    AASHTOflexiblepavementdesign

  • 7/29/2019 3.Flexible Pavement

    2/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    3/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    4/56

    Relatedto

    Roughness Rutdepth

  • 7/29/2019 3.Flexible Pavement

    5/56

    Cracking Patching

  • 7/29/2019 3.Flexible Pavement

    6/56

    0 5

    PresentServiceabilityIndex

    Poor Excellent

  • 7/29/2019 3.Flexible Pavement

    7/56

    Initial(pi) brandnew

    Termina pt e oreresur acingreconstruction

    ecommen e va ue

    Initial 4.2or4.5

    Terminal 2.5

    or

    3.0

  • 7/29/2019 3.Flexible Pavement

    8/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    9/56

    .

  • 7/29/2019 3.Flexible Pavement

    10/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    11/56

    D

    r

    r

  • 7/29/2019 3.Flexible Pavement

    12/56

    ForfinegrainsoilswithCBRof10orless

    2

    r

  • 7/29/2019 3.Flexible Pavement

    13/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    14/56

    Thicknessofeachlayercanbereducedifmateria strengt isa ovet eminimumva ue

  • 7/29/2019 3.Flexible Pavement

    15/56

    Thicknessof

    surface

    (1),

    base

    (2),

    and

    subbase (3)

    SN DaDaDa

    Strengt

    coe c ento

    sur ace

    1 ,

    ase

    2 ,

    an

    subbase (3)

  • 7/29/2019 3.Flexible Pavement

    16/56

  • 7/29/2019 3.Flexible Pavement

    17/56

  • 7/29/2019 3.Flexible Pavement

    18/56

  • 7/29/2019 3.Flexible Pavement

    19/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    20/56

    affectedby

    empera ure a n a

  • 7/29/2019 3.Flexible Pavement

    21/56

    erma

    s ress

    Creepproperties

    Freezing/thawing

    Watergets

    layers

  • 7/29/2019 3.Flexible Pavement

    22/56

    Resilientmodulusof

    roadbedvarieswith

    time

    season

  • 7/29/2019 3.Flexible Pavement

    23/56

  • 7/29/2019 3.Flexible Pavement

    24/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    25/56

    Incorporatingafactor

    for

    the

    base

    and

    su ase coe c en

    Modification

    to

    SN

    332211SN DaDaDa

    33322211

    SN mDamDaDa

  • 7/29/2019 3.Flexible Pavement

    26/56

    Quality of Drainage Water removed within*

    Excellent 2 hours

    Fair 1 week

    oor mon

    Very Poor (water will not drain)

    *Timerequiredtodrainthebaselayerto50%

    sa ura on.

  • 7/29/2019 3.Flexible Pavement

    27/56

    Quality of

    Percent of Time Pavement Structure is Exposed to MoistureLevels Approaching Saturation

    Drainage

    Less than 1% 1 5% 5 25%

    Greater than

    25%

    . . . . . . .

    Good 1.35 1.25 1.25 1.15 1.15 1.00 1.00

    Fair 1.25 1.15 1.15 1.05 1.00 0.80 0.80

    Poor 1.15 1.05 1.05 0.80 0.80 0.60 0.60

    Very Poor 1.05 0.95 0.95 0.75 0.75 0.40 0.40

  • 7/29/2019 3.Flexible Pavement

    28/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability

    Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    29/56

    performedsatisfactorily

    during

    the

    design

    .

    99%reliability=99%chanceforsuccessful

  • 7/29/2019 3.Flexible Pavement

    30/56

    FunctionalClassification

    ecommen e eve o e a y

    Interstate and 85 99.9 80 99.9

    Principal 80 - 99 75 95

    Collectors 80 - 95 75 95

    Local 50 - 80 50 - 80

  • 7/29/2019 3.Flexible Pavement

    31/56

    ZR =standard

    normal

    variate

    0

    ( )

  • 7/29/2019 3.Flexible Pavement

    32/56

    Reliability(R%) ZR

    50 0.000

    60 0.253

    70 0.524

    800.841

    .

    95 1.645

    .

    97 1.881

    .

    99 2.327

    . .

    99.993.750

  • 7/29/2019 3.Flexible Pavement

    33/56

    99%oftheareaundercurve

    ZR =2.327

  • 7/29/2019 3.Flexible Pavement

    34/56

    Trafficforecast

    Flexiblepavement 0.40 0.50

    Rigidpavement 0.30 0.40

  • 7/29/2019 3.Flexible Pavement

    35/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    36/56

    numberand

    the

    thickness

    of

    each

    layer

    ,

  • 7/29/2019 3.Flexible Pavement

    37/56

    MR =5000psiPSI=1.9

    X103

    95%reliability

    =

    5

    x

    106

    ESAL SN

    =

    5.0

  • 7/29/2019 3.Flexible Pavement

    38/56

    ra c, sp a oncre e ggrega e ase

    Less than 50,000 1.0 (or surface 4

    50,001 150,000 2.0 4

    150,001 500,000 2.5 4

    500 001 2 000 000 3.0 6

    2,000,001 7,000,000 3.5 6

    Greater than 7,000,000 4.0 6

  • 7/29/2019 3.Flexible Pavement

    39/56

    Pavementperformance

    Traffic

    Subgrade material

    Materialof

    construction

    Environment

    Drainage

    Reliability Designmethod

    Example

  • 7/29/2019 3.Flexible Pavement

    40/56

    Determineasuitableflexiblepavementstructureforan

    2x106.

    It

    is

    estimated

    that

    it

    takes

    about

    aweek

    for

    water

    tobedrainedfromwithinthe avementandthe avement

    structurewillbeexposedtomoisturelevelsapproaching

    saturationfor

    30%

    of

    the

    time.

    The

    following

    additional

    informationisavailable.

    2 ,

    CBRvalue

    of

    base

    course

    material

    =100,

    Mr =31,000lb/in

    2

    CBRvalueofsubbase coursematerial=22,Mr =13,500lb/in2

    CBRvalueofsubgrade coursematerial=6

  • 7/29/2019 3.Flexible Pavement

    41/56

    =

    Standarddeviation

    (S0)

    =0.45

    (0.4

    0.5

    for

    Initialserviceabilityindex(p

    i)=4.5

    Terminalserviceabilityindex(pt)=2.5

  • 7/29/2019 3.Flexible Pavement

    42/56

    =

    Standarddeviation

    (S0)

    =0.45

    (0.4

    0.5

    for

    Trafficload=2x106 ESALs

    MR ofsubgrade =1500x6=9000psi(forfinegrainsoilswithCBRof10orless)

    PSI=pt pi =

    4.5

    2.5

    =2.0

  • 7/29/2019 3.Flexible Pavement

    43/56

    MR =9000psiPSI=2.0

    X103

    99%reliability

    =

    2

    x

    106

    ESALSN=4.1

    SN mDamDaDa

  • 7/29/2019 3.Flexible Pavement

    44/56

    33322211SN mDamDaDa

    Itis

    estimated

    that

    it

    takes

    about

    aweek

    for

    water

    to

    be

    drainedfromwithinthepavementandthepavement

    saturationfor

    30%

    of

    the

    time.

    Quality of DrainageWater removed

    *

    Excellent 2 hours

    Good 1 day

    Fair 1 weekoor mon

    Very Poor (water will not drain)

    Quality ofDraina e

    Percent of Time Pavement Structure is Exposed to MoistureLevels Approaching Saturation

    m=0.80

    Less than 1% 1 5% 5 25%

    25%

    Excellent 1.40 1.35 1.35 1.30 1.30 1.20 1.20

    Good 1.35 1.25 1.25 1.15 1.15 1.00 1.00

    Fair 1.25 1.15 1.15 1.05 1.00 0.80 0.80

    Poor 1.15 1.05 1.05 0.80 0.80 0.60 0.60

    Very Poor 1.05 0.95 0.95 0.75 0.75 0.40 0.40

  • 7/29/2019 3.Flexible Pavement

    45/56

    33322211SN mDamDaDa

    Finda1,a2,anda3fromcharts

  • 7/29/2019 3.Flexible Pavement

    46/56

    .

    Resilientmodulus

    of

    asphalt

    concrete

    at

    68

    F=450,000

    lb/in

    2

  • 7/29/2019 3.Flexible Pavement

    47/56

    CBRvalueofbasecoursematerial=100 M =31 000lb in2

  • 7/29/2019 3.Flexible Pavement

    48/56

    CBRvalueofsubbase coursematerial=22,Mr =13,500lb/in2

  • 7/29/2019 3.Flexible Pavement

    49/56

    ..

    . . . . .. . .. .

    . ..

    D2

    1

    SN2

    SN1 . . . . . . . . .. . . .

    SN3

    Subbase Course D3

    RoadbedCourse

    111SN Da

    222112SN mDaDa

    333222113 = .

    UsecharttofindSN2 ChangeMR totheoneofsubbase

  • 7/29/2019 3.Flexible Pavement

    50/56

    2

    MR =13,500psiPSI=2.0

    X103

    99%reliability

    =

    2

    x

    10

    6

    ESALSN

    2=3.6

    UsecharttofindSN1 ChangeMR totheoneofbase

  • 7/29/2019 3.Flexible Pavement

    51/56

    1

    MR =31,000psiPSI=2.0

    X103

    99%reliability

    =

    2

    x

    10

    6

    ESALSN

    1=2.7

    SN D

    Values

    SN1 2 7

  • 7/29/2019 3.Flexible Pavement

    52/56

    SN1 =a1D1SN1 2.7

    2.7=0.44xD1SN3 4.1

    a1 0.44

    D1 =6.13

    in

    a2 0.14

    a3 0.10

    Roundedupto6.5in

    (usually

    rounded

    up

    to

    the

    nearest

    0.5

    in)SN1*=0.44x6.5=2.86

    * .

    Values

    SN1 2 7

  • 7/29/2019 3.Flexible Pavement

    53/56

    SN1 2.7

    SN2 =SN1*+a2D2m2SN3 4.1

    a1 0.44

    3.6=2.86

    +(0.14

    xD2 x

    0.80)

    a2 0.14

    a3 0.10

    D2 =6.61in

    Roundedupto7.0in

    SN2*=2.86

    +(0.14

    x7.0

    x0.80)

    =3.644

    Values

    SN1 2 7

  • 7/29/2019 3.Flexible Pavement

    54/56

    SN1 2.7

    SN3 =SN2*+a3D3m3SN3 4.1

    a1 0.44

    4.1=3.644

    +(0.10

    xD3 x

    0.80)

    a2 0.14

    a3 0.10

    D3 =5.7in

    Roundedupto6.0in

    SN3*=3.644

    +(0.10

    x6.0

    x0.80)

    =4.124

    ShouldbeclosedtotheSNthatyougotatthebeginning

  • 7/29/2019 3.Flexible Pavement

    55/56

    Therefore,thepavementconsistsof

    .

    7in

    of

    granular

    base

    Th ffi h d i l f d f l l i

  • 7/29/2019 3.Flexible Pavement

    56/56

    Thetrafficonthedesignlaneofaproposedfourlaneruralinterstate

    g waycons sts

    o

    truc s.

    c ass cat on

    stu es

    ave

    s own

    thatthetruckfactorcanbetakenas0.45,designasuitableflexible

    pavementiftheAADTonthedesignlaneduringthefirstyearof

    operationis1,000andpi =4.2.

    Designlife=20years

    Reliability

    level

    =

    95%Standarddeviation=0.45

    pt =2.5

    Thepavement

    structure

    will

    be

    exposed

    to

    moisture

    levels

    approachingsaturation20%ofthetimeanditwilltakeabout1week

    . , , ,