36
4.0 - ENGINEERING ISSUES REPORT

4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

4.0 - ENGINEERING ISSUES REPORT

Page 2: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

THIS PAGE INTENTIONALLY LEFT BLANK

Page 3: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

 

 

Sepu

 

Engine

 

 

 

 

 

Prepared 

 

 

 

 

 

 

Prepared 

 

 

HNTB Co

in collabo

 

Novembe

lveda P

eering Iss

 for: 

 by: 

rporation 

oration with P

er 2012 

Pass Cor

ues Repo

Parsons Brinc

rridor S

ort 

kerhoff, EMI,

ystems

, IBI Group, a

s Planni

nd V&A 

ing Studdy 

Page 4: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

THIS PAGE INTENTIONALLY LEFT BLANK

Page 5: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

Tableo1  Intro

2  Corri

2.1 

2.1.1

2.1.2

2.1.3

2.2 

2.2.1

2.2.2

2.2.3

2.3 

2.3.1

2.3.2

2.3.3

2.4 

2.4.1

2.4.2

2.4.3

2.5 

2.5.1

2.5.2

2.5.3

2.6 

2.6.1

2.6.2

3  Next

Appendix

Appendix

 

a Pass Corridong Issues Rep

ofContenoduction .......

idor System C

At‐Grade Van

1  Key Eng

2  Rough‐O

3  Issues fo

At‐Grade Fre

1  Key Eng

2  Rough‐O

3  Issues fo

Aerial Viaduc

1  Key Eng

2  Rough‐O

3  Issues fo

Tolled Highw

1  Key Eng

2  Rough‐O

3  Issues fo

Fixed‐Guidew

1  Key Eng

2  Rough‐O

3  Issues fo

Toll Tunnel a

1  Key Eng

2  Issues fo

t Steps ..........

x 1: Conceptu

x 2: Higher Sp

or Systems Plport 

nts.....................

Concepts ......

n Nuys/Sepul

gineering Elem

Order‐of‐Mag

or Further Inv

eeway Manag

gineering Elem

Order‐of‐Mag

or Further Inv

ct Managed L

gineering Elem

Order‐of‐Mag

or Further Inv

way Tunnel ....

gineering Elem

Order‐of‐Mag

or Further Inv

way Light Rail

gineering Elem

Order‐of‐Mag

or Further Inv

and Rail Tunn

gineering Elem

or Further Inv

.....................

ual Drawings 

peed Buses 

anning Study

.....................

.....................

lveda Bouleva

ments ............

gnitude Costs

vestigation an

ged Lanes ......

ments ............

gnitude Costs

vestigation an

Lanes .............

ments ............

gnitude Costs

vestigation an

.....................

ments ............

gnitude Costs

vestigation an

l or Heavy Ra

ments ............

gnitude Costs

vestigation an

el ..................

ments ............

vestigation an

.....................

 

......................

......................

ard Bus Rapid

......................

s ....................

nd Analysis ...

......................

......................

s ....................

nd Analysis ...

......................

......................

s ....................

nd Analysis ...

......................

......................

s ....................

nd Analysis ...

il Tunnel .......

......................

s ....................

nd Analysis ...

......................

......................

nd Analysis ...

......................

.....................

.....................

d Transit (BRT

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

T) ...................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

P

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

Page 1 

....... 2 

....... 2 

....... 2 

....... 4 

....... 4 

....... 6 

....... 6 

....... 8 

....... 8 

....... 9 

..... 10 

..... 12 

..... 12 

..... 13 

..... 14 

..... 16 

..... 18 

..... 19 

..... 20 

..... 22 

..... 23 

..... 24 

..... 25 

..... 27 

..... 29 

..... 30 

Page 6: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

THIS PAGE INTENTIONALLY LEFT BLANK

Page 7: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

1 INTRThis 

key e

been

cons

task 

Plan

 

This 

Char

geot

study

conc

 

2 CORThe s

and 

Conc

 

2.1 ATh

G

M

M

Ex

 

Th

B

p

Se

d

a Pass Corridong Issues Rep

RODUCTIOreport presen

engineering e

n developed t

sultant teams

orders for th

ning Charrett

report provid

rrette 2, high‐

echnical asse

y that need fu

cepts are inclu

RRIDOR SYsix concepts a

2 are mainly 

cepts 4 throug

At-Grade Vahe proposed 

reen Line and

MetroLink Stat

MetroLink/Am

xposition LRT

he at‐grade B

us on Should

rovision of tra

epulveda Bou

escribed belo

or Systems Plport 

ON nts refined co

elements for e

through work

 working on t

e Sepulveda 

te 1 and 2.   

des a summar

‐level, concep

essments, con

urther invest

uded in the A

YSTEM COare presented

at‐grade or s

gh 6 incorpor

n Nuys/Sepat‐grade BRT

d Crenshaw/L

tion to the no

mtrak, Orange

T, and Jefferso

BRT service tr

er operations

affic signal pr

ulevard, Van N

ow. 

anning Study

orridor system

each concept

king sessions w

the Transport

Pass Corridor

ry description

ptual cost est

nstructability 

igation and a

Appendix. 

ONCEPTSd in further d

urface alterna

rate major su

pulveda BouT provides a c

LAX Light Rail

orth. Interme

 Line Sepulve

on Boulevard

aveling along

s across Sepu

riority, and qu

Nuys Bouleva

 

m concepts, r

t and issues n

with Metro p

tation Plannin

r Systems Pla

n of the conce

imates, inform

issues, and is

nalysis.  In ad

etail in the fo

atives, Conce

bsurface (tun

ulevard Busonnection be

 Transit (LRT)

diate stops a

eda Station, W

.  

g existing road

lveda Pass on

ueue jump lan

ard, and San F

rough‐order‐o

eeding furthe

planning staff,

ng, Demand M

nning Study, 

epts and any 

mation on ke

ssues uncove

ddition, conce

ollowing secti

ept 3 is an aer

nnel) compon

s Rapid Traetween Centu

) line on the s

re proposed 

Wilshire Boule

dways will be

n I‐405 (in bo

nes at selecte

Fernando Roa

of‐magnitude

er study.  The

, input from t

Modeling, and

and from inp

changes resu

ey design elem

red during th

eptual drawin

ions.  In gene

rial viaduct al

nents. 

ansit (BRT) ury Boulevard

south to the S

at Nordhoff S

evard (Wests

e enhanced by

th directions

ed intersectio

ad. These enh

P

e cost estimat

e concepts ha

the other 

d Environmen

put received a

ulting from 

ments, 

he course of t

ngs for the 

ral, Concepts

ternative, an

d station with

San Fernando

Street, Van N

ide Subway), 

y the provisio

), and the 

ons along 

hancements a

Page 2 

tes, 

ave 

ntal 

at 

his 

s 1 

 the 

uys 

on of 

are 

Page 8: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

a Pass Corridong Issues Rep

Figure

 

or Systems Plport 

e 1.  Con

anning Study

ncept 1 At‐Gr

 

rade Van Nuyys/Sepulveda BRT Map 

P

 

Page 3 

Page 9: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.1.1

2.1.

2.1.

2.1.

2.1.2

a Pass Corridong Issues Rep

Key Engine 

1.1 Concept The prim

intersect

propose

operatio

reconfig

1.2 GeotechNo unco

Concept

 1.3 Construc

No nega

1 may pr

and abili

and tran

 

Rough-OrdThe majorit

estimates w

cases where

data from s

by Metro p

 

The unit co

quantified b

typical unit 

economies 

characterist

mile, where

costs were 

and a 30 pe

to account 

 

See the Sep

discussion o

specific ass

estimates.  

 

or Systems Plport 

eering Eleme

Design Elememary engineer

tion striping m

d BRT service

ons on I‐405 (t

uration of the

 nical Assessmommon geote

 1. 

ctability Issuetive construc

resent improv

ity to phase in

nsit signal prio

der-of-Magnity of the unit 

were provided

e unit costs w

similar project

ersonnel. 

sts used for t

by a cost per 

factor.  Whe

of scale.  The

tics of the con

eas some con

adjusted acco

ercent conting

for the prelim

pulveda Pass C

on the costing

umptions and

 

anning Study

ents

ents ring design el

modifications

e and signing 

the north sid

e Orange Line

ment echnical issue

s ctability issues

ved construct

ntersection a

ority.  

tude Costs cost factors u

d by the Metr

were not prov

ts and indust

his study rep

mile unit and

re appropriat

e cost estimat

ncept.  For ex

cepts were e

ordingly.  Last

gency was ap

minary nature

Corridor Syst

g methodolog

d adjustment

 

ements assoc

s associated w

and striping a

e of the Sepu

e Sepulveda s

s are anticipa

s are anticipa

tability due to

nd vehicle im

used to devel

ro Cost Estim

vided by Metr

ry resources,

resent the co

d major featu

te, the unit co

tes have also 

xample, the ty

nvisioned to 

tly, unit costs

pplied to each

e of this feasib

ems Planning

gy, unit cost v

s applied to d

ciated with C

with queue ju

associated w

ulveda Pass).  

station 

ated for the ro

ated for Conc

o its limited c

mprovements 

lop the rough

ating Departm

ro and the de

, which were 

oncepts at a v

res such as tr

osts have bee

been adjuste

ypical Metro 

have fewer s

s were develo

h concept’s to

bility level ass

g Study Prelim

values, gener

develop the r

Concept 1 are 

ump improvem

ith the bus on

This concept

oadway facili

ept 1, on the

construction n

associated w

h‐order‐of‐ma

ments.  There

esign team re

reviewed and

very high leve

ransit station

en adjusted to

ed to reflect t

rail project h

stations per m

oped to reflec

otal applied u

sessment.  

minary Cost R

ral assumptio

rough‐order‐o

P

traffic signal 

ments for the

n should 

t also assume

ties required

 contrary, Co

needs, lower 

with queue jum

agnitude cost

e were certai

lied up availa

d approved fo

el; alternative

s are assigned

o reflect 

the physical 

has a station e

mile and the u

ct program co

nit cost in ord

eport for a fu

ns, and conce

of‐magnitude

Page 4 

and 

es the 

 for 

ncept 

cost 

mps 

able 

or use 

es are 

d a 

every 

unit 

osts 

der 

ull 

ept 

e cost 

Page 10: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.1.2

2.1.

2.1.

 

a Pass Corridong Issues Rep

2.1 Capital CThe majo

estimate

S

a

A

S

 

The ro

$162M

 .2.2 Vehicle

Vehicl

Transit

perfor

sizes r

compo

option

lane fa

transm

transm

(differ

 

Based 

(refurb

service

new ve

 .2.3 Operat

Opera

mainte

2013, 

Based 

part of

year. 

 

or Systems Plport 

Cost Estimate or componen

e are: 

Shoulder imp

accommodat

Boulevard 

At‐grade BRT

Modifications

Priority treat

Sepulveda Bo

ough‐order‐of

M. 

e Cost Estimae costs assoc

t service. A p

rmed as part o

eflect the pro

onent associa

ns reflect the 

acility across S

mission of exis

mission that c

ing from curr

on the above

bished compa

e, and from $

ehicles respe

tions and Mainting and main

enance cost f

and average 

on these inp

f Concept 1, t

 

anning Study

nts of the con

provements o

te shoulder ru

T Station 

s at the Oran

ments, inters

oulevard and 

f‐magnitude c

ate iated with Co

lanning‐level 

of the Deman

ovision of BRT

ated with the 

need for BRT

Sepulveda Pa

sting vehicles

an maintain 4

rent fleet) tha

e consideratio

ared to new v

$4M to $78M 

ctively. 

ntenance Cosntenance cos

figures as rep

weekday pas

uts, average 

the at‐grade S

 

cept used to 

on the northb

unning buses 

ge Line statio

sections modi

Van Nuys Bo

capital cost es

oncept 1 inclu

calculation fo

nd Modeling t

T service acro

vehicle cost e

T service to m

ass. The first f

s in Metro’s fl

45 mph and t

at can mainta

on, vehicle co

vehicle purcha

for the high r

t Estimate t estimates w

orted in the M

senger mile r

annual opera

Sepulveda Bo

develop the 

ound and sou

from Ventura

on 

ifications, and

ulevard 

stimate for C

ude vehicles f

or both a low

task order. Th

oss the Sepulv

estimates, is 

aintain a 45 m

fleet option re

leet with a m

the other is fo

ain 45mph acr

osts for Conce

ase) for the e

range of BRT 

were develope

Metro Propos

results from t

ating costs for

oulevard BRT,

rough‐order‐

uthbound I‐40

a Boulevard t

d queue jump

Concept 1 is a

for the propo

w and high ran

he low and hi

veda Pass. Th

fleet type. Tw

mph speed in

eplaces the e

ore powerful

or the purcha

ross the Sepu

ept 1 range fr

estimated low

service, for r

ed using the o

sed Budget fo

the demand m

r BRT operati

, were estima

P

‐of‐magnitude

05 to 

to Sepulveda 

p lanes along 

nticipated to 

sed Bus Rapid

nge fleet size 

igh range flee

he second 

wo different f

n the manage

engine and 

l engine and 

ase of new ve

ulveda Pass.  

rom $2M to $

w range of BR

refurbished an

operating and

or Fiscal Year 

modeling effo

ons included 

ated at $96M 

Page 5 

e cost 

be 

was 

et 

fleet 

hicles 

$37M 

nd 

orts.  

as 

per 

Page 11: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.1.3

2.2 AC

in

A

o

ge

lim

o

 

A

La

d

d

la

p

w

ea

la

 

Th

A

m

ei

lo

40

ac

fr

 

B

vi

la

la

th

a Pass Corridong Issues Rep

Issues for Further inq

and operate

undertaken

shoulder op

transit signa

 

At-Grade Freoncept 2 wou

nterchange in

venue, I‐405 

ccupancy toll

eneral purpos

mit freeway w

nly be one m

t the point w

a Grange Ave

irection of tra

irect access r

anes to US‐10

rovided for a

westbound on

astbound on 

anes via a dire

he southern D

venue, just so

managed lanes

ither be unde

connection f

ocal streets (B

05) would be

ccess to adjac

rontage roads

RT vehicles u

ia direct acce

anes of I‐405 

ane on and of

he managed l

or Systems Plport 

Further Inveuiries and inv

e the roadwa

n to understan

perations and

al priority me

eeway Manauld implemen

 the north to

is proposed t

 (HOT) lanes 

se lanes wou

widening.  No

anaged HOT 

here the man

nue), one of 

avel) to a con

amp connect

01 serving traf

reas east of I‐

 US‐101 or co

US‐101 woul

ect access ram

Direct Access

outh of Santa

s in the medi

er or over I‐40

or managed l

Beloit Avenue

 converted to

cent properti

s).  

tilizing the I‐4

ss ramps. The

using a new u

ff ramps. Stan

anes could al

anning Study

stigation andvestigation w

ay facilities pr

nd each agen

d intersection

easures.  

aged Lanesnt managed la

 the I‐105 int

to consist of f

in each direc

ld be to main

orth of US‐101

lane in each d

naged lanes t

the managed

necting road

tion to US‐101

ffic with origi

‐405).  As suc

ontinue north

d have the op

mp connectio

 Ramp conne

a Monica Bou

an of I‐405 w

05).  Ramps o

lanes traffic t

e on the west 

o one way str

es (other des

405 managed

e proposed d

undercrossing

ndard in‐lane 

lso be provide

 

d Analysis ith Caltrans a

oposed for th

ncy’s particula

 signal, signin

s ane operation

erchange in t

five general p

tion.  A possi

ntain the four 

1 and south o

direction.   

ransition from

d lanes will be

way using dir

1 would prov

ns or destina

ch, traffic goin

hbound on I‐4

ption of direc

n.   

ection is prop

levard.  In thi

with a structur

on the outside

o the adjacen

side of I‐405 

eets, but kep

sign options m

d lanes are pro

esign would a

g and then ac

ingress and e

ed at standar

and other mu

he new BRT s

ar requiremen

ng and stripin

ns in the cent

the south.  Be

purpose (GP) 

ble exception

r lane section 

of Santa Mon

m two lanes t

e dropped or 

rect access ra

vide a connect

ations west of

ng northboun

405 dependin

ctly entering t

osed to be co

is scenario, ra

re to La Grang

e of each side

nt local street

and Cotner A

pt at their exis

may allow for 

oposed acces

allow buses t

ccess the man

egress from t

rd Caltrans int

nicipal agenc

ervice will ne

nts for implem

ng changes fo

ter lanes of I‐4

etween US‐10

lanes and two

n to the provi

in the southb

ica Boulevard

to one lane (a

added (depe

amps.  At the 

tion from the

f I‐405 (no co

nd on I‐405 w

ng on lane sel

the I‐405 sout

onstructed at

amps would c

ge Avenue (co

e of the freew

ts.  As design

Avenue on th

sting elevatio

 two‐way traf

ss to the Oran

o travel unde

naged lanes o

he general pu

tervals.  Simi

P

cies that main

eed to be 

menting bus 

r queue jump

405 from the

01 and La Gra

o managed, h

ision of five 

bound directi

d, there woul

at US‐101 and

nding on the 

north end, a 

e I‐405 manag

nnections 

would be able 

ection and tr

thbound man

 La Grange 

connect the 

onnection co

way would pro

ed, the adjac

e east side of

on to maintain

ffic on the 

nge Line Busw

er the northb

on I‐405 via ce

urpose lanes 

larly, addition

Page 6 

ntain 

on 

p and 

e I‐5 

ange 

high 

ion to 

d at 

ged 

to go 

affic 

naged 

uld 

ovide 

cent 

f I‐

way 

ound 

enter 

to 

nal 

Page 12: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

ac

al

 

a Pass Corridong Issues Rep

ccess to the m

lso be provide

Figure

 

or Systems Plport 

managed lane

ed via additio

e 2.  Con

anning Study

es (north and 

onal direct acc

ncept 2 At‐Gr

 

south of the 

cess ramps. 

rade Freeway

two‐lane Sep

y Managed La

pulveda Pass 

anes 

P

section) coul

 

Page 7 

Page 13: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.2.1

2.2.

2.2.

 2.2.

2.2.2

 

 

a Pass Corridong Issues Rep

Key Engine 

.1.1 ConceThe pr

lane o

majori

existin

the Se

 

The sin

of tolli

constr

constr

the we

associa

requir

Line, a

lanes t

direct 

crossin

anticip

 .1.2 Geotec

No unc

Conce

.1.3 ConstrConstr

mainli

to imp

Consid

constr

 

Rough-OrdSee Section

used when 

Systems Pla

or Systems Plport 

eering Eleme

pt Design Elerimary design

perations fro

ity of the dist

ng HOV lane, w

pulveda Pass

ngle lane sect

ing equipmen

ruction of the

ruction of dire

est, and at La 

ated with the

e additional r

additional righ

to the west, a

access ramps

ng Sepulveda

pated to rema

chnical Assescommon geo

pt 2. 

ructability Issuruction  of  th

ne construct

pact traffic op

derable traffic

ruction activit

der-of-Magnin 2.1.3 of this 

developing t

anning Study 

 

anning Study

ents

ments  elements for

m approxima

tance betwee

with a core se

s from the US

tions require 

nt for manage

 two‐lane seg

ect access ram

Grange Aven

e single lane o

right‐of‐way f

ht of way will

and additiona

s from the US

 Pass.  The pr

ain within the

ssment otechnical issu

ues e  direct  acce

ion required 

perations on I

c control and 

ties.  

tude Costs report for a b

he rough‐ord

Preliminary C

 

r this concept

ately the I‐5 in

en I‐5 and I‐10

egment of tw

‐101 to La Gr

signing and s

ed lane opera

gment of the 

mps to conne

nue, as well a

operations.  C

for two of the

 be required 

al right‐of‐way

S‐101 will join

roposed direc

e existing I‐40

ues are antici

ess  ramp  str

to accommo

‐405 and all a

mitigation m

brief discussio

der‐of‐magnit

Cost Report fo

t include the 

n the north to

05 would be a

wo‐lane opera

range Avenue

striping chang

ations. Design

managed lan

ect to the Ora

s the signing,

Construction o

e three propo

to shift the n

y will be requ

n the two‐lane

ct access ram

05 right‐of‐wa

pated for the

ructures  and 

odate the dire

adjacent and

measures are 

on of the met

tude costs or 

or a more in‐d

implementat

o the I‐105 in

a single lane c

ation (in each 

e. 

ges, as well as

n elements re

nes concept w

nge Line, US‐

, striping and 

of the direct a

osed locations

orthbound m

uired to widen

e section of m

ps at La Gran

ay envelope. 

e roadway fac

any  associat

ect access  fa

 intersecting 

expected to b

thodology an

the Sepulved

depth discuss

P

tion of manag

 the south.  T

conversion of

direction) ac

s the installat

equired for th

would require

‐101 to and fr

tolling eleme

access ramp w

s.  At the Ora

mainline I‐405

n I‐405 where

managed lane

nge Avenue ar

cilities require

ted  I‐405  fre

cilities  is exp

roadway fac

be required d

nd assumption

da Pass Corrid

sion. 

Page 8 

ged 

The 

f the 

cross 

tion 

rom 

ents 

will 

nge 

e the 

es 

re 

ed for 

eeway 

pected 

ilities. 

during 

ns 

dor 

Page 14: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.2.

2.2.

2.2.

2.2.3

 

 

a Pass Corridong Issues Rep

.2.1 CapitaThe m

cost es

C

a

T

t

 

The ro

$1.6B 

$1.1B 

 .2.2 Vehicle

Vehicl

BRT se

lower 

(refurb

BRT se

 .2.3 Operat

Opera

mainte

weekd

Pass C

costs f

lanes, 

 

Issues for Further traf

particularly

as for the si

or Systems Plport 

l Cost Estimatajor compon

stimate are: 

Direct Access

Construction 

and tolling eq

The incorpora

the Sepulved

ough‐order‐of

with $0.5B be

attributed to

e Cost Estimae costs assoc

ervice is the s

range  of  BR

bished and ne

ervice, again f

tion and Maintting  and ma

enance  cost 

day passenge

Corridor Syste

for BRT opera

were estimat

Further Inveffic analysis is

y at the two to

ingle lane sec

 

anning Study

te ents of the co

s Ramps at th

of express la

quipment; 

ation of the B

a Pass (Van N

f‐magnitude c

eing attribute

 the highway

ate ciated with Co

same for both

RT  service  ac

ew vehicles re

for refurbishe

tenance Cost intenance  co

from  the Me

r miles result

ems Planning 

ations  includ

ted $138M pe

stigation ands needed to b

o one lane tra

ctions to the n

 

oncept used t

e Orange Line

nes which wo

BRT improvem

Nuys and Sepu

capital cost es

ed to the tran

y based comp

oncept 2 are 

h concepts.  A

cross  Sepulve

espectively) a

ed and new ve

Estimate ost  estimates

etro Proposed

ts  from the d

Study.  Based

ed as part of

er year. 

d Analysis better underst

ansition point

north of US‐1

to develop th

e Busway, US

ould include r

ments from C

ulveda Boule

stimate for C

nsit‐only com

onents. 

the same as 

As noted for C

eda  Pass  is  e

and from $4M

ehicles respe

s were  devel

d Budget  for

demand mod

d on these in

f Concept 2, t

tand expecte

ts at US‐101 a

101 and south

he rough‐orde

S‐101, and La 

restriping, ph

Concept 1 for 

vard). 

Concept 2 is a

ponents of th

for Concept 1

Concept 1, ve

estimated  fro

M to $78M fo

ectively. 

oped  using  t

r  Fiscal Year 

deling efforts 

puts, average

the at‐grade 

ed managed la

and La Grang

h of La Grange

P

er‐of‐magnitu

Grange Aven

hysical barrier

areas outside

nticipated to 

he concept an

1, as the prop

ehicle costs fo

om  $2M  to 

r the high ran

the  operating

2013 and av

for the Sepu

e annual ope

freeway man

ane operation

e Avenue, as 

e Avenue.  

Page 9 

ude 

nue 

rs, 

e of 

be 

nd 

posed 

or the 

$37M 

nge of 

g  and 

verage 

ulveda 

rating 

naged 

ns, 

well 

Page 15: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.3 ATh

40

fo

ar

ce

b

 

A

B

w

ov

d

G

A

 

a Pass Corridong Issues Rep

Aerial Viaduhe highway v

05 between t

our managed 

rea of the I‐40

enter running

ound directio

ccess to the h

oulevard, at U

would begin at

ver US‐101 w

estinations w

range Avenu

venue.   

or Systems Plport 

ct Managedviaduct propo

the US‐101 to

lanes (two in

05 freeway.  

g columns, ut

ons.  

highway viad

US‐101 and a

t Burbank Bo

with direct acc

west of I‐405, 

e where an a

anning Study

d Lanes sed for Conce

o the I‐10.  Th

n each directio

As designed, 

ilizing 5 feet o

uct is propose

 southern acc

ulevard wher

cess ramp con

travel across 

erial T‐ramp 

 

ept 3 is an ele

e conceptual

on) and woul

the structure

of inside shou

ed in three lo

cess point at 

re it would co

nnections to U

the pass and

would provid

evated guidew

l aerial viaduc

ld be constru

e would be su

ulder from th

ocations, nort

La Grange Av

onnect to the 

US‐101 for tr

d south to the

de connection

way above th

ct structure w

cted in the m

upported by 1

he exiting nor

th of US‐101 a

venue. The el

existing over

avelers with o

e proposed te

ns to local str

Pa

he median of 

would consist 

median/should

10 foot wide 

th and south 

at Burbank 

evated struct

rcrossing, pas

origins or 

erminus at La 

eets via La Gr

age 10 

the I‐

of 

der 

ture 

ss 

range 

Page 16: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

a Pass Corridong Issues Rep

Figure

or Systems Plport 

e 3.  Con

anning Study

ncept 3 Aeria

 

al Viaduct Managed Lanes

Pa

 

age 11 

Page 17: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.3.1

2.3.

2.3.

2.3.

2.3.2

2.3.

 

a Pass Corridong Issues Rep

Key Engine 

.1.1 ConceThe pr

associa

Grange

design

 .1.2 Geotec

While 

requir

accura

structu

 .1.3 Constr

Constr

expect

Consid

constr

 

Rough-OrdSee Section

used when 

Systems Pla

 .2.1 Capita

The m

cost es

C

G

T

t

 

The ro

$2.3B 

$2.2B 

 

or Systems Plport 

eering Eleme

pt Design Elerimary design

ated direct ac

e Avenue.  Co

ned, are antic

chnical Assesno  uncomm

ed  for  Conce

ately  portray

ure of this siz

ructability Issuruction  of  th

ted  to  impac

derable traffic

ruction activit

der-of-Magnin 2.1.3 of this 

developing t

anning Study 

l Cost Estimatajor compon

stimate were

Construction 

Grange Aven

Direct Access

The incorpora

the elevated 

ough‐order‐of

with $0.13B b

attributed to

anning Study

ents

ments  elements for

ccess structur

onstruction o

ipated to req

ssment mon  geotech

ept  3,  geolog

y  any  geotec

e.   

ues he  aerial  via

ct  traffic  ope

c control and 

ties. 

tude Costs report for a b

he rough‐ord

Preliminary C

te ents of the co

of a four‐lan

ue; 

s Ramps at Bu

ation of the B

viaduct struc

f‐magnitude c

being attribut

 the highway

 

 

r this concept

res and ramp

f the propose

uire addition

nical  issues 

gic  and  seism

chnical  or  se

duct  and  as

erations  on  I‐

mitigation m

brief discussio

der‐of‐magnit

Cost Report fo

oncept used t

e elevated gu

urbank Avenu

BRT improvem

cture (Van Nu

capital cost es

ted to the tra

y based comp

t is the aerial

ps at Burbank 

ed direct acce

nal right‐of‐wa

are  anticipat

mic  issues  sh

eismic  issues 

ssociated  dire

‐405  and  all 

measures are 

on of the met

tude costs or 

or a more in‐d

to develop th

uideway betw

ue, US‐101 an

ments from C

uys and Sepulv

stimate for C

ansit‐only com

onents.  

 viaduct struc

Boulevard, U

ess locations,

ay.  

ted  for  the 

hould  be  ana

  associated 

ect  access  r

connecting 

expected to b

thodology an

the Sepulved

depth discuss

he rough‐orde

ween Burbank

nd La Grange 

Concept 1 for 

veda Bouleva

Concept 3 is a

mponents of t

Pa

cture and 

US‐101 and La

 as currently 

roadway  fac

alyzed  in  dep

with  an  ele

amp  structu

roadway  fac

be required d

nd assumption

da Pass Corrid

sion.  

er‐of‐magnitu

k Avenue and

Avenue; and

areas outside

ard). 

nticipated to 

the concept a

age 12 

cilities 

pth  to 

evated 

res  is 

ilities. 

during 

ns 

dor 

ude 

d La 

e of 

be 

and 

Page 18: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.3.

2.3.

2.3.3

 

a Pass Corridong Issues Rep

.2.2 VehicleVehicl

propos

costs f

$37M 

range 

 .2.3 Operat

Opera

transp

 

Issues for If Concept 3

An aerial via

adjacent to

particularly

Sepulveda P

 

Additional e

feasibility o

ability to pr

interchange

 

Further traf

required at 

understand

somewhat 

exit points t

exit points t

 

Lastly,  a hi

Widening  P

seismic ass

be  expecte

regarding s

or Systems Plport 

e Cost Estimae costs assoc

sed BRT servi

for the lower 

(refurbished 

of BRT servic

tion and Maintting and main

portation dem

Further Inve3 is progresse

aduct is antic

 the I‐405 fre

y challenging c

Pass Widenin

engineering is

of using a sing

rovide the ne

e to provide t

ffic analyses n

the proposed

d the operatio

more challen

to the viaduc

that could be

ghway  viadu

Project,  and 

essment of  in

ed  that  any 

eismic issues

 

anning Study

ate ciated with Co

ice is the sam

range of BRT

and new veh

e, again for r

tenance Cost ntenance cos

mand modelin

stigation anded, communit

cipated to cre

eeway and co

coming on th

g Project.   

ssues for furt

gle column str

eded clearan

the connector

needs to be p

d access and 

onal feasibility

ging for Conc

t facility, as c

e provided fro

ct  concept w

was  ultimate

ndividual con

further  study

 

oncept 3 are 

me for all conc

T service acro

hicles respec

efurbished an

Estimate t estimates w

ng efforts wer

d Analysis ty based impa

eate visual qu

mmunity imp

e heels of the

ther analysis a

ructural appr

ces from exis

r from northb

performed to 

egress locatio

y of the conce

cept 3 than fo

compared to t

om the adjace

was  considere

ely withdraw

ncepts was no

y  on  this  co

the same as

cepts.  As not

oss Sepulveda

ctively) and fr

nd new vehic

were not calcu

re not undert

acts would ne

ality impacts 

pacts during c

e current con

and investiga

oach for the 

sting structur

bound I‐405 t

determine th

ons to the ele

ept.  Traffic m

or Concept 2, 

the potential 

ent general pu

ed  in  the  EIR

n  due  to  sei

ot completed

oncept  would

s for Concept 

ted for Conce

a Pass is estim

rom $4M to $

cles respective

ulated for Co

taken for this 

eed to be ana

to residents 

construction m

nstruction of t

ation include a

aerial viaduct

es within the

to eastbound 

he traffic dem

evated viaduc

management 

 due to the li

 for intermed

urpose lanes 

R  for  the  I‐40

ismic  safety 

d as part of th

d  result  in  s

Pa

 1, 2, and 4 a

ept 1 and 2, ve

mated from $2

$78M for the

ely. 

ncept 3, as 

Concept. 

alyzed and ass

and business

may prove to

the I‐405 

analyzing the

t structure, a

e US‐101 

US‐101.  

mand and cap

ct to better 

may be 

mited entry a

diate entry an

under Conce

05  Sepulveda

concerns. W

his study,  it w

imilar  conclu

age 13 

as the 

ehicle 

2M to 

e high 

sess.  

ses 

o be 

nd 

pacity 

and 

nd 

ept 2.   

a  Pass 

hile  a 

would 

usions 

Page 19: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.4 TC

tw

cr

o

in

 

Th

th

lo

te

 

a Pass Corridong Issues Rep

Tolled Highwoncept 4 wou

wo lanes of h

ross section c

n a lower leve

nclude both a

he tunnel alig

hrough the Sa

oosely followi

erminus of th

or Systems Plport 

way Tunnel uld construct 

ighway traffic

consisting of e

el, or two sep

utos and bus

gnment would

anta Monica M

ng the I‐405 

e tunnel wou

anning Study

a bored tunn

c in each dire

either a single

parate bores w

es.  A graphic

d begin near 

Mountains, th

roadway (app

uld be located

 

nel under the 

ction.  The to

e bore with tw

with two lane

c depicting Co

the I‐405/US

hen south‐so

proximately 9

d near La Gran

 Santa Monic

olled tunnel c

wo lanes on a

es in each bor

oncept 4 is sh

‐101 intercha

utheast throu

9 miles).  Simi

nge Avenue. 

ca Mountains

oncept is ant

an upper leve

re.  Traffic in 

hown on the f

ange and wou

ugh Century C

ilar to Concep

 

Pa

 that would c

ticipated to ha

el and two lan

the tunnel w

following pag

uld extend so

City east of an

pt 2, the sout

age 14 

carry 

ave a 

nes 

would 

ge. 

uth 

nd 

thern 

Page 20: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

a Pass Corridong Issues Rep

Figure

or Systems Plport 

e 4.  Con

anning Study

ncept 4 Tolled

 

d Highway Tuunnel 

Pa

 

age 15 

Page 21: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.4.1

2.4.

a Pass Corridong Issues Rep

 

Key Engine 

.1.1 ConceThe pr

portal 

the US

for tra

101 tu

portals

second

single 

 

Figure

vertica

 

or Systems Plport 

eering Eleme

pt Design Elerimary design

structures ne

S‐101 intercha

ffic coming fr

unnel portal c

s with flyover

d would be in

tunnel.   

e 5. Typical cro

al egress poin

anning Study

ents

ments  elements for

ear US‐101 an

ange, one for

rom US‐101 t

onnections, t

r ramps (direc

ndependent t

oss‐section: S

nts. 

 

r Concept 4 a

nd La Grange 

r traffic comin

o the west.  T

the first conn

ct access ram

unnels to I‐40

Single bore tu

are the tunne

Avenue.  Tw

ng to and from

Two concepts

ects I‐405 an

mps) to a singl

05 and US‐10

unnel (stacked

l structure an

o tunnel port

m I‐405 to the

s were develo

d US‐101 wit

e, large bore 

01 that would

d roadway) a

Pa

nd the tunnel

tals are neede

e north and o

oped for the U

h the tunnel 

 tunnel, and t

 later join int

 lternative wit

age 16 

 

ed at 

one 

US‐

the 

to a 

th 

Page 22: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.4.

a Pass Corridong Issues Rep

Figure 6. T

emergency

 .1.2 Geotec

Site sp

orient

widely

while e

 

The ali

potent

Northr

fault r

slope s

furthe

evalua

In add

include

topple

design

be des

tunnel

tunnel

structu

 

Additio

Evalua

or Systems Plport 

Typical cross‐s

y egress.   

chnical Assespecific geolog

ation of majo

y varying grou

establishing a

ignment is loc

tially active fa

ridge Hill in 1

upture, seism

stability at po

r evaluation. 

ated during de

ition to seism

e oil field rela

e (which could

n must consid

signed to acco

l connects to 

l crosses a fau

ure may be co

onal informat

ation Memora

anning Study

section: twin 

ssment ical and envir

or seismic fau

und water in t

a desired align

cated in a sei

aults in the ar

994 and San 

mic shaking, li

ortals as well 

Potential dis

esign.   

mic hazards, o

ated hazards,

d impact port

er the geoha

ommodate th

portals, shaft

ult that has p

onsidered to 

tion regarding

andum (Metr

 

tunnel altern

ronmental co

lts, historical 

the study cor

nment profile

smically activ

rea. Two of th

Fernando in 1

quefaction an

as liquefactio

placements a

other geologic

 expansive an

tals and to a l

zards describ

he anticipated

ts and cross p

otential for a

accommodat

g geotechnica

o, June 20, 20

native with cr

onsiderations 

 oil fields, fav

rridor levels re

e for the selec

ve region and

hese faults ha

1971. Therefo

nd landslides 

on potential o

along the exis

c hazards that

nd collapsible

esser extent,

bed above.  Fo

d seismic mov

passages.  In e

an abrupt disp

te the movem

al issues can 

012). 

ross passage c

such as locat

vorable geolo

egime are of 

cted route.   

d there are nu

ad major eart

ore seismic h

need to be e

of portal struc

sting faults ne

t exist in the 

e soils, and la

, ventilation s

or example, t

vements, esp

extreme case

placement), a

ment.   

be found in t

Pa

connections f

tions and 

ogical formatio

great import

umerous 

thquakes – No

azards such a

evaluated.  Se

ctures will req

eed to be 

project area 

ndslides/rock

shafts).  The t

unnel joints m

pecially where

es (e.g., if the 

an oversized 

he Geotechn

age 17 

 for 

ons, 

ance 

orth 

as 

eismic 

quire 

unnel 

must 

e the 

ical 

Page 23: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.4.

2.4.2

2.4.

2.4.

a Pass Corridong Issues Rep

 .1.3 Constr

Constr

retriev

machi

constr

S

s

T

c

t

T

4

T

e

a

S

d

 

Rough-OrdSee Section

used when 

Systems Pla

 .2.1 Capita

The m

cost es

A

T

 

A low 

alignm

assum

mile tu

cost es

$12.9B

 .2.2 Vehicle

Vehicl

propos

or Systems Plport 

ructability Issuructability iss

val of the tun

ne for a single

ructability issu

Siting accepta

staging areas

The need to s

northbound I

construction 

the bored tun

The southern

405 freeway 

portal.   

The removal,

excavated so

approximatel

Siting of vent

densely deve

der-of-Magnin 2.1.3 of this 

developing t

anning Study 

l Cost Estimatajor compon

stimate are: 

A large diame

Tunnel porta

range and hig

ment, with the

ed economy 

unnel from w

stimate for Co

B. 

e Cost Estimae  costs assoc

sed BRT servi

anning Study

ues ues associate

nel boring ma

e, large‐bore 

ues include, b

able portal lo

s required to l

separate traff

I‐405 and wes

of diverging c

nnel. 

n tunnel porta

mainline lane

 transport an

il resulting fro

ly 7.6 million 

tilation plants

eloped urban 

tude Costs report for a b

he rough‐ord

Preliminary C

te ents of the co

eter bore tun

ls and approa

gh range estim

e low range co

of scale asso

which the cost

oncept 4 rang

ate ciated with C

ice is the sam

 

ed with Conce

achine, the la

tunnel.  Furt

but are not lim

ocations at ea

launch and re

fic in the nort

stbound US‐1

cut‐and‐cove

al connection

es to create s

nd identificati

om the bored

cubic yards. 

s and associat

environment

brief discussio

der‐of‐magnit

Cost Report fo

oncept used t

nel; and 

aches on eith

mate were de

ost represent

ciated a tunn

s were based

ged from a lo

Concept 4 are

me for all conc

ept 4 are mai

aunch, retriev

her detail on 

mited to the f

ch end of the

etrieve the tu

thbound tunn

101, which is 

er portal boxe

s at La Grang

ufficient spac

on of locatio

d tunnel cons

ted appurten

t. 

on of the met

tude costs or 

or a more in‐d

to develop th

er end of the

eveloped for 

ting a 20 perc

nel of this leng

d).  The rough

ow range of $

e  the  same a

cepts.  As not

nly surroundi

val and use of

 these and ot

following item

e tunnel to pr

unnel boring m

nel into two d

expected to r

ed sections th

ge may requir

ce in the med

ns in which to

struction, whi

ant tunnel st

thodology an

the Sepulved

depth discuss

he rough‐orde

e tunnel. 

the tunnel po

cent reductio

gth (as comp

h‐order‐of‐ma

10.4B to a hig

as  for Concep

ted for Conce

Pa

ing the launc

f a tunnel bor

ther 

ms:   

rovide sufficie

machine. 

directions, 

require 

hat will interfa

re shifting of t

dian for a tun

o deposit the

ich is estimat

ructures with

nd assumption

da Pass Corrid

sion.  

er‐of‐magnitu

ortions of the

n to reflect a

ared to a 1 to

agnitude capi

gh estimate o

pt 1 and 2, a

ept 1 and 2, ve

age 18 

h and 

ring 

ent 

ace 

the I‐

nel 

 

ed at 

hin a 

ns 

dor 

ude 

o 2 

tal 

of 

as  the 

ehicle 

Page 24: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.4.

2.4.3

 

 

a Pass Corridong Issues Rep

costs f

$37M 

range 

 .2.3 Operat

Opera

mainte

averag

Sepulv

operat

tunnel

 

Issues for Further ana

favorable co

reduce traff

 

Tunnel and 

to determin

adjacent to

 

In addition,

Concept 4 t

facilities.  A

determine t

better asse

and egress 

or Systems Plport 

for the lower 

(refurbished 

of BRT servic

tion and Maintting and main

enance costs 

ge weekday p

veda Pass Cor

ting costs for 

l, were estima

Further Invealysis is neede

onstruction s

fic impacts an

tunnel porta

ne to minimiz

 the tunnel a

 as noted for

than for Conc

As noted for C

the traffic de

ss (tunnel and

locations.  

 

anning Study

range of BRT

and new veh

e, again for r

tenance Cost ntenance cos

reported in t

passenger mil

rridor System

BRT operatio

ated $127M p

stigation anded regarding 

taging schem

nd lane closu

al constructio

ze the impact

nd tunnel po

 Concept 3, t

cept 2, due to

Concepts 2 an

mand and ca

d local street

 

T service acro

hicles respec

efurbished an

Estimate t estimates w

the Metro Pro

es results fro

s Planning St

ons included a

per year. 

d Analysis possible port

mes that woul

res.   

n near existin

s to foundatio

rtals. 

raffic manage

o the limited e

d 3, further t

pacity require

) operational

oss Sepulveda

ctively) and fr

nd new vehic

were develope

oposed Budge

om the deman

udy.  Based o

as part of Con

tal configurat

d minimize ri

ng structures 

ons of the ex

ement is som

entry and exis

traffic analyse

ed at the pro

 feasibility of

a Pass is estim

rom $4M to $

cles respective

ed using the o

et for Fiscal Y

nd modeling e

on these inpu

ncept 4, the t

ions in order 

ight‐of‐way re

will require a

xisting structu

mewhat more 

st points to th

es needs to be

oposed portal 

f the concept 

Pa

mated from $2

$78M for the

ely. 

operating and

Year 2013 and

efforts for the

ts, average a

tolled highwa

to examine 

equirements 

additional ana

ures that are 

challenging f

he tunnel 

e performed 

 locations to 

and the acce

age 19 

2M to 

e high 

nnual 

ay 

and 

alyses 

for 

to 

ess 

Page 25: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.5 FC

an

Sy

so

 

St

A

V

M

tr

w

o

 

Th

w

M

C

to

 

a Pass Corridong Issues Rep

ixed-Guideoncept 5 pro

nd the Los An

ylmar/San Fe

outh. Fifteen 

tarting at the

ntelope Valle

entura Boule

Monica Mount

ravel south on

would continu

r Green Line a

here are two 

would run at g

Monica Mount

entury Aviati

o run entirely

or Systems Plport 

way Light Rposes a rail li

ngeles Airport

rnando Metr

stations are p

 Sylmar Metr

ey tracks befo

vard where it

tains to a por

n Westwood 

e south to Se

at the Centur

options asso

grade in the S

tains, and the

on Station ne

y in a tunnel c

anning Study

Rail or Heavne connectin

t.  The line wo

olink station 

proposed wit

rolink station,

ore turning so

t would enter

rtal location s

Boulevard to

epulveda Bou

ry Aviation St

ciated with th

an Fernando 

en run in an a

ear LAX.  Conc

configuration,

 

vy Rail Tunng the San Fer

ould extend a

in the north t

h station spa

, the rail align

outh onto Van

r a tunnel por

south of Santa

 Overland Av

levard where

ation. 

his concept, C

Valley, trave

at‐grade confi

cept 5B is a h

, following th

nel rnando Valley

approximatel

to the Centur

cing that is ge

nment would 

n Nuys Boulev

rtal and trave

a Monica Bou

venue.  From 

e it would con

Concept 5A is

l in a tunnel c

iguration thro

eavy rail align

e same alignm

y with the We

y 28 miles an

ry Aviation St

enerally 2 mi

run parallel t

vard and trav

el underneath

ulevard.  The 

Overland Ave

nnect to the M

s a light rail al

configuration

ough West Lo

nment that h

ment.  

Pa

est Los Angele

nd connect th

tation to the 

les apart.  

to the existing

veling south to

h the Santa 

rail line woul

enue, the line

Metro Crensh

lignment that

n under the Sa

os Angeles to 

as been assu

age 20 

es 

haw 

anta 

the 

med 

Page 26: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

a Pass Corridong Issues Rep

Figure

or Systems Plport 

e 7.  Con

anning Study

ncept 5 Fixed

 

d Guideway Liight Rail or Heeavy Rail Tun

Pa

 nel 

age 21 

Page 27: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.5.1

2.5.

2.5.

2.5.

a Pass Corridong Issues Rep

Key Engine 

.1.1 ConceThe m

track 

include

underg

a main

 .1.2 Geotec

As dis

such a

geolog

are ne

route. 

 

The ali

potent

Northr

fault r

slope s

furthe

evalua

In add

include

topple

design

be des

tunnel

tunnel

structu

 

Additio

Evalua

 .1.3 Constr

The co

for Co

would

 

or Systems Plport 

eering Eleme

pt Design Elemajor  design 

and  necessar

es  dual  bor

ground statio

ntenance faci

chnical Assescussed  for C

as  locations a

gical  formatio

ecessary to co

  

ignment is loc

tially active fa

ridge Hill in 1

upture, seism

stability at po

r evaluation. 

ated during th

ition to seism

e oil field rela

e (which could

n must consid

signed to acco

l connects to 

l crosses a fau

ure may be co

onal informat

ation Memora

ructability Issuonstructability

oncept 4, with

 require the s

anning Study

ents

ments components 

ry  associated

re  tunnels  a

on.  Both Con

lity. 

ssment oncept  4,  sit

and orientatio

ons, widely va

onsider when

cated in a sei

aults in the ar

994 and San 

mic shaking, li

ortals as well 

Potential dis

he design of t

mic hazards, o

ated hazards,

d impact port

er the geoha

ommodate th

portals, shaft

ult that has p

onsidered to 

tion regarding

andum (Metr

ues y issues assoc

h  the excepti

siting of a new

 

associated w

d  facilities  sy

and  necessar

cept 5A and 

te  specific  ge

on of major s

arying groun

 establishing 

smically activ

rea. Two of th

Fernando in 1

quefaction an

as liquefactio

placements a

he tunnel.   

other geologic

 expansive an

tals and to a l

zards describ

he anticipated

ts and cross p

otential for a

accommodat

g geotechnica

o, June 20, 20

ciated with C

ion of  the  fre

w maintenanc

with  Concept

ystems  and  a

ry  associated

Concept 5B h

eological  and

seismic  faults

d water  in th

a desired alig

ve region and

hese faults ha

1971. Therefo

nd landslides 

on potential o

along the exis

c hazards that

nd collapsible

esser extent,

bed above; fo

d seismic mov

passages.  In e

an abrupt disp

te the movem

al issues can 

012). 

oncept 5 are 

eeway conne

ce and yard s

t  5A  include 

at‐grade  stati

d  facilities  a

have also assu

  environmen

s, historical o

he study corr

gnment profi

d there are nu

ad major eart

ore seismic h

need to be e

of portal struc

sting faults ne

t exist in the 

e soils, and la

, ventilation s

r example tu

vements, esp

extreme case

placement), a

ment.   

be found in t

 very similar 

ections.   How

shop facility.  

Pa

at‐grade  ligh

ions.    Conce

and  systems

umed the nee

ntal  considera

oil  fields,  favo

ridor  levels re

ile for the sel

umerous 

thquakes – No

azards such a

evaluated.  Se

ctures will req

eed to be 

project area 

ndslides/rock

shafts).  The t

nnel joints m

pecially where

es (e.g., if the 

an oversized 

he Geotechn

to those disc

wever,  this co

age 22 

ht  rail 

pt  5B 

s  and 

ed for 

ations 

orable 

egime 

ected 

orth 

as 

eismic 

quire 

unnel 

ust 

e the 

ical 

ussed 

ncept 

Page 28: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.5.2

2.5.

2.5.

2.5.

a Pass Corridong Issues Rep

It  sho

constr

mitiga

 

Rough-OrdSee Section

used when 

Systems Pla

 .2.1 Capita

Based 

concep

an at‐g

approx

assum

and th

concep

 

A

A

A

 

A low 

alignm

assum

magni

$8.3B 

“heavy

 .2.2 Vehicle

Vehicl

overal

.2.3 OperatOpera

mainte

averag

Sepulv

operat

or Systems Plport 

uld  also  be 

ruction  of  LR

tes some of t

der-of-Magnin 2.1.3 of this 

developing t

anning Study 

l Cost Estimaton direction 

pt option and

grade configu

ximately Sant

ed to operate

he heavy rail c

pt used to de

At‐grade light

At‐grade tran

Dual bore tun

Underground

A maintenanc

range and hig

ment, with the

ed economy 

tude capital c

for the light r

y rail” concep

e Cost Estimae cost associa

l per mile cap

 tion and Maintting and main

enance costs 

ge weekday p

veda Pass Cor

ting costs for 

anning Study

noted  that 

RT  facilities, 

the identified

tude Costs report for a b

he rough‐ord

Preliminary C

te from Charret

d a heavy rail 

uration on eit

ta Monica Bo

e in a tunnel 

concept optio

velop the rou

t rail 

nsit stations 

nnels 

d transit statio

ce facility 

gh range estim

e low range co

of scale asso

cost estimate

rail concept o

pt option. 

ate ated with the

pital costs dis

tenance Cost ntenance cos

as reported i

passenger mil

rridor System

the two rail o

 

Metro  has  e

including  20 

 risks associa

brief discussio

der‐of‐magnit

Cost Report fo

tte 2, cost est

concept opti

her side of th

ulevard.  The

configuration

ons include 14

ugh‐order‐of‐

ons 

mate were de

ost represent

ciated a tunn

e for Concept 

option to a hig

e proposed ra

cussed above

Estimate t estimates w

in the Metro 

es results fro

s Planning St

options (LRT a

extensive  exp

  foot  diame

ated with Con

on of the met

tude costs or 

or a more in‐d

timates were 

on.  The light

he tunnel from

e “heavy rail” 

n for the entir

4 stations.  Th

‐magnitude co

eveloped for 

ting a 20 perc

nel of this leng

5 ranged fro

gh estimate o

il service for 

e. 

were develope

Proposed Bu

om the deman

udy.  Based o

and heavy ra

perience  wit

ter  transit  ra

ncept 4.   

thodology an

the Sepulved

depth discuss

developed fo

t rail option w

m Ventura Bo

concept opti

re length.  Bo

he major com

ost estimate 

the tunnel po

cent reductio

gth. The roug

m a low rang

of $13.6B to $

Concept 5, ar

ed using the o

dget for Fisca

nd modeling e

on these inpu

il) included as

Pa

h  the  design

ail  tunnels,  w

nd assumption

da Pass Corrid

sion.  

or a light rail 

would operate

oulevard to 

on (5B) is 

oth the light r

mponents of t

are: 

ortions of the

n to reflect a

gh‐order‐of‐

e of $7.4B to 

$17.5B for the

re included in

operating and

al Year 2013 a

efforts for the

ts, average a

s part of Conc

age 23 

n  and 

which 

ns 

dor 

e in 

ail 

he 

 

n the 

and 

nnual 

cept 

Page 29: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.5.3

 

a Pass Corridong Issues Rep

5, rang

for hea

 

Issues for Constructio

require righ

reaches the

somewhat 

of the track

portal dime

configuratio

minimize rig

 

Siting of a n

highly deve

 

or Systems Plport 

ged from an e

avy rail opera

Further Inveon of the port

ht of way acq

e minimum co

less, dependi

k center to ce

ensions and sh

ons in order t

ght‐of‐way re

new maintena

eloped urban 

 

anning Study

estimated $14

ations.  

stigation andtal location w

uisitions.  The

over required

ng on ground

nter of 39’.  F

hape.  Furthe

to examine fa

equirements a

ance and yard

area.  

 

42M per year

d Analysis ill require lay

e portal woul

d for tunnels w

d conditions. 

Further geolo

er analysis is n

avorable cons

and reduce tr

d shop facility

r for light rail 

ydown areas t

d be a flared 

which is gene

 The box wou

ogic studies w

needed regar

struction stag

raffic impacts

y may be cha

operations to

that may imp

box construc

erally one tun

uld flare to re

would determ

rding possible

ging schemes 

s and lane clo

llenging with

Pa

o $188M per 

pact property 

ction until it 

nel diameter

each the full w

ine the actua

e portal 

that would 

osures.   

in the corrido

age 24 

year 

and 

r, or 

width 

al 

or’s 

Page 30: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.6 TC

th

se

 

Th

n

n

o

fr

n

10

 

Th

n

C

a Pass Corridong Issues Rep

Toll Tunnel aoncept 6 wo

hrough the Sa

ervice.   

he  proposed

orthern port

ear Century B

ne  lane  in ea

rom  eastbou

orthbound  I‐

01, south acr

he  private  sh

orthern  term

entury Aviati

 

or Systems Plport 

and Rail Tuuld be very s

anta Monica M

  highway  tun

al  at  approxi

Boulevard.  Fr

ach direction.

nd  US‐101, 

405.   The hig

oss Sepulved

huttle/rail  tu

minus at  the V

on Station th

anning Study

nnel similar to Con

Mountains an

nnel would  b

imately Rosco

rom Roscoe B

 A second  lan

while  a  nort

ghway  tunne

a Pass and to

unnel  would 

Van Nuys Me

at roughly pa

 

ncepts 4 and 

nd also includ

be  longer  tha

oe Boulevard

Boulevard to 

ne would be 

thbound  lan

l would cons

o the southern

be  shorter  t

etroLink Stati

arallels I‐405.

5, as  it cons

des a second 

an  that  prop

d  and  the  so

US‐101 the h

added  in the

e  would  exi

sist of  two  la

n portal near

than  that  pro

ion and a  slig

sists of a bore

tunnel for a p

posed  for  Co

uthern porta

highway tunne

e southbound

t  to  westbo

nes  in each d

r LAX. 

oposed  for  C

ghtly more d

Pa

ed highway t

private shutt

oncept  4, wit

al  in  the  LAX 

el would cons

d direction co

und  US‐101 

direction  from

Concept  5,  w

direct  route  t

age 25 

tunnel 

le/rail 

th  the 

area, 

sist of 

oming 

from 

m US‐

with  a 

to  the 

Page 31: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

a Pass Corridong Issues Rep

Figure

or Systems Plport 

e 8.  Con

anning Study

ncept 6 Toll T

 

Tunnel and Prrivate Shuttlee/Rail Tunnel 

Pa

 

age 26 

Page 32: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.6.1

2.6.

2.6.

2.6.

a Pass Corridong Issues Rep

 

Key Engine 

.1.1 ConceThe pr

tunnel

LAX.   A

Roscoe

101 in

comin

 

The m

structu

system

 .1.2 Geotec

As  dis

consid

fields, 

corrido

profile

 

As not

numer

seismi

at port

evalua

during

Other 

hazard

and th

In extr

geolog

regard

Memo

 .1.3 Constr

In add

applica

portal,

(north

requir

or Systems Plport 

eering Eleme

pt Design Elerimary design

l portal  struc

A  single  tunn

e Boulevard a

terchange, on

g from US‐10

major design c

ure, tunnel p

ms and a main

chnical Assesscussed  for 

derations  suc

favorable  g

or  levels regi

e for the selec

ted, the alignm

rous potentia

c shaking, liq

tals as well as

ation. Potenti

g the design o

geologic haza

ds, expansive 

he private shu

reme cases, s

gic and seism

ding geotechn

orandum (Me

ructability Issuition to the c

able to Conce

, traffic in the

bound 405 o

e the constru

anning Study

ents

ments n elements  fo

ctures near R

nel portal can

and Century B

ne for traffic 

01 to the west

components 

portals, tunne

ntenance and

ssment Concepts  4

h  as  location

geological  fo

me are neces

cted routes.  

ments are loc

ally active fau

uefaction and

s liquefaction

al displaceme

of the tunnels

ards previous

and collapsib

uttle tunnel d

pecial design

ic conditions 

nical issues ca

tro, June 20, 

ues onstructabilit

ept 6.  Howev

e northbound

r westbound 

uction of cut a

 

or Concept 6

Roscoe Boule

n accommod

Boulevard po

coming to an

t.   

associated w

el stations,  lig

d yard shop fa

4  and  5,  sit

ns  and orient

rmations,  w

ssary to cons

cated in a seis

lts in the area

d landslides n

n potential of 

ents along the

s.   

sly noted also

ble soils, and 

esigns must c

 and structur

that exist in t

an be found in

2012). 

ty issues note

ver, under Co

d tunnel need

US 101) whil

and cover tra

6  for  the high

evard, US‐101

ate both ent

ortals, but two

nd from I‐405 

with  the priva

ght rail track,

acility. 

te  specific  g

tation of maj

idely  varying

sider when es

smically activ

a and seismic

need to be ev

portal struct

e existing fau

o apply to Con

landslides/ro

consider the g

res may be ne

the corridor.

n the Geotech

ed for Concep

ncept 6, at th

s to separate

e still in the t

nsition box st

hway  tunnel 

1  and Centur

tering and ex

o portals are 

to the north 

ate shuttle  tu

, necessary a

geological  an

jor  seismic  fa

g  ground  wa

stablishing a 

ve region and 

c hazards such

valuated.  Seis

ures will requ

ults need to b

ncept 6, such 

ock topple.  Bo

geohazards d

ecessary to ac

 Additional in

hnical Evalua

pts 4 and 5, w

he US 101 hig

e into the two

tunnel.  This i

tructures of v

Pa

structure an

ry Boulevard,

xiting  traffic a

needed at th

and one for t

unnel  is  the  t

associated  fac

nd  environm

aults, historic

ater  in  the 

desired align

there are 

h as fault rup

smic slope sta

uire further 

e evaluated 

as oil field re

oth the highw

described abo

ccount for the

nformation 

tion 

which are also

ghway tunnel 

o destinations

s expected to

varying width

age 27 

nd  the 

, near 

at  the 

he US‐

traffic 

tunnel 

cilities 

mental 

cal oil 

study 

nment 

ture, 

ability 

elated 

way 

ove.  

s and 

Page 33: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.6.

 2.6.

2.6.

2.6.

 

a Pass Corridong Issues Rep

would

standp

the tu

for thr

box st

analys

expect

 .1.4 Rough

See Se

assum

Sepulv

depth 

.1.5 CapitaConce

from a

near C

locate

LAX ar

for Co

 

A low 

alignm

assum

magni

$30.8B

 .1.6 Vehicle

Vehicl

overal

 .1.7 Operat

Opera

mainte

Propos

from  t

Study.

Conce

or Systems Plport 

 create challe

point.  At the 

nnel would n

rough traffic c

ructure and s

sis is needed t

ted temporar

h-Order-of-Magection 2.1.3 of

ptions used w

veda Pass Cor

discussion. 

l Cost Estimatpt 6 consists 

approximately

Century Boule

d in either a l

rea, with dest

ncept 5.   

range and hig

ment, with the

ed economy 

tude capital c

B to $38.7B.   

e Cost Estimae cost associa

l per mile cap

tion and Maintting  and ma

enance  costs

sed  Budget  f

the demand 

  Based on th

pt 6 were est

anning Study

enges from a 

US 101, at th

eed to be con

continuing in 

similar issues 

to determine 

ry and perma

gnitude Costsf this report f

when develop

rridor System

te of a bored hi

y Roscoe Bou

evard.  Conce

large, single‐b

tinations and 

gh range estim

e low range co

of scale asso

cost estimate

ate ated with the

pital costs dis

tenance Cost intenance  co

s  for  bus  serv

for  Fiscal  Yea

modeling eff

hese inputs, a

timated $104

 

constructabil

he La Grange A

nfigured to al

the tunnel. T

as stated abo

the specific r

nent right of 

s for a brief dis

ping the roug

s Planning St

ghway tunne

ulevard to the

pt 6 also inclu

bore tunnel, o

operating ch

mate were de

ost represent

ciated a tunn

e for Concept 

e proposed ra

cussed above

Estimate ost  estimates

vice  and  ligh

ar  2013  and 

forts  for  the 

average annu

4M per year.

lity, right of w

Avenue and S

llow ingress a

This will also c

ove would ne

requirements

way impacts 

cussion of th

gh‐order‐of‐m

udy Prelimina

el through the

e southern en

udes a private

or a twin bore

aracteristics 

eveloped for 

ting a 20 perc

nel of this leng

6 was estima

il service for 

e. 

s were  devel

t  rail  operat

average we

Sepulveda P

al operating 

way, and main

Sepulveda Bo

and egress wh

create a need

eed to be add

s for each por

due to tunne

e methodolo

magnitude cos

ary Cost Repo

e Santa Monic

nd of the Stud

e shuttle serv

e tunnel from

as for the “he

the tunnel po

cent reductio

gth.  The roug

ated to have a

Concept 6, ar

oped  using  t

ions  as  repo

eekday  passe

Pass Corridor 

costs for the 

Pa

ntenance of t

oulevard port

hile also allow

d for a transit

ressed. Furth

rtal and the 

el constructio

gy and 

sts or the 

ort for a more

ca Mountains

dy corridor at 

vice that wou

m Sylmar to th

eavy rail” opt

ortions of the

n to reflect a

gh‐order‐of‐

a low range o

re included in

the  operating

rted  in  the M

nger miles  r

Systems Pla

rail compone

age 28 

traffic 

als, 

wing 

ion 

her 

on. 

e in‐

LAX, 

ld be 

he 

tion 

of 

n the 

g  and 

Metro 

esults 

anning 

ent of 

Page 34: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

2.6.2

 

a Pass Corridong Issues Rep

Issues for As noted fo

that may im

box constru

one tunnel 

private  shu

analysis  is 

constructio

traffic impa

 

Another  co

tunnel port

to the foun

 

As noted  fo

concepts  th

analyses ne

proposed p

the concept

 

Lastly,  simi

maintenanc

developed 

or Systems Plport 

Further Inveor Concepts 4

mpact propert

uction until  it

diameter, or

uttle  tunnel, 

needed  rega

n  staging  sch

acts and lane 

onstructability

tals and tunne

dations of the

or Concept 3

hat  have  lim

eed to be per

portal  location

t and the acc

lar  to  Conce

ce  and  yard 

urban area.  

 

anning Study

stigation and4 and 5, const

ty and requir

t reaches the

r somewhat le

the  box wou

arding  possib

hemes  that w

closures. 

y  issue with 

el facilities ne

e existing nei

3  and 4,  traff

ited  entry  a

formed to de

ns to better a

ess and egres

ept  5,  the  pri

shop  facility,

 

d Analysis truction of th

re right of wa

e minimum co

ess, dependin

uld  flare  to  r

le  portal  con

would minim

concept  6,  s

ear existing st

ghboring stru

fic managem

nd  exit  point

etermine the 

assess (tunne

ss locations. 

ivate  shuttle 

 which may 

he portal loca

y acquisitions

over required

ng on ground

reach  the  ful

nfigurations  i

mize  right‐of‐w

similar  to  Co

tructures, and

uctures.   

ment  is  somew

ts  to  the  roa

traffic deman

el and  local s

tunnel wou

be  challengi

tion will requ

s.  The portal

d for tunnels 

d conditions. 

ll width  of  t

in  order  to  e

way  requirem

ncept  4  is  th

d the need to

what more  c

adway  facilit

nd and capac

street) operat

ld  require  th

ng within  the

Pa

uire laydown 

l would be a f

which  is gen

 In the case o

he  track.    Fu

examine  favo

ments  and  re

he  constructi

o minimize im

challenging  fo

ty.    Further  t

city required a

tional feasibi

he  siting  of  a

e  corridor’s h

age 29 

areas 

flared 

nerally 

of the 

urther 

orable 

educe 

on  of 

mpacts 

or  the 

traffic 

at the 

lity of 

a  new 

highly 

Page 35: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

3 NEXThis 

could

for m

trans

for fr

for t

and s

grad

envir

At‐G

TunnIn ad

a mi

 

a Pass Corridong Issues Rep

XT STEPS study has ide

d be the iden

merit. Further

sit alternative

reeway altern

ransit service

station spacin

e alternatives

ronmental stu

rade and Aer

Create b

Addition

Search o

Develop

Refine co

Refine e

Refinem

Identify 

Perform

Commun

nel Options (Cddition to the

nimum, requ

Refine p

First pha

Mountai

Reconfir

based on

Refine tu

Develop

facilities

Identify 

Perform

and fan 

Identify 

construc

or Systems Plport 

entified six re

tification of o

r studies wou

es and would 

natives. Based

es could be es

ng on anticipa

s. The next st

udies include

rial Viaduct O

basemap inclu

nal geotechnic

of existing util

 preliminary r

ost estimate;

nvironmenta

ent of deman

sources of fu

 cost/benefit

nity outreach

Concepts 4, 5 items listed 

ire the follow

ortal location

ase of geotech

ins and labora

rm initial asse

n site investig

unnel alignme

 concepts for

possible loca

 conceptual d

plant building

standard des

ction, and ope

anning Study

presentative 

other feasible

ld also establ

establish lan

d on the conc

stablished tha

ated operatin

teps expected

e, but are not 

ptions (Conce

uding titles se

cal desk study

lities records 

ramp configu

 

l analysis of p

nd modeling a

nding and pr

 analysis base

h. 

and 6) above for Co

wing analyses 

ns; 

hnical site inv

atory testing;

essment of lar

gation results

ent, profile, a

r tunnel venti

tions for fan 

design and pr

gs. 

sign compone

erating cost.

 

concepts.  A 

e alternatives

lish alignmen

e configurati

ceptual engin

at would take

ng speeds, as 

d to be requir

limited to, th

epts 1, 2 and 

earch for prop

y; 

and buildings

urations; 

potential imp

and financial 

opose likely p

ed on above;

ncepts 1 thro

and evaluatio

vestigation, in

rge diameter 

and configura

lation, fire lif

plant building

roduce conce

ents that can 

potential out

, which shoul

nts and station

ons, ramp, an

neering plans,

e into account

well as grade

red as part su

hose listed be

3) 

per right of w

s records; 

acts and miti

analysis; 

project delive

ough 3, conce

ons: 

ncluding deep

TBM feasibil

tion; 

fe/safety and 

gs; 

ptual drawing

be utilized as

tcome of sub

ld also be tho

n locations fo

nd direct con

, conceptual o

t the effects o

e‐crossing de

ubsequent pla

elow.   

way requireme

gation; 

ery method; 

epts with tunn

p borings in th

ity with TBM 

other tunnel

gs for underg

s “typicals” to

Pa

sequent stud

oroughly anal

or the differen

nector locatio

operating pla

of grades, cur

lay for any at

anning or 

ents assessm

nel sections w

he Santa Mon

manufacture

 systems and

ground struct

o reduce desig

age 30 

dies 

yzed 

nt 

ons 

ans 

rves, 

t‐

ent; 

will, at 

nica 

ers, 

ures 

gn, 

Page 36: 4.0 - ENGINEERING ISSUES REPORTmedia.metro.net/projects_studies/sfv-405/images/final...annual opera epulveda Bo develop the ound and sou from Ventura n fications, and ulevard stimate

SepulvedaEngineeri

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Append

 

 

a Pass Corridong Issues Rep

dix 1: Conc

or Systems Plport 

ceptual Dra

 

anning Study

awings