4 National Uranium Resource Evaluation

Annual Activity Report

Page 2: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

This report was prepared as an account of work sponsored by the United States Government. Neither the UnitedStates nor the UnitedStates Department of Energy, nor any o f their employees, nor any of their contractors, subcontractors. or their emolovees. makes any warranty, express or ~mplred, or assumes any legal lrab~lrty or respons;brl~ty for the accuracy, completeness, or usefulness 01 any ~nlormatron. amaratus. DrOduct, or process disclosed, or represents that its use would not infringe piivately owned rights.

On the Cover: The different types o f acquisition methods used to obtain data for evaluating a quadrangle are indicated by the photographs as: surface geologic investigation, stream water sampling, aerial radiometric surveying, drilling, andlogging. So that the data may be used by the principal investigator in his evaluation procedures; the acquired data is presented in the quadrangle folio in reduced form, exemplified by: the plots; contour and density and the maps; geologic and cultural.

Page 3: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

FOR IMMEDIATE RELEASE May 29, 1980

ANNUAL N U R E ACTIVITY REPORT ISSUED

The Grand Junct ion , Colorado, Off ice , U.S. Department of Energy ( D O E ) , has i ssued the fou r th annual a c t i v i t y r e p o r t o f t h e National Uranium Resource Evaluation (NURE).

The 106-page r e p o r t , GJBX-11(80), "NURE 1979 - National Uranium Resource Evaluation Annual A c t i v i t y Report," was prepared by Bendix Field Engineering Corp., opera t ing con t rac to r f o r DOE's Grand Junct ion f a c i l i t y . The publ ica t ion i s a d e s c r i p t i o n o f work done during ca lendar yea r 1979 by Bendix and DOE and t h e i r c o n t r a c t o r s i n support o f N U R E . The r epor t does not conta in information on t h e s t a t u s o f uranium resources ; t h i s information w i l l be i ssued a s GJO-100(80), " S t a t i s t i c a l Data o f the Uranium Industry."

N U R E i s a program o f DOE's Grand Junct ion Off ice t o acqu i re and compile geologic and o t h e r information w i t h which t o a s ses s t h e magnitude and d i s t r i b u t i o n of uranium resources and t o determine a r e a s favorable f o r t h e occurrence of uranium i n t h e United S t a t e s .

Single copies of GJBX-ll(80) may be obtained a t no c o s t by w r i t i n g to :

Technical Library Bendix Field Engineering Corp. P. 0. Box 1569 Grand Junc t ion , Colorado 81502 Tel : 3031242-8621, E x t . 278.

PR NO. 80-91 Library Reference Inqu i r i e s : 303/242-8621, Ext. 279 News Media Contact: Pe te r Mygatt, 3031242-8621, Ext. 293

Page 4: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

URE 1979 National Uranium Resource Evaluation

Annual Activity Report

March 1980

Bendix Field Engineering Corporation Grand Junction, Colorado 81502

Prepared for the U.S. Department of Energy

Assistant Secretary for Resource Applications Grand Junction Office, Colorado

Under Contract No. DE-AC13-76GJ01664

Page 5: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Contents Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 National Uranium Resource Evaluation . . . . . . . . . . . . . . . . . . . 8 1979 Summary and Highlights.. . . ..................... . . . 9 Quadrangle Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Spokane Field Office . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Quadrangle Evaluation (BFEC): Sandpoint, Spokane, Okanogan, Ritzville, Challis, and Klamath Falls Quadrangle Evaluation (Subcontractors): Pocatello. Lewistown, Elk City, Hamilton, Butte, Dillon, Dubois. Bozeman, and Ashton

Reno Field Off ice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Quadrangle Evaluation (BFEC): Death Valley. Millett. Reno, Salton Sea, Wells, and Gravitv Survey of the Wells Quadrangle. Nevada Quadrangle Evaluation (Subcontractors): Elko, Lovelock, McDermitt, and Trona Quadrangle Evaluation (USGS): Delta, Richfield, and Walker Lake

Casper Field Office . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Quadrangle Evaluation (BFEC): Casper, Rawlins, Arrninto. Thermopolis, and Lander Quadrangle Evaluation (Subcontractors): Ashland, Rice Lake. Eau Claire, Green Bay. St. Cloud, New Ulm. Billings. Cody, and Rock Springs Quadrangle Evaluation (USGS): Ekalaka, Gillette, Torrington, and Newcastle

Grand Junction Field Off ice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Quadrangle Evaluation (BFEC): Durango. Montrose, Lamar, La Junta, and Trinidad Quadrangle Evaluation (Subcontractors): Leadville. Hutchinson, Manhattan, Pratt. and Wichita Quadrangle Evaluation (USGS): Greeley, Denver. Pueblo. Vernal, Craig, Moab. Cortez. Price, Salina, and Escalante

Albuquerque Field Off ice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Quadrangle Evaluation (BFEC): Kingman, Williams. Prescott, Mesa. St. Johns, Marfa. Presidio, and Emory Peak Quadrangle Evaluation (Subcontractors): Raton. Santa Fe, Dalhart, and Tularosa Quadrangle Evaluation (USGS): Albuquerque. Aztec. Gallup. Shiprock. Flagstaff, and Socorro

Austin Field Off ice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Quadrangle Evaluation (BFEC): Plainview. Seguin, Crystal City. Austin, Laredo, Beeville, Beaumont, and San Antonio Quadrangle Evaluation (Subcontractors): Palestine, Amarillo. Lubbock, Wichita Falls, Sherman, Lawton. Oklahoma City. Clinton, Enid. Joplin. Dyersburq, and Poplar Bluff

Atlanta Field Off ice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Quadrangle Evaluation (BFEC): Athens, Spartanburg, Greensboro. Raleigh, Dickinson. and Lemmon Quadrangle Evaluation (Subcontractors): Augusta

Pittsburgh Field O f f i ce . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Quadrangle Evaluation (BFEC): Harrisburg. Scranton, Williamsport. Hot Springs. Grand Canyon, and Marble Canyon Quadrangle Evaluation (Subcontractors): Glens Falls and Portland

Anchorage Field Office . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Quadrangle Evaluation (BFEC): Dixon Entrance and Kenai Quadrangle Evaluation (Subcontractors): Mt. McKinley, Talkeetna, Tyonek, Lime Hills, Circle, Charley River, Black River, and Coleen

Quadrangle Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 NURE Geostatistical Evaluation Study, Improved Appraisal System for U30, Endowment. Work Statement fo r Preparation o f Uran ium Deposit Occurrence Models. Potential Supply Systems, and Supply Analysis System

Page 6: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

.................................... Aerial Radiometric Reconnaissance and Detail Surveys Northeast WashingtonIMcDermitt, Northeast Washington. Sweetgrass, Idaho, RenolSnake River Basin, High LifelSBA. Marysvale, Powder River II, Gillette. Minnesota, Northern Rockies, Yellowstone, Uncompahgre, Montrose. Trinidad, Brushy Basin, Durango. Rocky, Mountains, Raton Basin, UtahlArizona, ColoradoIArizona, Llano Uplift, TexasIKentucky, TexasINebraska, Texas Gulf Coast II, Southeast United States, Appalachian Basin, ThorpelBigBend, Reading Prong, and Central Alaska ;

Subsurface Investigations.. .................................................................. 1979 Drilling Projects ......................................................... .. .............

Lemhi Pass (Thorium), Sand Wash Basin; Sonora Pass, San Rafael Swell, Southwest Prescott, Owens Lake, MissoulaIBitterroot Basins, Black Hills, Southeast Wyoming, R&D Drilling Programs-Red Desert, Wyoming, Copper Mountain, Wyoming, and San Juan Basin, New Mexico

1979 Quadrangle Logging Program.. ...................................................... Planning Study, South Texas and Central Wyoming~Logging, Denver-Julesburg and Williston Basins Logging, and San Joaquin Valley and Eastern Nevada Logging

Hydrogeochemical and Stream-Sediment Reconnaissance and Detailed Geochemical Surveys ............... i .........................................

Los Alamos Scientific Laboratory.. ...................................................... , ... ......................... Oak Ridge Gaseous Diffusion Plant.. .................... ;. :.

Savannah River Laboratory .......................... .,. ................................. Geologicstudies ...........................................................................

....... .......................... World-Class Deposit Studies .............................. : ;

Precambrian Quartz-Pebble Conglomerates. Northeast Black Hills, Tertiary Volcanics in Southwestern NewMexico, Proterozoic Unconformity, Van Horn. Texas. Precambrian Metasedimentary Rocks in Uinta Arch, Utah and Colorado. RaftRiver Mountains, Utah and Idaho, Precambr ian P lu ton ic Rocks of Northwest Ar izona, Precambr ian Conglomerates of Southwest Montana, Precambrian Pebble Conglomerates of Needle. Mountains. Colorado. Kettle Dome of Northeast Washington, Kingston Peak Formation of Southeast California, Precambrian Conglomerates of the Central Arizona Arch. Uranium in Metamorphic Core Complexes, and Carbonatites in the United States

Intermediate-Grade Studies .............................................................. Copper Mountain, Cedar Mountain. San Rafael Swell, Red Desert, Great Divide Basin, and Sand Wash Basin ~. .

Topical Geologic Studies ............................................................... Sandstone-Type Uranium Deposits. Data Enhancement and Display Techniques, HSSR Data in Uranium Resource Assessment and Identification, Interpretation of Ground- Water Data, Uranium in Fluorine-Enriched Volcanic Rock, Uranium in Proterozoic Metamorphic Roc.ks, Uranium in Accessory Minerals. Chronometr ic-Geologic Correlation Chartsfor the Precambrian of the United States and Mexico, Calcretes, Lacustrine Uranium Distribution, Red Muds, Uranium Favorability in Alaska, Uranium-and Thorium-Bearing Pegmatites, Radioactive Mineral Deposits in Arizona, and Uraniumin Granites of Southwestern North America

Low-Grade Studies .............................................................. ;. ..... Chattanooga Shale, Phosphate, Seawater, and Asphaltite Project

Geologic Map Compilation Program : .................................................... Technology Applications ................................................................ :

Technology Development and Evaluation .................................................. Logging with PFN. 252 Cf-Logging System, Borehole Neutron Activation Analysis, Borehole Neutron Experiments, Borehole Neutron Correlation, Gamma-Gamma. Transport Calculations, Spectral Gamma Evaluation, Intrinsic Germanium Probe, Computation and Nondestructive Assaying. R&D Logging Vehicle, Fiber-optic Logging Cable, Borehole Data Atquisiti.on System, Phoswich Airborne Detector, Spectrum Enhancement, MAZE Code. Vertical Radon Propagation, Effect ofvegetation. Statistical Techniques, TrainingStudies; Airborne Data Evaluation. Crvstal Citv lBeeviI Ie . - , - - -

Geochemical ~ n a l y s i s Models. Geophysical Interpretation, ~ i g Bend Area. Texas. Magnetics Interpretation, Video Image Enhancement, Imagery Pattern Recognition, Emanometry, He l i um Surveying, He l ium-4 lArgon-36 Rat io and ad on-222

4

Page 7: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Measurements, Numerical Modeling of Radon and Helium Migration, Radon Emanation, Uranium and Radon Daughters by Nuclear Emulsions, Ruggedized Radon Emanometer, Dr i l l ing M u d Emanometer, Thermoluminescence Techniques, Organic Matter and Uranium Deposits, and Ge(Li) Spectrometer Calibration and Software

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Technology Integration 74 Technology Integration Sites: Spokane Mountain, Red Desert, Copper Mountain, and San Juan Basin, Aer ia l EM, Complex Resist iv i ty , Stable lsotopes and Halos, Lead lsotopes in Ground Water, Selective Extraction, Uranium Isotopes, Aerial Geochemical Evaluation, and High-Resolution Seismic Reflection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Technology Support. . 79 Geochemica l Analysis, Emiss ion Spectrophotometer. XRF Laboratory, Gamma Spectrometer, Electronics Activities, Existing Calibration Facilities. Field Calibrat ion Sites, Fission Neut ron Water Factor Model , 300-Foot Borehole, Grade Assignment Studies, Calibration Facilities Monitoring, Radon Calibration Unit, Dynamic Test Range I Fol low-On, DynamicTes t Range I I , DR-11 Ground Support Vehicle, Aerial Qual i ty Assurance, and Aerial Data Standardization

Information Dissemination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Technical Meetings.. 85

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Uranium Industry Seminar 86 Computerized Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Technical Library Services 88 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bibliography of GJO Reports.. 90

Technical Reports, 1979 Open-File Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bendix Field Engineering Corporation 106

Page 8: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Foreword Bendix Field Engineering Corporation (BFEC), as prime operating contractor, provides man- agement, technical, and facility support to the United States Department of Energy (DOE), Grand Junction (Colorado) Office (GJO).

This fourth annual activity report summarizes technical activities undertaken during calendar year 1979 to support DOE'S National Uranium Resource Evaluation (NURE) program.

Bendix operates under U.S. Contract DE-AC13- 76GJ01664 with all activities performed under the supervision of DOE-GJO.

Bendix acknowledges the many individuals with- in BFEC, DOE, and the other organizations par- ticipating in NURE, who contributed t o this report.

The expanded Grand Junction calibration and standardization facility now includes the six fission neutron borehole models (upper middle of photo) and the large diameter fission neutron water factor model (center of photo).

Page 9: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

National Uranium Resource Evaluation NURE is a DOE-directed program with the major goal of establishing reliable and timely compre- hensive estimates of the uranium resources of the nation. T o develop and compile geologic. geophysical, and other information which will contribute to assessing the distribution and magnitude of uranium resources and to deter- mine areas favorable for the occurrence of uranium in the United States, NURE has been organized into the following elements:

1. Quadrangle Evaluation 2. Aerial Radiometric Reconnaissance 3. Subsurface Investigations 4. Hydrogeochemical and Stream-Sediment

Reconnaissance 5. Geologic Studies 6. Technology Applications

7. Information Dissemination

The extensive effort now under way on each of these NURE program elements will result in a systematic collection and compilation of data which will be culminating in a comprehensive report covering certain priority areas of the United States. These priority areas coincide to a high degree with those designated as having potential and as being favorable in the June 1979 DOE report G J O - l l l ( 7 9 ) ent i t led Na t iona l Uranium Resource Evaluation, Interim Report.

It is planned that the resource data published periodically by DOE-such as those found in GJO-100(79), Statistical Data of the Uranium Industry-during the time the NURE program is being executed will reflect the latest NURE data, along with the latest industry information.

The 7979 Mining and Petroleum Days in Grand Junction display used more than 40 color photographs to highlight the NURE program major activities.

Page 10: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

1979 Summary and Highlights Thequadrangle evaluation program was initiated in 1977toorganizetheNUREeffort in athorough, uniform, and systematic manner for examining the uranium resources of the United States.

Early in 1978 a DOE task force was assigned to review the program and to make recommen- dations. This review resulted in establishing an interim goal which was to evaluate 116 of the 272 so-called "A" priority quadrangles and to report the results in 1980. Increased emphasis was placed on examining and evaluating the most favorableareas for intermediate-grade resources and non-sandstone geologic settings identified as "world class" that, in other nations, have been known to contain large uranium resources.

By early 1979 geologic investigations were under way in all the 116 priority quadrangles. The effort was divided among the many organi- zations participating in the program which in- cludes Bendix, U.S. Geological Survey, state geologic surveys, universities, and private firms. By the end of 1979 investigation of 18 priority quadrangles had been completed. To guide the investigations and to provide a common base for evaluating and classifying project areas. Bendix provided each investigating group with specifi-

cations for preparing the quadrangle work plan and the assessment folio. Geologic Character- istics o f Environments Favorable for Uranium Deposits, GJBX-67(78), a major reference docu- ment for classifying deposits, was published in 1978, and Preliminary Recognition Criteria for Uranium Occurrences; A Field Guide, GJBX- 32(79), which gives a checklist of the types of information essential to the description of favor- able environments. was published in 1979. Both documents have been supplied to all partic- ipants. Bendix is working with DOE to develop procedures and methods for the final step in the assessment process and to estimate the amount of ore in a given area.

In direct response to the 116 priority quadrangle evaluation schedule, both the aerial radiometric reconnaissance program and the hydrogeo- chemical and stream-sediment (HSSR) program were modified to make the data covering the 116 priority quadrangles available to investigators at the earliest possible date.

During 1979, seven contractors used 10 airborne gamma-ray spectrometer systems t o perform a p p r o x i m a t e l y 190,000 l i n e m i les (306.000

Page 11: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

kilometers) of survey, bringing the total to 780,000 miles (1,255,000 kilometers), which represents approximately two-thirds the total reconnaissance surveys to be flown in the NURE program. I n add i t ion t o reconnaissance surveying, 48,000 line miles (77,000 kilometers) of detail surveying were flown in support of the 1980 goal, bringing the total detail flown to 70,000 line miles (113,000 kilometers).

Drilling activity on NURE increased substantially during 1979 over 1978. This activity accelerated the acquisition of subsurface data needed to confirm, with improved confidence, the uranium r e s o u r c e e s t i m a t e s i n a r e a s ' o f k n o w n occurrences. The acquisition of these data was to aid in evaluating uranium resources in areas o f h i g h po tent ia l , t o p rov ide subsur face information in geologic study areas, and to help define and locate halo-like zones around known uran ium deposi ts as a par t of exp lora t ion systems development.

Drilling, started in 1978, was completed for three quadrangles and two exploration systems devel- opment projects: Lemhi Pass in Montana (Dubois Quadrangle, thorium investigation); San Rafael Swell in Utah (Price and Salina Quadrangles); Missoula/Bitterroot Basins in Montana (Wallace and Hamilton Quadrangles); Copper Mountain in Wyoming (exploration systems development); and Red Desert in Wyoming (exploration systems development). Of the five new projects started in 1979, f o u r were comple ted and one was continued into 1980. Those completed were Sand Wash Basin, Colorado (Craig and Vernal Quadrangles); Sonora Pass. California (Walker Lake Quadrangle); Southwest Prescott. Arizona (Prescott and Williams Quadrangles); and San Juan Basin, New Mexico (exploration systems development). To be continued into 1980 is O w e n s L a k e . C a l i f o r n i a ( D e a t h V a l l e y Quadrangle).

Geologic studies drilling in 1979 included two world-class deposit projects: Northeast Black Hills in South Dakota (Precambrian quartz- pebble Estes conglomerate) and Southeast W y o m i n g ( P r e c a m b r i a n q u a r t z - p e b b l e conglomerate), and two intermediate-grade

deposit projects: Cedar Mountain, Utah (Brushy Basin Member of Jurassic Morrison Formation) and Red Desert, Great Divide Basin in Wyoming (lacustrine paludal facies).

Increased emphasis was placed on the quad- rangle logging program in 1979; first, by aug- menting Bendix in-house logging capability with two additional operational logging systems bringing to five the total number of specialized systems that have KUT gamma-ray spectrometer capability, and second, by initiating projects through subcontractors to obtain spectral and/or gross gamma-ray calibrated logs in designated regions from new and existing boreholes that were not drilled for uranium. The in-house logging effort resulted in 1,100,000 total feet (335,280 meters) logged in holes, a number of which were drilled specifically for the quad- rangle evaluation program. The subcontracted logging resulted in 363 holes aggregating 949,500 feet (289,410 meters) logged along the eastern slope of Colorado, eastern Nevada, and the San Joaquin Valley, California.

By the end of 1979 the DOE laboratories partici- pating in the HSSR program had completed samples for 328 quadrangles. Open-file reports on the sample data were issued for 58 quad- rangles which brought the total to date to 97. In addition to reconnaissance sampling. 27 de- tailed sampling studies were initiated. One was completed and the results were open fi led in support of the 1980 goal.

During 1979 Bendix continued to focus the geologic studies program on two areas of the 1978 DOE task force concern, by increasing the in-house and subcontracted study effort on world-class deposits and intermediate-grade resources. As elements in the 1980 world-class goal for evaluating the Precambrian pebble- conglomerate environment, drilling projects and field work were conducted in the northeastern

Interior view of ground support vehicle # I at Dynamic Test Range I.

Page 12: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Black Hills of South Dakota and in southeast Wyoming. I n addition to Precambrian pebble conglomerate, other geologicenvironments were studied in the United States which may offer ura- nium potential in a non-sandstone environment including: unconformity, volcanic, plutonic-meta- morphic, and regolith-related.

Work during 1979 on intermediate-grade re- sources (0.01 to 0.05 percent U308) was concen- trated on sandstone environments located near known producing areas. In addition to studying the information available i n the literature on four areas, field investigation and dril l ing projects were conducted in two: Cedar Mountain, Utah where the Brushy Basin Member of the Jurassic MorrisonFormationis the target, and Red Desert, Great Divide Basin, Wyoming where lacustrine paludal facies are being examined.

Three studies on low-grade resources (less than 100 ppm U308) were completed in 1979 which included the release of final reports: Chat- tanooga Shale, Phosphate, and Sea Water. Commercialization of any of the processes proposed for extracting uranium from these low- grade resources would place the recovered U,Os in the $200 to $3,600 per pound category. During the year asphaltite was examined as a fourth potential low-grade resource.

During the initial phase of the quadrangle eval- uation program, it was determined that only 189 of the 621 National Topographic Map Series (NTMS) quadrangles for the United States had geologic maps scaled 1:250,000. To furnish the remaining 432 geologic maps for use as data bases to all NURE program elements, 232 map compilations have been subcontracted, with 222 maps delivered by the end of 1979. This leaves 210 maps to be obtained.

Technology Applications during 1979 empha- sized those projects which should meet near- term technical requirements of the NURE pro- gram in the areas of: exploration techniques and systems integration, borehole logging sys- tems, data reduction and calibration facilities, airborne radiometric data quality control and interpretation, and laboratory geochemical ana- lytical techniques and systems.

Analysis of data taken in the three research test areas of Red Desert, Copper Mountain, and Spokane Mountain resulted in a better under- standing of how data on such uranium indicators as radon, helium, argon, as well as various trace elements, may be integrated for effective use in resource assessment and exploration. A fourth research test area was established in the San

Juan Basin as a representative sandstone envi- ronment t o be studied and compared with the Red Desert. Drilling programs were completed at all four sites.

The delayed fission neutron (DFN) logging system using 252Cf was in t roduced as a commercial service for directly assaying uranium ore in a borehole. A project was initiated to develop a neut ron act ivated gamma-ray spectroanalysis borehole probe for determining the presenceof traceelement or"haloU indicators for uranium exploration. The GJO-developed gamma-ray spectrometer (KUT) borehole probe system was added to the three computer-based operational logging systems introduced in late 1978 and early 1979.

The RBD logging vehicle was used effectively to evaluate improvements in KUT and magnetic susceptibility (MS) probe development. Using the vehicle, testing of an operational prompt fission neutron (PFN) logging system developed by Sandia was under way at year's end.

During 1979 a fission neutron water factor model was installed and a 300-foot (91.44 meter) test borehole was drilled at the Grand Junction facility as important additions to DOE'S cali- bration and standardization program for urani- um resource data. At the three calibration field sites, two KUT models and one fission neutron model were added to the two existing gross gamma-ray models giving each site a total of five models.

Statistical analysis computer programs using principal component theory were made opera- tional for the interpretation of airborne radio- met r ic data. A 100-percent sampl ing qua l i ty control program on contractor-supplied airborne radiometric data magnetic tapes was initiated, using a dedicated mini-computer system. The phoswich detector development program has resulted in a unit with approximately 50 percent improved sensitivity, compared to a like-size/ weight sodium iodide detector.

Development and testing of instrumentation equipment for field use continued, including the introduction of the production ruggedized radon emanometer and the delivery of the develop- mental drilling-mud emanometer.

Instrumentation equipment added t o the geo- chemical laboratory included two gamma-ray spectrometers for use in analyzing field samples for radiometric potassium, uranium, and thorium. Laboratory personnel developed a new ana- lytical procedure which is five times more cost

Page 13: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

effective than the previous method in deter- mining arsenic and selenium content of samples.

Dissemination of information on the NURE program resulted in the publication and open filing of 176 project and.program reports, some 13 other miscellaneous reports, as well as the issuance of 157 news releases. The technical program resulted in the presentation of 20 papers by the Bendix staff at professional meetings and specialized symposiums. In March 1979 the CDC 6600 was installed as the new central on-site computer, replacing the CDC 3100, which will be phased out during 1980.

DOE sponsored the 1979 Uranium Industry Seminar that was held at Grand Junction's Two Rivers Plaza.

12

Page 14: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Quadrangle Evaluation The basic work units of the NURE program are the 1:250,000-scale quadrangles of the National Topographic Map Series. Quadrangle evaluation is compr~sed of the data-collection and analysis activities that attempt to classify geologic envir- onments within a selected quadrangle as favor- able o r unfavorable for the occurrence o f uranium deposits.

In this context, the term "favorable environment" refers t o an area or a geologic unit that, on the basis of all available geologic evidence, could contain at least 100 tons U,O, at an average grade not less than 100 ppm. Designation of a favorable environment is based on the similarity of its geologic characterist ics ( recogni t ion criteria) to those found in close association with known uranium deposits.

To implement quadrangle evaluation activities, Bendix has established nine field offices, each with the responsibility for a particular region. In addition, organizations having specific know- ledge of the geology in certain quadrangles have been encouraged to participate in the evaluation procedure. To this end, a joint working agree- ment was made with the U.S. Geological Survey (USGS), and subcontracts were let t o state geo- logical surveys, universities, and private firms. All subcontracted investigations are directed and monitored by Bendix.

Of the 116 priority quadrangles to be evaluated before October 1980, 23 are assigned to the USGS, 14 to state geological surveys, 36 to sub- contractors in the private sector, and 43 to Bendix field offices. A total of 18 was completed by the end of 1979 and folios are currently in preparation.

LOCATION AND ASSESSMENT SCHEDULE OF 11 6 QUADRANGLES

Page 15: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Okanogan Quadrangle

Start Date: 3 October 1977 . Completion Date: 14 December 1979

Spokane Field Office The area of responsibility for the Spokane field office encompasses Washington, Oregon, much of Idaho, western Montana, and extreme north- western Wyoming. In 1979 Bendix geologists submitted reports for the Spokane and Sand- point Quadrangles and conducted field work in four other quadrangles. Private subcontractors continued work in nine quadrangles.

Quadrangle Evaluation (BFEC) Sandpoint Quadrangle

Start Date: 3 October 1977 Completion Date: 15 August 1979

The principal targets for investigation included granitic plutons and associated veins of Cre- taceous and Tertiary age, Tertiary fluvial sand- stones that are similar to the host rocks of the Sherwood Mine in the Ritzville Quadrangle t o the southwest, and Precambrian meta-argillites near quartz monzonite intrusives. Field work, delineation of favorable areas, report prepa- ration, and resource evaluation were all com- pleted this year.

Spokane Quadrangle . Start Date: 1 November 1977 . Completion Date: 31 July 1979

Environments evaluated for uranium resources included Precambrian metasedimentary rocks, alaskite-bearing quartz monzonite plutons of Cretaceous age, and Tertiary sedimentary rocks that are interbedded with basalt fissure flows of the Columbia River Plateaus. The investigation was comple ted in late spr ing and a repor t of results was submitted in July. Resource evalua- tion was completed shortly thereafter.

Gneissic domes and associated metamorphic rocks have been the main geologic environments under investigation. Uranium occurrences are found in zones of probable cataclastic defor- mation at contacts between major metamorphic rock types. Secondary targets were Tertiary fluvial and volcanogenic deposits. Field work was completed in August. Compilation and inter- pretation of data have since been finished and the report is in the final stage of preparation.

Ritzville Quadrangle

Start Date: 15 November 1978 Completion Date: 30 April 1980

I n the northeastern part of the quadrangle, uranium is produced from the Midnite Mine, where uraninite occurs in and near the contact of metasedimentary rocks with granitic intrusive rocks. Similar environments are found elsewhere in the quadrangle. Sedimentary rocks inter- bedded with Columbia River basalts also may be favorable for the occurrence of uranium. Field work was completed in October and preparation of a final report is in progress.

Challis Quadrangle

Start Date: 3 October 1977 Completion Date: 29 February 1980

U r a n i u m i s k n o w n t o o c c u r i n t h e l d a h o bathol i th, as wel l as i n Ter t ia ry arkos ic rocks adjacent t o the contac t between t h e Chal l i s Vo lcan ics and t h e batho l i th . These t ypes of occurrences are being sought elsewhere in the quadrangle and the Challis Volcanics are being investigated for uranium potential elsewhere in t h e v o l c a n i c s u c c e s s i o n . F i e l d w o r k w a s completed in October with analysis of data and preparation of a final report now under way.

Klamath Falls Quadrangle . Start Date: 15 November 1978 Completion Date: 30 May 1980

Near Lakeview, Oregon i n the southwestern part of this quadrangle, uranium occurs in Tertiary I a c u s t r i n e s ta ta t h a t a re p a r t l y t u f f a c e o u s . Targets for investigation are rhyol i te intrusive domes and plugs with which the mineralization may be associated. Fie ld invest igat ions were c o m p l e t e d i n N o v e m b e r ; c o m p i l a t i o n a n d analysis of data are in progress.

Page 16: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Quadrangle Evaluation (Subcontractors) Pocatello Quadrangle

Subcontractor: C. S. Robinson 8 Associates, Inc. Subcontract Value: $172,200 Start Date: 1 February 1978 Completion Date: 1 February 1980

In the Pocatello Quadrangle of southern ldaho, uranium reportedly occurs in shales and lignites of the Tertiary Salt Lake Formation. A granitic pluton in the quadrangle may have been the uranium source. I n the Albion Range, where vein-type sulfide deposits with anomalous radio- activity have been reported, metamorphic rocks are of further interest; and the uranium-bearing Permian P h o s p h o r i a F o r m a t i o n m a y h a v e potential for uranium concentrations. Field work and evaluation of results have been completed and preparation of the final report is in progress.

Lewistown Quadrangle

Subcontractor: C. S. Robinson 8 Associates, Inc. Subcontract Value: $172,200 Start Date: 1 February 1978 Completion Date: 1 February 1980

In this north-central Montana quadrangle, favor- able igneous and metamorphic environments, where hydrothermal uranium deposits may occur in veins or in contact-metamorphic zones, include the Judith Mountains, southern Bearpaw Mountains, and the Little Rocky Mountains. The Judith River Formation and Eagle Sanastone of Cretaceous age may be favorable for epigenetic sandstone-type uranium deposits. Both surface and subsurface investigations were completed this year. Preparation of a final report is near completion.

Elk City Quadrangle

Subcontractor: Salisbury 8 Dietz, Inc Subcontract Value: $277.500 Start Date: 1 February 1978 Completion Date: 1 February 1980

Hamilton Quadrangle

Subcontractor: Salisbury 8 Dietz, Inc Subcontract Value: $252,200 Start Date: 1 February 1978 Completion Date: 1 February 1980

Butte Quadrangle

Subcontractor: Salisbury 8 Dietz, Inc Subcontract Value: $210,900 Start Date: 1 February 1978 Completion Date: 1 February 1980

These three contiguous quadrangles lie in parts of ldaho and Montana. Portions of the ldaho batholith are targets for evaluation in all three

quadrangles. Also potentially favorable are sedi- mentary portions of the Challis Volcanics in the Elk City Quadrangle; portions of the Precambrian Belt Series adjacent to the ldaho batholith in the Hamilton Quadrangle; Tertiary sediments that occupy intermontane basins in the Hamilton and Butte Quadrangles; and portions of the Boulder batholith where uranium occurrences are found wi th quartz-sulf ide veins. Field investigations were completed this year for all three quadran- gles. Compilation of results and preparation of final reports are near completion.

Dillon Quadrangle

Subcontractor: GeoExplorers International, Inc. Subcontract Value: $217.500 Start Date: 1 February 1978 Completion Date: 1 February 1980

Dubois Quadrangle

Subcontractor: GeoExplorers International, lnc Subcontract Value: $216,500 Start Date: 1 February 1978 Completion Date: 1 February 1980

Dillon and Dubois are contiguous quadrangles in Montana and ldaho. Tertiary volcanogenic deposits, as well as other Tertiary strata in inter- montane basins, are important targets for inves- tigation in both quadrangles. In addition, veins in Mesozoic and Cenozoic plutons in the Dillon Quadrangle and the thrust-fault contact between Precambrian granite gneiss and the Madison Limestone in the Dubois Quadrangle may be favorable targets. The subcontractor completed field investigations in October and is in the process of analyzing results and preparing final reports.

Bozeman Quadrangle

Subcontractors: University of Montana Montana State University

Subcontract Value: $175.500 Start Date: 1 February 1978 . Completion Date: 1 February 1980

T h e p r i m a r y t a r g e t s f o r u r a n i u m r e s o u r c e evaluation in th is quadrangle are calc-alkal ic intrusives in the Crazy Mountains, silicic intru- sives and tuffs in the Independence mining district, and Tertiary sedimentary rocks in the Three Forks Basin. Selected portions of the Yellowstone volcanics, intrusives in the Cooke City area, and several Precambrian units may also be favorable for uranium. Field investi- gations and compilation of results were com- pleted in October. Preparation of af inal report is under way.

Page 17: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

A Bendix geologist samples an outcrop.

Ashton Quadrangle

Subcontractor: Meiiji Resource Consultants Subcontract Value: $187,900 Start Date: 1 February 1978 Completion Date: 1 February 1980

P r o m i s i n g e n v i r o n m e n t s i n t h e A s h t o n Quadrang le appear to. be po r t i ons of the Permian Phosphoria Formation, particularly the Meade Peak and Retort Shale Members. Other env i ronments ta rge ted fo r s tudy i nc lude channel-type sandstones enclosed by volcanic flows and tuffs of the Yellowstone volcanics and Tertiary strata in the Centennial and Madison River Basins. The subcontractor completed final f i e l d inves t iga t ions and subsequent data compilation and analysis this year and a final report of results is near completion.

Reno Field Office The Reno field office is responsible for Nevada, California, and extreme western Utah and Ari- zona. In 1979 field examinations were conducted in five quadrangles by Bendix geologists, in three quadrangles by the U.S. Geological Sur- vey, in two quadrangles by state surveys, and in two quadrangles by private subcontractors.

Page 18: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Bendix-Albuquerque geologists completed eval- uation of the Kingman Quadrangle; their work is discussed briefly in the Albuquerque section of this report.

Quadrangle Evaluation (BFEC) Death Valley Quadrangle

Start Date: 3 January 1978 Completion Date: 31 January 1980

Millett Quadrangle . Start Date: 3 October 1977 . Cornpietion Date: 31 January 1980

Reno Quadrangle

Start Date: 2 October 1978 Completion Date: 31 May 1980

Salton Sea Quadrangle

Start Date: 2 October 1978 Completion Date: 30 May 1980

Wells Quadrangle

Start Date: 2 October 1978 Completion Date: 30 May 1980

These quadrangles lie largely in the Great Basin. The principal geologic environments under investigation are calderas and associated volca- nogenic rock suites, granitic plutons and meta- morphic complexes intruded by them, and sedimentary deposits that f i l l intermontane basins. Field work was completed this year on all five quadrangles. Data compilation and prepa- ration of final reports are in progress.

Grav i t y S u r v e y o f t h e W e l l s Q u a d r a n g l e , Nevada . Subcontractor: Nevada Bureau of Mines and Geology

Subcontract Value: $14,035 . Start Date: 1 October 1978 Completion Date: 1 March 1980

This survey was performed to provide a gravity map of the Wells Quadrangle which would be useful f o r se lec t ing dr i l l -s i te locat ions and estimating depths of basin fill.

Data from 500 gravity stations were collected and incorporated with data from 1,074 gravity stations previously collected by the Nevada Bureau of Mines and Geology and 376 gravity stations collected by the Department of Defense. All data (1,950 gravity stations) were cross-tied, terrain corrected, and contoured at a scale of 1:250,000.

Results are complete and will be open filed by the Nevada Bureau of Mines and Geology in 1980.

Quadrangle Evaluation (Subcontractors) Elko Quadrangle . Subcontractor: Uranium Services Co . Subcontract Value: $157,900 . Start Date' 1 March 1978

Completion Date: 31 March 1980

Lovelock Quadrangle

Subcontractor: Berge Exploration. Inc. . Subcontract Value: $187,800 Start Date: 1 March 1978 Completion Date: 31 March 1980

McDermitt Quadrangle

Subcontractor: Nevada Bureau of Mines and Geology Subcontract Value: $193,400 Start Date: 1 March 1978 Completion Date: 31 March 1980

These three quadrangles are in the northern Nevada part of the Basin and Range Province where the main targets for evaluation are felsic volcanogenic deposits, tuffaceous sedimentary rocks, and metamorphic complexes associated with granitic intrusions. Basin-fill sedimentary deposits adjacent to favorable source rocks in fault-block mountains are also under investi- gation. Field investigations were completed this year and all three projects are now in the report preparation phase.

Trona Quadrangle . Subcontractor: California Division of Mines and Geology . Subcontract Value: $170,100 Start Date: 14 April 1978 Completion Date: 2 May 1980

The Trona Quadrangle is located in the Mojave Desert in southern California. Tertiary and Qua- ternary strata in basins adjacent to volcanic and pluton~c source rocks are the principal targets be ing investigated. F ie ld invest igat ions were completed at the close of 1979.

Quadrangle Evaluation (USGS) Delta Quadrangle . Start Date: 23 January 1978

Completion Date: 31 January 1980

Numerous uranium occurrences in the Spor Mountain area are associated principally with beryllium-bearing rhyolite flows and ash-flow tuffs. The Yellow Chief uranium mine, i n a fiuvial-sandstone host rock, is also in this quad- rangle. USGS geologists completed field work and data compilation this year and are preparing a final reDort.

Page 19: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Richfield Quadrangle

Start Date: 23 January 1978 Completion Date: 29 February 1980

Uranium has been produced from silicic volcanic rocks in the Marysvale area; similar rock units are found throughout the quadrangle. Paleozoic rocks in the Wah Wah Mountains and Needle Range are also being investigated. Field investi- gations were completed in 1979 and a final report of results is near completion.

Walker Lake Quadrangle

Start Date: 23 January 1978 Completion Date: 31 January 1980

In the western part of this quadrangle, envi- ronments being investigated for uranium favor- ability are paleostream channels cut in granitic rocks of the Sierra Nevada batholith and capped by silicic volcanics. In the eastern section, Tertiary and Quaternary sediments occur in basins adjacent to favorable rock sources. Rock sampling and other field investigations were finished this year. Compilation and evaluation of results are nearly complete and report preps- Geologists check a uranium occurrence in the

ration is in progress. Rawlins Quadrangle.

Casper Field Office The Casper field office is responsible for eval- parts of Idaho, Nebraska, Wisconsin, and Michi- uating uranium favorability in an area encom- gan. During 1979 Bendix geologists from the passing Wyoming; North Dakota; most of Casper office were engaged in resource eval- Montana, South Dakota, and Minnesota; and uation of five quadrangles. The U.S. Geological

Page 20: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Survey continued work on four quadrangles, state surveys on two, and private subcontractors on seven. In addition, geologists from the Bendix Atlanta and Pittsburgh offices were temporarily assigned to investigate three high-priority quad- rangles in North and South Dakota. Work on the Hot Springs Quadrangle is briefly described in the Pittsburgh field office section of this report; work on the Dickinson and Lemmon Quad- rangles is in the Atlanta section.

Quadrangle Evaluation (BFEC) Casper Quadrangle

Start Date: 3 October 1977 Completion Oate: 30 November 1979

Rawllns Quadrangle

Start Oate: 3 October 1977 Completion Date: 29 February 1980

Armlnto Quadrangle

Start Date: 2 October 1978 Completion Date: 31 March 1980

Thermopolis Quadrangle

Start Date: 2 October 1978 Completion Date: 31 March 1980

Lander Quadrangle

Start Date: 2 October 1978 Completion Date: 31 March 1980

In these five Wyoming quadrangles. Laramide uplifts with Precambrian cores and intermontane basins with thick Tertiary sections form the geologic framework. Included are the Wind River. Owl Creek, and Granite Mountains; parts of the Sierra Madre, Medicine Bow, Laramie, and Big Horn Mountains; the Wind River and Hanna Bas ins ; a n d p a r t s o f t h e s h i r l e y . L a r a m i e , Washakie, Great Divide, Big Horn, Powder River, and Green River Basins. Uranium districts lying within these quadrangles are Crooks Gap. Gas Hills. Shirley Basin, and Copper Mountain. Resource evaluation is being concentrated on the sandstone environment, which contains most of the reserves. Other promising environments include quartz-pebble conglomerates and unconformity-related vein deposits. Field work consisted of geochemical sampling, radon sur- veys, and study of known occurrences.

Quadrangle Evaluation (Subcontractors) Ashland Quadrangle

Subcontractor: Derry. Michener & Booth Subcontract Value: $191,700 Start Date: 1 February 1978 Completion Date: 1 February 1980

Rice Lake Quadrangle

Subcontractor: Derry, Michener 8 Booth Subcontract Value: $189.200 Start Oate: 1 February 1978 Completion Date: 1 February 1980

Eau Claire Quadrangle

Subcontractor: Golder Associates, lnc Subcontract Value: $193,700 . Start Date: 1 February 1978 Completion Date: 1 February 1980

Green Bay Quadrangle

Subcontractor: Golder Associates. Inc Subcontract Value: $194,700 Start Date: 1 March 1978 . Completion Date: 1 March 1980

These four Wisconsin quadrangles lie in the southern Canadian Shield. The investigation of potentially favorable environments has been concentrated primarily on Precambrian rocks related to unconformities. Extensive Pleisto- cene glacial deposits complicate evaluation of the sequence of Precambrian and Cambrian units i n bedrock. Almost all the known outcrops were visited and sampled during an intensive field investigation. The field work was completed in 1979 and final reports are in preparation.

St. Cloud Quadrangle

Subcontractor: Minnesota Geological Survey Subcontract Value: $158,700 Start Date: 1 March 1978 Completion Date: 1 March 1980

New Ulm Quadrangle

Subcontractor: Minnesota Geological Survey Subcontract Value: $162.700 Start Date: 1 March 1978 Completion Date: 1 March 1980

Lower and Middle Precambrian rocks, a south- westward extension of the Canadian Shield, under- lie a thin veneer of Cretaceous clastics in the St. Cloud and New Ulm Quadrangles. Unconfor- mlties within the Precambrian section, between the Precambrian and Cretaceous rocks, and, in restricted areas, between the Precambrian and a C a m b r i a n s a n d s t o n e , m a y b e s i m i l a r t o environments in which unconformity-related deposits occur i n Canada and Australia. Soil-gas surveys fo r he l ium and radon const i tu ted a major part of the field program.

Billings Quadrangle . Subcontractor: Morris & Warchola Subcontract Value: $171.900 Start Date: 1 February 1978 . Completion Date: 1 February 1980

Page 21: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Cody Quadrangle

Subcontractor: Garrand Corporation Subcontract Value: $185,400 Start Date: 1 March 1978 Completion Date: 1 March 1980

In these two adjoining quadrangles in south- central Montana and northwestern Wyoming, fluvial sandstones of Jurassic, Cretaceous, and Tertiary age appear to be favorable for uranium. I n t h e Pryor Mounta in d is t r ic t o f the B i l l ings Quadrangle, uranium has been produced from p a l e o k a r s t d e p o s i t s d e v e l o p e d i n t h e M iss iss ipp ian M a d i s o n L imes tone ; s im i la r paleokarst zones i n the Cody Quadrangle are being investigated. Extensive studies of both sandstone and limestone facies were carried out using surface and subsurface information.

Rock Springs Quadrangle

Subcontractor: Morris 8 Warchola Subcontract Value: $159.500 Start Date: 1 February 1978 . Completion Date: 1 February 1980

This quadrangle in southwestern Wyoming in- cludes the Rock Springs uplift and parts of the Green River and Washakie Basins. The poten- tially favorable environments being evaluated are Cretaceous and Tert iary f luvial sands. During 1979 geochemical data, together with

stratigraphic information from outcrops and drill holes, were analyzed.

Quadrangle Evaluation (USGS) In 1979 the USGS, under an interagency agree- ment with DOE, was engaged in uranium re- source evaluation of four quadrangles in the Casper field office region. These quadrangles- Ekalaka. Gillette, Torrington, and Newcastle- encompass the eastern part of the Powder River Basin and the western flank of the Black Hills. Investigations were being concentrated on fluvial and estuarine sands of Cretaceous and Tertiary age. Data from electric and gamma-ray logs were used extensively to locate favorable envi- ronments in the subsurface.

Ekalaka Quadrangle . Start Date: 3 January 1978 Completion Date: 29 February 1980

Gillette Quadrangle

Start Date: 23 January 1978 Completion Date: 31 March 1980

Torrington Quadrangle

Start Date: 30 January 1978 Completion Date: 31 March 1980

Newcastle Quadrangle

Start Date: 1 February 1978 Completion Date: 31 March 1980

Grand Junction Field Office The Grand Junction field office is responsible Dakota, Minnesota, Wisconsin, and Kentucky. In for uranium resource evaluations in Colorado, 1979 Bendix geologists investigated five quad- Kansas, and Iowa; eastern Utah; most of Ne- rangles in diverse geologic settings in Colorado; braska, Missouri, and Illinois; and parts of South work was completed on four of these, with the

Page 22: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

fifth scheduled for completion early in 1980. In addition, one quadrangle in this field region is being evaluated by a state geological survey, four by a subcontractor, and ten by the U.S. Geo- logical Survey.

Quadrangle Evaluation (BFEC) Durango Quadrangle . Start Date: 3 October 1977

Completion Date: 21 January 1980

Montrose Quadrangle . Start Date: 3 October 1977 Completion Date: 21 December 1979

These quadrangles contain a variety of geologic environments favorable for uranium deposits, including caldera systems in the Tertiary vol- canics of the San Juan Mountains, vein systems related to faults and fractures in Precambrian and Paleozoic sedimentary rocks, and sand- stone. Field work consisted of outcrop studies. examination of known occurrences, and geo- chemical and radiometric surveys. Remote areas were reached with the aid of helicopters. Field investigations have been completed and folios are being prepared for publication.

Lamar Quadrangle . Start Date: 3 October 1977 . Completion Date: 30 May 1979

La Junta Quadrangle

Start Dale: 1 April 1978 . Completion Date: 16 March 1979

In these two quadrangles, both of which lie in the Grea t P la ins , c o n t i n e n t a l sands tones i n Pennsylvanian-Permian, Triassic, and Jurassic s e d i m e n t s a r e t h e p r i n c i p a l f a v o r a b l e environments evaluated. A major part of the work on these quadrangles consisted of analyses of subsurface information from drill holes. These studies were completed in 1979 and the folios are being prepared for publication.

Trinidad Quadrangle

Start Date: 2 October 1978 Completion Date: 31 March 1980

Several potentially favorable environments for uranium are found in the Trinidad Quadrangle: Tertiary fill in the San Luis Valley; Precambrian crys ta l l ine and associated Pennsylvanian- Permian arkoses of the Sangre de Cristo Range; and Tertiary fluvial clastics of the Raton Basin and Huerfano Park. Results of outcrop studies and geochemical sampling were analyzed to de- lineate favorable environments.

Quadrangle Evaluation (Subcontractors) Leadville Quadrangle . Subcontractor: Colorado Geological Survey

Subcontract Value: $185,800 Start Date: 1 March 1978 Completion Date: 1 March 1980

Within the Leadville Quadrangle many envi- ronments favorable for uranium are represented, including uplifts of the Colorado Rockies, part of the Piceance Basin, and the Pennsylvanian Belden Formation. Field work consisted of out- crop studies, examination of occurrences, and geochemical and radiometric sampling.

Hutchinson Quadrangle

Subcontractor: Wichita State University Subcontract Value: $149,400 . Start Date: 16 March 1978 Completion Date: 1 March 1980

Manhattan Quadrangle . Subcontractor: Wichita State University Subcontract Value: $114,600 Start Date: 1 March 1978 Completion Date: 1 March 1980

Pratt Quadrangle . Subcontractor: Wichita State University . Subcontract Value: $181,200 Start Date: 1 March 1978 Completion Date: 1 March 1980

Wichita Quadrangle . Subcontractor: Wichita State University . Subcontract Value: $195.800 Start Date: 1 March 1978 Completion Date: 1 March 1980

These four quadrangles, all in Kansas, lie along and to the west of the northern part of the Nemaha Ridge. The north-trending Nemaha Ridge, or anticline, is composed of Precambrian granitic rocks that were the source of clastic sedi- ments deposited during Paleozoic and Mesozoic times. These sediments could contain deposits of uranium derived from granites along the Ridge. Many water wells throughout the area have a high radium content and well logs show sections of anomalous radioactivity. Because most favorable environments are expected to be subsurface, evaluation of these quadrangles was based largely on data from water wells and drill holes.

Quadrangle Evaluation (USGS) Greeley Quadrangle

Start Date: 23 January 1978 . Completion Date: 29 February 1980

Page 23: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Denver Quadrangle . Start Date: 23 January 1978 Completion Date: 29 February 1980

Pueblo Quadrangle . Start Date: 30 January 1978 Completion Date: 29 February 1980

In the eastern part of these quadrangles, the Denver Basin may offer favorable environments for uranium resources in Cretaceous and Ter- tiary fluvial and marine sandstones. In the western part, the Colorado Front Range has potentially favorable environments in vein de- posits and in sandstone facies of Tertiary volca- niclastic sediments.

Geochemical data, together with stratigraphic and radiometric information from outcrop and drill holes, were analyzed this year and final reports are in preparation.

Vernal Quadrangle . Start Date: 23 January 1978 Completion Date: 29 February 1980

Craig Quadrangle . Start Date: 23 January 1978 Completion Date: 29 February 1980

Located in these quadrangles are North Park Basin. Sand Wash Basin, and parts of the Piceance and Uinta Basins. Uplifts include part of the Front Range, the Gore Range, and Uinta Mountains. Geologic environments being eval- uated for uranium favorability are primarily Cre- taceous a n d Ter t i a ry sandstones. These evaluations are based on geochemical studies and facies analyses.

Moab Quadrangle

Start Dale: 23 January 1978 . Completion Date: 30 April 1980

Cortez Quadrangle

Start Date: 23 January 1978 . Completion Date: 30 April 1980

Price Quadrangle

Start Date: 23 January 1978 Completion Date: 30 April 1980

Salina Quadrangle

Start Date: 23 January 1978 . Completion Date: 30 April 1980

Escalante Quadrangle

Start Date: 23 January 1978 . Completion Date: 30 June 1980

These quadrangles contain most of the historic u r a n i u m d i s t r i c t s o f t h e C o l o r a d o P la teau . Cont inental sandstones o f Permian, Triassic. and Jurassic age are the principal targets of i n v e s t i g a t i o n s . T h e g e o c h e m i c a l a n d stratigraphic characteristics of these sandstones are being compared to uranium host rocks in the known uranium districts.

Albuquerque Field Office The Bendix Albuquerque field office is responsi- ble for uranium favorability evaluations in New Mexico, most of Arizona, west Texas, and the Oklahoma Panhandle. During 1979 Bendix geo- logists, state agencies, the U.S. Geological Sur- vey, and private contractors investigated 20 quadrangles in this four-state area.

Personnel in the Albuquerque office were en- gaged in resource evaluation of four Arizona quadrangles, as well as the Kingman Quad- rangle in the Reno field office region. In a joint effort with the Texas Bureau of Economic Geology, Bendix Albuquerque geologists con- tinued studies of three Texas quadrangles. Six quadrangles were investigated by the USGS, two by a New Mexico state agency, and two by subcontractors.

In addition, Bendix geologists from the Pitts- burgh off ice were assigned to investigate two high-priority quadrangles in Arizona. A brief description of their work i n the Grand Canyon and Marble Canyon Quadrangles is contained in the Pittsburgh office section of this report.

Page 24: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Quadrangle Evaluation (BFEC) Kingman Quadrangle

Start Date: 3 October 1977 Completion Date: 1 June 1979

Williams Quadrangle

Start Date: 3 October 1977 Compietion Date: 16 July 1979

Prescott Quadrangle

Start Date: 3 October 1977 Compietion Date: 16 July 1979

In these three quadrangles that lie within the Basin and Range Province, Tertiary basins alternate with fault-block mountains. Precam- brian crystallines, Paleozoic sediments. Cre- taceous granites, and Tertiary volcanics are exposed in the mountains. Part of the Williams Quadrangle also lies within the Colorado Plateau Province, with broad exposures of gently dip- ping Permian rocks. The prime focus of uranium resource evaluation has been on the Tertiary lake sediments in the basins: other possible favorable environments investigated are vein systems in the Precambrian, collapse structures in Paleozoic limestones, and Quaternary cal- cretes in the basins. Evaluation of the basins was based primarily on the study of outcrops and of available drill-hole data. Work was completed in 1979 and fo l ios are being prepared fo r publication.

Mesa Quadrangle

Start Date: 2 October 1978 Completion Date: 31 March 1980

In this quadrangle, which lies partly in the Basin and Range Province and partly in the Colorado Plateau Province, units being investigated for uranium favorability include the Precambrian Dripping Spring Quartzite, Pennsylvanian and Permian sandstones, and Tertiary lake sed- iments. In the 1950s some uranium was pro- duced from the Dripping Spring Quartzite. Field work this year consisted of geochemical Sam- p l ing and study of outcrops and known occurrences.

St. Johns Quadrangle

Start Date: 2 October 1978 Completion Date: 1 March 1980

Investigation of uranium favorability in this quadrangle concentrated on f luvial c last ic sediments in the Triassic Chinle Formation and in the Tertiary Baca Formation, and on marine and m a r g i n a l - m a r i n e sands tones o f t h e

Cretaceous Mesaverde Group. These units are known to contain occurrences of uranium in anomalous quantities. Evaluation of fluvial and marginal-marine sediments was based on facies analyses of surface exposures and driil-hole lithologic information.

Marfa Quadrangle

Presidio Quadrangle

Emory Peak Quadrang!e

Subcontractor: Texas Bureau of Economic Geology Subcontract Value: $171.000 Start Date: 15 August 1978 Completion Date: 15 February 1980

These quadrangles, along the Mexico-U.S. border in the Big Bend region of Texas, are being investigated jointly by theTexas Bureau of Economic Geology and the Bendix Albuquerque field office. Geologists of the Bureau of Eco- nomic Geology are studying Tertiary volcanic and volcaniclastic rocks and Tertiary-Quaternary bolson-fill deposits. Bendix geologists are eval- uating the uranium favorability of Paleozoic. Mesozoic, and Tertiary sediments and of Tertiary igneous intrusives in Cretaceous sediments. Geochemical, radiometric, and stratigraphic infor- mation is being analyzed.

Quadrangle Evaluation (Subcontractors) Raton Quadrangle

Subcontractor: New Mexico Bureau of Mines and Mineral Resources

Subcontract Value: $191.000 Start Date: 1 March 1978 Completion Date: 1 March 1980

Santa Fe Quadrangle

Subcontractor: New Mexico Bureau of Mines and Mineral Resources

Subcontract Value: $191,000 Start Date: 1 March 1978 Completion Date: 31 January 1980

These quadrangles may contain environments favorable for uranium deposits in the Precam- brian crystalline and Permian arkosic rocks of the Sangre de Cristo Range in the Southern Rocky Mountains Province and in Mesozoic sandstones of the Great Plains. Intensive field studies included radiometric and geochemical sampling surveys.

Dalhart Quadrangle

Subcontractor: Consulting Professionals, lnc. Subcontract Value: $146,700 Start Date: 1 February 1978 Completion Date: 29 February 1980

Page 25: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

I n this Great Plains quadrangle, geologic envi- ronments that may be favorable for uranium deposits are fluvial and marginal-marine sand- stones of Triassic, Jurassic, and Cretaceous age. Evaluation of these sandstones was based on both subsurface and surface information.

Tularosa Quadrangle

Subcontractor: Berge Exploration, Inc. . Subcontract Value: $187,M)O Start Date: 1 March 1978 Completion Date: 7 March 1980

This quadrangle in the Basin and Range Pro- vince contains potentially favorable geologic environments that include vein systems asso- c ia ted w i t h fau l t zones a n d f rac tu res i n Precambrian rocks; sandstones of the Pennsyl- vanian. Permian, and Cretaceous; and volcanics of the Tertiary Datil Formation. Results of outcrop studies and geochemical sampling were used t o evaluate these potentially favorable environments.

Quadrangle Evaluation (USGS) Albuquerque Quadrangle

Start Date: 23 January 1978 Completion Date: 31 March 1980

Aztec Quadrangle

Start Date: 23 January 1978 Completion Date: 31 March 1980

Gallup Quadrangle

Start Date: 23 January 1978 Completion Date: 31 March 1980

Shlprock Quadrangle

Start Date: 23 January 1978 Completion Date: 31 March 1980

Almost all of the San Juan Basin lies within these four quadrangles in the Colorado Plateau Pro- vince. The major uranium deposits of the Grants Mineral Belt occur i n the Jurassic sandstones on the south flank of the basin. The Jurassic units are exposed in the Defiance, Zuni, and Naci- miento uplifts that bound the basin. Strati- graphic and geochemical information was used to locate new favorable areas in this well-known uranium-producing basin.

Flagstaff Quadrangle

Start Date: 23 January 1978 Completion Date: 31 January 1980

Part of the Black Mesa Basin, with broad exposures of Triassic and Permian rocks on its

southwest flank, is contained in this quadrangle in the Colorado Plateau Province. Permian, Triassic, Jurassic, and Cretaceous sedimentary formations are the environments potentially favorable for uranium deposits. Stratigraphic information from drill holes and outcrops was used to evaluate rocks in this quadrangle.

Socorro Quadrangle

Start Date: 23 July 1978 Completion Date: 31 January 1980

I n this quadrangle, which is bisected by the Rio Grande trench, sandstones of Permian, Triassic, and Tertiary age are the principal favorable environments. The geochemical and strati- graphic character of these sandstones was intensively studied.

Austin Field Office The Austin field office is responsible for uranium favorability evaluations in a region that com- prises Arkansas. Louisiana, and Mississippi; central and eastern Texas; all of Oklahoma except the Panhandle; western Tennessee; and minor portions of southern Missouri and south- western Kentucky. During 1979 Bendix geol- ogists in the Austin office conducted studies in eight quadrangles, completing the investigation

Page 26: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

of three. The final report for one of these, the Plainview Quadrangle, was placed on open file i n March. Designated GJQ-001(79), it is the first fol io to be published for the NURE program. State surveys continued work on seven quad- rangles and subcontractors worked on five.

Quadrangle Evaluation (BFEC) Plainview Quadrangle

Start Date: 3 October 1977 . Completion Date: 31 January 1979

I n this High Plains quadrangle, units inves- tigated for uranium favorability include the Permo-Pennsylvanian granite wash and asso- ciated clastics, whose source was the Wichita Mountains to the northeast; the Triassic Dockum Group, which is considered equivalent t o the Chinle Formation of the Colorado Plateau; the Pliocene Ogallala Formation, which may contain calcrete-type deposits; and the Pleistocene Tule Formation. Uranium deposits are known in the Dockum Group, and radioactive anomalies occur in the Permo-Pennsylvanian units and in the Ogallala Formation. Work has been completed on this quadrangle and the final report, GJQ- 001(79), was published in March 1979.

Seguin Quadrangle

Start Date: 3 October 1977 Completion Date: 29 June 1979

Crystal City Quadrangle . Start Date: 1 November 1977 Completion Date: 30 July 1979

Austin Quadrangle . Start Date: 1 March 1978 . Completion Date: 31 January 1980

Laredo Quadrangle

Start Date: 1 November 1978 . Completion Date: 30 May 1980

Beeville Quadrangle

Start Date: 2 October 1978 Completion Date: 30 April 1980

Beaumont Quadrangle

Start Date: 1 November 1978 Completion Date: 30 May 1980

San Antonio Quadrangle

Start Date: 1 August 1979 Completion Date: 31 May 1981

Sediments ranging from Cretaceous to Recent underlie these seven quadrangles in the Texas Coastal Plain. Older rocks are in the north and west, younger rocks in the south and east along the coast. Uranium deposits in the south Texas uranium district occur in formations of Miocene

age. Eocene units in this area are also being investigated for uranium favorability. Electric logs are being examined t o determine the lithologic characteristics of the various rock units. Samples have been collected from out- crops of known uranium producing units. Work was completed on the Seguin and Crystal City Quadrangles. Field work was completed on all other quadrangles except San Antonio, which was started late in the year.

An open-file report on the Catahoula Formation. GJBX-131(79), was released in October 1979. It describes detailed geochemical and hydrologic characterist ics of uranium deposits i n th is formation.

Quadrangle Evaluation (Subcontractors) Palestine Quadrangle

Subcontractor: Texas Bureau of Economic Geology Subcontract Value: $165,300 Start Date: 31 March 1978 Completion Date: 31 March 1980

This quadrangle in the Texas Coastal Plain is underlain by sediments ranging in age from Cre- taceous to Recent. Faulting may be significant to the localization of uranium deposits. Lithology of the various rock units was investigated using both electric-log studies and field examinations. Field work was completed in December.

Amarillo Quadrangle

Subcontractor: Texas Bureau of Economic Geology Subcontract Value: $176.700 Start Date: 31 March 1978 Completion Date: 31 March 1980

Lubbock Quadrangle

Subcontractor: Texas Bureau of Economic Geology Subcontract Value: $172.600 Start Date: 31 March 1978 . Completion Date: 31 March 1980

These two quadrangles in theTexas High Plains are underlain by sedimentary rocks of Pennsyl- vanian to Pleistocene age. As in the Plainview Quadrangle, targets for uranium favorability i n v e s t i g a t i o n s a r e t h e P e r m o - Pennsylvanian granite wash and associated c last ics, the Tr iassic Dockum Group, t h e Pliocene Ogallala Formation, and the Pleis- tocene Tule Formation. Bureau personnel ex- amined electric logs and did field work during the year. Field work was completed in December.

Wichita Falls Quadrangle

Subcontractor: Texas Bureau of Economic Geology Subcontract Value: $177.000 Start Date: 31 March 1978 Completion Date: 31 March 1980

Page 27: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Sherman Quadrangle Joplin Quadrangle . Subcontractor: Texas Bureau of Economic Geology Subcontract Value: $175.300 Start Date: 31 March 1978 . Completion Date: 31 March 1980

Pennsylvanian and Permian sediments, includ- ing granite wash from the Wichita-Arbuckle Mountains, are targets for uranium resource eval- uation in both thesequadrangles. Granites in the Wichita-Arbuckle structure constitute an ade- quate source of uranium and the coarser clastics may form a suitable host for uranium deposits. Both field work and subsurface geologic studies were required in these quadrangles. Data gathering was completed in December.

Lawton Quadrangle

Start Date: 1 March 1978 Completion Date: 1 March 1980

Oklahoma City Quadrangle . Subcontractor: Geological Services of Tulsa Subcontract Value: $169,000 . Start Date: 16 March 1978 Completion Date: 16 March 1980

These two quadrangles in Oklahoma and Texas lie on the north flank of the Wichita-Arbuckle Mountain structure and in the Anadarko Basin. The units being investigated for uranium favor- ability are sediments, including granite wash, from the Wichita-Arbuckle positive area. Gran- ites in the structure constitute an adequate source of uranium, and granite wash in the sedi- ments may be favorable for uranium deposits. The Lawton Quadrangle includes the Wichita Mountains, which contain several radioactive occurrences that may be related to uranium deposits. Outcrops were examined and samples were collected and analyzed during the year.

Clinton Quadrangle

Subcontractor: Oklahoma Geological Survey . Subcontract Value: $169.000 Start Date: 1 March 1978 Completion Date: 1 March 1980

Enid Quadrangle

. Subcontractor: Geological Services of Tulsa Subcontract Value: $169.400 . Start Date: 16 March 1978 . Completion Date: 16 March 1980

TheClinton and Enid Quadrangles lie across the southern end of the north-trending Nemaha Ridge; the Joplin Quadrangle overlies part of the eastern flank of the Ridge. The Nemaha Ridge, or anticline, consists of Precambrian granitic rocks that were the source for sediments de- posited during Paleozoic and Mesozoic time. These sediments may contain uranium derived from the Nernaha granites. Many water wells in the area contain high amounts of radium and some well logs show anomalous radioactivity. Well logs were studied during the year and field work was conducted.

Dyersburg Quadrangle . Subcontractor: Geochemex . Subcontract Value: $121.800 Start Date: 1 March 1978 Completion Date: 1 March 1980

Poplar Bluff Quadrangle . Subcontractor: Geochemex Subcontract Value: $121,800 . Start Date: 1 March 1978 Completion Date: 1 March 1980

These quadrangles, which include parts of Missouri, Tennessee, and Kentucky, are under- lain by the Ozark Uplift, Nashville Dome, and Mississippi Embayment. Primary targets for uranium resource evaluation are carbonatites and the granites and pegmatites of the basement. Base metals have been mined for many years from the basement rocks and the overlying Paleozoic limestones and dolomites. Secondary targets f o r u ran ium invest igat ion are the Cretaceous and younger sediments of the Mississippi Embayment, which may have favor- able environments similar to those of the Texas Coastal Plain. Geologic cross sections. which will be important on these projects, were con- structed during the year. Field work included logging of a number of water wells.

S.ocon.raclo' O r anoma Gco oq ca S:.e, S~oconrracr Va *e $169 000 . Start Date: 1 March 1978 Completion Date: 1 March 1980

Page 28: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Atlanta Field Office The Bendix Atlanta field office is responsible for uranium favorability evaluations in North Caro- lina, South Carolina, Georgia, Alabama, and Florida; central and eastern Tennessee; and the southern parts of Kentucky, Virginia, and West Virginia. In 1979 Bendix geologists completed their investigations of three quadrangles and began literature search on a fourth, prior to full- scale field work during the 1980 field season. I n addition, several Bendix Atlanta geologists were assigned to investigate the high-priority Dickin- son and Lemmon Quadrangles in the Casper field office region. Subcontracted work con- tinued on one quadrangle.

Quadrangle Evaluation (BFEC) Athens Quadrangle . Start Date: 18 November 1977

Completion Date: 1 January 1979

Spartanburg Quadrangle

Start Date: 3 October 1977 Completion Date: 31 May 1979

Greensboro Quadrangle

Start Date: 19 October 1977 . Completion Date: 1 August 1g70

The Piedmont Province, which includes the greater part of these quadrangles, is composed of Precambrian and Lower Paleozoic metased- iments intruded by various granitic plutons. These plutons are the major targets for uranium resource investigations. Other potentially favor- able environments for uranium deposits are the Danville, Durham, and Sanford Triassic basins, which underlie parts of the Greensboro and Spartanburg Quadrangles. Field work consisted of data gathering and sample collection. One radon emission survey was performed. Work on these quadrangles was completed in 1979 and folios are now in preparation.

Raleigh Quadrangle

Start Date: 1 November 1979 Completion Date: 31 October 1981

Triassic rocks in the Wadesboro Basin constitute the predominant target for uranium resource evaluation in this quadrangle. Other targets include Paleozoic granites and possible roll-type deposits i n the Coastal Plain. Work in 1979 con- sisted of a literature survey in preparation for the 1980 field season.

Dickinson Quadrangle

Start Date: 2 October 1978 Completion Date: 31 May 1980

Lemmon Quadrangle

Start Date: 2 October 1978 Completion Date: 31 May 1980

Uranium resource evaluation of these two quad- rangles in North and South Dakota was con- ducted by geologists of the Bendix Atlanta field office. Both quadrangles are underlain by Cre- taceous and Paleocene siltstones, sandstones, and lignites. Uranium deposits are known in sandstones and lignites; uranium has been produced commercially from lignites in the vicinity of Belfield, North Dakota. Field investi- gations consisted of outcrop examination and sample collection and included 2,500 miles (4,023 kilometers) of car-borne scintillometer traverses. Field work was completed during 1979 and electric log study and folio compilation have begun.

Quadrangle Evaluation (Subcontractor) Augusta Quadrangle

Subcontractor: Carolina Geosciences Corp. Subcontract Value: $168.600 Start Date: 20 March 1978 Completion Date: 31 March 1980

Page 29: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Ninety-five percent of this quadrangle lies in the Coastal Plain, with the northwestern five percent in the Piedmont Province. In the Coastal Plain, roll-front uranium deposits may occur in Cre- taceous sediments; in the Piedmont, Paleozoic fault zones and associated crystalline rocks are being investigated for uranium favorability. Field work consisting of outcrop examination, sample collection, and emanometry surveys was com- pleted in 1979.

Pittsburgh Field Office Uranium resource evaluations in the entire north- eastern section of the United States are the responsibility of the Pittsburgh field office. In 1979 Bendix geologists completed the investi- gation of three quadrangles in the Pennsylvania- New York-New Jersey area and a subcontractor continued work on two quadrangles in New England. In addition, geologists from the Pitts- burgh off ice conducted uranium favorability studies in three high-priority quadrangles in the western United States: Pittsburgh personnel worked on the Hot Springs Quadrangle in the Casper field region, and on the Marble Canyon and Grand Canyon Quadrangles in the Albu- querque region.

Quadrangle Evaluation (BFEC) Harrisburg Quadrangle

Start Date: 1 November 1977 Completion Date: 1 November 1979

Scranton Quadrangle

Start Date: 1 November 1977 Completion Date: 30 April 1979

Williamspori Quadrangle

Start Date: 1 November 1977 Completion Date: 31 December 1979

Targets for uranium investigation in these three quadrangles are the Catskill Formation and the Mauch Chunk Formation, which have long been

Page 30: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Working in the Hot Springs Quadrangle near Pringle, South Dakota Bendix geologists examine an outcrop at a radiometric anomaly found by detailed aerial survey.

known to contain significant uranium deposits, and Precambrian metamorphics of the Reading Prong. All geologic units were investigated, outcrops examined, and samples collected for petrologic and chemical analysis. Electric logs were used for interpretation of geologic con- ditions in the Williamsport Quadrangle. Field studies were completed during 1979 and folio compilation has begun.

Hot Springs Quadrangle

Start Date: 20 November 1978 Completion Date: 31 May 1980

Upper Cretaceous and Lower Tertiary sediments underlie most of this Dakota Badlands quad- rangle. The Black Hills-intrusive crystallines surrounded by Paleozoic and Mesozoic sedi- ments-are in the northwest quarter. The Edge- mont,South Dakota uranium district, which was active in the 1950s, is also in this quadrangle. Resource evaluation has been assigned to geol- ogists from the Bendix Pittsburgh' office who examined outcrops in all parts of the project area

and collected samples for petrologic and chemi- cal analysis. A helicopter was used for a radio- metric reconnaissance of the intrusive rocks. Field work was completed during 1979 and folio compilation has begun.

Grand Canyon Quadrangle

Start Dale: 1 November 1978 Completion Date: 29 February 1980

Marble Canyon Quadrangle . Start Date: 1 November 1978 Completion Date: 29 February 1980

In these two high-priority quadrangles in Ari- zona, environments being assessed by Bendix Pittsburgh geologists are primarily in Paleozoic and Mesozoic sediments that are known host rocks for a number of deposits, some of which have had major production. Field investigations consisted of outcrop examination and sample collection for petrologic and chemical analysis. A helicopter was used for radiometric survey of areas thought to be favorable for the occurrence

Page 31: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

of uranium deposits and for access to remote In these two quadrangles, which include por- areas. Field work was completed during 1979 tions of New York, Vermont. New Hampshire. and folio compilation has begun. and Maine, the underlying rocks range from the

Adirondack structural front on the west to the Quadrangle Evaluation (Subcontractors) various plutons of Maine on the east. Uranium

Glens Falls Quadranale concentrations have been reported in basement - . Subcontractor: Chiasma Consultants. Inc. Subcontract Value: $143,700 Start Date: 9 February 1978 . Complet~on Date: 9 February 1980

rocks of the Adirondack Mountains and the Green Mountains anticlinorium. Plutons in New Hampshire and Maine are known to contain radioactive dikes and areas of radioactive coun- try rock. Other possible favorable environments

Portland Quadrangle being investigated are Lower Paleozoic sed- . Subcontractor: Chiasma Consultants, Inc. iments, where the uranium source may have . Subcontract Value: $143.700 been fluids from the underlying plutons. The Start Date: 9 February 1978 subcontractor's field crews examined outcrops Completion Date: 9 February 1980

and collected samples for petrologic and chemi- cal analysis.

9 ,

-'+-

Anchorage Field Office The area of responsibility of the Anchorage field office is the entire state of Alaska. During 1979 Bendix geologists conducted uranium favor- ability investigations of two quadrangles and served as monitors for subcontracted investi- gations of eight additional quadrangles.

Quadrangle Evaluation (BFEC) Dixon Entrance Quadrangle

Start Date: 1 March 1978 . Completion Date: 31 March 1980

In this quadrangle, uranium has been mined at Bokan Mountain on Prince of Wales Island. Similar geologic environments are being sought and the Precambrian Wales Group metamorphic complex is being investigated for possible vein- type uranium occurrences. Field investigations were finished in the summer. Data were com- piled and evaluated by year's end and the final report of results is near completion.

Kenai Quadrangle

Start Date: 1 December 1978 Completion Date: 31 December 1980

Land areas in the Kenai Quadrangle lie on opposite sides of Cook Inlet. The focus of the investigation is on Mesozoic plutonic and volca- nogenic rocks in the Alaska-Aleutian Range and on continental sedimentary deposits that make up the Tertiary Kenai Group. Preliminary field investigations were completed during the sum- mer and followup work will begin early in 1980.

Quadrangle Evaluation (Subcontractors) Mt. McKinley Quadrangle . Subcontractor: C. C. Hawley & Associates. Inc

Subcontract Value: $179.900 Start Date: 11 April 1978 . Completion Date: 31 July 1979

Talkeetna Quadrangle . Subcontractor: C. C. Hawley & Associates. Inc. . Subcontract Value: $179,900 Start Date: 11 April 1978 . Completion Date: 31 July 1979

Tyonek Quadrangle . Subcontractor: C. C. Hawley & Associates. Inc Subcontract Value: $179,900 Start Date: 11 April 1978 . Completion Date: 31 July 1979

Page 32: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Lime Hills Quadrangle

Subcontractor: C. C. Hawley 8 Associates. Inc. Subcontract Value: 0180,WO . Start Date: 1 1 April 1978 Completion Date: 31 July 1979

These quadrangles encompass part of the south- ern Alaska Range and adjoining lowlands, includ- ing the northern part of Cook Inlet. Targets that appear to be favorable for uranium are granitic plutons, felsic volcanogenic rocks, fluvial sand- stones, and schists. Final folios and resource evaluation were completed by mid 1979 on these four quadrangles.

Circle Quadrangle

Subcontractor: C. C. Hawley 8 Associates. Inc. Subcontract Value: $219,624 Start Date: 14 May 1979 Completion Date: 31 May 1980

Charley River Quadrangle

Subcontractor: C. C. Hawley 8 Associates. Inc. Subcontract Value: $219.624 Start Date: 14 May 1979 Completion Date: 31 May 1980

Black River Quadrangle Subcontractor: C. C. Hawley 8 Associates. Inc. Subcontract Value: $219.624 Start Date: 14 May 1979 Completion Date: 31 May 1980

Coleen Quadrangle

Subcontractor: C. C. Hawley 8 Associates. Inc. Subcontract Value: $219.624 Start Date: 14 May 1979 Completion Date: 31 May 1980

These four quadrangles are in the upper Yukon area of Alaska near the Canadian Border. Granitic plutons of Tertiary age, which are best exposed in the Circle Quadrangle and with which an important uranium deposit is asso- ciated in the adjacent Livengood Quadrangle, are the principal rocks under investigation. Addi- tional targets include granitic plutons of Pre- cambrian and Paleozoic ages, sedimentary rocks of Paleozoic and Cenozoic ages, and unconfor- m i t i e s f o u n d i n t h e Pa leozo ic -Cenozo ic sedimentary sequence. Field investigations were completed in September, compilation and inter- pretation of results were finished at the end of the year, and report preparation is in progress.

Quadrangle Assessment Quadrangle assessment uses the results of geologic evaluation to determine the potential uranium resources of each favorable area in

terms of estimated tons and average grade of U,Oe. The NURE program imposes two assess- ment requirements: estimation of the uranium endowment and estimation of the potential uranium resources of a favorable area. The endowment is the total quantity of uranium pos- tulated to exist in concentrations exceeding 100 ppm GOe. Potential uranium resources are those portions of the endowment estimated to be recoverable at selected forward costs, presently established at $30, $50, and $100 per pound of u a .

The resource assessment methodology em- ployed by Bendix requires comparison of areas to be assessed with control areas that have k n o w n minera l iza t ion, usua l ly p r o d u c i n g uranium districts. Estimation of endowment is accomplished by analogy: the favorable area is assumed to contain the same quantity of uran- ium per unit area, volume, or length as does the control area, subject to modification by factors provided by the field geologist. The potential resources are determined by assuming that the favorable area has the same grade-tonnage dis- tribution as the control area.

A classification of uranium deposits provides the framework for selecting control areas and mak- ing comparisons. Consistency and uniformity in geologic interpretation are essential. Preliminary report GJBX-32(79), Preliminary Recognition Criteria for Uranium Occurrences; A Field Guide was issued in 1979. This document is a consoli- dation of GJBX-63(78) and GJBX-67(78). I t provides a checklist of the types of information essential to the complete description of favorable environments, and is intended to help the field geologists make standardized classification assignments by comparing the characteristics of favorable areas with those of known uranium- producing areas.

Bendix performs the quadrangle assessments, except for those areas involving company- confidential information; these are assessed by DOE geologists. Final products of the assess- ments will be released in future NURE reDorts.

During 1979 assessments were completed for 26 quadrangles. Of these, 18 were part of the 116 quadrangles designated as high priority. These 18 are Athens, Crystal City. Greensboro. King- man, La Junta, Lamar, Lime Hills, Mt. McKinley, Plainview, Prescott, Sandpoint, Scranton, Se- guin. Spartanburg, Spokane, Talkeetna. Tyonek, and Williams. Eight quadrangles from the Seward-

Page 33: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Selawik Peninsula of Alaska were also assessed: Bendeleben. Candle, Kotzebue. Nome, Selawik, Shishmaref, Solomon, and Teller.

NURE Geostatistical Evaluation Study

Subcontractor: Terradata Subcontract Value: $70.633 Start Date: 18 July 1979 Completion Date: 4 January 1980

This geostatistical consulting firm is examining the current assessment methodology from a sta- tistical viewpoint and has made recommen- dations for minor modifications. An in-depth study of control-area parameters is in progress to provide a population data set for control areas.

Improved Appraisal System for UaOe Endowment

Subcontractor: University of Arizona Subcontract Value: $288,813 Start Date: 18 January 1977 . Completion Date: 29 Februrary 1980

The purpose of this project is to develop an improved methodology for the appraisal of U308 endowment as a function of the information level and geologic variables of a given area. Experts will exchange information and hypothesis via interactive computer terminals. The computer is programmed to force an appraisal using a decision-tree process.

The appraisal system is in the final stages of development and is currently undergoing testing.

Work Statement for Preparation of Uranium Deposit Occurrence Models

Subcontractor: Samuel S. Adams & Associates Subcontract Value: $354.700 Start Date: 2 April 1979 Completion Date: 30 September 1980

The objective of this project is to develop des- criptive models of six major types of uranium deposits and to provide professional geologic services related to occurrence models and re- source assessment methodology.

Tne subcontractor will develop geologic models for each of the following types of uranium deposits: (1) sandstone-epigenetic carbona- ceous material exemplified by the "primary" deposits of the Morrison Formation. San Juan Basin. New Mexico; (2) sandstone-roll front exemplified by the deposits of the Gas Hills, Shirley Basin, and Powder River Basin districts; (3) sandstone-detrital carbonaceous material exempl i f ied by deposi ts i n the Sal t Wash Member of the Morrison Formation and in the

Date Creek d is t r i c t , western Ar izona; ( 4 ) sandstone-gaseous reductants exemplified by the deposits of the Texas Coastal Plain; (5) quartz-pebble conglomerates exemplified by the Blind River, Canada, and the Witwatersrand. South Africa districts; and (6) unconformity- re lated vein deposi ts exemp l i f i ed by t h e Athabaska, Saskatchewan, and Alligator Rivers, Australia districts.

Related to the prime objective of providing models of six types of uranium occurrences is an additional requirement for professional geologi- cal services by the principal investigator. These additional services will serve to fully coordinate the modeling concepts with the USGS (Denver, Colorado and Reston, Virginia), DOE-Bendix (Grand Junction, Colorado), and with Dr. DeVerle Harris, University of Arizona (Tucson, Arizona) for validation work on the San Juan Basin model.

Potential Supply Systems Subcontractor: University of Arizona Subcontract Value: $317.106 . Star! Date: 18 September 1978 Completion Date: October 1980

The objective of this study is development of a model for uranium resource assessment that integrates geologic favorability data with mining and processing factors. This economic and engineering analysis of uranium exploration and exploitation should provide the capability of examining the effects of cost fluctuations and technological advances on potential supply.

Supply Analysis System Subcontractor: Dames & Moore Subcontract Value: $783,770 . Start Date: 20 February 1979 Completion Date: 13 May 1980

Under this contract, Dames and Moore, along with its subcontractors International Energy Associates and Colorado School of Mines, will develop an integrated computerized system for long-term analysis of domestic U,Os supply. This system will be used by DOE to rapidly eval- uate thousands of mineral properties, to allocate resources to more and larger production centers than presently exist, to schedule multilevel pro- duction plans, and to perform functional eco- nomic analyses.

The system is needed to facilitate frequent and reliable responses to new U308 demand projec- tions as impacted by updated ore reserve and potential resourceestimates, changes in the economic climate, and evolving environmental and institutional constraints.

Page 34: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Aerial Fiadiometric Reconnaissance and Detail Surveys The Aerial Radiometric Reconnaissance program the aerial reconnaissance program. The map has two principal objectives in support of NURE: presented below shows the areas completed and (1) to acquire surface gamma radiation data for in progress. the DOE-directed uranium resource evaluation effort, and (2) to rapidly identify broad source In 1979 contracts were signed for 11 projects

regions of highest uranium favorability to help and 58 GJBX reports on 112 quadrangles were

industry's U.S. exploration effort. open filed. Approximately 190,000 l ine miles (306,000 kilometers) were flown during 1979 in

In accomplishing these objectives, the aerial reconnaissance surveys. reconnaissance program will survey all states except Hawaii and fly about 1.24 million flight- line miles (2 million flight-line kilometers) with line spacing ranging from 1 to 12 miles (1.6 to 19.3 kilometers).

The Aerial Radiometric Reconnaissance program was initiated in 1974 and funded in 1975 at a level of $1 million. In 1979 the reconnaissance and detail program expanded to an $8-million effort.

At the end of 1979 more than 780.000 line miles (1,255.000 kilometers) of reconnaissance survey and 70,000 l ine miles (112,700 kilometers) of detail survey have been completed; this repre- sents nearly two-thirds of the flying portion of

A program, to perform detail surveys with line spacing as close as 114 mile (0.40 kilometer) that began in 1978, was continued. Detail surveys were car r ied ou t i n n ine areas wh ich were selected on the basis of favorable geology, known occurrences, or other selective criteria. Approximately 48,000 line miles (77,000 kilo- meters) of detail surveys were completed. One detail survey, the Gillette project, was open filed as GJBX-112(79).

During 1979 seven rotary-wing and three fixed- wing systems, belonging to seven different sub- contractors, were used in the aerial radiometric surveys. To ensure that each airborne system

STATUS OF THE AERIAL RADIOMETRIC RECONNAISSANCE SURVEYS

a ~ly inp in prcgrebr

1 -Flying complete

I Complsle quad data own filed

Page 35: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

All the detailsurvey flying cornpletedduring 1979

and resulting reduced data met surveying speci- fications, a system qualification program that began in 1977 continued. This evaluation program has resulted in improvements in establishing system parameters and better re- duced data. A long-term goal is a common data reduction scheme for all subcontractors.

A program of magnetic data tape quality control began in 1979. This program requires all subcon- tractors to submit data tapes which contain radio- metric and magnetic data in a common format and to analyze the tapes for correctness and completeness.

Northeast WashingtonlMcDermitt Rotary-WinglDetail Survey

Subcontractor: LKB Resources. Inc. Subcontract Value: 51,098,000 Start Date: 25 July 1979 Completion Date: 19 July 1980 . Line Miles: 21.127 (33.994 kilometers) Aircraft: Sikorsky S-58T

On September 1. 1979 flying began on a 9,105 line-mile (14.650 kilometer) detail survey cover- ing eight areas near Spokane, Washington; fly- ing was completed on November 14. 1979. On November 16. 1979 flying began on the McDer- mittlsteens Mountain 13.170-mile (21.191 kilo- meter) survey in Nevada and Oregon and is scheduled to be completed early in 1980.

used helicopters

Northeast Washington Rotary-Wing Survey

Subcontractor: LKB Resources. Inc. Subcontract Value: $652,731 Start Date: 10 August 1977 Completion Date: 31 January 1979 Line Miles: 14,754 (23.739 kilometers) Aircraft: Sikorsky S-58T

Flying on this survey was conducted between August 10. 1977 and October 3, 1977. An open- file report for the Spokane Quadrangle was released in 1978. The Okanogan and Sandpoint reports were released as GJBX-142(79).

Sweetgrass Rotary-Wing1 Fixed-Wing Survey . Subcontractor: Texas Instruments. Inc.

Subcontract Value: $945.054 Start Date: 20 June 1978 Complet!on Date: 3 October 1979 Line Miles: 29.210 (46.999 kilometers) Aircraft: Sikorsky S-58T and DC-3

The Sweetgrass survey was described in last year's report. Flying on this survey was con- ducted between July 31,1978and September 28, 1978. Areas covered by this survey are Shelby, Great Falls, iewistown, Butte. Choteau, Havre, and Cut Bank Quadrangles in Montana; Twin Falls and Pocatello Quadrangles in Idaho; Ritzviile Quadrangle in Washington; Hot Springs

Page 36: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Quadrangle in South Dakota; and St. Johns Quadrangle in Arizona and New Mexico. Open- fi le reports for these quadrangles were released as GJBX-126(79).

ldaho Rotary-Wing Airborne Survey Subcontractor: geoMetrics. Inc. Subcontract Value: $581,000 Start Date: 13 June 1979 Completion Date: 8 April 1980 Line Miles: 20,325 (32,723 kilometers) . Aircraft: Lama

Flying began on July 4. 1979 and was completed October 8, 1979.

Areas covered by this survey were the Boise, Hailey, ldaho Falls, Rapid City, Elk City, Salt Lake City, and Ogden Quadrangles.

The Boise, Hailey, ldaho Falls, and Elk City Quadrangles will be open filed early in 1980; and open fi l ing of the Rapid City, Salt Lake City, and Ogden Quadrangles will follow later in 1980.

RenoISnake River Basin Rotary-Wing Survey

Subcontractor: Geo-Life, Inc. DOE/SBA Contract Start Date: 11 March 1977 Completion Date: 30 June 1979 Line Miles: 84.629 (136,168 kilometers) Aircraft: Sikorsky S-58T and Lama

The subcontractor for this survey was a joint venture between High Life Helicopters, Inc., and Geodata International, Inc. The subcontract was handled by DOEISmall Business Administration (SBA), with technical monitoring by Bendix.

Twenty-seven quadrangles were f lown; four open f i led i n 1978, twenty in 1979, and the remaining three will be open filed in 1980. The 20 quadrangles open filed in 1979 were: Winne- m u c c a a s G J B X - 2 1 ( 7 9 ) ; G o l d f i e l d as GJBX-66(79); Tularosa as GJBX-67(79); Tono- pah as GJBX-104(79); Needles as GJBX-l14(79); L i t t l e R o c k as GJBX-115(79) ; P r i c e as GJBX-117(79) ; Tooe le as GJBX-118(79); B r i g h a m C i t y as GJBX-124(79) ; Vya as GJBX-136(79); Wells as GJBX-137(79); Millett as GJBX-154(79); Challis as GJBX-156(79); Elko as GJBX-159(79); Richfield as GJBX-161(79); Socorro as GJBX-163(79); Death Valley as GJBX-164(79); Vernal as GJBX-167(79); McDermitt as GJBX-168(79); and McAlester as GJBX-174(79).

High LifeISBA Rotary-Wing Survey . Subcontractor: High Life Helicopters. Inc. DOEISBA Contract . Start Dale: 1 October 1978 . Completion Date: 28 February 1980 Line Miles: 66,069 (106,306 kilometers) Aircraft: Lama

This project is in the fourth year of a DOEISBA contract with technical monitoring by Bendix.

The areas assigned in 1979 are for recon- naissance surveys on the Gadsden. Birmingham, Ely. Lund, Mariposa, Fresno, Bakersfield, San Jose, San Francisco, Santa Cruz, San Luis Obispo, San Bernardino. Los Angeles, Santa Maria, Santa Ana, and San Diego Quadrangles, total ing 38.666 miles (62,226 kilometers) o f reconnaissance flying. Detailed surveys were assigned fo r parts o f the Prescott, Marfa. Presidio, Fort Stockton, Sonora, Del Rio, Marble Canyon, Escalante, Flagstaff, Durango, and Rawlins Quadrangles, totaling 27,403 line miles (44,100 kilometers).

Data for Gadsden and Birmingham will be open filed in early 1980 and data for the remaining areas will be open filed at intervals during 1980.

Marysvale Rotary-Wing Survey . Subcontractor: Geo-Life, Inc. DOE/SBA Contract Start Date- 31 May 1978 Completton Date: 31 December 1979 Line Miles: 3,882 (6,246 kilometers) . Aircraft: Lama

Flying on the Marysvale detail survey in the Richfield Quadrangle, Utah began in October 1978, terminated in November 1978 due to snow in the survey area, and was completed in Sep- tember 1979. Results of the survey will be open filed in 1980.

Powder River II Rotary-Wing/ Fixed-Wing Survey

Subcontractor: geoMetrics. Inc. Subcontract Value: $339.000 Start Date: 28 June 1978 Completion Date: 1 October 1979 Line Miles: 17.466 (28.103 kilometers) Aircraft: Lama and Grumman 5-2

This survey covers the Ekalaka, Gillette, New- castle, Torrington, and Casper Quadrangles in Wyoming and Montana. Flying on this survey was conducted between August 12, 1978 and September 28. 1978. Data on the Casper Quad- rangle were integrated with earlier data covering a portion of thequadrangle that were acquired by

Page 37: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Texas Instruments in 1975 and reported under GJO-1631-1.

Reports for Ekalaka. Gillette, and Newcastle were released as GJBX-82(79). The Casper and Torrington Quadrangles were open filed as GJBX-l58(79).

Gillette Detail Airborne Survey . Subcontractor: geoMetrics. Inc. Subcontract Value: $21.287 Start Date: 28 June 1978 Completion Date: 14 May 1979 Line Miles: 810 (1,303 kilometers) . Aircraft: Lama

This survey was described in the 1978 report and covers the Bear Lodge Mountains over portions of the Devil's Tower, Alva, Nefsy, and Sundance 15-minute Quadrangles in northeastern Wyo- ming. A 1/4-mile (0.40 kilometer) grid, both north-south and east-west, was flown between August 12.1978 and August 22.1978. This report was released as GJBX-112(79).

Minnesota Fixed-Wing Survey Subcontractor. geoMetrlcs. Inc. Subcontract Value 5283.000 Start Date: 7 May 1979 Completion Date: 3 March 1980 Line Miles: 14,922 (24,024 kilometers) Aircraft: B-65 Oueenaire

Flying began August 1,1979 and was completed on September 22, 1979.

This survey includes the St. Cloud, New Ulm, Watertown, Sault Sainte Marie, Blind River, Escanaba. Cheboygan. Alpena, Milbank, Fargo, Grand Forks, and Thief River Falls Quadrangles in Minnesota and Michigan. The quadrangles in Minnesota are scheduled for a group release early in 1980 and the quadrangles in Michigan soon afterward.

Northern Rockies Rotary-Wing Survey Subcontractor: High Life Helicopters. Inc. Subcontract Value: 5336.500 Start Date: 23 June 1978 Completion Date: 22 August 1979 Line Miles: 13,370 (21.512 kilometers) . Aircraft: Lama

This survey covers the Hamilton, Dillon, Boze- man, White Sulphur Springs, and Billings Quad- rangles located in Montana and Idaho. Flying was completed for this contract in October 1978. The Bozeman Quadrangle was released as GJBX-81(79) ; B i l l i n g s Quadrang le as GJBX-87(79); White Sulphur Springs Quad- rangle as GJBX-96(79); Dillon Quadrangle as

GJBX-107(79); and the Hamilton Quadrangle as GJBX-119(79). Previous coverage of this survey appeared in the 1978 report.

Yellowstone Rotary-Wing Survey Subcontractor: Litton Aero Service Corp. Subcontract Value: $887,931 Start Date: 23 June 1978 Completion Date: 5 March 1979 Line Miles: 15.433 (24.832 kilometers) Aircraft: Sikorsky S-58T

Flying was completed on the Yellowstone project in November 1978 and it was reported in the 1978 report. The Cody Quadrangle was open filed as GJBX-105(79); the Ashton Quadrangle as GJBX-106(79); the Durango Quadrangle as GJBX-143(79); and the Dubois Quadrangle as GJBX-l55(79).

Uncompahgre Rotary-Wing Survey Subcontractor: geoMetrics. Inc. Subcontract Value: $473.921 Start Date: 28 June 1978 Completion Date: 12 February 1979 Line Miles: 13.369 (21,511 kilometers) Aircraft: Lama

The Uncompahgre survey was flown during the summer of 1978 and covered the Leadville, Montrose, Moab, and Salina Quadrangles as was reported in the 1978 report. The results of this survey were open filed as GJBX-95(79).

Montrose Detail Rotary-Wing Survey Subcontractor: geoMetrics. Inc. Subcontract Value: $150,753 Start Date: 28 June 1978 Completion Date: 8 May 1979 Line Miles: 4.231 (6.808 kilometers) . Aircraft: Lama

The Montrose detail survey consists of five separate areas in the Montrose Quadrangle. Fly- ing was completed in the summer of 1978 and final reports are scheduled for open f i l ing in 1980.

Trinidad Project . Subcontractor: Texas Instruments, lnc Subcontract Value: $155,915 Start Date: 19 October 1978 Completion Date: 15 December 1979 Line M~les: 3.212 (5.168 kilometers) . Aircraft: Sikorsky S-58T

This survey, reported on last year, covers the Trinidad Quadrangle in Colorado. Flying on this quadrangle began on October 21,1978 and was temporarily halted due to weather on November 30, 1978 after completing 80 percent of the area.

Page 38: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Flying was resumed on August 27, 1979 and completed on August 30, 1979. An open-file report for this quadrangle will be released in 1980.

Brushy Basin Rotary-Wing Survey . Subcontractor: High Life Helicopters. Inc. . Subcontract Value: $! 15,523 . Start Date: 7 September 1978 . Completion Date: 30 March 1979 Line Miles: 3.310 (5.326 kilometers) . Aircraft: Lama

AS reported in 1978 this detail survey was flown at 114-mile (0.40 kilometer) spacing over an area of numerous outcrops of the Brushy Basin Member of the Morrison Formation. The areas flown were near Green River, Utah and the San Rafael Swell in the Price and Salina Quadrangles in Utah. Flying was completed in October 1978; however, due to changes in the contract it will not be open filed until 1980.

Durango Detail Rotary-Wing Survey Subcontractor: Litton Aero Service Corp. . Subcontract Value: $28.000 Start Date: 23 June 1978 . Completion Date: 9 May 1979 . Line Miles: 703 (1,125 kilometers) Aircraft: Stkorsky S-58T

This survey was reported in the 1978 report. I t originally consisted of four areas in the Durango Quadrangle t o b e f l a w n at 114-mile (0.40 k i lo- meter) line spacing; only one area was flown in 1978 before snow forced termination of the sur- vey. Results of the survey for the one area com- p le ted w i l l b e open f i led in early 1980. (The remain ing three areas were f l o w n in 1979 by High Life Helicopters, Inc. under contract "High LifelSBA Rotary-Wing Survey" [see p. 351.)

Rocky Mountains Rotary-Wing Survey . Subcontractor: Geodata International, Inc. Subcontract Value: $577.627 Start Date: 13 June 1979 Completion Date: 8 May 1980 . Line Miles: 19.983 (32.153 kilometers) Aircraft: Lama

The Rocky Mountains rotary-wing survey con- sists of Aztec, Cedar City, Jordan Valley, Adel, Thermopolis, Lander, and Arminto Quadrangles. Flying was completed in 1979 and the final reports are scheduled t o be open filed in 1980.

Raton Basin Rotary-Wing/ Fixed-Wing Survey . Subcontractor: geoMetrics. Inc. . Subcontract Value: $485.000

Start Date: 28 June 1978 Completion Date: 18 January 1980 Line Miles: 15.995 (25.736 kilometers) . Aircraft: Lama and Grurnman 5-2

This survey covers the Albuquerque, .Shiprock, Gallup, Raton, Santa Fe, and Flagstaff Quadran- gles in New Mexico and Arizona. Flying was con- ducted between October 18,1978 and December 1, 1979. The Albuquerque, Shiprock, and Gallup reports were released as GJBX-116(79) and Flagstaff as GJBX-157(79). Raton and Santa Fe will be open filed in 1980.

UtahIArizona Rotary-Wing/ Fixed-Wing Survey

Subcontractor: Texas Instruments, Inc . Subcontract Value: $664.900 Start Date: 13 October 1977 Completion Date: 20 February 1979 Line Miies: 13,284 (21.374 kilometers) . Aircraft: Bell-212 and DC-3

This survey completes the coverage of quad- rangles partially flown with fixed-wing surveys in 1975 and 1976 over portions of the Tucson, Nogales, Mesa. Douglas, Silver City, and Clifton Quadrangles in Arizona and New Mexico and the Delta Quadrangle i n Utah and was reported in the 1978 report. The new data were integrated with the previous fixed-wing data and are presented on a complete quadrangle basis. Open-file reports for the UtahlArizona survey were released as GJBX-23(79) and GJBX-24(79).

Colorado/Arizona Rotary-Wing Survey Subcontractor: LKB Resources, Inc. Subcontract Value: $764,199 Start Date: 6 September 1978 Completion Date: 3 June 1979 Line Miles: 18,911 (30.428 kilometers) Aircraft: Sikarsky S-58T

As described in last year's report, f lying on this subcontract began in October 1978 and con- tinued through the winter in southern quad- rangles. The quadrangles included in the survey are Craig, Grand Canyon, Marble Canyon. Salton Sea, Ajo, Phoenix, Lukeville, and El Centro. Craig was open filed as GJBX-153(79); the remaining quadrangles are scheduled for open filing in 1980.

Llano Uplift Fixed-Wing Survey Subcontractor: Geodata International. Inc. Subcontract Value: $249,500 Start Date: 28 June 1978 Completion Date: 13 February 1979 Line Miies: 11.658 (18,758 kvlometers) Aircraft: DC-3

As reported in 1978 the Llano Uplift project consists of the Llano, Brownwood, Lemmon, and Dickinson Quadrangles. Flying was completed in October 1978. The Brownwood Quadrangle was open filed as GJBX-68(79); Lemmon as

Page 39: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

GJBX-138(79); and Dickinson as GJBX-l39(79). Llano will be open filed in 1980.

TexasIKentucky Fixed-Wing Survey Subcontractor: Texas Instruments, Inc. Subcontract Value: $350.467 Start Date: 1 March 1979 Completion Date: 14 February 1980 Line Miles: 17.618 (28.348 kilometers) . Aircraft: DC-3

Dalhart, Poplar Bluff. Dyersburg, Palestine, Beaumont, Rolla, Paducah, and Atlanta Quad- rangles are covered in the Texas-Kentucky survey. Flying was completed July 30, 1979 and the final reports are scheduled for release in 1980.

Texas/Nebraska Fixed-Wing Survey Subcontractor: geoMetrics. Inc. Subcontract Value: $226,000 Start Date: 9 July 1979 . Completion Date: 4 May 1980 Line Miles: 12,022 (19,355 kilometers) . Aircraft: Oueenair

This survey includes theTyler. Texarkana, Waco, Alliance, and Scottsbluff Quadrangles in Texas and Nebraska.

Flying began on September 24. 1979 and was completed in November 1979. The report is scheduled to be open filed in 1980.

Texas Gulf Coast II Fixed-Wing Survey . Subcontractor: Geodata International, lnc. . Subcontract Value: $445,362 Start Date: 11 January 1977 Completion Date: 31 March 1979 Line Miles: 18.155 (29.211 kilometers) . Aircraft: DC-3

This survey completed coverage of 10 quad- rangles which had been partially covered in a previous survey, the results of which were open filed in 1975 as report GJO-1632. Results of the present survey, which include data from the earlier surveys, were open filed for Houston, Brownsville, and McAllen Quadrangles in 1978; theSeguin Quadrangle as GJBX-37(79); Beeville and Bay City Quadrangles as GJBX-69(79);

Helicopters are used in ground follow-up investigations o f aerial survey data.

38

Page 40: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Crystal City Quadrangle as GJBX-98(79); Corpus Christi and Laredo Quadrangles as GJBX-99(79); and the Austin Quadrangle as GJBX-l48(79).

Southeast United States Fixed-Wing Survey . Subcontractor: Geodata International. Inc.

Subcontract Value: $454.000 Start Date: 13 June 1979 . Completion Date: 8 May 1980 Line Miles: 21.120 (34.003 kilometers) . Aircraft: DC-3

Flying began on this survey on June 23, 1979 and was completed on September 18, 1979.

Quadrangles in this survey are Montgomery, Phenix City, Macon. Evansville. Winchester, Raleigh, Norfo lk , Beaufort , Wilmington, Salisbury. Eastville, Manteo, and Rocky Mount. Open-file reports are scheduled for release in mid 1980.

Appalachian Basin Rotary-Wing Survey Subcontractor: Carson Helicopters. Inc Subcontract Value: $555,000 Start Date: 1 June 1979 Completion Date: 27 March 1980 Line Miles: 19,180 (30.880 kilometers) Aircraft: Sikorsky S-58T

This survey consists of the Canton, Clarksburg. Cumberland. Charlottesville. Charleston. Jenkins, Roanoke, Bluefield, Corbin, Chatta- nooga, and Rome Quadrangles.

Flying began on September 5, 1979 and was completed on December 1. 1979. Open-file reports are scheduled for mid 1980.

ThorpeIBig Bend Rotary-Wing Survey Subcontractor: LKB Resources. Inc. . Subcontract Value: $641.207 Start Date: 28 October 1976 . Completion Date: 20 July 1979 Line Miles: 19.000 (30,571 kilometers) Aircraft: Sikorsky S-58 and S-58T

The Thorpe portion of this study covered the Wil- liamsport. Harrisburg. Scranton, and Newark Quadrangles in Pennsylvania. New Jersey, and New York. Flying on the Thorpe survey was con- ducted between November 8,1976 and April 11, 1977.

In the Big Bend area, the survey covers the Fort Stockton. Marfa, Presidio, and Emory Peak Quadrangles In Texas. Flying on the Big Bend survey was conducted between January 13,1978 and February 13, 1978. The Marfa, Presidio, Fort Stockton, and Emory Peak Quadrangles were open filed as GJBX-88(79).

Reading Prong Detail Rotary-Wing Survey

Subcontractor: LKB Resources. Inc. Subcontract Value: $217.054 . Start Date: 6 September 1978 . Completion Date: 3 June 1979 Line Miles: 5,935 (9.551 kilometers) Aircraft: Sikorsky S-58T

The Reading Prong detail survey, reported in the 1978 report. was flown during September and October 1978, with 1/4-mile (0.40 kilometer) line spacing. The final report was scheduled for open filing in 1979 but addittonal data processing requirements have delayed the report until 1980. The detail survey area lies in the Newark and Scranton Quadrangles.

Central Alaska Rotary-Wing Survey Subcontractor: Litton Aero Service Corp. Subcontract Value: $954.000 Start Date: 1 June 1979 Completion Date: 26 March 1980 Line Miles: 13.273 (21.370 kilometers) reconnaissance

and 688(1,107 kilometers) detail. total 13,961 (22.477 kilometers)

Aircraft: Sikorsky S-58T

Flying began in early July 1919 and was com- pleted by the end of September 1979. Ten quad- rangles, Sleetmute, Id i ta rod , McGrath, Unalakleet, Ophir. Medfra, Norton Bay. Nulato, Ruby, and Kantishna River were flown in the reconnaissance survey; an area in the southeast corner of the Ruby Quadrangle and extending into adjacent quadrangles, called the Four Corners survey, was flown in detail with 1-mile (1.6 kilometer) line spacing.

Results of these surveys will be open filed in 1980.

Interior of a helicopter used in %-mile line spac- ing surveys.

Page 41: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Subsurface Investigations Subsurface geologic investigations in Support of NURE are conducted throughout the United States under the direction of DOE. These inves- tigations obtain subsurface data to reduce the uncertainty of uranium resource estimates in areas of known occurrences, or to help evaluate favorability in areas of suspected occurrences and in areas containing potentially uraniferous host rocks. Subsurface data are generated by dr i l l ing , cor ing, and logg ing format ions wi th potential for uranium mineralization. Additional subsurface data are obtained by logging holes drilled by industry or other governmental agen- cies for nonuranium purposes.

Each proposed subsurface project undergoes a geologic study to determine its applicability to NURE objectives. Upon acceptance of the pro- ject a detailed dril l ing plan is prepared that defines all drilling and data acquisition require- ments. Drilling operations are subcontracted and are directed by Bendix engineers and geol- ogists. In-house logging operations to provide specialized downhole log data are supplemented by commercial logging. After completion of drilling operations, two reports are written: (1) the engineering report, containing a description of technical aspects of the drilling project, is submitted approximately 2 months after drilling completion, and (2) a geologic report, con- taining basic geological data and a preliminary evaluation of the results relative to project objectives, is completed about 3 months after the drilling is completed.

During 1979 drilling operations were undertaken for 14 projects. Five of the projects were initiated during 1978 and completed in 1979; seven projects were both initiated and completed during 1979; and drilling of two projects began in 1979 and continued in 1980. A total of 167 holes, having an aggregate total depth of 229,355 feet (69,907 meters), was dr i l led dur ing 1979. Cores, having a cumulative total length of 42,042 feet (12,814 meters), were cut. Geophysical and lithological logs were obtained from all drill holes.

At the start of 1979 two downhole logging units and one surface survey unit (owned by DOE and operated by BFEC) were operational. During the year, three additional downhole logging units (all with on-board computers) were acquired and equipped with KUT (spectral gamma-ray) probes t o support the various NURE projects. A total of 197 holes were logged in 1979; 88 holes

Bendix subcontracted to experienced drillers with proven equipment.

were BFEC drilled and 109 were industry drilled holes located in the various project areas. Just under 1,000,000 feet (304,800 meters) of conven- tional suite log data and more than 100,000 feet (30,480 meters) of select KUT sampling were performed for projects located in Texas, New Mexico. Arizona, California, Utah. Wyoming. North Dakota, South Dakota, Montana, and Washington. In addition to the in-house logging effort, a new NURE program element called the Quadrangle Logging Program was initiated in 1979 to obtain subsurface information from

Page 42: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

holes drilled by industry for purposes other than uranium exploration. The resulting subcon- tracted logging aggregated 949,500 feet (289,410 meters) logged along the eastern slope of Colorado, eastern Nevada, and the San Joaquin Valley, California. Throughout the year Bendix logging personnel also provided technical support and advice to industry and other government agencies on a routine basis.

During 1979 engineering and geological reports were prepared for drilling projects completed during 1978. These included geological report GJBX-3(79) on the Red River Project in North Dakota and Minnesota; engineer ing report GJBX-50(79) and geological report GJBX- 162(79) for the Michigan Basins Project; engi- neering report GJBX-103(79) on the Spor Moun- tain Project i n Utah; and engineering report GJBX-lOl(79) on the East Chaco Canyon Project in New Mexico.

1979 Drilling Projects Drill ing projects completed during 1979 and the Owens Lake, California Project, still in progress, are summarized below. Further discussions of data obtained by projects are included in the Geologic Studies and Technology Applications sections of this report.

Lemhi Pass (Thorium) Quadrangle: Dubois State: Montana Subcontractors: Udy Core Dri l l~ng Co.

Wild Cat Drilling Service. Inc Total Subcontract Value: $115,647 Start Date: 3 August 1978 Completion Date: 14 September 1979 Number of Holes: 4 Total Feet Drilled: 2.378 (725 meters)

This project was performed in conjunction with USGS which will issue the geologic report. Project holes were 100 percent cored to examine thorium occurrences in veins cutting the Belt Series strata.

Sand Wash Basin t Quadrangles: Craig, Vernal

State: Colorado Subcontractors: American Drilling Co.

Camp Drilling Co. Exploration Services, Inc. Adventures, Inc.

Total Subcontract Value: $639.698 Start Date: 14 May 1979 Completion Date: 4 November 1979 Number of Holes: 27 Total Feet Drilled: 26,084 (7.950 meters)

This project examined the Browns Park sand- stone-a Miocene formation with broad surface exposure in northwestern Colorado, south- central Wyoming, ana northeastern Utah- which is the host for economic uranium deposits. Some zones of weak uranium m~neralization were encountered by project drilling.

Sonora Pass Quadrangle: Walker Lake State: California Subcontractors: Salisbury & Dietz, Inc.

California Division of Mines &Geology Hosklng Exploration Helicopters

Total Subcontract Value: $319.174 . Start Date: 4 June 1979 Completion Date: 19 September 1979 Number of Holes: 19 Total Feet Drilled: 6,577 (2.005 meters)

This drilling project was conducted in coopera- tion with the California Division of Mines and Geology. I t examined bur ied Ter t ia ry stream channels in the central High Sierras of Califor- nia. The objective was to obtain subsurface data f r o m sediments, though t t o be analogous t o those of the Jun iper channel, wh ich conta in moderate uranium reserves.

The data obtained indicate that several channels w i th in the pro jec t area have potent ia l f o r uranium mineralization. Project engineering and geological reports are in preparation.

San Rafael Swell Quadrangles: Price. Salina State: Utah Subcontractors: Chesney Drilling Inc.

H~mes Drilling Company. Inc Baroid Engineering Division Exploration Services, Inc. Century Geophysical Corp. Adventures, Inc. . Total Subcontract Value: $1,083.000

Start Date: 24 September 1978 Completion Date: Estimated December 197s . Number of Holes: 22 Total Feet Drilled: 39,230 (11,957 meters)

The San Rafael Swell area of southeast Utah contains known uranium occurrences. This pro- ject examined the Brushy Basin and Salt Wash Members of the Morrison Formation and the Moss Back and Monitor Butte Members of the Chinle Formation. Some zones of weak uranium mineralization were encountered and substantial new geological information was obtained in areas of limited exploration.

Page 43: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

A portable down hole grossgamma-ray probeis used in one of thesoutheast Wyoming boreholes.

Southwest Prescott Quadrangles: Prescott. Williams . State: Arizona Subcontractors: Stewart Brothers Drilling Co

Century Geophysical Corp. Exploration Services, Inc. Adventures. Inc.

Total Subcontract Value: $1,557,234 . Start Date: 9 June 1979 Completion Date: 30 October 1979 Number of Holes: 18 Total Feet Drilled: 63,558 (19.372 meters)

This project examined the stratigraphy and uranium favorability of Tertiary sediments in por- tions of the Date Creek, Big Sandy, Congress, McMullan. Butler, and Sacramento Basins. Some zones of weak uranium mineralization were encountered. The data obtained will greatly increase the geological knowledge and reduce the uncertainty of NURE uranium resource estimates for these areas.

Owens Lake . Quadrangle: Death Valley State: California Subcontractors: X-L Drilling Co.

Exploration Services, Inc. Adventures, Inc. . Total Subcontract Value: $1,253,055

StaR Date: 24 June 1979 Completion Date: Estimated January 1980 Number of Holes: 5 . Total Feet Drilled: 16.703 (5,091 meters)

The Coso Formation of Tertiary age in lnyo County, California is a complex of coarse con- tinental clastic sediments, volcaniclastic rocks, and lacustrine sediments which contains known uranium deposits. This project is examining the uranium potential and stratigraphy of these sed- iments in areas and to depths which previously have not been ex~lored.

Page 44: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

MissoulaIBitterroot Basins Ouadrangles: Wallace, Hamilton State: Montana Subcontractors: X-L Drilling Company. Inc.

Goodwell Inc. Monaco Engineering Co. Montana Bureau of M!nes and Geology . Total Subcontract Value: $802,500

Start Date: 10 May 1978 . Completion Date: 15 April 1979 Number of Holes: 7 Total Feet Drilled: 14,448 (4,404 meters)

This project was conducted in conjunction with the USGS and the Montana Bureau of Mines and Geology. Its purpose was t o obtain subsurface data t o he lp assess the uran ium potent ia l of southwestern Montana Tertiary basins. Drilling was restricted to the Missoula and Bitterroot val- leys. The engineering report. GJBX-127(79), has been open filed. A detailed study of the samples obtained is being made by the University of Mon- tana and the project geological report has been completed.

Black Hills Drilling Project Subcontractor: Longyear Company . Subcontract Value: $65,146 Start Date: 3 August 1979 Completion Date: 7 September 1979

Uranium-bearing Precambrian quartz-pebble Estes conglomerate in the northeastern Black Hills, South Dakota was core drilled to evaluate its uranium content and to solve stratigraphic- structural problems in the area.

Five dril l holes totaling 2,211 feet (674 meters) were cored. Engineering information regarding the dril l ing operation will be open filed in 1980. Geologic information obtained from study of the recovered core will also be open filed in 1980.

Southeast Wyoming Drilling Subcontractor: Earth Exploration Drilling of Utah Subcontract Value: $1,030.834 Start Date: 13 June 1979 Completion Date: 2 January 1980

This project was a follow-up phase of previous geologic investigations conducted by University of Wyoming researchers. Anomalous amounts of radioactivity had been found in outcrops of Precambrian quartz-pebble conglomerates in numerous localities within the Medicine Bow and Sierra Madre Mountains of southeastern Wyoming. Eighteen core holes totaling 13.037 feet (3,974 meters) were drilled in 1979 to test the

subsurface below weathered outcrops. Addi- tional holes are planned for next year. Data from this coring program will be utilized in substan- tiating DOE resource estimates and the resource base of this region.

R&D Drilling Program- Red Desert, Wyoming

DOE Contractor: Hol-Han Drilling R&R Drilliog Go.

Subcontract Value: $230.101 . Start Date: September 1978 . Completion Date: October 1979

Twe lve ho les ( 5 % inches113 cen t ime te rs diameter) were drilled in support of the Tech- nology lntegration project; seven were core and five were rotary holes. The rotary holes averaged 600 feet (183 meters) TD and the fully cored holes averaged about 750 feet (229 meters) to TD. The core recovery ranged between 50-100 percent, averaging about 75 percent. The sam- ples were lithologged and the holes were logged for KUT, total gamma, self potential, resistivity, and density. Borehole water samples were also collected for helium and uranium isotopic stu- dies. The results from this dril l ing will be inte- grated with other geophysical, geochemical, and geological studies of the area to meet the Tech- nology lntegration objectives described in the Technology Applications section of this report.

R&D Drilling Program- Copper Mountain, Wyoming . Subcontractor: Longyear Company

Subcontract Value: $276,940 Start Date: September 1978 Completion Date: October 1979

Seven core holes were drilled in support of the Technology lntegration project. Six holes aver- aged a depth of 600 feet (183 meters) and the seventh hole reached a depth of 2,785 feet (849 meters) , p rov id ing a to ta l p ro jec t footage of 6,350 feet (1,935 meters). The core recovery averaged about 98 percent. Samples were litho- logged, borehole geophysical logging was com- pleted, and water samples were co l lec ted for radon, hel ium, and uran ium iso top ic studies. The results from this dril l ing will be combined wi th theo the r geophysical, geochemical, and geological studies to meet the Technology Inte- gration objectives described in the Technology Applications section of this report.

Page 45: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

R&D Drilling Program- San Juan Basin, New Mexico

Subcontractors: Stewart Brothers Drilling Co. Birdweli Division, Seismograph Service Corporation Century Geophysical Corp.

Subcontract Value: Stewart Brothers $670.000 Birdwell $27.463

Start Date: June 1979 Completion Date: October 1979

Fourteen holes (45h to 5% inches/ll.? to 13 cen- timeters diameter) were drilled, each with an average TD of 2,400 feet (732 meters). In every hole, the first 1,900 feet (579 meters) or so were rotary dri l led and the remaining footage was cored to TD. The core recovery averaged about 90 percent. Subsequent to the drilling, the samples were lithologged, borehole geophysical logging was completed, and ground water samples were collected for radon, helium, and lead isotopic studies. The results from this drilling will be integrated with other geophysical, geochemical. and geological studies of the area to meet the

Technology Integration objectives described in the Technology Applications section of this report.

1979 Quadrangle Logging Program A quadrangle logging program was conceived and initiated during FY79. Its purposeistoobtain calibrated geophysical logs in designated regions from new and existing holes not drilled for uranium. The areas designated by DOE for assignment to subcontractors are lo x 2O NTMS quadrangles (see map). The preferred logs are (spectral gamma-ray) KUT, gross gamma-ray, neutron, electrical, and caliper. A maximum density of one hole logged per 9 square miles (23.3 square kilometers) and a maximum depth of 5,000 feet (1,524 meters) have been estab- lished as requirements. All acquisition of permits and logging activities are performed by BFEC subcontractors.

Project area showing proiect tit le and contractor ---- Quadrangle boundaries

Page 46: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

During 1979 the first year of this new NURE program element, 363 holes were logged, gen- eratlng 949,500 feet (289,410 meters) of gamma- ray log data. The following subcontracts were in effect:

Planning Study Subcontractor: Fugro. Inc. Total Subcontract Value: $84.207 Start Date: 24 October 1978 Completion Date: 11 February 1979

This study led to the initiation of the quadrangle logging program.

South Texas and Central Wyoming Logging

Subcontractor: Fugro. Inc. Total Subcontract Value: $796,180 (ceiling) Start Date: 30 April 1978 Completion Date: Continuing into FY80

These were the first areas t o be surveyed under thequadrangle logging program. As of December 31, 1979 production of logs was:

South Texas: 166 holes, 552.821 feet (168,500 meters) of hole logged . Central Wyoming: 58 holes. 194.040 feet (59.143 meters) of hole logged

Denver-Julesburg and Williston Basins Logging . Subcontractor: High Life Helicopters, Inc. . Total Subcontract Value: $423.000 (ceiling) . Start Date: 31 May 1979

Completion Date: Continuing into FY80

The Failing CF1250 drill r ig is typical of the type used by subcontractors.

As of December 31, 1979 production of logs was: Denver-Julesburg Basin: 45 holes, 68,948 feet (21,015 meters) of hole logged Williston Basin: 40 holes. 71,104 feet (21,672 meters) of hole logged

San Joaquin Valley and Eastern Nevada Logging

Subcontractor: J. H. Kleinfelder and Associates, Inc. Total Subcontract Value: $240.000 Start Date: 14 September 1979 Completion Date: Continuing into FY80

As of December 31,1979 production of logs was: Nevada: 22 holes, 18.911 feet (5.764 meters) of hole logged California: 32 holes. 43,674 feet (13.312 meters) of hole logged

Page 47: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Hydrogeochemical and Stream-Sediment Reconnaissance and Detailed Geochemical Surveys

The Hydrogeochemical and Stream-Sediment Reconnaissance (HSSR) and Detailed Geochem- ical Surveys are directed by the Grand Junction Office of DOE. These surveys are carried out by three DOE national laboratories. The eastern and far western areas are the responsibility of the Savannah River Laboratory at Aiken. South Carolina; the central and plains areas are the responsibility of the Oak Ridge Gaseous Dif- fusion Plant at Oak Ridge, Tennessee; and the Rocky Mountain area and Alaska are the respon- sibility of the Los Alamos Scientific Laboratory at Los Alamos, New Mexico. A quality assurance effort is the responsibility of the Ames Labora-

sample site density of one site per 5 to 10 square miles (13 to 26 square kilometers). The detailed geochemical program involves the collection of selected rock, soil, and vegetation samples as well as those sample types mentioned above. The reconnaissance surveys are reported on the basis of 1:250,000-scale lo x 2O NTMS quad- rangles while the detailed survey areas are selected to meet special needs of the NURE resource assessment.

Bendix conducts the necessary coordination and liaison among the national laboratories and DOE and Bendix resource assessment groups.

located 6n the campus Of Iowa State During 1979, 100 quadrangles had sampling University at Ames, Iowa. completed, totaling 328 to date; 58 quadrangle

The field reconnaissance program consists of reports were open filed, totaling 97; and 27 the collection of samples of ground water, detailed studies were initiated. 1 of which was stream water, and streambed sediments at. a open filed.

STATUS OF THE HYDROGEOCHEMICAL RECONNAISSANCE SURVEYS

Sampling completed: 231 mTofal: 328

Page 48: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

In addition to the coordination of reconnais- sance and detailed geochemical surveys being conducted by DOE laboratories, Bendix admin- isters subcontracts that support the geochemical surveys. The subcontracts are described in greater detail in the Geologic Studies section. They include studies on the distribution of ura- nium and related elements in sedimentary and igneous rocks and ground water as well as stu- dies designed to improve data presentation, interpretation, and the direct application of geo- chemical data to resource assessment.

Lawrence Livermore Laboratory (LLL) published reports on Millet. Wflliams, Sandpoint, Tonopah, and Lovelock-five high-priority quadrangles of the LLL program; one quadrangle reconnais- sance report; and two special reports. These publications completed the LLL responsibility to the NURE program.

Los Alamos Scientific Laboratory The Los Alamos Scientific Laboratory (LASL) is responsible for the HSSR program throughout 79 quadrangles in the Rocky Mountain region and 136 quadrangles in Alaska. During 1979 nine Rocky Mountain region quadrangles-Driggs,

Preston, Ogden, Clifton, Silver City, Douglas, El Paso, Brownfield, and Hobbs-were added to LASL's region of responsibility while 17 quad- rangles, encompassing much of the Aleutian Islands area of Alaska, were dropped by DOE. Altogether the LASL region includes about 1,122,000 square miles (2,906,000 square kilo- meters) or approximately 30 percent of the total U.S. land area.

Among LASL's noteworthy accomplishments during 1979 were the collection of water and sediment samples from 32,000 locations, approx- imately half of which were in Alaska, the analyses of some 35,000 water and 35,000 sediment samples, and the publication of recon- naissance reports for 20 quadrangles, including 17 in the 116-quadrangle program. Through 1979 LASL has collected reconnaissance samples from 70 quadrangles in the Rocky Mountain region and 102 quadrangles in Alaska, leaving Only parts of the nine newly added Rocky Mountain region quadrangles and 34 Alaska quadrangles to be sampled in 1980 and beyond.

LASL routinely analyzes water samples for 13 elements using fluorometry, plasma-source emission spectrography, and delayed-neutron

The HSSR program requires that many samples be collected in remote areas.

Page 49: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

counting at a rate of 400 samples per day. Sediment samples are analyzed for 43 elements using a combination of short- and long-time delay neutron activation analysis (NAA), x-ray fluorescence, and arc-source emission spectro- g r a p h ~ . The addition of a second complete NAA system at the reactor site during 1979 has doubled the throughput to 400 samples per day. With the increased NAA capability, as many as 80,000 water and 80,000 sediment analyses can now be made each year by LASL.

LASL is responsible for report ing o n 48 quad- rangles in the 116-quadrangle program. Through 1979 reports cover ing 25 o f the quadrangles have been published and 8 others are near com- pletion. Computer tapes of the field and analyti- cal data contained in these quadrangle reports (as well as all other open-file LASL HSSR reports) are made available to the public from: GJOlS Project, Union Carbide Corporation Nuclear Div- ision (UCCND), Computer Applications Depart- ment, 4500 North Building. Oak Ridge National Laboratory. P.O. Box X. Oak Ridge, TN 37830.

LASL has undertaken 10 HSSR detailed geo- chemical surveys (at the request of the DOE) (see map): NW Pueblo (LA-1); Pie Town (LA-2);

Spring Creek(LA-3); Oscura Mountains-San Andres Mountains (LA-4);Southern Powder River Basin(LA-5); Sawatch Range (LA-6); Grants (LA-7); Bozeman (LA-8); Needle Moun- tains-Vallecito Creek (LA-9); and Red Creek Quartzite (LA-10). The NW Pueblo Survey was open filed as GJBX-42(79); sampling for the other nine surveys was completed in 1979 and resulted in the collection of water and/or sed- iment samples from 12.250 locations. Reports of these surveys are scheduled to be open filed in 1980.

Since the beginning of the HSSR program in 1975 LASL has collected water and sediment samples from approximately 155,000 locations in the Rocky Mountain region and 66,000 locations in Alaska. Analyses have been performed on 85,000 water samples and 96,000 sediment samples. Reconnaissance and special study reports containing the field data and analytical results for water and sediment samples from 82,000 locations in a combined area equivalent t o 50 quadrangles have been open filed through the DOE Grand Junction Office. I n addition, four topical and progress reports related to LASL HSSR activities were released this year.

DETAILED GEOCHEMICAL SURVEYS CONDUCTED DURING 1979

Page 50: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Oak Ridge Gaseous Diffusion Plant The Oak Ridge Gaseous Dif fusion Plant (ORGDP) is conducting the Hydrogeochemical and Stream-Sediment Reconnaissance (HSSR) program in an area of more than 970.000 square miles (2,512,000 square kilometers) in the cen- tral United States (see map). Major accom- plishments by ORGDP during 1979 included the collection of 32,455 samples, the analysis of 32,527 samples, and the release of 18 quad- rangle reconnaissance reports.

Samples collected for the HSSR studies include surface and ground water and stream sediments. The samples are collected by ORGDP field geol- ogists, state geological surveys, and subcon- tractors.

Uranium in water samples is determined by fluo- rometry and isotope-dilution mass-spectrometry methods, and in sediments by fluorometry and neutron activation (delayed neutron counting techniques). Atomic absorption plasma-source emission spectrophotometry, and mass spec- trometry are used for analysis of 33 additional variables in sediment and water samples.

During 1979 HSSR reports for the following quadrangles of the 116 program were open filed: Enid, Austin, Lawton, Wichita. St. Cloud, Ashland, Clinton, Pratt, Joplin, Palestine, Wichita Falls, Amarillo, New Ulm, Hutchinson, Manhattan, and Lubbock.

Reports were also issued in 1979 for two priority quadrangles, Emory Peak and Presidio. A pilot geochemical survey report in Oklahoma was also issued in 1979. Pilot surveys were planned to sample small but regionally and geologically representat ive loca t ions as a basis fo r understanding data from the HSSR program.

Reports for Laredo, Hot Springs, Lemmon. Beaumont, Dickinson, Marquette, Iron River, Corpus Christi, Grand Island, Lincoln, Rapid City. Alliance, Watertown. Scottsbluff, Milbank, Thief River Falls, Brownsville, and Broken Bow Quadrangles are scheduled for release during 1980. Thirteen detailed geochemical surveys were actively in progress by ORGDP (see map). These include Trans-Pecos (OR-1), South Texas Coastal Plain (OR-2), Lakeview (OR-4), Sonora Pass (OR-3) , Laramie Mounta ins (OR-5). Wichita Uplift (OR-9), Date Creek Basin (OR-6), Duluth-Stillwater Precambrian (OR-?). Edge- mont (OR-lo), Buffalo Lignite (OR-ll), Trans- Pecos Addition (OR-8), Marysvale (OR-12), and

Thomas Range-Wasatch (OR-13). Approxi- mately 10,600 samples were collected and 10,200 samples were analyzed. The reports for Trans- Pecos. South Texas Coastal Plain, Wichita Uplift. Date Creek Basin. Duluth-Stillwater Precam- brian. Laramie Mountains, and Thomas Range- Wasatch are scheduled for release during 1980. Three semiannual progress reports were issued during 1979.

Two topical reports were issued during 1979. These included Fitting a Three-Parameter Log- normal Distribution With Applications to Hydro- geochemical Data From the National Uranium Resource Evaluation Program, GJBX-175(79) and Application of Discriminant Analysis and Generalized Distance Measures to Uranium Ex- pl$ation. GJBX-l76(79).

Several papers were presented by the ORGDP Uranium Resource Evaluation Project staff. Two papers were given at the Association of Explo- ration Geochemists/U.S. Department of Energy Symposium, Geochemical Exploration for Uranium at San Diego, California on November 4, 1979: Management and Analysis of Regional Geochemical Data and Uranium Exploration- Ground and Surface Water. One paper was presented at the 1979 Department of Energy Sta- tistical Symposium at Gatlinburg, Tennessee on October 24-26, 1979: Application of Discrimin- ant Analysis and Generalized Distance Measures to Uranium Exploration. A paper was given at the Classif ication Society Annual Meeting in Gainesville, Georgia on April 8-10, 1979: Results Using an Improved Probabilistic Method for Grouping Data. Also, a paper was given at the American Statistical Association Annual Meeting in Washington, D.C. on August 13-16, 1979: Fitting a Three-Parameter Lognormal Distribu- tion With Applications to Hydrogeochemical Data From the National Uranium Resource Eval- uation Program.

Savannah River Laboratory The Savannah River Laboratory (SRL) is respon- sible for conducting the HSSR program over an area of more than 1,500,000square miles (3,885.000 square kilometers), covering 220 quadrangles in all or part of 30 eastern states and 7 western states. Major accomplishments in 1979 included the collection of over 65,000 samples, analysis of over 40,000 samples, and conducting the sam- pling and analysis of samples from seven western states in support of the 116-priority-quadrangle program.

Page 51: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

During 1979 samples collected included ground water, stream water, stream sediment, and vege- tation in support of the reconnaissance program. Ground water, stream water, stream sediment, and vegetation samples were collected for de- tailed studies in four areas. The samples were collected primarily by SRL-trained and super- vised contractors.

Thirty-two high-priority quadrangles were assigned to SRL to be included in the NURE resource assessment report for 1980. By the end of 1979 reports were issued for 11 of these quad- rangles. HSSH data reports were issued for Spar- tanburg. Scranton, Athens, Portland, Harrisburg, Glens Falls. Augusta. Dyersburg, and Poplar Bluff in the east. The 23 high-priority quad- rangles in the west have been sampled, and of these, Richfield and Delta have been open filed.

Other reports issued in 1979 include data reports for Charlotte. Greenville, Knoxville, Hartford, Atlanta, Albany, and Williamsport Quadrangles. Special reports included the Wolcott. Vermont Orientation Study, a report on uraniferous gor-

ce ix~re occurrences i n Aiken County, South Carolina, three semi-annual reports, and a pilot study on the geology of Birmingham, Gadsden, and Montgomery Quadrangles.

Four detailed geochemical studies were per- formed in 1979. The reports will be open filed by late 1980 (see map for location of detailed geo- chemical studies). The studies included two areas in Washington, the Midnite Mine area of the Ritzville Quadrangle (SR-2) and the Kettle Falls Dome area of the Okanogan Quadrangle (SR-3), and a study in the Glen Wild, New York area of the Scranton Quadrangle (33-1). Of special interest is the detailed study of gorceixite in Aiken County, South Carolina in the Augusta Quadrangle (SR-4). In addition to standard ana- lytical procedures, limited drilling was performed with natural gamma and electric logging. Gor- ceixite is a barium-aluminum phosphate that contains significant concentrations of uranium. It is a rare mineral in the United States; however, it occurs as a major uraniferous material in Brazil and Africa.

Page 52: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Geologic Studies The NURE program for 1979 emphasized special projects in the areas of World-Class and lnter- mediate-Grade uranium studies. Both areas are being considered in the search for additional potential uranium resources which may become economic in the foreseeable future. The World- Class studies emphasized the Quartz-Pebble Conglomerates as an environmental target. The Intermediate-Grade Studies concentrated on extending known deposits to include large resources in the 100 to 500 ppm uranium cate- gory. Three studies on low-grade resources (less than 100 ppm uranium were completed and a fourth study (asphaltite) was initiated.

The Geologic Studies initiated during the fiscal year emphasized World-Class environments and Intermediate-Grade resources.

World-Class Deposit Studies The World-Class Deposit Studies program was established in 1978 to provide complete analyses of geologic environments of uranium deposits that are important producers throughout the world and have the highest probability of occur- ring in the United States. Occurrence models based on results of these studies will guide the evaluation of analogous U.S. geologic envi- ronments to broaden the resource base.

Goals of the program are: (1) complete, by October 1980, an evaluation of the Precambrian pebble-conglomerate environment, (2) assess the unconformity-vein and volcanic environ- ments by October 1981, (3) evaluate the plutonic- metamorphic environment by October 1983, and (4) appraise regolith-related environments by October 1984.

POSSIBLE WORLD-CLASS DEPOSIT STUDY AREAS

Page 53: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Program strategy for each environment is to develop occurrence models and then identify areas in the United States fitting the models. Specific areas are then selected for favorability and evaluation studies and the most promising sites are chosen for detailed geologic studies and drilling.

Uranium in Precambrian Quartz-Pebble Conglomerates

Subcontractor: University of Wyoming Subcontract Value: $217,540 . Start Date: 16 July 1979 Completion Date: 15 September 1980

Previous NURE-sponsored research by Dr. R. S. Houston and Mr. Karl E. Karlstrom of the Uni- versity of Wyoming resulted in a considerable compilation of geologic data on uranium-bearing Precambrian quartz-pebble conglomerates through- out the world. These data were used to formulate a general exploration model for uraniferous conglomerate, which was subsequently applied to the Late Archean and Early Proterozoic terrains of the United States to define areas most favorable for this type of uranium mineralization.

In support of the World-Class Studies program, the subcontract to the University of Wyoming was extended to provide direct geologic support to the World-Class drilling project for ura- niferous pebble conglomerate in the Medicine Bow and Sierra Madre Mountains. The work revolves around seven major tasks: (1) core logging, (2) detailed geologic mapping. (3) rock- chip sampling, (4) surface radiometrics, (5) mineralogy-petrology studies, (6) geostatistical studies, and (7) consultation services. The end result of the work and research will be a com- prehensive geologic report on the surface and subsurface characteristics of uranium-bearing Late Archean and Early Proterozoic pebble- conglomerate and quartzite units in the Sierra Madre and the Medicine Bow Mountains. The report will also provide a preliminary geosta- tistical evaluation of uranium resources in the project area.

The drilling aspects of these projects are report- ed in thesubsurface Investigation section of this report.

Geology of the Northeast Black Hills Subcontractor: South Dakota School of Mines and

Technology Subcontract Value: 553,486 Start Date: 15 May 1979 Completion Date: 31 December 1979

The Precambrian Estes conglomerate, exposed in the Nemo district on the northeastern flank of the Black Hills, South Dakota is known to contain uranium and was selected as a target for surface and subsurface geologic investigation to deter- mine its potential as a World-Class-type uranium source.

Detailed field mapping, radiometric and mag- netic surveys, logging of cores from five holes in the area, plus chemical analyses of represent- ative samples were carried out under the direc- tion of Dr. J. Redden. South Dakota School of Mines and Technology. Results ot the study will be published in an open-file report in 1980.

Tertiary Volcanic Rocks in Southwestern New Mexico

Subcontractor: University of Kansas Subcontract Value: $34.500 Start Date: 1 June 1979 Completion Date: 31 December 1979

The Tertiary volcanics and Cretaceous lime- stones in southwestern New Mexico were select- ed for examination and evaluation of their uranium potential because of their similarity with respect t o rock types and age to the World-Class type Pelia Blanca uranium district in Chihuahua. Mexico. The study, under the direction of Dr. A. Walton, included field mapping, radiometric surveys, and sample collection. A total of 350 samples was collected for chemical and petro- graphic-mineralogical examinations. The results of the study will be published in 1980.

Proterozoic Unconformity, Van Horn, Texas

Subcontractor: University of Texas at El Paso Subcontract Value: $37.318 Start Date: 10 May 1979 Completion Date: 30 November 1979

Proterozoic rocks in the Van Horn area, Texas show lithologic and structural characteristics favorable for World-Class unconformity-type uranium deposits.

The area, under the direction of Drs. D. Davidson and P. Goodall, was mapped, surveyed radio- metrically, and sampled for chemical analyses. Results of the study will be published in an open- file report in 1980.

Geologic Evaluation of Precambrian Metasedimentary Rocks, Uinta Arch, Utah and Colorado . Subcontractor: Research Associates of Wyoming

Subcontract Value: $93.489 Start Date: 15 June 1979 . Completion Date: 15 March 1980

Page 54: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

The prime objective of the project, directed by Dr. Paul J. Graff of Research Associates of Wyoming, is to evaluate selected areas along the flanks of the Uinta Arch in Colorado and Utah for the occurrence of Precambrian metasedimen- tary rock sequences that could potentially host uranium deposits of the pebble-conglomerate or unconformity-related types. The target meta- sedimentary rock units chosen for the recon- naissance study are the Red Creek Quartzite, which crops out in the northeastern Uinta Mountains; the Little Willow Series of the west- central Wasatch Mountains; and selected quart- zite intervals of the Farmington Canyon Complex in the northern Wasatch Mountains.

The study is field oriented and revolves around literature compilation, reconnaissance mapping, and cock-chip sampling. Attempts will be made to correlate the target metasedimentary rock units with known uranium-bearing Late Archean and Early Proterozoic sequences in southeast Wyoming and elsewhere in the Wyoming Pre- cambrian province. The results of the project will be released in an open-file report.

Geologic-Geochemical Evaluation of Raft River Mountains, Utah and ldaho

Subcontractor: Meiiji Resource Consultants Subcontract Value: $92.104 Start Date: 9 July 1979 Completion Date: 15 April 1980

A variety of metasedimentary rocks of probable Precambrian age crop out in the Raft River Mountains, Grouse Creek Mountains, and Albion Range of northwestern Utah and southern ldaho. Some of these units, especially m e Elba quart- zite, have characteristics that meet the general favorability criteria for the occurrence of uranium- bearing quartz-pebble conglomerate. The pro- ject area is of interest because it is the location of a recently recognized metamorphic core complex.

Thestudy, directed by Dr. Alan Black of Meiiji Resource Consultants, will concentrate on the basal metasedimentary quartzite, schist, and conglomerate horizons and involves four major tasks: (1) regional mapping and stratigraphic correlation, (2) rock-chip sampling, (3) stream- sediment and water sampling, and (4) sedimen- tologic studies. The goal of the work is to identify those locations within tne project area most favorable for uranium mineralization and most deserving of the follow-up work. All data and results of the work will be released in an open-file report.

Precambrian Plutonic Rocks of Northwest Arizona

Subcontractor: Loghry-Heinrichs Subcontract Value: $61.000 Start Date: 5 July 1979 . Completion Date: 16 July 1980

Proterozoic quartz monzonites are being studied in the Hualapai, Cerbat, Peacock, and Aquarius Mountains of northwestern Arizona. Represent- ative geologic and geochemical data are being collected and evaluated on a best-fit basis with previously developed recognition and favor- ability criteria.

The final report will note the distribution of uranium, thorium, and associated elements in these plutonic rocks as well as discuss the host and source rocks potential of each pluton.

Uranium in Precambrian Conglomerates, Southwest Montana

Subcontractor: Robert E. Cohenour &Associates Subcontract Value: $113,000 Start Date: 2 July 1979 Completion Date: 2 March 1980

In southwestern Montana, older Precambrial; rocks generally referred to as pre-Beltian shon evidence of a period of sedimentation followed by high temperature metamorphism. Rapid ero- sion of the topographically high Pony and Cherry Creek series rocks has given rise to the coarse clastics of the Beltian LaHood Formation conglomerate.

Both the older and younger Precambrian rock units exhibit similarities to Precambrian quartz- pebble conglomerates of the Medicine Bow- Sierra Madre type and are included in this regional reconnaissance study.

Geologic Study of Precambrian Pebble Conglomerates, Needle Mountains, Colorado

Subcontractor: Colorado State University Subcontract Value: $73,705 Start Date: 7 May 1979 Completion Date: 1 February 1980

Precambrian quartz-pebble conglomerates with characteristics similar to those of the Witwa- tersrand and Medicine Bow Mountains have been noted in the Needle Mountains of south- western Colorado. This study was undertaken to test the uranium favorability of this thick rock (5,000 feet/1,524 meters) sequence and to com- pare the resultant data with the general quartz- pebble conglomerate model on a best-fit basis.

Page 55: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Detailed stratigraphic sections have been meas- ured and sampled both geochemically and radiometrically.

Geologic Study of Kettle Dome, Northeast Washington

Subcontractor: Cruson and Pansze, Geologists . Subcontract Value: $60.000 Start Date: 1 June 1979 . Completion Date: 15 February 1980

The goal of this geologic study is to evaluate the uranium potential of the plutonic and meta- morphic rocks of Kettle Dome in northeastern Washington. Chemical and radiometric analy- ses of samples, local detailed mapping, studies of mineral paragenesis, and uranium mineral- ization modeling will assist i n evaluating the uranium potential of Kettle Dome and will provide a comparison of this geologic envi- ronment with similar World-Class environments and uranium deposits. There are numerous small uranium-bearing simple pegmatites in amphibolitic rocks on the margins of the dome. Many of the pegmatites show both metasomatic and injection features.

Geologic Study of Kingston Peak Formation, Southeast California

Subcontractor: University of California at Los Angeles . Subcontract Value: $91.221 . Start Date: 4 May 1979 . Completion Date: 31 March 1980

Late Precambrian quartz-pebble conglomerates of the Kingston Peak Formation are exposed along the west side of the Panamint Range and in nearby ranges of southeastern California. The conglomerates are locally radioactive and are oelng studied to determine the amount and extent of uranium mineralization and to deter- mine if the geologic conditions associated with Precambrian uranium-bearing conglomerates else- where in the world are present in the Kingston Peak Formation. Three field crews under the direction of Dr. Don Carlisle are doing sampling and detailed stratigraphic studies of the con- glomerates. The final report will evaluate the uranium potential of the Kingston Peak For- mation and recommend additional studies and drilling if warranted.

Precambrian Conglomerates of the Central Arizona Arch . Subcontractor: Wallaby Enterprises . Subcontract Value: $93,985

Start Date: 1 August 1979 . Completion Date: 1 April 1980

This project includes the evaluation of the uranium potential of the Precambrian conglo- merates of the central Arizona Arch in Gila County and parts of adjacent counties. Extensive rock sampling and locally detailed stream and sediment sampling are being conducted to evalu- ate areas which have uranium potential. There are several stratigraphic intervals which have quartz-pebble conglomerates and the conglo- merates are being studied in terms of envir- onments of deposition t o compare them with Precambrian rocks known to produce uranium. Uranium has been mined in this area in noncon- glomeratic rocks and the current study also seeks to determine if Precambrian conglomerates may have been source rocks.

Uranium in Metamorphic Core Complexes

Subcontractor: University of Arizona Subcontract Value: $109.000 . Start Date: 19 July 1979 Completion Date: 19 August 1980

The goal of this project is to determine how uranium is mobilized, partitioned, and deposited in and around metamorphic core complexes. This modeling study entails literature review, study of uranium occurrences in core com- plexes, regional map compilations, and detailed sampling and field study of two core complexes. Geologists under the direction of Dr. Peter Coney have been studying uranium in core complexes in the Ruby Mountains of Nevada and the Rincon Mountains of Arizona. A genetic model and uranium recognition criteria plus recommendations for detailed study and dril l ing at selected sites will be the final product.

Uranium in Carbonatites in the United States - Subcontractor: Powell and Associates . Subcontract Value: $93.405 . Start Date: 2 July 1979

Completion Date: 2 July 1980

The objective of the project is to prepare genetic models for uranium in carbonatites using world- wide geologic, geochemical, and geophysical data from carbonatites and associated alkaline rocks and to use these models in evaluating the uranium potential of selected carbonatites in the Uni ted States. Carbonati tes at Rocky Boy, Montana; Powderhorn, Colorado; and Magnet Cove, Arkansas have been studled in the field and sampled. Genetic models have been com- pleted, and evaluation of the models is in Drocess.

Page 56: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

LOCATION OF POSSIBLE INTERMEDIATE-GRADE STUDY AREAS

Intermediate-Grade Studies The Intermediate-Grade Resource Studies be- gan in 1978 to develop, evaluate, and expand that category of uranium resources between 0.01 and 0.05 percent Us08 which normally are not recoverable at costs under $50/per pound.

The targets chosen for detailed study in 1979 were largely in sandstone environments, geo- graphically centered in producing areas. Facies previously considered marginal were given spe- cial attention.

Other environments are being considered and priorities for their test and evaluation will be set by DOE.

Work progressed on four areas, two of which reached the preliminary report stage in 1979. Additional potential locations have been sub- jected to preliminary analysis to develop prior- ities for 1980.

Copper Mountain Drilling Project

Subcontractor: Bendix plus drilling contractor not yet determined

Subcontract Value: Not Yet Determined Start Date: 1 August 1979 Completion Date: 1 August 1980

Subsurface and surface studies are being con-

ducted at Copper Mountain, Wyoming by Bendix personnel in order to outltne a drllling program intended to determine intermediate-grade ura- nium resources outside the area of current industry exploration. Selected boreholes are being logged for KUT data, and use is being made of extensive geophysical and geochemical studies at Copper Mountain completed by Bendix.

Cedar Mountain Drilling, San Rafael Swell

Subcontractor: HimeS Drilling Company, Inc Subcontract Value: $78,100 Start Date: 15 June 1979 Completion Date: 28 July 1979

The drilling project examined the Brushy Basin Member of the Morrison Formation in the area of Cedar Mountain, Utah.

The data obtained from the drilling program increased subsurface knowledge of the Brushy Basin Member. The known reserves of the Cedar Mountain area were confirmed. These are con- fined to the Mountain itself and have no lateral continuity due to the faulting, leaching, and erosion of the region. There were no additional resources identified in the Brushy Basin Member. Results of this project will be publisked in an open-file report in 1980.

Page 57: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Red Desert, Great Divide Basin . In-house project-Intermediate Grade Start Date July 1979 - Completon Date: September 1980

The Great Divide Basin of Wyoming has several depositional environments grading from pied- mont slope through flood plain to lacustrine and swamp facies. The lacustrine paludal facies exhlbit what appear to be large volume, low- grade uraniferous potential with possible rela- tively uniform continuity. The objective of the project is to define and quantify that area con- taining mineral reserve potential in the 0.01-0.05 percent U,O, cateqorv.

Six rotary holes were completed during FY79 for 4,697 feet (1.432 meters) of drilling.

Sand Wash Basin Start Date July 1979 Com~llet ion Date September 1980 . In-house prolect-intermediate Grade

Uranlum mineralization in the sandstones of the Browns Park Format~on of Miocene age has been widely recognized. The formation consists of a basal fluvial conglomerate and lacustrine- eolian tuffaceous sands. The host rock is wide- spread in the basin and is potentially a viable uranium resource.

The objective of this project is to evaluate and assess the formation for its potential as an intermediate-grade (0.01-0.05 percent U,O,) ura- nium resource. Data compilat~on and evaluation coordinated with geologic, geochemical, and geophysical surveys have been conducted. Re- cently, a detaiied aerial resistivity and VLF-EM survey was performed for the purpose of delin- eating favorable structural features. A rotary and core drilling program is scheduled for the spring of 1980.

Topical Geologic Studies Topical Geologic Studies that were part of the NURE program through 1979 have been winding down. Thesespecialized studies in the future will be directed toward broadening the target base for World-Class and Intermediate-Grade Studies.

Geochemical Exploration for Sandstone-type Uranium Deposits . Subcontractor Pennsylvan~a State University

Subcontract Value $58 475 Start Date 2 January 1978 C o m ~ l e t ~ o n Date 31 December 1979

The investigation included the Devonian Catskill Formation in eastern Pennsylvania and the Uravan mineral belt in western Colorado. The obiectives were: (1) to find if sandstone-type uranium deposits are accompanied by regional uranium anomalies in the host rocks. (2 ) to f ind the relations of uranlum to thorium and other major and trace elements, and how these rela- tions can be used in exploration. (3) to see if the ground-water conduits through which uranium was transportea to form orebodies are enriched or depleted in uranium, and (4) to find i f U and Th contents of zircon are useful to explore for uranium deposits in sedimentary rocks.

Results in Pennsylvania indicate regional anom- alies in uranium and thorium probably arose during sed~mentation. During diagenesis, ura- nium was apparently mobilized into aquifers. Paleoaqulfers through which uranium was trans- ported are enriched in U and Fe,O,.

Detailed discussion of this project will be open filed in 1980.

Development of Data Enhancement and Display Techniques

Subcontractor U n v e r s l y of Gporgla Subcontract Value $55 000 Start Date 1 August 1978 Cornpet~on Date 1 December 1979

Significant amounts of highly reliable geo- chemical data, consisting of multi-element analyses of waters and sediments from many sites in each quadrangle, are being generated in the HSSR portion of the NURE program. In order to extract the maximum benefit from this mass of information, most specifically in the identifi- cation of areas favorable for uranium exploration. Dr. George S. Koch. Jr. of the Un~versity of Georg~a with the assistance of Dr. Richard J. Howarth ( Imper~ai College, London), Dr. John Schuenemeyer (University of Delaware), and Dr. Robert H. Carpenter (Un~versity of Georgia) are studying appropriate statistical methods for enhancing HSSR data and b r ing ing out anomalous signals from the background noise. Geochemical mapping and graphic display tech- niques are being developed to optimize portrayal of the statistically treated parameters for visual interpretation of uranium favorability.

The group selected stream-sediment data from three geologically, geographically. climatolog- ically, and hydrologically distinct areas-the Pueblo, Colorado Quadrangle; theseguin, Texas Quadrangle; and a four-quadrangle (Winston- Salem, Charlotte, Spartanburg, and Greenville)

Page 58: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

region in the southeastern United States-for analysis by statistical and graphic methods.

A major portion of the research was devoted to identification and resolution of genuinely sig- nificant uranium anomalies by initially grouping samples according to source-rock type and then using mineralogical models to remove the uranium associated with heavy minerals, leaving residual uranium values thought to represent mobile uranium.

Results of this project will be open filed in 1980.

Involvement of HSSR Data in Uranium Resource Assessment and Identification of Areas Favorable for Uranium Deposits

Subcontractor: University of Georgia Research Foundation. Inc.

Subcontract Value: $139.973 Start Date: 1 August 1979 Completion Date: 1 August 1980

Dr. George S. Koch. Jr. (University of Georgia). in association with Dr. Richard J. Howarth (Imperial College, London) and Dr. Robert H. Carpenter (University of Georgia), has under- taken this study. The team has chosen the four- quadrangle block comprising the Pueblo, Montrose, Durango, and Trinidad Quadrangles in Colorado as the training and test areas.

The HSSR data from thosefour quadrangles will be combined with published grade-tonnage- production data to generate and test mathe- matical models for estimation of uranium resources. Results will be compared with re- source estimates derived by other methods and conclusions will be drawn concerning whether the HSSR data-based estimate can be combined with the other estimates to establish a more reliable final number for the uranium endow- ment of an area.

Results of this project will be published in an open-file report in 1980.

Geochemical Interpretation of Ground- Water Data in the NURE Program

Subcontractor: Colorado School of Mines Subcontract Value: $93.850 Start Date: 1 May 1979 Completion Date: 1 October 1980

Dr. Donald Langmuir of the Colorado School of Mines will study in detail the chemistry and radio- chemistry of ground waters from two known uranium districts in the western and south- western United States. The chemical data, along with measurements of physico-chemical parame- ters such as Eh, pH, and temperature, will be fed into a computer program to determine what solution-mineral equilibria may be controlling transport and deposition of uranium in each area and the extent to which the waters are saturated with respect to uranium minerals. This thermo- dynamic approach may lead to markedly im- proved detection of blind uranium deposits from ground-water data.

Results of this project are to be published in an open-file report in 1980.

Uranium Distribution in Fluorine- Enriched Volcanic Rock

Subcontractor: Arizona State University Subcontract Value: $78.786 Start Date: 1 January 1979 Completion Date: 29 February 1979

Fluorine-enriched silicic volcanic environments in the western United States generally show uranium enrichment when compared to other volcanic terrains. As such, fluorine-enriched volcanic environments provide excellent source rocks for secondary uranium mobilization into

Bendix geologists use a scintillorneter to study a mineralized outcrop in the Copper Mountain area.

Page 59: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

peripheral volcaniclastic and sedimentary envi- ronments. With primary petrochemical enrich- ment, various depositional facies of the volcanic terrain may achieve sufficient uranium minerali- zation for consideration as an intermediate- grade uranium resource in themselves.

The objectives of the project are to study the dynamics of the uranium-fluorine relationship during magmatic differentiation; eruption, weld- ing, secondary crystallization, and diagenesis of tuff sheets; and hydrothermal fluid migration. The primary study area is the Spor Mountain- Thomas Range area of western Utah. Secondary sites have been studied where there are known occurrences of fluorine-enriched voicanics and (or) topaz-bearing rhyolite.

At Spor Mountain, the principal investigators, Drs. D. M. Burt and M. F. Sheridan, will integrate pre-existing geologic and geochemical infor- mation from government, industry, and Bendix sources with their own field and laboratory data to formulate a geologic-geochemical occur- rence model(s) for the various types of uranium mineralization that might be found in fluorine- enriched volcanic rocks. Recognition and favor- ability criteria will be generated from the model. The final report will also identify areas in the United States where the model(s) might be applied for uranium exploration purposes.

Uranium in Proterozoic Metamorphic Rocks

Subcontractor: Michigan Technological University Subcontract Value: $100.892 Start Date: 29 March 1977 Completion Date: 30 April 1979

Sedimentation of the basal Kombolgie Formation (Upper Precambrian-Carpentarian), Northern Territory, Australia has possible significance in the genesis of the underlying Alligator Rivers unconformity-type uranium deposits.

Dr. R. W. Ojakangas of the University of Min- nesota (Duluth) synthesized current data col- lected in Australia during field studies for the original contract.

The controversy surrounding the genesis of the major Australian deposits in the Northern Terri- tory made these data important. A definitive posi- tion on their genesis cannot yet be made. Dr. Ojakangas has determined that paleocurrents, as indicated by sedimentary structures, Lower Kom- bolgie sandstone, and conglomerate, flowed down a paleoslope from west and northwest to east and southeast. Thesediments reflect thetec- tonics to which the Kombolgie was subjected.

These facts are related by Ojakangas to the genetic theories.

Uranium in Accessory Minerals SuDcontractor: Colorado School of Mines

Research lnstitute S~bconlracf Value $82.296 (Amended. $55.100, Starr Dale 27 SePtemDer 1978 Completion at el 31 January 1980

The analytical work on whole rock samples relating to known uranium occurrences has been completed and the Colorado School of Mines Research lnstitute has entered into the interpretive phase.

The study is part of the U.S. effort in collabo- ration with IAEA to answer in part the hypothesis that certain trace elements other than thorium may be reliable indicators of uranium districts.

CSMRl will conduct additional sampling and analyses when synthesis of the existing material indicates these efforts are warranted.

Preparation and Publication of Chronometric-Geologic Correlation Charts for the Precambrian of the United States and Mexico

Subcontractor: University of Wyoming Subcontract Value: $15,000 Start Date: 1 November 1977 Completion Date: 31 March 1980

Precambrian metamorphic, igneous, and sedi- mentary rocks are recognized by geologists to be favorable hosts for many types of base-metal and precious-metal mineralization. Recent dis- coveries of uranium and thorium mineralization in Precambrian host rocks provide the need to further understand the chronometric relatlon- ships of Precambrian rocks on a "continent- wide" basis.

rhis project will provide funds for Dr. R. S. Houston, University of Wyoming, and various team members of the Structural Union of Geophysical Societies Working Group on the Precambrian for the United States and Mexico to complete the work on chronometric relationships of Precam- brian rocks started by the USGS.

The correlation charts, with companion manu- scripts, will be released jointly by a GJO open- file report and by a special issue of Economic Geology in mid 1980.

Uranium Favorability of Calcretes Subcontractor: University of California at Los Angeles Subcontract Value: $111,300 Start Date: 21 June 1976 Completion Date: 31 January 1980

Page 60: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

The original model study was open filed as GJBX-29(79). Further work has been done in South Africa to update the model, and this will be open filed in 1980.

Lacustrine Uranium Distribution . Subcontractor: Lamar-Merrifield Subcontract Value: $20,600 . Start Date: 18 October 1978 . Completion Date: 18 October 1979

The Kern Lake. California study produced a number of surprising results in regard to uranium and thorium deposition in the lacustrine envir- onment. Contrary to expectations, thorium highs were encountered in mid lake. Uranium dissemi- nation does not follow expected patterns with relation to solutions entering the lake via the Kern River with its relatively rich source rocks, such as those found at the Miracle Mine.

The report, to be open filed in 1980, will give the results of a detailed geochemical survey of the lakeand its environs. The investigators were able to utilize trenches opened up by the USGS in the course of its Microseismic Studies.

Uranium in Red Muds . Subcontractor: Zellars-Williams Subcontract Value: $44.500 . Start Date: 12 September 1978 Completion Date: 12 April 1980

The Red Mud residues from aluminum pro- duction have been analyzed for uranium and thorium content.

The results of this program indicate, by reason of the tremendous volumes of material and a posslale 30 ppm uranium content, that these residues are a potential low- to intermediate- grade uranium resource. The study indicates that there is a by-product potential with alu- minum production not unlike that of phosphates. The study, t o be open-filed in 1980, will assess the by-product potential and indicate the re- sources contained in the muds.

Regional Geology and Uranium Favorability in Alaska . Subcontractor: Geophysical Institute

University of Alaska . Subcontract Value: $74,677 . Start Date: 3 August 1978 Completion Date: 3 February 1980

Metamorphic terrains in the Seward Peninsula are included in a study of the tectonic evolution of Alaska. A total of 14 areas are being tested to ascertain if variations in uranium and thorium content have a correlative relationship between tectonic events.

Enriched andlor depleted uraniumlthorium prov- inces, therefore, can be identified and rank ordered on the basis of developed uranium favorability criteria.

Study of Uranium- and Thorium-Bearing Pegmatites . Subcontractor: Derry. Michener & Booth

Subcontract Value: $83.000 Start Date: 1 October 1978 Completion Date: 30 April 1980

In order to assess the uranium/thorium potential of individual pegmatites within the several peg- matite provinces in the US. , a minimum of eight radioactive pegmatite localities are being sam- pled and studied in detail. From these studies favorability criteria are being developed which may be utilized in future economic studies of additional pegmatite localities within the U S . and Canada.

Radioactive Mineral Deposits in Arizona . Subcontractor Unverslty of Arizona

Subcontract Value $59 270 . Start Date 1 September 1979 Completlon Date 30 November 1980

The Arizona Bureau of Geology and Mineral Technology, a division of the University, is con- ducting a detailed inventory of the radioactive mineral occurrences in Arizona. The goal is to provide a complete synthesis of all available data and to locate and describe all known radioactive occurrences in Arizona. A complete report, to be published by the Bureau in late 1980, will sum- marize the present widely scattered data so that they will be more useful in the exploration for. and the development of, the radioactive minerals in Arizona.

Uranium in Granites of Southwestern North America

Subcontractor: California Institute of Technology Subcontract Value: $108.180 . Start Date: 20 August 1979 Completlon Date: 19 August 1980

Dr. Leon T. Silver of California Institute of Tech- nology, is studying the systematics of the distri- bution of uranium, thorium, and radiogenic lead among the major, minor, and trace minerals of uraniferous and nonuraniferous plutonic suites of igneous rocks in southwestern North America. These studies will include petrogenic, tectonic, and chemical characterization of and compari- sons between high uranium (greater than 8 ppm) and low uranium (less than 4 ppm) plutons of similar geologic provenance. Representative plutonic rock suites will be identified from

Page 61: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's
Page 62: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Technology Applications The Technology Applications element of NURE Uranium Borehole Logging with PFN provides technical development evaluation, DOE Contractor: Sandia Laboratories

and integration of new and improved techniques, . Subcontract Value: $560.000 methodologies and instrumentation for uranium Start Date: September 1978

exploration and resource assessment. Tech- . Completion Date: September 1979

nology Applicationsencompassesthedisciplines Activity continued in two major areas: commer- of geophysics, geology, physics, geochemistry, cialization of the neutron generating tube computer science, and electrical engineering. technology and prompt fission neutron system Bendix pursues this program with in-house pro- refinement along with field work. fessional specialists and subcontractor back-up services and experience. Continuing develop- A subcontract issued by Sandia to Kaman ment and improvement in testing and evaluation Sciences Corporation, Colorado Springs, Colo- of geophysical and logging instrumentation used rado in mid 1978 continued with the objective of in uranium exploration is oneof the key program transferring Sandia's tube technology to the objectives. Technology integration, anotner key commercial sector. Phases I and II required the objective, is achieved by geophysicists, geol- construction of 10 Controlatron tubes and five ogists, physicists, and geochemists combining to transformers with three tube transformer assem- produce research and developmental data con- blies (TTA), respectively, and were successfully cerning: exploration and resource assessment concluded. Phases I l l and IV, which aretied to the strategies; ore genesis models; and definition and Zetatron tube (an improvedversion of thecontro- identification of uranium-associated halos. This latron) development, were deferred pending stu- research is carried out using evaluations of iden- dies by Sandia and General Electric Neutron tified deposits in known geological environments Devices on the system handling procedures for havino a varietv of oeoloaical conditions. preloaded reservoirs. It is planned that Phase I l l - , - -

work by Kaman to build 20 of the high output In addition, technical support is furnished in Zetatron tubes will resume in January 1980, electronics and geochemical analyses for the entire NURE program. Technical products of the program are transferred to the public via open- Improved prompt fission neutron (PFN) probes

file reports, professional journals, and presen- were completed and successfully tested. Of par-

tations at professional meetings and forums. ticular note was the elimination of a troublesome

The resultant program and budgetary categories noise problem and the increase in epithermal

for Technology Applications are identified as neutron sensitivity. Late in the year, l ife testing

Technology Development and Evaluation, Tech- of the neutron generating tube was intiated. Re-

nology integration, and Technology Support. sults of the testing will be available in early 1980.

Technology Development and Evaluation

Bendix is involved in a number of projects with the potential t o improve instrumentation and methodology in uranium exploration and re- source assessment.

Areas of broad interest in Technology Devel- opment and Evaluation include prompt and delayed fission neutron logging, gamma-ray spectral logging, radon and helium emanometry, and aerial radiometrics.

Technology resulting from these projects is made available to industry, other government agencies, and the general public vla oper,-file reports, seminars, professional forums, and journal publications.

Field work during the year using the PFN system was conducted in Texas. New Mexico, and Washington. The latter was by special arrange- ment with DOE'S Hanford facil ity contractor Rockwell for PFN logging (for plutonium) at a waste disposal site near Richland. Also of note f r ~ m the year's field work was the logging of mill settling ponds by dragging the PFN probe along the bottom of the ponds.

2Wf-Based Direct Uranium Logging System . Subcontractor: IRT Corporation

Subcontract Value: $240.464 (Phase'l) $531,329 (Phase I!)

Start Date: 1 June.1977 (Phase I) Completion Date: December 1979

Efforts during the year were directed at bringing the prototype development and field testing to an end. Costs incurred during the year amounted to $32,342.

Page 63: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

In summary the activities for the year included the completion of reduction/analysis of all re- maining unanalyzed data and the delivery of the equipment and f~na l report to Grand Junction.

During the latter part of 1978, field work was conducted in Texas and Wyoming and by special arrangement on DOE'S Hanford facility located near Richland, Washington. These data were reduced, analyzed, and disseminated to the principals involved.

The first draft of the final report was received in late September and after some revision is scheduled for open filing in 1980. The system drawings were accepted in an "as is" condition and are available for inspection at GJO.

Based on this work, IRT designed and built a system for use in mineral exploration and announced the availability of a commercial "Delayed Neutron Logging" service late in 1979. The photo on page 65 shows the commercial system at the time i t was calibrated in the fission neutron models in Grand Junction

Borehole Neutron Activation Analysis (NAA) for Uranium Associated Elements

. DOE Contractor: Sandia Laboratories . Contract Value: $220.000 . Stan Date: 1 January 1979 Completion Date: February 1983

The goal of this work is t o develop a gamma-ray spectroanalysis probe that assays for elements which are associated with uranium deposits. It is envisaged that this probe, when developed, will be used in concert wi th other prospect ing techniques in a systems approach for the identi- f i ca t ion of locat ions favorable t o uran ium mineralization. The principles involved in the probe concept include the generation of 14 MeV neutrons, the resulting propagation and sub- sequent capture of these neutrons by formation elements, the time and spectrally resolved detec- tion of both capture and delayed gamma-rays emitted by the capturing atoms, and a reduction of the data culminating in an elemental analysis of the formation.

Chemist inserting boat i n LECO sulphur analyzer at the Grand Junction laboratory

62

Page 64: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

After consulting with experts from the U.S. Geo- logical Survey and the National Aeronautics and Space Administration, a specification was put together and a request for proposal (RFP) was issued. The basis of the RFP was a cooled high purity germanium detector with a preamplifier, amplifier, and high voltage circuits, all to be housed in a 2.5-inch (63.5 millimeter) outer diameter probe. Subcontract award was made to Ortec Inc. in Oak Ridge. Tennessee.

Borehole Neutron Experiments Subcontractor: Science Applications, Inc. Subcontract Value: $44.350 . Start Date: December 1977 Completion Date: October 1979

The measurement program for this project, a joint effort with Science Applications and BFEC personnel, is now complete and the report, GJBX-165(79), was open filed in December 1979.

The first phase was an experimental evaluation of a fast fission source monitor that measures the pulsed 14 MeV neutron output from direct uranium borehole logging probes. The WJ-lined proportional counters used as the monitor detect only neutrons with energies above the fast fission threshold at about 1.5 MeV. Results indicate that the fast fission counter functions well as a 14 MeV neutron monitor and is rela- tively insensitive to variations in borehole con- ditions and to other variations in the surrounding neutron scattering medium. Additional tests are required to further evaluate this source monitor concept.

The second phase of the project required a series of benchmark neutron flux measurements to verify results of a previous calculative study on the performance of fission neutron direct uranium logging probes. Absolute neutron flux measurements for both 252Cf and 14 MeV sources are in agreement with the calculative results re- ported previously in GJBX-44(77) and GJBX-52(79).

Borehole Neutron Correlation, Phase II . Subcontractor: Consolidated Controls Corporation . Subcontract Value: $53.350 Start Date: 17 May 1979 . Completion Date: 17 August 1980

Experiments are being conducted t o test the associated particle technique for uranium explo- ration with probes containing neutron gener- ators. Utilizing this technique, the alpha particle. emitted as a result of the reaction in the gen- erator, is monitored to provide information on

the time and direction of neutron emission. Gamma rays and neutrons from the neutron- induced reactions in the formation are subse- quently detected and correlated with the initial neutron emission.

The experiments are being conducted in a laboratory using simulated sandstone forma- tions containing known amounts of uranium. The results will be used to test theoretical caicu- lations from Phase I of the project and t o determine the feasibility of the technique for uranium exploration.

Gamma-Gamma Transport Calculations Subcontractor: Science Applications. Inc. . Subcontract Value: $69,633 . Start Date: April 1979 Completion Date: May 1980

This calculative study by Science Applications employs state-of-the-art Monte Carlo radiation transport techniques to investigate the gamma- ray backscatter principle as a direct uranium logging method. With this technique the study will also determine the sensitivity of formation density measurements to variations in borehole diameter, fluid, rugosity, and mud cake con- ditions and will determine probe design para- meters.

Four of the eight Monte Carlo calculations are complete. Each calculation models the probe and borehole geometry in great detail and predicts the probe signal as a function of source- detector spacing, uranium ore grade, detected gamma-ray energy, source emission angle, de- tector incident angle, and formation sampling depth.

When complete, the data base of results will be implemented on the GJO CDC 6600 computer system. A user's program will permit the use of this data base in solving calibration and design problems for gamma-ray backscatter borehole probes.

A final report for this project will be open filed in 1980.

Spectral Gamma Evaluation/Refinement Ongoing in-house project

Bendix has a continuing project to improve data- reduction and correction procedures for spectral gamma-ray logs. This project also seeks to improve hardware used for collecting borehole data.

The Grand Junction calibration models are used in conjunction with borehole probes t o provide

Page 65: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

data for the studies. Results have helped to better cha'racterize these models and to provide understanding of data collected in the field by the Bendix logging personnel.

T h e work th is year was concentrated i n the fol lowing areas: energy stabilization methods, tests of commercial portable spectrometers, log deconvoiution with the inverse digital filters, and interpretations of h igh resolution gamma-ray transport calculations.

A gamma-ray logging workshop is planned for 1980 to discuss the results of the investigations and to confer with industry representatives. After the workshop a report on the studies will be open filed.

lntrinsic Germanium Probe Evaluation Ongoing in-house project in cooperation with the USBM. Princeton Gamma-Tech, and CONOCO

This project to evaluate high resolution intrinsic germanium probes for direct uranium logging began in 1978 as a cooperative effort between the DOE/GJO and the USBMIDenver. The ger- manium probe fielded by Princeton Gamma- Tech and the fission neutron probes developed by IRT, Sandia, and Century Geophysical logged a set of 30 test holes in south Texas.

The test holes exhibited a wide range of uranium grades and uraniumhadium disequilibrium con- dit~ons. Extenswe core analyses were performed by BFEC' to characterize the composition and physical properties of the test holes. All core and logging results have been written to a compu- terized data base. The data base was then exercised to produce various comparison plots and other forms of data evaluation for the several direct uranium probes.

Calculation of the grade-thickness product for each orezone and sonde type shows that the logging results are widely dispersed about the values obtained from the core assays. Results for ,the IRT sonde are systematically lower than core results, the Century sonde severely overesti- mates the grade thickness product for very low grade zones, and the PGT sonde exhibits a sys- tematic trend toward underestimating grade thickness for higher grade (>1,000 ppm) ore zones. The Sandia sonde shows no such sys- tematic trends but seems to agree better with core results at the higher grades (1,000 to 2,500 ppm range). Neglecting the very large discre- pancies observed, for example, with Century's sonde at low grades, or with IRT's sonde when malfunction was suspected, the four direct

uranium logging sondes exhibited similar dis- persions about the core results.

Approximately 50 peccent of the time the logging sondes are within ?r30 percent of the core results while about 75 percent of the time they a r e within ?50 percent. A certain amount of this dis- persion is due to the unfavorable borehole con- ditions and to the variety of host environments sampled.

Complete project results will appear in an open- file report to be published early in 1980.

lntrinsic Germanium Probe Subcontractor: Prlnceton Gamma-Tech Subcontract Value: $44,374 Start Date: 13 June 1979 Completion Date: 15 December 1979

A borehole probe for use in the DOE calibration models was built by the subcontractor for use by Bendix. The probe contains an intrinsic ger- manium detector which is cryogenically cooled during operation and warmed to room tempera- ture during storage.

The germanium detector provides high reso- lution gamma-ray spectra from the calibration models. The spectra are superior to those col- lected by scintillation detectors such as sodium iodide because there is much less overlapping of gamma-ray signals from the various radioactive elements in the models. Data from this probe will be used to obtain correlations of the grades in the calibration models.

Computation and Nondestructive Assay Methods

Subcontractor: Los Alamos Scientific Laboratow . Subcontract Value: $200.000 Start Date: October 1976 . Completion Date: December 1980

In 1979 the Los Alamos Scientific Laboratory (LASL) completed a program of theoretical spectral gamma-ray flux calculations for three distributions of rock with gamma-ray source material: (1) an infinite, homogeneous rock medium, (2) two "semi-infinite," homogeneous media, air and rock, separated by a plane interface (airborne model), and (3) an infinite, homogeneous rock medium which is penetrated by a borehole (borehole model). In each case. the simulated gamma-ray fluxes were generated in the rock by uniform concentrations of po- tassium-40, uranium-235, uranium-238, thorium- 232, and radioactive elements in the decay chains. Secular equilibrium was assumed for all decay series.

Page 66: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Commercial version of IRT delayed neutron logging system.

Previously developed sodium iodide detector response calculations were refined and convo- lution methods were formulated to enfold the calculated detector responses with the cal- culated gamma-ray flux spectra. With these results, pulse-height spectra can be calculated for simulated airborne surveys or logging runs. The borehole model calculations allow for vari- ations in borehole diameter, borehole fluid (air or water), borehole casing composition and thickness, sonde wall thickness, and rock bulk density, porosity, and saturation. The calcu- lations can therefore be used to predict the effects of these parameter variations on gamma- ray logs. In the airborne model, the effect of aircraft height on the survey can be investigated.

Comparisons between calculated results and experimental data demonstrated the accuracy of the borehole calculational methods. Flux calcu- lations, detector response calculations, and en- folding calculations were performed for po- tassium, uranium. and thorium source material surrounding a 1.5-inch by 9.0-inch (3.8 cen- timeter by 22.9 centimeter) sodium iodide de- tector in a borehole. The calculations utilized source and borehole parameters from the DOE K. U, and T borehole calibration models at Grand Junction. The calculated pulse-height spectra were in excellent agreement with data collected by BFEC with a 1.5-inch by 9.0-inch (3.8 centimeter by 22.9 centimeter) sodidm iodide detector in the K, U, and T borehole cali- bration models.

LASL completed a series of gamma-ray trans- port calculations for a gamma-gamma-type sonde in a borehole. This sonde was designed to obtain accurate uranium assays in formations characterized by uranium/radium disequil- ibrium. The calculations imply that the uranium K-shell x-ray fluorescence signal can be utilized

to detect disequilibrium and obtain the desired uranium assay.

A sonde that employs a photoneutron source has been designed and is being evaluated for direct uranium detection through fission neutron logging. Photoneutrons will be generated in the sonde by gamma-ray bombardment of beryl- lium. This is accomplished through the mechan- ical coupling of an antimony-124 gamma-ray source with a beryllium target. Neutron radiation safety problems are alleviated by the fact that neutron generation terminates upon separation of the gamma-ray source from the target. A prototype sonde is now undergoing borehole tests.

In 1979 a report entitled Nondestructive Assay Technology for Uranium Resource Evaluation: Infinite Medium Calculations Final Report, GJBX-85(79), was placed on open file. It de- scribes gamma-ray flux calculations for infinite, homogeneous rock media.

R&D Logging Vehicle Start Date: August 1977 Completion Date: December 1979

The purpose of this project is the construction of an R&D logging vehicle. Fabrication of the vehicle's logging cabin, draw works, and boom was completed by Energy Products, Ltd., of Fort Worth, Texas. The installation and checkout of electronics systems, including a Data General Nova 3/12 minicomputer, was completed by Bendix personnel. The vehicle will support Bendix R&D work in borehole logging tech- niques and geophysics. Major projects that make use of the vehicle are gamma-ray spectral logging (including KUT), prompt fission neutron (PFN) logging, and magnetic susceptibility (MS) logging. It also provides caliper, total gamma-

Page 67: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

ray, neutron-neutron, resistivity, self potential, and gamma-gamma density measurements for ancillary information.

With the on-board minicomputer, the vehicle will support borehole instrumentation R&D with ex- ceptional data taking and processing capabili- ties. I t hassupported gamma-ray spectral studies and MS work in Colorado, Wyoming, and Utah. PFN demonstrations began in December 1979.

Fiber-optic Logging Cable Development . Subcontractor: Optelecom lnc

The system will include a downhole electronics package that contains a 16-channel analog-to- digital converter, six pulse counters (scalers), two multichannel scalers (MCS), a four-bit digital I10 interface, a high speed serial interface (for a pulse height analyzer), and a high speed modem to transmit data from the above men- tioned acquisition components to the surface. At the surface, a mating modem and rninicom- outer interface will be Drovided and laced in the ~ e n d i x 1 ~ 0 ~ R&D logging vehicle.

A report and documentation will be provided by the subcontractor.

Subcontract Value: $91.306 Start: October 1978 Phoswich Airborne Detector Completion Date: 1 March 1980 Subcontractor: Grumman Aerospace Corporation

Subcontract Value: $253.492 A fiber-optic borehole logging cable will in- Start Date: 27 April 1976

crease the data-transmission capabilities of log- - Completion Date: February 1980

ging systems many times over the industry standard, four-conductor, logging cable. The objective of this project is to develop a fiber- optic logging cable system that includes a 1,000- foot (305 meter) length of fiber-optic cable containing three optical fibers, three copper conductors, and two armored layers, having the same mechanical characteristics as a standard four-conductor logging cable. Cable termination assemblies and interface electronics are provid- ed to: transmit digital data through the optical fibers from borehole electronics to the surface, transmit control data from the surface to bore- hole electronics via an optical fiber, and power the probe using the copper conductors.

Construction of a 400-foot (122 meter) prototype fiber-optic logging cable has been completed. This prototype cable was tested and proved to be feasible for borehole logging. A draft report has been scheduled for open filing.

Borehole Data Transmission and Acquisition System (BDATS)

Subcontractor: Science Applications. Inc. Subcontract Value: $100,000 Start Date: 17 December, 1979 . Completion Date: November 1980

Digital data transmission of borehole probe signals will provide a much needed improvement over analog data transmission techniques. This is especially true when pulse-type signals and large quantities of data are t o be transmitted across long lengths of standard logging cable.

This subcontract provides for construction of a prototype BDATS that utilizes digital data trans- mission and acquisition techniques.

Based on a study of possible Phoswich detector configurations, Grumman Aerospace has fab- ricated a hybrid Phoswich detector that is expected to have a greater sensitivity for uranium than a sodium iodide detector by about 50 percent for equal volume or weight systems. The configuration selected should also provide infor- mation concerning atmospheric radon and topo- graphic changes. The hybrid detector has a sodium iodide main crystal, a cesium iodide back crystal, and a sodium iodide annulus. Testing of the detector in the laboratory and in flight has been accomplished. The flight pro- gram consisted of collecting dataon: the Walker Field Pads. the Dvnamic Test Ranae, and a portion of the ~ u b b b c k Quadrangle. E e l h i n a r y results indicate that each of the two Phoswich detectors tested have a spectrum with a reduced background level in the region of the uranium peak that gives an effective sensitivity improve- ment of approximately 50 percent. The testing also established the directionality of the detector system since a nonuniform radiation field can readily be ascertained by the ratio of the total counts from the annulus crystal to the total counts from the central crystal. The results of this project are scheduled for open fi l ing in 1980.

Spectrum Enhancement (Phase II) Subcontractor: Science Applications. Inc. Subcontract Value: $141.149 Start Date: 1 February 1977 Completion Date: 31 May 1979

This is the second phase of a study to demon- strate the applicability of the spectrum-enhance- ment technique (MAZE) t o data acquired with sodium iodide detector systems currently used

Page 68: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

in aerial radiometric surveys. The technique treats spectral data mathematically to extract more accurate information on the potassium, uranium, and thorium signature gamma-ray intensities. Also, the technique is capable of revealing previously hidden spectral features which will be helpful in making corrections for the presence of airborne bismuth-214, vege- tation, and overburden.

As announced in the NURE 1978Annual Activity Report, results of the study were published in report GJBX-169(79) which includes: (1) an eval- uation ofthe technique, as afunction of counting statistics, (2) an investigation of the ground mois- ture and ground cover effects on the aerial gamma-ray spectrum, (3) an analysis of cor- rections for nonlinearities in sodium iodide (thallium drifted) data, (4) a fast running version of the computer code, (5) the conceptual design of a new data-filtering technique for aerial data. and (6) a comparison of MAZE techniques to conventional processing methods.

Subcontractor's MAZE Code DOE Contractor: Science Applications, lnc. Subcontract Value: $212,398 Start Date: 4 June 1979 Completion Date: June 1980

With the successful conclusion of the Spectrum Enhancement Phase II Project, this effort was begun in order to prepare for implementation of the spectrum enhancement (MAZE) technique. The study is organized into two tasks. First is the final development and demonstration of a tem- poral filtering technique conceptually developed under the Phase II project. Second is to assem- ble computer codes for determining detector response functions of typical aerial radiometric detectors into a user oriented package.

Both tasks are required to transfer all codes to a minicomputer. The HP 1000/45 has been chosen as the representative minicomputer since one is availableto BFEC. Converting codes of tasksone and twoto theHP 1000/45 isstill in progress.The planned code performance tests and demonstra- tions toward code evaluations and processing of radiometric data should begin in early 1980.

Vertical Radon Propagation Subcontractor: Radiation Research Associates, lnc Subcontract Value: $168.488 Start Date: 31 January 1978 Completion Date: 30 November 1979

Data acquisition under this subcontract has been completed. A relative cost advantage was realized by locating the radon detectors at

various levels on a commercial 1,500 foot (457 meter) tall RF transmission tower and using local labor to maintain the instrumentation over the 3-month emplacement period.

When open filed in early 1980,thefinal report will provide knowledge of the near-earth distribution of radon during seasonal variations as well as the effect of microscale weather patterns on its concentration and stay time.

In addition, the report will promulgate much needed information for developing more accu- rate techniques to account for radon daughters and further improve subsequent model calcu- lations. A data summary from current literature has been prepared and will be included in the final report.

Effect of Vegetation . Subcontractor: Radiation Research Associates. Inc. Suoconlracl V a l ~ e $25.657 Start Dale 29 September 1978 Completion ~ a t e i 30 November 1979

This effort examined the magnitude of the vege- tation effect on natural gamma transport. Ground cover biomass and tree/tree-root biomass were modeled using both one and three dimensional analyses. Their effect on the angular distribution of ground emanating gamma-rays was also quantified. Preliminary results verify that vege- tation reduced the field of view of aerial spec- trometers and that the sensitivity can be reduced by a factor of two. Complete results of this study will be open filed in 1980.

Statistical Techniques Applied to Aerial Radiometric Surveys (STAARS)

Ongoing in-house project

STAARS is an in-house project designed to develop independent computational tools for the interpretation of NURE aerial radiometric survey data. Techniques such as principal components analysis, discriminant analysis,trend surface gen- eration, robust outlier evaluations, and maxi- mum sequential variance analysis are some of those now in operation. Additional techniques including regression analysis, nonparametric analysis, and various forms of spatial filtering are oeing evaluated. Both binary and dynamic clus- tering algorithms are also under development. Publications of software developed under this project will be produced as each method com- pletes test and evaluation; also, publications illustrating each technique applied to geological interpretation will be prepared.

Page 69: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Training Area Studies Ongoing in-house project

The Training Areastudies project is designed to provide a case study vehicle by which interpreta- tion methods developed under the STAARS pro- ject will be applied to specific uranium deposi- tional environments. Training area sites now include Copper Mountain, Wyoming, the Bear Lodge Mountains area of Wyoming, the central portion of the Powder River Basin, Wyoming, and the southeast Texas Gulf Coast area. Additional training area sites will include the Big Bend region, Texas, the McDermitt Caldera area of Nevada, and the Date Creek area of Arizona. The first of several reports on this work is scheduled to be completed late in the summer of 1980.

Airborne Data Evaluation Subcontractor: G-Cubed, Inc. Subcontract Value: $156,000 Start Date: 1 August 1978 Completion Date: 15 October 1979

The intent of this program is to acquire an inde- pendent assessment of the exploration utility of NURE aerial survey data. The Lubbock, Texas NTMS Quadrangle was selected as the study area. Three tasks were undertaken to determine the practical exploration applications of the NURE aerial radiometric reconnaissance survey as evaluated for the Lubbock Quadrangle. The tasks include: (1) evaluation and interpretation of the aerial survey data for exploration targets, (2) determination of ground truth for specific areas chosen and/or eliminated as exploration targets, and (3) evaluation of the available NURE hydrochemical and stream-sediment reconnais- sance data for the quadrangle and correlation of the results with the survey interpretation. Open- file report GJBX-135(79) is a result of this study.

Two exploration models are proposed. The first and most obvious involves the basal Dockum (Triassic) sandstone while a second more spec- ulative model was derived from the NURE data by integrating NURE aerial radiometric, NURE HSSR, subsurface geologic, and ground geolo- gic and geochemical data.

The report concludes that the NURE data sets, when coupled with that normally integrated into exploration programs, can be used in this area to generate exploration models.

Crystal CityIBeeville Geochemical Analysis Models

Subcontractor: Rice University Subcontract Value: $70,341 Start Date: 1 June 1979 Completion Date: 31 March 1980

68

The objective of this project is to: (1) obtain an independent expert assessment of the utility of the NURE aerial survey open-file report, (2) obtain an independent expert assessment of the utility of the NURE aerial survey data, and (3) investigate various techniques by which NURE aerial reconnaissance survey data may be used to characterize the radioelement distribution of six formations from the study area.

Completion of this project will lead to an open- file report in 1980 that will include a map showing relative uranium favorability in the Crystal City and Beeville, Texas NTMS Quad- rangles. This favorability may be expressed in terms of dollars per square kilometer of explo- ration costs and will be based on aerial radio- metric data, hydrogeochemical data, formation characterization, and drilling depths involved. Also in the report will be a geochemical model which fits the radiometric characterizations devel- oped. This model will be validated through "ground truth." Hydrogeochemical, stream- sediment, and aerial reconnaissance data will be included in the model and any inconsistencies between the model and the aerial radiometric data will be addressed.

Preliminary results indicate that the data in the open-file reports have identified, on a relative basis, the granitic provenance factor in the Qua- ternary alluvium and barrier island part of the Beaumont Formation and even in the Beaumont proper, assuming that almost all of the Beau- mont in the study quadrangles is radiometrically dominated by clastics from the Precambrian of central Texas.

Geophysical Interpretation, Big Bend Area, Texas

Subcontractors: University of Texas at El Paso Purdue University University of Texas at Dallas

Subcontract Value: $111.161 Start Date: 19 September 1978 Completion Date: 19 September 1980

The major objective of this study is to prepare a geological interpretation of geophysical data in the area of the Marfa, Emory Peak, Presidio, and Fort Stockton Quadrangles in west Texas for controls on the distribution of observed uranium and thorium resources. A secondary objective of this study is to evaluate and illustrate the use of geophysical data derived from the NURE aerial radiometric and magnetic surveys. Special em- phasis is placed on the utility of analytical methods to derive magnetic maps from the original magnetic anomaly data by computer processing.

Page 70: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

A major product of this study will be regional gravity and magnetic maps of the area as well as an integrated analysis of geochemical sampling from NURE HSSR surveys and other ground truth sampling. This study will provide a regional geophysical and geochemical interpretation as background for detailed aerial radiometric and HSSR surveys now being conducted in the Big Bend area of Texas. A report will be open filed in late 1980.

Reconnaissance Magnetics Interpretation

Subcontractor: QEB. Inc. Subcontract Value: $54,849 Start Date: 23 October 1978 . Completion Date: 15 November 1979

The aerial gamma-ray spectrometer surveys subcontracted under the Aerial Radiometric Reconnaissance element of the NURE program include a collection of aeromagnetic data. The surveys are designed for the collection of high quality radiometric data and are not limited by some of the normal constraints of magnetic data collection. This project is designed to examine the usefulness of combining magnetic data from the NURE surveys with available gravimetric data to provide a more complete regional sub- surface interpretation for possible use in eval- uating uranium resource potential. As part of the study the quality of NURE-collected aeromag- netic data wil l be assessed and calibration procedures and checks recommended.

An open-file report on this study is planned for 1980.

Video lmage Enhancement Subcontractor: University of Wyoming Subcontract Value: $1 19.925 Start Date: 1 April 1975 . Completion Date: 15 December 1979

As reported in the 1977 Annual NURE Report, t t e original contract with the University of Wyoming was twice modified to: (1) allow varied demonstrations of the capabilities of the video enhancement system, and (2) establish ground truth correlation with proposed uranium-asso- ciated alteration evident in video-processed LANDSAT and aer ia l fa lse-color in f rared imagery.

As a result of the first modification. LANDSAT imagery was analyzed and interpreted for nine areas in the southern and western United States, selected by Bendix and DOE geologists. Dif- ferent procedures were used in each area, depending on specific problems and objectives.

L i thologic dist inctions and detection of al- tered zones were accomplished with spectral processing: edge enhancement and contrast stretching were used as aids for structural inter- pretation. A detailed presentation of this work is available in open-file report GJBX-137(78).

As a result of thesecond modification, LANDSAT imagery and aerial photography were shown to be useful for mapping areas of altered sandstone associated with roll-front uranium deposits. lmage data must be enhanced so that spectral contrasts related to alteration can be seen through masking contrasts of soil moisture and vegetation. For LANDSAT data, the ratio of band 7 to band 4 produces the best enhancement of altered sandstone. The ratio of 6 to 4 is most effective for color infrared aerial photography.

Samples col lected at t h e Pumpkin Buttes uranium district show that iron, i n theform of an oxide stain on sand grains, is the primary coloring agent which makes alteration visually detectable. Statistical analyses show that the detectability of geochemical and color zonation in host sands is weakened by soil-forming pro- cesses. When alteration can be mapped in areas of thin soil cover and moderate to sparse vegeta- tivecover, it often isa good indicatorfor roll-front uranium deposits. These results are presented in GJBX-l71(79).

Imagery Pattern Recognition Subcontractor: Earth Satellite Corporation Subcontract Value: $108.700 Start Date: July 1978 . Completion Date: December 1979

The purpose of this subcontract was to inves- tigate the application of texture measures and displays to uranium exploration, using data from the LANDSAT series of spacecraft as the primary information source.

Six training sites were selected, consisting of Copper Mountain (Wyoming); Pumpkin Buttes/ Kaycee (Wyoming); Grants (New Mexico); Rossing (Namibia); Marysvale (Utah); and Beaverlodge (Saskatchewan). For each of these sites, texture measures and/or texture displays were generated, and where possible, discrimi- nation functions were developed to separate known uraniferous areas from areas of unknown uranium content.

T h e analysis was app l ied t o t h e or ig ina l LANDSAT spectral bands, to all eigenbands (linear combinations of the original bands), and to band ratios (visual inspection only). The basic data sources for all analyses were the LANDSAT Computer Compatible Tapes.

Page 71: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Of all data and all texture measures, the most successful results were obtained by plotting measure pair, Inverse Difference Moment against Angular Second Moment applied to the third eigenband of the LANDSAT data. Use of this measure pair permitted separation of uranium from nonuranium in certain geological settings (particularly Pumpkin Buttes/Kaycee) but was unsuccessful in others.

Attempts to develop general discriminants by extending calculated discr iminat ion curves across LANDSAT frame boundaries were unsuc- cessful. This lack of success in jumping bound- aries is attributed to variations in LANDSAT images caused by changes in sun angle, atmo- sphere, and season from one frame to another.

The use of texture displays as a tool for analysis showed hints of correlation with uranium occur- rences but the resolution of available data limited the strength of this inference. Generally speaking, texture and enhanced lineament dis- plays are still too crude to enable any real corre- lation with uranium to be demonstrated or denied.

Although the results cannot be described as providing a new tool for uranium exploration, it is evident that computed texture measures are describing some element of the LANDSAT data source that cannot be readily observed or ana- lyzed by visual interpretation. The success of eigenband-3 is less surprising, since other evi- dence exists suggesting that such a band should be relevant to image textures.

I t is concluded that the experiments would be worth pursuing further only in areas with selected geological settings, such as that of Pumpkin Buttes. I n addition, portions of this work should definitely be repeated as soon as the higher reso- lution data of LANDSAT-D becomes available. There were sufficient data to indicate that texture cannot be discounted as a basis for classifying terrain in terms of uranium-bearing potential.

A detailed presentation of this work, including LANDSAT imagery in microfiche format, is scheduled for open filing in 1980.

Emanometry . Ongoing in-house project

Emanometry is defined as the measurement of the gases, radon and helium, which are pro- duced by uranium. I t is expected that radon and helium gases can migrate from their source to provide broader exploration or assessment tar-

gets than uranium itself. Bendix is conducting a program to determine the relationship between these gases and mineralization. The influence of geologic controls, environmental conditions, and migration processes on the emanometric-pat- terns measured will also be determined.

Detailed surface sampling programs at three known uranium occurrences (Red Desert and Copper Mountain in Wyoming and Spokane Mountain in Washington as covered in detail in the Technology Integration section) indicated that both radon and helium concentrations in soil correlated with the known mineralization at depth, and that these gases may be used to locate drilling targets. Subregional sampling programs at the three sites demonstrated that a major component of a radon or helium signs1 is related to lithology and/or structure. Due to physical differences between radon and helium, these gases are affected differently by the same geologic environment and exhibit different spa- tial patterns. Areas of overlap between anom- alous radon and helium signals may be a more successful approach to indicating areas for detai led fo l l ow u p than e i ther s ing le gas measurement.

Ground water samples collected from boreholes at the same three sites indicated that radon can provide a strong indication of mineralization, both vertically and horizontally, sufficient t o dis- t~nguish a near-miss drill-hole condition. The helium concentration in the ground water sam- ples was more subtly indicative of near minerali- zation. An elevated helium concentration was usually found in ground water downdip from an accumulation. Thus, the helium concentration in ground water may provide information con- cerning updip mineralization. Further sampling at these sites has been performed to confirm these observations. Also, ground water samples have been collected for radon and helium analysis from boreholes near a known deep deposit in the Grants Mineral Belt, New Mexico.

Reports on the results of this project will be submitted for open filing during 1980.

Helium Surveying . Subcontractor: Helium Surveys, lnc Subcontract Value: $80.010 . Start Date: August 1977 Completion Date: December 1979

Helium surveys have been performed over three areas of known uranium mineralization. The geologic sites include a sandstone environment

Page 72: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

at the Red Desert in Wyoming, a granitic envi- ronment at Copper Mountain i n Wyoming, and a metamorphic environment at Spokane Mountain in Washington. (These test sites are also dis- cussed in the Technology lntegration section.) Sampling was repeated over the Red Desert site during the winter months of 1978 and early spring of 1979 t o determine the seasonal effects on the helium surveys.

Results of the two Red Desert surveys indicate that the helium in soil values obtained from samples collected during early spring were much lower than the identical survey completed during the previous summers. Correcting the soil helium for biogenic effects and residual soil gases indicated results of both surveys corre- lated to the known uranium occurrence.

The helium anomalies found in soil samples reflected the presence of the known deposits at both the Red Desert and Copper Mountain sites. At Spokane Mountain,the pattern of soil helium values was ambiguous although the presence of a fault that transects the mineralization was high- lighted by the helium values.

Helium contained in soil samples proved t o be the best method for surveying. The helium anomalies measured in soil gas were found to be weakerthan the helium in soil. Helium signals in water showed higher anomaly contrast except at Spokane Mountain but sources of water sam- ples are not as readily available as the soil samples along a systematic grid pattern.

Copies of the open-file report will be available in 1980.

Helium-4lArgon-36 Ratio and Radon-222 Measurements . Subcontractor: Teledyne Isotopes

Subcontract Value: $141.000 Start Date: 19 August 1977 Completion Date: March 1980

Radon and helium gases are produced via the decay of uranium. Presumably these gases, created by an orebody at depth, migrate to the suriace where they can be detected, and when combined with a knowledge of favorable geo- logic characteristics, will aid in locating the orebody. The primordial gas argon-36 is as- sumed t o be stable in abundance throughout the earth. Thus, the concentrations of argon should reflect the local variations in soil gas and the ratio helium-4Jargon-36 should not be sensitive to meteorological conditions or changes.

This project includes sampling three different areas of known mineralization. They include a

sandstone environment at the Red Desert in Wyoming, a granitic environment at Copper Mountain, Wyoming, and a metamorphic envi- ronment at Spokane Mountain in Washington. (These test sites are discussed in theTechnology Integration section.)

Results indicated the helium-4/argon-36 ratio did eliminate local variations in the soil-gas values.

At the Red Desert site radon showed minimal excess in surface gas samples but excess 210Pb was present and correlated with ore location. In vertical profiles most of the gas and water sam- ples were deficient in 222Rn but excess was found 46 feet (14 meters) above the ore zone at a level 230 times that expected from in-situ emanation.

Dissolved 222Rn in ground water was mobilized by induced pumping of fluids in a drill hole, thus suggesting a technique for enhancing the effec- tive sampling radius at chosen depth.

The presence of excess 2ioPb in surface samples and in vertical profiles suggests that it may be an ore indicator although statistical variation at low concentrations and absence of measurements in true background locations limit a conclusive interpretation.The210Pbvalue~from soil samples cor re la te wel l w i t h near sur face u ran ium concentrations at al! the sites.

Complete results of this study are scheduled for open filing early in 1980.

Numerical Modeling of Radon and Helium Migration

Subcontractor: Teledyne Isotopes Subcontract Value: $95.750 Start Date: 26 September 1976 . Completion Date: January 1980

Phase I of this project was reported in the 1978 NUREAnnual Activity Report and in GJBX-67(79). Phase II started in late 1978 and will be com- pleted in FY80 with an open-file report. The pro- j e c t i n v o l v e s t h e d e v e l o p m e n t o f o n e - dimensional mathematical models to simulate the transport of the radon and helium gases away from uranium mineralization. The resulting concentrations of indicator nuclides in the soil are used t o infer the detectability of buried uranium deposits by emanation methods.

In the case where there is a nonradioactive over- lying formation, radon and some of its daughter products are calculated to be detectable at dis- tances of several tens of meters from a planar uranium deposit. When the overlying rock- sediment column is assumed to contain 4 ppm

Page 73: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

uranium, the masking effect of locally produced radon reduces the detection range to less than 33 feet (10 meters). Models of helium diffusion in rock yield highly uncertain results because meas- urements of diffusion coefficients in actual rock types are lacking and because the flux of helium from deep within the earth is generally unknown.

lnhomogeneity in a rock-sediment column is simulated by multiple-layer models. Each hori- zon may be assigned uranium and thorium con- centrations as well as a diffusion coefficient and physical properties. Results are in reasonable agreement with the subsurface distribution of radon and some of its daughter products at a site of known mineralization in central Wyoming.

Barometric influences on gas transport are sim- ulated by time-dependent numerical models. Sinusoidal variations in atmospheric pressure cause sinusoidal changes in gas concentrations which are attenuated with increasing depth. The effect is less than T15 percent near the soil surface for radon while helium exhibits a maxi- mum variation of 0.4 percent.

This new emission spectrometer is capable of analyzing up to 64 elements per analysis

72

Page 74: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Radon Emanation Studies DOE Contractor: General Electric Co Subcontract Value: $159,940 Start Date: 1 April 1977 Completion Date: July 1979

In order to determine the nature of radon signals, field and laboratory experiments were performed by General Electric. The field work was carried out at a known occurrence at a depth of 328 feet (100 meters) in New Mexico. Extensive monthly near-surface integrated radon measurements were made. These measure- ments, which were made insensitive to thoron, moisture, and heat, can be reproduced within 22 percent. The median radon value was remark- ably constant and no seasonal effect was per- ceivable. Monthly variations of the high and low radon values do not correlate with large-scale weather variations. An interpretation of these temporal variations acknowledges that they are produced by upflows and downfiows of gas from unknown depths. The observations are com- patible with vertical velocities in the range of 1 to 2 x centimeters/second, which would be suf- ficient to transport significant radon signals from ore at 98 to 164 feet (30 to 50 meters) below the surface. Downhole radon and permeability meas- urements were made at the field site. One region

data, the radon concentration measurements should be directly correlated not only with quan- titative measurements for uranium and radium in related soil or core samples but also with the longer lived daughter products such as 2'oPb.

The major objective of this investigation is to obtain data on the systematic distribution and concentration of uranium (238U) and its daughter products (Z26Ra, 210Pb, and 234U) from drill-hole and geochemical samples collected over or near known uranium orebodies via nuclear emulsion techniques. Also, it will be determined whether leachable 2'oPb values represent an enhanced 22ZRn signal.

This project may determine the feasibility of the nuclear emulsion as a uranium exploration tool and obtain information concerning the vertical migration and the subsurface distribution of radon and its precursors.

A report on this project is scheduled for open filing in 1980.

Ruggedized Radon Emanometer Subcontractor: TSA Systems, Inc. Subcontract Value: $58.120 Start Date: 1 December 1977 Completion Date: December 1979

near the orebody was found to have very high Sixteen ruggedized radon emanometers were permeability, such that if the orientation and procured and distributed to Bendix field per- extent of the region were favorable, flow from sonnel for of radon in near-surface the ore to the surface might be possible. soil gas and ground waters. - .

Results of this study were open filed in report These units are being tested side by side with GJ BX-97(79). other commerciallv available emanometers and

Uranium and Radon Daughters by Nuclear Emulsions . Subcontractor: Stieff Research and

Development Co.. Inc. Subcontract Value: $51,227 Start Date: May 1979 Completion Date: April 1980

The interpretation of 222Rn concentration data in soil gas has generally proceeded from the assumption that the processes of emanationand diffusion are responsible for the presence of radon at the mineral grain boundaries and inter- stitial pore spaces nearthe uranium source area. It is also assumed that the radon migrated to the surface under the influence of various transport mechanisms, and that the diffusion process is not significant at long distances. Therefore, the relatively short half-life of 3.8 days for 2Z2Rn has placed an uncertainty on the geologic processes which could account for the observed surface data. In order to evaluate the radon gradient

the test results then compared to the data from alpha-track integration surveys of the same sites.

An evaluation report on these instruments is expected to be open filed in FY80.

Drilling Mud Emanometer . Subcontractor: Overhoff and Associates. Inc Subcontract Value: $19,800 Start Date: 18 August 1978 Completion Date: December 1979

Radon gas emanating from deeply buried ura- nium orebodies may not be readily detected at the surface using current emanometric tech- niques. If, however, some of the migrating gas is intersected by a borehole, some of the gas may be rapidly carried to the surface in the circu- lating mud used to clean and lubricate the drill bit.

Overhoff and Associates has devdoped and built a prototype instrument which separates the

Page 75: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

trapped gases from the dril l mud and provides a real-time record of radon concentration which can be correlated with drilling depth. This prototype instrument is currently undergoing laboratory testing by Bendix at Grand Junction and will be evaluated in the field during FY80.

Thermoluminescence Techniques for Uranium Ore Exploration

DOE Cunlraclor B roo~na .en h a 1 on8 . aoora'or, . S.bcontrac1 Va - e DOE Brookna.en interagency agreement . Start Date: October 1978 . Completion Date: September 1979

The use of the thermoluminescence properties of the quartz component of sandstone is being studied for its ability to "remember" past expo- sures to radiation. This exposure could indicate the flow of uranium-bearing solutions through a sandstone bed or the flow of radon through a rock column. Core and near-surface soil sam- ples from areas with known deposits are being analyzed for their thermoluminescence re- sponse. The results from this study are sched- uled for open filing in 1980.

Geochemical Relationship of Organic Matter and Uranium Deposits

Subcontractor: Denver Research lnstitute . Subcontract Value: $63,201 . Start Date: 30 September 1976 Completion Date: 10 September 1979

The association of uranium with organic matter in several major mining districts is well known and studies of this association have demon- strated that uranium concentration resulted from organic chemical interactions. Denver Research Institute undertook a study t o develop further understanding of the association of uranium deposition with the presence of organic matter in host rocks.

A final report. GJBX-130(79), open filed in Sep- tember 1979, presents the results of a detailed literature search and preliminary experimental results on the possible interactions of uranium with humic and fulvic acids.

Ge(Li) Spectrometer Calibration and Software

Subcontractor: Science Applications. Inc. Subcontract Value: $15,000 Start Date: November 1978 . Completion Date: February 1980

A project t o develop new and improved data reduction techniques for the radiometric survey

assay of bulk uranium samples was successfully completed in October 1978 and is documented in open-file report GJBX-124(78). The tech- niques were developed for the GJO high resolu- tion Ge(Li) gamma-ray spectrometer. They cor- rect for the effects of sample self absorption and permit radiometric bulk sample assays for potas- sium, direct uranium, equivalent uranium, radium, and thorium.

On the current project, Science Applications is developing the computer software necessary to perform these radiometr ic assays wi th the GJO Ge(Li) system and associated DEC 11/20 comDuter.

Technology lntegration Technology lntegration projects have the fol- lowing major objectives: (1) establishment of integrated approaches for uranium exploration and resource assessment, (2) characterization of uranium occurrences by suites of geochemical, geological, and geophysical parameters, and (3) development of ore genesis models. These objec- tives are being pursued with state-of-the-art and developing technologies in varying geologic en- vironments favorable for uranium accumulation.

Results of this work will enhance the NURE resource assessment data and should assist in exploration for new deposits. Such studies may be most Important in development of inter- mediate- or iow-grade resources.

Bendix personnel are in the process of inte- grating data sets from four research sites, each having a specific uranium development envi- ronment : Spokane Mounta in , Washington; Copper Moun ta in , Wyoming ; Red Desert , Wyoming; and San Juan Basin, New Mexico.

Spokane Mountain Technology lntegration Site

Ongoing in-house project

The Spokane Mountain, Washington research site was chosen as a part of the Technology lntegration project to identify and characterize primary and secondary geological, geochemical, and geophysical halos associated with uranium mineralization along a contact between igneous and metasedimentary rocks.

The research area is located northwest o f Spokane and is within the Deer Trail anticline.

Page 76: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

The area is made up of pelitic and calc-silicate Precambrian rocks underlying the Tertiary quartz monzonite, dacite, and dacitic flows.

Regional and detailed geochemical, radiometric, emanometric, and geophysical surveys were conducted in the area.

Analyses of various samples and data and their interpretation and compilation are in progress. Preliminary results of the geochemical and ema- nometric surveys indicate anomalies in close proximity to the known mineralized zones. VLF-EM and magnetic surveys indicate north- east-trending regional structures and reflect the different lithological units in the area. Magnetic survey data were particularly useful in the recognition of remanent magnetism that might indicate the time of intrusion and perhaps mineralization.

A detailed presentation of the results of work at this site will be open filed in 1980.

Red Desert Technology lntegration Site Ongoing in-house project

The Red Desert, Wyoming research site was chosen to identify and characterize primary and/or secondary geological, geochemical, and geophysical halos associated with uranium min- eralization in a Tertiary sandstone-type sedi- mentary environment.

The research area, within the Great Divide Basin of south central Wyoming, is made up of Tertiary sediments that were derived from the erosion of surrounding Precambrian granitic rocks. The uranium deposits are found in fluviatile arkosic sedimentary rocks. The source for uranium is either the granitic rocks, the volcanic ash, or both.

Regional and detailed geophysical, geochemi- cal, radiometric, and emanometric surveys were conducted in and around the main orebody bcing studied. Altogether 12 holes (7 core and 5 rc!ary) were drilled and borehole geophysical logging was completed. The drilled samples are b e i ~ g composited for various geochemical and geophysical analyses. In support of the study, aerial EM evaluation, complex resistivity surveys, and uranium isotopic study subcontracts were awarded; each of these projects is described elsewhere in the Technology lntegration section of this report.

Analyses of various samples and data and their interpretation and compilation are in progress. Preliminary results of regional geochemical sur-

veys indicate helium, radon, and soil trace- element anomalies in and around the deposit. These anomalies have also indicated new local targets of interest. The 234U/238U ratios and total uranium in ground water were found to be good indicators of uranium deposits.

A detailed presentation of the results of work at this site will be open filed during 1981.

Copper Mountain Technology lntegration Site

Ongoing in-house project

The Copper Mountain, Wyoming research site was chosen because of its recent emergence as an important type of granitic uranium occur- rence. I t is located along the southeastern edge of the Owl Creek Mountains in north-central Wyoming. The area is made up of a Precambrian interbedded sequence of metasedimentary rocks and amphibolitized extrusive and intrusive rocks. Subsequent felsic granitic rocks and late-stage complex pegmatites are also present. Uranium is found within the granitic rocks and is spatially related to the complex structure developed during Laramide tectonism.

Aerial and surface radiometrics, magnetics, elec- tromagnetic~, and geochemical surveys were conducted. Seven core holes were drilled and borehole geophysical logging was completed. Borehole samples are being composited for geochemical and geophysical analyses. In sup- port of the study, subcontracts for aerial EM application and aerial geochemical evaluation were awarded and are described elsewhere in this section.

Preliminary results of regional geochemical sur- veys indicate trace-element and radionuclide halos associated with the principal economic deposits. Subregional magnetics. VLF-EM, and complex resistivity data are used to map favor- able fracture zones and local targets of interest.

A detailed presentation of the results of work at this site will be open filed during 1981.

San Juan Basin Technology lntegration Site . Ongoing in-house Project

The San Juan Basin. New Mexico researcn site was chosen because of its prominence as the most important sandstone-type sedimentary en- vironment uranium district in the United States and because it issignificantly different from that of the Red Desert, Wyoming site.

Page 77: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

The research area, located in the southern part of the San Juan Basin, is made up of Triassic to Cretaceous sedimentary rocks where the urani- um deposits are associated with the Jurassic sandstones.

Altogether 14 holes (rotary and core) were drilled. Drilling samples were lithologged, bore- hole geophysical logging was completed. and borehole ground water samples were collected for helium, radon, lead. uranium isotopic, and trace-element studies The drilling samples are being composited for geochemical and geophys- ical analyses. Subcontractor-conducted studies of lead isotopes in ground water, uranium iso- topes, and selective extraction evaluation are described elsewhere in this section.

Further geophysical surveys are planned for the area during the summer of 1980 and the inte- grated study flndings will be presented in an o ~ e n - f i l e report during 1982.

Aerial EM Evaluation Subcontractor Geoterrex L~ml ted Subcontract Value $66 170 Start Date 13 November 1978 . Cornplet~on Date 30 November 1979

It has become increasingly evident that the proper utilization of nonradiometric geophysical methods is a cost effective tool in uranium exploration. For certain conceptual models used in exploration, measurements of various elec- trical parameters w ~ i yield such information as porosity. fracturing, alteratlor, and clay and metallic mineral content. Such information may result in defining sedmentary channels by using a low-frequency airborne EM system.

A study was undertaken to evaluate the effec- tiveness of the Barringer INPUT system to map resistivity of the sedimentary environments of the Red Desert Technology Integration site and the Powder River Basin study area. To make the airborne survey program as complete as pos- sible, spectrometer and magnetic surveys were included. Such a combined survey may permit more detailed evaluation of an exploration target.

Preliminary results from both study areas indi- cate that the INPUT system was able to map gross variations of the subsurface resistivity structure but was not sufficiently detailed to map stream channels. Survey results will be n te - grated with other data In an open-file report in early 1981

Aerial EM Application Subcontractor Dlghem Llmlted Subcontract Value $42 800 Start Date 1 November 1979 . Completion Date 1 February 1980

Conceptual models of particular exploration targets of interest should indicatt. which geo- physical tools are likely to be most effective. For the Copper Mountain research site in Wyoming, the favorable geologicai conditions associated with major fracture systems are considered an essential part of the conceptual model for explo- ration. The environment appears to be a favor- able target for utilizing a combined airborne EM/resistivity/magnetic/VLF-EM survey to map near-surface lithology changes and fractures. Borehole studies, in conjunction with other geo- logical and geochemical data, are aimed at halo identification tasks around the known orebody. Survey results will be integrated with other geo- logical and geochemical data in an open-file report on the Copper Mountain uraniferous deposit In 1981.

Complex Resistivity Survey SubCOnt lactOl Phoenx Geophyscs inc . Subcontract Value $26 500 Start Date 6 September 1978 Completlon Date 31 March 1979

Uranlum deposlts are known to contaln certaln unique spatlal dlstrlbutlons of pyrlte molyb- denum selenum and calcite The dlstr~bution of these provdes an explorat~on target In drilling programs

Complex resistivity, the measurement of phase and magnitude of a received voltage signal across a wide frequency range, is a technique that has previously met wlth success in explo- ration for base metals and their associated minerals. Such a survey was conducted over the Red Desert and Copper Mountain research sites in Wyoming to determine how this system might be used in uranium exploration.

Results f rom the Red Desert (sandstone) research site indicate that a small amount of polarization is produced by the pyrite and carbonaceous matter associated with the ura- nium deposit. The Copper Mountain (granitic) research site, on theother hand, did not produce any appreciable polarization. The resistivity por- tion of the survey resulted in delineating areas of favorable geological conditions. Survey results will be integrated with other data in an open-file report on both sites in the early part of 1981.

Page 78: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Stable Isotopes and Geochemical Halos . Subcontractor: Global Geochemistry Corporation Subcontract Value: $85,000 Start Date: October 1979 Completion Date: June 1980

NURE drill core obtained from the San Juan Basin, New Mexico research site will be selected for sulfur and carbon isotope determinations and for neutron activation analysis on whole rock samples and leachates for a large suite of elements. Both isotopic and trace-element stud- ies on the core samples in and around the known ore deposit are underway. These studies are aimed at delineating the halos around a known deposit and at developing an exploration model. The genesis of the trend ore deposit being inves- tigated will be considered and the isotopic and trace-element halos around the deposit will be mapped. The data will be interpreted and incor- porated into the case study report for this site. A report of the complete case study will be open filed in early 1982.

Lead Isotopes in Ground Water Subcontractor: CallfornlaStateUniversity at Los Angeies Subcontract Value: $56.764 Start Date: September 1979 Completion Date: September 1980

This project was initiated for the San Juan Basin research site to study the U/Pb variations in and around the known mineralization for halo identi- fication study. Ground water was collected at different levels from seven BFECIDOE holes and additional samples will be collected from leach- ing the core samples collected from the same site. Initially, the investigations of the subcon- tractor have attempted to sample enough levels within boreholes to identify UIPb variations in the various geologic formations. Samples of all known contaminants were acquired in order to place constraints on their contribution, if any, to the UIPb analyses associated with the aquifer. This study will be completed with an open-file rcport in 1980.

Selective Extraction Evaluation Subcontractor: Uranium-West Labs. Subcontract Value: $42,000 Start Date: September 1979 Completion Date: June 1980

This project is a combined in-house and subcon- tracted effort. Rock, core, sediment, and soil samples with anomalous and background con- centrations of uranium were obtained from the Technology Integration research sites. Bendix geoscientists and the subcontractor will leach

these samples with various weak leaching solu- tions. The leachates will be analyzed for a large suiteof elements by both neutron activation and atomic absorption techniques.

The data obtained wil l be used in a detailed evaluation of the ability of each wet digestion technique to improve the contrast of anomalous samples to background. Both petrography and electron microscopy will be used to study the speci f ic minerals be ing dissolved by each l each ing agent. The f ina l resu l ts w i l l be incorporated into theTechnology Integration case study open-file reports.

Uranium Isotope Studies DOE Contractor: Florida State University Subcontract Value: $122.000 Start Date: 1 April 1978 Completion Date: June 1980

Phase I of the project involved an evaluation of the234U/238U activity ratio as a prospecting tool in three uranium districts: (1) Red Desert, Wyo- ming; (2) Copper Mountain, Wyoming; and (3) south Texas Gulf Coast. Activity ratios and accu- rate uranium concentration determinations were evaluated on borehole ground water samples collected around known uranium occurrences in each district. Phase I noted high activity ratios for samples collected downdip from several accumulations. The activity ratio is considered an effective ground water indicator for updip accumulations.

Along with the data for the first three districts investigated, the basic methods and principles of the technique are discussed in the final report for Phase I, scheduled for open filing early in 1980. Phase II of the project, which is now underway, involves an in-depth evaluation of the technique with ground water samples from deep holes in the Grants Mineral Belt, New Mexico.

Aerial Geochemical Evaluation . Subcontractor: Barringer Research. Inc. Subcontract Value: $164,000 Start Date: August 1977 Completion Date: December 1979

The aerial geochemical sampling techniques developed by Barringer Research include AIRTRACE and SURTRACE. The SURTRACE survey over the Copper Mountain, Wyoming site revealed meaningful multielement patterns re- lated to residual soil anomalies adjacent to a major deposit but the AIRTRACE data are, as yet, inconclusive. A correlative study between SURTRACE, AIRTRACE, and residual soil-ele- ment anomalies is underway. A complete evalua-

Page 79: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Drilling and logging of boreholes in areas of southeast Wyoming were accomplished by transport- ing equipment with helicopters.

tion of the data from these systems will be open filed with the case study report on Copper Mountain in 1981.

High-Resolution Seismic Reflection Subcontractor: Boise State University . Subcontract Value: $78.218 . Start Date: 12 August 1977 Completion Date: 1 July 1979

A study was undertaken to evaluate the effec- tiveness of the high-resolution seismic tech- nique for mapping of stratigraphic and structural controls in the Gas Hills uranium district in Wyoming. The test area contains uranlum depos- its in Tertiary sediments overlying a Mesozoic1 Paleozoic section. Paleochannels on the uncon- formity between the Tertiary and Mesozoic appear to have significant control over locali- zation of the uranium deposits. Extensive drilling in the area allows an evaluation of the effec- tiveness of the study. The objective of the

research was to use sonic and density logs and computed synthetic seismograms to evaluate the feasibility of predicting success of the seismic reflection technique and to test this pre- diction using surface seismic data.

The field study was undertaken utilizing pri- marily two energy sources-a high-frequency vibrator (40-350 hz) and 1-pound (0.45 kilogram) dynamite charges shot in 10-foot (3 meter) holes. A limited amount of data was acquired utilizing detonating cord on thesurface. Some 3-D reflec- tion and passive seismic data were also acquired.

As reported in the NURE 1978 Annual Activity Report, the 2-D seismic reflection data were clearly successful not only in delineating the unconformable surface and mapping paleodrain- ages on the unconformity but also in defining channel deposits within the Tertiary section. Correlation with the well logs clearly shows the success of the study. Several areas were delin-

Page 80: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

eated where tight drilling patterns might be undertaken and other areas were delineated in which drilling might be minimized or eliminated. The synthetic seismograms could have pre- dicted success of the seismic work.

The passive seismic data appeared to show the approximate top of the Wind River Formation but failed to give any indication of the existence of the unconformity. The 3-D reflection data, al- though very limited in spatial extent and multi- plicity of stack, demonstrated a capability for detailed mapping of both the Tertiary section and the unconformable surface.

In conclusion, the study indicates that, in a geologic environment such as the Gas Hills uranium district, the high-resolution seismic reflection technique offers a cost-effective ap- proach to minimizing the total number of drill holes and favorably locating those that are drilled. A detailed presentation of this work is available as open-file report GJBX-lOO(79).

Technology Support Technology support to the NURE program is provided through ongoing in-house activities, in-house projects, and subcontracted projects.

Ongoing in-house activities include geochemi- cal analysis of samples for Bendix and DOE geoscientists; reduction of borehole and surface geophysical data; calibration of borehole, sur- face, and aerial data systems for NURE and the uranium industry; maintenance and improve- ment of borehole calibration and airborne radio- metric standardization facilities at GJO and remote sites; continued evaluation, upgrading, and maintenance of geophysical and geochemi- cal instrumentation systems for Bendix and DOE technical divisions; and aerial survey data stand- ardization and quality assurance.

In-house projects include the development and evaluation of new geophysical and geochemical instrumentation systems such as borehole log- ging systems and probes.

Subcontractors are developing new instrument systems and facilities needed to enhance in- house support capabilities.

Geochemical Analysis Support Ongoing in-house project

The geochemical analysis laboratory continues to provide timely and effective analytical support

of field programs by meeting analysis require- ment schedules and constantly improving and expanding analytical capabilities. During this past year a new analytical procedure was devel- oped for two important uranium pathfinders, arsenic and selenium. These elements are ana- lyzed by carbon furnace atomic absorption after using a block digestor for sample dissolution. This procedure permits up to five times more arsenic and selenium determinations than was previousiy possible while actually decreasing the personnel required. Similarly, an ion selec- tive electrode procedure for fluoride analysis has been streamlined to yield twice as many analyses without additional manpower or equipment.

Analytical capabilities have been expanded in several areas. Some significant examples in- clude the addition of analytical procedures for elements such as antimony and tellurium whose determination was not previously possible. Also developed was an analytical procedure for the analysis of silver and gold at concentrations as low as five parts per billion. The laboratory has given direct support to Bendix field offices by evaluating the Scintrex UA-3 uranium analyzer and presenting a training course on its use. Other such projects are expected to further reduce costs and increase the efficiency of operation in the next year.

In addition to providing in-house determination, the geochemical analysis laboratory supported quadrangle evaluation by monitoring the quality control of the outside laboratories used by Bendix field offices.

Emission Spectrophotometer Implementation

In-house project Start Date: 1 January 1978 Routine production started September 1979

A direct-reading emission spectrophotometer with d.c. arc sample excitation was installed at GJO. This instrument combined present tech- nology of direct readers and a standard geologic survey technique using powdered samples di- luted with graphite for semi-quantitative deter- mination of 35 elements. Bendix developed computer techniques for the standardizing, multi-element interferencecorrect ing, and p o l y n o m i a l a n a l y z i n g t o a d a p t t h e instrumentation to the analysis of geologic samples. The system was implemented into routine analysis in September 1979.

Page 81: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

XRF Laboratory Development Ongoing in-house project . Start Date: 1 April 1975 Routine production started October 1979

An energy dispersive x-ray fluorescence (EDX) system is being developed by Bendix for multi- element analysis of geologic samples. Various sample preparation and data reduction methods have been evaluated. A modified Compton- backscatter matiix-correction routine looks prom- ising for most elements in geologic matrices.

A Compton-backscatter method with a loose- powder sample-preparation technique for rou- tine quantitative analysis of rubidium, strontium, yttrium, and zirconium has been developed and implemented on the EDX. This procedure should be applicable for elements with atomic numbers greater than 26. Currently of interest to the project are arsenic, selenium, niobium, molyb-. denum, tin, lanthanum, hafnium, tungsten, mercury, the rare earths, and thorium. Methods of analysis for these elements are being invest- igated. For example, an existing wavelength dis- persive (WDX) x-ray fluorescence system was incorporated into the XRF lab development project early in 1979 for routine analysis of low levels of thorium. The WDX uses a modification of the Compton-backscatter matrix-correction method.

Gamma Spectrometer Implementation In-house project Start Date: January 1978 Completion Date: April 1980

The gamma analysis laboratory at GJO is being expanded to meet the increased demand for radiometric, potassium, uranium, and thorium analyses by gamma spectroscopy. At present, onesodium iodide (Nal) spectrometer and one lithium drifted germanium [Ge(Li)] spectrometer are in routine operation. The new facility includes a room to be used exclusively for gamma spec- troscopy that will house three Nal spectrometers and one Ge(Li) spectrometer together with con- veyor systems, sample changers, and lead caves to shield the detectors.

The conveyor system is designed to handle samples for up to 4 days continuous analysis. Total automation of the sample changers and the use of an uninterrupted power supply allow unattended, continuous operation. The facility is designed so that the Nal detectors can be upgraded to Ge(Li) detectors at any future time.

Presently two new lead caves, sample changers, and conveyor systems have been built and

installed. One of these systems has all electronic apparatus installed and is operational. After both new systems are operating routinely, the present Nal system and Ge(Li) system will be moved and incorporated in the new facility.

Electronics Support Activities Ongoing in-house project

The electronics laboratory provides technical support to the NURE program in resource eval- uation and technical development. Primary func- tions are the design, fabrication, testing, and maintenance of geophysical and geochemical instrumentation systems. Electronic engineers also provide technical consultation, system spec- ification, and performance evaluation services to DOE and Bendix divisions.

Some 1979 activities included testing and eval- uation of 16 newly developed radon emano- meters procured from TSA Systems, Inc. Ten dual crystal KUT probes and four new KUT log- ging systems were designed, fabricated, and tested. Electronics and mechanical subsystems for the new Nal gamma-ray spectroscopy system in the geochemical analysis laboratory were designed, fabricated, and installed by electron- ics laboratory personnel.

Existing Calibration Facilities and Services

Through Bendix, DOE provides to participants in the NURE program and makes available to the uranium industry facilities for calibrating and certifying borehole probes, portable scintillo- meters, portable spectrometers, and airborne spectrometers. Based on measurements made in the model with the instrument to be calibrated, Bendix personnel in Grand Junction calculate the calibration factors for the particular instru- ment. These factors are then supplied to the owners in the form of a certificate. In addition. these factors are stored in Grand Junction for use in the DOE ore-reserve calculations and ore- potential estimates.

Facilities for calibration of borehole probes and portable instruments are located in Grand Junction, Colorado; Casper. Wyoming; Grants, New Mexico; and George West, Texas. Including the models installed during 1979 each facility outside Grand Junction has four borehole models for calibration of borehole probes and two models (blocks) for calibration of portable scintillometers and spectrometers. All four bore- hole models have a run tube extending 13 feet (3.9 meters) below the model bottom to accom-

Page 82: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

modate the newer long probes; two models are for gross count gamma ray, one is for KUT (pot- assium, uranium, and thorium) spectrometer gamma ray (1979 installation), and one is for fission-neutron (1979 installation) borehole probes.

Grand Junctionfacilitiesfor routinecalibration of gross count gamma-ray probes consist of four models featuring ore grades from 0.24 percent to 2.0 percent eU,Oa, and one model featuring four holes ranging in size from 2% inches (6 centime- ters) to 8% inches (21.9 centimeters). There are four models for routine calibration of KUT (spec- trometer gamma ray) probes: three, each with one element high relative to the other two ele- ments. The fourth is a water factor model for cali- brating and testing holesizelfluid effects in KUT logging systems. The model features a single ore zone containing approximately 5.2 percent po- tassium, 370 ppm equivalent uranium, and 275 ppm equivalent thorium; there are five bor~holes ranging in size from 3 inches (7.6 centimeters) to 12 inches (30 centimeters).

Six borehole models, installed during 1978at the Grand Junction facility, are now available for use in calibrating and testing fission neutron logging systems. These models are 6 feet (1.8 meters) in diameter and 15 feet (4.6 meters) deep, each with a 15-foot (4.6 meter) run tube. They feature eight ore zones having characteristics needed to study tool responses versus ore grade (four values), density (two values), porosity or moisture (three values), and thermal neutron cross section (two values). A seventh borehole model (water factor) for calibration and testing of fission neutron log- ging systems in different size holes was com- pleted in 1979. The model features a single ore zone penetrated by seven boreholes, ranging in size from 3 inches (7.6 centimeters) to 13 inches (33 centimeters). A 300-foot (91 meter) test borehole was another important addition to the Grand Junction complex in 1979. Several other t o r e h o l e m o d e l s a r e a v a i l a b l e f o r specialized calibration or research measure- ments including those related to thin dipping beds, granite (block), and magnetic (suscep- tibility) materials.

A set of five surface models for calibration and testing of portable gamma-ray spectrometers is available. The models are cylindrical blocks. 4 feet (1.2 meters) in diameter by 1.5 feet (0.46 meters) in length, featuring radioelement con- centrations of potassium, uranium, thorium, a mixture, and one with nominal natural radioele- ment materials (barren).

All standardization and calibration effort under- taken by industry using these government- supplied facilities is done voluntarily in order to obtain a consistent, reliable data base for estab- lishing the uranium resources of the nation.

Field Calibration Sites- Construction and Up-grade

Ongoing in-house project

The f ield calibration facil i t ies at Casper, Wyoming; Grants, New Mexico; and George West, Texas were all upgraded so that spectral gamma ray and fission neutron logging equipment can be calibrated.

At each site, two calibration models were in- stalled for use with spectral gamma-ray logging probes. Each of these spectral gamma-ray cali- bration models has two ore zones. Together they provide zones of potassium, uranium, thorium, and a mixed zone making it possible to compute the elemental response of logging probes, from which logs of the potassium, uranium, and tho- rium (KUT) concentration can be derived.

At each site, one calibration model was installed forthe useof fission neutron logging probes.The model has two ore zones with different grades of uranium, making it possible to calculate both the K-factor and the "dead time" for fission neutron logging probes.

New calibration facilities, which will be compara- b le t o these up-graded f i e ld fac i l i t ies, have been approved for installation at Spokane, Washington; Pittsburgh, Pennsylvania; and Reno, Nevada. Plans call for the completion of these new facilities in 1980.

Fission Neutron Water Factor Model In-house project Start Date: September 1977 Completion Date: December 1979

In 1979 a fission neutron water factor model was constructed, under BFEC supervision, and made available for NURE and industry use at the DOE Grand Junction facility. This model is a right circular concrete cylinder having a 16-foot (4.88 meter) diameter and a depth of 15 feet (4.57 meters). There are three zones of uniform thick- ness and composition: 5-foot (1.52 meter) thick upper barren zone, a6-foot (1.83 meter) thick ore zone with a uranium grade of 0.0797 percent U,Oa, and a4-foot (1.22 meter) thick lower barren zone. Seven uncased, water-filled boreholes, with diametersof3inches (7,6centimeters), 4%inches (1 1.43 centimeters), 6 inches (15,24centimeters),

Page 83: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

79/,, inches (19.21 centimeters), 9 inches (22.86 centimeters), 11 inches (27.94 centimeters), and 13 inches (33 centimeters) penetrate the zones. Each borehole has a 14-foot (4.27 meter) run tube below the lower barren zone. The boreholes are oriented approximately 2 degrees from the vertical to ensure that probes will be sidewalled during logging runs.

Because of the ability of water to moderate neu- trons, the response of a fission neutron-based logging probe in a water-filled borehole will in general be strongly dependent on the diameter of the borehole. The determination of borehole size-dependent correction factors, or water factors, is an essential part of the calibration procedure for any fission neutron-based logging probe. Since the seven fission neutron water factor model boreholes differ only in borehole size, water factor corrections can be calculated from logs run in each of the model boreholes.

300-Foot Borehole Subcontractor: Himes Drilling Company, Inc. Subcontract Value: $28,364 Start Date: 1 May 1979 Completion Date: 21 November 1979

The 300-foot (91 meter) borehole was con- structed as part of the Grand Junction facility primarily to provide for testing the draw works of logging trucks, their instrumentation, and the hydraulic seals of logging probes under close to normal field conditions.

The hole is cased to the bottom with 4-inch (10.1 centimeter) 1.D. schedule 40 ABS plastic pipe. The pipe intersects coarse aggregate for the first 20 feet (6.1 meters) and then penetrates the Morrison Formation.The water level in the pipe is 18 inches (45.7 centimeters) from the top.

Grade Assignment Studies Ongoing in-house project

Bendix and DOE provide calibration models that are used by industry as standards. Because these models are standards, the values assigned to them are fundamental.

The purpose of this project is to devise and improve methods used for calibration of bore- hole logging systems. Present efforts have fo- cused on improving grade assignments for models used for calibration of total-count gamma-ray logging systems. There are four total count gamma-ray calibration models at Grand Junction and two at each of the field sites: Casper, Wyoming; George West, Texas; and Grants, New Mexico.

Calibration Facilities Monitoring System Start Date: 1 March 1978 Completion Date: February 1980

A special system has been developed to moni- tor and better characterize models at Grand Junction and field locations. The system con- tains three spectral gamma-ray probes: one gamma-gamma density probe and two neutron- neutron probes. It is automated to allow col- lection of long-term, statistically precise data.

A novel problem in design of the system was that of insuring stability. Because the calibration models are standards, it is difficult to determine whether the model or the monitoring system has changed between two sets of measurements. To define limits of stability, precision (highly stable) references are being used before, during, and after measurements in calibration models. Pre- liminary data are now being collected with the system and show the system to be performing according to design specifications.

Radon Calibration Unit and Instrument Evaluation

Ongoing in-house project

The useof radon to remotely detect the presence of buried uranium deposits has brought about the development of a number of radon mea- surement instruments. These newly developed instruments are being tested both in the labora- tory and in the field to determine their sensitivity, variability, integrity, and accuracy.

The testing in the laboratory includes the use of the calibration unit which was delivered by a subcontractor in December 1978. The radon concentration in the unit is variable and can be set automatically. The radon concentration, humidity, temperature, and operating conditions are continuously monitored and automatically adjusted to remain constant. The unit is also used to standardize, in absolute radon units, any radon measurement instruments, making it pos- sible to compare radon measurements obtained using different instruments.

Reports on these evaluations will be placedon open file as they are completed. A report on the field testing of several instruments is scheduled for open filing early in 1980. A report on the radon calibration unit is also scheduled for open filing in 1980.

Dynamic Test Range I Follow-on Subcontractor: LKB Resources, Inc. Subcontract Value: $130,822 Start Date: 6 September 1978 Completion Date: 29 February 1980

Page 84: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Detailed radiometric and aeromagnetic data of DTR-I was obtained and the project is complete except for acceptance and publication of the final report.

The immediate benefit to NURE aerial radio- metric subcontractors is the concentration-con- tour maps which will allow these range users, for the first time since the range became operational in 1977, to find both altitude and location- dependent concentration variations and apply this information to improvetheirairborne calibra- tion coefficients.

Dynamic Test Range II . Subcontractor: Golder Associates. Inc. Subcontract Value: $196,287 Start Date: 1 December 1978 Completion Date: 1 April 1979

The search for a candidate test site having dif- ferent radiometric characteristics from already operational DTR-I, is in process.

DTR-II will complement the effectiveness of the original calibration facility (DTR-I) by providing

a second aerial radiometric calibration data set with which to cross check established NURE aerial radiometric subcontractors' system cali- bration coefficients. This cross check, not poss- ible with DTR-I alone, will greatly increase the numerical confidence in the ultimate accuracy of NURE aerial radiometric data.

DTR-II Ground Support Vehicle Subcontractor: Radiation Management Corporation Subcontract Value: $64.836 Stan Date: 5 July 1979 Completion Date: 5 January 1980

The possibility of normalizing aerial system cali- bration data using a mobile radiometric sur- veillance system, correlating realtime ground and weather conditions with calibration over flights, was established during the past 2 years since DTR-I became operational. With the estab- lishment of asecond dynamictest range, asimilar dedicated mobile system is being acquired.

Drawing on the practical experience gained from field operations with the DTR-I system, minor design improvements are being incorporated into

By using an auxiliary boom truck, an industry logging vehicle was able to use the Grand Junction KUT models to calibrate a petroleum spectral logging probe.

Page 85: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

this new vehicle. The major radiometric electron- ics and meteorological components have been duplicated to take advantage of the dual opera- tional reliability afforded by redundant systems.

Aerial Product Quality Assurance Ongoing in-house project

This project is a continuation and expansion of the "Support for Operational Aerial Surveys" program. Activities are designed to assure the quality of survey data acquired by the subcon- tractors on the Aerial Radiometric Reconnais- sance program.

Quality checks are made at two critical points in an aerial survey. First, prior to a survey, the cali- bration of each aircraft is carefully evaluated to insure compliance with BFEC specifications 1200-C and 1250-A, wh ich set min imum standards for hardware and data reduction. Second, prior to accepting data acquired by a subcontractor, all survey data (raw and reduced)

digitally recorded on magnetic tape, are played back to assure proper format and completeness. Data records from each tape are then randomly sampled and analyzed for reasonable physical meaning.

Aerial Data Reduction Standardization Ongoing in-house project

A standardized magnetic data tape format for aerial survey data was completed in February 1979 and incorporated in specification BFEC 1200-C, to eliminate intra-subcontractor format differences and greatly enhance computer usage of aerial survey data.

Work continues to develop a standardized cali- bration and data reduction specification for the aerial survey program which will eliminate intra- subcontractor processing biases and will ensure usageof state-of-the-art calibration analysis tech- niques. Completion is expected in early 1980 for use in the 1980 surveys.

Page 86: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

lnformation Dissemination lnformation generated from NURE-related activ- ities is published as technical papers, reports, and maps, and is released to the public as soon as it is open filed by DOE. Other sources of information for the public and the uranium industry are DOE-sponsored technical meetings, tours of the GJO facilities, demonstrations of new hardware, release of annually updated sta- tistical data of the uranium industry, and the NURE data bank.

Activity highlights in 1979 were the annual Uranium lndustry Seminar, the issuance of 157 press releases, the open filing of 176 NURE- related technical reports. 213 other miscellane- ous reports and 253 technical memoranda, and the participation in community affairs.

Technical Meetings Technical meetings provide a forum for the dis- persal and exchange of information. In addition to the DOE-sponsored annual Uranium lndustry Seminar in October, DOE and Bendix personnel participated in other technical discussions at meetings of national and international profes- sional societies, and at specialized symposiums and workshops. These opportunities reduce the lead time associated with publication of printed material and provide face-to-face exchange of ideas among industry, other government agen- cies, and DOE/BFEC representatives concerning key technical issues in areas of interest to NURE.

The following bibliography lists papers on NURE-related topics presented by Bendix and subcontractor personnel at various national and international meetings.

National Uranium Resource Evaluation (NURE) Program i n Alaska; J. R. Anderson, Bendix; Alaska Geological Society, Anchorage. Alaska; April 23-25, 1979.

Total Sulfur Content and Morphology of lron- disulfide Minerals in the Parachute Creek Member of Green River Formation, Piceance Creek Basin, Colorado; R. D. Cole, Bendix; Geo- logical Society of America (GSA). Rocky Moun- tain Section, Fort Collins, Colorado; May 25-26, 1979.

A Borehole Spectrometer for Uranium Explo- ration; D. C. George, Bendix; Society of Profes- sional Well Log Analysts (SPWLA). Tulsa, Oklahoma; June 3-6, 1979.

Spectral Gamma-ray Logging I: Energy Stabili- zation Methods; D. C. Stromswold, Bendix; SPWLA, Tulsa, Oklahoma; June 3-6, 1979.

Advance registration for the 1979 DOE Uranium lndustry Seminar exceeded 900.

Dr. Donald Everhart, Manager, DOEIGJO, wel- comed participants to the seminar held in Grand Junction's Two Rivers Plaza.

Page 87: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Spectral Gamma-Ray Logging 11: Borehole Cor- rection Factors; D. C . Stromswold, Bendix; SPWLA, Tulsa, Oklahoma; June 3-6, 1979.

SpectralGamma-Ray Logging I l l : Formation and Thin Bed Effects; D. C. Stromswold, Bendix; SPWLA, Tulsa, Oklahoma; June 3-6, 1979.

Evaluation Models for Uranium Exploration by Active Neutron Logging; W . Woolson and M . Gritzner, Science Applications Inc.; SPWLA, Tulsa. Oklahoma; June 3-6, 1979.

Nonmarine Deposi t ional Envi ronments and Uranium Exploration in the Lower Cretaceous Antlers Formation, North Texas; D. Hobday, University of Texas at Austin; American Asso- ciation of Petroleum Geologists (AAPG), Casper, Wyoming; June 3-6, 1979.

Definition o f Depositional Facies of the Par- achute Creek Member of Green River Formation, Colorado: Evidence from Sulfur Isotopes and Whole-Rock Mineralogical Data; R. D. Cole, Bendix; AAPG, Society of Economic Petroleum Geologists (SEPG), Casper, Wyoming; June 3-6, 1979.

Petrology of Tertiary Sandstones of the Southern Piceance Creek Basin, Colorado: Implications for Provenance and Depositional Processes; R. D. Cole. Bendix; AAPG, Society of Economic Paleontologists and Mineralogists ( S E P M ) , Casper, Wyoming; June 3-6, 1979.

Execution o f the National Uranium Resource Evaluation Program; R . C. Horton, Bendix; Inter- national Atomic Energy Agency, Nuclear Energy Agency, International Symposium on Uranium Evaluation and Mining Techniques; Buenos Aires, Argentina; October 1-3, 1979.

U r a n i u m G e o p h y s i c s , C o p p e r M o u n t a i n , Wyoming; D. A. Emilia, Bendix; American Insti- tu te of Mining, Metallurgical and Petroleum Engineers (A IME) , Tucson, Arizona; October 17-19, 1979.

World Class Program of Department of Energy; R. G . Young, Bendix; Wyoming Geological Association, Casper, Wyoming; October 26, 1979.

Geochemical Exploration: Technique Integra- t ion in the Red Desert, Wyoming; L. Bramlett, Bendix; Association of Exploration Geologists (AEG), San Diego, California; November 5. 1979.

Radon and Helium Surveys at Three Known Uranium Occurrences; J. C. Pacer. Bendix; Society of Exploration Geologists. (SEG) , New Orleans, Louisiana; November 5-9, 1979.

Charac te r i s t i cs o f R a d o n T e c h n i q u e s f o r Uranium Exploration; J. C. Pacer, Bendix; SEG, New Orleans, Louisiana; November 5-9, 1979.

Calibration Facility Monitoring System; M . Dale, Bendix; SEG, New Orleans, Louisiana; November 5-9, 1979.

Geochemical Characterization of Stream Sed- iment and Soil in the Midnite Uranium District, Eastern Washington; L. Bramlett, Bendix; GSA, San Diego, California; November 5-9, 1979.

Stream Sediment in Regional Uranium Recon- naissance, V . Price, SRL; GSA Annual Con- ference, San Diego, California; November 5, 1979.

Production, Control and Retrieval of Well Log Microfi lm Records, R. W. Smith. Bendix; Depart- ment of Energy Contractors Micrographics Asso- ciation, LasVegas. Nevada; November 7-9.1979.

Uranium Industry Seminar This annual seminar was held in Grand Junction on October 16-17, 1979. DOE and BFEC staff members f rom GJO and DOE staff from head- quarters in Wash ington, D.C., presented 14 papers on the current and probable future status and activities of the uranium industry. T w o addi- tional papers were presented, the first of which dealt wi th the International Nuclear Fuel Cycle Evaluation (INFCE) program, presented by a DOE coordinator for INFCE; and the second paper, presented by a member of the Branch of Uranium andThorium Resources, USGS, Denver, dealt wi th the status of the USGS uranium and thorium resource assessment and exploration research program.

DOE'S 1979 seminar was attended by 830 people representing various organizations, including energy-related companies; electric utilities; pri- vate consultants; state and federal governments; universities; foreign companies; and service, manufacturing, and construction companies. T h e proceedings of the seminar have been pub- lished as GJO-108(79) released in January 1980. T h e agenda included: Uranium Enrichment Policies, W . R. Voigt , J r . Uranium Enrichment Plans, R. H. Smith Uranium Issues and Policies: An Overview,

J. A. Patterson The U.S. Uranium Market 1978-1979.

G. F. Combs Uranium Market Forecast, R. G . Clark and

A. W . Reynolds Overview o f NURE Progress, Fiscal Year

1979, C. H. Roach

Page 88: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

USGS Uranium and Thorium Resource Assess- ment and Exploration Research Program, Fiscal Year 1980, T. W. Offield

NURE Quadrangle Evaluation and Assessment, R. C. Horton

Foreign Exploration and Uranium Supply. R. J. Wright and R. K. Pitman

INFCE Nearing Conclusion, E. S. Beckjord Uranium Reserves, R. J. Meehan Potential Uranium Resources, D. L. Hetland Industry Exploration Activities, W. L. Chenoweth Results of Low-Grade Uranium Studies,

F. E. McGinley Uranium Production, J. F. Facer, Jr. Uranium Production Capability in the United

States, J. Klemenic

Computerized Information The large quantities of data that must be pro- cessed and analyzed in the course of the NURE program requlre processing by computer. The facilities currently available for processing these data at Grand Junction include an on-site CDC 3100 computer, a CDC 6600 computer, and a

remote access link to the Oak Ridge National Laboratory. During 1979 the CDC 6600 com- puter was installed to replace the CDC 3100 computer system in order to provide adequate capacity for satisfying the needs of the program. This large-scale computer system was received in December 1978 and became operational in March 1979. The CDC 3100 will be phased out during 1980.

The CDC 6600 computer provides on-site batch as well as local and remote interactive oper- ations. Development of a system for handling the large quantities of ore reserves data on the CDC 6600 began in 1978 using the data base man- agement system DMS-170. Parts of this system are now in use and much of the data editing for ore reserves is being performed interactively. Systems design for quadrangle analysis and laboratory bookkeeping for samples, which have been temporarily implemented at Oak Ridge, has begun in order to provide a permanent and adequate capability in Grand Junction for han- dling these data. In addition to applications di- rectly related to the technical aspects of the

The recently installed CDC 6600 computer provides support for local and remote interactive as well as batch operations.

Page 89: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

NURE program, Grand Junction accounting applications for both Bendix and DOE are being ~mplemented on thls system, with DOE ac- counting in operation during 1979.

The remote access link to the computer center at Oak RidgeNational Laboratory includesaremote batch terminal, a multiplexer, and two leased lines. In addition to providing access to interim computer capability fbr analyzing and processing NURE data, the link provides access to a bank of technical data collected under the NURE pro- gram. Currently data from aerial radiometric reconnaissance and hydrogeochemical surveys on approximately 180 quadrangles are archived at Oak Ridge; additional data will be included in this data bank as they become available.

Copies of these technical data sets are available from DOE on a cost-to-copy basis. Compu- terized evaluation models used in support of the NURE program assessment rely heavily on these data sets.

Since May the Oak Ridge link has been housed with the CDC 6600 system and in December the remote batch portion was modified to allow use

for communication with the Bendix Data Center i n A n n A r b o r , M i c h i g a n a n d ~ t o a l l o w simultaneous operation as a key disk system for the purpose of interactive entry of laboratory analysis data. An interactive digitizer system has been instal led t o prov ide better and faster processing. The output of all computing systems can be displayed on sophisticated color and line plott ing equipment located in the CDC 6600 facility.

Technical Library Services The DOE Technical Library, now located in the new library facility at the Grand Junction Office, maintains a collection of more than 100.000 volumes of uranium-related books, periodicals, legal references, maps, and drilling information, which is used daily by industry, the public, and Grand Junction personnel. Reference services include answering written and telephone inquir- ies and assisting library visitors. The technical library is also the local open-file report repository and houses almost 600 current NURE-related open-file reports and several thousand reports dating back to 1948, which deal with uranium exploration, mining, and milling activities.

The new library at the GJO facility houses more than 100,000 volumes of material related to uranium.

Page 90: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

The library has microfiche copies of GJO open- file reports available for sale to the public at a nominal charge. At present, more than 1.550 reportsareavailableon microfiche. In 1979, more than 9,600 microfiche copies of reports weresold, an increase of 50 percent over 1978 microfiche sales of 6.223 copies, and nearly three times the combined 1976 and 1977 sales of 3,283 copies.

Microfiche copies of reports are at a 241 reduction; accompanying maps and oversize charts are on 35mm film. Any individual or organization wishing to automatically receive all future GJO open-file publications on microfiche may do so by establishing a deposit account with the library in Grand Junction.

Bibliography of GJO Reports . Subcontractor: Mesa College Start Date: October 1978 Completion Date: January 1980 Subcontract Value: $38.000

The bibliography will include all GJO reports open filed through December 1978. It is intended that this subcontract will be extended for annual updates to include reports open filed each year. This bibliography will be available on magnetic tape with access to the data base by report number, title, author, subject, and lo x 2' quad- rangle name.

Technical Reports Technical reports, maps, and raw data generated by DOE, Bendix, and subcontractors about NURE activities are released to the public via open filing. This open-filing system requires the distribution of printed materials to selected open-file repositories throughout the United States. At present there are 16 open-file locations which receive all reports except aerial radio- metric reconnaissance volumes, and 18 open- file locations which receive technical reports on a case-by-case exception basis. (See map.)

1979 Open-File Reports In the listing that follows, a GJBX prefix desig- nates reports of current projects by DOE, Bendix, or subcontractors; a GJO prefix desig- nates reports developed by DOE staff members; a GJQ prefix designates NURE quadrangle assessment folios; and a DAO, DBO, DEB, RME, or TM-D prefix designates reports on uranium investigations carried out in the 1950s and 1960s. The section listing 13 miscellaneous reports contains three reports produced annu- ally by DOE at GJO, two of which deal with statistical data and exploration expenditures of the uranium industry; the third is the Uranium Industry Seminar Proceedings.

The prices in the following list refer to microfiche unless otherwise noted and are to be prepaid.

0 Permanent opsmfila locations Iexcspt airborne)

A Cass-by-case opehfile locations

Page 91: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Reports Issued in 1979

"Uranium Distribution in Mined Deposits and in the Earth's Crust," K. Deffeyes and I. MacGregor. Princeton University Department of Geological and Geophysical Sciences, August 1978. 480 p., $3.00.

"Scranton 1" x 2" NTMS Area. New Jersey. New York, and Pennsylvania, Preliminary Basic Data Report, NURE Hydrogeochemical and Stream Sediment Reconnaissance," R. B. Ferguson. P. L. Jones. Savannah River Laboratory, November 1978, 226 p.. 10 illus.. 3fiche, $5.00.

"A Preliminary Report on the Uranium Geology of the Red River Valley Drilling Project. Eastern North Dakota and Northwestern Minnesota." Walter L. Moore, University of North Dakota. August 1978. 301 p., $3.00.

"Engineering Assessment and Feasibility Study of Chattanooga Shale as a Future Source of Uranium," Mountain States Research and Development and PRC Toups Corp.. June 1978. 951 p.. $9.00.

"Radioactive Mineral Occurrences of Colorado and Bibliography:' J. L. Nelson-Moore, et al., Colorado Geological Survey, 1978, 1.061 p., 12 illus., $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Emory Peak NTMS Quadrangle, Texas." Oak Ridge Gaseous Diffusion Plant, December 1978. 105 p., 7 illus., 1 fiche, $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Enid NTMS Quadrangle, Oklahoma." Oak Ridge Gaseous Diffusion Plant, December 1978. 130 p.. 7 illus., 2 fiche, $5.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Bozeman NTMS Quadrangle, Montana." S. L. Bolivar. Los Alamos Scientific Laboratory, November 1978. 103 p.. 4 illus., $4.00.

"Flight Path Recovery System (FPRS) Design Study,'' SysTech Inc., September 1978. 253 p., $3.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Durango NTMS Quadrangle, Colorado." H. E. Dawson, T. A. Weaver, Los Alamos Scientific Laboratory, January 1979. 111 p., 3 illus., $4.00.

"NURE. 1978. Annual Activity Report," Bendix Field Engineering Corporation. May 1979. 112 p., Free.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Presidio NTMS Quadrangle, Texas." Oak Ridge Gaseous Diffusion Plant. December 1978. 88 p.. 7 illus.. 1 fiche. $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance. Semi-Annual Report, Eastern United States, April-September 1978." Savannah River Laboratory. 57 p., $3.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Pueblo NTMS Quadrangle, Colorado, Including Concentrations of Forty-Three Additional Elements," S. S. Shannon, Jr.. Los Alamos Scientific Laboratory, December 1978. 144 p.. 3 illus., $4.00.

"Modes of Uranium Occurrences in the Colorado Front Range." Dr. Robert H. Carpenter, et al., July 1978. 294 p.. 4 flche. $20.00.

"NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey. Blue Ridge Area, Greensboro NJ 17-12, Winston-Salem NJ 17-11, Johnson City NJ 17-10 Quadrangles." LKB Resources Inc , December 1978,643 p., 50 fiche. $15.00.

"Aerial Gamma Ray and Magnetic Survey. Rock Springs, Rawiins, and Cheyenne Quadrangles. Wyoming, and the Greeley Quadrangle, Colorado," geoMetrics, December 1978. 843 p., 93 fiche, $20.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Austin NTMS Quadrangle. Texas," Oak Ridge Gaseous Diffusion Plant. December 1978. 140 p.. 7 illus., 2 fiche, $5.00.

"Helicopter-Assisted Radiometric Survey of the Dixon Entrance Quadrangle, Alaska," W. A. Burgett. K. J. Krause. Bendix Field Engineering Corporation, February 1979, 11 p.. 2 fiche, $5.00.

"Athens 1' x 2' NTMS Area Georgia and South Carolina. Preliminary Basic Data Report. Hydrogeochemical and Stream Sediment Reconnaissance." R. 8. Ferguson. Savannah River Laboratory. December 1978.169 p.. 8 illus., 3 fiche, $5.00.

"Aerial Radiometric and Magnetic Survey, Winnemucca National Topographic Map. Nevada." Geo-Life. September 1978, 339 p.. 62 fiche. $10.00.

"Formation of Uranium Ores by Diagenesis of Volcanic Sediments, Final Report," C. D. Henry. A. W. Walton. University of Texas Bureau of Economic Geology, 1978,443 p.. $3.00.

"Aerial Radiometric and Magnetic Reconnaissance Survey of Portions of Arizona-New Mexico, Mesa, Clifton, Tucson, Silver City. Nogales, and Douglas Quadrangles." Texas Instruments. Inc., November 1978, 1,167 p.. 99 fiche, $30.00.

"Aerial Radiometric and Magnetic Reconnaissance Survey of the Delta Quadrangle. Utah," Texas Instruments. Inc., November 1978. 576 p., 28 fiche, $10.00.

"Study to Integrate NURE Data," K. Golabi. A. Lamont. Woodward-Clyde Consultants. September 1978.92 p., $3.00.

Page 92: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's
Page 93: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

GJBX-49(79) "Aerial Gamma Ray and Magnetic Survey, RockiesILaramie Range Project, Denver and Pueblo Quadrangles. Colorado," geoMetrics, March 1979. 718 p.. 39 fiche. $10.00.

GJBX-50(79) "Engineering Report on the Drilling in the Upper Michigan Precambrian Basins." J. Trow, Michigan Department of Natural Resources. Geological Survey Division. April 1979. 84 p.. 13 fiche, $3.00.

GJBX-51(79) "Survey of Lands Held for Uranium Exploration. Development, and Production in Fourteen Western States in the Six Month Period Ending December 31. 1978." Bendix Field Engineering Corporation, May 1979, 22 p., $3.00.

GJBX-52179) "Evaluation Models of Active Neutron Logging Tools for Direct Uranium Measurement," W. A. Woolson and M. L. Gritzner. Science Applications. Inc . September 1978. 220 p.. $3.00.

(;.EX-53 79 n, oroqeucrwm ca ano Stream Sea men1 Reconna ssance Program r, ihp Cenlra .n lea Slaws S e m ~ a n n ~ a l Progress Report Apr 1 l n r o ~ q n S e p l r m b ~ r 30 1978 kV Arcnot Oak R dge G a s e o ~ s D f ldson Plant 0c t ibe r 1978. 9 p., $3.00.

.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Wichita NTMS Quadrangle. Kansas." Oak Ridge Gaseous Diffusion Plant. March 1979, 119 p.. 7 illus.. 3 fiche. $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for St. Cloud NTMS Quadrangle. Minnesota." Oak Ridge Gaseous Diffusion Plant. March 1979. 119 p.. 9 illus., 3 fiche, $5.00.

"Uranium in Coal." J. Fred Facer. Jr., U S . Department of Energy/Grand Junction Office, May 1979, 73 p., $3.00.

"NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey. Blue Ridge Area. Knoxville and Charlotte Quadrangles." LKB Resources. Inc., March 1979, 366 p., 30 fiche, $10.00.

"Dyersburg 1" x 2" NTMS Area Kentucky. Missouri. Tennessee. and Illinois-Data Release.'' P. L. Jones. Savannah River Laboratory. April 1979. 205 p., 10 illus., 3 fiche. $5.00.

"Airborne Gamma-Ray Spectrometer and Magnetometer Survey. Las Vegas Quadrangle (Arizona, California. Nevada). Williams Quadrangle (Arizona), Prescott Quadrangle (Arizona), and Kingman Quadrangle (Arizona. California, Nevada), Final Report." Aero Service Division, Western Geophysical Company of America. February 1979. 993 p.. 148 fiche. $20.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Program in Central United States, Semiannual Progress Report. October 1.1978 through March 31,1979." J. W. Arendt, Oak Ridge Gaseous Diffusion Plant. April 1979. 22 p., $3.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Ashland NTMS Quadrangle. Wisconsin; Michigan: Minnesota," J. W. Arendt. Oak Ridge Gaseous Diffusion Plant. March 1979, 130 p.. 8 ilus.. 2 fiche, $5.00.

"Hydrogeochemical and Stream Sediment Reconnassance Basic Data for Clinton NTMS Quadrangle, Okiahoma," J. W. Arendt, Oak Ridge Gaseous Diffusion Plant. March 1979. 147 p., 7 illus., 3 fiche, $5.00.

"Poplar Bluff 1' x 2' NTMS Area. Missouri and Arkansas, Data Release, NURE Program Hydrogeochemical and Stream Sediment Reconnaissance." J. D. Heffner, Savannah River Laboratory. April 1979,210 p., 10 illus.. $5.00.

"Uranium Hydrogeochemical and Stream Sedlment Reconnaissance of the Lamar NTMS Quadrangle, Colorado. Including Concentrations of Forty-Three Additional Elements," S. S. Shannon. Jr., Los Alamos Scientific Laboratory. April 1979. 155 p., 5 illus.. $4.00.

"Aerial Radiometric and Magnetic Survey, Trona National Topographic Map. California." Geo-Life. Inc., December 1978, 204 p.. 126 fiche. $5.00.

"Aerial Radiometric and Magnetic Survey. Goldfield National Topographic Map. California and Nevada." Geo-Life, I n c . December 1978. 339 p., 116 fiche, $5.00.

"Aerial Radiometric and Magnetic Survey. Tularosa National Topographic Map. New Mexico." Geo-Life. Inc., December 1978. 184 p.. 66 fiche. $5.00.

"Aerial Radiometric and Magnetic Survey. Brownwood National Topographic Map. Texas." Geodata International. Inc., February 1979. 293 p.. 62 fiche. S10.00.

"Aerial Radiometric and Magnetic Survey Beeville/Bay City National Topographic Map. Texas Gulf Coast." Geodata International, l n c . January 1979, 256 p.. 114 fiche. $15.00.

"Hydrogeochem~cal and Stream Sediment Reconnaissance Raw Data Report for Sandpoint NTMS Quadrangle. Washington, Idaho. and Montana," F. J. Ciminesi. Lawrence Livermore Laboratory. February 1979. 122 p., 6 illus.. 8fiche. $4.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data Report for Williams NTMS Quadrangle. Arizona." J. L. Wagoner, Lawrence Livermore Laboratory. February 1979, 77 p.. 6 illus.. 5 fiche. $4.00

Page 94: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

"Artillery Peak Orientation Study, Mohave County, Arizona," K. P. Puchlik, et al.. Lawrence Livermore Laboratory, March 1979, 28 p., 3 illus., 1 fiche. $4.00.

"Athens, Charlotte, Greenville, and Spartanburg NTMS 1- x Z9 Quadrangle Areas. Supplemental Data Release," R. B. Ferguson, Savannah River Laboratory. March 1979. 126 p.. $3.00.

"Results of Elemental Analyses of Water and Waterborne Sediment Samples from the Fairbanks NTMS Quadrangle. Alaska." R. R. Sharp, Jr., et al., Los AlamosScientific Laboratory. April 1979,211 p., 5 illus., $4.00.

"Knoxville 1' x 2' NTMS Area North Carolina. South Carolina and Tennessee. Data Release." E. I. Baucom and R. B. Ferguson, Savannah River Laboratory, May 1979, 136 p., 8 illus., 3 fiche, $3.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Craig NTMS Quadrangle. Colorado, Including Concentrations of Forty-Three Additional Elements," S. L. Bolivar and D. E. Hill, Los Alamos Scientific Laboratory, May 1979, 238 p., 5 illus., $4.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Cortez NTMS Quadrangle, ColoradolUtah, lncluding Concentrations of Forty-Three Additional Elements." R. G. Warren. Los Alamos Scientific Laboratory, May 1979, 201 p., 5 illus., $4.00.

"Geology of the Birmingham, Gadsden, and Montgomery 1' x Z9 NTMS Quadrangles. Alabama." C. W. Copeland and M. A. Beg, Savannah River Laboratory, April 1979,88 p., 10 illus., $5.00.

"Automated Data Handling of Uranium Analyses for the NURE Program," S. T. Kosiewicz, Los Alamos Scientific Laboratory, February 1979. 16 p.. $3.00.

"Calculated Time-Correlated Neutron-Induced Radiations in a Sandstone Formation." C. W. Peters and E. I. Karaoglan, Consolidated Controls Corporation, March 1979, 98 p., $3.00.

"Aerial Radiometric and Magnetic Survey, Bozeman National Topographic Map, Montana." High Life Helicopters, Inc., and Geodata International, Inc., April 1979, 300 p., 128 fiche, $5.00.

"Aerial Gamma Ray and Magnetic Survey. Powder River II Project, Newcastle, Gillette, Wyoming and South Dakota. Ekalaka. Montana. South and North Dakota Quadrangles," geoMetrics. April 1979. 472 p.. 54 fiche. $15.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Pratt NTMS Quadrangle. Kansas," J. W. Arendt, Oak Ridge Gaseous Diffusion Plant, April 1979, 111 p., 7 illus., 2fiche. $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Joplin NTMS Quadrangle, Kansas; Missouri," Oak Ridge Gaseous Diffusion Plant, April 1979, 137 p.. 7 illus.. 3 fiche. $5.00.

"Nondestructive Assay Technology for Uranium Resource Evaluation, Infinite Medium Calculations, Final Report." M. Jain, et al.. Los Alamos Scientific Laboratory, March 1979. 74 p.. $3.00.

'Savannah Rwer Laooralory Seml-Anndal Report Hydrugeochcmlcal ana Stream Sedment Reconnanssance. Natlonal U r a n ~ ~ m Reso~rcc Evaluallon Program. October 1978-March 1979." Savannah R ver Laboratory, May 1979, 51 p., $3.00.

"Aerial Radiometric and Magnetic Survey. Billings National Topographic Map, Montana," High Life Helicopters. Inc.. and Geodata International, Inc., April 1979, 237 p., 6 illus.. 127 fiche, $5.00.

"NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Big Bend area. Marfa MH 13-5, Fort Stockton MH 13-6. Presidio MH 13-8. and Emory Peak MH 13-9 Quadrangles," LKB Resources. Inc.. February 1979. 578 p., 39 fiche. $20.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Report for the Tonopah NTMS Quadrangle, Nevada," B. Qualheim, Lawrence Livermore Laboratory, March 1979, 58 p., 6 illus., 3 fiche, $4.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Report for the Lovelock NTMS Quadrangle, Nevada," B. Qualheim, Lawrence Livermore Laboratory, March 1979, 58 p., 6 illus., 3 fiche, $4.00.

"Mining and Processing Methods end Cost Models for the Recovery ofThorium from Domestic Occurrences," J. F. Lemons, Jr., and L. V. Coppa, U.S. Bureau of Mines, May 1979.75 p., $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Palestine NTMS Quadrangle, Texas," Oak Ridge Gaseous Diffusion Plant, May 1979, 123 p., 7 illus., 3 fiche, $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for the Wichita Falls NTMS Quadrangle, Texas," Oak Ridge Gaseous Diffusion Plant, May 1979, 144 p., 7 illus.. 2 fiche. $5.00.

"Hartford l0 x 2' NTMS Area, Connecticut. New Jersey and New York. Data Release, Hydrogeochemical and Stream Sediment Reconnaissance," P. L. Jones, Savannah River Laboratory, May 1979. 226 p., 10 illus., 3 fiche, $5.00.

"Aerial Gamma Ray and Magnetic Survey. Uncompahgre Uplift Project, the Salina, Utah; Moab, Utah and Colorado; Montrose and Leadville, Colorado Quadrangles." geoMetrics, April 1979, 826 p., 128 fiche, $20.00.

GJBX-96(79) "Aerial Radiometric and Magnetic Survey. White Sulphur Springs, National Topographic Map. Montana." High Life Helicopters, Inc., and Geodata International, Inc., May 1979, Vol. 1: 224 p., Vol. 11: 72 p., 124 fiche,

Page 95: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's
Page 96: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data Report for the Prescott NTMS Quadrangle. Arizona." R. J. Clark, Lawrence Livermore Laboratory, May 1979, 96 p., 6 l lus.. 7 flche. $4.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the McGrath and Talkeetna NTMS Quadrangles. Alaska, Including Concentrations of Forty-Three Additional Elements." P. L. Aamodt, et al.. Los Alamos Scentif ic Laboratory, April 1979. 223 p., 12 iilus.. $5.00.

"Aerial Radiometric and Magnetic Survey. Brigham City National Topographic Map. Utah," Geo-Life. Inc.. August 1978. Voi. 1: 199 p., Vol. 11: 64 p , 98 fiche. $5.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Montrose NTMS Quadrangle, Colorado, Including Concentrations of Forty-Three Additional Elements." D. E. Broxton, et al., Los Alamos Scentif lc Laboratory. July 1979. 256 p.. 5 illus., $4.00.

"Aerial Radiometric and Magnetic Reconnaissance Survey of Portions of Arizona. Idaho. Montana,New Mexico. South Dakota and Washington." Texas Instruments. I n c . March 1979, Vol. 1: 67 p., Voi. IIA through Val. IiL: 1,860 p.. 1 fiche, $7500 (This 13-volume report contains evaluations forthese quadrangles: Cut Bank, Shelby, Havre, Choteau, Great Fails, Lewistown, Butte, Twin Falls, Pocatello. Ritzville, Hot Springs, and St. Johns.)

"Engineering Report on the Drilling in the Missouia/Bitterroot Basins of Montana." Bendix Field Engineering Corporation. August 1979. 39 p.. 10 fiche, $3.00.

"Geostatistcs Project o f the Natonal Uranium Resource Evaluation Program. October 1978-March 1979." R. J. Beckman. et al.. Las Alamos Scientific Laboratory. March 1979. 29 p., $3.00.

"Atlanta 1" x 2' NTMS Area, Alabama and Georgia, NURE Data Report." P. L. Jones, Savannah River Laboratory, August 1979, 176 p.. 8 ilius.. 5 fiche, $5.00.

"Investigation of the Relationship Between Organc Matter and Uranium Deposits." J. J. Schmidt-Collerus. University of Denver. Denver Research Institute. June 1978. 295 p.. $3.00.

"Catahoula Formation of the Texas Coastal Plain: Origin. Geochemical Evolution. and Characteristics of Uranium Deposits." W. E. Galloway and W. R. Kaiser. University of Texas Bureau of Economic Geology. 148 p.. $3.00.

"Demonstrat ion and Evaluat ion of 'So l id State' Photomul t ip l ier Tube fo r Uranium Explorat ion Instrumentation. Final Report," R. M. Polichar. Science Applications. I n c . April 1979. 84 p.. $3.00.

"Hydrogeochemical and Stream Sedment Reconnaissance Basic Data for Hutchinson NTMS Quadrangle, Kansas," Oak Ridge Gaseous Diffusion Plant, July 1979, 142 p.. 7 illus., 2 fiche. $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Manhattan NTMS Quadrangle. Kansas." Oak Ridge Gaseous Diffusion Plant. July 1979, 150 p.. 7 illus.. 2 fiche, $5.00.

"Integration of NURE and Other Data Sets with Emphasis on their Utilization in Generating Exploration Models in the Lubbock. TX., 1" x 2' Quadrangle." Marion and Robert Lankston. G-CUBED. Inc., May 1979. 332 p.. 114 ilius.. 15 fiche. $4.00.

"Aerial Radiometric and Magnetic Survey. Vya National Topographic Map. Nevada," Geo-Life, Inc.. Vol. I: 150 p.. l l0f iche. Vol. 11: 73 illus., $5.00.

"Aerial Radiometric and Magnetic Survey, Wells National Topographic Map, Nevada.'' Geo-Life. Inc.. Vol. I: 145 p.. Vol. l l : 73 illus.. 96 fiche. $5.00.

"Aerial Radiometric and Magnetic Survey, Lemman National Topographic Map, South Dakota," Geodata International. Inc., Vol. I: 110 p., Vol. 11: 66 illus.. 101 fiche. $5.00.

"Aerial Radiometric and Magnetic Survey, Dickinson National Topographic Map. South Dakota." Geodata International. Inc., V o l I: 109 p., Vol. 11: 68 p.. 62fiche. $5.00.

"Albany 1' x 2" NTMS Area. Connecticut, Massachusetts. New Hampshire, New York and Vermont," G. R. Kciier, Savannah River Laboratory. August 1979. 195 p.. 10 illus., 6 fiche, $3.00.

"Uranium Deposits o f the Grants, New Mexlco, Mineral Belt (II)," D. G. Brookins, University of New Mexico Department of Geology. Juiy 1979. 434 p.. 1 !llus., $4.00.

"NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, NE Washington Area. Okanogan NM 11-10. Sandpoint NM 11-11 Quadrangles," LKB Resources. Inc., August 1979, Vol. 1: 144 p., Vol II isandpoint): 235 p.. 29 fiche, Vol. l l (Okanogan): 247 p., 25 fiche. $10.00.

"Airborne Gamma-Ray Spectrometer and Magnetometer Survey, Durango Quadrangle (Colorado)." Aero Service Division. Western Geophysical Company of America. July 1979, Val. 1: 22 p., Vol. 11: 193 p., 37 fiche, $500.

"Airborne Gamma-Ray Spectrometer and Magnetometer Survey, Corter Quadrangle (Colorado, Utah)," Aera Service Division Western Geophysical Company of America. July 1979, Vol. 1: 123 p.. Vol. 11: 137 p., 26 fiche. $5 00.

Page 97: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Albuquerque NTMS Quadrangle. New Mexico, Including Concentrations of Forty-Three Additional Elements," L. W. Maassen and S. L. Bolivar. Los Alamos Scientific Laboratory. 197 p.. 5 illus.. $4.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Moab NTMS Quadrangle. UtahfColorado, Including Concentrations of Forty-Three Additional Elements." Sue Jacobsen Golf and Richard G. Warren, Los Alamos Scientific Laboratory, September 1979, 207 p., 5 illus., $4.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance of the Lander NTMS Quadrangle. Wyoming, Including Concentrations of Forty-Three Additional Elements." Spencer S. Shannon, Jr.. Los Alamos Scientific Laboratory, September 1979, 173 p., 5 illus., $4.00.

"Aerial Radiometric and Magnetic Survey, Austin National Topographic Map. Texas Gulf Coast." Geodata International, Inc., August 1979, Vol. 1: 171 p., Vol. 11: 91 p., 82 fiche. $5.00.

"Hydrogeochemical and Stream Sediment Reconnaissance of the National Uranium Resource Evaluation Program. Semiannual Progress Report. October 1978-March 1979," P. L. Aamodt, et al., Los Alamos Scientific Laboratory. July 1979. 21 p.. $3.00.

"Uranium Hydrogeochemical and Stream Sediment Reconnaissance Data Release for the Billings NTMS Quadrangle, Montana, Including Concentrations of Forty-Three Additional Elements." D. E. Broxton, et al.. LOS AIamos Scientific Laboratory, August 1979. 203 p.. 6 ilius., $4.00.

"National Uranium Resource Evaluation Program. Hydrogeochemical and Stream Sediment Reconnaissance Basic Data for Lubbock NTMS Quadrangle. Texas," Oak RidgeGaseous Diffusion Plant. August 1979, 148 p.. 7 illus.. 3 fiche. $5.00.

"Williamsport lo x Z9 NTMS Area. Pennsylvania. Data Report, National Uranium Resource Evaluation Program. Hydrogeochemical and Stream Sediment Reconnaissance." J. D. Heffner, Savannah River Laboratory. September 1979. 219 p., 10 illus., 3 fiche, $5.00.

"NURE Aerial Gamma-Ray and Magnetic Reconnaissance Survey, Colorado-Arizona Area, Craig NK 13-1@ Quadrangle," LKB Resources. Inc., September 1979, Vol. 1: 131 p., Vol. 11: 131 p., 21 fiche, $5.00.

"Aerial Radiometric and Magnetic Survey, Millett. National Topographic Map, Nevada." Geo-Life, Inc.. 220 p.. 80 fiche. $5.00.

"Airborne Gamma-Ray Spectrometer and Magnetometer Survey, DuboisQuadrangle, (Idaho and Montana)." Final Report. Aero Service Division. Western Geophysical Company of America. July 1979. Vol. I: 108 p.. 23 fiche. Vol. 11: 134 p., $5.00.

"Aerial Radiometric and Magnetic Survey. Challis National Topographic Map. Idaho." Geo-Life. Inc.. Vol. I: 216 p.. Vol. 11: 219 p., $5.00.

"Aerial Gamma Ray and Magnetic Survey. Raton Basin Project. Flagstaff Quadrangle. Arizona," geoMetrics, August 1979. Vol. 1: 78 p.. Vol. 11: 170 p., 27fiche. $5.00.

"Aerial Gamma Ray and Magnetic Survey, Powder River II Project. Torrington and Casper Quadrangles. Wyoming and Nebraska." geoMetrics, August 1979, Vol. I: 84 p., Vol. 11: 178 p., Vol. Ill: 142 p., $10.00.

"Aerial Radiometric and Magnetic Survey. Elko National Topographic Map. NevadalUtah." GeoLife. Inc.. 135 p., 122 fiche. $5.00.

"Savannah River Laboratory Semi-Annual Report, Hydrogeochemical and Stream Sediment Reconnaissance. National Uranium Resource Evaluation Program, April 1979-September 1979," Savannah River Laboratory, October 1979, 38 p., $3.00.

"Delta and Richfield t 0 x 2' NTMS Areas, Utah. Data Report. NURE Program. Hydrogeochemical and Stream Reconnaissance." P. L. Jones. Savannah River Laboratory. September 1979. 60 p.. 6 illus., 4 fiche. $4.00.

"NURE Final Report: Diamond Drilling for Geologic Information in the Middle Precambrian Basins in the Western Portion of Northern Michigan." James Trow, Michigan Department of Natural Resources, October 1979, 129 p., $3.00.

"Aerial Radiometric and Magnetic Survey, Socorro National Topographic Map, New Mexico." Geo-Life. Inc.. 215 p., 114fiche, $5.00.

"Aerial Radiometric and Magnetic Survey, Death Valley National Topographic Map, Nevada, California." Geo-Life, Inc., 465 p., 298 fiche, $5.00.

"Neutron Transport Measurements and Source Monitor Development For Uranium Borehole Logging Sonde," V. Verbinski, et al.. Science Applications, Inc.. December 1978. 74 p.. $3.00.

"NURE Program. Hydrogeochemical and Stream Sediment Reconnaissance Program in Central United States," Semiannual Progress Report, April-September 1979. J. W. Arendt. Oak Ridge Gaseous Diffusion Plant. October 1979. 23 p.. $3.00.

"Aerial Radiometric and Magnetic Survey. Vernal National Topographic Map. ColoradolUtah." Geo-Life, Inc., 230 p.. 134 fiche. $5.00.

Page 98: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

"Aerial Radiometric and Magnetic Survey. Mc ~ e r m i t t National Topographic Map. Nevada. Oregon and Idaho." Geo-Life. Inc.. 168 p., 171 fiche, $5.00.

"Analysis of Airborne Radiometric Data." Science Applications. inc.. December 1978. Voi. I: Evaluation of the DE-PnlIMAZAS Computer Coae. 122 P Vo II Descr p l on L st ng and Operating lnstr~crlons for the Code DE-Pnl MAZAS 182 p , Vo I Toplcal Reports. 100 p , Vol IV MAZhAl Coae for Gamma-Ray Spectral Enhancement, 67 p., $12.0014 volumes.

"Chattanooga Shale Conference, November 14-15, 1978, Oak Ridge, Tennessee," Bendix Field Engineering Corporation. November 1979. 184 0.. $3.00.

"Video Processing ~ i .Remote~ensor Data Applied to Uranium Exploration in Wyoming." R. A Levinson, e l al.. University of Wyoming Department of Geology, June 1979. 223 p.. 2 illus.. $10.00.

"Aerial Radiometric and Magnetic Survey, Richfield National Topographic Map. Utah." Geo-Life. Inc.. 184 p.. $5.00.

"Sedimentation of the Basal Kombolgie Formation (Upper Precambrian-Carpentarian) Northern Territory, Australia: Possible Significance in the Genesis of the Underlying Alligator Rivers unconformity-~ype Uranium Deposits," R. W. Ojakangas. University of Minnesota Department of Geology, October 1979, 43 p.. $3.00.

"Aerial Radiometric and Magnetic Survey. McAlester National Topographic Map, Oklahoma. Arkansas." Geo-Life. Inc.. 117 p.. $5.00.

':Fitting a Three-Parameter Lognormal Distribution with Applications to Hydrogeochemical Data from the National Uranium Resource Evaluation Program." V. E. Kane. Oak Ridge Gaseous Diffusion Plant. October 1979. 52 p., $3.00.

"Application of Discriminant Analysis and Generalized Distance Measures to Uranium Exploration." J. J. Beauchamp, et al., Oak Ridge Gaseous Diffusion plant, November 1979.70 p, $3.00.

Miscellaneous Reports

"Uranium Mine Operations Data." Production Evaluation Division. U.S. Atomic Energy Commission. January 1. 1959. 363 p., $3.00.-

"Survey of U.S. Uranium Marketing Activity." U.S. Department of Energy, Office of Uranium Resourkes and Enrichment, August 1979, 33 p.. Free paper.

"Pilot Study in Eight Areas of Montana and idaho: Muiti-element Analyses for 733 Pilot Study Samples from Western Montana and East-Central Idaho." Los Alamos Scientific Laboratory, 66 p., $3.00.

"HydrogeochemicaLandStream Sediment Reconnaissance Bask Data Release for Austin NTMS Quadrangle. Texas." Oak Ridge Cas%ous Diffusion Plant, 2 p.. Free paper.

"Statistical Data of:the Uranium Industry," U.S. Department of EnergylGrand Junction Office, May 1979. 100 p.. $3.00, paper or fiche.

"Uranium Exploration Expenditures in 1978 and Plans for 1979-1980," U.S. Department of EnergylGrand Junction Office. April 1979, 12 p.. $3,00fiche, Free paper.

"Uranium industry Seminar Proceedings, October 17-18. 1978,"U.S. Department of EnergylGrand junction Office. October 1978, 254 p.. $10.00. paper or fiche.

GJO-l l t (79) i 'Ilnterim NURE Report," US. Department of EnergylGrand Junction Operations. April 1979. 184 p.. $3.00 fiche. $4.00 paper.

GJQ-OOl(79) "National Uran~um Resource Evaluation, Plainview Quadrangle, Texas." E. J. Amaral: Bendix Field Engineering Corporation. March 1979. 36 p.. 26 illus.. $3.00 fiche. $10.00 paper.

RME-103 "Environment of Uranhm Deposition in the Bull Canyon Area. Southwestern Colorado," J. W: Dalrymple. R. C. Dickinson, N. B. Young, U.S. Atomic Energy Commission. December 1957, 38 p., 18 iilus., $3.00.

RME-1087 "Uranium Deposits of Duval County. Texas." J. C. Barnes. U.S. Atomic Energy Commission. February 1959, 45 p., 10 illus., $3.00.

RME-3161 "Uranium Occurrences. Michigan. Wisconsin, and Minnesota." L. P. Barrett. U.S. Atomic Energy Commission. February 1958, 18 p.. $3.00.

Pre munary "General Geo ogy of tne Western Dakota Pla ns an0 References Relatell l o Uranlferous L~gn~tes." Map h o 27 H B Wood. U S. Atom c Energy Commlsslun. J ~ l y 1967. t sheet. S1.50. paper; $3.00 flcne.

Page 99: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Technical Memoranda (Prepared for US. Atomic Energy Commission)'

"Interim Report. Schwartzwalder Mlne, Ralston Creek Area. Jefferson County. Colorado." J. D. Schlottmann and A. V. Green. April 1957, 15 p.. 7 illus.. $3.00.

"Thorium Occurrences in the Capitan Mountains Area. Lincoln County, New Mexico," G. E. Collins. August 1956. 11 p.. 2 illus.. $3 00.

"Uranium Occurrences on the Empire Claims, Iron Mountain Mlning District. Sierra County. New Mexico." F S. Boyd. Jr.. November 1957. 13 p., 3 illus.. $3.00.

"A Report on Auger Drilling Project Conducted on the Harte-Mansfield Ranch. Oldham County. Texas," J. W Allison. December 1956. 23 p.. 2 illus.. $3.00.

"An Occurrenceof Uranium at the PalanganaSalt Dome. Duval County.Texas,"S. R. Steinhauser. March 1957. 17 p., 7 illus., $3.00

"Preliminary Reconnaissance for Uranium in the Cornudas Mountains, Otero County, New Mexico. and Hudspeth County. Texas." G. E. Collins. February 1958. 16 p , 2 illus.. $3.00.

"Uranium Occurrences in the Datil Mountaln Area. Catron and Socarra Counties. New Mexico,"G. E. Collins. February 1958. 11 p.. 2 illus.. $300.

"Geology of the Busfield Coffinite Deposit in Northwestern Croak County. Wyoming." B. A. MacPherson. February 1956. 12 p.. 4 tilus.. 53.00.

"Geologic Evaluation Report on Morrison Uranium Company near Morrison. Jefferson County, Colorado." E. L. Grossman. July 1955. 2 p.. $300.

"Geologfc Evaluation of Stone Placer. Holy Terror and Hiroshina Claims (Water Board Property) Jefferson County. Colorado for Fringe Area Contract." E. L Grossman. July 1955. 3 p., 1 illus.. $3.00.

"Geologic Evaluation of Red Gate Ranch. Custer County. Colorado. V. D. Maulin Lease." L. Frankel. August 1955, 1 p., $3.00.

"Geologic Evaluation of A i a n Emory (Orphan Boy) Mine. Summit County. Colorado." E. L. Grossman, August 1955. 2 p.. $3.00

"Geologlc Evaluation of the Eagle and Mary Alice Claims. Lake City. Hlnsdale County. Colorado, for 'Fringe Area' Contract." R. C. Malan. H. W. Ranspot. August 1955. 2 p.. $3.00.

"Geologic Evaluat~on of the Pallaoro Lease, near Morrison. Jefferson County. Colorado for 'Fringe Area' Contract." E. L. Grossman. September 1955. 3 p.. 1 illus.. $3.00.

"Geologic Evaluatlon Report on the Victory Lode. Lulu B. Lode, and Gold Leaf Lode, Jamestown. Boulder County. Colorado." E. L. Grossman, September 1955. 3 p.. 1 illus.. $3.00.

"Geologic Evaluation of Lady Stith Clalm an Stratton Cripple Creek Mlning and Development Company Property. Cripple Creek District. Teller County. Colorado." E. L. Newcomb. September 1955.3p.. 1 illus.. 53.00.

"Geologlc F~,sluation of theDo RadoCla~ms. EagleCounty.Colorado."E. L. Grossman, September 1955.3p.. 1 illus . $300

"Geoiog~c Evaluation of Grlnstead Property. Fremont County. Colorsdo;' E. L Grossman, August 1955.2 p.. $300.

DEB-3-TM-14 "Geologic Evaluat~on of the Whale Mine. Bonanza Minlng District. Bonanza. Saguache County. Coiocado." H. W Ranspot. August 1955. 2 p., $300.

DEB-3-TM-15 "Geologic Evaluat~on 01 Maur Stryk Claims. Gunnison County. Colorado." H. W. Ranspot, September 1955. 2 p.. $3 00.

DEB-3-TM-16 "Geolog~c Evaluation @I the Denver-Golden Oil and Uranium Company's Prospect. Jefferson County. Colorado." R. C. Malan. October 1955. 3 p.. $3.00.

DEB-3-TM-17 "Geologlc Evaluation of New Hope Group on Storm Mountain. Larimer County. Colorado." E. L. Newcomb. September 1955. 2 p . $300

DEB-3-TM-18 "Geologic Evaluat~on Report, for 'Fringe Area' Contract, of the Bonita #1 Claim. Bonanza Minlng D~str ict . Saguache County. Colorado.'' H W Ranspot. October 1955. 2 p , 1 illus.. $3.00.

DEB-3-TM-19 "Geologic Evaluation far 'Fringe Area' Contract of the C D. Slsk Ranch near Lyons. Bouider County. Colorado." E L Grossman. October 1955, 2 p.. $3.00

DEB-3-TM-20 'Geo log~c Evaluation for Fr lnge Area' Contract. on the La Rue If1 Claim. Saguache County. Colorado." H. W. Ranspot. October 1955. 2 p.. $3.00

DEB-3-TM-22 "Geologic Evaluat~on on the Curmac Mlnlng Company Lease. Fremont County. Colorado." R. Malan and M. R. Simon. October 1955. 2 p.. $300.

DEB-3-TM-23 "Geologic Evaluatlon for'Frlnge Area' Contract on the Fan Dyke No. 1 Clalm. Las Animas County. Colorado." R. Malan. October 1955. 3 P . S3 00.

Page 100: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

DEB-3-TM-24 "Geologic Evaluation of the Caltex Uranium Company's High No. 1 Claim for 'Fringe Area' Contract.'' R. C. Malan. November 1955. 3 p., $3.00.

DEB-3-TM-25 "Geologic Evaluation Reportfor'Fringe Area' Contract on the Leyden Coal Mine. Jefferson County, Colorado," E. L. Grossman. November 1955. 4 p.. 1 illus.. $3.00.

DEB-3-TM-26 "Geologic Evaluation Reportfor'Fringe Area' Contract on thelzabel Group. Sec 5 , T 25s.. R.7OW.. Huerfano County. Colorado," R. C. Malan. M. R. Simon, November 1955.3 p.. 1 illus.. $3.00.

DEB-3-TM-28 "Geologic Evaluation Report for 'Fringe Area' Contract on the D.A.C. Uranium Property, Fremont County, Colorado and Supplement." R. C. Malan and M. R. Simon, December 1955, 6 p.. 12 illus., $3.00.

DEB-3-TM-29 "Geologic Evaluation Report for 'Fringe Area' Contract on the Wright Lease. Idledale. Jefferson County, Colorado." J. D. Schlottmann. January 1956. 4 p.. 1 illus.. $3.00.

DEB-3-TM-32 "Geologic Evaluation, for 'Fringe Area' Contract, of the Parco Claims. Park County. Colorado." M. R. Simon. January 1956. 3 p., $3.00.

DEB-3-TM-33 "Geologic Evaluation Report for 'Fringe Area' Contract on the Vanadium Queen Prospect near Morrison. Jefferson County. Colorado," J. D. Schlottmann and B. Scott, March 1956.4 p., 1 illus.. $3.00.

DEB-3-TM-34 "Geologic Evaluationfor'Fringe Area' Contract on theStumbling Stud Prospect, HuerfanoCounty.Colorado." M. R. Simon, April 1956. 3 p., $3.00.

DEB-3-TM-35 "Geologic Evaluation Report for 'Fringe Area' Contract on Eureka Group, near Loveland. Larimer County, Colorado," J. D. Schlottmann and B. Scott, April 1956. 3 p.. 2 illus., $3.00.

DEB-3-TM-36 "Geoiogic Evaluation for 'Fringe Area' Contract on the Whitecliff Group, Huerfano County. Colorado." M. R. Simon. April 1956. 2 p.. $3.00.

DEB-3-TM-37 "Geologic Evaluation Report for ' f r inge Area' Contract on the Lady Bug Group. Jamestown. Boulder County, Colorado," J. D. Schlottmann and B. Scott. April 1956. 4 p.. 2 illus., $3.00.

TM-1 "Fan Pattern Drilling.'' G. E. Morehouse, February 1952, 7 p., 4 illus.. $3.00.

TM-2 "Preliminary Report on the J. R. Simplot Claims in Happy and Hatch Canyons, Wayne and Garfield Counties, Utah," R. F. Shirley and G. L. Brooke, February 1952, 2 p., 1 illus., $3.00.

TM-3 "Investigation of Shinarump Channels on Oljetoh Mesa, Arizona-Utah,"R. C. Cutter. January 1952.2 p., 1 illus.. $3.00.

TM-4 "Shinarump Benches Northeast and Southwest of Temple Mountain, Utah." H. N. Jensen and R. K. Pitman, February 1952. 5 p., 3 illus.. $3.00.

TM-5 "Trip to Richfield, Utah, Regarding Circle Cliffs Area." H. N. Jensen. March 1952. 2 p., $3.00

TM-6 "Progress Report on Geologic Investigation of Happy and Hatch Canyons. Utah," R. F. Shirley and G. L. Brooke, March 1952. 9 p.. 2 illus., $3.00

TM-7 "Geological Reconnaissanceofthe Hosteen Nez Claims.TubaCity. Arizona."P. C. Ellsworth. March 1952.5 p.. 5 illus., $3.00.

TM-8 "Preliminary Report on the Green River Desert Area, Utah.'' G. E. Morehouse, Aprii 1952. 4 p.. 1 illus., $3.00.

TM-9 "Report on Trip to Circle Cliffs. Utah Area. April 14-24. 1952," H. N. Jensen, April 1952. 4 p.. $3.00.

TM-10 "Investigational Drilling-Cold and Sheep Mesas." J. W. Chester. May 1952, 1 p., $3.00.

TM-11 "Bulldozing Rim, Chilchinbeto Area." J. W. Chester. May 1952, 1 p.. $3.00.

TM-12 "Investigational Drilling. Blue Lake Claim." J. W. Chester, May 1952, 1 p., $3.00.

TM-13 "Investigational Drilling, Hoskinnini Mesa," J. W. Chester and R. K. Pitman. May 1952. 2 p.. 2 illus., $3.00.

TM-14 "McElmo Drilling Project. Monteruma County, Colorado," J. B. Hopkins, June 1952. 9 p.. 3 illus., $3.00.

TM-15 "Reconnaissanceof Uranlum-Bearing Deposits, YampaRiver Region. Colorado." R. P. Darnell. July 1952.9 p.. 1 illus., $3.00.

TM-16 "Inequilibrium, a Guide to Uranium Ore Deposits on the Colorado Plateau." P. H. Dodd, August 1952. 18 p., $3.00.

TM-17 "Diamond Drilling Recommendations for the Four Aces Prospect, White Canyon. Utah." F. J. Frankovich. August 1952, 7 p., 4 illus., $3.00.

TM-18 "Investigation and Ore Reserve Estimation of Barlow Creek Roscoelite Deposits with Ore Reserve Data from Graysill and Lightner Creek Areas. Colorado," G. E. Morehouse and R. J. Pursley. 6 p., 7 illus.. $3.00.

TM-19 "Reconnalssanceofwilson Mesaand Upper Brumley Ridge, San Juan County, Utah," R. F. Droullard, August 1952. 5 p.. 1 illus., $3.00.

TM-20 "Geology of Horse Mesa. Arizona-New Mexico, with Recommendations for Wagon Drilling," J. W. King. "September 1952, 6 p., 1 illus., $3.00.

Page 101: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

TM-22 "Some Observations on the Chlnle Formation of Arizona." J. H Leonard, November 1952. 3 p.. $3.00.

TM-23 "Uranium MlneOperated by F. 0 . Manoal on theSW'/s Sec 30. T. 13 N.. R. 9 W . " F. R. rincher. February 1953. 3 p.. 1 illus.. $3.00.

TM-24 "Geology of the Poison Canyon Mine, Valencia County. Sec. 19, T. 13 N.. R. 9 W., near Grants. New Mexico," D. E Mathewson. March 1953. 7 p.. 6 illus.. $3.00.

TM-25 "Ore Reserves of Polar Mesa," L. Garbrecht. April 1953. 7 p., $300.

TM-26 "Report on Phase I Drilling on the King Tut Mesa Experimental Program." P. H. Dodd. March 1952. 9 p.. 12 illus., $3.00.

TM-27 "Report on Phase II Drilling on the King Tut Mesa Experimental Program," P. H. Dodd. March 1952. 6 p.. 14 i l lus. S3.00.

TM-28 "The Salt Wash-Bluff Contact at King Tut Mesa and Its Importance to Contract Mapping." J. A. Masters and N. J. Clnton. April 1952, 4 p , 6 i l lus. $3 00.

TM-29 "Under-reamer Sampllng Experment," J. A Tavelli. May 1952. 3 p.. 1 i l lus. $3.00.

TM-30 "Megascopic Examrnation of Temple Mountain 'Tongue.' D r I I Core DDH 2-31." R C. Gerhard. January 1953. 8 p.. 4 i l lus. S3.00.

TM-37 "Studies of Diamond Drilling at the Lukachukai No. 2 Project." L. Roberts. September 1952.8 p. (Engineering Report). $3.00.

TM-38 "An Operational Report on Wagon Drilling," R. J. Garcia. September 1952. 6 p.. $3.00.

TM-39 "Results of Preliminary Drilling. Red Rock, Arizona." A. H. Anderson. J. R. Foster. D. B. Hurley. October 1952. 4 p., 2 illus., $3.00.

TM-41 "Wagon Drill Sampling." J. W. Chester, March 1953, 2 p., 2 illus., $3.00.

TM-42 "Uranium Occurrences on Secs 4. 8, and 9. T. 12 N., R. 9 W.. McKinley County, New Mexico," F. R. Fincher, April 1953. 7 p., 2 illus., $3.00.

TM-43 "Analysis of Submarginal Ore. Fawn Springs Area, Bull Canyon District. San Miguel and Montrose Counties. Colorado." L. Garbrecht. June 1953. 3 p.. 1 illus., $3.00.

TM-44 "Uranium Occurrences in the Alamosa Creek Area. Catron County, New Mexico,'' P. E. Melancon. December 1953, 5 p.. 3 illus.. $3.00.

TM-45 "Regional Reconnaissance and Prospecting in Northeast Grants District. New Mexico."A. Mirsky. July 1953. 16 p.. 1 illus.. $3.00.

TM-46 "Estimates of Ore Reserves of the Bull Canyon District. Montrose County. Colorado." L. Garbrecht. August 1953, 6 p.. $3.00.

TM-47 "Exploration Thinking," T. W. Mitcham. August 1953. 1 p., $3.00.

TM-49 "Approach to Reconnaissance," Y. W. Isachsen, November 1953. 1 p.. $3.00.

TM-50 "New Ore-Guide Concepts, Grants District."T. W. Mitcham, January 1954, 2 p., $3.00.

TM-51 "Effects of Mining Methods on the Outcome of Small Mines, Begay Claim No. 1, King Tut Mesa, East Carrizo Area. Ar~zona," L. Garbrecht, February 1954. 3 p.. $3.00.

TM-52 "A Study of Ore Controls on Club Mesa, Montrose County. Colorado." E. V. Reinhardt, October 1953. 18 p.. 5 illus.. $3.00.

TM-53 "Ore Controls in the Northwest Carrizo Area." E. V. Reinhardt. December 1953. 8 p., 2 illus.. $3.00.

TM-54 "Comparative Report on What Might Have Been Done on Cove Mesa, Arizona, with Diamond Drills." D. B. Hurley. November 1951. 8 p.. $3.00.

TM-55 "Defin~tion of Exploration." T. W. Mitcham. March 1954. 1 p., $3.00.

TM-56 "D f fe ren t ia Strain Character~st~cs-A Posslble Guide to Shinarump Channels." T. W. Mltcham and C G. Evensen. April 1954, 1 p . $3.00.

TM-57 'Tentatlve Evaluation of Crl ter~a of Favorabilliy Maps." L. Garbrecht May 1954. 7 p . $3.00.

TM-58 "Prelmlnary Reconnaissance for Uranium near the Rio Puerco. East o f Mount Taylor in New Mexico." D. E. Mathewson. May 1954. 5 p.. 2 ~llus.. S300

TM-59 "Intrus~vesof the Jackptle Area. Valencia County. New Mex~ca:'J. W. Allison. August 1954. 3 p.. 1 illus.. $3.00.

TM-60 "Reconnaissance of Red Rock Valley Apache County. Arlzona. B B Hanshaw. July 1954. 4 p.. 1 ~llus.. $3.00

TM-61 "Reconna~ssanceot the Morrison Formallon North of Prewltt. McKinley County. New Mexico." R C. Gerhard, August 1954. 8 p.. 4 i l lus. $3 00.

Page 102: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

"Average Sire of Uranium Ore Targets an the Colorado Plateau." L. Garbrecht. July 1954.7 p.. 2 illus., $3.00.

"Locating Paleochannelsas Opposed to Locating Uranium Orebodiesin Shinarump Exploration," J. D. Lowell. July 1954. 2 p., 2 illus., $3.00.

"Air-Ground Exploration Method for the Chinle Formation." J. D. Lowell. August 1954, 2 p.. $3.00.

"Reconnaissance of the De Beque Area. Mesa and Garfield Counties. Colorado." W. D. McDougald, August 1954, 5 p., 3 illus., $3.00.

"Review of Some Geologic Features on Uranium Deposition on the Colorado Plateau." L. Garbrecht, November 1954, 17 p., $3.00.

"Review of Drilling Methods and Procedures with Results Obtained." L. Garbrecht. October 1954, 33 p.. 15 illus.. $3.00.

"Reconnaissance for Uranium in the Morrison Formation. Church Rock Area, McKinley County, New Mexico." J. V. A. Sharp. September 1954. 8 p.. 3 illus.. $3.00.

"Reconnaissance for Uranium in the Chinle Formation In and Adjacent To Dinosaur National Monument. Uintah County, Utah, and Moffat County, Colorado." N. B. Young, January 1955. 4 p., 2 illus., $3.00.

"Reconnaissance of the Salt Wash Deposits in Little Valley and South Lisbon Valley. San Juan County, Utah, and San Miguel County. Colorado." 0. M. McRae, June 1955. 12 p.. 10 illus.. $3.00.

"Tentative Appraisal of Future Ore Possibilities of Northeast Utah and Northwest Colorado." I . Garbrecht, April 1955, 8 p.. $3.00.

"Reconnaissance of the West Side of the San Rafael Swell. Emery County. Utah." R. G. Blair. December 1954, 10 p.. 3 illus., $3.00.

"Reconnaissance for Uranium and Vanadium Mineralization in the Glenwood Springs-Rio Blanco Area. Rio Blanco and Garfield Counties. Colorado," W. D. McDougald, January 1955, 13 p.. 1 illus., $3.00.

"Exploration Drilling. Dry Valley District. San Juan County. Utah, Contract No. AT(05-1)-225, April 3. 1953. Contract No. AT(05-1)-236, July 7, 1953." R. A. Teichman. I. T. Fisk. and C. D. Thompson, June 1955. 6 p.. $3.00.

"Results of Gamma Ray Logging of Climax Uranium Company Wagon Drill Holes. Martin Mesa, Northwest Carrizo Area. Apache County. Arizona." W. L. Chenoweth, July 1955. 3 p.. 3 illus., $3.00.

"Investigation of the Calyx No. 3 Mine. Temple Mountain Area. San Rafael Swell. Emery County, Utah." L. Baumgardner and E. A. Noble. April 1957, 11 p.. 4 illus.. $3.00.

''Radioactive Warm Springs on the San Rafael River. Emery County. Utah,"W. S. Keys, November 1955, 4 p., 2 illus.. $3.00.

"Reconnaissance of Uranium Deposits in the Castle Dale Region, Emery County. Utah," I. Million. December 1955, 5 p., 3 illus., $3.00.

"Drilling on Tenderfoot Mesa, Mesa County, Colorado," W. T. Davis. January 1956. 16 p.. 5 illus.. $3.00

"Prelimnary Drilling Report. Big Indian Wash District. San Juan County. Utah. Contract No. AT(05-1)-225." R. A Teichman. Jr.. I. T. Flsk, and J. I. McLelland. March 1956. 14 p.. 6 l l lus. S3.00.

"Drilling on the Ruth and Brigham Claims. Holbrook Area. Navajo County.Arizona-ContractsAT(30-1)-1361 and AT(05-1)-247," C. C. Gregg and E. L. Moore, March 1956. 4 p.. 6 illus.. $3.00.

"Preliminary Report on'the Uranium Possibilities of the Jemez Indian Reservation and Jemez Pueblo Grant, Sandoval County. New Mexico." J. C. Brassfield, May 1956. 8 p.. 4 illus.. $3.00.

"A Reconnaissance for Uranium in Part of the Roan and Book Cliffs Area of East Central Utah." N. B. Young. revised by R. G. Young. May 1956. 8 p.. 3 illus., $3.00.

"Radioactive Titaniferous Heavy Mineral Placers in the San Juan Basin. New Mexico and Colorado." W. I. Chenoweth. May 1956. 12 p.. 11 illus.. $3.00.

"Petrography of the Black Todilto Limestone Area with Respect to Processing Properties." R. A. Laverty. August 1954. 19 p.. 14 illus.. $3.00.

"Final Report on Lockhart Canyon Trail Project." M. E. Howell. November 1954. 3 p.. (Engineering Report). $3.00.

"Final Report on Cane Creek Trail Project." M. E. Howell. November 1954. 3 p.. (Engineering Report). $3.00.

"Summary ofthe Airborne Radiometricsurvey of the Dark Canyon Project. Southeastern Utah."W. D. Siapno, May 1955. 9 p.. 2 illus., $3.00.

"Airborne Radiometric Reconnaissance of the Inter-River Project. Southeastern Utah." W. D. Siapno. March 1956. 17 P , 2 illus.. $3.00.

Page 103: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

TM-90 "Summary of the Airborne Radiometric Survey of the Ouray Area. Utah," W. D. Siapno. October 1955. 8 p.. 2 illus., $3.00.

"Appraisal of Uranium Explorat~on in the Blanding District, San Juan County, Utah," R. A. Teichman, R C. Dickinson, revised by E. A. Anderson, May 1956, 10 p.. 8 illus., $3.00.

"Application of the Dithirone Heavy-Metals Test to Uranium Deposits of the Chinle Formation near Cameron, Arizona." R. F. Wright, January 1957. 8 p , 9 illus.. $3.00.

"A Brief Evaluation afthe Practical Useof an Airplaneand Pilot in Geologic Reconnaissance." E.A. Noble. July 1956. 3 p.. $300

"Geologic Logs of Dry Hale Oil Wells In Emery. Garfield. Grand and Kane Counties, Utah." W. R. Kastelic. August 1956. 2 p.. 8 illus., $3.00.

"Reconnaissance for Uranium Depositsin the Kaiparowits Plateau Region, Utah,"E. C. Annes. Jr.. September 1956. 8 p . 2 illus., $3.00.

"The Horseshoe and Other Diatremesofthe Hopi ButtesVolcanic Field NortheastArizona,"C. L. Fair. October 1956, 15 p.. 20 illus.. $3.00.

"A Preliminary Investigation of Triassic Rocks in the Lukachukai Mountains. Arizona." R. F. Kosatka, December 1956. 10 p.. 4 illus.. $3.00,

"Preliminary Reconnaissanceofthe Central Zuni Uplift. New Mexico."L. Baumgardner. November1956.21 p.. 6 illus., $3.00.

"Reconnaissance for Uranium in the Toadlena Area. San Juan County, New Mexico," 6. J. Archer. January 1957. 15 p., 5 illus., $3.00.

"Reconnaissance of the Red Canyon Area. San Juan County. Utah," E. V. Mace, revised by E. W. Oertell. January 1957. 8 p.. 6 illus.. $3.00.

TM-101 "Geology and Uranium Deposits of Calf Mesa. Emery County. Utah," R. L. Akright, February l 9 5 7 . l l p.. 2 illus.. $3.00.

TM-102 "Investigative Drilling in the Bee Area. White Canyon. San Juan County. Utah. Contract AT(05-1)-221," W. D. Grundy. February 1957, 10 p.. 5 illus.. $3.00.

TM-I03 "Reconnatssancefor Uranium in the Southern Carrzo Mountains. Apache County, Arizona." R. A. Labreque. February 1957. 7 p., 2 lllus., $3.00.

TM-104 "Investigative Drilling on the Posey. Blue Lizard and Markey Localities, Red Canyon Area, San Juan County, Utah." E. V Mace, revised by E. W. Oertell. March 1957, 17 p.. 9 illus., $3.00.

TM-105 "Final Drilling Report. Elk Ridge Area. San Juan County. Utah. Contract No. AT(05-1)-236." J. A. Richardson. January 1956, 3 p., 1 ~llus.. (Engineering Report). $3.00.

TM-106 "Final Drilling Report, Elk Rdge Area. San Juan County. Utah. Contract No. AT(05-1)-236." A. Petrick, January 1956. 5 p.. 1 illus.. (Engineering Report). $3.00.

TM-107 ' Dr~ l l tng in the Lukachukal Mounta~ns. North Chuska Mountan Area Apache County. Arlzona. Contract AT(O5 1)-234: J W Epp~ch. January 1956. 9 p 2 i u s . (Englneerlng Report). 53 00

TM-108 F tna l Drr l lng Report Uranium Peak Area. Rlo Blanca County. Colorado. Contract No. AT(05-1)-236." H R Hart. January 1956. 5 p . . 1 llus.. (Engineerng Report). 5300

TM-109 Frnal D r l l n g Report. CoveMesaArea.ApacheCounty.Arlzona. Contract Nos AT(05-1)-120. AT(30-1)-1364. ATl05-1)-231 ' J F Brown January 1956. 11 p., 1 illus.. (Eng~neer~ng Report). $3 00

TM-110 D r l i l ~ n g in the Lukachukal Moun tan Area. Apache County. Ar~zona, Contract No. AT(30-1)-1364." J F Brown. February 1956 6 p.. 1 ~ l l u s . (Engineering Report). 53.00.

TM-111 'Drlll8ng In the Red Canyon Area, San Juan County, Utah. Contract No AT(O5-11236."J. K. Hllleary. March 1956. 5 p . 1 illus (Eng~neer~ng Report). $3 00

TM-112 ' D r i n g in the Rattlesnake Area, ApacheCounty.Arzona. Contract No AT(05-1)-236,"G.T Brown. February 1956 4 p . 1 i u s . (Engneerlng Report). $3 00.

TM-114 "Reconnatssance for Uranlum in Parts of the San Juan Basin. New Mexico and Colorado," W. L. Chenoweth and F. T. Stehle, March 1957, 19 p , 2 lllus , $3.00.

TM-115 "Ore Occurrence Study Mesa 4-112 M~nes, Lukachukai Mountains. Apache County, Arizona." T. E. Beam. March 1957. 7 p.. 10 i l lus, $3 00.

TM-116 "Exploratory Drilling in the Posey and Markey Localities. Red Canyon Area, San Juan County. Utah, Contract NO. AT(05-1)-236." W. W. Easton and E W Oertell. March 1957. 9 p.. 2 l lus.. $3.00.

TM-117 Exploratory Drllilng in the Nash Car Locallty Whlte Canyon Area. San Juan County. Utah (Contract No. AT(O5-11-221). E W Oertell and D F Spencer. March 1957. 9 p . 3 u s . 53 00

Page 104: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

TM-118 "Reconnaissance of Uranium Deposits in the Capitol Reef Area. Wayne and Garfield Counties, Utah.'.' L. H. Baumgardner. D. H. Warner. April 1957. 17 p , 8 illus. $3.00.

TM-119 "Estimate of All Ore Reserves on Polar Mesa. Grand County, Utah." L. Garbrecht. April 1957. 11 p.. 1 illus.. $3.00.

TM-120 "Radiometric Airborne Survey of the Southwest Zuni Mountains. New Mexico," J. Ruzycki. April 1957. 7 p., 1 illus.. $3.00.

TM-121 "Report on theTexas Company Radioactivity Survey and Evaluation by AECTest Drilling in the Blanding Area. July-October 1951," P. E. Melancon and E. F. Dressner. April 1957. 13 P.. 2 illus.. $3.00.

TM-122 "Fractures of Circle Cliffs Area, Garfield County, Utah," M. C. Hemminger, May 1957, 7 p., 6 illus., $3.00.

TM-123 "Fracturing in the San Rafael Swell, Emery County. Utah," R. L. White, May 1957, 16 p., 12 illus.. $3.00.

TM-124 "AirborneRadiometric RecordedSurvey oftheMarshail PassandTomichi DomeAreas.Colorado."B. C.Smith and C. W. Fickel. March 1957, 5 p.. 1 illus.. $3.00.

TM-125 "Exploratory Drilling on Frey Point Mesa. White Canyon Area. San Juan County. Utah. Contracts AT(30-1)-1361 andAT(O5-1)-221." L. J. Miller. D. F. Spencer and E. W. Oertell. June 1957.16p.3 illus.. S3.00.

TM-126 "Drilling in the Flatirons Locality. Monument Valley. Arizona." 1. 8. Gray. August 1957. 19 p.. 9 illus.. S3.00.

TM-127 "Reconnaissance of the Cretaceous and rertlaiy Uranium Deposits in the Wasatch Plateau, Utah," W. R. Kastelic and K. E. Scott, August 1957, 10 p., 5 illus., $3.00.

TM-128 "Preliminary Fracturestudy, Smith Lake Area. McKinley County. New Mexico." B. B. Hanshaw and H. M. Dahl. May 1960. 4 p.. 4 illus.. $3.00.

TM-134 "Orphan Lode Uranium Mine, Grand Canyon, Arizona," Dan N. Magleby, March 1961.9 p.. 8 illus., $3.00.

TM-135 "Some Observations on the Stratigraphic Relationships in the Morrison Formation in the Southern San Juan Basin," L. R. Kittleman, Jr., June 1957, 14 p., 3 illus., $3.00.

TM-136 "Airborne Radiometric Recorded Survey of the Denver Basin, Colorado," B. C. Smith and C. W. Fickel. May 1957. 4 p.. 2 illus.. $3.00.

TM-137 "Drilling in the Monument Valley Area, San Juan County, Utah and Navajo County, Arizona," C. K. Presley. June 1957, 6 p., 1 illus., (Engineering Report), $3.00.

TM-138 "Airborne Radiometric Survey of Upper Michigan and Parts of Wisconsin." B. C. Smith and C. W. Fickel. October 1957. 7 p.. 4 illus., $3.00.

TM-139 "Uranium in Northern Arizona, with Emphasis on the Deposits of the Cameron Area." W. L. Chenoweth. November 1958. 4 p.. 1 illus., $3.00.

TM-140 "Drilling in the Sanastee District. San Juan County. New Mexico." J. B. Collyer. December 1957.6 p., 1 illus.. (Engineering Report). $3.00.

TM-t41 "Drilling in the Grants District, McKinley County, New Mexico," C. W. Foutz, December 1957. 7 p.. 2 illus., (Engineering Report). $3.00.

TM-142 "F ina l Drilling Report, Radium Mountain. Bull Canyon No.3 Pr0iect:'A. Petrick, December 1957.10 p.. 1 iilus.. (Engineering Report). $3.00.

TM-143 "Drilling in the Lukachukai Mountains. North Chuska Mountain Area, Apache County, Arizona." J. W. Eppich. December 1957. 7 p.. 1 illus.. (Engineering Report). $3.00.

TM-144 "Drilling in the Grants District, McKinley County. New Mexico." C. W. Foutz. December 1957. 6 p.. 1 illus.. (Engineering Report). 8 .00.

TM-145 "Drilling in the Sanastee Area, San Juan County, New Mexico." J. B. Collyer, December 1957. 9 p., 1 illus.. (Engineering Report), $3.00.

TM-146 "Drilling in the Big Indian Wash Area. San Juan County, Utah." J. K. Hilleary, December 1957. 6 p.. 1 illus., (Engineering Report). $3.00.

Tlvl-147 "Ambrosia Lake-New Mexico's Newest Uranium Bonanza." J. W. Gabelman. R. G. Young and G. K. Ealy. February 1956, 12 p.. $3.00.

TM-148 "Drilling in the Inter-River Area, Grand and San Juan County. Utah." H. R. Hart. December 1957.7 p.. 1 illus.. (Engineering Report), $3.00.

TM-149 "Drilling in the Holbrook District. Navajo County. Arizona:' J. E. Gannon. Decembei 1957, 5 p.. 1 illus., (Engineering Report). $3.00.

TM-150 "Drilling in the Calf Mesa Area, Emery County. Utah." W. J. Potter. December 1957.5 p.. 1 illus.. (Engineering Report). $3.00.

TM-151 "Drilling in the Coal Creek Area, Rio Blanco County. Colorado;' J. E. ~ a n n o n ; ~ecembk?? t957:'5-p.. t iltus., (Engineering Report). $3.00.

Page 105: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

TM-152 "Uranium Geology and Mineralogy as Related to Ore Types on the Colorado Plateau," R. A. Laverty. August 1963. 6 p., 1 illus.. $3.00.

TM-153 "Drilling in the Montezuma Canyon Area, San Juan County, Utah." J. A. Littrell, December 1957.7 p., 1 illus., (Engineering Report), $3.00.

TM-154 "Final Drilling Report Dry Valley Area, San Juan County. Utah," J. K. Hilleary, December 1957, 8 p., 1 illus.. (Engineering Report), $3.00.

TM-155 "Drilling in the Rattlesnake Area. Apache County. Arizona." G. T. Brown, December 1957. 5 p.. 1 illus., (Engineering Report), $3.00.

TM-156 "Drilling in the Circle Cliffs Area. Garfield County, Utah," J. K. Hilleary. December 1957. 7 p.. 1 illus.. (Engineering Report), $3.00.

TM-157 "Drilling in the White Canyon Area. San Juan County, Utah." J. A. Richardson, December 1957, 8 p., 1 illus., (Engineering Report), $3.00.

TM-158 "Drilling in the White Canyon Area, San Juan County, Utah." J. A. Richardson, December 1957. 4 p., 1 illus., (Engineering Report). $3.00.

TM-159 "Final Drilling Report Rattlesnake Area. Apache County, Arizona." G. T. Brown. December 1957.4 p.. 1 illus., (Engineering Report), $3.00.

TM-160 "Diamond and Wagon Drilling in the Northwest Carrizos Area, Apache County, Arizona." J. F. Brown, December 1957, 9 p., 1 illus., (Engineering Report), $3.00.

TM-161 "Drilling in the East Carrizo Area, Apache County, Arizona, San Juan County, New Mexico," J. F. Brown. December 1957, 9 p., 1 illus., (Engineering Report), $3.00.

TM-162 "Drilling in the Blanding District, Cottonwood Wash Area, San Juan County, Utah," J. K. Hilleary, December 1957. 6 p.. 1 illus.. (Engineering Report), $3.00.

TM-163 "Drilling in the Rattlesnake Area. Apache County, Arizona." G. T. Brown, December 1957. 6 p., 1 illus., (Engineering Report), $3.00.

TM-164 "Drilling In theSan Rafael Desert and Calf Mesa Areas-San Rafael No. 2and Calf MesaNo.3 Projects, Emery County, Utah." W. D. Mathews and T. E. Hopkins, December 1957, 7 p., 1 illus., (Engineering Report), $3.00.

TM-165 "The Applicability of Resistivity, Self Potential and Radiometric Logging Techniques to Stratigraphic and Lithologic Problems in the Ambrosia Lake Area, New Mexico," J. B. Misz, July 1958, 63 p., $3.00.

TM-166 "Processes of Uranium Deposition in Continental Sedimentary Rocks," P. H. Dodd. August 1958.17 p.. $3.00.

TM-167 "Use and Operation of Mobile Geochemical Laboratory," R. L. Kinnaman. July 1959. 3 p., 2 ilius., $3.00.

TM-168 "Operator's Instructions, TU-5A Gamma Ray Logging Unit," R. L. Kinnaman, March 1960, 7 p.. $3.00.

TM-168(R) "Operator's Instructions. TU-5A Gamma Ray Logging Unit." R. L. Kinnaman. July 1961, 11 p.. 2 illus., $3.00.

TM-169 "Preliminary Petrographic Study of Rocks from Nevada Test Site-Basalt Mesa," E. E. Anderson, May 1960. 3 p., 2 illus., $3.00.

TM-170 "Uranium Deposits of the Southern San Juan Mineral Belt, New Mexico." R. G. Young, August 1960. 48 p., 7 illus.. $3.00.

TM-171 "limenite, Magnetite, and Feldspar Alteration under Reducing Conditions." S. R. Austin, August 1960, 4 p., $3.00.

TM-172 "Quantitative Method for Gamma Assaying of Uranium Ores In Situ." R. F. Droullard and R. L. Kinnaman. August 1960. 5 p.. 5 illus., $3.00.

TM-173 "The Riverview Mine. CoconmoCounty. Arizona."W. L. Chenowethand P. P. Blakemore. October 1960.3 p.. 1 illus.. $3.00,

TM-174 "Field Evaluation of the Dfferentiai Mine Face Scanner.'' M. E. Crew, December 1960. 11 p.. $3.00.

TM-175 "Linear-Logarithmic Regression Analysis." J. H. Scott. April 1961, 19 p., $3.00.

TM-176 "Hydrogeochemical Reconnaissance for Uranium in the Stanley Area, Idaho," C. T. Illsley. July 1961, 21 p.. 3 illus.. $3.00.

TM-177 "Procedures for Determination of Density and Moisture Content." S. R. Austin. December 1961. 11 p., $3.00.

TM-178 "Mineralogy of Thorium." S. R. Austin. February 1962, 16 p.. $3.00.

TM-179 "GAMLOG-A Computer Program for Interpreting Gamma-Ray Logs." J. H. Scott. September 1962, 44 p., $3.00.

TM-180 "DOLLAR. A Computer Program for Calculating Uranium Ore Reserves for Underground Mines at Various U,O, Prices," J. H. Scott. July 1963. 28 p.. $3.00.

Page 106: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

"GRADE-A Computer Program for Calculating Uranium Ore Reserves for Underground Mines at Selected Cut-Off Grades." J. H Scott. July 1963, 23 p.. $3.00.

"Preparation of Gamma-Ray Log Data for IBM Card Punching." H. B. Young, and P. C. deVerg8e. December 1963. 18 p., 8 illus.. $3.00.

"Estimation of Uranium Ore Reserves by Statistical Methods and a Digital Computer (ORSAC2 Program)," R. J. Meehan and W. D. Grundy. February 1963. 27 p.. 18 ilius., $300.

"Uranium Occurrences on the Goodner Lease. Sandoval County. New Mexico." L. R. Kittleman, Jr. and W. L. Chenoweth, July 1957, 12 p.. 6 illus.. 53.00.

"Causesof Color Variations in thesalt Wash and Recapture Members o f lhe Morrison Formation on theSouth Side Mesas. Lukachukai Mountains. Apache County. Arizona," R. A. Laverty. January 1954. 13 p.. $3.00.

"Geologic Dril l ing in the Northwest Carrizo Area. Apache County. Arizona." W. L. Chenoweth, March 1956. 11 p.. 4 illus., $3.00.

"Summary and Chronology of the Domestic Uranium Program." Neilsen B. O'Rear, May 1966. 50 p.. $3.00.

"Mapping Open-Pit Mines with a Standard Film Camera," L. Y. Marks, April 1960. 12 p.. 4 illus., $3.00.

"Uranium Occurrences of the Nacimiento Region, Sandoval and 9 io Arriba Counties. New Mexico." W. L. Chenoweth. June 1972. 15 p.. 1 illus.. 53.00.

"Report on Airborne Radioactivity Surveys and the Uranium Deposits in the Red River Region of Texas and Oklahoma," R. G. Blair. F. T. Stehle and R. A Levich, November 1973, 16 p.. 3 illus., $3.00.

"The Uranium Deposits of Northeastern Arizona."W. L. Chenoweth and R. C. Malan, June 1973. 23 p., 7 illus.. $3.00.

"Uranium Deposits of the Canyoniands Area." W. L. Chenoweth. 1975. 39 p.. 2 illus., $3.00.

"Uranium Resources of New Mexico." W. L. Chenoweth. May 1976. 23 p.. 3 illus.. $3.00.

"Uranium Occurrences of the Nacimlento-Jemez Region. Sandoval and Rio Arriba Counties. New Mexico." W. L. Chenoweth, May 1974. 16 p.. 2 illus., 53.00.

"Status of the NURE Program." E. W. Grutt. Jr.. August 1976. 16 p.. 26 lilus., $3.00.

"Report of Examination, Little Wolf Mining and M~nerals. Inc.. Anklam Property, Big Falls. Waupaca County Wisconsin," J. W. King, July 1960. 14 p., 10 illus.. $3.00.

"Ground Water Conditions and the Relation to Uranium Deposits in theGas Hills Area, Fremont and Natrona Counties. Wyoming," L. Y. Marks. November 1958. 9 p.. 3 illus.. 53.00.

"Uranium in the San Juan Basln-An Overview," W. L. Chenoweth. May 1977. 6 p., $3.00.

"Uranium in Western Colorado." W. L. Chenoweth. September 1977. 9 p.. 2 illus., $3.00.

"The Estimation of Potential Uranwm Resources.'' D. L. Curry. September 1977. 16 p.. 4 illus.. $3.00.

"Some Remarks on Carborne Scintiliometry." L. L. Smith, November 1969. $3.00.

"Uranium Geology of the Gulf Coastal Area." D. L. Norton. November 1969. 10 p., $3.00.

"Uravan Mineral Belt, General Description. Road Logs. Maps, StratigraphicColumns, Typical Rolls. Historical Notes," U.S. Atomic Energy Commission. Grand Junction Office, August 1972, 11 p., 4 illus.. $3.00.

"Road Log from Cortez. Colorado to Gallup. New Mexico: Road Log from Gallup. New Mexico to Albuquerque. New Mexico; Road Log from Albuquerque. New Mexico to the Oja del Espiritu Santo Grant, New Mexico; Stratigraphic Relationships and Nomenclature Chart. Stratigraphic Sections. Comments on Pomts of Interest." U S . Atomic Energy Commission, Grand Junction Office. August 1972. 26 p.. 15 ilius.. 53.00.

"Paradox Basin Tour: Grand Junction, Colorado to Moab. Utah, via Dead Horse Point: Moab. Utah. to Grand Junction. Colorado. via Lisbon Valley and Unaweep Canyon; Road Logs, Maps, Stratigraphic Column, Comments on Points of Interest." U S . Energy Research and Development Administration. Grand Junction Office, Resource Division. March 1975, 4 p.. 9 iiius.. $3.00.

"An Airborne Radiometric Survey of Parts of Motfat and Roult Countles. Colorado: Sweetwater and Carbon Counties. Wyoming," G. V. Holmquist and F. T. Stehle. May 1956, 26 p.. 3 illus.. $3.00.

''An Airborne Radcometric Survey of the Rock Springs Uplift. Sweetwater County. Wyoming and Adjacent Areas of Northwest Moffat County. Colorado." E. E. Schneider and J. Ruzycki, August 1956. 17 p.. 11 illus..

''An Aerial Radiometric Survey of the Seminoe Mountains. Shirley Mountains, Freereout Mountains. Laramie and Hanna Basins. Carbon and Albany Countles. Wyoming." J. Ruzycki. October 1956. 9 p.. 3 iiius.. $3.00.

Page 107: 4 National Uranium Resource Evaluation Annual Activity Report80).pdfEvaluation Annual Activity Report," was prepared by Bendix Field Engineering Corp., operating contractor for DOE's

Bendix Field Engineering Corporation Bendix Field Engineer~ng Corporation was se- lected by the Energy Research and Development Administration, the predecessor of the U.S. Department of Energy, in June 1975, as the on- site contractor for the Grand Junction Office. Under the contract. Bendix supports DOE in carrying out a number of responsibilities, in- c luding: conduct ing the Nat ional Uranium Resource Evaluation program and managing the program of leasing U.S. government lands for the production of uranium and vanadium ores. In addition to performing in these program areas. Bendix handles all facility support required by GJO.

During 1979 Bendix at Grand Junction grew from 475 to 580 permanent employees, plus 64 special assignment and temporary employees. Minor realignments in the Bendix organization were effected including the addition of the staff position. Executive Assistant to the Manager's Office, and the integration into the Geology

Division of the World-Class and lntermediate- Grade Studies group under a newly appointed Assistant Director.

The high level of technical effort maintained by Bendix is a reflection of the experience and educational backgrounds of the managerial and professional personnel: of these 344 employees, approximately 170 have bachelor's degrees, 85 have master's degrees, and 40 have doctor's degrees.

During 1979 Bendix made significant gains in its efforts to provide both job opportunity and upward mobility to all employees. Within the managerial and professional categories at year's end, there were 2.6 percent minority and 17.1 percent female employees. Overall. Bendix has 8.3 percent minority and 35.4 percent female personnel in its employment.

Bendix Field Engineering Corporation - F i e l d Engineering C~rporafion

I ASST MMlAGEII

I RESOURCE I ASST MANAljlR

ASSESSMENT I DATA SERVICES

I I

C. EDWARDS

MlNlNG I I OPLRAT.TIONS

DlVlSlON

I G. N I T E R I C. BRUNER

I I I I

* DEYEL. DIVISION DIVISION

W. DlEHL S. ClTKO

lo6