3rd Avenue and 5th Avenue North

PUBLIC MEETINGJuly 30, 2020

Page 2: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

Spanish Language Line

Dial: 602-534-1000

Enter: 63519 and press #

Page 3: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

PANEL MEMBERSCity of Phoenix Kini Knudson, Street Transportation Director

Briiana Velez, Assistant Street Transportation Director

Mario Brown, Special Projects Administrator

Carl Langford, Traffic Operations Engineering Supervisor

Chris Manno, Project Manager

WSP USA, Inc. Sam Grombacher, Project Manager

Page 4: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

WELCOME

Street Transportation Director,

Kini Knudson

Page 5: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

MEETING AGENDA

• Project Scope • Project Goals• Project Background• Proposed Design Concepts• Input on Design Elements• Updated Schedule

Page 6: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

PROJECT SCOPE • Pedestrian and Bicycle Improvements

• 3rd Avenue: McDowell Road to Muhammad Ali Way

• 5th Avenue: McDowell Road to Thomas Road

Page 7: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

PROJECT GOALS• Install protected bicycle facilities• Assess and implement sidewalk

connectivity• Upgrade curb ramps at intersections• Improve local drainage conditions• Upgrade traffic signals at Thomas Road

and McDowell Road• Update street lighting to current standards

Page 8: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

PROJECT BACKGROUND

• November 2019: Public Open-House o Asked for input on one-lane and two-lane design concepts

• Early 2020: Concept designo One-lane and two-laneo Feasibility study

• Additional traffic analysis• Bicycle conflict at 3rd Avenue and Encanto Boulevard• Result: One lane with two lane flare at signalized intersections

Page 9: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

3RD AVE – DESIGN CONCEPT• Connect to 3rd Avenue (south of

McDowell Road)• Connect to existing crosswalk at

Muhammad Ali Way• Multi-use path OR two-way cycle

track• All-Way STOP at Encanto Boulevard• Traffic signal upgrades• On-street parking

Page 10: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

Multi-Use Path• Physically separated from

driving lanes using horizontal and/or vertical protection

• Used by cyclists and pedestrians

• Two-way travel

MULTI-USE PATH (3RD AVENUE)

Page 11: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

Two-Way Cycle Track• Bicycles only (two-way travel)• Physically separated from driving

lanes using horizontal and/or vertical protection

• Physically separated from sidewalk/pedestrian traffic

TWO-WAY CYCLE TRACK (3RD AVENUE)

Page 12: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

3RD AVENUE / ENCANTO BOULEVARDOption 1 – Straight Traffic Flow

Page 13: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

3RD AVENUE / ENCANTO BOULEVARD Option 2 - Curved Traffic Flow

Page 14: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

3RD AVENUE / ENCANTO BOULEVARD Summary

Design Element Option 1: Straight Traffic Flow

Option 2: Curved Traffic Flow

Intersection Traditional Non-traditionalCrosswalks At intersection Set backCurbing Modifications Moderate Minor

Landscape Modifications Moderate Minor

Vehicle Buffer Constant width Reduced near intersection

On-street Parking Restriction

Cypress to Vernon Cypress to Vernon

Page 15: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

5TH AVE – DESIGN CONCEPT• Connect to 5th Avenue (south of

McDowell Road)• Southbound bike lane with

pedestrian access• Horizontal and/or vertical

protection• Traffic signal upgrades• Relocation of GRID bike station

near McDowell Road• On-street parking

Page 16: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

5TH AVE – TYPICAL SECTION

Page 17: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

PROJECT SCHEDULE

•Next Public Meeting – Early 2021

•Design Completion – Summer 2021

•Start of Construction - TBD

Page 18: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

YOUR INPUT IS IMPORTANT

Complete the Project Survey at:

phoenix.gov/streets/3rdand5thavenuesnorth

Survey open through Friday, August 14, 2020

Provide Input on:

• Satisfaction with proposed design concepts• Multi-Use Path OR Two-Way Cycle Track• All-Way STOP Design at 3rd Ave and Encanto

Page 19: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

QUESTIONS?

Page 20: 3rd Avenue and 5th Avenue North - Phoenix, Arizona · 30.07.2020  · PowerPoint Presentation Author: Katy Konik Created Date: 7/31/2020 4:27:01 PM

CLOSING REMARKS

Thank you for participating!

Complete the Project Survey at: phoenix.gov/streets/3rdand5thavenuesnorth

Survey open through Friday, August 14, 2020