13
3D Building Modelling with ZE Modeller Team: ZENITH Julien Li-Chee-Ming, Damir Gumerov, Tudor Ciobanu

3D Building Modelling with ZE Modeller Team: ZENITH Julien Li-Chee-Ming, Damir Gumerov, Tudor Ciobanu

Embed Size (px)

Citation preview

3D Building Modellingwith

ZE Modeller

Team: ZENITH Julien Li-Chee-Ming,

Damir Gumerov,Tudor Ciobanu

Introduction

Objective

Develop a software solution for creating

accurate photo-realistic polygon models

from high density point clouds and digital

imagery.

Latest Specifications

Developed Components

• ZE Point Cloud Registration Module

• ZE Point Cloud Geo-referencing Module

• ZE Surface Modelling Module

• ZE Texture Mapping Module

Progress to Date

• Point Cloud Registration/Geo-referencing• Implemented adjustment module for point cloud

registration• Developed and tested ATR algorithm • GUI is undergoing development

Progress to Date• Surface Modelling

• Decreased run-time ten fold• Able to model more accurately

Texture Mapping Components I• Tie Point Acquisition & Camera solution

Texture Mapping Component II

Progress to Date• Synchronizing Frame Controls

with Viewport• Implementing Movement

of Camera• Finalizing Import File Format• Finalizing Efficient Display Method• Optimizing Frame Controls • Inverse Kinematics of Geographic Points

Resolved Risks

• Huge data set Long run-times• Require efficient data structures and data processing

techniques• Set appropriate thresholds and parameters in data

collection and processing

• Back up methods• Have a backup method for every module, if component

fails, attempt second method• Trade off between ease of implementation and quality of

output

Budget Expenditure

Item Quantity Unit Price Total Price

Web hosting 1 year 1 $60 60$

ILRIS-3D Laser Scanner 1 Borrowed

Observation Parser 1 Borrowed

Target type A 5 25$ 125$

Final Presentation 1 100$ 100$

TOTAL 285$

Schedule

26-Sep 15-Nov 4-Jan 23-Feb 14-Apr 3-Jun

Date

IntegrationGUI Viewport

Texture MappingSurface

Geo-referencingRegistration

Data CollectionInst. Calibration

Project planningInst. Training

Tas

k

Schedule2008 – 2009 Team Zenith

Conclusions•Project is on track to basic completion in accordance to design specs

•Component integration will be next

•There are contingency plans prepared in case of failure of future components

Thank You