Upload
esh84
View
217
Download
0
Embed Size (px)
Citation preview
7/29/2019 4-82 Targeting Workshop
1/118
UNCLASSIFIED
UNCLASSIFIED
BCT Targeting /Cyclic MDMP
4 IBCT, 82 ABN DIV
8 JUN 11
1
7/29/2019 4-82 Targeting Workshop
2/118
UNCLASSIFIED
UNCLASSIFIED
Agenda
I. PurposeII. Doctrine and References
III. Challenges and Trends
IV. BCT Targeting/ Cyclic MDMP
V. Commanders Guidance
VI. Exercise
2
7/29/2019 4-82 Targeting Workshop
3/118
UNCLASSIFIED
UNCLASSIFIED
Purpose
To provide doctrinalreference and to discussthe way ahead for the
targeting /cyclic MDMP forthis exercise and beyond.
3
7/29/2019 4-82 Targeting Workshop
4/118
Unified Endeavor 11-3
As of: 17 MAR 11
4/82nd Airborne Division Training Objectives
Training Objectives
Execute BCT & RC-S (DIV) Mission Command (Common Operating Picture &
CCIR)
Execute BCT staff processes
Synchronize the integration of Holistic Targeting, Campaign
Refinement/Planning, and mission command of execution over a 30 day
operational horizon lethal and non-lethal effects into planning and execution
Coordinate and integrate Interagency support for stability operations
Execute Operational Intelligence, Surveillance, and Reconnaissance
7/29/2019 4-82 Targeting Workshop
5/118
82 ABN DIV Trng OBJ
Al to obtain
5
7/29/2019 4-82 Targeting Workshop
6/118
UNCLASSIFIED
UNCLASSIFIED
BCT Targeting Doctrine
6
Continual updates reflect current implementationto include Nonlethal and Joint TTPs
7/29/2019 4-82 Targeting Workshop
7/118
UNCLASSIFIED
UNCLASSIFIED
Other References
7
The value of an SOPcannot be overstated.
It reflects our bestpractices and it becomes
our legacy.
7/29/2019 4-82 Targeting Workshop
8/118
UNCLASSIFIED
UNCLASSIFIED
Targeting Defined
Targeting is the process of
selecting and prioritizing targetsand matching the appropriateresponse to them, consideringoperational requirements andcapabilities (FM 3-60, FM 3-90.6)
The emphasis of targeting is onidentifying resources (targets) the enemy can
least afford to lose or that provide him with thegreatest advantage, then further identifying thesubset of those targets which must be acquiredand attacked to achieve friendly success.
8Sou rce: FM 3-60, pg . 1-1
7/29/2019 4-82 Targeting Workshop
9/118
UNCLASSIFIED
UNCLASSIFIED
Targeting Process
9
D3A:The targeting process is based on fourfunctions: decide, detect, deliver, and assess(D3A). It is a Cyclic process. The D3Afunctions are not phased or sequenced, andfrequently occur simultaneously throughout
planning and execution.FM 3-90.6, The BCT, para 8-15
7/29/2019 4-82 Targeting Workshop
10/118
UNCLASSIFIED
UNCLASSIFIED
How are we defining
a Target?
10
7/29/2019 4-82 Targeting Workshop
11/118
UNCLASSIFIED
UNCLASSIFIED
An area, complex, installation, force, equipment,capability, function, or behavioridentified forpossible action to support the commanders
objectives, guidance, and intent.
Target (Problem Set)
planned or immediate
lethal and/ornonlethal
enemy and/orneutral
developed during missionanalysis from IPB products
injected into the targeting process
FM 1-02 (Operational Terms)
11
7/29/2019 4-82 Targeting Workshop
12/118
UNCLASSIFIED
UNCLASSIFIED
Targeting Essentials
TargetLethal
Nonlethal
Target
NAI
TAI
CCIR
PIR
DP
HVT
HPT
Linkages
Targeting Meetings
CDRGuidance
SITTEMP
AssessDecide
What drives targeting?
12
DSM
DST
COA
7/29/2019 4-82 Targeting Workshop
13/118
UNCLASSIFIED
UNCLASSIFIED
Decision Point (DP)The point in space and time where the
commander or staffanticipates making a decisionconcerning a specific friendly course of action. A decisionpoint is usually associated with a specific target area ofinterest, and is located in time and space to permit the
commander sufficient lead time to engage the adversaryin the target area of interest.
FM 1-02 Operational Terms and Graphics
DP
One result of the MDMP is linking the situation and eventtemplates with NAIs and target areas of interest (TAI) thatare linked to decision points (DP) for the commander. Thecommander approves selected IR as his CCIR for his DPs.These NAIs, TAIs, and DPs are expressed on the decisionsupport template (DST).
FM 3-90.6, para 4-9, The BCT13
7/29/2019 4-82 Targeting Workshop
14/118
UNCLASSIFIED
UNCLASSIFIED
Targeting Challenges
1. Staff preparation for the
targeting WG/meeting2. WFF input to the SITEMP /
CIVIL CONSIDERATIONS
3. Staff presentation/productsfor BCT commander
4. Updating the ISR plan to support targeting
5. Knowledge Management in support of targeting
6. Integrating Nonlethal targeting effects
7. Effective use of a consolidating matrix (i.e., TSM)
8. Targeting beyond the next 24-48 hours
14Sourc e: BCTC-C FSX Trends 2011
BCT Targeting Meeting
7/29/2019 4-82 Targeting Workshop
15/118
UNCLASSIFIED
UNCLASSIFIED 15
Sourc e: FM 3-60,
pg . 2-23 Fig. 2-9
Considering All Assets
Who on the
BCT Staff
manages
these
assets ?
7/29/2019 4-82 Targeting Workshop
16/118
UNCLASSIFIED
UNCLASSIFIED
NTC Trends
16
Sourc e: NTC
Trends, Jan 2010
Solution:Develop and
use ourTargeting SOP.
7/29/2019 4-82 Targeting Workshop
17/118
UNCLASSIFIED
UNCLASSIFIED
JRTC Trends
17
Sourc e: JRTC FY 10 Trends
Solution: Develop and use our Targeting SOP.
7/29/2019 4-82 Targeting Workshop
18/118
UNCLASSIFIED
UNCLASSIFIED
Are we Targeting
right now?
18
7/29/2019 4-82 Targeting Workshop
19/118
UNCLASSIFIED
UNCLASSIFIED
FM 5-0, Mar 2010
FM 3-90.6(The BCT)
The BCT should integratethe initial targeting effortinto the units MDMP. As
the staff develops its planfor future operations, theyshould use the D3Amethodology
FM 3-90.6 (The BCT), para 8-44
19
7/29/2019 4-82 Targeting Workshop
20/118
UNCLASSIFIED
UNCLASSIFIED 20Sou rce: FM 3-60, pg . 1-8, Fig 1-3
7/29/2019 4-82 Targeting Workshop
21/118
UNCLASSIFIED
UNCLASSIFIEDCALL Newsletter 10-49, June 2010 21
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
22/118UNCLASSIFIED
Targeting Outputs
22
AWGAssessment
Working Group(MissionAnalysis)
Identification oftargets or
problem sets(Decide)
Updated CCIR,HPTL
BCT CDRs
TargetingGuidance
Draft TSM,IOSM, ISRSM
Staff / Partnered units Run nin g Estim ates(Asses sm ent of Operation s and Effects (PMESII-PT)
Commanders Estimate and overarching BCT Campaign Design/Plan/LOEs
WGWorking Group
(Gov, Dev, HN, Security)(MA / COA Development)
Determination ofproposed approach
(COA) to engagetargets or problemssets (Detect, Deliver)
Prioritized Decide
LOE/WG approved
Nominations Draft input to OpsSynch Matrix / ExCheck List
TMTargeting Meeting
(COA Dev/Wargame)
Synchronizationand confirmationof nominated
COAs (Decide,Detect, Deliver)
Finalizedtargeting /planning products
Final Draft OpsSynch Matrix / ExCheck List
WARNO
DBDecision Brief
(CDR)
BCT CDRapprovedCOAs
Approvedtargeting /planningproducts
Completed
Ops SynchMatrix / ExCheck List
FRAGO
7/29/2019 4-82 Targeting Workshop
23/118
4/82 ABN, UE 11-3Sunday Monday Tuesday Wednesday Thursday Friday Saturday
29 MAY (E-8) 30 (E-7) 31 (E-6) 1 (E-5) 2 (E-4) 3 (E-3) 4 (E-2)
5 (E-1) 6 (E) 7 (E+1) 8 (E+2) 9 (E+3) 10 (E+4) 11 (E+5)
12 (E+6) 13 (E+7) 14 (E+8) 15 (E+9) 16 (E+10) 17 (E+11) 18 (E+12)
19 (E+13) 20 (E+14) 21 (E+15) 22 (E+16) 23 (E+17) 24 (E+18) 25 (E+19)
ADVON 2 Main Body
1500 MID AAR
1500 Final AAR
1400 SM In-Brief -OPSGRP-C
Information Engagements Information Engagements
IEs
IEs
Rehearsals
Site & Sim Preparation
1000 Role PlayerIntegration
STAREX
Equipment Upload
& Set Up
ADVON 1
Phase IIB
Phase IIB Phase IIC
Phase IIC
Equipment Packand Ship
Trail Party Departs
As of: 11 May 11
0900: FSX INTRO
1000: MSN CMD WS
1000: WFF BO
1200: XO/S3 BO
1330: TGT WS1500: KM WS
NATO Systems TrainingUE 11-3/TE 11-01, IJC Phase 2APH 1A IA Pre-Deployment TRNG
WARM
START
WARM
START
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
24/118UNCLASSIFIED
4/82 IBCT
BATTLE RHYTHM
24
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
25/118
UNCLASSIFIED
DIV/RCSBATTLE RHYTHM
Up to 13 June
25
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
26/118
UNCLASSIFIED
Targeting / Cyclic MDMP
Targeting CycleTC a period oftime in which
targeting meetings
/ forums are heldbeginning with
some form of
Assessment and
ending with aDecision Brief(usually noted by
numbers).
26
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
27/118
UNCLASSIFIED
Targeting / Cyclic MDMP
Targeting Cycle TC a period of time in which targeting meetings / forums are
held beginning with some form ofAssessment and ending with a Decision Brief
(usually noted by numbers).27
LD
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
28/118
UNCLASSIFIED
Targeting Cycle TC a period of time in
which targeting meetings are held
beginning with some form ofAssessmentand ending with a Decision Brief(usuallynoted by numbers with dates).
Time Period TP the period of time
in which a target or targets aredesignated for execution (usuallynoted by letters).
This TC is fromJun 11-13 and itcovers TP A
28
LDTargeting / Cyclic MDMP
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
29/118
UNCLASSIFIED
1. Backward planning provides at least one TC for each echelon to receive andprocess a TP
2. Multiple TPs allows the BCT to plan for future TPs
3. Resourcing provides RC / DIV with maximum time to coordinate resources
29
BCT CDRapproves twocycles beforeexecution.
LDTargeting / Cyclic MDMP
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
30/118
UNCLASSIFIED 30
LDTargeting / Cyclic MDMP
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
31/118
UNCLASSIFIED
What do we need from
ou r Commander?
31
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
32/118
UNCLASSIFIED
CDR Guidance for Targeting
ISAF Campaign Design
RC South Campaign Plan
Mission Command
Mission command is the exercise of authority and direction by the
commander using mission orders to enable disciplined initiative within
the commanders intent to empower agile and adaptive leaders in the
conduct of full spectrum operations. It is commander-led and blends the
art of command and the science of control to integrate the warfighting
functions to accomplish the mission.
32
Mi i C d
7/29/2019 4-82 Targeting Workshop
33/118
Mission Command
Mission command is the exercise of authority and direction by the commander using mission orders
to enable disciplined initiative within the commanders intent to empower agile and adaptive leaders
in the conduct of full spectrum operations. It is commander-led and blends the art of command and
the science of control to integrate the warfighting functions to accomplish the mission.
The Art of CommandThe creative and skillful exercise of
authority through decisionmaking
and leadership
The Science of ControlDetailed systems and procedures to
improve commanders understanding
and support execution of missions.
Enabled by mission commandnetworks and systems
Design pervades all tasks
Staffs tasks
Conduct the operations process:
plan, prepare, execute, and assess
Conduct knowledge management
and information management
Conduct inform and influence and
cyber/electromagnetic activities
Commanders tasks
Drive the operations process
Understand, visualize, describe, direct,
lead, and assess operations
Lead development of teams among
modular formations and JIIM partners
Lead inform and influence activities;
establish themes and messages and
personally engage key players
Enables: Operational Adaptability
Understand the operational
environmentAdaptive teams that
anticipate transitions
Acceptance of risk to create
opportunity
Influence friendly, neutrals,
adversaries, enemies, and JIIM partners
Result: Successful Full Spectrum Operations Figure 4-3. FM 3-0, C1
LEADS
SUPPORTS
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
34/118
UNCLASSIFIED
CDRs Targeting Guidance
34Sou rce: FM 3-60, pg . 1-2
( 1 of 2 )
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
35/118
UNCLASSIFIED
RC South CDR Guidance PH I
PH I - Targeting Objectives
Destroy INS indirect fire capability
Destroy INS AD and AT capability
Suppress and interdict INS formations in defensive positions
Priority Category Target Description
1 C2 Tier I and II INS leaders and key coordinators
2 Maneuver INS company sized teams/direct action cells
3 Air Defense Mistral MANPAD positions/dismounts
4 Fire Support 120mm and 82mm mortars, 122mm rocket systems
5 AT Systems AT-14, AT-5, Spandrel, MILAN positions/dismounts
6 Nonlethal GIRoA and tribal key influential leaders
7 IED Cells IED factories, trigger pullers
8 Logistics INS safe houses and weapons caches
35
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
36/118
UNCLASSIFIED
CDRs Targeting Guidance
36Sou rce: FM 3-60, pg . 1-4
( 2 of 2 )
UNCLASSIFIED
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
37/118
UNCLASSIFIED
RC South Targeting Guidance3.A.2. Targeting Objectives.
3.A.2.A. Information OperationsI1: Conduct all operations in a manner to limit Civilian Casualties (CIVCAS)
I2: Improve Afghan population confidence in ANSF and GIRoA competence and equalityI3: Leverage informal power-brokers to reinforcing GIRoA legitimacy
I4: Rapidly illustrate and exploit insurgent actions that inflict CIVCAS or harm the population
I5: Visibly demonstrate that the Taliban does not offer a viable alternative to the legitimate GIRoA
3.A.2.B. Governance.G1: Visibly support and reinforce Provincial and District GIRoA actions and decisions that benefit the populace
G2: Assist the GIRoA and ANSF to identify and reduce corruption through legitimate Afghan institutions
G3: Improve GIRoA capacity to deliver essential services through Unified Action; focus first on FDD and population centersG4: Encourage informal ethnic and tribal structures to complement and cooperate with GIRoA
G5: Reinforce emergence of Rule of Law (RoL) among GIRoA and Afghan populace
3.A.2.C. Economic Development.E1: Support developmental programs that expand legal and sustainable employment opportunities
E2: Improve road networks to support legal movement of goods and services and ensure access to key population center
E3: Foster agricultural development by improving access to clean water, sustainable crops, and sustainable farming methods
3.A.2.D. Security.3.A.2.D.1. Protect the Population.
D1: Take all precautions to limit civilian casualtiesD2: Freedom of movement along major highways (1, 2, 7, KG) ensured for the population and commerce
D3: AAF are neutralized to a point that does not allow them to jeopardize transitions to GIRoA
3.A.2.D.2. Enable ANSF.
A1: Partner with ANSF at all echelons: focus first on FDD and population center securityA2: Ensure OCC-Ps and OCC-Ds are fully functioning, enabling security in depth, and improving confidence in ANSF
A3: (AUP) Conduct Combined Action to enable AUP to protect the population and enforce the law and visibly transition to AUP in
the Lead IOT improve population perception of AUP
A4: (AUP) Develop AUP institutions to effectively provide District AUP with adequate facilities, equipment, and training
A5: (ANA) Reinforce offensive and COIN capabilities; improve ANA ability to conduct independent operations
A6: (ANA) Improve ANA competence along Warfighting Functions and capability to sustain long-term operations
A7: (ANA) Support ANA development of a professional and competent NCO Corps
A8: (ABP) Improve ABP capabilities to secure the border and protect licit economic traffic ICW PAKMIL
A9: (ABP) Develop ABP capabilities to identify and contain illegal cross-border movement and interstate smuggling routes
A10: (ABP) Develop ABP institutions and systems to effectively resource BCPs with adequate facilities and equipment
Source: RC South Campaign Plan UNCLASSIFIED 37
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
38/118
UNCLASSIFIED
EXERCISE
Situation:8 Jun 2010
4/82 IBCT OPORD issued
Begin:
Targeting Cycle 2 (Jun 14-16)Time Period B
38
UNCLASSIFIED
A t W ki G
7/29/2019 4-82 Targeting Workshop
39/118
39UNCLASSIFIED
Agenda: Roll Call - XO Review Targeting Cycle and Purpose for Meeting - XO Review Inputs/Outputs - XO Intelligence Update / ISR Assets Available / Initial ISM S2 /Collection Manager Proposed CCIR S2 Operations Update (Task Org, Mission, Intent, OperationsCompleted) - S3
Campaign Plan/LOEs/OBJs Review S3 / S3 Plans BCT Assessment of Operations and Effects from Last TGTCycle S3 / FSO / S7 / S9 / PRT / HTT Developed BCT Problem Sets / Future Operations S3 / S3Plans BN/Partnered Units Assessment of Operations and Effects /Target Assessment Last TGT Cycle HN Reps / BN LNOs /BN S3s / TTs BN Proposed Problem Sets / Targets - HN Reps / BN LNOs /BN S3s / TTs CDRs Targeting Guidance - CDR
Inputs:
Staff Running Estimates
BCT CDRs Targeting Guidance
Proposed CCIR and PrioritizedLethal and Non Lethal HPTL
BCT Assessment of Operationsand Effects (PMESSII)
Updated Subordinate/Partnered Unit Assessments(BN LNOs/S3s/TTs/ HNSFs)
Previous Targeting CycleLethal and Non-Lethal TSMs
Current/Initial TargetFolders/CONOPs
Proposed CDR Engagementand IO/PAO Plan
Proposed Initial ISM
Purpose: Conduct Mission Analysis on TargetedPeriod and Receive CDRs Targeting Guidance
Endstate: Staff prepared to conduct COA DEV at
Standing Working Groups and acknowledged CDRsGuidance for Targeted Period
Frequency: Once per Targeting CycleDuration: 2 hoursLocation: BCT HQs linked to Subordinate andPartnered Units with Collaborative Systems
Chair: XO
Attendees: CDR, DCO, XO, S3, S2, Collection Manager,FSO, FSCOORD, Targeting Officer, S3 Plans, S7, S9, ALO,
BAE, PSYOP, PAO, ENG, BOLT, S6, PMO, S1, S4, CHEMO,SURG, Chaplain, BN LNOs, SOF LNO, PRT TM LDR/Rep,HTT, HN LNOs, HN Reps, BN S3s/S2s and TTs viacollaborative systems
Supporting Systems: Collaborative systems to engageBNs S3s/S2s and TTs (CPOF, Ventrillo, Adobe Connect,VOIP, etc.)
Assessments Working Group
Outputs:
Updated Staff RunningEstimates
Approved BCT CDRs
Targeting Guidance
Approved CCIR, HPTL, BCTLethal/Non Lethal Target List
Updated BCT Assessment ofOperations and Effects(PMESSII)
Refined Subordinate/Partnered Unit Assessments
Refined CampaignPlan/LOEs/Benchmarks/OBJs /MOEs/MOPs Assessment
Updated TSM (Decide
section complete), IOSM,FSEM, AGM
Updated ISM
Source: NTC Apr 2011
RC South Campaign Plan
7/29/2019 4-82 Targeting Workshop
40/118
40UNCLASSIFIED//FOUO
p g
Development (LOE 3)
Build /Improve Roads Improve Agro businessfocused on repairing/rebuilding field to marketdistribution infrastructure
Prioritize DevelopmentProjects & Integrate GIRoAMinistries into DevelopmentPrograms
Develop AlternativeCash Crop
SAFE & SECURE ENVIRONMENT
INDEPENDENT SECURITY FORCES
RULE OF LAW ESTABLISHED
DEVELOPING ECONOMY
AGRICULTURE EXPANSION
ESTABLISHED ROAD NETWORK
PROVIDE FOR NEEDS OF PEOPLE
LEGITIMATE & EFFECTIVE GOVERNMENT
ENDSTATE
Source: MCTP RCS Scenario
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
41/118
UNCLASSIFIED
Extract: RC SOUTH TSM 12 JUN
TGT
OBJCAT
HPT/HVI
DescribeASSET LOC TIME ASSET METHOD TIME ASSET TIME
A4A AD
AD system
AA5015 (BP
A1C)
P: RCS
CAS; SOF;
UAS;
A: 4/82ABCT
NAI # 1-S2
(P);
11SNV50211
38641
D-8
to
D+1
P: HIMARS
(2/B/1-14
FA); CAS;
SOF
A: 4/82ABCT
P: GMLRS;
GBU/ LGB;
DA
A: CCA; 1-319 FAR
D-8
to
D+1
P: RCS
CAS;
SOF;
UAS;
A: 4/82ABCT
Immed
+2 hrs
A4CFS -
Mortar
120mm
mortar
position
AA4015 (POO
28 April)
P: RCS
Q36/7;
CAS; UAS;
SOF
A: 4/82ABCT
NAI # 13-
SE7 (P);
15SNV49887
38646
D-8
to
D+1
P: MLRS
(2/B/1-14
FA); CAS;
SOF
A: 4/82ABCT
P: HIMARS;
GBU/ LGB;
DA
A: 1-319
FAR
D-8
to
D+1
P: RCS
Q36/7;
CAS;
UAS;
SOF
A: 4/82ABCT
Immed
+2 hrs
A1DLocal
LeaderSangin Mayor 4/82 ABCT
Sangin city
centerD+1 4/82 ABCT KLE D+1
4/82
ABCT
DELIVER ASSESSDETECTDECIDE
41
RC South Target Overlay
7/29/2019 4-82 Targeting Workshop
42/118
42UNCLASSIFIED//FOUOUNCLASSIFIED//FOUO
10 km
3
1
1
2
1
1
1
1
2
2
2
Target Sets:
1 - 120mm mortars, 82mm mortars
2 Mistral MANPAD, AT-14, AT-5,
Manever elements (platoon-sized)
3 C2 platforms, Tier I-III leaders
3
3
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
43/118
43UNCLASSIFIED
Staff Proponent: S3Chair: XOAttendees: DCO, XO, S3, S2, Collection Manager, FSO, FSCOORD,Targeting Officer, S3 Plans, S7, S9, ALO, BAE, PSYOP, PAO, ENG,BOLT, S6, PMO, S1, S4, CHEMO, SURG, Chaplain, BN LNOs, SOFLNO, PRT TM LDR/Rep, HTT, HN LNOs, HN Reps, BN S3s/S2s and TTsvia collaborative systems
Supporting Systems: Collaborative systems to engage BNs S3s/S2sand TTs (CPOF, Ventrillo, Adobe Connect, VOIP, etc.)
Agenda: Introduction XO
Brief WARGAME Method and Tools (Map, Icons, Synch
Matrix, Recorder, etc.) Review Current IPB Products (SITEMP, Pattern Analysis, etc.) -S2 Review Higher Mission/Intent, Unit Mission/Intent, Task Org - S3 CDRs Current Targeting Guidance, Ops Summary, CCIR S3/S2 Review Approved HPTL and Target Folders/CONOPs -S3/S2/FSO/Plans Review Updated TSM (Lethal, Non-Lethal, IO, AGM, ATO)FSO/S7 Review BN Proposed Targets/CONOPs BN LNOs/S3s Review BCT Proposed Targets/CONOPs S3/FSO Review Updated ISM - S2
Synch Approved CONOPs with ISR and ResourcesXO/S3/S2/S7/FSO
CONDUCT STAFF WARGAME by phase for entire timeperiod targeted Use Wargame Map and Icons Display Synchronization Matrix for All To See All staff record notes on hard copy of synch matrixduring wargame Identify specific tasks and decision points and allocateresources during wargame
Review Updated Wargame Synch Matrix and Decision Pts - XO Conclusion - XO
Purpose: Synchronize the BCT Lethal and Non-LethalTargeting PlanEndstate: Fully synchronized and integrated BCT
Targeting PlanFrequency: Once per Targeting CycleDuration: 2 hrsLocation: BCT HQs linked to Subordinate andPartnered Units with Collaborative Systems
Targeting Meeting
Input: Updated Staff Running Estimates
Updated IPB Updated ISM Proposed HPTL Proposed CCIR Updated PMESSII Assessments Updated CampaignPlan/LOEs/Benchmarks Approved CCIR, HPTL, CDRs
Targeting Guidance Approved Target Folders(CONOPS)
Updated Lethal and Non-LethalTSM (left side complete)/IOSM/AGMDRAFT Ops Synch Matrix DRAFT DSM Updated AGM Updated FSEM Revised IO Themes and Messages
Output: Revised Staff Running
Estimates Revised CampaignPlan/LOEs Final ISM Completed Lethal andNon-Lethal TSM, IOSM Final HPTL Final CCIR Fully SynchronizedCONOPs/TGT Folders Updated Ops SynchMatrix/Ex Check List Final DSM Final AGM Final FSEM Final CF TGT Boxes Final IO Themes andMessages
COA AnalysisSynchronization
Source: NTC Apr 2011
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
44/118
UNCLASSIFIED
120mmPOO
Target: AA4015Grid: 11S NV 49776 38646Description: 120mm mortar position
250 meters to nearest populationCDE: 4 LOW
OBJ VIPER
44
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
45/118
UNCLASSIFIED
Residence
Target: AA8420Grid: 11S NV 49114 38634Description: Local Leader(Mohammed Nazir).CDE: NA
OBJ VIPER (South)
45
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
46/118
UNCLASSIFIED
Haji
Omar
Khan
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
47/118
UNCLASSIFIED
Recommended Products for COA
Enemy Set / SITEMP/ EVENTEMP / HVT
HPTL / AGM / TSS
TSM / OPS SM / ISR SM
COA Sketch
Tasks to Subordinate Units Annexes Task Organization Maneuver Movement Matrix Fire Support Execution Matrix ISR Plan
Intel Update
Operations Update Running Estimates
AO Assessments
CONOPS
47
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
48/118
UNCLASSIFIED
AA 4015 (120mm POO)
120mmPOO
RESOURCING:Detect: EQ-36 (CFFZ 6)/ RCS Q-37 (CFZ 2)Deliver: 1/1/B/2-377 FA / 2/A/1-377FA w/ PGMAssess: BCT UAS
OPERATIONS SNYCH:DESCRIPTION:Target: 120mm POO (AA 4015)Problem Set: Security of Gereshk
(Southwest) and TAA EAGLENetwork: New Taliban / HVI: Haji OmarKhan/Tribal Influence (Alikozai)Grid: 11S NV 49776 38646Influence Opportunity: Mohammed Nazir
MISSION STATEMENT:4/25 ABCT influences, disrupts, and/ordestroys INS mortar assets threatening the
Gereshk population and BCT operations.
SCHEME OF MANEUVER:
SO: TBD
DO: TBD
TASK ORGANIZATION:
BCT:
HN:
Other:
CAMPAIGN PLAN:Affected LOE: Civil SecuritySupporting OBJ: INS IDF
MOP:MOE:
CCIR:TBD
CONCEPT OF FIRES:FA:CAS:EW:CCA:
CONCEPT OF IOMISO:CA:PAO:Combat Camera:
TASKS:BCT Staff: TBD
Subordinate Units: TBD
COORD INSTRUCTIONS:TBD
48
UNCLASSIFIEDUNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
49/118
UNCLASSIFIED 49
UNCLASSIFIED
Decision Brief
7/29/2019 4-82 Targeting Workshop
50/118
50UNCLASSIFIED
Agenda: Introduction - XO Current IPB and SITEMP S2 CCIR S2 ISM S2/Collection Manager Review Higher Mission/Intent, BCT and HNSFMission/Intent S3 BCT and Partnered HNSF Task Org S3
Review CDRs Targeting Guidance, Ops Summary S3 Review Final Lethal and Non-Lethal HPTL andSynchronized Target Folders/CONOPs for ExecutionS2/S3/S3 Plans/FSO Review Updated Lethal and Non-Lethal TSM FSO Review Emerging Target Folders/CONOPs S3 Review Updated Ops Synch Matrix and DSM withProposed CDRs Decision Points S3/XO Battle Rhythm and Due Outs XO
Commanders Guidance CDR
Purpose: Present Integrated and SynchronizedTargeting COAs to the CDR for Decision and Approval
Endstate: CDR approves Targeting COAs for
Execution and the Staff prepares the TargetingFRAGO for publication.
Frequency: Once per Targeting CycleDuration: 2 hoursLocation: BCT HQs linked to Subordinate andPartnered Units with Collaborative Systems
Chair: XO
Attendees: CDR, DCO, XO, S3, S2, Collection Manager,FSO, FSCOORD, Targeting Officer, S3 Plans, S7, S9, ALO,
BAE, PSYOP, PAO, ENG, BOLT, S6, PMO, S1, S4, CHEMO,SURG, Chaplain, BN LNOs, SOF LNO, PRT TM LDR/Rep,HTT, HN LNOs, HN Reps, BN S3s/S2s and TTs viacollaborative systems
Supporting Systems: Collaborative systems to engageBNs S3s/S2s and TTs (CPOF, Ventrillo, Adobe Connect,VOIP, etc.)
Decision Brief
Input: Revised Staff RunningEstimates Revised CampaignPlan/LOEs Final ISM Completed Lethal andNon-Lethal TSM, IOSM Final HPTL
Final CCIR Fully SynchronizedCONOPs/TGT Folders Updated Ops SynchMatrix/Ex Check List Final DSM Final AGM Final FSEM Final CF TGT Boxes Final IO Themes andMessages
Output Updated Staff RunningEstimates Revised CampaignPlan/LOEs Fully Synchronized Lethaland Non-Lethal TSM, IOSM Approved ISM Approved HPTL
Approved CCIR Approved CONOPs/TGTFolders Approved DSM Approved AGM Approved FSEM Approved CF TGT Boxes Approved IO Themes andMessages Completed Ops SynchMatrix/Ex Check List
UNCLASSIFIED
R i
7/29/2019 4-82 Targeting Workshop
51/118
UNCLASSIFIED
Review
1. When we are planning (MDMP) we are also Targeting (primarily
Decide products and processes).2. When we are targeting (D3A, F3EAD) we are using planningmethods (primarily COA development and analysis).
3. Commanders guidance for targeting is more implicit than explicit(macro to micro desired effects, translation of intent, broad COAplanning guidance).
4. At a minimum, we should apply the D3A methodology to thosetarget /problem sets to (a) ensure synchronization with currentassets, and to (b) coordinate for external assets.
5. We must ensure that what we target/engage will link to ourcampaign plan objectives and our tactical priorities IAW CDR intent.
6. We should see the enemy and understand as much about theenemy as possible, before we develop our HVT and HPTL.
51
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
52/118
UNCLASSIFIED
Conclusion
52
UNCLASSIFIEDCDE ASSESSMENT REFERENCE GUIDE
7/29/2019 4-82 Targeting Workshop
53/118
UNCLASSIFIED
No Restr ic t ions
PGM, Unitary
PGM, Mk-84
PGM, Mk-84, Delay Fuze, Hdg: 090-180
PGM, Mk-84, Delay Fuze Hdg: 090-180,CE: 5D/7N/9E
ASUGM, F-15, Mk-18, Delay Fuze,Hdg: 135-225, CE: 7D/9N/12E
ASUGM, F-15, Mk-82
ASUGM, F-15, Mk-82, Delay Fuze, Hdg: 135-225
ASUGM, B-52, Mk-82, Hdg; 315
ASUGM, B-52, Mk-82, Delay Fuze, Hdg: 315
PGM, Mk-84, Delay Fuze
ASUGM, B-52, Mk-82, Dely Fuze, Hdg: 315,CE: 12D/8N/22E
SSBM, 105mm, M119A1, M1HE, PD/MTSQ/VT
SSBM, 105mm, M109A1, M1HE, VT
SSBM, 155mm, M198, M107HE, VT,CE: 9D/12N/16E
CDE 1 LOW
CDE 2 LOW
CDE 3 LOW
CDE 4 LOW
CDE 5 LOW(HIGH)
CDE 5 LOW(HIGH)
CDE 3 LOW
CDE 4 LOW
CDE 3 LOW
CDE 4 LOW
CDE 3 LOW
CDE 5 LOW(HIGH)
CDE 3 LOW
CDE 4 LOW
CDE 5 LOW(HIGH)
PGM, ClusterPGM
ASUGM
SSBM
Meth. Of Eng.:Single Warhead
(Un-Mit igated)
(Mit igated)
Meth. Of Eng.:Multiple Warhead
ALL
Assessment Restrictions
Note:Underlin
edentriesarevariable.
*CEisonlyincludedinFacilityLevelAssess
ments.
53
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
54/118
UNCLASSIFIED
Fundamentals
54
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
55/118
UNCLASSIFIED
TARGET(S)Area
Complex
Installation
Force
Equipment
Capability
Function
Behavior
Acknowledge
Plan
Consider
Execute
AssessDecideDetect
Deliver AssessInfluence . Destroy
Targeting
Object ives
HVTHPT
Brigade fight.Battalion fight
Synch ronized Effor t
Target/Problem Set Continuum
55
UNCLASSIFIED
SITEMP
7/29/2019 4-82 Targeting Workshop
56/118
UNCLASSIFIED
SITEMP
56
a primary source
for developingtargets / problemsets
enables reverse/cro ss WFF IPB
requires inputfrom all WFFs
A depiction ofassumed adversary dispositions, based on
adversary doctrine and the effects of the battlespace [OE]if the adversary should adopt a particular course of action.
FM 1-02 (Operational Terms)
UNCLASSIFIED
Sample Threat Analysis Caspian Sea
7/29/2019 4-82 Targeting Workshop
57/118
UNCLASSIFIED
NEFTECHALA
KARAVELLY
PUSHKINO
CASPIANSEA
DZHALILABAD
BORADYGYAKH
MASALLY
ALLAR
+TE UETD UD
1 241
2 241
3 241
54
234
3 253
233
232
252
244
80%
90%
80%
15%
95%
55%
65%
55%
75%
20%
60%
80%
231
85%
2 253
243
PRISHIB
60%
1 242
2 242
50%
3 242
50%
2 251
60%
50%
3 251
50%
1 251
6
1
2
3
5
4
4
1
1
4
6
6
H-2
2HR
4HR
6HR
8HR
10HR
H+2
H-6H-24
H-24 H+2
H+2-4
6
OSC CDR DECISION POINTS
DP1: Transition BNs to Adaptive Ops(MDECOA)
DP2: Commit 244 TK BDE (MLECOA)
DP3: Commit CO size air assault (MLECOA)
DP4: Attack Infrastructure (All ECOAs)
DP5: Withdraw (LLECOA)
DP6: Create TIM release or employChemical Munitions (All ECOAs)
Should we target all
templated enemypositions?
- Priority reconstitution to frontline BNs- OSC reconstitution slowed by worry of USAF attack- Retrograde of 2/251 due to Atropian CATK on 9 APR- 1/253 reinforcing D-Bad as part of 3/253- 1/241 & 244 TK BDE receiving most support for
reconstitution
57
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
58/118
UNCLASSIFIED
OBJ TEXAS58
UNCLASSIFIED
30x PAX
ENY MDCOA (Decentralize Defense)
EA
BP 1
7/29/2019 4-82 Targeting Workshop
59/118
UNCLASSIFIED
AT7
RPG-7
SA-18AT7
AT7
K
K
KKK
K
K
K
FF T
T
AT7
EA
30x PAX
30x PAX
T
EA
EAEA
EA
BP 7
EA
EA
BP 6
BP 5
BP 4
BP 2
BP 3BP 10
BP 9
BP 8
BP 4,5,6(AQI / ISI )
T: 1 x Infantry Platoon engage blue forces with RPG 7s, PKM MG, Milan 3, and 60mm TR
P: Delay movement through city and attrite blue forces
BP 7,8 (AQI/ISI)
T: 1 x Infantry Platoon move to support BP 9/10 with RPG 7s, PKM MG, Milan 3, and 60mmTR
P: Reinforce battle positions
BP 9,10 (AQI/ISI)
T: 1 x Infantry Platoon engage blue forces with RPG 7s, PKM MG, Milan 3, and 60mm TR. 1x
Anti Tank Section engage blue forces moving east on MSR Bull RunP: Delay movement through city and attrite blue forces
BP 1 (AQI / ISI)
T: 1 x Anti Tank team identify movement of times and composition of blue forces, blow bridge if
blue forces attempt to cross. 1 x Anti Tank section attack blue forces moving across bridge
P: Provide early warning, delay movement through city and attrite blue forces
BP 2 (AQI / ISI)
T: 1 x Anti Tank team identify movement times and composition of blue forces, blow bridge if blue
forces attempt to cross.
P: Provide early warning, delay movement through city and attrite blue forces
BP3 (AQI / ISI)
T: 1 x Anti Tank BPT team move to support BP2. 1 x Infantry platoon engage blue forces moving
south of MSR Bull Run with RPG-7s, 60mm TR, PKM MG, and Milan 3. 1 x 120mm Teamtargeting TF2 moving north into city
P: Delay movement through city and attrite blue forces
T 57
60MMT 57
60MM
T 57
60MM
RPG-7
T 57
60MM
T 57
60MM
O
O
2X60MM TR
4XRPG-7
2X60MM TR
4XRPG-7
1xKORNETE
1X AT-5
1X MANPAD ADA
1XDShk
4XRPG-7
1xKORNETE
1X AT-5
1X MANPAD ADA1XDShk
4XRPG-7
1xKORNETE
1X AT-5
1X MANPAD ADA
1XDShk
4XRPG-7
1x 60 MM TR
1xRPG-7
1xMilan -3
1xPKM MG
1x 60 MM TR
1xRPG-7
1xMilan -3
1xPKM MG
1x 60 MM TR
1xRPG-7
1xMilan -3
1xPKM MG
59
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
60/118
UNCLASSIFIED
High Value Target (HVT)
derived from the SITTEMPand Enemy COA
can be nonlethal (i.e., thehost nation population)
can be neutral (i.e., religionsand/or political official)
High-value target A target the enemy commanderrequires for the successful completion of the mission.The loss of high-value targets would be expected toseriously degrade important enemy functions throughoutthe friendly commanders AI.
FM 1-02 (Operational Terms)
60
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
61/118
UNCLASSIFIED
High Payoff Target (HPT)
derived from the HVTs(which are on the SITTEMP)
prioritized by their
importance to contributeto the friendly COA
can be friendly (i.e., political
official for KLE)
High-payoff target A target whose loss to the enemy will
significantly contribute to the success of the friendlycourse of action. High-payoff targets are those high-valuetargets that must be acquired and successfully attackedfor the success of the friendly commanders mission.
FM 1-02 (Operational Terms)
HPTL
Pri Category Target Description
1 C2 Tier I and II INS leaders and keycoordinators
2 Nonlethal GIRoA and tribal key influential leaders
3 Logistics INS safe houses and weapons caches
4 IED Cells IED factories, IED initiators
5 Fire Support 120mm and 82mm mortar systems,122mm rocket systems
6 Maneuver INS platoon sized teams/direct actioncells
7 Air Defense Mistral MANPAD positions/dismounts
8 AT Systems AT-14, AT-5, Spandrel, MILANpositions/dismounts
61
UNCLASSIFIED
From HVT to HPT
7/29/2019 4-82 Targeting Workshop
62/118
UNCLASSIFIED
From HVT to HPT
HVTs are identified and prioritized during the war
gaming phase of planning. In addition, it[wargaming] identifies the subset of HVTs thatmust be acquired and attacked for the friendlymission to succeed. HVTs may be nominated as
HPTs when these targets can be successfullyacquired, vulnerable to attacks, and such anattack supports the commanders scheme of
maneuver. Once identified and nominated, HPTsare grouped into a list identifying them for aspecific point in the battle. The completed HPTL issubmitted to the commander for approval.
62Sou rce: FM 3-60, pg . 2-5
UNCLASSIFIED
Targeting Meetings
7/29/2019 4-82 Targeting Workshop
63/118
UNCLASSIFIED
Targeting Meetings
63
Meetings, working groups, boards, and/or other collaborative
efforts conducted across the BCT staff to enable D3A. Rangefrom informal (cell meetings) to formal (boards).
Targeting meetings integrate the targeting process into other
BCT processes. The purpose of a targeting meeting is to focus
and synchronize the unit's combat power and resourcestoward finding, attacking, and assessing current HPT by using
the D3A methodology.
CellMeetings
Working Groups Pre-TargetingMeetings
TargetingMeetings
TargetingBoards
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
64/118
UNCLASSIFIED
Targeting Meeting Objectives
1. Verification and update of the HPTL.
2. Verification, update of, and re-taskingavailable collection assets for each HPT.
3. Allocation ofdelivery systems to engage each target.
4. Confirmation that assets are tasked to assess whether thedesired effects have been achieved by attacking the target.
5. Identification oftarget nominations for attack by jointassets.
6. Synchronization of lethal and non-lethal actions.
7. Synchronization of FS and IO assets to generate desiredlethal and non-lethal effects.
Sou rce: FM 3-90.6 Brig ade Com bat Team (Nov 11); para: 7-34.
64
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
65/118
UNCLASSIFIED
Named Area of Interest (NAI)The geographical area where information that will satisfy a
specific information requirement can be collected. NAIsare usually selected to capture indications of enemycourses of action, but also may be related to [conditionsin the area of operations]. An NAI may be designated a TAI
when enemy activity is detected within it.
developed initially duringmission analysis
drives the ISR plan will answerCCIR
indicated in the Detect
column of the TSM
FM 1-02 Operational Terms and Graphics
65
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
66/118
UNCLASSIFIED
Target Area of Interest (TAI)
The geographical area where HVTs can be acquired andengaged by friendly forces. Not all target areas of interestwill form part of the friendly course of action; only targetareas of interest associated with HPTs are of interest tothe staff. TAIs differ from engagement areas in degree.
Engagement areas plan for the use of all availableweapons; TAIs might be engaged by a single deliverysystem. The geographical area or point along a mobilitycorridor where successful interdiction will cause the
enemy to abandon a particular course of action or requirehim to use specialized engineer support to continueFM 3-09.42 TTP for FS for BCT
indicated in the Detect column of the TSM66
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
67/118
UNCLASSIFIED
Priority Intel Requirements (PIR)
critical questions
drives thedevelopment of NAIs
linked to DPs
Those intelligence requirements for which a commanderhas an anticipated and stated priority in his task ofplanning and decisionmaking. An intelligencerequirement associated with a decision that will criticallyaffect the overall success of the commands mission.
FM 1-02 Operational Terms and Graphics
67
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
68/118
UNCLASSIFIED
Decision Point (DP)The point in space and time where the
commander or staffanticipates making a decisionconcerning a specific friendly course of action. A decisionpoint is usually associated with a specific target area ofinterest, and is located in time and space to permit the
commander sufficient lead time to engage the adversaryin the target area of interest.FM 1-02 Operational Terms and Graphics
DP
One result of the MDMP is linking the situation and eventtemplates with NAIs and target areas of interest (TAI) that
are linked to decision points (DP) for the commander. Thecommander approves selected IR as his CCIR for his DPs.These NAIs, TAIs, and DPs are expressed on the decisionsupport template (DST).
FM 3-90.6, para 4-9, The BCT
68
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
69/118
UNCLASSIFIED
How the manmade infrastructure, civilian institutions, and attitudes andactivities of the civilian leaders, populations, organizations within an area of
operations influence the conduct of military operations. FM 3-0 Operations
Other sources to derivetargets/problem sets from.
Civil Considerations
69
UNCLASSIFIED
C
7/29/2019 4-82 Targeting Workshop
70/118
UNCLASSIFIED
DECIDE
Considerations:
Targeting Objectives/Guidance
HPTL review and update
HVT nominations (L/NL)
Staff estimates input
External agency input
Assessment update and re-
attack criteria
The decide function provides the overall
focus, identifies targeting requirements,and sets the initial priorities andplanning for specific ISR activities.
FM 3-90.6, The BCT, para 8-18
70
UNCLASSIFIED
DETECT
7/29/2019 4-82 Targeting Workshop
71/118
UNCLASSIFIED
DETECT
Considerations: Targeting Objectives/Guidance
Select appropriate assets and request from higher
Maximize use of detection assets, employing
redundancy as required, and ensuring minimal gaps
Develop and monitor NAI/TAI for HPTs
Rapid processing of information gathered from
collection assets
The detect function involves locating HPTs
accurately enough to engage them. The S3,assisted by the S2, is responsible for directing the
ISR plan to detect HPTs identified in the decidefunction. Execution of detect functions must be
timely and accurate.FM 3-90.6, The BCT, para 8-23/4
71
UNCLASSIFIED
DETECT A t
7/29/2019 4-82 Targeting Workshop
72/118
UNCLASSIFIED
DETECT Assets(1 of 2)
BCT Detection Assets
1 x Q36 Radar 1 x Q37 Radar (BDE)
2 x PROPHET
1 x SHADOW UAS
10 x RAVEN UAV CCA / RECON
Observers/COLTs
TACP
Scouts
4 x HUMINT Collection
Teams (HCTs)
CAT 1 thru 3 linguists
Partnered/HN elements 72
UNCLASSIFIED
DETECT A t
http://www.globalsecurity.org/intell/systems/images/raven_uav_throw.jpghttp://en.wikipedia.org/wiki/File:RQ-7B_UAV.jpg7/29/2019 4-82 Targeting Workshop
73/118
UNCLASSIFIED
DETECT Assets(2 of 2)
Echelons above Brigade
Classified systems
COMINT platforms Rivet Joint, Guardrail, EC-130
ELINT platforms Aries, Prowler, Compass Call
MASINT platforms JSTARS, Q36 & Q37 radars
IMINT platforms Global Hawk, Reaper, Hunter, Predator
Other HCT, SOF, EOD
73
UNCLASSIFIED
DELIVER
7/29/2019 4-82 Targeting Workshop
74/118
UNCLASSIFIED
DELIVER
Considerations:
Targeting Objectives/Guidance
Select appropriate assets and request from higher
Conduct CDM as required & mitigate effects (L)
Avoid fratricide - use appropriate control measures
Following IEs, develop and exploit opportunities
Rehearse delivery plan for each HPT
The deliver function involves engaging
targets located within the TSS according to theguidance in the AGM. This includes using both
lethal and non-lethal attack systems. HPTsthat are located within the TSS are tracked and
engaged at the time designated in the
OPORD/AGM. FM 3-90.6, The BCT, para 8-29
74
UNCLASSIFIED
DELIVER Assets
7/29/2019 4-82 Targeting Workshop
75/118
UNCLASSIFIED
DELIVER Assets(1of 2)
BCT Lethal Assets
105mm Howitzer (FA) Mortars
Maneuver direct fire
systems
155mm Howitzer (FA) Close Combat Attack (CCA)
Echelons Above Brigade
USAF platforms (i.e. bombers,F-16, A-10, EW platforms)
Naval Gunfire (i.e. Tomahawk)
ATACMS
MLRS with PGM (GMLRS) 155mm Howitzerw/Excalibur
75
UNCLASSIFIED
DELIVER A t
7/29/2019 4-82 Targeting Workshop
76/118
UNCLASSIFIED
BCT Nonlethal Assets Unit Commanders
Unit Patrols
HUMINT Collection Teams
Engineers Advise and Assist Brigadepersonnel
Tactical *MISO TMs
Civil Affairs TMs
Echelons Above Brigade Provincial ReconstructionTeams
HN Security Forces
Partnered Human Terrain Teams
Interagency Assets
Public Affairs Detachment
Combat Camera
DELIVER Assets(2of 2)
* PSYOP changed to MISO (Military Information Support Operations) per
memo dtd 23 Jun 2010 76
UNCLASSIFIED
Nonlethal Assets
7/29/2019 4-82 Targeting Workshop
77/118
UNCLASSIFIED
Nonlethal AssetsMethod
Inform at ion Eng agements
Loudspeaker Ops
Handbi l ls
Radio Broadcasts
Press Releases
Media Events
Medic al/Vet Visits
Reconstruct ion (CERP)
Condo lence / Claims
Payments
Rewards Programs
Force Presence
Electronic Attack
Targets
Key
Leaders
Enemy
Systems
Select
Populace
Groups
Effect
Translates into: Reduced attacks
Limiting enemy freedom of maneuver
Intel tips
Positive attitude towards unit from
populace
Assets
Tacti cal MISO TMs
Civi l Affairs TMs
Uni t Commanders
Unit Patrols
HUMINT Collection TMs
Provincia l Recons truct ion
Teams
HN Secu r i ty Forces
Hum an Terrain Teams
Interagenc y Assets
Publ ic A ffairs Det.
Combat Camera
In f luence
Att i tudes
and
Behavior
(MOE)
77
UNCLASSIFIED
ASSESS
7/29/2019 4-82 Targeting Workshop
78/118
UNCLASSIFIED
ASSESS
Considerations: Targeting
Objectives/Guidance
Criteria or conditions the
define the desired effects
Feedbackmechanisms/processes and
their efficiency
Nonlethal positive and
negative effects
MOP and MOE assessment
The assess function involves the assessment of
the results of mission execution. Assessmentoccurs throughout the operations process.Targets are attacked until the effects outlined inthe AGM are achieved or until the target is nolonger within the TSS.
FM 3-90.6, The BCT, para 8-31
78
7/29/2019 4-82 Targeting Workshop
79/118
JRTC Quads
79
AWGPurpose: Assess effectiveness of last targeting cycle; nominatetargets and priorities for engagement based on full spectrumanalysis against BCT Campaign plan and MOE/MOP Two parts 1)
Working Groups (Recommend Lethal, NL, ISR and CIED):Purpose: To refine draft concepts and resources applied to BCT
target nominations. This should lead to draft COAs that include
7/29/2019 4-82 Targeting Workshop
80/118
analysis against BCT Campaign plan and MOE/MOP. Two parts 1)staff AWG and 2) Brief to BCT CDR the results of the AWG (OEassessment and recommended targets).Homework required: Assessment from previously executed targeting cycle BN PMESII/AO assessments (briefed by BN CDRs at CUB andproducts from BN staffs).
Assessments from PRT, HNSFs and HN Government ctrparts. Updated Running Estimate (RE) by WFF.
Compare to assessment from previous targeting cycle to see
what changed and why. This should yield recommended BCT
target(s).
WFFs come to the meeting prepared to brief their part of the
assessment and nominate targets.
Execution of the Briefing: Brief your part of the assessment focus on the analysis and so
whatpaint the picture for the CDR on how you arrived at yourtarget nomination (if you have one). Receive CDRs prioritized guidance for the targeting cycle.
Post-AWG/Pre-Working Group Homework: S3/S3 Planner ICW nonlethal lead (S7, S9, PAO, PSYOP) writes arough draft concept for each target that includes, at a minimum,Task, Purpose, and desired Endstate/Effect of target. Place onCONOP/Baseball Card for WGs to use as a basis for their specificWG concept development.
S2 section develops enemy MLCOA and MDCOA as it applies toeach target and adds to draft concept developed by S3/S7. Thisfacilitates staff section/WG planning from a common base concept. S3 delineates BCT/BN fights for each target. Adjust Campaign Plan and associated MOE/MOP as necessary. Issue WARNO 1. Individual WFF:
Use running estimate and internal trackers to identify resources to
apply to targets. Draft Task and Purpose for concept of target as it applies to each staff
section. Draft CCIR/IRs for each target.
all applicable WFF enablers.
Required Resources:
Results of homework
Draft concept
Synch matrix enabler inputs
Updated Running estimateExecution of the Working Group:
Integrate necessary enablers into the concept for each target.
Plan in an unconstrained environment best case.
Collate individual staff section concepts of support into a WG
concept for each target. Insure adherence to BCT/BN fight.
Determine minimum required enabler support to accomplish
the effects on each target (each target will compete for finite
resources at the wargame). Consolidate draft CCIR/IR for each target
Endstate: The working group concept of support should be at
the 75%+ solution. The remainder will be dependent on input
from the other WGs and will be consolidated prior to the Pre-
Targeting Meeting.
Post-Working Groups/Pre-PTM Homework:
Results of NLWG should be fully filled out on CONOP/Baseballcard and the synch matrix should have refined task/purpose for
each function/action.
Handoff results to S3 Plans for staffing.
S3 Plans consolidates target concepts and adds data to synch
matrix after all WGs are complete, in preparation for Pre-
targeting meeting
Collaboration with TF WFF counterparts, HNSF and other
agencies as required. 80
7/29/2019 4-82 Targeting Workshop
81/118
Assessment Work Group
7/29/2019 4-82 Targeting Workshop
82/118
Agenda
Inputs:BDE Staff Running Estimates
Overall BDE AO AssessmentsSubordinate Unit Assessments
Previous Targeting Objective Statuses
SIGACTS Last 48-Hours/Next 72
Target Synch Matrix (Blank)
INTSUMs/INTREPs
Outputs:
Target Cycle TimeframeUpdated BCT AO Assessments
Refined Unit Assessments
Proposed Problem Sets/Targets - prioritized
Confirmed Collaborative Sessions (Working Groups)
WARNO #1
Purpose: AO Assessment (Understand the
Environment-PMESIIPT); Target
Nominations/Problem sets; Assess last Targeting
Cycle
Frequency: Beginning of each TGT cycle
Duration: 120 Minutes
Location: BCT TOC (BNs participates)Establish Cycle Timeframe
Changes to Commanders Guidance
Intelligence Update
AO SITEMPEnemy MLCOA/MDCOA
PIR Review
HVT/HVI Review
Operations Update
Current Task Organization
Campaign Plan Review
Operations Last 48/Next 72
PIR Review
OPORD/FRAGO UpdateBCT Assessment
Battalion Assessments
HPTL Review
Current Target Sets
HVI List
Prioritized Target Set
Target Set Review
Proposed Problem Sets /Targets
General Concept of the OPN for each Target
Chair: DCO/XO
Lead: ECOORD
Attendees: S2, S3, S3 Planner DECOORD,TO, IO, SJA, CA,PSYOP, PAO, PMO, BAE, ENG, ALO, BN LNOs, PRT Rep, HTT
Rep, C-IED Rep
82
Assessment Working Group Quick Reference Card
All Fires
Staff Preparation for AWGRequired Prior to AWG Assessments from previously executed Targeting
7/29/2019 4-82 Targeting Workshop
83/118
Running Estimates(IPB, Mission Analysis)
AO Assessments (PMESII)
Proposed Target Nominations
DCO/XO
Guidance from CDR and any changes
S3
FRAGOs from higher/Tasks identified Task Organization
Troop to Task/CBT Power Synch Matrix
Updates to CDR Intent
Campaign Plan Review
Operations conducted during last TGT Cycle
Proposed Target Nominations
S2
AO SITEMP
Enemy MLCOA/MDCOA Current PIR
Collection Assests Available
HVT/HVI Review
Proposed Target Nominations
Assets Available (including Joint)
CDRs Guidance for Fires ROE (as it relates to fires)
Proposed Target Nominations
Targeting Officer
Working High Payoff Target List (HPTL) Working Attack Guidance Matrix (AGM)
Working Target Synch Matrix (TSM)
Prioritized Target Set
S7
AO Assessments
Target Nominations for Lethal/Non-Lethal WG
Working Talking points/ Themes and
messages
PSYOP
S9 AO Assessments
Proposed Target Nominations
Project Update
Tools/Visual Aids
CBT Power Synch Matrix (S3) Task Org (S3)
Campaign Plan (S3)
SITEMP (S2)
ISM (S2)
HPTL/AGM/TSM (TO)
Meeting Agenda
Roll Call (ECOORD)
Focus Assessments on last TGT
Cycle/Next 24/48/72 hr TGT Cycle
Establish Cycle TimeframeChanges to CDRs Guidance
Targeting Battle Rhythm
Intelligence Update (S2)
AO SITEMP
Enemy MLCOA/MDCOA
PIR Review
HVT/HVI Review Operations Update (S3)
Current Task Org
Campaign Plan Review
Operations Last 48/Next 72
OPORD/FRAGO Update
BCT Assessment (ALL)
Battalion Assessment (BN LNOs) HPTL Review (TO) Current Target Sets (TO)
HVI List
Prioritized Target Set
Proposed Problem Sets/Targets (ALL) DCO/XO Guidance
Post AWG/Pre-WG Homework
S3 Planner ICW NL lead (S7) Develop draft concept for eachtarget that includes, at a minimum, Task, Purpose, and desired
Endstate/Effect of Target
Develop enemy MLCOA/MDCOA as it applies to each target
and add to draft concept developed by S3/S7
S3 delineates BCT/BN fight for each target
Adjust Campaign Plan and associated MOE/MOP as
necessary
Issue WARNO 1
WFFs refine draft concepts and resources applied to
nominations
p y g g
Cycle
BN PMESII/LOE/AO Assessments
Assessments from PRT, HNSF, and HN Government
counterparts
Updated Running Estimates by WFF
Identify gaps in progress along BCT LOEs to
yield recommended BCT target(s) WFF prepared to brief/discuss their part of
the assessment and nominate targets
83
Working Group Quick Reference CardExecution of the Working Groups
Targeting Battle Rhythm
Assessment Working Group
7/29/2019 4-82 Targeting Workshop
84/118
Integrate necessary enablers into the concept for each target. Plan in an
unconstrained environment best case
Collate individual staff section concepts of support into a WG concept for each target
insure adherence to BCT/BN fight
Determine minimum required enabler support to accomplish the effects on each
target (Each target will compete for finite resources at the Targeting Meeting) Consolidate draft CCIR/IR for each target
Consolidate proposed/draft decision points
EndState
The working group concept of support should be at the 75% + solution. The
remainder will be dependent on input from the other WGs and will be consolidated
prior to the Pre-Targeting Meeting and Targeting Meeting
Tools/Visual Aids
SITEMP ISM
HVT/HVI lists
TSS
HPTL
TSM
Operation Synch Matrix
Decision Point Matrix
Target CONOPs
Post-Working Groups/Pre-PTM Homework:
Results of WGs should be fully filled out on Target CONOPsand the Synch Matrix should have refined Task/Purpose for
each function/action
Handoff results to S3 Plans/DECOORD/TO for staffing
S3 Plans consolidates target concepts and adds data to
synch matrix after all WGs are complete, in preparation for
the Targeting Meetings
Collaboration with BN/TF WFF counterparts, HNSF and
other agencies as required
Required Prior to WFF Working Groups Results of AWG homework
Draft Concept
Synch matrix enabler inputs
Updated Running estimate
Meeting Agenda
As needed per working Group (See Quad Charts) The group lead determines how formal or
informal the Working Group will be At a minimum, Working Group must address
everything that is required for the Pre-Targeting
Meeting and Targeting Meeting
Assessment Working Group Lethal/Non-Lethal WG, C-IED WG, S2/ISR WG Pre-Targeting Meeting
Targeting Meeting
CDRs Dec Brief Targeting FRAGO Published
84
Lethal Working Group
7/29/2019 4-82 Targeting Workshop
85/118
AgendaInputs: Commanders Guidance
AssessmentsBCT/TF target nominations
HPTL/HVIL
CAMPLAN
Fused INTEL
ATO
Assets available by time
Outputs:BCT AO and LOO Assessment (Security)
Lethal Target Priorities
Targets for Execution and Development
HPTL/HVIL recommended changes
Resource allocation recommendation
Mission Analysis for Next Targeting Cycle
Lethal portion of next cycle Targeting FRAGO
Purpose: The Lethal Working Group is designed toconduct Mission Analysis/Course of Action Development
to develop a Course of Action (TSM) during the TargetingMeeting for those targets that need to be engaged
during the next targeting cycle using lethal effects.
Review Commanders Guidance
Review the PIRsAO assessment (BCT/TF)
LOO assessment for Security
Review and assessment of executed targets during
last targeting cycle
Review of HPTL/HVIL
BCT/TF lethal target nominations (Execute and
Developing targets)
TF target nominations for BCT Target ListISR Synch
Issues/Comments
Chair: S3
Lead: ECOORD
Attendees: S2, BN S3s, BN S2s TO, ALO, BAE, JAG, PMO,S2X, ISR Manager, IO, PAO,
85
Non-Lethal Working Group
7/29/2019 4-82 Targeting Workshop
86/118
AgendaInputs: Commanders Guidance
AO Assessment (S2, S7, S9)BCT/PRT/Bn target nominations
CAMPLAN
KLE Priorities
Current Project List
IO Recommended Messages
HPTL/HVIL
Outputs:BCT AO and LOO Assessments (Governance, Economy, Essential
Services)
Target Priorities (KLEs/Projects/Activities)
Targets for Development and Execution(KLEs/Projects/Activities)HPTL/HVIL recommended changesResource allocation recommendation
Recommended IO Messages/Themes
Mission Analysis/Course of Action Development for Next Targeting
Cycle
Non-lethal portion of next cycle Targeting FRAGO
Non-Lethal portion of TSM
Purpose: The Non-Lethal Working Group is designed to conduct
Mission Analysis/Course of Action Development to develop a
Course of Action (TSM) during the Targeting Meeting for those
targets that need to be engaged during the next targeting cycleusing non-lethal effects.
When: 1300, 1st Day of each Tgt Cycle
Conducted: In person, with SVOIP as needed
Review Commanders Guidance
AO Assessment (BCT) (S2)AO Assessment (BCT) (S9)
HPTL/HVIL Review
KLE Strategy
PRT Focus
BCT/PRT/Bn Targeting Focus/Nominations
Issues/Comments
Chair: XO
Lead: S9
Attendees: ECOORD, S7, AS2,TO, S3/Plans, PRT, JAG , BCTENG, BN Reps, HTT, USACE Rep, USAID, Chaplain
86
S2/ISR Working Group
7/29/2019 4-82 Targeting Workshop
87/118
AgendaInputs: Commanders Guidance
BCT/TF AO Assessments
BCT/TF target nominations
HPTL/HVIL nominations
Cell and Network updates
Resource request
NAI Rollup
PIR/SIR
Assets Available
Outputs:BCT AO and LOO Assessment
Lethal Target Priorities
Targets for Execution and Development
HPTL/HVIL recommended changes
Resource allocation recommendation
ISR Collection Plan
MLCOA/MDCOA for COA
Purpose: Provides intelligence updates throughout theAO from the BCT Fusion Cell and TF S2s. BCT and TF will
also discuss BCT and TF level targets for action and
development, TF level targets nominations for BCTTarget List, provide assessments on targets action during
last targeting cycle, updates on cells and networks
operating throughout AO and request for resources. The
S2 Working Group feeds the Lethal Targeting Meeting.
Review Commanders Guidance
Review the PIRs
AO assessment (BCT/TF)
Review and assessment of executed targets during
last targeting cycle
Review of HPTL/HVIL
BCT/TF lethal target nominations (Execute andDeveloping targets)
Resource request
BN target nominations for BCT Target List
Issues/Comments
Chair: S2
Lead: S2
Attendees: S3 Rep, DECOORD,TO, S7, BN S2s, MICO, ISRManager, IO Rep, OMT Rep, MASINT Rep, HTT Rep, C-IED
Rep
87
Pre-Targeting Meeting
7/29/2019 4-82 Targeting Workshop
88/118
Agenda
Purpose: Complete COAs for BCT
nominated targetsFrequency: Each TGT cycle
Duration: 120 minutes
Location: BCT TOC
Updated Commanders Guidance for Targeting
Intel UpdateAO SITEMP Review
SIGACT Review
HVI Review
Intel Synch Matrix (ISM)
Recommended changes to HPTL
Active Target COA Brief
New target COA DevelopmentDraft input to TSM
Draft DPsGuidance
Chair: XO/S3
Lead: ECOORD
Attendees: S3 Planner, DECOORD,TO, TA, S2, S3, IO, SJA, CA,PSYOP, PAO, PMO, BAE, ENG, ALO, BN LNOs, PRT Rep, HTT
Rep, C-IED Rep, Chaplain
Inputs:BDE Staff Running Estimates
Updated Unit Assessments
Refined Target List
Proposed COA for each target
Working COA Target Folders
Working Synch Matrix
Working Intel Synch Matrix (ISM)
Working Target Synch Matrix (TSM)Current FRAGOs
Outputs:Updated BCT AO Assessments
Refined Unit Assessments
Finalized HPTL
Finalized Prioritized Target List
Refined COA Folders
Completed Synch Matrix
Completed ISMCompleted TSM 88
Pre-Targeting Meeting Quick Reference Card
All Fires
Staff Preparation for PTMTargeting Battle Rhythm Assessment Working Group
h l/ h l /
7/29/2019 4-82 Targeting Workshop
89/118
WG homework results
AO Assessments (PMESII)
Refined COA for each Target
ECOORD
Updated CDRs Guidance for Targeting
S3 Planner
Delineates BCT/BN fight for each target Draft concept for new target nominations
that includes Task, Purpose, and desired
Endstate/Effect of Target
Working Operation Synch Matrix
Draft Decision Points for each Target
Target Draft COAs from Working Groups
S2
AO SITEMP
SIGACT Review HVT/HVI Review
Intel Synch Matrix (ISM)
Recommended changes to the HPTL
MLCOA/MDCOA for each target
Target Draft COAs from Working Groups
Counter-Mortar/Rocket analysis
Target Draft COAs from Working Groups
Targeting Officer
Refined High Payoff Target List (HPTL) Refined Attack Guidance Matrix (AGM)
Refined Target Synch Matrix (TSM)
Refined Target SetS7
AO Assessments
Target COAs from Lethal/Non-Lethal WG
Working Talking points/ Themes and
messages for each target
PSYOP
Target Draft COAs from Working Groups
S9
AO Assessments Target Draft COAs from Working Groups
Project Update
Tools/Visual Aids
SITEMP (S2) ISM (S2)
HPTL (TO)
AGM (TO)
TSM (TO)
Operation Synch Matrix (S3)
Decision Point Matrix (S3)
Target CONOPs (All WFF)
Meeting Agenda
Roll Call (ECOORD)
Updated CDRs Guidance for Targeting
Intelligence Update (S2) AO SITEMP
SIGACT Review
HVT/HVI Review
Intel Synch Matrix (ISM)
Target Update
HPTL Review
Prioritized Target Set
Active Target COA Brief(ALL) Review COAs for each target
Recommend timeline for execution
Identify Decisive, Shaping, and Sustainingoperations
Identify operations required before, during,
and after target execution
Consolidate CCIR/IR by target Complete each COA and draft sych matrixes Identify potential decision points
Determine minimum required support to
accomplish the effects on each target
New Target COA development
XO/S3 Guidance
Post PTM/Pre-Targeting meeting Homework
Refine Synch matrix based on proposed timeline establishedduring PTM
Update COA (CONOP) for each Target Collaborate with TF/BN counterparts
Continue coordination with HNSF, HN Government, and PRT
for projected resource requirements
ECOORD/XO/S3 conduct azimuth check with BCT CDR and
BN counterparts
Issue WARNO 2 (CONOPs with timeline is sufficient)
Required Prior to Pre-Targeting Meeting Running Estimates
Results of Working Groups and Homework refined
COAs and base synch matrix. * COAs should be
placed on a CONOP/baseball card
Lethal/Non-Lethal WG, C-IED WG, S2/ISR WG
Pre-Targeting Meeting
Targeting Meeting
CDRs Dec Brief
Targeting FRAGO Published
89
7/29/2019 4-82 Targeting Workshop
90/118
7/29/2019 4-82 Targeting Workshop
91/118
7/29/2019 4-82 Targeting Workshop
92/118
CDRs Decision Brief Quick Reference Card
All
Res lts of PTM
Targeting Officer
Final Hi h P ff T t Li t (HPTL)
Staff Preparation for CDRs Decision BriefTargeting Battle Rhythm
Assessment Working Group Lethal/Non Lethal WG C IED WG S2/ISR WG
7/29/2019 4-82 Targeting Workshop
93/118
Results of PTM
AO Assessments (PMESII)
Updated COA for each Target
ECOORD
Updated CDRs Guidance for Targeting
S3
Task ORG Review Operations Last 48/Next 72
Review CDR Intent
S2
AO SITEMP
Enemy MLCOA/MDCOA
SIGACT Review
PIR Review
HVT/HVI Review
Intel Synch Matrix (ISM)
Target COAs for Lethal/Non-Lethal WG
Final High Payoff Target List (HPTL) Final High Value Individual List (HVI List) Final Target Synch Matrix (TSM)
Prioritized Target Set
S7
AO Assessments
Final Talking points/ Themes and messages foreach target
PSYOP
S9
AO Assessments
Project Update
Tools/Visual Aids
SITEMP (S2) ISM (S2)
HPTL (TO)
TSM (TO)
Operation Synch Matrix (S3)
Decision Point Matrix (S3)
Target CONOPs (All WFF)
Post Targeting Cycle FRAGO:
Coordinate and track resources/enabler requests Insure effective handoff to Current OPS for execution
Required Prior to CDRs Dec Brief Results of Targeting Meeting
Final HPTL, TSM, OPSYNC Matrix, DSM,
Target CONOPS
Running Estimate
Meeting Agenda
Roll Call (ECOORD)
Targeting Battle Rhythm
Intelligence Update (S2)
AO SITEMP Enemy MLCOA/MDCOA
PIR Review
SIGACT Review
HVT/HVI Review
Intel Synch Matrix (ISM)
Operations Update (S3)
Current Task Org
Campaign Plan Review
Operations Last 48/Next 72
OPORD/FRAGO Update
BCT Assessments
Updated BN Assessments
HPTL Approval(TO)
HVI List Approval (TO)
Prioritized Target List Approval (ECOORD/TO)
Target COA Approval (S3)
Synch Matrix Approval (S3) Decision Guidance
Lethal/Non-Lethal WG, C-IED WG, S2/ISR WG
Pre-Targeting Meeting
Targeting Meeting
CDRs Dec Brief
Targeting FRAGO Published
93
7/29/2019 4-82 Targeting Workshop
94/118
7/29/2019 4-82 Targeting Workshop
95/118
UNCLASSIFIED
7/29/2019 4-82 Targeting Workshop
96/118
96UNCLASSIFIED
NTC Quad Charts
7/29/2019 4-82 Targeting Workshop
97/118
UNCLASSIFIED
Governance/E3 Working GroupE3 = Essential Services Economics and Education
7/29/2019 4-82 Targeting Workshop
98/118
98UNCLASSIFIED
Input: IO Objectives (linked with Commanders
Intent or Lines of Effort (LOE)) (S7) Bi-lat Engagement summary Agreements / promises made S2 Update (S2 or S2X) Recent and Upcoming SIGACTS with
analysis TF Commanders Assessments (MOE
Review) (TF LNOs)
Running Estimate Ongoing project status Fiscal Spending / Targeting Rollup Significant press activity / analysis
(POE) Updates / Changes to Personality or
Organization Target nominations (from LNOs and
staff) Engagement Summary Reports /
Promises
Purpose: Develop comprehensive COA forGovernance/E3 for Targeted Time Period
End state: Prioritized Governance/E3synchronized COA to serve as input to BCTTargeting meeting.Frequency: Once per targeting cycleDuration: 1-2 hoursLocation: BCT HQs
Staff Proponent: BCT S7Chair: XOAttendees: DCO/XO, S7, S2, S2X, S3, FSO, S4, S5, S9, SJA,
PMO, PAO, CAT-B OIC, TPD OIC, Targeting Officer, Chaplain,EN, SURG, Cultural Advisor, BN LNOs, STB S3, ENG, CA,PSYOP, SJA, PRT, PMO; BN S3/S5/S7, TTs, and HNSF partnersvia collaborative systems; Interagency LNOs, NGO LNOs, SOFLNO, HTTSupporting Systems: Collaborative systems to engage BNsS3s/S2s and TTs (CPOF, Ventrillo, Adobe Connect, VOIP, etc.)
Agenda: Roll Call-S7 LOE Review-S7 Enemy Situation-S2 SIGACTS-S2 Review of Promises made-S7/LNO Review Non-Lethal TSM - FSO Town Demographic Updates-
S9/LNO MOE Assessment updates-
XO/S7/LNO -by LOE -by essential task -by Town CERP Expenditure/Project review-
S9/SJA/LNO Updated themes/messages-S7/XO Recommended Products-PSYOP RFI review-S7
Guidance-DCO/XO
Output: Non-Lethal Targets Nominations Recommended CCIR Updated Themes and Messages Updates / Changes to Personality
or Organization Updated Target Folders Updated Non-Lethal TSM RFIs higher or lower Recommended PSYOP Products
E3 = Essential Services, Economics, and Education
UNCLASSIFIED
C-IED Working Group
7/29/2019 4-82 Targeting Workshop
99/118
99UNCLASSIFIED
g p
Input: CDRs guidance from AWG Terrain and enemy IPB products (IED EAs,
SIGACTs, caches, link diagrams, IED database,etc.)
Current HPTL Subordinate unit assessments Patrol reports Synopsis of trends (storyboards
EOD, WIT, BNs) EW/Freq. management issues Previous cycle MOPs/MOEs ISF availability and resources DIV taskings and clearance times CLP/VIP/ISF movement times
Output: IED Defeat COA sketch Prioritized HPTL Updated/refined IED EAs and NAIs Draft route clearance matrix ISR collection recommendations Recommended changes to asset allocation
(CREW, EOD, WIT, dog teams, etc.) EW coordinating instructions
Purpose: Develop comprehensive COA for C-IED Operations for Targeted Time Period
End state: Prioritized C-IED synchronized COAto serve as input to BCT Targeting meeting.Frequency: Once per targeting cycleDuration: 1-2 hoursLocation: BCT HQs
Staff Proponent: BCT ENGChair: BCT ENGAttendees: ENG, S3, EOD, WIT, S2 rep, BN LNOs, CHEMO,
IO rep, ADAM/BAE, FSO, Movement Rep (S4), CA/PSYOP,POE, SJASupporting Systems: Collaborative systems to engageBNs S3s/S2s and TTs (CPOF, Ventrillo, Adobe Connect,VOIP, etc.)
Agenda: Roll Call (ENG)
Review CDRs guidance and campaignplan/key tasks (ENG/S3)
IED Intel overview and MOEassessment (S2, ENG)
SIGACTS/Database/Overlays
Pattern and predictive analysis(friendly and enemy)
Terrain analysis
IED Network update
LNO presentation of CDRsassessments and unitstoryboards (LNOs)
BDE operations and DIV RCP schedulereview next targeting window (S3, ENG)
CEXC Trends Update (EOD and WIT)
Technical trends
Emerging enemy TTPs
New Technology
EOD/WIT observations andstoryboards
HPTL refinement, newnominations and COAdevelopment (ALL)
IED Eas
IED Cell Key Personnel
Supply sources/facilities
Political/Religious figures
Smuggling routes
Develop C-IED Synch Matrix (ISR
platforms, enablers, routeclearance, etc.) (S2, S3, ENG, FSO)
Due out review (ENG)
UNCLASSIFIED
Security Working Group
7/29/2019 4-82 Targeting Workshop
100/118
100UNCLASSIFIED
y g p
Input: Intelligence Update / Initial ISM Maneuver Concept of Operations Assessments/BDA last Targeting Cycle Commanders Intent for Fires (FSCOORD)
Concept of Fires/Counterfire (FSO/S3) Engagement Criteria Association / Activities Matrices (Target
Folders) S2X CCIR, PIR, IR (Relative to CM2RI) Assessments (MOE Review) (FSCOORD)
Mortar/Rocket Attacks (POO/POI) Interdicted Attacks, Caches Discovered Counterfire Rollup (Acquire to Fire/Action) Negative IO Effects of CF (S7) HPTL (Proposed) Running Estimate (from all staff sections) Lethal TSM Airspace De-confliction (ADAM/BAE) Air Assets Available (ALO) Target nominations (from LNOs and staff)
Purpose: Develop comprehensive COA forSecurity Operations for Targeted Time Period
End state: Prioritized Security synchronizedCOA and target nominations to serve as inputto the BCT targeting meeting.Frequency: Once per targeting cycleDuration: 1-2 hoursLocation: BCT HQs
Staff Proponent: S3Chair: XO or S3Attendees: DCO / XO, S2, S2X, S3, S3 Plans, S4, S5, S7, S9,
FSO, FSCOORD, ALO, TGT OFF, EWO, Collection Manager,ADAM/BAE, SJA, PMO, PAO, Chaplain, EN rep, SURG, BNLNOs; BN S3/S2/FSOs, TTs, and HNSF partners viacollaborative systems; Interagency LNOs, NGO LNOs, SOFLNO, HTTSupporting Systems: Collaborative systems to engage BNsS3s/S2s/FSOs and TTs (CPOF, Ventrillo, Adobe Connect, VOIP,etc.)
Agenda: Review Commanders Intent and TGT Guidance S3
Intelligence Update and ISR Plan S2
Review Lethal Target List/TSM/HPTL S2/FSO
Current CCIR with Decision Points S2
Operations Update, TGTing effects last TGT cycle S3
Review Targeting Objectives/Tasks S3
Future operations (next 96, 72, 48-24 hrs) S3/S3 Plans
Prioritized BN lethal TGT nominations/CONOPs
BN LNOs/BN S3s/FSOs Prioritized BCT lethal TGT nominations/CONOPs S3
Proposed updated lethal HPTL and TSM - S2/FSO
Propose changes to CCIR and / or decision points- S3
Review due outs or coordination requirements- XO/S3
Output: Prioritized Lethal TSM Revised ISM Updated HPTL Proposed Updated CCIR Updated Counterfire Target
Boxes RFIs higher or lower Prioritized lethal target
nominations Updated Staff Running
Estimates Synchronized CONOPs / TGT
Folders Updated Ops Synch Matrix Updated FSEM Updated AGM
7/29/2019 4-82 Targeting Workshop
101/118
UNCLASSIFIED
ISR Working Group
7/29/2019 4-82 Targeting Workshop
102/118
102UNCLASSIFIED
g p
Input: Current CCIR Updated Commanders Intent
Updated Task ORG Current and Future
Operations/CONOPs COA from Security WG Recent Enemy Activities Enemy SITEMP
NAI Overlay Current ISR Plan / ISM Division/EAB ISM Assets available and those to be
requested Target Folders D/S/P Lists
Purpose: Develop comprehensive COA for ISRfor Targeted Time Period
End state: Prioritized synchronized ISR planand ISM to serve as input to the BCT targetingmeeting.Frequency: Once per targeting cycleDuration: 1-2 hoursLocation: BCT HQs
Staff Proponent: S2Chair: XOAttendees: DCO/XO, S3, S3 Plans, S2, Collection Manager, S2X,
MICO CDR, SMEs, FSO, ADAM/BAE, ALO, CHEMO, S6,Sustainment Cell Rep, S7, S9, ENG, STB Rep, BN LNOs; BNS2s/S3s, TTs, and HNSF partners via collaborative systems;Interagency LNOs, NGO LNOs, SOF LNO, HTTSupporting Systems: Collaborative systems to engage BNsS2s/S3s/FSOs and TTs (CPOF, Ventrillo, Adobe Connect, VOIP,etc.)
Agenda:CDRs Intent/Targeting Guidance S3Task ORG S3Current / Future (Recommended COA)OPS S3/S3 PlansCurrent CCIR S2IPB/SITEMP S2Current ISR Plan / ISR Focus / ISM S2DIV/EAB ISM S2
D/S/P (Target Folders) - FSOAsset Status S2/ADAM/BAEAsset to target assignments S3/S2Assets to be requested from higherS3/S2Due outs/requirements - XO
Output: Updated SITEMP Updated CCIR Updated NAI Overlay Updated ISR Tasking
Matrix Updated ISM Updated TSM Updated Collection Focus Prioritized Target Deck for
UAS RFIs Request for EAB assets 1972s AMRs Updated ACMRs for UAS Updated FSEM Updated AGM
UNCLASSIFIED
Security Working Group
7/29/2019 4-82 Targeting Workshop
103/118
103UNCLASSIFIED
y g p
Input: Intelligence Update / Initial ISM Maneuver Concept of Operations Assessments/BDA last Targeting Cycle Commanders Intent for Fires (FSCOORD)
Concept of Fires/Counterfire (FSO/S3) Engagement Criteria Association / Activities Matrices (Target
Folders) S2X CCIR, PIR, IR (Relative to CM2RI) Assessments (MOE Review) (FSCOORD)
Mortar/Rocket Attacks (POO/POI) Interdicted Attacks, Caches Discovered Counterfire Rollup (Acquire to Fire/Action) Negative IO Effects of CF (S7) HPTL (Proposed) Running Estimate (from all staff sections) Lethal TSM Airspace De-confliction (ADAM/BAE) Air Assets Available (ALO) Target nominations (from LNOs and staff)
Purpose: Develop comprehensive COA forSecurity Operations for Targeted Time Period
End state: Prioritized Security synchronizedCOA and target nominations to serve as inputto the BCT targeting meeting.Frequency: Once per targeting cycleDuration: 1-2 hoursLocation: BCT HQs
Staff Proponent: S3Chair: XO or S3Attendees: DCO / XO, S2, S2X, S3, S3 Plans, S4, S5, S7, S9,
FSO, FSCOORD, ALO, TGT OFF, EWO, Collection Manager,ADAM/BAE, SJA, PMO, PAO, Chaplain, EN rep, SURG, BNLNOs; BN S3/S2/FSOs, TTs, and HNSF partners viacollaborative systems; Interagency LNOs, NGO LNOs, SOFLNO, HTTSupporting Systems: Collaborative systems to engage BNsS3s/S2s/FSOs and TTs (CPOF, Ventrillo, Adobe Connect, VOIP,etc.)
Agenda: Review Commanders Intent and TGT Guidance S3
Intelligence Update and ISR Plan S2
Review Lethal Target List/TSM/HPTL S2/FSO
Current CCIR with Decision Points S2
Operations Update, TGTing effects last TGT cycle S3
Review Targeting Objectives/Tasks S3
Future operations (next 96, 72, 48-24 hrs) S3/S3 Plans
Prioritized BN lethal TGT nominations/CONOPs
BN LNOs/BN S3s/FSOs Prioritized BCT lethal TGT nominations/CONOPs S3
Proposed updated lethal HPTL and TSM - S2/FSO
Propose changes to CCIR and / or decision points- S3
Review due outs or coordination requirements- XO/S3
Output: Prioritized Lethal TSM Revised ISM Updated HPTL Proposed Updated CCIR Updated Counterfire Target
Boxes RFIs higher or lower Prioritized lethal target
nominations Updated Staff Running
Estimates Synchronized CONOPs / TGTFolders
Updated Ops Synch Matrix Updated FSEM Updated AGM
UNCLASSIFIED
Targeting Meeting
7/29/2019 4-82 Targeting Workshop
104/118
104UNCLASSIFIED
Staff Proponent: S3Chair: XOAttendees: DCO, XO, S3, S2, Collection Manager, FSO, FSCOORD,Targeting Officer, S3 Plans, S7, S9, ALO, BAE, PSYOP, PAO, ENG,
BOLT, S6, PMO, S1, S4, CHEMO, SURG, Chaplain, BN LNOs, SOFLNO, PRT TM LDR/Rep, HTT, HN LNOs, HN Reps, BN S3s/S2s and TTsvia collaborative systems
Supporting Systems: Collaborative systems to engage BNs S3s/S2sand TTs (CPOF, Ventrillo, Adobe Connect, VOIP, etc.)
Agenda: Introduction XO
Brief WARGAME Method and Tools (Map, Icons, SynchMatrix, Recorder, etc.)
Review Current IPB Products (SITEMP, Pattern Analysis, etc.) -S2 Review Higher Mission/Intent, Unit Mission/Intent, Task Org - S3 CDRs Current Targeting Guidance, Ops Summary, CCIR S3/S2 Review Approved HPTL and Target Folders/CONOPs -S3/S2/FSO/Plans Review Updated TSM (Lethal, Non-Lethal, IO, AGM, ATO)FSO/S7 Review BN Proposed Targets/CONOPs BN LNOs/S3s Review BCT Proposed Targets/CONOPs S3/FSO Review Updated ISM - S2 Synch Approved CONOPs with ISR and Resources
XO/S3/S2/S7/FSO CONDUCT STAFF WARGAME by phase for entire timeperiod targeted Use Wargame Map and Icons Display Synchronization Matrix for All To See All staff record notes on hard copy of synch matrixduring wargame Identify specific tasks and decision points and allocateresources during wargame
Review Updated Wargame Synch Matrix and Decision Pts - XO Conclusion - XO
Purpose: Synchronize the BCT Lethal and Non-LethalTargeting PlanEndstate: Fully synchronized and integrated BCT
Targeting PlanFrequency: Once per Targeting CycleDuration: 2 hrsLocation: BCT HQs linked to Subordinate andPartnered Units with Collaborative Systems
Input: Updated Staff Running Estimates Updated IPB
Updated ISM Proposed HPTL Proposed CCIR Updated PMESSII Assessments Updated CampaignPlan/LOEs/Benchmarks Approved CCIR, HPTL, CDRs
Targeting Guidance Approved Target Folders(CONOPS) Updated Lethal and Non-LethalTSM (left side complete)/IOSM/AGMDRAFT Ops Synch Matrix DRAFT DSM Updated AGM Updated FSEM Revised IO Themes and Messages
Output: Revised Staff RunningEstimates
Revised CampaignPlan/LOEs Final ISM Completed Lethal andNon-Lethal TSM, IOSM Final HPTL Final CCIR Fully SynchronizedCONOPs/TGT Folders
Updated Ops SynchMatrix/Ex Check List Final DSM Final AGM Final FSEM Final CF TGT Boxes Final IO Themes andMessages
UNCLASSIFIED
Decision Brief
7/29/2019 4-82 Targeting Workshop
105/118
105UNCLASSIFIED
Agenda: Introduction - XO Current IPB and SITEMP S2 CCIR S2 ISM S2/Collection Manager Review Higher Mission/Intent, BCT and HNSFMission/Intent S3 BCT and Partnered HNSF Task Org S3 Review CDRs Targeting Guidance, Ops Summary S3
Review Final Lethal and Non-Lethal HPTL andSynchronized Target Folders/CONOPs for ExecutionS2/S3/S3 Plans/FSO Review Updated Lethal and Non-Lethal TSM FSO Review Emerging Target Folders/CONOPs S3 Review Updated Ops Synch Matrix and DSM withProposed CDRs Decision Points S3/XO Battle Rhythm and Due Outs XO Commanders Guidance CDR
Purpose: Present Integrated and SynchronizedTargeting COAs to the CDR for Decision and Approval
Endstate: CDR approves Targeting COAs forExecution and the Staff prepares the TargetingFRAGO for publication.
Frequency: Once per Targeting CycleDuration: 2 hoursLocation: BCT HQs linked to Subordinate andPartnered Units with Collaborative Systems
Chair: XO
Attendees: CDR, DCO, XO, S3, S2, Collection Manager,FSO, FSCOORD, Targeting Officer, S3 Plans, S7, S9, ALO,BAE, PSYOP, PAO, ENG, BOLT, S6, PMO, S1, S4, CHEMO,SURG, Chaplain, BN LNOs, SOF LNO, PRT TM LDR/Rep,HTT, HN LNOs, HN Reps, BN S3s/S2s and TTs viacollaborative systems
Supporting Systems: Collaborative systems to engageBNs S3s/S2s and TTs (CPOF, Ventrillo, Adobe Connect,VOIP, etc.)