4. Presentation on Formwork 2 by Neeraj Jha Delhi

Embed Size (px)

Citation preview

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    1/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step 8: Concrete pouring

    and compaction

    Step 9: Striking of wall

    formwork

    Construction steps for MIVAN55

    K

    NJH

    A

    DepartmentofCivilEngineering

    IITDelhi

    Pitampura TV Tower in New Delhi,

    235 m height

    constructed

    using slipform

    56

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Straight Slipform-Actual photograph57

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    2/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Straight Slipform- Schematic view58

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Part Plan of a typical slipform

    Part plan for

    straight

    slipform

    59

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Slipforming for tapered structures60

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    3/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Inclined slip form

    61

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Slipform for chimney in progress

    Slipform in

    progress for

    the chimney

    A chimney of

    275 m height,

    30 m base

    diameter, and

    20.8 m top

    diameter was

    built by using

    slipform

    method at

    Anpara in U.P.

    62

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Tapered slipform

    275 m high

    RCC

    slipformed

    tapered

    chimney at 2x 500 MW

    Anpara

    Thermal

    Power Station

    in U.P.

    63

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    4/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Construction of Pier using slipform

    Construction

    of Pier(Jammu

    Udhampur

    Raillink

    Project)

    Concrete pier

    of 80 m

    height was

    constructed

    using slipform

    for the Jammu

    Udhampur

    Railway

    bridge

    project.

    64

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Slipforming of octagonal shaped RCC bridge piers

    Slipforming of

    octagonal

    shaped RCC

    bridge piers

    in progress for

    the Panvel

    River Viaduct

    at Ratnagiri

    65

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Flying formwork

    The flying form is a system of formwork which is assembled

    into form units usually at ground and is located to form

    concrete elements at the site location. The form units are

    further relocated at new location with virtually no disassembly

    of parts to form concrete elements.

    The flying forms are more common in high rise buildings for

    rapid cycle construction where in large repetitions are possible

    and thus justifying their relatively high initial cost of

    fabrication.

    66

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    5/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Flying formwork

    In case of flying formwork all the members are assembled

    together to allow lifting of the whole system in one piece which is

    in contrast of hand set forms.

    A typical flying formwork consists of sheathing member

    (mostly plywood), trusses or shores, wooden beams as stringers

    and joists.

    Joists are timber or aluminium beams connected in most cases

    to deep trusses.

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step-1

    Forms are preassembled at ground level

    Entire assembly is lifted and placed on existing floor or at

    desired level by crane and hoist line.

    Flying Formwork Cycle

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step-2

    Form assembly Is then moved and placed into exact

    position by movable dollies.

    Flying Formwork Cycle

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    6/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step-3

    Form assembly is adjusted to correct height and attached

    firmly with other modules.

    Reinforcement steel is fixed and electrical, mechanical and

    plumbing work is done.

    Flying Formwork Cycle

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step-4

    Form assembly support systems are lowered to bring the

    form down.

    This process is done by the hydraulic jacks places under the

    formwork.

    Flying Formwork Cycle

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step-5

    Then the form assembly is moved to the edge of the

    support system by dollies.

    Special attention on its movement has to be given.

    Flying Formwork Cycle

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    7/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Step-6

    Form assembly tilts when about half of assembly is out of

    the floor slab.

    Again the formwork is hoisted to the upper level fot the

    next cast.

    Flying Formwork Cycle

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table Forms

    Another variant of flying form.

    Capable of providing very high speed of

    construction.

    Used primarily for multi- storey building (such as

    residential flats, hotels, hostels, offices and

    commercial buildings) construction works with

    regular plan layouts and long repetitive structures.

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    operation procedure75

    Assembling the table form at the ground level

    Shifting to the location where the floor is to be cast.

    After aligning the formwork, the reinforcement is tied and provisions forother services are laid.

    Concrete is poured and allowed to gain strength.

    The formwork is struck with the help of jacks and without disassembly oftable form it is rolled towards the faade (exterior) of the building.

    From here the table form is picked up by crane for locating it to upperstory.

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    8/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table formwork being flown76

    Table

    formworkbeing flown to

    its new

    location

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table formwork77

    Table

    formwork

    being

    positioned

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Transportation arrangement78

    Transportation

    arrangement

    for table

    formwork

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    9/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table form in practice79

    Extensive use

    of Table format Oberoi

    Mall Project

    Site Mumbai

    (Courtesy

    L&T)

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table module being shifted80

    Table module

    being shifted

    to new

    location (Note

    the props in

    folded

    position)

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table module being transported using crane81

    Table module

    being

    transported

    using crane

    (note thelifting fork)

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    10/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table form being shifted on trolley82

    Table form

    being shiftedon trolley to

    the desired

    location

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    PERI Table Formwork83

    Peri offers modular tables which are pre assembled

    for immediate use.

    The modules are available in four standard sizes

    which allow optimal adjustment to the building. The

    sizes are:

    Table Module VT 200/215 x 400

    Table Module VT 250/265 x 400

    Table Module VT 200/215 x 500

    Table Module VT 250/265 x 500

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Peri Uniportal Table form84

    PERI Uniportal

    Table form

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    11/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Table swivel head85

    Table swivel

    head used inprops

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Skytable form -PERI86

    Skytable form

    (see the

    trusses)

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Tunnel form

    Fixed bracing.

    Need to dismantle into smaller modules before reuse.

  • 7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi

    12/12

    4/9/20

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Tunnel form

    Wall and ceilings are cast together.

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Tunnel formwork system89

    Tunnel

    formwork

    system

    K

    NJ

    HA

    DepartmentofCivilEngineering

    IITDelhi

    Construction steps-Tunnel form90

    Construction

    of starter wall

    for the tunnel

    formwork

    system