOOR - DEMOLITION 191332-P100 ABOVE GROUND PIPING PLAN BASEMENT 201332-P101 ABOVE GROUND PIPING PLAN FIRST FLOOR 21

ELECTRICAL SHEETS1332-E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS 221332-E100 ELECTRICAL PLAN - BASEMENT 231332-E101 ELECTRICAL PLAN - FIRST FLOOR 24

Page 2: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

DRAWING INDEX

APPROVED BY: DATE

VFOTNEMTRAPED SRIA

FFA

SNARETE

E S OF AM

ERI CAU

N I T E DSTAT

DEPARTMENT OF VETERANS AFFAIRSMINNEAPOLIS, MN. MEDICAL CENTER

BUILDING 49 FLOORING REPLACEMENT

ENGINEERING PROJECT SECTION CHIEF:

ENGINEERING CHIEF:

MAINTENANCE CHIEF:

SAFETY MANAGER:

VA POLICE:

PATIENT SAFETY:

INFECTION CONTROL:

UNION 1969:

UNION 3669:

LOCATION MAP: MPLS. VAMC

68

47 9

72

10

11

12

13

14

62

28

3.99PARKING AREA 6

545ACRESSPACES

PARKING AREA 1

SPACES5433.96 AC (5.48 W/IN BORDER)

PARKING AREA 8-10ACRESSPACES775

5.72

PARKING AREA 43BACRESSPACES104

.904

PARKING AREA 43CACRESSPACES55

.359

ACRESSPACES149

1.25

PARKING AREA 9BACRESSPACES 16

.145

PARKING AREAACRESSPACES 3

.016

PARKING AREA 43AACRESSPACES79

.729

PARKING AREA 9ACRES.028

7 SPACES

EAST 54th. STREET

46th. AVE

. SO

UTH

MINNEH

AHA A

VE. SOUTH

(T.H.55)

STREET

VETERANS

DRIVE

AREA A 85.24 ACRES. (CHECK LOCATION - SC)

o

FENCE LINE

FENCE LINE

FENCE LINE

FENCE LINE

FENCE LINE

FENCE LIN

E

FENCE LIN

E

FENCE LINE

FENCE LINEFENCE LINE

FENCE

LINE

""PARKING SPACES: 2,878.

VA MEDICAL CENTER

34

18

55th.

56th.STREET

VETERANS ADMINITRATION HOSPITALFINISH FLOOR ELEVATION = 256.1387FINISH FLOOR ELEVATION = 840.33

73

74

49-SV

VOL. PARKING AREA ACRESSPACES92

0.65

SPACESACRES

PARKING AREA 5

1711.47

PARKING AREA 73.129 ACRES20 SPACES

Track B0.43 acres

26

29

18

VAN

VAN

VAN

VAN

VAN

VAN

VAN

98 TOTAL -

VERIFY

40

26

-4

LOADING

26

17

17

17

17

22

APRONDOCK

OXYGEN TANK

RAMPPARKING AREA 49

ACRESSPACES66

0.54

PARKING AREA 43ACRESSPACES380

3.06

SCI PARKING AREA ACRESSPACES95

0.93

76

69

BLDG 70

SHEETNUMBER

SHEET TITLE PAGENUMBER

GENERAL SHEETS1332-G000 COVER SHEET 11332-G001 ARCHITECTURAL ABBREVIATIONS AND SYMBOL LEGEND 21332-G002 LIFE SAFETY PLAN AND CODE ANALYSIS BASEMENT 31332-G003 LIFE SAFETY PLAN AND CODE ANALYSIS FIRST FLOOR 41332-G004 PHASING PLAN 5

ARCHITECTURAL SHEETS1332-AD100 ARCHITECTURAL DEMOLITION PLAN BASEMENT 61332-AD101 ARCHITECTURAL DEMOLITION PLAN FIRST FLOOR 71332-A100 BASEMENT FLOOR PLAN 81332-A101 FIRST FLOOR PLAN 91332-A501 DETAILS 101332-A601 DOOR DETAILS 11

INTERIORS SHEETS1332-I100 INTERIOR FINISH SCHEDULE AND PLAN BASEMENT 121332-I101 INTERIOR FINISH SCHEDULE AND PLAN FIRST FLOOR 13

MECHANICAL SHEETS1332-H001 MECHANICAL SYMBOLS AND ABBREVIATIONS 141332-HD101 AC AND VENTILATION PLAN FIRST FLOOR - DEMOLITION 151332-H100 AC AND VENTILATION PLAN BASEMENT 161332-H101 AC AND VENTILATION PLAN FIRST FLOOR 171332-PD100 ABOVE GROUND PIPING PLAN BASEMENT - DEMOLITION 181332-PD101 ABOVE GROUND PIPING PLAN FIRST FLOOR - DEMOLITION 191332-P100 ABOVE GROUND PIPING PLAN BASEMENT 201332-P101 ABOVE GROUND PIPING PLAN FIRST FLOOR 21

ELECTRICAL SHEETS1332-E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS 221332-E100 ELECTRICAL PLAN - BASEMENT 231332-E101 ELECTRICAL PLAN - FIRST FLOOR 24

PROJECTLOCATION

Drawing Scale

Plot Scale9/19/16

Office ofFacilities

ManagementTRUE NORTH

PLAN NORTHBY THE VARIOUS SUBCONTRACTORS.GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLEDGENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THESUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THERESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVERESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THECEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'SGENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS &

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TORESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR,GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE

GEN

ERAL

NOTES:

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED UNDER THE LAWS OF THE STATE OF MINNESOTA

REGISTRATION NUMBER:

BUILDING 49 FLOORING REPLACEMENT 618-16-109

49

24

Drawing Title Project Title

Approved: Division Chief

Approved: Service Director

Building Number

Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

one-

eigh

th inch

= o

ne foo

t

04

816

one-

quarter inch =

one foo

t

04

8

three-

eigh

ths inch =

one foo

t

04

04

one-

half

inch =

one foo

t

02

three-

qusrter inch =

one foo

t

60

2

one inch =

one foo

t

60

1

one an

d on

e-ha

lf inch =

one foo

t

60

three inches =

one foo

t

V.A. MEDICAL CENTERONE VETERANS DRIVEMINNEAPOLIS, MN 55417 1332-

REVISIONS: DATE

95% SUBMITTAL FOR REVIEW 7/29/16

a Haskell Company

100% ISSUE FOR CONSTRUCTION 9/19/16

01DRETW1:1

AS INDICATED

COVER SHEET

G000

ARCHITECT

Page 3: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

ARCHITECTURAL ABBREVIATIONSA LABEL CLASS A DOORA/C AIR CONDITIONA/C UNIT AIR CONDITIONING UNITA/E ARCHITECT/ENGINEERAAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATIONAB ANCHOR BOLTABC AGGREGATE BASE COURSEAC ASBESTOS CEMENT OR

ASPHALTIC CONCRETEACI AMERICAN CONCRETE INSTITUTEACS DR ACCESS DOORACS FLR ACCESS FLOORACS PNL ACCESS PANELACST ACOUSTICACT ACOUSTICAL CEILING TILEAD AREA DRAINADA AMERICANS WITH DISABILITIES

ACTADC AUTOMATIC DOOR CLOSERADDL ADDITIONALADDN ADDITIONADH ADHESIVEADJ ADJACENT, ADJOINING, OR

ADJUSTABLEADMIN ADMINISTRATIONADB AUTOMATIC DOOR BOTTOMAFC ABOVE FINISHED COUNTERAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAFS ABOVE FINISHED SLABAGA AMERICAN GAS ASSOCIATIONAGC ASSOCIATED GENERAL

CONTRACTORSAGGR AGGREGATEAHJ AUTHORITY HAVING

JURISDICTIONAHR ANCHORAHU AIR HANDLING UNITAIA AMERICAN INSTITUTE OF

ARCHITECTSAISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTIONALT ALTERNATEALT NO ALTERNATE NUMBERALUM ALUMINUMAMP AMPEREAMT AMOUNTANOD ANODIZEANSI AMERICAN NATIONAL STANDARDS

INSTITUTEANT ANTENNAAPA AMERICAN PLYWOOD

ASSOCIATIONAPPD APPROVEDAPPROX APPROXIMATEAPT APARTMENTAR AS REQUIREDARCH ARCHITECTASB ASBESTOSASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTIONASKLR AUTOMATIC SPRINKLERASPH ASPHALTASSN ASSOCIATIONASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALSATCH ATTACHMENTATM AUTOMATIC TELLER MACHINEATS AUTOMATIC TRANSFER SWITCHAUTO AUTOMATICAUX AUXILIARYAV AUDIO VISUALAVE AVENUEAVG AVERAGEAW ACID WASTEAWI ARCHITECTURAL WOODWORKING

INSTITUTEAWPA AMERICAN WOOD PRESERVERS'

ASSOCIATIONAWS AMERICAN WELDING SOCIETYAWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOORB PL BASE PLATEBALC BALCONYBAT BATTENBB BULLETIN BOARDBD BOARDBD FT BOARD FEET (FOOT)BEV BEVELBHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATIONBI FLD DR BIFOLDING DOORSBITUM BITUMINOUSBKG BACKINGBLD BUILDBLDG BUILDINGBLKT BLANKETBLVD BOULEVARDBM BEAM OR BENCHMARKBOT BOTTOMBR BEDROOMBRCG BRACINGBRDG BRIDGINGBRDG JST BRIDGING JOISTBRG BEARINGBRG PL BEARING PLATEBRKT BRACKETBRZ BRONZEBSMT BASEMENTBTWN BETWEENBU BUSHELBUR BUILT-UP ROOFING

C CELSIUS CHANNELC CHANNEL CELSIUSC CONC CAST CONCRETEC LABEL CLASS C DOORC TO C CENTER TO CENTERCAB CABINETCAC CEILING ATTENUATION CLASSCB CATCH BASIN OR CORNER BEADCBB CEMENTITIOUS (BACKER) BOARDCC CUBIC CENTIMETERCCTV CLOSED CIRCUIT TELEVISIONCCW COUNTERCLOCKWISECD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTSCEM CEMENTCEM PLAS CEMENT PLASTERCER CERAMICCF CONTRACTOR FURNISHEDCF/CI CONTRACTOR

FURNISHED/CONTRACTORINSTALLED

CF/OI CONTRACTORFURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHINGCFM CUBIC FEET PER MINUTECFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECONDCG CENTER OF GRAVITY OR

CORNER GUARDCGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITSCH BD CHALKBOARDCHEM CHEMICALCHFR CHAMFERCHK CHECKCI CAST IRONCIP CAST-IN-PLACECIR CIRCLECIRC CIRCULARCJ CONSTRUCTION JOINT OR

CONTROL JOINTCL CENTER LINECLDG CLADDINGCLG CEILINGCLG HT CEILING HEIGHTCLR CLEARcm² SQUARE CENTIMETERcm³ CUBIC CENTIMETERCM CONSTRUCTION MANAGEMENTCMU CONCRETE MASONRY UNITCNR CORNERCNTR COUNTERCO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,CLEANOUT, OR COMPANY

CO₂ CARBON DIOXIDECOL COLUMNCOM COMMONCOMB COMBINATION, COMBINEDCOMM COMMUNICATIONCOMP COMPONENT

CONC CONCRETECONC FLR CONCRETE FLOORCOND CONDENSER OR CONDITIONCONF CONFERENCECONN CONNECTCONSTR CONSTRUCTIONCONT CONTINUECONTR CONTRACTORCOORD COORDINATECORR CORRIDORCPM CRITICAL PATH METHODCPRS COMPRESSIBLECPT CARPETCRS COLD ROLLED STEELCRSI CONCRETE REINFORCING STEEL

INSTITUTECSB CONCRETE SPLASH BLOCKCSG CASINGCSI CONSTRUCTION SPECIFICATIONS

INSTITUTECSK COUNTER SUNKCSMT CASEMENTCSWK CASEWORKCT CERAMIC TILECTB CERAMIC TILE BASECTF CERAMIC TILE FLOORCTG COATINGCTR CENTER CONTOURCTRL CONTROLCTV CABLE TELEVISIONCU COPPER CCU FT CUBIC FEETCU IN CUBIC INCHCU YD CUBIC YARDCURT CURTAINCYL CYLINDERCYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)D LABEL CLASS D DOORDAT DATUMDB DECIBELDBL DOUBLEDBL GLZ DOUBLE GLAZEDC DIRECT CURRENTDEG DEGREEDEL DELETEDEMO DEMOLITIONDEPT DEPARTMENTDET DETAILDF DRINKING FOUNTAINDIA DIAMETERDIAG DIAGONAL DIAGRAMDIAG DIAGRAM DIAGONALDIFF DIFFERENCE OR DIFFUSERDIM DIMENSIONDIR DIRECTIONDISP DISPENSERDIST DISTANCEDIV DIVIDE OR DIVISIONDL DEAD LOADDOC DOCUMENTDOUG FIR DOUGLAS FIRDOZ DOZENDR DOOR, DRAIN, DRESSING ROOM,

OR DRIVEDR CL DOOR CLOSERDR FR DOOR FRAMEDR OPNG DOOR OPENINGDS DOWNSPOUTDSGN DESIGNDW DISHWASHERDWG DRAWINGDWTR DUMBWAITER

E EASTE LABEL CLASS E DOOREA EACHEFF EFFICIENCYEFS EXTERIOR FINISH SYSTEMEIFS EXTERIOR INSULATION AND

FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELAST ELASTOMERICELEC ELECTRICELEC DR OP ELECTRIC DOOR OPENERELEV ELEVATOREMER EMERGENCYEMER SHR EMERGENCY SHOWERENCL ENCLOSUREENGR ENGINEERENVIR ENVIRONMENTEPA ENVIRONMENTAL PROTECTION

AGENCYEPDM ETHYLENE PROPYLENE DIENE

MONOMEREPO EMERGENCY POWER OFFEPS EXPANDED POLYSTYRENE BOARD

(INSULATION)EQ EQUALEQL SP EQUALLY SPACEDEQUIP EQUIPMENTEQUIV EQUIVALENTERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEONESCAL ESCALATORESMT EASEMENTESP ESPECIALLYEST ESTIMATEETC AND SO FORTH OR ET

CETERAEW EACH WAYEWC ELECTRIC WATER COOLEREWS EYE WASH STATIONEXH EXHAUSTEXIST EXISTINGEXP EXPANSION OR EXPOSEDEXP BT EXPANSION BOLTEXST GR EXISTING GRADEEXT EXTERIOR, EXTERNAL, OR

EXTINGUISHEREXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALEFA FIRE ALARMFAB FABRICFAC FACTORFACIL FACILITYFAS FASCIAFAS BD FASCIA BOARDFCO FLOOR CLEANOUTFCTY FACTORYFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDTN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FACEFF EL FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE, AND

EQUIPMENTFH FLAT HEAD OR FLAT HEAD

SCREWSFHC FIRE HOSE CABINETFHMS FLAT HEAD MACHINE SCREWFHP FULL HEIGHT PARTITIONFHWS FLAT HEAD WOOD SCREWFIG FIGUREFIL FILLETFIN FINISHFIN FLR FINISH FLOORFIN GR FINISH GRADEFIN WD FINISH WOODFIXT FIXTUREFL FLOORLINEFLASH FLASHINGFLDG FOLDINGFLEX FLEXIBLEFLG FLOORINGFLR FLOORFLR FIN FLOOR FINISHFLR SK FLOOR SINKFLUOR FLUORESCENTFLUOR FIX FLUORESCENT FIXTUREFM FACTORY MUTUALFM-G FACTORY MUTUAL GLOBALFO FINISHED OPENINGFOC FACE OF CONCRETE OR FACE

OF CURBFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF SLAB OR FACE OF

STUDFOUNT FOUNTAINFOW FACE OF WALLFP FIRE PROTECTION OR

FIREPROOFFPM FEET PER MINUTEFPS FEET PER SECONDFR FIRE RATING, FIRE RESISTANT,

OR FRAMEFR SNK FLUSHING RIM SINKFREQ FREQUENCYFRMG FRAMINGFRP FIBER REINFORCED POLYESTER

OR FIBERGLASS REINFORCEDPLASTIC

FRZ FREEZER FS FEDERALSPECIFICATION

FSTNR FASTENERFT FEET OR FOOTFTG FOOTINGFURG FURRINGFURN FURNISH OR FURNITUREFUT FUTUREFWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATIONGAL GALLONGALV GALVANIC OR GALVANIZEDGALV STL GALVANIZED STEELGB GRAB BARGC GENERAL CONTRACTORGD GUARDGDR GUARD RAILGEN GENERAL OR GENERATORGFRC GLASS-FIBER-REINFORCED

CONCRETEGFRG GLASS-FIBER-REINFORCED

GYPSUMGFRP GLASS-FIBER-REINFORCED

PLASTICGI GALVANIZED IRONGL GLASSGL BLK GLASS BLOCKGLU LAM GLUED LAMINATED WOODGR FL GROUND FLOORGRAN GRANITEGRTG GRATINGGSB GYPSUM SHEATHING BOARDGSM GALVANIZED SHEET METALGSU GLAZED STRUCTURAL UNITGT GROUTGUAR GUARANTEEGUT GUTTERGYP GYPSUMGYP BD GYPSUM BOARDGYP PLAS GYPSUM PLASTER

H HIGHH PLAM HIGH PRESSURE PLASTIC

LAMINATEHAZ MAT HAZARDOUS MATERIALSHB HOSE BIBBHC HOLLOW COREHCWD HOLLOW CORE WOOD DOORHDBD HARDBOARDHDNR HARDENERHDO HIGH DENSITY OVERLAYHDR HEADERHDW HARDWAREHDWD HARDWOODHEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)HEX HEXAGONHF HIGH FREQUENCY

HGR HANGERHM HECTOMETERHM HOLLOW METALHMD HOLLOW METAL DOORHMDF HOLLOW METAL DOOR AND

FRAMEHMF HOLLOW METAL FRAMEHNDRL HANDRAILHO HOLD OPENHORIZ HORIZONTALHOSP HOSPITALHP HIGH PRESSURE OR

HORSEPOWERHQ HEADQUARTERSHS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTHHSE HOUSEHSKPG HOUSEKEEPINGHST HOISTHT HEIGHTHVAC HEATING, VENTILATING, AND AIR

CONDITIONINGHVY HEAVYHW HOT WATERHYD HYDRANTHYDR HYDRAULIC

I INTERSTATE (HIGHWAY) ORMOMENT OF INERTIA

IAQ INDOOR AIR QUALITYIBC INTERNATIONAL BUILDING CODEID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGNID NO IDENTIFICATION NUMBERILLUM ILLUMINATIONINCL INCLUDEDIND INDEPENDENT OR INDUSTRIALINFO INFORMATIONINSUL INSULATIONINT INTERIORINTERCOM INTERCOMMUNICATIONINTL INTERNATIONALIRMA INVERTED ROOF MEMBRANE

ASSEMBLYIWH INSTANTANEOUS WATER HEATER

JAN JANITORJ-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKEDDOWN

KIT KITCHENKO KNOCKOUTKPL KICKPLATE

L ANGLELAB LABORATORYLAD LADDERLAM LAMINATELAM GL LAMINATED GLASSLAU LAUNDRYLAV LAVATORYLBR LUMBERLBS POUNDLD BRG LOAD-BEARINGLDR LEADERLED LIGHT EMITTING DIODELF LINEAR FEET (FOOT)LH LEFT HANDLHR LEFT HAND REVERSELHR LEFT HAND REVERSE LATENT

HEAT RATIOLIB LIBRARYLIN LINEARLINO LINOLEUMLIQ LIQUIDLKR LOCKERLKR RM LOCKER ROOMLKWASH LOCKWASHERLL LEAD LINEDLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLMST LIMESTONELNDSCP LANDSCAPELR LIVING ROOMLRG LARGELRV LOUVERED ROOF VENTLS LUMP SUMLT LIGHTLT GA LIGHT GAGELT WT LIGHTWEIGHTLTG LIGHTINGLTNG LIGHTNINGLVD LOUVEREDLVR LOUVERLWC LIGHTWEIGHT CONCRETELWIC LIGHTWEIGHT INSULATING

CONCRETELYR LAYER

MACH MACHINEMACH RM MACHINE ROOMMAINT MAINTENANCEMAN MANUALMATL MATERIALMATV MASTER ANTENNA TELEVISION

SYSTEMMAX MAXIMUMMB MACHINE BOLTMCB METAL CORNER BEADMD DECKME MECHANICAL ENGINEERMEAS MEASUREMECH MECHANICALMECH RM MECHANICAL ROOMMED MEDICAL MEDIUMMED MEDIUM MEDICALMEK METHYL ETHYL KETONEMEL MELAMINEMEMB MEMBRANEMEMO MEMORANDUMMEZZ MEZZANINEMF MILL FINISHMFD MANUFACTUREDMFG MANUFACTURINGMFR MANUFACTURERMFR REC MANUFACTURER'S

RECOMMENDATIONMGT MANAGEMENTMH MANHOLEMIC MICROPHONEMID MIDDLEMIL STD MILITARY STANDARDMIN MINIMUM MINUTEMIN MINUTE MINIMUMMIRR MIRRORMISC MISCELLANEOUSMIT MITERMKR MARKERML METAL LATHMLDG MOLDING (MOULDING)

MLWK MILLWORKmm MILLIMETERMO MASONRY OPENING OR MOTOR

OPERATEDMOD MODEL, MODIFY OR MODULEMOD BIT MODIFIED BITUMENMON MONITORMOPR MOP RACKMR MOISTURE RESISTANTMS MACHINE SCREW OR MOP SINKMTD MOUNTEDMTG MOUNTINGMTL METALMULL MULLIONMW MICROWAVEMWP MEMBRANE WATERPROOFING

N NORTHNA NOT APPLICABLENAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METALMANUFACTURERS

NAT NATURALNATL NATIONALNC NOISE CRITERIANCOMBL NONCOMBUSTIBLENEC NATIONAL ELECTRICAL CODENEG NEGATIVENEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATIONNEUT NEUTRALNFC NATIONAL FIRE CODENFPA NATIONAL FIRE PROTECTION

ASSOCIATIONNIC NOT IN CONTRACTNO NUMBERNOM NOMINALNR NOISE REDUCTIONNRC NOISE REDUCTION COEFFICIENTNRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATIONNRP NONREMOVABLENS NARROW STILENTE NOT TO EXCEEDNUM NUMERAL

O/O OUT TO OUTO OXYGENOA OUTSIDE AIR OR OVERALL OC

ON CENTEROCC OCCUPYOCT OCTAGONOD OUTSIDE DIAMETER OUTSIDE

DIMENSIONOD OUTSIDE DIMENSION OUTSIDE

DIAMETEROF/CI OWNER

FURNISHED/CONTRACTORINSTALLED

OFD OVERFLOW DRAINOFF OFFICEOF/OI OWNER FURNISHED/OWNER

INSTALLEDOH OVERHANGOH DR OVERHEAD (COILING) DOOROPH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOPR OPERABLEOPT OPTIONALOR OPERATING ROOM OR OUTSIDE

RADIUSORD ORDNANCE OR OVERFLOW ROOF

DRAINORG ORGANICORIG ORIGINALORN ORNAMENTALOSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINSTRATIONOUT OUTLETOZ OUNCE

PAR PARALLEL OR PARAPETPARA PARAGRAPHPART PARTIALPAT PATTERNPB PUSHBUTTONPBD PARTICLEBOARDPC PIECE, POLYCARBONATE OR

PORTLAND CEMENTPCA PORTLAND CEMENT ASSOCIATIONPCC PRECAST CONCRETEPCCP CONCRETE PAVEMENTPCD PAPER CUP DISPENSERPCF POUNDS PER CUBIC FOOTPCP PORTLAND CEMENT PLASTERPED PEDESTALPEN PENETRATEPEND PENDANTPERF PERFORATEDPERIM PERIMETERPERP PERPENDICULARPGBD PEGBOARDPHAR PHARMACYPHOTO PHOTOGRAPHPHS PHILLIPS HEAD SCREWPKG PACKAGEPL PROPERTY LINEPL GL PLATE GLASSPLAM PLASTIC LAMINATEPLAS PLASTER OR PLASTICPLBG PLUMBINGPLYWD PLYWOODPMTL PAINTED METALPNEU PNEUMATICPNL PANELPO POST OFFICE PURCHASE ORDERPO PURCHASE ORDER POST OFFICEPOLY POLYETHYLENE (PLASTIC)PR PAIRPRCST PRECASTPREFAB PREFABRICATEPREFIN PREFINISHPRELIM PRELIMINARYPREP PREPARATIONPRESS PRESSUREPREV PREVIOUSPRKG PARKINGPRMLD PREMOLDEDPROJ PROJECTPROP PROPERTYPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTN PARTITIONPVC POLYVINYL CHLORIDE (PLASTIC)PVG PAVINGPWR POWER

QA QUALITY ASSURANCEQC QUALITY CONTROLQRY QUARRYQT QUARRY TILEQTB QUARRY TILE BASEQTF QUARRY TILE FLOORQTR QUARTERQTY QUANTITYQUAD QUADRANTQUAL QUALITY

R RADIUS OR RISERRA RETURN AIRRAD RADIATORRB RESILIENT BASE OR RUBBER

BASERB HK ROBE HOOKRBM REINFORCED BRICK MASONRYRBR RUBBERRC REMOTE CONTROLRCP REFLECTED CEILING PLANRCVR RECEIVERRD ROAD OR ROOF DRAINREC RECESSEDRECD RECEIVEDRECPT RECEPTACLERECT RECTANGLEREF REFERENCE OR REFRIGERATORREFR REFRACTORY REFRIGERATIONREFR REFRIGERATION REFRACTORYREG REGISTERREINF REINFORCEREP REPAIRREPL REPLACEREQ REQUIREREQD REQUIREDRESIL RESILIENTRET RETURNREV REVISIONRF RADIO FREQUENCYRFG ROOFINGRFI REQUEST FOR INFORMATIONRFP REQUEST FOR PROPOSALRH RIGHT HANDRHMS ROUND HEAD MACHINE SCREWRHR RIGHT HAND REVERSERHWS ROUND HEAD WOOD SCREWRL ROOF LEADERRLG RAILINGRM ROOMRND ROUNDRO ROUGH OPENINGROW RIGHT OF WAYRPM REVOLUTIONS PER MINUTERS ROUGH SAWNRT RIGHTRV ROOF VENTRVS REVERSERWD REDWOODRWL RAIN WATER LEADER

SA SUPPLY AIRSALV SALVAGESAMP SAMPLESAN SANITARYSAT SUSPENDED ACOUSTICAL TILESATC SUSPENDED ACOUSTICAL TILE

CEILINGSB SPLASH BLOCKSBS STYRENE BUTADIEN STYRENESBSTR SUBSTRATESC SHADING COEFFICIENT OR SOLID

CORESCH SCHOOLSCHED SCHEDULESCHEM SCHEMATICSCP SCUPPERSCRN SCREENSCT STRUCTURAL CLAY TILESCWD SOLID CORE WOOD DOORSD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAPDISPENSER;

SDG SIDINGSECT SECTIONSEG SEGMENTSEL SELECTSEP SEPARATESF SQUARE FOOT (FEET)SFTWD SOFTWOODSGD SLIDING GLASS DOORSGL SINGLESHR SHOWERSHR HD SHOWER HEADSHRD SHOWER DRAINSHT SHEETSHT MTL FLASH SHEET METAL (FLASHING)SHTHG SHEATHINGSHV SHELVINGSIM SIMILARSJ SCORED JOINTSJI STEEL JOIST INSTITUTESK SKETCHSKLT SKYLIGHTSLD WDW HORIZONTAL SLIDING WINDOWSLDG SLIDINGSLNT SEALANTSM SHEET METALSMK SMOKESND SANITARY NAPKIN DISPENSERSND INS SOUND INSULATIONSNDU SANITARY NAPKIN DISPOSAL

UNITSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSPLY SUPPLYSQ SQUARESQ IN SQUARE INCHSQ YD SQUARE YARDSS SANITARY SEWER OR SERVICE

SINKSST STAINLESS STEELST STAIRS OR STREETSTC SOUND TRANSMISSION CLASSSTD STANDARDSTIF STIFFENERSTL JST STEEL JOISTSTL LNTL STEEL LINTELSTL PL STEEL PLATESTL RF DK STEEL ROOF DECKSTL TB STEEL TUBESTL TR STEEL TRUSSSTNLS STAINLESSSTOR STORAGESTR STRINGERSSTRUCT STRUCTURALSTRUCT STL STRUCTURAL STEELSUB SUBSTITUTESURF SURFACESUSP SUSPEND

SUSP CLG SUSPENDED CEILINGSV SHEET VINYLSW SWITCHSWDR SWING DOORSYM SYMBOLSYNTH SYNTHETICSYS SYSTEMT TREADT&G TONGUE AND GROOVET&M TIME AND MATERIALSTB THROUGH BOLT OR TOWEL BARTCA TILE COUNCIL OF AMERICATCP TELEPHONE CONTROL PANEL

TEMPERATURE CONTROL PANEL;TRAFFIC CONTROL PLAN

TD TOWEL DISPENSERTECH TECHNICALTEL TELEPHONETEMP TEMPERATURE OR TEMPORARYTER TERRAZZOTHD THREADTHERM THERMALTHK THICKNESSTHRES THRESHOLDTHRU THROUGHTHRUOUT THROUGHOUTTK BD TACKBOARDTMPD TEMPEREDTMPD GL TEMPERED GLASSTN TRUE NORTHTO TOP OF ___TO FDN TOP OF FOUNDATIONTOB TOP OF BEAMTOM TOP OF MASONRYTOP TOP OF PARAPETTOS TOP OF STEELTOW TOP OF WALLTPD TOILET PAPER DISPENSERTPH TOILET PAPER HOLDERTR TOWEL RACKTRANS TRANSOMTRANS WD FIN TRANSPARENT WOOD FINISHTRTD TREATEDTS TENSILE STRENGTH OR TUBE

STEELTSTAT THERMOSTATTV TELEVISIONTYP TYPICAL

U HEAT TRANSFER COEFFICIENTUC UNDERCUTUCD UNDERCUT DOORUGND UNDERGROUNDUL UNDERWRITERS LABORATORIESULT ULTIMATEUNFIN UNFINISHUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER

SUPPLYUR URINALUTIL UTILITYUV ULTRAVIOLET

V VOLTVAC VACUUMVAR VARIESVCT VINYL COMPOSITION TILE

VITRIFIED CLAY TILEVEH VEHICLEVENT VENTILATIONVERT VERTICALVEST VESTIBULEVFAT VINYL FACED ACOUSTICAL TILEVIC VICINITYVID VIDEOVIF VERIFY IN FIELDVNR VENEERVOC VOLATILE ORGANIC COMPOUNDVOL VOLUMEVOLT VOLTAGEVP VENEER PLASTERVR VAPOR RETARDERVTR VENT THROUGH ROOFVWC VINYL WALL COVERINGVWF VINYL WALL FABRIC

W WIDE OR WESTW/ WITHW/O WITHOUTWARR WARRANTYWBL WOOD BLOCKINGWC WALL COVERING OR WATER

CLOSETWC WL HNG WATER CLOSET, WALL HUNGWCHR WATER CHILLERWCL WL MTD WATER COOLER, WALL HUNGWD WOODWDW WINDOWWF WIDE FLANGEWFAB WALL FABRICWFR WOOD FRAMEWFS WOOD FURRING STRIPSWH WATER HEATERWHSE WAREHOUSEWLD WELDEDWM WIRE MESHWP WATERPROOFINGWPD WATER PRESSURE DROPWPM WATERPROOF MEMBRANEWR WEATHER RESISTANTWS WEATHERSTRIPWSCT WAINSCOTWT WEIGHTWWF WELDED WIRE FABRIC

X BRACE CROSS BRACEXPS EXTRUDED POLYSTYRENE BOARD

(INSULATION)

YD YARDYR YEAR

1304-GXXX

SHEETDRAWING SET

SHEET NAMING CONVENTIONDISCIPLINE

FIRE RESISTIVE RATED LINE, 4 HOUR

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

SMOKE BARRIER LINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

DOOR OPENING IDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

ARCHITECTURAL SYMBOLSCENTER LINE

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

GRAPHIC SCALE, 18 "=1'-0"

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

DRAWING BLOCK TITLE1 1/2" = 1'-0"C4 1 1/2'1/2'0 1'

A-201A4

0 16'8'4'

234

A2A-202

A

BC

D

A-202A2

A-201A4

A-512D2

A-512D2

A-512D2

CL

S

S

S

S

S

C2CORRIDOR ROOM NAME AND NUMBER

FEC

A1

CG

22

COLUMN GRID

KEYNOTE

WALL OR PARTITIONTYPEFIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROWNORTH

MATERIALS LEGENDEXISTINGCONSTRUCTION TOREMAINEXISTINGCONSTRUCTION TOBE REMOVEDNEW CONSTRUCTION

CONCRETE

EARTH

BASECOURSE

RIGIDINSULATION

BATTINSULATION

V V ITEM - VA SUPPLIED &INSTALLED

VC ITEM - VA SUPPLIED &CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED& INSTALLED

A4A-201

DETAIL NUMBER

SHEET WHERE REF.SHEET WHERE DRAWN

1A3.1 A4.3

BUILDING SECTION INDICATOR

DETAIL INDICATOR

AA

LEAD LINED WALL

T

1 2

A10E

Page 4: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

ARCHITECTURAL ABBREVIATIONSA LABEL CLASS A DOORA/C AIR CONDITIONA/C UNIT AIR CONDITIONING UNITA/E ARCHITECT/ENGINEERAAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATIONAB ANCHOR BOLTABC AGGREGATE BASE COURSEAC ASBESTOS CEMENT OR

ASPHALTIC CONCRETEACI AMERICAN CONCRETE INSTITUTEACS DR ACCESS DOORACS FLR ACCESS FLOORACS PNL ACCESS PANELACST ACOUSTICACT ACOUSTICAL CEILING TILEAD AREA DRAINADA AMERICANS WITH DISABILITIES

ACTADC AUTOMATIC DOOR CLOSERADDL ADDITIONALADDN ADDITIONADH ADHESIVEADJ ADJACENT, ADJOINING, OR

ADJUSTABLEADMIN ADMINISTRATIONADB AUTOMATIC DOOR BOTTOMAFC ABOVE FINISHED COUNTERAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAFS ABOVE FINISHED SLABAGA AMERICAN GAS ASSOCIATIONAGC ASSOCIATED GENERAL

CONTRACTORSAGGR AGGREGATEAHJ AUTHORITY HAVING

JURISDICTIONAHR ANCHORAHU AIR HANDLING UNITAIA AMERICAN INSTITUTE OF

ARCHITECTSAISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTIONALT ALTERNATEALT NO ALTERNATE NUMBERALUM ALUMINUMAMP AMPEREAMT AMOUNTANOD ANODIZEANSI AMERICAN NATIONAL STANDARDS

INSTITUTEANT ANTENNAAPA AMERICAN PLYWOOD

ASSOCIATIONAPPD APPROVEDAPPROX APPROXIMATEAPT APARTMENTAR AS REQUIREDARCH ARCHITECTASB ASBESTOSASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTIONASKLR AUTOMATIC SPRINKLERASPH ASPHALTASSN ASSOCIATIONASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALSATCH ATTACHMENTATM AUTOMATIC TELLER MACHINEATS AUTOMATIC TRANSFER SWITCHAUTO AUTOMATICAUX AUXILIARYAV AUDIO VISUALAVE AVENUEAVG AVERAGEAW ACID WASTEAWI ARCHITECTURAL WOODWORKING

INSTITUTEAWPA AMERICAN WOOD PRESERVERS'

ASSOCIATIONAWS AMERICAN WELDING SOCIETYAWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOORB PL BASE PLATEBALC BALCONYBAT BATTENBB BULLETIN BOARDBD BOARDBD FT BOARD FEET (FOOT)BEV BEVELBHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATIONBI FLD DR BIFOLDING DOORSBITUM BITUMINOUSBKG BACKINGBLD BUILDBLDG BUILDINGBLKT BLANKETBLVD BOULEVARDBM BEAM OR BENCHMARKBOT BOTTOMBR BEDROOMBRCG BRACINGBRDG BRIDGINGBRDG JST BRIDGING JOISTBRG BEARINGBRG PL BEARING PLATEBRKT BRACKETBRZ BRONZEBSMT BASEMENTBTWN BETWEENBU BUSHELBUR BUILT-UP ROOFING

C CELSIUS CHANNELC CHANNEL CELSIUSC CONC CAST CONCRETEC LABEL CLASS C DOORC TO C CENTER TO CENTERCAB CABINETCAC CEILING ATTENUATION CLASSCB CATCH BASIN OR CORNER BEADCBB CEMENTITIOUS (BACKER) BOARDCC CUBIC CENTIMETERCCTV CLOSED CIRCUIT TELEVISIONCCW COUNTERCLOCKWISECD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTSCEM CEMENTCEM PLAS CEMENT PLASTERCER CERAMICCF CONTRACTOR FURNISHEDCF/CI CONTRACTOR

FURNISHED/CONTRACTORINSTALLED

CF/OI CONTRACTORFURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHINGCFM CUBIC FEET PER MINUTECFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECONDCG CENTER OF GRAVITY OR

CORNER GUARDCGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITSCH BD CHALKBOARDCHEM CHEMICALCHFR CHAMFERCHK CHECKCI CAST IRONCIP CAST-IN-PLACECIR CIRCLECIRC CIRCULARCJ CONSTRUCTION JOINT OR

CONTROL JOINTCL CENTER LINECLDG CLADDINGCLG CEILINGCLG HT CEILING HEIGHTCLR CLEARcm² SQUARE CENTIMETERcm³ CUBIC CENTIMETERCM CONSTRUCTION MANAGEMENTCMU CONCRETE MASONRY UNITCNR CORNERCNTR COUNTERCO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,CLEANOUT, OR COMPANY

CO₂ CARBON DIOXIDECOL COLUMNCOM COMMONCOMB COMBINATION, COMBINEDCOMM COMMUNICATIONCOMP COMPONENT

CONC CONCRETECONC FLR CONCRETE FLOORCOND CONDENSER OR CONDITIONCONF CONFERENCECONN CONNECTCONSTR CONSTRUCTIONCONT CONTINUECONTR CONTRACTORCOORD COORDINATECORR CORRIDORCPM CRITICAL PATH METHODCPRS COMPRESSIBLECPT CARPETCRS COLD ROLLED STEELCRSI CONCRETE REINFORCING STEEL

INSTITUTECSB CONCRETE SPLASH BLOCKCSG CASINGCSI CONSTRUCTION SPECIFICATIONS

INSTITUTECSK COUNTER SUNKCSMT CASEMENTCSWK CASEWORKCT CERAMIC TILECTB CERAMIC TILE BASECTF CERAMIC TILE FLOORCTG COATINGCTR CENTER CONTOURCTRL CONTROLCTV CABLE TELEVISIONCU COPPER CCU FT CUBIC FEETCU IN CUBIC INCHCU YD CUBIC YARDCURT CURTAINCYL CYLINDERCYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)D LABEL CLASS D DOORDAT DATUMDB DECIBELDBL DOUBLEDBL GLZ DOUBLE GLAZEDC DIRECT CURRENTDEG DEGREEDEL DELETEDEMO DEMOLITIONDEPT DEPARTMENTDET DETAILDF DRINKING FOUNTAINDIA DIAMETERDIAG DIAGONAL DIAGRAMDIAG DIAGRAM DIAGONALDIFF DIFFERENCE OR DIFFUSERDIM DIMENSIONDIR DIRECTIONDISP DISPENSERDIST DISTANCEDIV DIVIDE OR DIVISIONDL DEAD LOADDOC DOCUMENTDOUG FIR DOUGLAS FIRDOZ DOZENDR DOOR, DRAIN, DRESSING ROOM,

OR DRIVEDR CL DOOR CLOSERDR FR DOOR FRAMEDR OPNG DOOR OPENINGDS DOWNSPOUTDSGN DESIGNDW DISHWASHERDWG DRAWINGDWTR DUMBWAITER

E EASTE LABEL CLASS E DOOREA EACHEFF EFFICIENCYEFS EXTERIOR FINISH SYSTEMEIFS EXTERIOR INSULATION AND

FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELAST ELASTOMERICELEC ELECTRICELEC DR OP ELECTRIC DOOR OPENERELEV ELEVATOREMER EMERGENCYEMER SHR EMERGENCY SHOWERENCL ENCLOSUREENGR ENGINEERENVIR ENVIRONMENTEPA ENVIRONMENTAL PROTECTION

AGENCYEPDM ETHYLENE PROPYLENE DIENE

MONOMEREPO EMERGENCY POWER OFFEPS EXPANDED POLYSTYRENE BOARD

(INSULATION)EQ EQUALEQL SP EQUALLY SPACEDEQUIP EQUIPMENTEQUIV EQUIVALENTERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEONESCAL ESCALATORESMT EASEMENTESP ESPECIALLYEST ESTIMATEETC AND SO FORTH OR ET

CETERAEW EACH WAYEWC ELECTRIC WATER COOLEREWS EYE WASH STATIONEXH EXHAUSTEXIST EXISTINGEXP EXPANSION OR EXPOSEDEXP BT EXPANSION BOLTEXST GR EXISTING GRADEEXT EXTERIOR, EXTERNAL, OR

EXTINGUISHEREXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALEFA FIRE ALARMFAB FABRICFAC FACTORFACIL FACILITYFAS FASCIAFAS BD FASCIA BOARDFCO FLOOR CLEANOUTFCTY FACTORYFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDTN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FACEFF EL FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE, AND

EQUIPMENTFH FLAT HEAD OR FLAT HEAD

SCREWSFHC FIRE HOSE CABINETFHMS FLAT HEAD MACHINE SCREWFHP FULL HEIGHT PARTITIONFHWS FLAT HEAD WOOD SCREWFIG FIGUREFIL FILLETFIN FINISHFIN FLR FINISH FLOORFIN GR FINISH GRADEFIN WD FINISH WOODFIXT FIXTUREFL FLOORLINEFLASH FLASHINGFLDG FOLDINGFLEX FLEXIBLEFLG FLOORINGFLR FLOORFLR FIN FLOOR FINISHFLR SK FLOOR SINKFLUOR FLUORESCENTFLUOR FIX FLUORESCENT FIXTUREFM FACTORY MUTUALFM-G FACTORY MUTUAL GLOBALFO FINISHED OPENINGFOC FACE OF CONCRETE OR FACE

OF CURBFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF SLAB OR FACE OF

STUDFOUNT FOUNTAINFOW FACE OF WALLFP FIRE PROTECTION OR

FIREPROOFFPM FEET PER MINUTEFPS FEET PER SECONDFR FIRE RATING, FIRE RESISTANT,

OR FRAMEFR SNK FLUSHING RIM SINKFREQ FREQUENCYFRMG FRAMINGFRP FIBER REINFORCED POLYESTER

OR FIBERGLASS REINFORCEDPLASTIC

FRZ FREEZER FS FEDERALSPECIFICATION

FSTNR FASTENERFT FEET OR FOOTFTG FOOTINGFURG FURRINGFURN FURNISH OR FURNITUREFUT FUTUREFWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATIONGAL GALLONGALV GALVANIC OR GALVANIZEDGALV STL GALVANIZED STEELGB GRAB BARGC GENERAL CONTRACTORGD GUARDGDR GUARD RAILGEN GENERAL OR GENERATORGFRC GLASS-FIBER-REINFORCED

CONCRETEGFRG GLASS-FIBER-REINFORCED

GYPSUMGFRP GLASS-FIBER-REINFORCED

PLASTICGI GALVANIZED IRONGL GLASSGL BLK GLASS BLOCKGLU LAM GLUED LAMINATED WOODGR FL GROUND FLOORGRAN GRANITEGRTG GRATINGGSB GYPSUM SHEATHING BOARDGSM GALVANIZED SHEET METALGSU GLAZED STRUCTURAL UNITGT GROUTGUAR GUARANTEEGUT GUTTERGYP GYPSUMGYP BD GYPSUM BOARDGYP PLAS GYPSUM PLASTER

H HIGHH PLAM HIGH PRESSURE PLASTIC

LAMINATEHAZ MAT HAZARDOUS MATERIALSHB HOSE BIBBHC HOLLOW COREHCWD HOLLOW CORE WOOD DOORHDBD HARDBOARDHDNR HARDENERHDO HIGH DENSITY OVERLAYHDR HEADERHDW HARDWAREHDWD HARDWOODHEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)HEX HEXAGONHF HIGH FREQUENCY

HGR HANGERHM HECTOMETERHM HOLLOW METALHMD HOLLOW METAL DOORHMDF HOLLOW METAL DOOR AND

FRAMEHMF HOLLOW METAL FRAMEHNDRL HANDRAILHO HOLD OPENHORIZ HORIZONTALHOSP HOSPITALHP HIGH PRESSURE OR

HORSEPOWERHQ HEADQUARTERSHS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTHHSE HOUSEHSKPG HOUSEKEEPINGHST HOISTHT HEIGHTHVAC HEATING, VENTILATING, AND AIR

CONDITIONINGHVY HEAVYHW HOT WATERHYD HYDRANTHYDR HYDRAULIC

I INTERSTATE (HIGHWAY) ORMOMENT OF INERTIA

IAQ INDOOR AIR QUALITYIBC INTERNATIONAL BUILDING CODEID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGNID NO IDENTIFICATION NUMBERILLUM ILLUMINATIONINCL INCLUDEDIND INDEPENDENT OR INDUSTRIALINFO INFORMATIONINSUL INSULATIONINT INTERIORINTERCOM INTERCOMMUNICATIONINTL INTERNATIONALIRMA INVERTED ROOF MEMBRANE

ASSEMBLYIWH INSTANTANEOUS WATER HEATER

JAN JANITORJ-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKEDDOWN

KIT KITCHENKO KNOCKOUTKPL KICKPLATE

L ANGLELAB LABORATORYLAD LADDERLAM LAMINATELAM GL LAMINATED GLASSLAU LAUNDRYLAV LAVATORYLBR LUMBERLBS POUNDLD BRG LOAD-BEARINGLDR LEADERLED LIGHT EMITTING DIODELF LINEAR FEET (FOOT)LH LEFT HANDLHR LEFT HAND REVERSELHR LEFT HAND REVERSE LATENT

HEAT RATIOLIB LIBRARYLIN LINEARLINO LINOLEUMLIQ LIQUIDLKR LOCKERLKR RM LOCKER ROOMLKWASH LOCKWASHERLL LEAD LINEDLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLMST LIMESTONELNDSCP LANDSCAPELR LIVING ROOMLRG LARGELRV LOUVERED ROOF VENTLS LUMP SUMLT LIGHTLT GA LIGHT GAGELT WT LIGHTWEIGHTLTG LIGHTINGLTNG LIGHTNINGLVD LOUVEREDLVR LOUVERLWC LIGHTWEIGHT CONCRETELWIC LIGHTWEIGHT INSULATING

CONCRETELYR LAYER

MACH MACHINEMACH RM MACHINE ROOMMAINT MAINTENANCEMAN MANUALMATL MATERIALMATV MASTER ANTENNA TELEVISION

SYSTEMMAX MAXIMUMMB MACHINE BOLTMCB METAL CORNER BEADMD DECKME MECHANICAL ENGINEERMEAS MEASUREMECH MECHANICALMECH RM MECHANICAL ROOMMED MEDICAL MEDIUMMED MEDIUM MEDICALMEK METHYL ETHYL KETONEMEL MELAMINEMEMB MEMBRANEMEMO MEMORANDUMMEZZ MEZZANINEMF MILL FINISHMFD MANUFACTUREDMFG MANUFACTURINGMFR MANUFACTURERMFR REC MANUFACTURER'S

RECOMMENDATIONMGT MANAGEMENTMH MANHOLEMIC MICROPHONEMID MIDDLEMIL STD MILITARY STANDARDMIN MINIMUM MINUTEMIN MINUTE MINIMUMMIRR MIRRORMISC MISCELLANEOUSMIT MITERMKR MARKERML METAL LATHMLDG MOLDING (MOULDING)

MLWK MILLWORKmm MILLIMETERMO MASONRY OPENING OR MOTOR

OPERATEDMOD MODEL, MODIFY OR MODULEMOD BIT MODIFIED BITUMENMON MONITORMOPR MOP RACKMR MOISTURE RESISTANTMS MACHINE SCREW OR MOP SINKMTD MOUNTEDMTG MOUNTINGMTL METALMULL MULLIONMW MICROWAVEMWP MEMBRANE WATERPROOFING

N NORTHNA NOT APPLICABLENAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METALMANUFACTURERS

NAT NATURALNATL NATIONALNC NOISE CRITERIANCOMBL NONCOMBUSTIBLENEC NATIONAL ELECTRICAL CODENEG NEGATIVENEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATIONNEUT NEUTRALNFC NATIONAL FIRE CODENFPA NATIONAL FIRE PROTECTION

ASSOCIATIONNIC NOT IN CONTRACTNO NUMBERNOM NOMINALNR NOISE REDUCTIONNRC NOISE REDUCTION COEFFICIENTNRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATIONNRP NONREMOVABLENS NARROW STILENTE NOT TO EXCEEDNUM NUMERAL

O/O OUT TO OUTO OXYGENOA OUTSIDE AIR OR OVERALL OC

ON CENTEROCC OCCUPYOCT OCTAGONOD OUTSIDE DIAMETER OUTSIDE

DIMENSIONOD OUTSIDE DIMENSION OUTSIDE

DIAMETEROF/CI OWNER

FURNISHED/CONTRACTORINSTALLED

OFD OVERFLOW DRAINOFF OFFICEOF/OI OWNER FURNISHED/OWNER

INSTALLEDOH OVERHANGOH DR OVERHEAD (COILING) DOOROPH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOPR OPERABLEOPT OPTIONALOR OPERATING ROOM OR OUTSIDE

RADIUSORD ORDNANCE OR OVERFLOW ROOF

DRAINORG ORGANICORIG ORIGINALORN ORNAMENTALOSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINSTRATIONOUT OUTLETOZ OUNCE

PAR PARALLEL OR PARAPETPARA PARAGRAPHPART PARTIALPAT PATTERNPB PUSHBUTTONPBD PARTICLEBOARDPC PIECE, POLYCARBONATE OR

PORTLAND CEMENTPCA PORTLAND CEMENT ASSOCIATIONPCC PRECAST CONCRETEPCCP CONCRETE PAVEMENTPCD PAPER CUP DISPENSERPCF POUNDS PER CUBIC FOOTPCP PORTLAND CEMENT PLASTERPED PEDESTALPEN PENETRATEPEND PENDANTPERF PERFORATEDPERIM PERIMETERPERP PERPENDICULARPGBD PEGBOARDPHAR PHARMACYPHOTO PHOTOGRAPHPHS PHILLIPS HEAD SCREWPKG PACKAGEPL PROPERTY LINEPL GL PLATE GLASSPLAM PLASTIC LAMINATEPLAS PLASTER OR PLASTICPLBG PLUMBINGPLYWD PLYWOODPMTL PAINTED METALPNEU PNEUMATICPNL PANELPO POST OFFICE PURCHASE ORDERPO PURCHASE ORDER POST OFFICEPOLY POLYETHYLENE (PLASTIC)PR PAIRPRCST PRECASTPREFAB PREFABRICATEPREFIN PREFINISHPRELIM PRELIMINARYPREP PREPARATIONPRESS PRESSUREPREV PREVIOUSPRKG PARKINGPRMLD PREMOLDEDPROJ PROJECTPROP PROPERTYPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTN PARTITIONPVC POLYVINYL CHLORIDE (PLASTIC)PVG PAVINGPWR POWER

QA QUALITY ASSURANCEQC QUALITY CONTROLQRY QUARRYQT QUARRY TILEQTB QUARRY TILE BASEQTF QUARRY TILE FLOORQTR QUARTERQTY QUANTITYQUAD QUADRANTQUAL QUALITY

R RADIUS OR RISERRA RETURN AIRRAD RADIATORRB RESILIENT BASE OR RUBBER

BASERB HK ROBE HOOKRBM REINFORCED BRICK MASONRYRBR RUBBERRC REMOTE CONTROLRCP REFLECTED CEILING PLANRCVR RECEIVERRD ROAD OR ROOF DRAINREC RECESSEDRECD RECEIVEDRECPT RECEPTACLERECT RECTANGLEREF REFERENCE OR REFRIGERATORREFR REFRACTORY REFRIGERATIONREFR REFRIGERATION REFRACTORYREG REGISTERREINF REINFORCEREP REPAIRREPL REPLACEREQ REQUIREREQD REQUIREDRESIL RESILIENTRET RETURNREV REVISIONRF RADIO FREQUENCYRFG ROOFINGRFI REQUEST FOR INFORMATIONRFP REQUEST FOR PROPOSALRH RIGHT HANDRHMS ROUND HEAD MACHINE SCREWRHR RIGHT HAND REVERSERHWS ROUND HEAD WOOD SCREWRL ROOF LEADERRLG RAILINGRM ROOMRND ROUNDRO ROUGH OPENINGROW RIGHT OF WAYRPM REVOLUTIONS PER MINUTERS ROUGH SAWNRT RIGHTRV ROOF VENTRVS REVERSERWD REDWOODRWL RAIN WATER LEADER

SA SUPPLY AIRSALV SALVAGESAMP SAMPLESAN SANITARYSAT SUSPENDED ACOUSTICAL TILESATC SUSPENDED ACOUSTICAL TILE

CEILINGSB SPLASH BLOCKSBS STYRENE BUTADIEN STYRENESBSTR SUBSTRATESC SHADING COEFFICIENT OR SOLID

CORESCH SCHOOLSCHED SCHEDULESCHEM SCHEMATICSCP SCUPPERSCRN SCREENSCT STRUCTURAL CLAY TILESCWD SOLID CORE WOOD DOORSD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAPDISPENSER;

SDG SIDINGSECT SECTIONSEG SEGMENTSEL SELECTSEP SEPARATESF SQUARE FOOT (FEET)SFTWD SOFTWOODSGD SLIDING GLASS DOORSGL SINGLESHR SHOWERSHR HD SHOWER HEADSHRD SHOWER DRAINSHT SHEETSHT MTL FLASH SHEET METAL (FLASHING)SHTHG SHEATHINGSHV SHELVINGSIM SIMILARSJ SCORED JOINTSJI STEEL JOIST INSTITUTESK SKETCHSKLT SKYLIGHTSLD WDW HORIZONTAL SLIDING WINDOWSLDG SLIDINGSLNT SEALANTSM SHEET METALSMK SMOKESND SANITARY NAPKIN DISPENSERSND INS SOUND INSULATIONSNDU SANITARY NAPKIN DISPOSAL

UNITSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSPLY SUPPLYSQ SQUARESQ IN SQUARE INCHSQ YD SQUARE YARDSS SANITARY SEWER OR SERVICE

SINKSST STAINLESS STEELST STAIRS OR STREETSTC SOUND TRANSMISSION CLASSSTD STANDARDSTIF STIFFENERSTL JST STEEL JOISTSTL LNTL STEEL LINTELSTL PL STEEL PLATESTL RF DK STEEL ROOF DECKSTL TB STEEL TUBESTL TR STEEL TRUSSSTNLS STAINLESSSTOR STORAGESTR STRINGERSSTRUCT STRUCTURALSTRUCT STL STRUCTURAL STEELSUB SUBSTITUTESURF SURFACESUSP SUSPEND

SUSP CLG SUSPENDED CEILINGSV SHEET VINYLSW SWITCHSWDR SWING DOORSYM SYMBOLSYNTH SYNTHETICSYS SYSTEMT TREADT&G TONGUE AND GROOVET&M TIME AND MATERIALSTB THROUGH BOLT OR TOWEL BARTCA TILE COUNCIL OF AMERICATCP TELEPHONE CONTROL PANEL

TEMPERATURE CONTROL PANEL;TRAFFIC CONTROL PLAN

TD TOWEL DISPENSERTECH TECHNICALTEL TELEPHONETEMP TEMPERATURE OR TEMPORARYTER TERRAZZOTHD THREADTHERM THERMALTHK THICKNESSTHRES THRESHOLDTHRU THROUGHTHRUOUT THROUGHOUTTK BD TACKBOARDTMPD TEMPEREDTMPD GL TEMPERED GLASSTN TRUE NORTHTO TOP OF ___TO FDN TOP OF FOUNDATIONTOB TOP OF BEAMTOM TOP OF MASONRYTOP TOP OF PARAPETTOS TOP OF STEELTOW TOP OF WALLTPD TOILET PAPER DISPENSERTPH TOILET PAPER HOLDERTR TOWEL RACKTRANS TRANSOMTRANS WD FIN TRANSPARENT WOOD FINISHTRTD TREATEDTS TENSILE STRENGTH OR TUBE

STEELTSTAT THERMOSTATTV TELEVISIONTYP TYPICAL

U HEAT TRANSFER COEFFICIENTUC UNDERCUTUCD UNDERCUT DOORUGND UNDERGROUNDUL UNDERWRITERS LABORATORIESULT ULTIMATEUNFIN UNFINISHUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER

SUPPLYUR URINALUTIL UTILITYUV ULTRAVIOLET

V VOLTVAC VACUUMVAR VARIESVCT VINYL COMPOSITION TILE

VITRIFIED CLAY TILEVEH VEHICLEVENT VENTILATIONVERT VERTICALVEST VESTIBULEVFAT VINYL FACED ACOUSTICAL TILEVIC VICINITYVID VIDEOVIF VERIFY IN FIELDVNR VENEERVOC VOLATILE ORGANIC COMPOUNDVOL VOLUMEVOLT VOLTAGEVP VENEER PLASTERVR VAPOR RETARDERVTR VENT THROUGH ROOFVWC VINYL WALL COVERINGVWF VINYL WALL FABRIC

W WIDE OR WESTW/ WITHW/O WITHOUTWARR WARRANTYWBL WOOD BLOCKINGWC WALL COVERING OR WATER

CLOSETWC WL HNG WATER CLOSET, WALL HUNGWCHR WATER CHILLERWCL WL MTD WATER COOLER, WALL HUNGWD WOODWDW WINDOWWF WIDE FLANGEWFAB WALL FABRICWFR WOOD FRAMEWFS WOOD FURRING STRIPSWH WATER HEATERWHSE WAREHOUSEWLD WELDEDWM WIRE MESHWP WATERPROOFINGWPD WATER PRESSURE DROPWPM WATERPROOF MEMBRANEWR WEATHER RESISTANTWS WEATHERSTRIPWSCT WAINSCOTWT WEIGHTWWF WELDED WIRE FABRIC

X BRACE CROSS BRACEXPS EXTRUDED POLYSTYRENE BOARD

(INSULATION)

YD YARDYR YEAR

1304-GXXX

SHEETDRAWING SET

SHEET NAMING CONVENTIONDISCIPLINE

FIRE RESISTIVE RATED LINE, 4 HOUR

DEMOLITION LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

SMOKE BARRIER LINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

DOOR OPENING IDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

ARCHITECTURAL SYMBOLSCENTER LINE

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

GRAPHIC SCALE, 18 "=1'-0"

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

DRAWING BLOCK TITLE1 1/2" = 1'-0"C4 1 1/2'1/2'0 1'

A-201A4

0 16'8'4'

234

A2A-202

A

BC

D

A-202A2

A-201A4

A-512D2

A-512D2

A-512D2

CL

S

S

S

S

S

C2CORRIDOR ROOM NAME AND NUMBER

FEC

A1

CG

22

COLUMN GRID

KEYNOTE

WALL OR PARTITIONTYPEFIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROWNORTH

MATERIALS LEGENDEXISTINGCONSTRUCTION TOREMAINEXISTINGCONSTRUCTION TOBE REMOVEDNEW CONSTRUCTION

CONCRETE

EARTH

BASECOURSE

RIGIDINSULATION

BATTINSULATION

V V ITEM - VA SUPPLIED &INSTALLED

VC ITEM - VA SUPPLIED &CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED& INSTALLED

A4A-201

DETAIL NUMBER

SHEET WHERE REF.SHEET WHERE DRAWN

1A3.1 A4.3

BUILDING SECTION INDICATOR

DETAIL INDICATOR

AA

LEAD LINED WALL

T

1 2

A10E

Drawing Scale

Plot Scale9/19/16

Office ofFacilities

ManagementTRUE NORTH

PLAN NORTHBY THE VARIOUS SUBCONTRACTORS.GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLEDGENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THESUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THERESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVERESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THECEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'SGENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS &

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TORESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR,GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE

GEN

ERAL

NOTES:

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED UNDER THE LAWS OF THE STATE OF MINNESOTA

REGISTRATION NUMBER:

BUILDING 49 FLOORING REPLACEMENT 618-16-109

49

24

Drawing Title Project Title

Approved: Division Chief

Approved: Service Director

Building Number

Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

one-

eigh

th inch

= o

ne foo

t

04

816

one-

quarter inch =

one foo

t

04

8

three-

eigh

ths inch =

one foo

t

04

04

one-

half

inch =

one foo

t

02

three-

qusrter inch =

one foo

t

60

2

one inch =

one foo

t

60

1

one an

d on

e-ha

lf inch =

one foo

t

60

three inches =

one foo

t

V.A. MEDICAL CENTERONE VETERANS DRIVEMINNEAPOLIS, MN 55417 1332-

REVISIONS: DATE

95% SUBMITTAL FOR REVIEW 7/29/16

a Haskell Company

100% ISSUE FOR CONSTRUCTION 9/19/16

021:1

AS INDICATED

ARCHITECTURAL ABBREVIATIONS ANDSYMBOL LEGEND

G001DRETW

ARCHITECT

Page 5: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

28293031

20 21A

CB7

21B 21C

22

27

CB6

CB5

S2

24A2

25

26

26A

DOORACCESS

539

38

37

6 7 8 9 11

36

35

34

33

ELECTROPHYSIOLOGYSTUDIES ROOM

HEMODYNAMICANIMAL STUDIES ROOM

ELEVATORMACHINEROOM

ELEVATORPIT

CORRIDOR

STAIRWAYNUMBER 2

CORRIDOR

STORAGE

ANIMALWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

CORRIDOR

WORK ANDSUPPLY ROOM

OPERATINGROOMOPERATING

ROOMOPERATING

ROOMPOST-OPWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

FOOD ANDBEDDINGSTORAGE

NECROPSYROOM

WASTEROOM

OFFICE

ROOMCOLD35

ROOMRADIOLOGY

35

EXAMINATIONROOM

DIAGNOSTICLABORATORY

QUARANTINEWARD

QUARANTINEWARD

LOUNGE STORAGE

STORAGE24

HAC10

15aMEN'S

WOMEN'S15b

WARDQUARANTINE

13

24a2TELEPHONE

24aELECTRICAL

24a1AREA WELL

RECEIVING40

ELEV. MACH.4

STORAGE3

STAIRWAYNo. 1

ELEVATORNo. S-1

ELECTRICAL15c1

15c2TELEPHONE

15cCORRIDOR

PREP. ROOM15d

16PROCEDURE CB-10

CORRIDOR

CORRIDORCB-4

CB-1CORRIDOR

CB-2CORRIDOR

CB-3CORRIDOR

CORRIDORCB-9

CORRIDORCB-8

COMPR.17

STAIR WAR No. 3

HAC32

ROOMEXAMINATION

SV-16 SV-18EXAMINATION

ROOM

HACSV-20

SV-21STAFFLOUNGE

ROOMCOMPUTER

SV-23

SV-23aSTORAGE

SV-17RESTROOM RESTROOM

SV-19

OFFICE/DOCTORSV-23bMOLD ROOM

SV-15

CLINACSV-14

2100CONTROL

SV-24CONFERENCE

ROOMSV-24a

OFFICE CHIEF

SV-24bOFFICE/DOCTOR

OF SERVICE

X-RAY FILESSV-24c

SV-2MECH. CLOSET

TEL. CLOSETSV-3 ELECT. CLOSET

SV-1

PROCESSINGFILMSV-12

SV-11NURSESSTATION

SV-10PROCESSOR

AREA

SV-6CLINIC No.4CONTROL

RECEPTION/WAITINGSV-4

ROOMRESTSV-4a

SV-5ORTH-VOLTAGE

ROOMSIMULATOR

SV-7

CLOSETSV-13

SV-8CLOSET

2100CLINACSV-9

CORRIDORCSV-3

CSV-2CORRIDOR

CSV-1CORRIDOR

CSV-0CORRIDOR

STAIRWAYNo. 5

STAIRWAYNo. 4

ELEVATORNo. P-2

CLOSETSV-23

BUILDING 49 - BASEMENT FLOORMINNEAPOLIS VA MEDICAL CENTER

SV-7aTOILET

ROOMCONTROLSV-7b

NEW FLOORING AND PAINT - UNDER CONTRACT

NEW FLOORING AND PAINT - OPTIONAL1 2 3 4 5 6 7 8

9

1011 12 13 14 15 16 17 18

19 20

21

22

23 24 25 26 2728

29 30

32

31

33

37

38

34 35

36

39 40 41 42 43 44

45

46

47 48 49 50 51 52 5354

121110987654321

J

H

G

F

E

D

C

121110987654321

J

H

G

F

E

D

C

1 2

43

65

87

LINE INDICATES PRIMARY LIMITS OF PROJECT SCOPE

QUARANTINEWARD

8QUARANTINEWARD

7DIAGNOSTIC

LABORATORY

6

CORRIDOR

CB-2

ANIMAL WARD

35

ANIMAL WARD

34

ANIMAL WARD

33

CORRIDOR

CB-8

ANIMAL WARD

31ANIMAL WARD

30ANIMAL WARD

29ANIMAL WARD

28

CORRIDOR

CB6

WORK ANDSUPPLY ROOM

22

POST-OP WARD

20

CORRIDOR

CB-9

PREP ROOM

15d

PROCEDURE

16 CORRIDOR

CB-10

QUARANTINEWARD

13

CORRIDOR

CB-3CORRIDOR

CB-4

OPERATINGROOM

21A

OPERATINGROOM

21BOPERATING

ROOM

21C

NECROPSY ROOM

37

FOOD ANDBEDDINGSTORAGE

36

EXAMINATIONROOM

5

CORRIDOR

CB-7

Page 6: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

28293031

20 21A

CB7

21B 21C

22

27

CB6

CB5

S2

24A2

25

26

26A

DOORACCESS

539

38

37

6 7 8 9 11

36

35

34

33

ELECTROPHYSIOLOGYSTUDIES ROOM

HEMODYNAMICANIMAL STUDIES ROOM

ELEVATORMACHINEROOM

ELEVATORPIT

CORRIDOR

STAIRWAYNUMBER 2

CORRIDOR

STORAGE

ANIMALWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

CORRIDOR

WORK ANDSUPPLY ROOM

OPERATINGROOMOPERATING

ROOMOPERATING

ROOMPOST-OPWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

FOOD ANDBEDDINGSTORAGE

NECROPSYROOM

WASTEROOM

OFFICE

ROOMCOLD35

ROOMRADIOLOGY

35

EXAMINATIONROOM

DIAGNOSTICLABORATORY

QUARANTINEWARD

QUARANTINEWARD

LOUNGE STORAGE

STORAGE24

HAC10

15aMEN'S

WOMEN'S15b

WARDQUARANTINE

13

24a2TELEPHONE

24aELECTRICAL

24a1AREA WELL

RECEIVING40

ELEV. MACH.4

STORAGE3

STAIRWAYNo. 1

ELEVATORNo. S-1

ELECTRICAL15c1

15c2TELEPHONE

15cCORRIDOR

PREP. ROOM15d

16PROCEDURE CB-10

CORRIDOR

CORRIDORCB-4

CB-1CORRIDOR

CB-2CORRIDOR

CB-3CORRIDOR

CORRIDORCB-9

CORRIDORCB-8

COMPR.17

STAIR WAR No. 3

HAC32

ROOMEXAMINATION

SV-16 SV-18EXAMINATION

ROOM

HACSV-20

SV-21STAFFLOUNGE

ROOMCOMPUTER

SV-23

SV-23aSTORAGE

SV-17RESTROOM RESTROOM

SV-19

OFFICE/DOCTORSV-23bMOLD ROOM

SV-15

CLINACSV-14

2100CONTROL

SV-24CONFERENCE

ROOMSV-24a

OFFICE CHIEF

SV-24bOFFICE/DOCTOR

OF SERVICE

X-RAY FILESSV-24c

SV-2MECH. CLOSET

TEL. CLOSETSV-3 ELECT. CLOSET

SV-1

PROCESSINGFILMSV-12

SV-11NURSESSTATION

SV-10PROCESSOR

AREA

SV-6CLINIC No.4CONTROL

RECEPTION/WAITINGSV-4

ROOMRESTSV-4a

SV-5ORTH-VOLTAGE

ROOMSIMULATOR

SV-7

CLOSETSV-13

SV-8CLOSET

2100CLINACSV-9

CORRIDORCSV-3

CSV-2CORRIDOR

CSV-1CORRIDOR

CSV-0CORRIDOR

STAIRWAYNo. 5

STAIRWAYNo. 4

ELEVATORNo. P-2

CLOSETSV-23

BUILDING 49 - BASEMENT FLOORMINNEAPOLIS VA MEDICAL CENTER

SV-7aTOILET

ROOMCONTROLSV-7b

NEW FLOORING AND PAINT - UNDER CONTRACT

NEW FLOORING AND PAINT - OPTIONAL1 2 3 4 5 6 7 8

9

1011 12 13 14 15 16 17 18

19 20

21

22

23 24 25 26 2728

29 30

32

31

33

37

38

34 35

36

39 40 41 42 43 44

45

46

47 48 49 50 51 52 5354

121110987654321

J

H

G

F

E

D

C

121110987654321

J

H

G

F

E

D

C

1 2

43

65

87

LINE INDICATES PRIMARY LIMITS OF PROJECT SCOPE

QUARANTINEWARD

8QUARANTINEWARD

7DIAGNOSTIC

LABORATORY

6

CORRIDOR

CB-2

ANIMAL WARD

35

ANIMAL WARD

34

ANIMAL WARD

33

CORRIDOR

CB-8

ANIMAL WARD

31ANIMAL WARD

30ANIMAL WARD

29ANIMAL WARD

28

CORRIDOR

CB6

WORK ANDSUPPLY ROOM

22

POST-OP WARD

20

CORRIDOR

CB-9

PREP ROOM

15d

PROCEDURE

16 CORRIDOR

CB-10

QUARANTINEWARD

13

CORRIDOR

CB-3CORRIDOR

CB-4

OPERATINGROOM

21A

OPERATINGROOM

21BOPERATING

ROOM

21C

NECROPSY ROOM

37

FOOD ANDBEDDINGSTORAGE

36

EXAMINATIONROOM

5

CORRIDOR

CB-7

Drawing Scale

Plot Scale9/19/16

Office ofFacilities

ManagementTRUE NORTH

PLAN NORTHBY THE VARIOUS SUBCONTRACTORS.GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLEDGENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THESUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THERESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVERESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THECEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'SGENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS &

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TORESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR,GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE

GEN

ERAL

NOTES:

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED UNDER THE LAWS OF THE STATE OF MINNESOTA

REGISTRATION NUMBER:

BUILDING 49 FLOORING REPLACEMENT 618-16-109

49

24

Drawing Title Project Title

Approved: Division Chief

Approved: Service Director

Building Number

Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

one-

eigh

th inch

= o

ne foo

t

04

816

one-

quarter inch =

one foo

t

04

8

three-

eigh

ths inch =

one foo

t

04

04

one-

half

inch =

one foo

t

02

three-

qusrter inch =

one foo

t

60

2

one inch =

one foo

t

60

1

one an

d on

e-ha

lf inch =

one foo

t

60

three inches =

one foo

t

V.A. MEDICAL CENTERONE VETERANS DRIVEMINNEAPOLIS, MN 55417 1332-

REVISIONS: DATE

95% SUBMITTAL FOR REVIEW 7/29/16

a Haskell Company

100% ISSUE FOR CONSTRUCTION 9/19/16

031:1

AS INDICATED

LIFE SAFETY PLAN AND CODE ANALYSIS -BASEMENT

G002DRETW

ARCHITECT

1. VA FACILITIES ARE PART OF FEDERAL AGENCY. CODESSHOWN ON THIS PLAN ARE THE APPLICABLE CODES ANDSUPERCEDE THE STATE AND LOCAL CODES.

2. PLAN INDICATES PRIMARY PROJECT LIMITS ONLY. SOME MEPWORK MAY BE REQUIRED OUTSIDE OF THE LIMITS SHOWN.REF MEP PLANS FOR ADDITIONAL INFORMATION.

3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THEINTEGRITY OF THE LIFE SAFETY SYSTEMS INCLUDING BUT NOTLIMITED TO: RATED PARTITIONS, FIRE SUPPRESSIONSYSTEMS, FIRE ALARM SYSTEMS AND EMERGENCY LIGHTINGAND EMERGENCY POWER.

GENERAL NOTES:

BASEMENT LIFE SAFETY PLAN1 1/8" = 1'-0"

CODE EDITIONNFPA 101 - LIFE SAFETY CODE 2015ICC CODES 2015

INTERNATIONAL BUILDING CODEINTERNATIONAL PLUMBING CODEINTERNATIONAL MECHANICAL CODE

NATIONAL ELECTRIC CODE 2014ASHRAE32.1-2004VA SPECIFCATIONS

APPLICABLE CODES

NOTETHE SCOPE OF THIS PROJECT DOES NOT ALTER THE USE,OCCUPANCY, OCCUPANT LOAD OR EXISTING EGRESS PATHS FROMTHE EXISTING PROJECT AREA. AS SUCH, IT IS DETERMINED THEEXISTING EGRESS IS SUFFICIENT.

Page 7: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

1 2 3 4 5 6 7 8

910

11 12 13 14 15 16 17 18

1920

21

23

22

24 25 26 27 28 29 30

31

33

34 35

36

32

3738

39 40 41 42 43 4445

46

4748 49 50 51 52 53 54

MEDICAL OFFICERVMO/VETERINARY

131

UNIT WORK LEADERVETERINARY MEDICALSTAFF ASSOSTANT

133

MEDICAL UNITVETERINARYSUPERVISOR

132

SCIENTISTRESEARCHOFFICE134

ROOMCONFERENCE

138

LABORATORYDIAGNOSTIC

139

STORAGE142WARD

ANIMAL143145

ANIMALWARD

135HAC

130MENSLOCKERROOM

129WOMENSLOCKERROOM

127LOUNGE

126RESTROOM

RESTROOM128

ROOMPROCEDURE

144

ROOMPROCEDURE

123

ROOMTELEPHONE

124

CLOSETELECTRICAL

125

WARDANIMAL147

WARDANIMAL149

WARDANIMAL153

WARDANIMAL154

WARDANIMAL148

146PROCEDURE

ROOM

115PROCEDURE

ROOM

ROOMPROCEDURE

114

116ISOLATIONROOMROOM

ISOLATION117

ROOMISOLATION

118ROOM

STORAGE119

ROOMISOLATION

116

ROOMISOLATION

113111ISOLATIONROOMROOM

ISOLATION108 110

ISOLATIONROOM

STORAGEFOOD AND BEDDING

157

QUARANTINE156

157QUARANTINE

KITCHENDIET104

SOILED AREASANITIZING AREA

122

CLEAN AREASANITIZING AREA

121

107ISOLATIONROOM

105ISOLATIONROOM

RECEIVING158

LABORATORYHYDROGENATION

159

STORAGE103

102STORAGE

LOUNGEA100

ROOMEQUIPMENTMECHANICAL

A101

TOILETA102

BLOWINGGLASSA104

MACHINE SHOPSCIENTIFIC APPARATUS

A105

CLOSETELECTRICAL

A103

A106HAC

106STORAGE STORAGE

109

A105bCARPENTRY

SHOPA108

GENERATORROOM

A107SWITCH GEAR

ROOM

151ELEVATOR

MACHINE ROOM

STORAGEA105a

CA1-1CORRIDOR

CORRIDORCA1-2C1-1

CORRIDORC1-2

CORRIDOR

C1-3CORRIDOR

C1-3CORRIDOR

C1-4CORRIDOR

C1-4CORRIDOR

C1-5CORRIDOR

C1-5CORRIDOR

C1-6CORRIDOR

C1-14CORRIDOR

C1-7CORRIDOR

C1-8CORRIDOR

C1-8CORRIDOR

C1-9CORRIDOR

C1-10CORRIDOR

C1-10CORRIDOR

C1-11CORRIDOR

C1-12CORRIDOR

C1-12CORRIDOR

C1-13CORRIDOR

C1-13CORRIDOR

C1-7CORRIDOR

A105SCIENTIFIC APPARATUS

MACHINE SHOP

BUILDING 49 - FIRST FLOORMINNEAPOLIS VA MEDICAL CENTER

NEW FLOORING AND PAINT - UNDER CONTRACT

NEW FLOORING AND PAINT - OPTIONAL

LINE INDICATES PRIMARY LIMITS OF PROJECT SCOPE

CORRIDOR

C1-2

FOOD ANDBEDDINGSTORAGE

157

CORRIDOR

C1-3

DIET KITCHEN

104

ISOLATION ROOM

113CORRIDOR

C1-4

STORAGE

119

PROCEDUREROOM

114

CORRIDOR

C1-4

SANITIZING AREACLEAN AREA

121

PROCEDUREROOM

146CORRIDOR

C1-9

STORAGE

142

CORRIDOR

C1-13

ANIMAL WARD

153

ANIMAL WARD

154

QUARANTINE

155

QUARANTINE

156

CORRIDOR

C1-6

SANITIZING AREASOILED AREA

122

ISOLATION ROOM

111ISOLATION ROOM

110ISOLATION ROOM

108ISOLATION ROOM

107ISOLATION ROOM

105

CORRIDOR

C1-3

CORRIDOR

C1-7

CORRIDOR

C1-10

CORRIDOR

C1-14

CORRIDOR

C1-13

ANIMAL WARD

148

CORRIDOR

C1-5

ISOLATION ROOM

120ISOLATION ROOM

118ISOLATION ROOM

117ISOLATION ROOM

116

CORRIDOR

C1-5

PROCEDUREROOM

115

CORRIDOR

C1-8CORRIDOR

C1-8

PROCEDUREROOM

123

PROCEDUREROOM

144

ANIMAL WARD

149ANIMAL WARD

147ANIMAL WARD

145ANIMAL WARD

143

CORRIDOR

C1-10

Page 8: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

LINE INDICATES PRIMARY LIMITS OF PROJECT SCOPE

CORRIDOR

C1-2

FOOD ANDBEDDINGSTORAGE

157

CORRIDOR

C1-3

DIET KITCHEN

104

ISOLATION ROOM

113CORRIDOR

C1-4

STORAGE

119

PROCEDUREROOM

114

CORRIDOR

C1-4

SANITIZING AREACLEAN AREA

121

PROCEDUREROOM

146CORRIDOR

C1-9

STORAGE

142

CORRIDOR

C1-13

ANIMAL WARD

153

ANIMAL WARD

154

QUARANTINE

155

QUARANTINE

156

CORRIDOR

C1-6

SANITIZING AREASOILED AREA

122

ISOLATION ROOM

111ISOLATION ROOM

110ISOLATION ROOM

108ISOLATION ROOM

107ISOLATION ROOM

105

CORRIDOR

C1-3

CORRIDOR

C1-7

CORRIDOR

C1-10

CORRIDOR

C1-14

CORRIDOR

C1-13

ANIMAL WARD

148

CORRIDOR

C1-5

ISOLATION ROOM

120ISOLATION ROOM

118ISOLATION ROOM

117ISOLATION ROOM

116

CORRIDOR

C1-5

PROCEDUREROOM

115

CORRIDOR

C1-8CORRIDOR

C1-8

PROCEDUREROOM

123

PROCEDUREROOM

144

ANIMAL WARD

149ANIMAL WARD

147ANIMAL WARD

145ANIMAL WARD

143

CORRIDOR

C1-10

Drawing Scale

Plot Scale9/19/16

Office ofFacilities

ManagementTRUE NORTH

PLAN NORTHBY THE VARIOUS SUBCONTRACTORS.GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLEDGENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THESUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THERESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVERESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THECEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'SGENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS &

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TORESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR,GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE

GEN

ERAL

NOTES:

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED UNDER THE LAWS OF THE STATE OF MINNESOTA

REGISTRATION NUMBER:

BUILDING 49 FLOORING REPLACEMENT 618-16-109

49

24

Drawing Title Project Title

Approved: Division Chief

Approved: Service Director

Building Number

Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

one-

eigh

th inch

= o

ne foo

t

04

816

one-

quarter inch =

one foo

t

04

8

three-

eigh

ths inch =

one foo

t

04

04

one-

half

inch =

one foo

t

02

three-

qusrter inch =

one foo

t

60

2

one inch =

one foo

t

60

1

one an

d on

e-ha

lf inch =

one foo

t

60

three inches =

one foo

t

V.A. MEDICAL CENTERONE VETERANS DRIVEMINNEAPOLIS, MN 55417 1332-

REVISIONS: DATE

95% SUBMITTAL FOR REVIEW 7/29/16

a Haskell Company

100% ISSUE FOR CONSTRUCTION 9/19/16

041:1

AS INDICATED

LIFE SAFETY PLAN AND CODE ANALYSIS - FIRSTFLOOR

G003

CODE EDITIONNFPA 101 - LIFE SAFETY CODE 2015ICC CODES 2015

INTERNATIONAL BUILDING CODEINTERNATIONAL PLUMBING CODEINTERNATIONAL MECHANICAL CODE

NATIONAL ELECTRIC CODE 2014ASHRAE32.1-2004VA SPECIFCATIONS

APPLICABLE CODES

NOTETHE SCOPE OF THIS PROJECT DOES NOT ALTER THE USE,OCCUPANCY, OCCUPANT LOAD OR EXISTING EGRESS PATHS FROMTHE EXISTING PROJECT AREA. AS SUCH, IT IS DETERMINED THEEXSITING EGRESS IS SUFFICIENT.

DRETW

ARCHITECT

1. VA FACILITIES ARE PART OF FEDERAL AGENCY. CODESSHOWN ON THIS PLAN ARE THE APPLICABLE CODES ANDSUPERCEDE THE STATE AND LOCAL CODES.

2. PLAN INDICATES PRIMARY PROJECT LIMITS ONLY. SOME MEPWORK MAY BE REQUIRED OUTSIDE OF THE LIMITS SHOWN.REF MEP PLANS FOR ADDITIONAL INFORMATION.

3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THEINTEGRITY OF THE LIFE SAFETY SYSTEMS INCLUDING BUT NOTLIMITED TO: RATED PARTITIONS, FIRE SUPPRESSIONSYSTEMS, FIRE ALARM SYSTEMS AND EMERGENCY LIGHTINGAND EMERGENCY POWER.

GENERAL NOTES:

FIRST FLOOR LIFE SAFETY PLAN1 1/8" = 1'-0"

Page 9: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

28293031

20 21A

CB7

21B 21C

22

27

CB6

CB5

S2

24A2

25

26

26A

DOORACCESS

539

38

37

6 7 8 9 11

36

35

34

33

ELECTROPHYSIOLOGYSTUDIES ROOM

HEMODYNAMICANIMAL STUDIES ROOM

ELEVATORMACHINEROOM

ELEVATORPIT

CORRIDOR

STAIRWAYNUMBER 2

CORRIDOR

STORAGE

ANIMALWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

CORRIDOR

WORK ANDSUPPLY ROOM

OPERATINGROOMOPERATING

ROOMOPERATING

ROOMPOST-OPWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

FOOD ANDBEDDINGSTORAGE

NECROPSYROOM

WASTEROOM

OFFICE

ROOMCOLD35

ROOMRADIOLOGY

35

EXAMINATIONROOM

DIAGNOSTICLABORATORY

QUARANTINEWARD

QUARANTINEWARD

LOUNGE STORAGE

STORAGE24

HAC10

15aMEN'S

WOMEN'S15b

WARDQUARANTINE

13

24a2TELEPHONE

24aELECTRICAL

24a1AREA WELL

RECEIVING40

ELEV. MACH.4

STORAGE3

STAIRWAYNo. 1

ELEVATORNo. S-1

ELECTRICAL15c1

15c2TELEPHONE

15cCORRIDOR

PREP. ROOM15d

16PROCEDURE CB-10

CORRIDOR

CORRIDORCB-4

CB-1CORRIDOR

CB-2CORRIDOR

CB-3CORRIDOR

CORRIDORCB-9

CORRIDORCB-8

COMPR.17

STAIR WAR No. 3

HAC32

ROOMEXAMINATION

SV-16 SV-18EXAMINATION

ROOM

HACSV-20

SV-21STAFFLOUNGE

ROOMCOMPUTER

SV-23

SV-23aSTORAGE

SV-17RESTROOM RESTROOM

SV-19

OFFICE/DOCTORSV-23bMOLD ROOM

SV-15

CLINACSV-14

2100CONTROL

SV-24CONFERENCE

ROOMSV-24a

OFFICE CHIEF

SV-24bOFFICE/DOCTOR

OF SERVICE

X-RAY FILESSV-24c

SV-2MECH. CLOSET

TEL. CLOSETSV-3 ELECT. CLOSET

SV-1

PROCESSINGFILMSV-12

SV-11NURSESSTATION

SV-10PROCESSOR

AREA

SV-6CLINIC No.4CONTROL

RECEPTION/WAITINGSV-4

ROOMRESTSV-4a

SV-5ORTH-VOLTAGE

ROOMSIMULATOR

SV-7

CLOSETSV-13

SV-8CLOSET

2100CLINACSV-9

CORRIDORCSV-3

CSV-2CORRIDOR

CSV-1CORRIDOR

CSV-0CORRIDOR

STAIRWAYNo. 5

STAIRWAYNo. 4

ELEVATORNo. P-2

CLOSETSV-23

BUILDING 49 - BASEMENT FLOORMINNEAPOLIS VA MEDICAL CENTER

SV-7aTOILET

ROOMCONTROLSV-7b

NEW FLOORING AND PAINT - UNDER CONTRACT

NEW FLOORING AND PAINT - OPTIONAL1 2 3 4 5 6 7 8

9

1011 12 13 14 15 16 17 18

19 20

21

22

23 24 25 26 2728

29 30

32

31

33

37

38

34 35

36

39 40 41 42 43 44

45

46

47 48 49 50 51 52 5354

121110987654321

J

H

G

F

E

D

C

121110987654321

J

H

G

F

E

D

C

1 2

43

65

87

LINE INDICATES PRIMARY LIMITS OF PROJECT SCOPE

LINE INDICATESPRIMARY LIMITSOF PROJECTSCOPE

Page 10: 4)&&55*5-& 1(& /6.#&3 - MDM Construction · drawing index approved by: date o f v n t e m t r a p e d s r i a f f a s e t e r a es o f a m e r i c u a n i t e d s t a t department

LINE INDICATES PRIMARY LIMITSOF PROJECT SCOPE

28293031

20 21A

CB7

21B 21C

22

27

CB6

CB5

S2

24A2

25

26

26A

DOORACCESS

539

38

37

6 7 8 9 11

36

35

34

33

ELECTROPHYSIOLOGYSTUDIES ROOM

HEMODYNAMICANIMAL STUDIES ROOM

ELEVATORMACHINEROOM

ELEVATORPIT

CORRIDOR

STAIRWAYNUMBER 2

CORRIDOR

STORAGE

ANIMALWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

CORRIDOR

WORK ANDSUPPLY ROOM

OPERATINGROOMOPERATING

ROOMOPERATING

ROOMPOST-OPWARD

ANIMALWARD

ANIMALWARD

ANIMALWARD

FOOD ANDBEDDINGSTORAGE

NECROPSYROOM

WASTEROOM

OFFICE

ROOMCOLD35

ROOMRADIOLOGY

35

EXAMINATIONROOM

DIAGNOSTICLABORATORY

QUARANTINEWARD

QUARANTINEWARD

LOUNGE STORAGE

STORAGE24

HAC10

15aMEN'S

WOMEN'S15b

WARDQUARANTINE

13

24a2TELEPHONE

24aELECTRICAL

24a1AREA WELL

RECEIVING40

ELEV. MACH.4

STORAGE3

STAIRWAYNo. 1

ELEVATORNo. S-1

ELECTRICAL15c1

15c2TELEPHONE

15cCORRIDOR

PREP. ROOM15d

16PROCEDURE CB-10

CORRIDOR

CORRIDORCB-4

CB-1CORRIDOR

CB-2CORRIDOR

CB-3CORRIDOR

CORRIDORCB-9

CORRIDORCB-8

COMPR.17

STAIR WAR No. 3

HAC32

ROOMEXAMINATION

SV-16 SV-18EXAMINATION

ROOM

HACSV-20

SV-21STAFFLOUNGE

ROOMCOMPUTER

SV-23

SV-23aSTORAGE

SV-17RESTROOM RESTROOM

SV-19

OFFICE/DOCTORSV-23bMOLD ROOM

SV-15

CLINACSV-14

2100CONTROL

SV-24CONFERENCE

ROOMSV-24a

OFFICE CHIEF

SV-24bOFFICE/DOCTOR

OF SERVICE

X-RAY FILESSV-24c

SV-2MECH. CLOSET

TEL. CLOSETSV-3 ELECT. CLOSET

SV-1

PROCESSINGFILMSV-12

SV-11NURSESSTATION

SV-10PROCESSOR

AREA

SV-6CLINIC No.4CONTROL

RECEPTION/WAITINGSV-4

ROOMRESTSV-4a

SV-5ORTH-VOLTAGE

ROOMSIMULATOR

SV-7

CLOSETSV-13

SV-8CLOSET

2100CLINACSV-9

CORRIDORCSV-3

CSV-2CORRIDOR

CSV-1CORRIDOR

CSV-0CORRIDOR

STAIRWAYNo. 5

STAIRWAYNo. 4

ELEVATORNo. P-2

CLOSETSV-23

BUILDING 49 - BASEMENT FLOORMINNEAPOLIS VA MEDICAL CENTER

SV-7aTOILET

ROOMCONTROLSV-7b

NEW FLOORING AND PAINT - UNDER CONTRACT

NEW FLOORING AND PAINT - OPTIONAL1 2 3 4 5 6 7 8

9

1011 12 13 14 15 16 17 18

19 20

21

22

23 24 25 26 2728

29 30

32

31

33

37

38

34 35

36

39 40 41 42 43 44

45

46

47 48 49 50 51 52 5354

121110987654321

J

H

G

F

E

D

C

121110987654321

J

H

G

F

E

D

C

1 2

43

65

87

LINE INDICATES PRIMARY LIMITS OF PROJECT SCOPE

LINE INDICATESPRIMARY LIMITSOF PROJECTSCOPE

Drawing Scale

Plot Scale9/19/16

Office ofFacilities

ManagementTRUE NORTH

PLAN NORTHBY THE VARIOUS SUBCONTRACTORS.GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLEDGENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THESUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THERESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVERESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THECEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'SGENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS &

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TORESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR,GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE

GEN

ERAL

NOTES:

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED UNDER THE LAWS OF THE STATE OF MINNESOTA

REGISTRATION NUMBER:

BUILDING 49 FLOORING REPLACEMENT 618-16-109

49

24

Drawing Title Project Title

Approved: Division Chief

Approved: Service Director

Building Number

Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

one-

eigh

th inch

= o

ne foo

t

04

816

one-

quarter inch =

one foo

t

04

8

three-

eigh

ths inch =

one foo

t

04

04

one-

half

inch =

one foo

t

02

three-

qusrter inch =

one foo

t

60

2

one inch =

one foo

t

60

1

one an

d on

e-ha

lf inch =

one foo

t

60

three inches =

one foo

t

V.A. MEDICAL CENTERONE VETERANS DRIVEMINNEAPOLIS, MN 55417 1332-

REVISIONS: DATE

95% SUBMITTAL FOR REVIEW 7/29/16

a Haskell Company

100% ISSUE FOR CONSTRUCTION 9/19/16

051:1

AS INDICATED

PHASING PLANS

G004DRETW

ARCHITECT

FIRST FLOOR PHASING PLAN2 1/16" = 1'-0"

PHASING STAGES

1. PHASING PLAN IS TO GIVE THE GENERAL CONTRACTOR THEINTENT OF THE SEQUENCE FOR THE WORK.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FORPREPARING A DETAILED PHASING PLAN AND ENSURING ALLWORK IS COMPLETED TO ALLOW FOR TURN OVER OF SPACESIN THE ORDER INDICATED BY THE PHASING PLAN.

3. GENERAL CONTRACTOR SHALL COORDINATE THE DETAILEDPHASING PLAN WITH ALL TRADES.

4. ADDITIONAL COSTS INCURRED DUE TO IMPROPERSEQUENCING OF THE WORK SHALL BE THE RESPONSIBILITYOF THE CONTRACTOR ALONE.

5. PROTECT ALL ITEMS NOT SHOWN TO BE DEMOLISHED FROMANY DAMAGE. REPAIR ANY DAMAGE TO LIKE-NEW CONDITION.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDINGTEMPORARY PARTITIONS AS REQUIRED TO ENSURE THESAFETY AND SECURITY OF THE FACILITY DURINGCONSTRUCTION.

7. COORDINATE REMOVAL OF ALL EQUIPMENT WITH ALL OTHERTRADES AND VA STAFF.

8. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDINGON-SITE STORAGE CONTAINER FOR ITEMS TO BE SAVED FORREUSE. COORDINATE LOCATION OF STORAGE CONTAINERWITH VA STAFF.

9. A LIMITED AMOUNT OF STORAGE IS AVAILABLE IN THEBUILDING FOR THE STORAGE OF SMALLER ITEMS.COORDINATE WITH VA STAFF.

GENERAL NOTES:

GENERAL NOTES:

PHASE 1

PHASE 2

PROVIDE LINE ITEM FOR INCLUSION AS ALTERNATE

NOTE:AREAS THAT ARE INDICATED AS ALTERNATES WILL BE INCLUDED INTHE PHASE FOR THE RESPECTIVE FLOOR, SHOULD THE ALTERNATEBE ACCEPTED.

1. BASEMENT1.1. REMOVE/SAVE FOR REUSE EQUIPMENT; FLOOR MOUNTED

SINKS, LOW CLEARANCE PIPING & POWER, AUTOCLAVE,REFRIGERATORS , ETC AND DISASSEMBLE CAGES .

1.1.1. CAGES ON WHEELS WILL BE MOVED BY VA STAFF.1.2. REMOVE FLOOR SURFACE. PREP WALLS, FLOORS AND DOOR

FRAMES FOR NEW FINISHES.1.2.1. CONTRACTOR TO PROTECT PREVIOUSLY UNPAINTED

COPPER AND STAINLESS STEEL PIPING FROM PAINTING.ALL PREVIOUSLY PAINTED CONDUIT, PIPING, ETC IS TOBE REPAINTED.

1.3. REMOVE SERVICES UP TO BOTTLE WASH AND TUNNEL WASHEQUIPMENT INDICATED TO BE REMOVED IN PHASE 2.

1.4. APPLY NEW WALL, FLOOR AND DOOR FRAME FINISHES.1.5. REINSTALL SAVED EQUIPMENT; FLOOR MOUNTED SINKS, LOW

CLEARANCE PIPING & POWER, AUTOCLAVE.1.6. GC TO PERFORM CAGE AND OTHER MISCELLANEOUS

EQUIPMENT REINSTALLATION.1.6.1. CAGES ON WHEELS WILL BE MOVED BY VA STAFF1.6.2. GC TO COORDINATE WITH VA TIMING AND SEQUENCING

OF REINSTALLATION EFFORTS RELATED.

2. FIRST FLOOR2.1. PHASE 2 WILL COMMENCE APPROXIMATELY 1 WEEK AFTER

THE COMPLETION OF PHASE 1 TO ALLOW VA STAFF TOPREPARE FOR PHASE 2

2.2. REMOVE/SAVE FOR REUSE EQUIPMENT; FLOOR MOUNTEDSINKS, REFRIGERATORS, LOW CLEARANCE PIPING & POWER,BIO-SAFETY HOODS (DEMO 2, RETAIN 1), DISASSEMBLE PLAYCAGES AND KENNELS

2.2.1. CAGES ON WHEELS WILL BE MOVED BY VA STAFF.2.3. DEMO TUNNEL WASHER, BOTTLE WASH STATION .2.4. DEMO WALL FOR NEW DOOR IN ROOM 104.2.5. REMOVE FLOOR SURFACE. WALL IN-FILL AT REMOVED TUNNEL

WASH AND BOTTLE WASH STATIONS. PLUMBING SUPPLYROUGH-INS FOR NEW BOTTLE FILL STATION.

2.6. PREP WALLS, FLOORS AND DOOR FRAMES FOR NEWFINISHES. INSTALL NEW DOOR IN ROOM 104.

2.6.1. VA TO EXECUTE OR DIRECT ADDITIONAL WALL/CEILINGPREP FOR VA FURNISHED AND INSTALLED EQUIPMENT.

2.6.2. CONTRACTOR TO PROTECT EXPOSED PREVIOUSLYUNPAINTED COPPER AND STAINLESS STEEL PIPINGFROM PAINTING. ALL PREVIOUSLY PAINTED CONDUIT,PIPING, ETC IS TO BE REPAINTED.

2.7. APPLY NEW WALL, FLOOR AND DOOR FRAME FINISHES.2.8. INSTALL SAVED EQUIPMENT; FLOOR MOUNTED SINKS, LOW

CLEARANCE PIPING & POWER.2.8.1. CAGES ON WHEELS TO BE MOVED BY VA STAFF2.8.2. GC TO COORDINATE INSTALLATION TIMING AND

SEQUENCING WITH VA STAFF.2.9. INSTALL NEW BOTTLE FILL STATION.2.10. INSTALL (1) NEW AND (1) REUSED BIO-SAFETY CABINET.2.11. AIR SIDE BALANCE.

BASEMENT PHASING PLAN1 1/16" = 1'-0"