7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
1/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step 8: Concrete pouring
and compaction
Step 9: Striking of wall
formwork
Construction steps for MIVAN55
K
NJH
A
DepartmentofCivilEngineering
IITDelhi
Pitampura TV Tower in New Delhi,
235 m height
constructed
using slipform
56
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Straight Slipform-Actual photograph57
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
2/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Straight Slipform- Schematic view58
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Part Plan of a typical slipform
Part plan for
straight
slipform
59
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Slipforming for tapered structures60
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
3/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Inclined slip form
61
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Slipform for chimney in progress
Slipform in
progress for
the chimney
A chimney of
275 m height,
30 m base
diameter, and
20.8 m top
diameter was
built by using
slipform
method at
Anpara in U.P.
62
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Tapered slipform
275 m high
RCC
slipformed
tapered
chimney at 2x 500 MW
Anpara
Thermal
Power Station
in U.P.
63
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
4/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Construction of Pier using slipform
Construction
of Pier(Jammu
Udhampur
Raillink
Project)
Concrete pier
of 80 m
height was
constructed
using slipform
for the Jammu
Udhampur
Railway
bridge
project.
64
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Slipforming of octagonal shaped RCC bridge piers
Slipforming of
octagonal
shaped RCC
bridge piers
in progress for
the Panvel
River Viaduct
at Ratnagiri
65
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Flying formwork
The flying form is a system of formwork which is assembled
into form units usually at ground and is located to form
concrete elements at the site location. The form units are
further relocated at new location with virtually no disassembly
of parts to form concrete elements.
The flying forms are more common in high rise buildings for
rapid cycle construction where in large repetitions are possible
and thus justifying their relatively high initial cost of
fabrication.
66
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
5/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Flying formwork
In case of flying formwork all the members are assembled
together to allow lifting of the whole system in one piece which is
in contrast of hand set forms.
A typical flying formwork consists of sheathing member
(mostly plywood), trusses or shores, wooden beams as stringers
and joists.
Joists are timber or aluminium beams connected in most cases
to deep trusses.
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step-1
Forms are preassembled at ground level
Entire assembly is lifted and placed on existing floor or at
desired level by crane and hoist line.
Flying Formwork Cycle
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step-2
Form assembly Is then moved and placed into exact
position by movable dollies.
Flying Formwork Cycle
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
6/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step-3
Form assembly is adjusted to correct height and attached
firmly with other modules.
Reinforcement steel is fixed and electrical, mechanical and
plumbing work is done.
Flying Formwork Cycle
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step-4
Form assembly support systems are lowered to bring the
form down.
This process is done by the hydraulic jacks places under the
formwork.
Flying Formwork Cycle
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step-5
Then the form assembly is moved to the edge of the
support system by dollies.
Special attention on its movement has to be given.
Flying Formwork Cycle
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
7/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Step-6
Form assembly tilts when about half of assembly is out of
the floor slab.
Again the formwork is hoisted to the upper level fot the
next cast.
Flying Formwork Cycle
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table Forms
Another variant of flying form.
Capable of providing very high speed of
construction.
Used primarily for multi- storey building (such as
residential flats, hotels, hostels, offices and
commercial buildings) construction works with
regular plan layouts and long repetitive structures.
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
operation procedure75
Assembling the table form at the ground level
Shifting to the location where the floor is to be cast.
After aligning the formwork, the reinforcement is tied and provisions forother services are laid.
Concrete is poured and allowed to gain strength.
The formwork is struck with the help of jacks and without disassembly oftable form it is rolled towards the faade (exterior) of the building.
From here the table form is picked up by crane for locating it to upperstory.
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
8/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table formwork being flown76
Table
formworkbeing flown to
its new
location
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table formwork77
Table
formwork
being
positioned
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Transportation arrangement78
Transportation
arrangement
for table
formwork
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
9/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table form in practice79
Extensive use
of Table format Oberoi
Mall Project
Site Mumbai
(Courtesy
L&T)
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table module being shifted80
Table module
being shifted
to new
location (Note
the props in
folded
position)
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table module being transported using crane81
Table module
being
transported
using crane
(note thelifting fork)
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
10/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table form being shifted on trolley82
Table form
being shiftedon trolley to
the desired
location
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
PERI Table Formwork83
Peri offers modular tables which are pre assembled
for immediate use.
The modules are available in four standard sizes
which allow optimal adjustment to the building. The
sizes are:
Table Module VT 200/215 x 400
Table Module VT 250/265 x 400
Table Module VT 200/215 x 500
Table Module VT 250/265 x 500
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Peri Uniportal Table form84
PERI Uniportal
Table form
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
11/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Table swivel head85
Table swivel
head used inprops
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Skytable form -PERI86
Skytable form
(see the
trusses)
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Tunnel form
Fixed bracing.
Need to dismantle into smaller modules before reuse.
7/21/2019 4. Presentation on Formwork 2 by Neeraj Jha Delhi
12/12
4/9/20
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Tunnel form
Wall and ceilings are cast together.
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Tunnel formwork system89
Tunnel
formwork
system
K
NJ
HA
DepartmentofCivilEngineering
IITDelhi
Construction steps-Tunnel form90
Construction
of starter wall
for the tunnel
formwork
system