4/4/12 330 Hudson Workflow

Embed Size (px)

Citation preview

  • 8/2/2019 4/4/12 330 Hudson Workflow

    1/30

    Buildings are almost always designed and built as isolated,individual entities. Te adverse eects on neighboringbuildings and the community at large are rarely consideredoutside o the legally mandated setback requirements.

    Buildings as Individual Entities

  • 8/2/2019 4/4/12 330 Hudson Workflow

    2/30

    Buildings Interact

    Te shadow cast by the iconic Empire State on its neighboring buildings. Wind tunnel o okyo build

    Blocked window view in Hong Kong high

    LIGHT

    VIEWS

    WIND

  • 8/2/2019 4/4/12 330 Hudson Workflow

    3/30

    Pedestrian skybridges connecting buildings at 24th Street,NYC

    I.M. Peis Hancock ower is skewed to have a minimalimpact on Bostons historic Copley Square

    Optimally Designed Building Interaction

    Kevin Roches proposed elevated buildingallowing or open public plaza below

    Apartment building with solar panels(Bern, Switzerland)

    ACCESS PLAZASOLAR SIZE

  • 8/2/2019 4/4/12 330 Hudson Workflow

    4/30

    Retrot Buildings orPositive Interactions

    Altering buildings to interact as a retrot conditioninvolves prohibitve initial costs when considered inisolation

    $$

  • 8/2/2019 4/4/12 330 Hudson Workflow

    5/30

  • 8/2/2019 4/4/12 330 Hudson Workflow

    6/30

    Original Condition Cut Out Courtyard Tower Add

    Retrot - FAR Example:

    Do I want a courtyard to improve environmental conditions?

    Yes No

    Can I aord a courtyard?

    Yes No

    Build as Individual Partnership Opportunities Available?

    Yes No

    Invoking new FAR exception, will the valueo the FAR created by cutting out the court-

    yard sell at a high enough price to cover thecost o cutting out the courtyard?

    No Yes

    Build with money rom sale o FAR

    }

  • 8/2/2019 4/4/12 330 Hudson Workflow

    7/30

    Tower Addition Consider Eects

    on Neighbor

    Optimize Tower Addition to

    Mitigate Adverse Eects

    on Neighbor

    How Will the Addition Impact Neighbors?

    FAR CAVEAT:

    Bought to be developed, the extra FAR will inevitably aectits neighbors. Tereore, another condition or using the extraFAR is that the developer must coordinate with the communityto mitigate any adverse eects on neighboring buildings.

    FAR Marketplace

  • 8/2/2019 4/4/12 330 Hudson Workflow

    8/30

    New Addition - Neighbor Interaction Example:

    Designed by developer

    Neighbor chooses

    Designed by developer

    Neighbor chooses

    Neighbor chooses

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

  • 8/2/2019 4/4/12 330 Hudson Workflow

    9/30

    Tis Interaction can be Dened by a Linear Workfow

    Optimize Tower Addition to

    Mitigate Adverse Eectson Neighbor

    Original Condition Cut Out Courtyard Tower Addition

  • 8/2/2019 4/4/12 330 Hudson Workflow

    10/30

    MAXIMIZE:

    MINIMIZE:

    MEHOD:

    LightAir

    New core with atrium (Jenna)

    LightAirSquare ootageSouthern exposure

    Construction costsAdverse eects on neighbor

    Solar collectorGreen wall

    Neighbor approval

    Neighbors blocked lightingNeighbors bad views

    RotateFormal changesOutput rom towers solar collectorView o towers green wallCommunity program

    Each Stage has Dierent Goals and Methods

    Optimize Tower Addition to

    Mitigate Adverse Eectson Neighbor

    Original Condition Cut Out Courtyard Tower Addition

  • 8/2/2019 4/4/12 330 Hudson Workflow

    11/30

  • 8/2/2019 4/4/12 330 Hudson Workflow

    12/30

    Typical Floor Plan- Ofce Floor

    Women Men

  • 8/2/2019 4/4/12 330 Hudson Workflow

    13/30

    Parametric Changes- Void Strategy

    Women Men Women

    Men

  • 8/2/2019 4/4/12 330 Hudson Workflow

    14/30

    Element Strategy- Jm3544 Element

  • 8/2/2019 4/4/12 330 Hudson Workflow

    15/30

    - Void Area : 2767 square feet

    Output parameter

    - Core Area : 2981 square feet

    - Length of Void : 70 feet

    Input parameter

    - Void Area : 3275square feet

    Output parameter

    - Core Area : 2981 square feet

    - Length of Void : 82 feet

    Input parameter

    - Void Area : 4833 square feet

    Output parameter

    - Core Area : 2981 square feet

    - Length of Void : 120 feet

    Input parameter

    Input Parameter

    Parametric Changes- Void Strategy

  • 8/2/2019 4/4/12 330 Hudson Workflow

    16/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    default

  • 8/2/2019 4/4/12 330 Hudson Workflow

    17/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    defaul

    f.a.r. f.a.r.

  • 8/2/2019 4/4/12 330 Hudson Workflow

    18/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    default

    f.a.r.f.a.r.

    extension

    extens

  • 8/2/2019 4/4/12 330 Hudson Workflow

    19/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    default

    f.a.r.f.a.r.

    extension

    extens

  • 8/2/2019 4/4/12 330 Hudson Workflow

    20/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    default

    f.a.r.f.a.r.

    extension

    extens

  • 8/2/2019 4/4/12 330 Hudson Workflow

    21/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    default

    f.a.r.f.a.r.

    extension

    neutralizing strategy

    P i l Si Addi i

  • 8/2/2019 4/4/12 330 Hudson Workflow

    22/30

    Potential Site or Addition

    Ad E t N i hb

  • 8/2/2019 4/4/12 330 Hudson Workflow

    23/30

    Adverse Eects on NeighborCaused by Addition

  • 8/2/2019 4/4/12 330 Hudson Workflow

    24/30

    }Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

  • 8/2/2019 4/4/12 330 Hudson Workflow

    25/30

    }

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

  • 8/2/2019 4/4/12 330 Hudson Workflow

    26/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    }

  • 8/2/2019 4/4/12 330 Hudson Workflow

    27/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    }

  • 8/2/2019 4/4/12 330 Hudson Workflow

    28/30

    Mitigation o developing extra FAR

    Design solution

    Veto Massing Redesign

    Utility / monetary compensation

    Payo Veto

    $$ Energy

    Program Access

    Does the redesign solve adverse eects?

    Yes No

    Aesthetics

    }

  • 8/2/2019 4/4/12 330 Hudson Workflow

    29/30

  • 8/2/2019 4/4/12 330 Hudson Workflow

    30/30