19
Pipe Lining Vanessa McCauley, EI Hydraulics Engineer, INDOT [email protected] February 7, 2017

4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Pipe Lining

Vanessa McCauley, EIHydraulics Engineer, INDOT

[email protected] 7, 2017

Page 2: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Agenda Inlet Configurations

Options

Common Mistakes

Clarifications

Page 3: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Inlet Configurations Mitered

Page 4: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Inlet Configurations Mitered

Page 5: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Inlet Configurations 1:1 Beveled Headwall

Page 6: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: HDPE HDPE

HDPE as mitered to conform to slope HDPE with headwall or beveled headwall HDPE with bored pipe

HDPE: mitered to conform to slope Bored Pipe

“Smooth HDPE” Thin edge projecting Minimum size of 18”

Page 7: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: HDPE Only smooth wall

Page 8: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: CIPP CIPP

CIPP same as existing entrance or mitered CIPP with headwall or beveled headwall CIPP with bored pipe

Page 9: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: Paved Invert Paved Invert

Match existing entrance Paved Invert with headwall or beveled

headwall Paved Invert with bored pipe Sizing

5 in thickness CMP: Up to about ¼ rise CMPA: Up to the vertical location

Page 10: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: Paved Invert

Standard drawing coming soon

CMP Paved Invert

Top

Paved Invert

Bottom

CMPA Paved Invert

Top

Paved Invert

Bottom

Page 11: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: Paved Invert

Page 12: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Option Sequence: Replacements Corrugated, Semi-smooth, and

Smooth Details to be discussed later

Contracts Provide documentation for the requested

options.

Page 13: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Common Mistakes Dos

Determine legal drain status Mitered to conform to slope Place liners at bottom of pipe May increase backwater

contained in R/W or upstream channel Documentation Contact Hydraulics

Page 14: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Common Mistakes Don’ts

Use Trapezoidal or Triangular channel Use next smallest CMPA for HDPE sizing

Page 15: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Common Mistakes

Host Pipe Outside HDPE Inside HDPE Next Smallest CMPA

Page 16: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Clarifications Raise liner inverts: liner thickness Raise bored pipe inverts: min 12 in Raise paved inverts: 5 in

Page 17: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Clarifications

0

1

2

3

4

5

6

0 2 4 6 8 10 12 14 16 18

Existing Bore Raised 0.5 ft Cross Section Bore Raised 1 ft

Page 18: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Clarifications Assume no scour hole Backwater calculation

Determine existing backwater Backwater difference based on difference in

headwater elevation between existing and liner model

Page 19: 4 - McCauley - Pipe Liners - 2-7-17 - McCauley - Pipe Liners - 2-7-17.pdfOption Sequence: Paved Invert Paved Invert Match existing entrance Paved Invert with headwall or beveled headwall

Clarifications Existing Backwater =104.79-(100.5+1.90) =2.39 Liner Backwater = (105.17-104.79)+2.39 = 2.77

Not 105.17-(100.75+1.90) = 2.52