4 Transport ICT - EARD by Cai Li rev 19Mar2013

Embed Size (px)

Citation preview

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    1/20

    Business Opportunities

    2021 March 2013

    Transport and Communications

    Division (EATC)East Asia Department (EARD)

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    2/20

    EARD Countries

    The Peoples Republic of

    China (PRC)

    Mongolia

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    3/20

    ADB Assistance to PRC and MongoliasTransport and Communication Sectors

    (as of 11 January 2013)

    Country Start YearLoan Amount

    ($ million)% of TotalLending

    TA Amount($ million)

    % of TotalTA

    PRC 1986 13,613.00 52 68.5 17

    Mongolia 1991 324.53 35 14.7 18

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    4/20

    Transport Sector Strategy in thePRC Country Partnership Strategy

    Accessible, affordable, environment-friendlyand safe transport system

    Road network rehabilitation, rural roads, moreeffective road maintenance systems, and roadsafety

    Efficient and safe railways with strong regionaldimensions and facilitation of containerization

    Urban public transport, non-motorizedtransport, multimodal passenger hubs, andtraffic demand management

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    5/20

    Transport Sector Strategy in thePRC Country Partnership Strategy

    (continued)

    Inland waterways and inland ports

    Multimodal logistics centers, logisticsservices, and intelligent transport systems

    Key policy reforms including assetmanagement and road maintenance,

    efficiency and safety of transport services,and effective urban transport planning

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    6/20

    Transport Sector Strategy inMongolia Country Partnership

    Strategy

    Regional and international transport corridorsto reduce transport and logistics costs for

    trade and foster regional cooperation Urban transport infrastructure and services to

    enhance urban efficiency

    Transport efficiency and safety through public-private partnership (PPP)

    Harmonization of cross-border transportprocedures and transport regulations

    Sector institutions, financial management, andhuman capacity

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    7/20

    Business Opportunities

    TypeNo. of TAProjects

    No. of LoanProjects

    Total Value(S million) Timeline

    1. Consulting Services 8 7 18.45 201320142. Equipment 0 7 687.90 201320153. Civil Works 0 6 907.50 20132015

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    8/20

    Consulting ServicesUnder Approved TAs

    Country Indicative Project NameTA Amount

    ($)TA

    TypeIndicative Yearof Opportunity

    7975-PRC YuxiMohan Subregional RailwayLink 800,000 PPTA 2014

    8209-PRC Highway Safety and InformationSystem Development 500,000 PATA 2013

    8080-MON Logistics Capacity Development 899,000 CDTA 2013

    8212-MON Ulaanbaatar Urban TransportCapacity Development 1,000,000 CDTA 20132014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    9/20

    Consulting ServicesUnder Proposed TAs

    Country Indicative Project NameTA Amount

    ($)TA

    TypeIndicative Yearof Opportunity

    PRC Shaanxi Trunk RoadsImprovement 700,000 PPTA 20132014

    PRC Railway Container TransportDevelopment 450,000 PA/CDTA 20132014

    PRC Strategy for RestructuringInland Waterway Transport inChongqing 400,000 PA/CDTA 20132014

    PRC Formulation of Neal NetDevelopment Program andOrganizational Mechanism 400,000 PA/CDTA 20132014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    10/20

    Consulting ServicesUnder Approved Loans

    Loan No. Project NameRequired Field

    of Service

    CostEstimates($ million)

    IndicativeTiming

    2802-PRC Xi'an Urban RoadNetwork Improvement Project management andtraining 1.50 2013

    2962-PRC Hunan Xiangjiang InlandWaterway Transport

    Institutionalstrengthening

    0.60 2013

    2915-PRC Jiangxi Fuzhou UrbanIntegrated InfrastructureImprovement Project

    Institutionalstrengthening andenvironmental and socialmonitoring

    1.44 2013

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    11/20

    Consulting ServicesUnder Approved Loans

    (continued)

    Country Project NameRequired Field

    of Service

    CostEstimates($ million)

    IndicativeTiming

    2934 / 2935-MON Ulaanbaatar UrbanTransportDevelopment

    Investment Program

    Detailed design for rapid bustransit infrastructure, bridgeexpansion and road

    improvement, and intelligenttransport system;construction supervision; andproject management support

    4.10 2013

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    12/20

    Consulting ServicesUnder Proposed Loans

    Country Project NameRequired Field

    of Service

    CostEstimates($ million)

    IndicativeTiming

    PRC Inner Mongolia Road

    Development Project

    Environmental conservation and

    ecotourism development,project management,environmental monitoring, andtourism development

    1.00 2013

    PRC Yunnan SustainableRoad Maintenance

    Project management andtraining

    2.66 2013

    PRC HubeiYichangSustainable UrbanTransport

    Project management andcapacity development, externalenvironment monitoring, andexternal resettlement and socialmonitoring

    2.00 2013

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    13/20

    Civil WorksUnder Approved Loans

    Loan No. Project Name Type of WorksCost

    Estimates($ million)

    IndicativeTiming

    2802-PRC Xi'an Urban Road

    Network Improvement

    Road subgrade, bridges,

    pavement, road furniture,transport hubs, CNGstations works, and greeningworks

    282.00 20132015

    2915-PRC Jiangxi Fuzhou UrbanIntegratedInfrastructureImprovement Project

    Roads, bus rapid transitroute station, terminal andparking area; bus companyheadquarter area; buscompany headquarter andbus terminal; and hydraulicwork for river improvement

    80.46 20132015

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    14/20

    Civil WorksUnder Approved Loans

    (continued)

    Loan No. Project Name Type of WorksCost

    Estimates($ million)

    IndicativeTiming

    2934 / 2935-MON Ulaanbaatar UrbanTransport

    DevelopmentInvestment Program

    Bus rapidtransit

    infrastructure

    51.54 20142015

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    15/20

    Civil WorksUnder Proposed Loans

    Loan Project Name Type of WorksCost

    Estimates($ million)

    IndicativeTiming

    PRC Inner Mongolia RoadDevelopment Project

    Roads 312.00 20132014

    PRC Yunnan Sustainable Road

    Maintenance

    Roads 29.50 20132014

    PRC HubeiYichang SustainableUrban Transport

    Roads and bus rapidtransit

    152.00 20132014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    16/20

    EquipmentUnder Approved Loans

    Loan No. Project Name Type of EquipmentCost

    Estimates($ million)

    IndicativeTiming

    2605-PRC MFF Railway

    Energy Efficiencyand SafetyEnhancement - T1

    Telecommunication systems;

    signaling; overhead catenary;traction substation system; electricpower cable and equipment noisebarriers; operation, maintenance,and safety; and fasteners

    256.0 20132015

    2724-PRC MFF Railway

    Energy Efficiencyand SafetyEnhancement - T2

    Heavy duty switches and fasteners 59.6 20132014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    17/20

    EquipmentUnder Approved Loans (continued)

    Loan No. Project Name Type of EquipmentCost

    Estimates($ million)

    IndicativeTiming

    2765-PRC MFF RailwayEnergy Efficiencyand SafetyEnhancement - T3

    Railway electrification, electricpower supply system, noisebarriers, fasteners and switches,railway telecommunication system,railway signaling system,advanced railway inspectionequipment and emergency rescueequipment

    250.0 20132014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    18/20

    EquipmentUnder Approved Loans (continued)

    Loan No. Project Name Type of EquipmentCost

    Estimates($ million)

    IndicativeTiming

    2802-PRC Xi'an Urban RoadNetworkImprovement

    Light signaling systems, roadlighting, traffic signal controlsystem, IT enforcement system,and intelligent transport system(traffic information collection and

    release, traffic video monitoring,and camera enforcement)

    25.5 20132014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    19/20

    EquipmentUnder Approved Loans (continued)

    Loan No. Project Name Type of EquipmentCost

    Estimates($ million)

    IndicativeTiming

    2962-PRC HunanXiangjiang InlandWaterwayTransport

    Turbine generator and auxiliaryequipment, metal structure of powerplant and sluice structure, metalstructure of ship lock, hydraulichoist of dial gates and ship lock,dam crest gantry crane, tailwatergantry crane, overhead crane,

    sewage crane power supply anddistribution system and auxiliaryequipment for ship lock, powersupply and distribution system andauxiliary equipment for sluicestructure

    59.6 2013

    2014

  • 7/29/2019 4 Transport ICT - EARD by Cai Li rev 19Mar2013

    20/20

    EquipmentUnder Proposed Loans

    Loan No. Project Name Type of EquipmentCost

    Estimates($ million)

    IndicativeTiming

    PRC Inner Mongolia RoadDevelopment Project

    Road maintenance andsafety equipment

    9.4 20132014

    PRC HubeiYichang

    Sustainable UrbanTransport

    Traffic aids, vehicle

    operation system, ticketingsystems and screen doorsystem

    27.8 2013