7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
1/20
Business Opportunities
2021 March 2013
Transport and Communications
Division (EATC)East Asia Department (EARD)
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
2/20
EARD Countries
The Peoples Republic of
China (PRC)
Mongolia
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
3/20
ADB Assistance to PRC and MongoliasTransport and Communication Sectors
(as of 11 January 2013)
Country Start YearLoan Amount
($ million)% of TotalLending
TA Amount($ million)
% of TotalTA
PRC 1986 13,613.00 52 68.5 17
Mongolia 1991 324.53 35 14.7 18
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
4/20
Transport Sector Strategy in thePRC Country Partnership Strategy
Accessible, affordable, environment-friendlyand safe transport system
Road network rehabilitation, rural roads, moreeffective road maintenance systems, and roadsafety
Efficient and safe railways with strong regionaldimensions and facilitation of containerization
Urban public transport, non-motorizedtransport, multimodal passenger hubs, andtraffic demand management
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
5/20
Transport Sector Strategy in thePRC Country Partnership Strategy
(continued)
Inland waterways and inland ports
Multimodal logistics centers, logisticsservices, and intelligent transport systems
Key policy reforms including assetmanagement and road maintenance,
efficiency and safety of transport services,and effective urban transport planning
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
6/20
Transport Sector Strategy inMongolia Country Partnership
Strategy
Regional and international transport corridorsto reduce transport and logistics costs for
trade and foster regional cooperation Urban transport infrastructure and services to
enhance urban efficiency
Transport efficiency and safety through public-private partnership (PPP)
Harmonization of cross-border transportprocedures and transport regulations
Sector institutions, financial management, andhuman capacity
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
7/20
Business Opportunities
TypeNo. of TAProjects
No. of LoanProjects
Total Value(S million) Timeline
1. Consulting Services 8 7 18.45 201320142. Equipment 0 7 687.90 201320153. Civil Works 0 6 907.50 20132015
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
8/20
Consulting ServicesUnder Approved TAs
Country Indicative Project NameTA Amount
($)TA
TypeIndicative Yearof Opportunity
7975-PRC YuxiMohan Subregional RailwayLink 800,000 PPTA 2014
8209-PRC Highway Safety and InformationSystem Development 500,000 PATA 2013
8080-MON Logistics Capacity Development 899,000 CDTA 2013
8212-MON Ulaanbaatar Urban TransportCapacity Development 1,000,000 CDTA 20132014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
9/20
Consulting ServicesUnder Proposed TAs
Country Indicative Project NameTA Amount
($)TA
TypeIndicative Yearof Opportunity
PRC Shaanxi Trunk RoadsImprovement 700,000 PPTA 20132014
PRC Railway Container TransportDevelopment 450,000 PA/CDTA 20132014
PRC Strategy for RestructuringInland Waterway Transport inChongqing 400,000 PA/CDTA 20132014
PRC Formulation of Neal NetDevelopment Program andOrganizational Mechanism 400,000 PA/CDTA 20132014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
10/20
Consulting ServicesUnder Approved Loans
Loan No. Project NameRequired Field
of Service
CostEstimates($ million)
IndicativeTiming
2802-PRC Xi'an Urban RoadNetwork Improvement Project management andtraining 1.50 2013
2962-PRC Hunan Xiangjiang InlandWaterway Transport
Institutionalstrengthening
0.60 2013
2915-PRC Jiangxi Fuzhou UrbanIntegrated InfrastructureImprovement Project
Institutionalstrengthening andenvironmental and socialmonitoring
1.44 2013
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
11/20
Consulting ServicesUnder Approved Loans
(continued)
Country Project NameRequired Field
of Service
CostEstimates($ million)
IndicativeTiming
2934 / 2935-MON Ulaanbaatar UrbanTransportDevelopment
Investment Program
Detailed design for rapid bustransit infrastructure, bridgeexpansion and road
improvement, and intelligenttransport system;construction supervision; andproject management support
4.10 2013
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
12/20
Consulting ServicesUnder Proposed Loans
Country Project NameRequired Field
of Service
CostEstimates($ million)
IndicativeTiming
PRC Inner Mongolia Road
Development Project
Environmental conservation and
ecotourism development,project management,environmental monitoring, andtourism development
1.00 2013
PRC Yunnan SustainableRoad Maintenance
Project management andtraining
2.66 2013
PRC HubeiYichangSustainable UrbanTransport
Project management andcapacity development, externalenvironment monitoring, andexternal resettlement and socialmonitoring
2.00 2013
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
13/20
Civil WorksUnder Approved Loans
Loan No. Project Name Type of WorksCost
Estimates($ million)
IndicativeTiming
2802-PRC Xi'an Urban Road
Network Improvement
Road subgrade, bridges,
pavement, road furniture,transport hubs, CNGstations works, and greeningworks
282.00 20132015
2915-PRC Jiangxi Fuzhou UrbanIntegratedInfrastructureImprovement Project
Roads, bus rapid transitroute station, terminal andparking area; bus companyheadquarter area; buscompany headquarter andbus terminal; and hydraulicwork for river improvement
80.46 20132015
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
14/20
Civil WorksUnder Approved Loans
(continued)
Loan No. Project Name Type of WorksCost
Estimates($ million)
IndicativeTiming
2934 / 2935-MON Ulaanbaatar UrbanTransport
DevelopmentInvestment Program
Bus rapidtransit
infrastructure
51.54 20142015
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
15/20
Civil WorksUnder Proposed Loans
Loan Project Name Type of WorksCost
Estimates($ million)
IndicativeTiming
PRC Inner Mongolia RoadDevelopment Project
Roads 312.00 20132014
PRC Yunnan Sustainable Road
Maintenance
Roads 29.50 20132014
PRC HubeiYichang SustainableUrban Transport
Roads and bus rapidtransit
152.00 20132014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
16/20
EquipmentUnder Approved Loans
Loan No. Project Name Type of EquipmentCost
Estimates($ million)
IndicativeTiming
2605-PRC MFF Railway
Energy Efficiencyand SafetyEnhancement - T1
Telecommunication systems;
signaling; overhead catenary;traction substation system; electricpower cable and equipment noisebarriers; operation, maintenance,and safety; and fasteners
256.0 20132015
2724-PRC MFF Railway
Energy Efficiencyand SafetyEnhancement - T2
Heavy duty switches and fasteners 59.6 20132014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
17/20
EquipmentUnder Approved Loans (continued)
Loan No. Project Name Type of EquipmentCost
Estimates($ million)
IndicativeTiming
2765-PRC MFF RailwayEnergy Efficiencyand SafetyEnhancement - T3
Railway electrification, electricpower supply system, noisebarriers, fasteners and switches,railway telecommunication system,railway signaling system,advanced railway inspectionequipment and emergency rescueequipment
250.0 20132014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
18/20
EquipmentUnder Approved Loans (continued)
Loan No. Project Name Type of EquipmentCost
Estimates($ million)
IndicativeTiming
2802-PRC Xi'an Urban RoadNetworkImprovement
Light signaling systems, roadlighting, traffic signal controlsystem, IT enforcement system,and intelligent transport system(traffic information collection and
release, traffic video monitoring,and camera enforcement)
25.5 20132014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
19/20
EquipmentUnder Approved Loans (continued)
Loan No. Project Name Type of EquipmentCost
Estimates($ million)
IndicativeTiming
2962-PRC HunanXiangjiang InlandWaterwayTransport
Turbine generator and auxiliaryequipment, metal structure of powerplant and sluice structure, metalstructure of ship lock, hydraulichoist of dial gates and ship lock,dam crest gantry crane, tailwatergantry crane, overhead crane,
sewage crane power supply anddistribution system and auxiliaryequipment for ship lock, powersupply and distribution system andauxiliary equipment for sluicestructure
59.6 2013
2014
7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013
20/20
EquipmentUnder Proposed Loans
Loan No. Project Name Type of EquipmentCost
Estimates($ million)
IndicativeTiming
PRC Inner Mongolia RoadDevelopment Project
Road maintenance andsafety equipment
9.4 20132014
PRC HubeiYichang
Sustainable UrbanTransport
Traffic aids, vehicle
operation system, ticketingsystems and screen doorsystem
27.8 2013