Upload
irish-anne-alonzo-ubalde
View
214
Download
0
Embed Size (px)
Citation preview
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 1/17
Technical Education and Skills Development Authority
Skills Mastery Institute
TRAINEE’S RECORD BOOK
Trainee’s No.2016010024
NAME: MARIA C.REYES
QUALIFICATION: TECHNICAL DRAFTING NCII
TRAINING DURATION : 222 HOURS
TRAINER: IRISH ANNE A. UBALDE
I.D.
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 2/17
Instructions:
This Trainees’ Record Book (TRB) is intended to serve as
record of all accomplishment/task/activities while
undergoing training in the industry. It will eventually
become evidence that can be submitted for portfolio
assessment and for whatever purpose it will serve you. It is
therefore important that all its contents are viably entered by
both the trainees and instructor.
The Trainees’ Record Book contains all the required
competencies in your chosen qualification. All you have todo is to fill in the column “Task Required” and “Date
Accomplished” with all the activities in accordance with the
training program and to be taken up in the school and with
the guidance of the instructor. The instructor will likewise
indicate his/her remarks on the “Instructors Remarks”
column regarding the outcome of the task accomplished bythe trainees. Be sure that the trainee will personally
accomplish the task and confirmed by the instructor.
It is of great importance that the content should be
written legibly on ink. Avoid any corrections or erasures and
maintain the cleanliness of this record.
This will be collected by your trainer and submit thesame to the Vocational Instruction Supervisor (VIS) and
shall form part of the permanent trainee’s document on file.
THANK YOU.
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 3/17
NOTES:
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 4/17
Unit of Competency: Participate in workplace communication
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Obtain andconvey
workplaceinformation
Specific and relevant information is
accessed from appropriate sources
Effective questioning , active listeningand speaking skills are used to gather
and convey information
Appropriate medium is used to transfer
information and ideas
Appropriate non- verbal communicationis used
Appropriate lines of communication with
supervisors and colleagues are identifiedand followed
Defined workplace procedures for the
location and storage of information areused
Personal interaction is carried out clearlyand concisely
Completerelevant workrelateddocuments
Team meetings are attended on time
Own opinions are clearly expressed and
those of others are listened to withoutinterruption
Meeting inputs are consistent with themeeting purpose and establishedprotocols
Workplace interactions are conducted in
a courteous manner
Questions about simple routine
workplace procedures and mattersconcerning working conditions ofemployment are asked and responded to
Meetings outcomes are interpreted and
implemented
Participate in
workplacemeeting anddiscussion
Range of forms relating to conditions ofemployment are completed accurately
and legibly
Workplace data is recorded on standard
workplace forms and documents Basic mathematical processes are used
for routine calculations
Errors in recording information onforms/ documents are identified and
properly acted upon
Reporting requirements to supervisor are
completed according to organizationalguidelines
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 5/17
Unit of Competency: Work in a team environment
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Describe andidentify team
role andresponsibilityin a team
The role and objective of the team isidentified from available sources of
information Team parameters, reporting
relationships and responsibilitiesare identified from teamdiscussions and appropriateexternal sources
Describe workas a team
Individual role and responsibilitieswithin the team environment areidentified
Roles and responsibility of other
team members are identified andrecognized
Reporting relationships within teamand external to team are identified
Work as ateam member
Effective and appropriate forms ofcommunications used andinteractions undertaken with teammembers who contribute to knownteam activities and objectives
Effective and appropriate
contributions made to complementteam activities and objectives,based on individual skills andcompetencies and workplacecontext
Observed protocols in reportingusing standard operatingprocedures
Contribute to the development ofteamwork plans based on anunderstanding of team’s role and
objectives and individualcompetencies of the members.
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 6/17
Unit of Competency: Practice career professionalism
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Integratepersonal
objectives withorganizationalgoals
Personal growth and work plansare pursued towards improving the
qualifications set for the profession Intra- and interpersonal
relationships is are maintained inthe course of managing oneselfbased on performance evaluation
Commitment to the organizationand its goal is demonstrated in theperformance of duties
Set and meetwork priorities
Competing demands are prioritizedto achieve personal, team and
organizational goals and objectives Resources are utilized efficiently
and effectively to manage workpriorities and commitments
Practices along economic use andmaintenance of equipment andfacilities are followed as perestablished procedures
Maintainprofessionalgrowth anddevelopment
Training and career opportunitiesare identified and availed of based
on job requirements Recognition is sought/received and
demonstrated as proof of careeradvancement
Licenses and/or certificationsrelevant to job and career areobtained and renewed
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 7/17
Unit of Competency: Practice occupational health and safety
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Identifyhazards and
risks
Safety regulations and workplace safety
and hazard control practices and
procedures are clarified and explainedbased on organization procedures
Hazards/risks in the workplace and
their corresponding indicators areidentified to minimize or eliminate riskto co-workers, workplace andenvironment in accordance withorganization procedures
Contingency measures during workplace
accidents, fire and other emergenciesare recognized and established inaccordance with organization
proceduresEvaluatehazards andrisks
Terms of maximum tolerable limits
which when exceeded will result in harmor damage are identified based onthreshold limit values (TLV)
Effects of the hazards are determined
OHS issues and/or concerns and
identified safety hazards are reported todesignated personnel in accordance withworkplace requirements and relevantworkplace OHS legislation
Controlhazards andrisks
Occupational Health and Safety (OHS)
procedures for controlling hazards/risks in workplace
are consistently
followed
Procedures for dealing with workplace
accidents, fire
and emergencies are followed inaccordance with
organization OHS policies
Personal protective equipment (PPE) iscorrectly used in accordance withorganization OHS procedures andpractices
Appropriate assistance is provided in
the event of a workplace emergency inaccordance with establishedorganization protocol
Maintainoccupationalhealth andsafetyawareness
Emergency-related drills and trainingare participated in as per establishedorganization guidelines and procedures
OHS personal records are completedand updated in accordance withworkplace requirements
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 8/17
Unit of Competency: Perform mensuration and calculation
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Selectmeasuring
instruments
Object or component to bemeasured is identified, classified
and interpreted according to theappropriate regular geometricshape
Measuring tools areselected/identified as per object tobe measured or job requirements
Correct specifications are obtainedfrom relevant sources
Appropriate measuring instrumentsare selected according to job
requirements Alternative measuring tools are
used without sacrificing cost andquality of work
Carry outmeasurementsandcalculation
Accurate measurements areobtained according to jobrequirements
Alternative measuring tools areused without sacrificing cost andquality of work
Calculation needed to completework tasks are performed using thefour basic process of addition (+),subtraction (-), multiplication (x)and division (/)including but notlimited to: trigonometric functions,algebraic computations
Calculations involving fractions,percentages and mixed numbersare used to complete workplacetasks
Numerical computation is self-checked and corrected for accuracy
Instruments are read to the limit ofaccuracy of the tool
Systems of measurement identifiedand converted according to jobrequirements/ISO
Work pieces are measuredaccording to job requirements
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 9/17
Unit of Competency: Interpret technical drawings and plans
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Analyze signs,symbol and
data
Technical plans are obtainedaccording to job requirements
Signs, symbols and data areidentified according to jobspecifications
Signs symbols and data aredetermined according toclassification or as appropriate indrawing
Interprettechnicaldrawings and
plans
Necessary tools, materials andequipment are identified accordingto the plan
Supplies and materials are listedaccording to specifications
Components, assemblies or objectsare recognized as required
Dimensions are identified asappropriate to the plan
Specification details are matchedwith existing/available resourcesand in line with job requirements
Work plan is drawn following the
specificationsApplyfreehandsketching
Where applicable, correct freehandsketching is produced in accordancewith the job requirements
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 10/17
Unit of Competency: Apply quality standards
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Assess qualityof received
materials
Received materials or component parts are checked based on
material specifications Defective material or components
are identified and
isolated following standardoperating procedures
Defective materials or componentsare replaced in
accordance with workplaceprocedures.
Assess own
work
Documents relative to quality
within the company is identifiedand used
Completed work is checkedbased on workplace standards
relevant to the task undertaken
In cases of deviations from specifiedquality standards,
causes are documented andreported in accordance with
the workplace’ standards operating
proceduresEngage inquality
Process improvement proceduresare participated in
relation to workplace assignment
Work is carried out in accordancewith process
improvement procedures
Performance of operation or qualityof product or service is
monitored in accordance tocustomer satisfaction
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 11/17
Unit of Competency: Operate personal computer
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Start thecomputer
The peripheral devices are properly
connected
Power is checked and the computer
and peripheral devices are switched on
Proper logging in and logging off issuccessfully done
The operating system features andfunctions are accessed and navigated
Hardware configuration and othersystem features are checked
Arrange andcustomizedesktop
display/window setting
The desktop screen or Windowselements are changed as needed
Desktop icons are added, renamed,moved, copied or deleted
The online help functions are accessedor used as needed
Desktop icons of application programs
are selected, opened and closed Properties of icons are displayed
Computer or desktop settings are savedand restored
Work with filesand folders
A file or folder is created, opened,
moved, renamed or copied
Files are located, deleted and restored
Details and properties of files and
folders are displayed or viewed Various files are organized for easy
lookup and use
Files and information are searched
Disks are checked, erased or formattedas necessary
Work withuserapplicationprogram
Application program s are added,changed, removed or ran
User software or application program
are installed, updated and upgraded
Information/data are moved betweendocuments or files
Printinformation
Printer is added or installed and correct printer settings is ensured
Default printer is assigned accordingly
Information or document is printed onthe installed printer
Progress of print jobs are viewed and
deleted as required
Shutdowncomputer
All open application programs are closed
Computer and peripheral devices are
properly shut down
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 12/17
Unit of Competency: Draft architectural layout and details
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Plan andprepare for
work
Work instruction is securedfollowing standard operating
procedures (SOP) and interpretedaccording to architectural job
requirements
Drawing tools , materials andequipment are identified based on job requirements.
Prepare andset-up toolsand materialsfor drawing
Drawing tools, materials, andequipment are selected andprepared according to jobrequirements
Set-up procedure for workingdrawing is performed following jobrequirements
Lay-outarchitecturaldrawings anddetails
Sheet requirement is accomplishedfollowing technical drawingstandards
Sheet requirement is reviewedbased on technical drawingstandards
Sheet requirement is revised
following technical drawingstandards, if necessary
Submitcompletedrawings
Complete drawing is submitted to personnel following SOP.
Comments and corrections arenoted for final drawings followingSOP.
Comments and corrections areintegrated into final drawing basedon job requirements
Housekeeping procedure is
performed following SOP
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 13/17
Unit of Competency: Prepare computer-aided drawings
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Prepare toolsand materials
and set-upequipment fordrawing
Work instruction is securedfollowing standard operating
procedures (SOP) and interpretedaccording to drawing job
requirements
Drawing guidelines andparameters, materials, tools andequipment are identified based on job requirements.
Prepare toolsand materialsand set-up
equipment fordrawing
Material is selected and preparedaccording to job requirements.
System set-up procedure for
working drawing is performedfollowing job requirements
Lay-out andproducecomputer-aideddrawings anddetails
Sheet requirementaccomplishment procedure isperformed following technicaldrawing standards and symbols
Review procedure for finaldrawing is performed following jobrequirements.
Page set-up and scaling procedure
is performed based on technicaldrawing requirements and printercharacteristics.
Saving and backup procedure forfinal working drawing is performedin accordance with enterpriseprocedure.
Submitcompletedrawing
Complete drawing is submitted to personnel following SOP.
Comments and corrections arenoted for final drawings following
SOP. Comments and corrections are
integrated into final drawing basedon job requirements
Housekeeping procedure isperformed following SOP
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 14/17
Unit of Competency: Draft structural layout and details
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Plan andprepare for
work
Work instruction is securedfollowing standard operating
procedures (SOP) and interpretedaccording to structural job
requirements
Drawing tools , materials andequipment are identified based on job requirements.
Prepare andset-up toolsand materialsfor drawing
Drawing tools, materials, andequipment are selected andprepared according to jobrequirements
Set-up procedure for workingdrawing is performed following jobrequirements
Lay-outstructuraldrawings anddetails
Sheet requirement is accomplishedfollowing technical drawingstandards
Sheet requirement is reviewedbased on technical drawingstandards
Sheet requirement is re-
accomplished following technicaldrawing standards, if necessary
Submitcompletedrawings
Complete drawing is submitted to personnel following SOP.
Comments and corrections arenoted for final drawings followingSOP.
Comments and corrections areintegrated into final drawing basedon job requirements
Housekeeping procedure is
performed following SOP
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 15/17
Unit of Competency: Draft electrical and electronic layout and details
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Plan andprepare for
work
Work instruction is securedfollowing standard operating
procedures (SOP) and interpretedaccording to electrical layout
drawing job requirements
Drawing tools , materials andequipment are identified based on job requirements.
Prepare andset-up toolsand materialsfor drawing
Drawing tools, materials, andequipment are selected andprepared according to jobrequirements
Set-up procedure for workingdrawing is performed following jobrequirements
Lay-outelectricaldrawings anddetails
Sheet requirement is accomplishedfollowing technical drawingstandards and symbols
Sheet requirement is reviewedbased on technical drawingstandards and symbols
Sheet requirement is re-
accomplished following technicaldrawing standards, if necessary
Submitcompletedrawing
Complete drawing is submitted to personnel following SOP.
Comments and corrections arenoted for final drawings followingSOP.
Comments and corrections areintegrated into final drawing basedon job requirements
Housekeeping procedure isperformed following SOP
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 16/17
Unit of Competency: Draft sanitary/plumbing layout and details
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Plan andprepare for
work
Work instruction is securedfollowing standard operating
procedures (SOP) and interpretedaccording to sanitary and
plumbing layout drawing jobrequirements
Drawing tools , materials andequipment are identified based on job requirements.
. Prepare andset-up toolsand materials
for drawing
2.1 Drawing tools, materials, andequipment are selected andprepared according to job
requirements 2.2 Set-up procedure for working
drawing is performed following jobrequirements
Lay outsanitary andplumbingdetails anddrawings
Sheet requirement is accomplishedfollowing technical drawing
standards and symbols
Sheet requirement is reviewedbased on technical drawingstandards and symbols
Sheet requirement is re-accomplished following technicaldrawing standards, if necessary
Submitcompletedrawings
Complete drawing is submitted to personnel following SOP.
Comments and corrections arenoted for final drawings followingSOP.
Comments and corrections areintegrated into final drawing basedon job requirements
Housekeeping procedure isperformed following SOP
Trainee’s Signature Trainer’s Signature
8/19/2019 3_TRB Final.pdf
http://slidepdf.com/reader/full/3trb-finalpdf 17/17
Unit of Competency: Draft mechanical layout and details
NC Level II
LearningOutcome
Task/Activity RequiredDate
AccomplishedInstructorsRemarks
Plan andprepare for
work
Work instruction is securedfollowing standard operating
procedures (SOP) and interpretedaccording to mechanical layout
drawing job requirements
Drawing tools , materials andequipment are identified based on job requirements.
Prepare andset-up toolsand materialsfor drawing
Drawing tools, materials, andequipment are selected andprepared according to jobrequirements
Set-up procedure for workingdrawing is performed following jobrequirements
Lay-outmechanicaldetails anddrawings
Sheet requirement is accomplishedfollowing technical drawingstandards and symbols
Sheet requirement is reviewedbased on technical drawingstandards and symbols
Sheet requirement is re-
accomplished following technicaldrawing standards, if necessary
Submitcompletedrawings
Complete drawing is submitted to personnel following SOP.
Comments and corrections arenoted for final drawings followingSOP.
Comments and corrections areintegrated into final drawing basedon job requirements
Housekeeping procedure is
performed following SOP
Trainee’s Signature Trainer’s Signature