17
8/19/2019 3_TRB Final.pdf http://slidepdf.com/reader/full/3trb-finalpdf 1/17  Technical Education and Skills Development Authority Skills Mastery Institute TRAINEE’S RECORD BOOK  Trainee’s No.2016010024 NAME: MARIA C.REYES QUALIFICATION: TECHNICAL DRAFTING NCII  TRAINING DURATION : 222 HOURS  TRAINER: IRISH ANNE A. UBALDE I.D.

3_TRB Final.pdf

Embed Size (px)

Citation preview

Page 1: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 1/17

 Technical Education and Skills Development Authority

Skills Mastery Institute

TRAINEE’S RECORD BOOK 

 Trainee’s No.2016010024

NAME: MARIA C.REYES

QUALIFICATION: TECHNICAL DRAFTING NCII

 TRAINING DURATION : 222 HOURS

 TRAINER: IRISH ANNE A. UBALDE

I.D.

Page 2: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 2/17

Instructions:

 This Trainees’ Record Book (TRB) is intended to serve as

record of all accomplishment/task/activities while

undergoing training in the industry. It will eventually

become evidence that can be submitted for portfolio

assessment and for whatever purpose it will serve you. It is

therefore important that all its contents are viably entered by

both the trainees and instructor.

 The Trainees’ Record Book contains all the required

competencies in your chosen qualification. All you have todo is to fill in the column “Task Required” and “Date

Accomplished” with all the activities in accordance with the

training program and to be taken up in the school and with

the guidance of the instructor. The instructor will likewise

indicate his/her remarks on the “Instructors Remarks”

column regarding the outcome of the task accomplished bythe trainees. Be sure that the trainee will personally

accomplish the task and confirmed by the instructor.

It is of great importance that the content should be

written legibly on ink. Avoid any corrections or erasures and

maintain the cleanliness of this record.

 This will be collected by your trainer and submit thesame to the Vocational Instruction Supervisor (VIS) and

shall form part of the permanent trainee’s document on file. 

 THANK YOU.

Page 3: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 3/17

NOTES:

Page 4: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 4/17

Unit of Competency: Participate in workplace communication

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Obtain andconvey

workplaceinformation

  Specific and relevant information is

accessed from appropriate sources

 

Effective questioning , active listeningand speaking skills are used to gather

and convey information

  Appropriate medium is used to transfer

information and ideas

  Appropriate non- verbal communicationis used

  Appropriate lines of communication with

supervisors and colleagues are identifiedand followed

  Defined workplace procedures for the

location and storage of information areused

  Personal interaction is carried out clearlyand concisely

Completerelevant workrelateddocuments

   Team meetings are attended on time

  Own opinions are clearly expressed and

those of others are listened to withoutinterruption

  Meeting inputs are consistent with themeeting purpose and establishedprotocols

  Workplace interactions are conducted in

a courteous manner

  Questions about simple routine

workplace procedures and mattersconcerning working conditions ofemployment are asked and responded to

  Meetings outcomes are interpreted and

implemented

Participate in

workplacemeeting anddiscussion

  Range of forms relating to conditions ofemployment are completed accurately

and legibly

  Workplace data is recorded on standard

workplace forms and documents  Basic mathematical processes are used

for routine calculations

  Errors in recording information onforms/ documents are identified and

properly acted upon

  Reporting requirements to supervisor are

completed according to organizationalguidelines

 Trainee’s Signature   Trainer’s Signature 

Page 5: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 5/17

Unit of Competency: Work in a team environment

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Describe andidentify team

role andresponsibilityin a team

   The role and objective of the team isidentified from available sources of

information   Team parameters, reporting

relationships and responsibilitiesare identified from teamdiscussions and appropriateexternal sources

Describe workas a team

  Individual role and responsibilitieswithin the team environment areidentified

  Roles and responsibility of other

team members are identified andrecognized

  Reporting relationships within teamand external to team are identified

Work as ateam member

  Effective and appropriate forms ofcommunications used andinteractions undertaken with teammembers who contribute to knownteam activities and objectives

  Effective and appropriate

contributions made to complementteam activities and objectives,based on individual skills andcompetencies and workplacecontext

  Observed protocols in reportingusing standard operatingprocedures

  Contribute to the development ofteamwork plans based on anunderstanding of team’s role and

objectives and individualcompetencies of the members.

 Trainee’s Signature   Trainer’s Signature 

Page 6: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 6/17

Unit of Competency: Practice career professionalism

NC Level II 

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Integratepersonal

objectives withorganizationalgoals

  Personal growth and work plansare pursued towards improving the

qualifications set for the profession  Intra- and interpersonal

relationships is are maintained inthe course of managing oneselfbased on performance evaluation

  Commitment to the organizationand its goal is demonstrated in theperformance of duties

Set and meetwork priorities

  Competing demands are prioritizedto achieve personal, team and

organizational goals and objectives  Resources are utilized efficiently

and effectively to manage workpriorities and commitments

  Practices along economic use andmaintenance of equipment andfacilities are followed as perestablished procedures

Maintainprofessionalgrowth anddevelopment

   Training and career opportunitiesare identified and availed of based

on job requirements  Recognition is sought/received and

demonstrated as proof of careeradvancement

  Licenses and/or certificationsrelevant to job and career areobtained and renewed

 Trainee’s Signature   Trainer’s Signature

Page 7: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 7/17

Unit of Competency: Practice occupational health and safety

NC Level II 

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Identifyhazards and

risks

  Safety regulations and workplace safety

and hazard control practices and

procedures are clarified and explainedbased on organization procedures

  Hazards/risks in the workplace and

their corresponding indicators areidentified to minimize or eliminate riskto co-workers, workplace andenvironment in accordance withorganization procedures

  Contingency measures during workplace

accidents, fire and other emergenciesare recognized and established inaccordance with organization

proceduresEvaluatehazards andrisks

   Terms of maximum tolerable limits

which when exceeded will result in harmor damage are identified based onthreshold limit values (TLV)

 

Effects of the hazards are determined

  OHS issues and/or concerns and

identified safety hazards are reported todesignated personnel in accordance withworkplace requirements and relevantworkplace OHS legislation

Controlhazards andrisks

  Occupational Health and Safety (OHS)

procedures for  controlling hazards/risks in workplace

are consistently

  followed

  Procedures for dealing with workplace

accidents, fire

 

and emergencies are followed inaccordance with

  organization OHS policies

  Personal protective equipment (PPE) iscorrectly used in accordance withorganization OHS procedures andpractices

  Appropriate assistance is provided in

the event of a workplace emergency inaccordance with establishedorganization protocol

Maintainoccupationalhealth andsafetyawareness

  Emergency-related drills and trainingare participated in as per establishedorganization guidelines and procedures

  OHS personal records are completedand updated in accordance withworkplace requirements

 Trainee’s Signature   Trainer’s Signature 

Page 8: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 8/17

Unit of Competency: Perform mensuration and calculation

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Selectmeasuring

instruments

  Object or component to bemeasured is identified, classified

and interpreted according to theappropriate regular geometricshape

  Measuring tools areselected/identified as per object tobe measured or job requirements

  Correct specifications are obtainedfrom relevant sources

  Appropriate measuring instrumentsare selected according to job

requirements  Alternative measuring tools are

used without sacrificing cost andquality of work

Carry outmeasurementsandcalculation

  Accurate measurements areobtained according to jobrequirements

  Alternative measuring tools areused without sacrificing cost andquality of work

 

Calculation needed to completework tasks are performed using thefour basic process of addition (+),subtraction (-), multiplication (x)and division (/)including but notlimited to: trigonometric functions,algebraic computations

  Calculations involving fractions,percentages and mixed numbersare used to complete workplacetasks

 

Numerical computation is self-checked and corrected for accuracy

  Instruments are read to the limit ofaccuracy of the tool

  Systems of measurement identifiedand converted according to jobrequirements/ISO

  Work pieces are measuredaccording to job requirements

 Trainee’s Signature   Trainer’s Signature 

Page 9: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 9/17

Unit of Competency: Interpret technical drawings and plans

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Analyze signs,symbol and

data

  Technical plans   are obtainedaccording to job requirements

 

Signs, symbols and data areidentified according to jobspecifications

  Signs symbols and data aredetermined according toclassification or as appropriate indrawing  

Interprettechnicaldrawings and

plans

  Necessary tools, materials   andequipment are identified accordingto the plan  

 

Supplies and materials are listedaccording to specifications

  Components, assemblies or objectsare recognized as required

  Dimensions are identified asappropriate to the plan

  Specification details are matchedwith existing/available resourcesand in line with job requirements

  Work plan is drawn following the

specificationsApplyfreehandsketching

  Where applicable, correct freehandsketching is produced in accordancewith the job requirements

 Trainee’s Signature   Trainer’s Signature 

Page 10: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 10/17

Unit of Competency: Apply quality standards

NC Level II 

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Assess qualityof received

materials

  Received materials or component parts   are checked based on

material specifications  Defective   material or components

are identified and

  isolated following standardoperating procedures

  Defective materials or componentsare replaced in

  accordance with workplaceprocedures.

Assess own

work

  Documents   relative to quality  

within the company is identifiedand used

  Completed work is checkedbased on workplace standards

relevant to the task undertaken

  In cases of deviations from specifiedquality standards,

  causes are documented andreported in accordance with

  the workplace’ standards operating

proceduresEngage inquality

  Process improvement proceduresare participated in

  relation to workplace assignment

  Work is carried out in accordancewith process

  improvement procedures

  Performance of operation or qualityof product or service is

  monitored in accordance tocustomer  satisfaction

 Trainee’s Signature   Trainer’s Signature 

Page 11: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 11/17

Unit of Competency: Operate personal computer

NC Level II 

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Start thecomputer

   The  peripheral devices   are properly

connected

 

Power is checked and the computer  

and peripheral devices are switched on

  Proper logging in and logging off issuccessfully done

 

 The operating system   features andfunctions are accessed and navigated

 

Hardware configuration and othersystem features  are checked

Arrange andcustomizedesktop

display/window setting

   The desktop screen or Windowselements are changed as needed

 

Desktop icons are added, renamed,moved, copied or deleted

 

 The online help functions  are accessedor used as needed

  Desktop icons of application programs  

are selected, opened and closed  Properties of icons are displayed

  Computer or desktop settings are savedand restored

Work with filesand folders

  A file or folder is created, opened,

moved, renamed or copied

  Files are located, deleted and restored

  Details and properties of files and

folders are displayed or viewed  Various files   are organized for easy

lookup and use

  Files and information are searched

 

Disks  are checked, erased or formattedas necessary

Work withuserapplicationprogram

 

Application program s  are added,changed, removed or ran

  User software or application program

are installed, updated and upgraded

 

Information/data are moved betweendocuments or files

Printinformation

 

Printer is added or installed and correct printer settings  is ensured

  Default printer is assigned accordingly

  Information or document is printed onthe installed printer

  Progress of print jobs are viewed and

deleted as required

Shutdowncomputer

  All open application programs are closed

  Computer and peripheral devices are

properly shut down

 Trainee’s Signature   Trainer’s Signature 

Page 12: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 12/17

Unit of Competency: Draft architectural layout and details

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Plan andprepare for

work

  Work instruction is securedfollowing standard operating

procedures (SOP) and interpretedaccording to architectural job

requirements  

  Drawing tools , materials   andequipment are identified based on job requirements.

Prepare andset-up toolsand materialsfor drawing

  Drawing tools, materials, andequipment are selected andprepared according to jobrequirements

 

Set-up procedure   for workingdrawing is performed following jobrequirements

Lay-outarchitecturaldrawings anddetails

  Sheet requirement is accomplishedfollowing technical drawingstandards

  Sheet requirement is reviewedbased on technical drawingstandards

  Sheet requirement is revised

following technical drawingstandards, if necessary

Submitcompletedrawings

  Complete drawing is submitted to personnel  following SOP.

  Comments and corrections arenoted for final drawings followingSOP.

  Comments and corrections areintegrated into final drawing basedon job requirements

  Housekeeping procedure   is

performed following SOP

 Trainee’s Signature   Trainer’s Signature 

Page 13: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 13/17

Unit of Competency: Prepare computer-aided drawings

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Prepare toolsand materials

and set-upequipment fordrawing

  Work instruction is securedfollowing standard operating

procedures (SOP) and interpretedaccording to drawing job

requirements  

  Drawing guidelines andparameters, materials, tools   andequipment   are identified based on job requirements.

Prepare toolsand materialsand set-up

equipment fordrawing

  Material is selected and preparedaccording to job requirements.

  System set-up procedure for

working drawing is performedfollowing job requirements

Lay-out andproducecomputer-aideddrawings anddetails

  Sheet requirementaccomplishment procedure   isperformed following technicaldrawing standards and symbols

  Review procedure   for finaldrawing is performed following jobrequirements.

  Page set-up and scaling procedure

is performed based on technicaldrawing requirements and printercharacteristics.

  Saving and backup procedure forfinal working drawing is performedin accordance with enterpriseprocedure.

Submitcompletedrawing

  Complete drawing is submitted to personnel  following SOP.

  Comments and corrections arenoted for final drawings following

SOP.  Comments and corrections are

integrated into final drawing basedon job requirements

  Housekeeping procedure   isperformed following SOP

 Trainee’s Signature   Trainer’s Signature 

Page 14: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 14/17

Unit of Competency: Draft structural layout and details

NC Level II 

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Plan andprepare for

work

  Work instruction is securedfollowing standard operating

procedures (SOP) and interpretedaccording to structural job

requirements  

  Drawing tools , materials   andequipment are identified based on job requirements.

Prepare andset-up toolsand materialsfor drawing

  Drawing tools, materials, andequipment are selected andprepared according to jobrequirements

 

Set-up procedure   for workingdrawing is performed following jobrequirements

Lay-outstructuraldrawings anddetails

  Sheet requirement is accomplishedfollowing technical drawingstandards

  Sheet requirement is reviewedbased on technical drawingstandards

  Sheet requirement is re-

accomplished following technicaldrawing standards, if necessary

Submitcompletedrawings

  Complete drawing is submitted to personnel  following SOP.

  Comments and corrections arenoted for final drawings followingSOP.

  Comments and corrections areintegrated into final drawing basedon job requirements

  Housekeeping procedure   is

performed following SOP

 Trainee’s Signature   Trainer’s Signature 

Page 15: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 15/17

Unit of Competency: Draft electrical and electronic layout and details

NC Level II 

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Plan andprepare for

work

  Work instruction is securedfollowing standard operating

procedures (SOP) and interpretedaccording to electrical layout

drawing job requirements

  Drawing tools , materials   andequipment are identified based on job requirements.

Prepare andset-up toolsand materialsfor drawing

  Drawing tools, materials, andequipment are selected andprepared according to jobrequirements

 

Set-up procedure   for workingdrawing is performed following jobrequirements

Lay-outelectricaldrawings anddetails

  Sheet requirement is accomplishedfollowing technical drawingstandards and symbols

  Sheet requirement is reviewedbased on technical drawingstandards and symbols

  Sheet requirement is re-

accomplished following technicaldrawing standards, if necessary

Submitcompletedrawing

  Complete drawing is submitted to personnel  following SOP.

  Comments and corrections arenoted for final drawings followingSOP.

  Comments and corrections areintegrated into final drawing basedon job requirements

 

Housekeeping procedure   isperformed following SOP

 Trainee’s Signature   Trainer’s Signature 

Page 16: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 16/17

Unit of Competency: Draft sanitary/plumbing layout and details

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Plan andprepare for

work

  Work instruction is securedfollowing standard operating

procedures (SOP) and interpretedaccording to sanitary and

 plumbing layout drawing jobrequirements  

  Drawing tools , materials   andequipment are identified based on job requirements.

. Prepare andset-up toolsand materials

for drawing

  2.1 Drawing tools, materials, andequipment are selected andprepared according to job

requirements  2.2 Set-up procedure   for working

drawing is performed following jobrequirements

Lay outsanitary andplumbingdetails anddrawings

  Sheet requirement is accomplishedfollowing technical drawing

standards and symbols

  Sheet requirement is reviewedbased on technical drawingstandards and symbols

 

Sheet requirement is re-accomplished following technicaldrawing standards, if necessary

Submitcompletedrawings

  Complete drawing is submitted to personnel  following SOP.

  Comments and corrections arenoted for final drawings followingSOP.

  Comments and corrections areintegrated into final drawing basedon job requirements

 

Housekeeping procedure   isperformed following SOP

 Trainee’s Signature   Trainer’s Signature 

Page 17: 3_TRB Final.pdf

8/19/2019 3_TRB Final.pdf

http://slidepdf.com/reader/full/3trb-finalpdf 17/17

Unit of Competency: Draft mechanical layout and details

NC Level II

LearningOutcome

 Task/Activity RequiredDate

AccomplishedInstructorsRemarks

Plan andprepare for

work

  Work instruction is securedfollowing standard operating

procedures (SOP) and interpretedaccording to mechanical layout

drawing job requirements  

  Drawing tools , materials   andequipment are identified based on job requirements.

Prepare andset-up toolsand materialsfor drawing

  Drawing tools, materials, andequipment are selected andprepared according to jobrequirements

 

Set-up procedure   for workingdrawing is performed following jobrequirements

Lay-outmechanicaldetails anddrawings

  Sheet requirement is accomplishedfollowing technical drawingstandards and symbols

  Sheet requirement is reviewedbased on technical drawingstandards and symbols

  Sheet requirement is re-

accomplished following technicaldrawing standards, if necessary

Submitcompletedrawings

  Complete drawing is submitted to personnel  following SOP.

  Comments and corrections arenoted for final drawings followingSOP.

  Comments and corrections areintegrated into final drawing basedon job requirements

  Housekeeping procedure   is

performed following SOP

 Trainee’s Signature   Trainer’s Signature