    Site ID: Dated:

    Site Name: Auditor:

    Subcon: PTID

    Audit

    ResultScore Resp.

    OK /

    NG

    Subcon/

    NSN

    2-5103

    5013 Si te clear of any hazardous substances (or under cont ro lled storage) 2

    5102Personal Protective Equipment "PPE" (helmet, harness, etc.) on siteand used when necessary 1

    5501-5602

    5501 Site Folder on site 4

    5509 Site integration checklist completed 4

    5510 Commissioning tests passed according to specification 2

    5513 All microw ave installation data entered into the site folder 3

    5514

    All microwave commi ssioning data and results entered into the site

    folder and all tests passed 3

    5602

    No visible damage to im plementation equ ipment (e.g. scratch, broken

    part) 3

    1-6021

    6001 Cabinet installed according to specifications 2

    6002 Cover doors and locks properly adjusted 3

    6003 Cable entry kits / bridging kits and sealing installed correctly 3

    6006 Plinth air guide installation done correct ly 3

    6012

    Int ernal Plug-in unit / Modules installed correctly and to Project /

    customer configuration 2

    6018 Spare mater ial l ef t on si te acco rd ing to requi remen t/ speci fi cat ion 4

    6019 wrist straps used correctly 2

    6021 Site clean and tidy 4

    1-6113

    6101 Internal cables installed correctly 2

    6102

    Cabinet (and all it s elements) grounding done correctly (cable,

    position, stops washer, etc) 2

    6103 AC/ DCsupply pow er cables inst alled according to specificat ion 1

    6104 External alarms cabling done correctly 2

    6108 Unused and used connectors are covered whit IP seals 2

    6109 Cab les between BTS modules are rou ted via co rrect cab le en tr ies 3

    6110 Flexi WCDMA BTS modules are grounded to the plinth 26111 Cable ties installed properly (no sharp or jagged edges) 4

    6112 Spare cable securely t ied and labeled as such. 36113 All connector t ight ened according to specification 2

    3-6507

    6503 Labeling done according to specifications 4

    6504 Alarm panel installed correctly(External) 2

    6505 DDF rack installed correctly 1

    6506 DDF module installed correct ly 16507 DDF is grounded to the grounding busbar 2

    1-6560

    6551 Cables preparat ions (str ipping cutt ing ...) according to specif icat ions 2

    6552 Cables labeled correct ly 3

    6554 Connectors labeled correctly 36555 Cable installed over specified route 4

    6557 Connections done correctly according to specifications 2

    6559 Cabling done correctly according to specifications 26560 Grounding cable done correct ly according to specificat ions 2

    5-6708

    6615 OVP instal led co rrect ly 2

    6701 Correct antenna types on each sector 2

    6703 Ti lt ing (mechanical &/or elect rical ) done accord ing to speci ficat ions 3

    6704 Antennas orientation according to specification 2

    6705 Antennas properly mounted and secured 2

    6708 Equipment painted accord ing to local requi rement and speci ficat ions 4

    1-6760

    INSTALLATION(ANTENNA)

    INSTALLATION(CABINET)

    CABLING(INTERNALLY)

    INSTALLATION (DDF/ALARM)

    CABLING (DDF/ALARM)

    Site Quality Checklist for 3G Telecom Implementation

    DOCUMENTATI ON

    m

    mber

    Rectified

    DateRemarksDescription

    Severity

    Level

    HEALTH & SAFETY GENERAL

    CABLING(ANTENNA LINE)

    Page 1 of 2

  • 8/3/2019 3g Quality Checklist Ti Ver-001

    2/2

    6751 Jumper installed correctly 3

    6752 Feeder and/ or jum pers inst alled correct ly t hrough cable ent ry 3

    6753 Feeder and/or jumpers labeled correctly 4

    6754 Connectors installed and tightened correct ly 2

    6755 EMPs properly installed and grounded 2

    6756 All connectors tightened to specified torque setting 2

    6757 Waterproof on connectors according to specifications 3

    6758 Ground ing k it s number and posi ti on ing acco rd ing to speci fi cat ions 36759 Grounding kits installed according to specificat ion 2

    6760 Feeder installed correctly (bending, clamps, radius, etc) 2

    1-6802

    6801

    Measured Comm issionin g results & parameters are w ith in specified

    range 26802 Measures executed with cal ibrated instruments 2

    1-7003

    7001 Rack(s) installed at specified position 3

    7002 Rack(s) secured correct ly 37003 Rack(s) grounded correct ly 2

    1-7204

    7201 Indoor Unit installed at specified position 3

    7202 Indoor Unit grounded correctly 2

    7203 Indoor Unit power connection correct 27204 Indoor Un it l abeled co rrect ly 4

    1-7311

    7301Installation done like shown in the documentation (pole, direction,height,) 3

    7302

    Alignment unit and antenna are installed properly and screws are

    t ightened 2

    7303 Antenna polarization according to specifications 1

    7304

    Coupler & Waveguide is properly m ounted (Separate antenna or HSB

    configurat ion) 2

    7305 The serial number of the antenna is recorded 3

    7306

    OU is installed p roperly (screws are tightened, sealing is in right

    position, ...) 2

    7307 Enough space left for removing Outdoor Unit 4

    7308 OU is grounded properly 2

    7309 Outdoor Unit labeled according to specifications 4

    7310

    Installation according to planning data (frequency, polarization, signa

    etc) 1

    7311 Equipment painted accord ing to local requi rement and speci ficat ions 4

    1-7510

    7501 Cables properly installed 2

    7502 All connectors tightened properly 2

    7503 Q1 bus cable properly installed 3

    7504

    Indoor Unit to Outdoor Unit cables grounding kits properly installed

    and waterproofed (including quantity & position) 2

    7506 Cables entry glands sealing done properly 3

    7507 Cables labeled according to specificat ions 4

    7508 OU connector is sealed according to specifications 27509 External PAM cables installed correctly and tested 27510 External Fiber Op ti c cab les i nstal led co rrect ly, cl eaned and tested 2

    CABLING betw een ODU & IDU

    INSTALLATION(TRANSMISSION RACK)

    INSTALLATION I NDOOR UNIT (FIU/ SDH/MUX)

    INSTALLATION(ODU/MW )

    COMMISSIONING

    Page 2 of 2