AASHTOflexiblepavementdesign
7/29/2019 3.Flexible Pavement
2/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
3/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
4/56
Relatedto
Roughness Rutdepth
7/29/2019 3.Flexible Pavement
5/56
Cracking Patching
7/29/2019 3.Flexible Pavement
6/56
0 5
PresentServiceabilityIndex
Poor Excellent
7/29/2019 3.Flexible Pavement
7/56
Initial(pi) brandnew
Termina pt e oreresur acingreconstruction
ecommen e va ue
Initial 4.2or4.5
Terminal 2.5
or
3.0
7/29/2019 3.Flexible Pavement
8/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
9/56
.
7/29/2019 3.Flexible Pavement
10/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
11/56
D
r
r
7/29/2019 3.Flexible Pavement
12/56
ForfinegrainsoilswithCBRof10orless
2
r
7/29/2019 3.Flexible Pavement
13/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
14/56
Thicknessofeachlayercanbereducedifmateria strengt isa ovet eminimumva ue
7/29/2019 3.Flexible Pavement
15/56
Thicknessof
surface
(1),
base
(2),
and
subbase (3)
SN DaDaDa
Strengt
coe c ento
sur ace
1 ,
ase
2 ,
an
subbase (3)
7/29/2019 3.Flexible Pavement
16/56
7/29/2019 3.Flexible Pavement
17/56
7/29/2019 3.Flexible Pavement
18/56
7/29/2019 3.Flexible Pavement
19/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
20/56
affectedby
empera ure a n a
7/29/2019 3.Flexible Pavement
21/56
erma
s ress
Creepproperties
Freezing/thawing
Watergets
layers
7/29/2019 3.Flexible Pavement
22/56
Resilientmodulusof
roadbedvarieswith
time
season
7/29/2019 3.Flexible Pavement
23/56
7/29/2019 3.Flexible Pavement
24/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
25/56
Incorporatingafactor
for
the
base
and
su ase coe c en
Modification
to
SN
332211SN DaDaDa
33322211
SN mDamDaDa
7/29/2019 3.Flexible Pavement
26/56
Quality of Drainage Water removed within*
Excellent 2 hours
Fair 1 week
oor mon
Very Poor (water will not drain)
*Timerequiredtodrainthebaselayerto50%
sa ura on.
7/29/2019 3.Flexible Pavement
27/56
Quality of
Percent of Time Pavement Structure is Exposed to MoistureLevels Approaching Saturation
Drainage
Less than 1% 1 5% 5 25%
Greater than
25%
. . . . . . .
Good 1.35 1.25 1.25 1.15 1.15 1.00 1.00
Fair 1.25 1.15 1.15 1.05 1.00 0.80 0.80
Poor 1.15 1.05 1.05 0.80 0.80 0.60 0.60
Very Poor 1.05 0.95 0.95 0.75 0.75 0.40 0.40
7/29/2019 3.Flexible Pavement
28/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability
Designmethod
Example
7/29/2019 3.Flexible Pavement
29/56
performedsatisfactorily
during
the
design
.
99%reliability=99%chanceforsuccessful
7/29/2019 3.Flexible Pavement
30/56
FunctionalClassification
ecommen e eve o e a y
Interstate and 85 99.9 80 99.9
Principal 80 - 99 75 95
Collectors 80 - 95 75 95
Local 50 - 80 50 - 80
7/29/2019 3.Flexible Pavement
31/56
ZR =standard
normal
variate
0
( )
7/29/2019 3.Flexible Pavement
32/56
Reliability(R%) ZR
50 0.000
60 0.253
70 0.524
800.841
.
95 1.645
.
97 1.881
.
99 2.327
. .
99.993.750
7/29/2019 3.Flexible Pavement
33/56
99%oftheareaundercurve
ZR =2.327
7/29/2019 3.Flexible Pavement
34/56
Trafficforecast
Flexiblepavement 0.40 0.50
Rigidpavement 0.30 0.40
7/29/2019 3.Flexible Pavement
35/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability Designmethod
Example
7/29/2019 3.Flexible Pavement
36/56
numberand
the
thickness
of
each
layer
,
7/29/2019 3.Flexible Pavement
37/56
MR =5000psiPSI=1.9
X103
95%reliability
=
5
x
106
ESAL SN
=
5.0
7/29/2019 3.Flexible Pavement
38/56
ra c, sp a oncre e ggrega e ase
Less than 50,000 1.0 (or surface 4
50,001 150,000 2.0 4
150,001 500,000 2.5 4
500 001 2 000 000 3.0 6
2,000,001 7,000,000 3.5 6
Greater than 7,000,000 4.0 6
7/29/2019 3.Flexible Pavement
39/56
Pavementperformance
Traffic
Subgrade material
Materialof
construction
Environment
Drainage
Reliability Designmethod
Example
7/29/2019 3.Flexible Pavement
40/56
Determineasuitableflexiblepavementstructureforan
2x106.
It
is
estimated
that
it
takes
about
aweek
for
water
tobedrainedfromwithinthe avementandthe avement
structurewillbeexposedtomoisturelevelsapproaching
saturationfor
30%
of
the
time.
The
following
additional
informationisavailable.
2 ,
CBRvalue
of
base
course
material
=100,
Mr =31,000lb/in
2
CBRvalueofsubbase coursematerial=22,Mr =13,500lb/in2
CBRvalueofsubgrade coursematerial=6
7/29/2019 3.Flexible Pavement
41/56
=
Standarddeviation
(S0)
=0.45
(0.4
0.5
for
Initialserviceabilityindex(p
i)=4.5
Terminalserviceabilityindex(pt)=2.5
7/29/2019 3.Flexible Pavement
42/56
=
Standarddeviation
(S0)
=0.45
(0.4
0.5
for
Trafficload=2x106 ESALs
MR ofsubgrade =1500x6=9000psi(forfinegrainsoilswithCBRof10orless)
PSI=pt pi =
4.5
2.5
=2.0
7/29/2019 3.Flexible Pavement
43/56
MR =9000psiPSI=2.0
X103
99%reliability
=
2
x
106
ESALSN=4.1
SN mDamDaDa
7/29/2019 3.Flexible Pavement
44/56
33322211SN mDamDaDa
Itis
estimated
that
it
takes
about
aweek
for
water
to
be
drainedfromwithinthepavementandthepavement
saturationfor
30%
of
the
time.
Quality of DrainageWater removed
*
Excellent 2 hours
Good 1 day
Fair 1 weekoor mon
Very Poor (water will not drain)
Quality ofDraina e
Percent of Time Pavement Structure is Exposed to MoistureLevels Approaching Saturation
m=0.80
Less than 1% 1 5% 5 25%
25%
Excellent 1.40 1.35 1.35 1.30 1.30 1.20 1.20
Good 1.35 1.25 1.25 1.15 1.15 1.00 1.00
Fair 1.25 1.15 1.15 1.05 1.00 0.80 0.80
Poor 1.15 1.05 1.05 0.80 0.80 0.60 0.60
Very Poor 1.05 0.95 0.95 0.75 0.75 0.40 0.40
7/29/2019 3.Flexible Pavement
45/56
33322211SN mDamDaDa
Finda1,a2,anda3fromcharts
7/29/2019 3.Flexible Pavement
46/56
.
Resilientmodulus
of
asphalt
concrete
at
68
F=450,000
lb/in
2
7/29/2019 3.Flexible Pavement
47/56
CBRvalueofbasecoursematerial=100 M =31 000lb in2
7/29/2019 3.Flexible Pavement
48/56
CBRvalueofsubbase coursematerial=22,Mr =13,500lb/in2
7/29/2019 3.Flexible Pavement
49/56
..
. . . . .. . .. .
. ..
D2
1
SN2
SN1 . . . . . . . . .. . . .
SN3
Subbase Course D3
RoadbedCourse
111SN Da
222112SN mDaDa
333222113 = .
UsecharttofindSN2 ChangeMR totheoneofsubbase
7/29/2019 3.Flexible Pavement
50/56
2
MR =13,500psiPSI=2.0
X103
99%reliability
=
2
x
10
6
ESALSN
2=3.6
UsecharttofindSN1 ChangeMR totheoneofbase
7/29/2019 3.Flexible Pavement
51/56
1
MR =31,000psiPSI=2.0
X103
99%reliability
=
2
x
10
6
ESALSN
1=2.7
SN D
Values
SN1 2 7
7/29/2019 3.Flexible Pavement
52/56
SN1 =a1D1SN1 2.7
2.7=0.44xD1SN3 4.1
a1 0.44
D1 =6.13
in
a2 0.14
a3 0.10
Roundedupto6.5in
(usually
rounded
up
to
the
nearest
0.5
in)SN1*=0.44x6.5=2.86
* .
Values
SN1 2 7
7/29/2019 3.Flexible Pavement
53/56
SN1 2.7
SN2 =SN1*+a2D2m2SN3 4.1
a1 0.44
3.6=2.86
+(0.14
xD2 x
0.80)
a2 0.14
a3 0.10
D2 =6.61in
Roundedupto7.0in
SN2*=2.86
+(0.14
x7.0
x0.80)
=3.644
Values
SN1 2 7
7/29/2019 3.Flexible Pavement
54/56
SN1 2.7
SN3 =SN2*+a3D3m3SN3 4.1
a1 0.44
4.1=3.644
+(0.10
xD3 x
0.80)
a2 0.14
a3 0.10
D3 =5.7in
Roundedupto6.0in
SN3*=3.644
+(0.10
x6.0
x0.80)
=4.124
ShouldbeclosedtotheSNthatyougotatthebeginning
7/29/2019 3.Flexible Pavement
55/56
Therefore,thepavementconsistsof
.
7in
of
granular
base
Th ffi h d i l f d f l l i
7/29/2019 3.Flexible Pavement
56/56
Thetrafficonthedesignlaneofaproposedfourlaneruralinterstate
g waycons sts
o
truc s.
c ass cat on
stu es
ave
s own
thatthetruckfactorcanbetakenas0.45,designasuitableflexible
pavementiftheAADTonthedesignlaneduringthefirstyearof
operationis1,000andpi =4.2.
Designlife=20years
Reliability
level
=
95%Standarddeviation=0.45
pt =2.5
Thepavement
structure
will
be
exposed
to
moisture
levels
approachingsaturation20%ofthetimeanditwilltakeabout1week
. , , ,
22,and70,respectively. MR fortheasphaltconcreteis450,000psi.