400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

400-25 OPERATION

Page 2: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

General Information

• Completely self-contained unit.

• Designed to apply all of Rusmar’s Long Duration Foams.

• Foam is dispersed via a 200’/ 60.96m hose.

• Manual release/electric rewind hose reel.

• Freeze Protected for winter operation.

Page 3: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

Safety Notes

• The 400-25 is extremely heavy, always place wheel chocks under unit when not being towed.

• When in use the 400-25 engine and compressor can get very hot, avoid burns.

• The hydraulic, foam and air system operate under high pressure always vent before servicing.

• Avoid rotating parts.

• Always wear proper PPE, Rusmar recommends. Safety shoes, gloves, safety glasses and hearing protection.

Page 4: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

General Preparation

• Inspect system for any leaks or apparent damage that may affect the operation of the unit.

• Check and fill if necessary all fluid reservoirs, engine oil, compressor oil, hydraulic oil, Cat pump oil.

• Fill the diesel fuel tank.

• Check the diesel engine coolant level.

• Check that the hydraulic system is disengaged, handle in the vertical position.

• Check that the Main Control valves (labeled “Comp Air” and “Chemical”)are in the “Off” position.

Page 5: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

System Start Up.

• At compressor control panel, depress “Bypass” button and turn ignition switch to start position.

• Once running switch the “Compressor” unloader switch to the “Run” position.

• Proceed to “Main Foam Control” panel at rear of unit.

Page 6: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

System Start Up.

Start/

Run

Switch

Compressor

Unloader

switch

Page 7: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

System Filling

• Connect supplied suction hose and dipleg to the 3 way fill valve.

• Place dipleg into chemical concentrate drum.

• Open 3 way fill valve (handle facing outwards).

• Make certain that all safety clips are in place.

• Slowly engage “Sandpiper Control” ball valve, located on the right side of the “Main Foam Control” panel.

• Once apparent that the unit is pumping, increase valve opening to half way.

Page 8: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

System Filling Cont.

• Engage “Hydraulic Control Valve” located to the right of the “Main Foam Control” panel by pulling handle towards the rear of the unit.

• Pump in one drum of concentrate to make a full load of solution. 6.5:1

• Once drum is empty, fill the balance of the unit with water.

• Close valve, disconnect dipleg and fill hose and store.

• Disengage “Hydraulic” control valve by pushing handle towards the tank.

• Shut down unit if necessary. Turn “Unloader” to start position, turn ignition to “Off” position.

• Be careful of dipleg placement as stones or other debris can be introduced

into the pumping system causing damage.

Page 9: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

System Filling Cont.

Sandpiper

control

valve

Hydraulic

Control Valve

Fill Port

Foam

Control

Panel

Page 10: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

Foaming

• Once ready to foam:

• Restart unit and compressor as outlined previously.

• Engage “Hydraulic” control valve.

• With the foam discharge hose firmly held, open the “Chemical” and “Compair” valves at the “Main Foam Control” panel.

• Foam will start within a few seconds.

• Cover desired area.

• Note operating pressures:

• Cat pump 400 PSI

• Air Pressure 105-110 PSI

Page 11: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

Foaming Shut Down

• Once desired area is covered:

• At “Main Foam Control” panel, close the “Chemical” valve and reduce the “Compair” to half way.

• Make certain that the operator has a firm grasp on the discharge hose as pulsing may occur.

• Once discharge line has been purged, close “Compair” valve.

• If finished, disengage hydraulic system, rewind hose and follow previous shut down sequence.

Page 12: 400-25 OPERATION · •Connect supplied suction hose and dipleg to the 3 way fill valve. •Place dipleg into chemical concentrate drum. •Open 3 way fill valve (handle facing outwards)

Additional Notes • Diluted material can remain in the unit for up to 30 days.

• When using previously diluted material, start the unit and engage the “Hydraulic” valve to remix the solution.