Upload
saurabh-singh
View
248
Download
4
Embed Size (px)
Citation preview
7/23/2019 4.0 - Piping Construction Standard (PS)
1/58
7/23/2019 4.0 - Piping Construction Standard (PS)
2/58
7/23/2019 4.0 - Piping Construction Standard (PS)
3/58
Butt-weld
Stub-in
Branch conn
1) PIPE & PIPE
2) PIPE & FLANGE
3) PIPE FIING & FLANGE
!) PIPE & FIING
Sli"-on
#eldin$ Nec% hreaded
Soc%et-weld
La" oint
Elbow
ee
'educer
For 1-1(2 "i"e & below
hreaded Soc%et-weld
7/23/2019 4.0 - Piping Construction Standard (PS)
4/58
7/23/2019 4.0 - Piping Construction Standard (PS)
5/58
7/23/2019 4.0 - Piping Construction Standard (PS)
6/58
7/23/2019 4.0 - Piping Construction Standard (PS)
7/58
Branch
tee
union
branch coupling
Straight stub-in
Lateral
stub-in
7/23/2019 4.0 - Piping Construction Standard (PS)
8/58
7/23/2019 4.0 - Piping Construction Standard (PS)
9/58
7/23/2019 4.0 - Piping Construction Standard (PS)
10/58
7/23/2019 4.0 - Piping Construction Standard (PS)
11/58
7/23/2019 4.0 - Piping Construction Standard (PS)
12/58
Pri*ar+
S',,'E
.PE /F 'EINF/'E0EN #ater ti$ht doubler
#ater ti$ht "i"e leee
Inert Plate
Pi"e ou"lin$
Non-ti$ht doubler
Non-ti$ht "i"e leee
ubin$ - A ( A4 ( #55
6S7 Plu$ ( 6'ote8
Plu$
Secondar+
7/23/2019 4.0 - Piping Construction Standard (PS)
13/58
7/23/2019 4.0 - Piping Construction Standard (PS)
14/58
7/23/2019 4.0 - Piping Construction Standard (PS)
15/58
7/23/2019 4.0 - Piping Construction Standard (PS)
16/58
7/23/2019 4.0 - Piping Construction Standard (PS)
17/58
7/23/2019 4.0 - Piping Construction Standard (PS)
18/58
7/23/2019 4.0 - Piping Construction Standard (PS)
19/58
7/23/2019 4.0 - Piping Construction Standard (PS)
20/58
STEEL POLISHED ROD
GUIDE SUPPORT
Steel with bra (
bron9e buhin$
JOINT :
1) ,nieral "l$
2) Beel Gear
VALVE ATTACHMENT :
1) 'iin$ Ste*
2) Non-riin$ Ste*
3) For% +"e
!) Butter:l+ ;ale
STUFFING BOX &
W.T. GLAND
VALVE HANDLE
INDICATOR & PIPE
SLEEVE AS GUARD
7/23/2019 4.0 - Piping Construction Standard (PS)
21/58
7/23/2019 4.0 - Piping Construction Standard (PS)
22/58
Bevel gear
Attachment
Extension rod
Gate valve
Guide support
Guide support
Extension rod
Handwheel
Attachment
Universal
Cplg
W.T. gland
stuffing ox
Butterfl! valve
position handle
Guide support
Butterfl!
"alve
7/23/2019 4.0 - Piping Construction Standard (PS)
23/58
W.T. gland
stuffing ox#ositionindicator
Handwheel
7/23/2019 4.0 - Piping Construction Standard (PS)
24/58
Firewater +te*
Sewa$e +te*
7irt+ oil +te*
Bil$e +te*
7/23/2019 4.0 - Piping Construction Standard (PS)
25/58
he hore connection "iece hall be%e"t near the :illin$ tation on eitheride o: the eel5
It hall be %e"t to$ether with bolt &waher !et-14** ) 8 =**
7/23/2019 4.0 - Piping Construction Standard (PS)
26/58
7/23/2019 4.0 - Piping Construction Standard (PS)
27/58
he :lan$e *ade o: teelhall be intalled
7/23/2019 4.0 - Piping Construction Standard (PS)
28/58
he :lan$e *ade o: teelhall be intalled
7/23/2019 4.0 - Piping Construction Standard (PS)
29/58
7/23/2019 4.0 - Piping Construction Standard (PS)
30/58
o" "lu$ & cou"lin$
E8tended "i"e with
ca"
E8tended "i"e with
el:-cloin$ ale
Botto* tri%in$
"late
an% chec% ale
7/23/2019 4.0 - Piping Construction Standard (PS)
31/58
S# - SEA #'
7# - 7'ILL #'
F/ - F,EL /IL
;/I7 - ;/I7
B/ - BASE /IL
P# - P/ABLE #'
BL - BILGE
0 - 0,7/NAI0INAE7
7/ - 7I'. /IL
7/23/2019 4.0 - Piping Construction Standard (PS)
32/58
N/E SELF L/SING ;AL;E / BE INSALLE7 /NL. F/' /IL ANC S/,N7ING PIPE E'0INAING BEL/##EADE' 7EC
7/23/2019 4.0 - Piping Construction Standard (PS)
33/58
7/23/2019 4.0 - Piping Construction Standard (PS)
34/58
7/23/2019 4.0 - Piping Construction Standard (PS)
35/58
7/23/2019 4.0 - Piping Construction Standard (PS)
36/58
7/23/2019 4.0 - Piping Construction Standard (PS)
37/58
IE0
INSE S'EEN - SE#AGE
FLA0E S'EEN - /IL
7/23/2019 4.0 - Piping Construction Standard (PS)
38/58
Coaming $ drip pan
%for oil tan&'
7/23/2019 4.0 - Piping Construction Standard (PS)
39/58
Butt-weld end
+"e 1 - onc5 reducer
+"e 2 - Dal: "i"e with ca"
7/23/2019 4.0 - Piping Construction Standard (PS)
40/58
7/23/2019 4.0 - Piping Construction Standard (PS)
41/58
7/23/2019 4.0 - Piping Construction Standard (PS)
42/58
RATIO OF CLEAR THROUGH STRAINER TO PIPE
AREA IS 2.7:1
ALL DRAINS IN AREAS WITH DECK COVERING TO
BE ELEVATED TO DECK COVERING
7/23/2019 4.0 - Piping Construction Standard (PS)
43/58
7/23/2019 4.0 - Piping Construction Standard (PS)
44/58
7/23/2019 4.0 - Piping Construction Standard (PS)
45/58
,-B/L PIPE LA0P PIPE SD/E
7/23/2019 4.0 - Piping Construction Standard (PS)
46/58
DIS ABLE IS APPLIABLE F/' 0A5 SPAING BE#EEN PIPE S,PP/'S F/' D/'I/NALS'AIGD ',N /F SAN7A'7 AN7 DEA;IE' PIPE A 0A5 /PE'AING E0P5 /F = de$F
7/23/2019 4.0 - Piping Construction Standard (PS)
47/58
7/23/2019 4.0 - Piping Construction Standard (PS)
48/58
7/23/2019 4.0 - Piping Construction Standard (PS)
49/58
7/23/2019 4.0 - Piping Construction Standard (PS)
50/58
7/23/2019 4.0 - Piping Construction Standard (PS)
51/58
7/23/2019 4.0 - Piping Construction Standard (PS)
52/58
7/23/2019 4.0 - Piping Construction Standard (PS)
53/58
PIPE SUPPORT DIRECTLY WELDED TO SIDE SHELL TO BE
AVOIDED.
7/23/2019 4.0 - Piping Construction Standard (PS)
54/58
ALL BOLTS AND NUTS TO BE CADMIUM
PLATED SAE J42 G!." AND SAE J#
G!."$ HEAVY DUTY
ALL METAL COMPONENTS OF THE STAUFF
CLAMPS TO BE %INC PLATED.
7/23/2019 4.0 - Piping Construction Standard (PS)
55/58
7/23/2019 4.0 - Piping Construction Standard (PS)
56/58
7/23/2019 4.0 - Piping Construction Standard (PS)
57/58
7/23/2019 4.0 - Piping Construction Standard (PS)
58/58