39
3WCDRR: UN GAR Global Risk Assessment INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

3WCDRR: UN GAR Global Risk Assessment - CPAESS · ü Risk assessment is key to aware but also to concern decision-makers of their responsibility ü Disaster risk is a contingent liability

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

3WCDRR:UNGARGlobalRiskAssessment

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

GARGlobalRiskAssessment:AtGlance

Dr. Prof. Omar-Dario CARDONA A.

National University of Colombia at Manizales

Representative

MULTI-HAZARDFULLYPROBABILISTICRISKASSESSMENTRESULTSATGLOBALLEVEL

International Centre for Numerical Methods in Engineering

& INGENIAR LTDA

INGENIAR

Scoping Meeting Agricultural Risk Assessment

Incorporating drought and the agricultural sector in the GAR Global Risk Model

7 – 9 February 2017 – Boulder, Colorado

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

ü  Measuring is essential to decide; what is not dimensioned cannot be administrated

ü  An operational picture of risk improves risk knowledge and provides an overall risk landscape

ü  Risk assessment is key to aware but also to concern decision-makers of their responsibility

ü  Disaster risk is a contingent liability and therefore a sovereign risk for the society

ü  Risk reduction and prevention are duties for risk governance and for the nations’ accountability

ü  Track DRM progress over time means considering the development transformation trade-offs

Why a Global Risk Assessment ?

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

COMPREHENSIVE APPROACH TO PROBABILISTIC RISK ASSESSMENT INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

ü Mutuallyexclusive

ü Collectivelyexhaustiveü Admitprobabilisticrepresentation

.AME FORMAT

Setofstochasticscenarios

CyclonicWindandSeismicHazard

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Exceed

acerate

Intensitymeasure

T = 100 years

T =500 years

T = 1000 years

ν = 0.01

ν = 0.002

ν = 0.001

Hazardmapsfordifferentreturnperiods

Intensitymeasure

Exceed

ancera

te(1/year)

SeismicHazardAssessmentIntensityexceedancecurvesineachnodeoftheglobalgrid

C I M N E INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

T=0.5sec,Tr=475years

SeismicHazardAssessmentEarthquakeHazardMaps

Cardonaet.al.(2015)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Tr=100years

TropicalCycloneWindHazardMapsCyclonicWindHazard

020406080100120150180220250280300350400Cardonaet.al.(2015)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Tsunami,Floods,VolcanicAsh,StormSurge,ClimateChangeScenarios

OtherProbabilisticHazards

Tsunami:Run-upheightforTr500years Løvholtet.al.(2014)

VolcanicashloadforTr100yearsFloodsforTr1000years

Bear-Crozieret.al,2014CIMA(2014)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

5x5kmgrids&1x1kminthecoastsGlobalExposureDatabase

GRID,UNEP(2014)INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Vulnerabilityfunctionsfordifferenthazards

Vulnerability

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Vulnerabilityfunctionsforearthquakes

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00 0.50 1.00 1.50 2.00

SEISMICDESIGNLEVEL:M

MDR(%)

SpectralAcceleration,Sa(g)

MDR- - - - Var.

Vulnerability

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

QUALITYLEVEL:M

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 50 100 150 200 250 300 350 400 450 500

MDR(%)

WindSpeed(kph)

MDR

- - - - Var.

WOOD

REINFORCEDCONCRETEFRAM

ES

REINFORCEDMASONRY

Vulnerabilityfunctionsforwind

Vulnerability

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

ExposedAssets Vulnerability

Hazard

Loss

PDF of Loss LossesEconomic Human

Risk

Loss

Exc

eeda

nce

Rat

e v(

p)

PML

AAL

LOSSEXCEEDANCECURVE

PROBABLEMAXIMUMLOSS

AVERAGEANNUALLOSS

RiskModeling:LossAssessment

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Considered event from the stochastic set

Considered asset (or grid) at analysis area

Considered building(s) class(es)

Hazard intensity at analysis site

Vulnerability function selection

Loss and variance calculation

Loss probability distribution function calculation for the event

Any other building class at the site?

Has all area been

analyzed?

Have all events been considered?

Loss exceedance rate calculation using the loss PDF associated to each event and its occurrence frequency

Yes

No Yes

Yes

No

No

RiskModelling:LossAssessment

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

p P

f(x)

p P

f(x)

Lossexce

edan

cerate(#/year)

Losses

( ) ∑=

⋅≥=Events

iA iEventFiEventLlpv

1)()|(Pr

∫∞

=0

)|()|()|( dSaiEventSafSalfiEventlf Vulnerability Hazard

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

LossExceedanceCurveGovernmentsneedtodefineariskreduction/financingstrategy

Transfer Retention

Loss($000)

Layer 1 Layer 4 Layer 2

Retention (budget / contingent credit)

1=Highprobability&low/moderatelosses2=Mediumprobability&moderate/highlosses3=Lowprobability&highlosses4=Verylowprobability&veryhighlosses

Layer 3

Planning / Prevention / Mitigation

Regulation (Codes / Standards / Land use) (Residual Risk)

Warning / Emergency response

10 5 1 0.5 0.1 0.01 0.001

50 100 500 1000

0.1 0.2 1 2 10 100 1000

Return

period(yea

rs)

Lossexc

eeda

nce(#

/yea

r)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

ExtensiveandIntensiveRiskAssessmentAnalytical(propective)LossExceedanceCurve

0.001

0.01

0.1

1

10

100

1,000

10,000

100,0000.00001

0.0001

0.001

0.01

0.1

1

10

100

1,000

0.01 0.1 1 10 100 1,000 10,000 100,000

Returnperiod[years]

Lossexceedancerate[1/year]

Economicloss[Million$USD]

Analyticalcurve

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

0.001

0.01

0.1

1

10

100

1,000

10,000

100,0000.00001

0.0001

0.001

0.01

0.1

1

10

100

1,000

0.01 0.1 1 10 100 1,000 10,000 100,000

Returnperiod[years]

Lossexceedancerate[1/year]

Economicloss[Million$USD]

Historiccurve Analyticalcurve

ExtensiveandIntensiveRiskAssessmentEmpiric(retrospective)LossExceedanceCurve

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Proposalofa“Hybrid”LossExceedanceCurve0.001

0.01

0.1

1

10

100

1,000

10,000

100,0000.00001

0.0001

0.001

0.01

0.1

1

10

100

1,000

0.01 0.1 1 10 100 1,000 10,000 100,000

Returnperiod[years]

Lossexceedancerate[1/year]

Economicloss[Million$USD]

Historiccurve Analyticalcurve Hybridcurve

AAL

------------ PML-------------

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

DistributionofAALbycountry,US$millions

RiskMapsSeismicRiskAssessment

C I M N E INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

DistributionofAALrelativetotheexposedvaluebycountry

RiskMapsSeismicRiskAssessment

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

DistributionofPML1500bycountry,US$millions

RiskMapsSeismicRiskAssessment

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

DistributionofPML1500relativetotheexposedvaluebycountry

RiskMapsSeismicRiskAssessment

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

UsingAverageAnnualLoss(AAL)resultsRiskRankingsofCountries

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

RiskMaps

Multi-hazardRiskAssessment

DistributionofAALbycountry,US$millionsINGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

RiskMaps

Multi-hazardRiskAssessment

DistributionofAALrelativetotheexposedvaluebycountryINGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

SomeGlobalFiguresbyRegionandEconomyLevel

ExposureValue(PC)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

SomeGlobalFiguresbyRegion(Multi-hazard)

AALValue AAL/PC‰

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

AALValue AAL/PC‰

SomeGlobalFiguresbyEconomyLevel(Multi-hazard)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

DisasterRiskDevelopmentImplicationsIndex(DRDI)

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

RiskMapsSeismicRiskAssessment

CAPRA-Viewer

C I M N E INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

TheChallenge:FromGlobaltoLocal

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

ü  A fully probabilistic multi-hazard risk assessment has been conducted at global level. Results are useful for comparisons and rankings among countries

ü  In the past, risk had been estimated mainly based on historical records. The GAR’s Global Risk Model takes into account “events that have not yet occurred”. This is a key issue for SFA follow-up.

ü  Countries must carry-out risk assessments with higher resolution at sub-national and local level when the required information is available.

ü  From global to local: the same “arithmetic” can be used for any resolution level.

Regarding the GAR’s Global Risk Model:

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Global Risk Assessment (Model):

Earthquakes,

Tsunami,

Tropical Cyclones (w and w/o cc),

Riverine floods,

Volcanic ash-fall,

Droughts ?

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

Understanding probable losses due to hazard events (not only disasters)

creates powerful incentives for countries to develop planning options and tools to cope with risk, including

allocating the sustained budgetary resources necessary to reduce the

potential damage and safeguard the transformation of development.

C I M N E INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

It is necessary to explore how probabilistic risk models and holistic

models can be integrated in an effort to develop a methodology that can

provide the true benefits of aggregation and disaggregation of hard

and soft risk drivers to identify the corrective and prospective interventions to be done.

INGENIAR CAD/CAE Ltd. Cardona, O.D., Bernal, G. (2017). Scoping Meeting Agricultural Risk Assessment. Boulder, CO, 7-9 February 2017.

“Farbetteranapproximateanswertotherightquestion,whichisoftenvague,thananexactanswertothewrongquestion,whichcanalwaysbemadeprecise”

JohnW.Tukey