Continuous Beam: 3B6-7 300X400 (Code of Practice : Eurocode 2 - 2004) C0118/8/2015 11:59:41 AM
Input Tables
Fcu (MPa)Fy (MPa)Fyv (MPa)% RedistributionDownward/Optimized redistr.Cover to centre top steel(mm)Cover to centre bot.steel(mm)Dead Load FactorLive Load FactorDensity of concrete (kN/m3)% Live load permanent (Creep coefficient)Ecs (Free shrinkage strain)
305005000D40401.351.524252300E-6
SecNo.
Bw (mm)
D (mm)
Bf-top (mm)
Hf-top (mm)
Bf-bot (mm)
Hf-bot (mm)
Y-offset (mm)
Web offset
Flangeoffset
1 300 400
SpanNo
SectionLength(m)
Sec NoLeft
Sec NoRight
1 3 1 12 3 1 1
SupNo.
CodeC,F
Column Below CodeF,P
Column above CodeF,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)1 1000 200 8 2 600 600 8 3 C
Case D,L
Span
Wleft(kN/m)
Wright(kN/m)
a (m)
b (m)
P (kN)
a (m)
M (kNm)
a (m)
LoadDescription
D 1 4.2 4.2 L 1 0.75 0.75
D 2 4.2 4.2 30 3 L 2 0.75 0.75 3 3 D 2 30 3 L 2 3 3
Span
M left(kNm)
M right(kNm)
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015
SECTION 1
300
400
Sections
1 2 3SPAN 1
Dead+Own W
Live
7.08
0.75
SPAN 2
60.00
6.00
Beam Elevation
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015
Elastic Deflections (Alternate spans loaded) Def max = 19.72mm @ 6.00m
15.0
10.0
5.00
.20
0
.40
0
.60
0
.80
0
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
Deflection, Shear, Moment and Steel diagrams. Spans 1,2
Long-term Deflections (All spans loaded - using required reinforcement) Def max = 68.12mm @ 6.00m
60.050.040.030.020.010.0
.20
0
.40
0
.60
0
.80
0
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
SHEAR: X-X V max = 122.0kN @ 3.00m
-40.0-20.0
20.040.060.080.0100 120
.20
0
.40
0
.60
0
.80
0
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
MOMENTS: X-X M max = -318.1kNm @ 3.00m
-50.0-100
-150-200-250-300
.20
0
.40
0
.60
0
.80
0
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
Shear Steel: X-X Asv max = .3466mm/mm @ 3.00m
.050
.100
.150
.200
.250
.300
.350
.20
0
.40
0
.60
0
.80
0
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
Bending Steel: X-X As max = -2423mm2 @ 3.00m
500
-500
-1000
-1500
-2000
-2500
.20
0
.40
0
.60
0
.80
0
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
5.80
6.00
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015
=====================================================================
C O N T I N U O U S B E A M Ver W2.6.05 - 09 May 2014
Title : 3B6-7 300X400 Data File : C:\Users\T&TECLLP\Desktop\RC BEAM\3B6-7.C01 Date/Time : 18/8/2015 Code of Practice : Eurocode 2 - 2004 =====================================================================
BENDING MOMENTS & REINFORCEMENT
SPAN 1
Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)
0.000 25.33 29.77 0.00 193.99 0.250 19.85 22.87 0.00 148.32 0.500 13.71 15.37 0.00 99.19 0.750 6.90 7.47 0.00 47.95 1.000 -1.42 -0.57 9.09 0.00 1.250 -10.71 -8.71 68.92 0.00 1.500 -20.60 -17.53 133.41 0.00 1.750 -31.09 -27.00 202.76 0.00 2.000 -42.17 -37.15 277.16 0.00 2.250 -53.85 -47.97 356.88 0.00 2.500 -66.13 -59.45 442.19 0.00 2.750 -79.31 -71.60 535.54 0.00 3.000 -93.16 -84.41 635.86 0.00
SPAN 2
Position(m) Min.Moment(kNm) Max.Moment(kNm) As-top(mm2) As-bot(mm2)
0.000 -318.07 -286.01 2422.54 642.01 0.250 -287.90 -258.89 2205.63 425.10 0.500 -258.38 -232.37 1993.53 213.00 0.750 -229.54 -206.44 1786.22 5.69 1.000 -201.37 -181.12 1518.61 0.00 1.250 -173.86 -156.39 1274.15 0.00 1.500 -147.02 -132.25 1050.31 0.00 1.750 -120.85 -108.72 843.72 0.00 2.000 -95.34 -85.78 651.90 0.00 2.250 -70.50 -63.44 472.96 0.00 2.500 -46.34 -41.69 305.42 0.00 2.750 -22.83 -20.55 148.09 0.00 3.000 0.00 0.00 0.00 0.00
---------------------------------------------------------------------
SHEAR FORCES & REINFORCEMENT
SPAN 1
Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom) Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm)
0.000 -26.41 -20.56 47.74 0.08 0.26 0.250 -28.80 -23.23 47.74 0.08 0.26 0.500 -31.19 -25.90 47.74 0.09 0.26 0.750 -33.58 -28.57 47.74 0.10 0.26 1.000 -35.97 -31.24 47.74 0.10 0.26
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015
1.250 -38.36 -33.91 47.74 0.11 0.26 1.500 -40.75 -36.58 47.74 0.12 0.26 1.750 -43.39 -39.25 47.74 0.12 0.26 2.000 -46.06 -41.92 47.74 0.13 0.26 2.250 -48.73 -44.59 48.59 0.14 0.26 2.500 -51.40 -47.26 52.19 0.15 0.26 2.750 -54.07 -49.93 55.63 0.15 0.26 3.000 -56.74 -52.60 58.91 0.16 0.26
SPAN 2
Position(m) Minimum Maximum Shear Asv/Sv Asv/Sv(nom) Shear(kN) Shear(kN) Capacity(kN) (mm2/mm) (mm2/mm)
0.000 109.67 122.05 88.55 0.35 0.26 0.250 107.28 119.38 88.55 0.34 0.26 0.500 104.90 116.71 86.22 0.33 0.26 0.750 102.51 114.04 83.12 0.32 0.26 1.000 100.12 111.37 78.74 0.32 0.26 1.250 97.73 108.70 74.27 0.31 0.26 1.500 95.34 106.02 69.63 0.30 0.26 1.750 92.95 103.35 64.73 0.29 0.26 2.000 90.56 100.68 59.40 0.29 0.26 2.250 88.17 98.01 53.37 0.28 0.26 2.500 85.78 95.34 47.74 0.27 0.26 2.750 83.39 92.67 47.74 0.26 0.26 3.000 81.00 90.00 47.74 0.26 0.26
---------------------------------------------------------------------
COLUMN REACTIONS
Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)
1 -16.50 -1.61 -18.11 -26.41 2 118.98 12.11 131.09 178.79 3 0.00 0.00 0.00 0.00
---------------------------------------------------------------------
COLUMN MOMENTS (Ultimate limit state)
Columns below
Support Bending Moment(kNm) Shear Force (kN) No. Min. Max. Min. Max.
1 25.33 29.77 4.75 5.58 2 -225.59 -201.60 -42.30 -37.80 3 0.00 0.00 0.00 0.00
Columns above
Support Bending Moment(kNm) Shear Force (kN) No. Min. Max. Min. Max.
1 0.00 0.00 0.00 0.00 2 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00
---------------------------------------------------------------------
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015
ELASTIC DEFLECTIONS (Alternate spans loaded - positive downward)
Modulus of elasticity: Ec = 20 + fcu/5 = 26.0 Gpa
SPAN 1
Position(m) Min.Deflection(mm) Max.Deflection(mm)
0.000 0.00 0.00 0.250 -0.04 -0.04 0.500 -0.11 -0.09 0.750 -0.19 -0.17 1.000 -0.28 -0.25 1.250 -0.37 -0.32 1.500 -0.44 -0.39 1.500 -0.44 -0.39 1.750 -0.50 -0.44 2.000 -0.52 -0.46 2.250 -0.49 -0.44 2.500 -0.41 -0.37 2.750 -0.25 -0.22 3.000 -0.00 -0.00
SPAN 2
Position(m) Min.Deflection(mm) Max.Deflection(mm)
0.000 -0.00 -0.00 0.250 0.42 0.46 0.500 1.13 1.24 0.750 2.09 2.31 1.000 3.29 3.63 1.250 4.69 5.17 1.500 6.26 6.90 1.500 6.26 6.90 1.750 7.98 8.80 2.000 9.82 10.82 2.250 11.76 12.96 2.500 13.76 15.17 2.750 15.82 17.43 3.000 17.90 19.72
---------------------------------------------------------------------
LONGTERM DEFLECTIONS (All spans loaded - positive downward)
Symbols: DS : Shrinkage deflection. DL : Long-term deflection under permanent load. DI : Instantaneous deflection under short-term load. DT : Total long-term deflection.
SPAN 1
Position(m) DS(mm) DL(mm) DI(mm) DT(mm)
0.000 0.00 0.00 0.00 0.00 0.250 -0.03 -0.21 -0.02 -0.26 0.500 -0.09 -0.62 -0.05 -0.75 0.750 -0.16 -1.15 -0.08 -1.40 1.000 -0.24 -1.73 -0.12 -2.09 1.250 -0.32 -2.30 -0.16 -2.78 1.500 -0.39 -2.79 -0.20 -3.38
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015
1.500 -0.39 -2.79 -0.20 -3.38 1.750 -0.43 -3.12 -0.22 -3.77 2.000 -0.44 -3.19 -0.22 -3.85 2.250 -0.40 -2.95 -0.21 -3.56 2.500 -0.32 -2.36 -0.16 -2.84 2.750 -0.19 -1.39 -0.09 -1.67 3.000 0.00 0.00 0.00 0.00
SPAN 2
Position(m) DS(mm) DL(mm) DI(mm) DT(mm)
0.000 0.00 0.00 0.00 0.00 0.250 0.24 1.90 0.12 2.25 0.500 0.52 4.39 0.28 5.19 0.750 0.86 7.48 0.46 8.81 1.000 1.26 11.17 0.67 13.11 1.250 1.72 15.43 0.92 18.07 1.500 2.24 20.23 1.19 23.67 1.500 2.24 20.23 1.19 23.67 1.750 2.82 25.55 1.49 29.86 2.000 3.46 31.34 1.81 36.62 2.250 4.15 37.58 2.17 43.89 2.500 4.90 44.20 2.54 51.64 2.750 5.68 51.14 2.94 59.76 3.000 6.49 58.27 3.36 68.12
---------------------------------------------------------------------
QUANTITIES
Section Area(m) 1 0.120
Total weight of beam = 17.28 kN =====================================================================
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) LtdInternet: http://www.prokon.comE-Mail : [email protected]
NSH/28/1518 TUAS AVE 8M/s SH NG CONSULTANTS PTE LTDHT T&T AUGUST 2015