SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 1 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
List of Documents
General Data Sh. 2
Mechanical Check and Visual Inspection Sh. 3 & 4
Evacuation & Filling Sh. 5 & 6
Voltage Drop ( Contact Resistance Measurement) Sh. 7 & 8
Testing of Gas Density Relay Sh. 9
Calibration of Sensors Sh. 10
Gas Measurements Sh. 11
Gas Tightness ( Leakage test) Sh. 12
Circuit Breaker Sh. 13 to 15
Disconnector / Grounding Switch Sh. 16 & 17
Earthing Switch Sh. 18
Local control Panel Sh. 19
Local Alarms Sh. 20
Interlocking Test Sh. 21
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 2 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
General Data:
GIS Type: ELK- No. of Bays: ----------------
Layout Diagram: Revision:
Standard: IEC
Installation according to Installation Instructions: Product manual GIS Type ELK
Filling according to Pressure Diagram:
Ratings:
Voltage: Control Voltage: :________
Frequency:60 Hz Auxiliary voltage: AC_______
Lightning Impulse withstand Voltage: :________ Auxiliary voltage: DC_______
Power Frequency withstand Voltage: :________ Heater voltage: :________
Breaking Current: :________ Voltage Drive Motor: :________
Current Busbar: :________ Voltage hydraulic pump motor: :______
Current Feeder: :________ Crane: Yes: x No:___
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 3 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
Current-Coupler: :________ Lifting Capacity:___________tons
MECHANICAL CHECK AND VISUAL ISPECTION
SL.N0. DESCRIPTION CHECKED1 Inspect for physical damage / defects. Yes N/A
2 Check name plate information for correctness Yes N/A
3 Inspect enclosures for proper alignment, foundation fixing and grounding
Yes N/A
4 Check quality of Paint work Yes N/A
5 Ensure that all special tools and equipment are provided as specified and that proper storage is provided.
Yes N/A
6 Ensure that all Special tools and Equipment are provided as specified and proper storage is provided.
Yes N/A
7 Verify that all lifting device are correctly labeled for lifting. Yes N/A
8 Ensure that adequate ladders and walkways are provided for access to meters, filling ports, cranes, light, etc.
Yes N/A
9 Check that all grounding is securely connected as per approved layout drawing,
Yes N/A
10 Check that all specified grounding switches are insulated, with removable grounding links.
Yes N/A
11 Check operation of all mechanical interlocks. Yes N/A
12 Check tightness of all bolted connection (torque wrench method)
Yes N/A
13 Check SF6 gas at each gas section for air and moisture content .
Yes N/A
14 Check each gas section filled to correct rated pressure. Yes N/A
15 Gas leak test of all flanges and joints after erection and filling.
Yes N/A
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 4 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
16 Calibrate Gas pressure gauges . Yes N/A
17 Check operation of all gas density switches ( alarm, trip signals and lockout function.)Confirm correct set points. Yes N/A
SL.N0. DESCRIPTION CHECKED18 Check all wiring is correct according to approved
drawings. Yes N/A
19 Verify that all front panel mounted device (meters, push buttons, switches, indicators lamps, mimic buses, etc) are installed as per drawings and correctly labeled.
Yes N/A
20 Verify that all operating devices are correctly labeled.
Yes N/A
21 Check that all Phases marking have been installed as per specification.
Yes N/A
22 Ensure that all disconnects switches are provided with viewing windows or mechanical indicators for verification of contact position and that all grounding switch position can be safely verified visually.
Yes N/A
23 Ensure that correct dispatch Numbers have been installed.
Yes N/A
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 5 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
1: EVACUATION AND FILLING:
SF6-GasCompartment
Vacuum Period
Pressurerising
Pre check With
AmbientTemperature
Filling Pressure
Filling date Sign.
(h) (mbar) (h) (mbar) SF6 (deg. C) ( KPa abs )
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 6 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
SF6-GasCompartment
Vacuum Period
Pressurerising
Pre check With
AmbientTemperature
Filling Pressure
Filling date Sign.
(h) (mbar) (h) (mbar) SF6 (deg. C) ( KPa abs )
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 7 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
2:PRIMARY RESISTANCE MEASUREMENTS
Measuring Instrument Type : Micro Ohmmeter (adjusted current range: 100 A DC)
PHASE
From TOCalculated Resistance
Measured Resistance
Current AmbientTemp.
Measuring Circuits Consist
of Following UnitsOhm Ohm A Cº
BAY POINT BAY POINT
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 8 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
PHASE
From TOCalculated Resistance
Measured Resistance
Current AmbientTemp.
Measuring Circuits Consist of
Following Units
Ohm Ohm A Cº
BAY POINT BAY POINT
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 9 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
3: TESTING OF GAS DENSITY MONITORS OPERATING POINT
SF6-GasCompartment
FEEDER PHASE SERIAL NO. AmbientTemperature
Signal -1 Signal -2 Signal-3 Date
(deg. C) ( KPa abs) ( KPa abs) ( KPa abs)
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 10 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
4: CALIBRATION OF SENSOR
SF6-GasCompartment
SERIAL NO. Measured Pressure Current for Optimal
DensityAmbient
Temperature
Corrected Pressure in function of the ambient
TemperatureRemarks
( KPa abs) (deg. C) ( KPa abs)
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 11 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
5: GAS MEASUREMENT
Bay SF6-GasCompartment
Phase Dew point MoistureContent
SF6 Vol. Gas Pressure Ambient Temp.
SF6 Purity Test
(º C ) ( ppmw ) ( %) ( Kpa abs ) (º C )
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 12 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
6:Gas Tightness ( Leak test)
Gas compartment-Identification through:O.K Remarks
Bay Electrical Designation ofGas Density Relay
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 13 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
7. BREAKER:
1:GENERAL INFORMATION :
Make: ABB Type: ELK
Rated current : Rated voltage:
Breaker serial number :
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 14 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
Drive serial number :
2: MECHANICAL CHECK AND VISUAL INSPECTION (tick if verified)
Item Description
1Inspect for physical damage / defects. Yes N/A
2Check nameplate information for correctness. Yes N/A
3Check tightness of all bolt connections.( torque wrench method)
Yes N/A
5Check quality of paint work. Yes N/A
6Check that all groundings are securely connected. Yes N/A
7Check for correct breaker position indications. ( breaker Open / closed
Yes N/A
3. ELECTRICAL TEST
1. INSULATION TEST WIRING (500V) Acceptance > 1 M
WIRING-EARTH
(M)Remarks
2. PICK-UP VOLTAGE TEST
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 15 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
COIL PICK-UP VOLTS CURRENT REMARKS Close coil Trip coil 1 Trip coil 2
3. TIMING TEST FOR PRIMARY CONTACT SEPARATION AT RATED PRESSURESwitching sequence O – 0.3 s – CO – 3 min – CO
PHASE C O 1 O 2 C-O 1 C-O 2 RemarksABC
4. PUMP RUNNING TIME FROM P=0
PUMP RUNNING REMARKS TIME
5. SPACE HEATER CURRENT TEST
Space heater Phase A Phase B Phase C REMARKS Current
6. FUNCTION TEST (tick if verified)
1 Local control, alarm and indications. Yes N/A 2 Remote control, alarm and indications. Yes N/A 3 Check correct operation of all auxiliary “a” and “b” contacts Yes N/A 4 Check trip free and anti-pumping circuit, see note. Yes N/A 5 Check operation of thermostat and space heater. Yes N/A
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 16 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
6 Check counter for pump starts. Yes N/A 7 Check counter for breaker operations. Yes N/A
NOTE: ANTI PUMPING RELAY FUNCTIONAL TEST
STEP OPERATION TRIPSIGNAL
BREAKERSTATUS
1 Breaker control switch switched to “close” and held in “close” position.
No. Breaker closes and remains closed.
2 Breaker control switch held in “close” position.
Yes.Electrically.
Breaker trips and does not attempt to reclose.
3 Breaker control switch returned to “normal”.
No. Breaker remains open.
4 Breaker control switch switched to “close” and held in “close” position.
No. Breaker closes and remains closed.
5 Breaker control switch held in “close” position.
Yes.Mechanically.
Breaker trips and does not attempt to reclose.
8:DISCONNECTOR/ GROUNDING SWITCH
1. GENERAL INFORMATION
Make: ABB Type:
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 17 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
Rated current : Rated voltage:
Serial number :
2. MECHANICAL CHECK AND VISUAL INSPECTION (tick if verified)
Item Description1 Inspect for physical damage / defects. Yes N/A 2 Check nameplate information for correctness. Yes N/A 3 Check tightness of all bolt connections. Yes N/A 4 Check smoothness and easy of operation.
(Closing /Opening)Yes N/A
5 Check proper operation of all mechanical interlocks. Yes N/A 6 Check manual operation by handle. Yes N/A 7 Check drive blocking by handle. Yes N/A 8 Check local position indication. Yes N/A
3. ELECTRICAL TEST
2. TIMING AND CURRENT TEST
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 18 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
Disconnect#
OPERATION PHASE A PHASE B PHASE C TIME CURR. TIME CURR. Time. CURR. CLOSE OPEN CLOSE OPEN CLOSE OPEN
3. OPERATION TEST AT MINIMUM VOLTAGE AT 90 V
Disconnect#
OPERATION PHASE A PHASE B PHASE C TIME CURR. TIME CURR. Time. CURR. CLOSE OPEN CLOSE OPEN CLOSE OPEN
4. SPACE HEATER CURRENT TEST
Space heater Phase A Phase B Phase C Remarks Current
5. FUNCTION TEST (tick if verified)
1 Local control, alarm and indications. Yes N/A 2 Remote control, alarm and indications. Yes N/A 3 Check correct operation of all auxiliary “a” and “b” contacts Yes N/A 5 Check operation of thermostat and space heater. Yes N/A
9: EARTHING SWITCHTested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 19 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
1. GENERAL INFORMATION
Make: ABB Type:
Rated current : Rated voltage:
Serial number :
2. MECHANICAL CHECK AND VISUAL INSPECTION (tick if verified)
Item Description1 Inspect for physical damage / defects. Yes N/A 2 Check nameplate information for correctness. Yes N/A 3 Check tightness of all bolt connections. Yes N/A 4 Check smoothness and easy of operation.
(Closing /Opening)Yes N/A
5 Check proper operation of all mechanical interlocks. Yes N/A 6 Check manual operation by handle. Yes N/A 7 Check drive blocking by handle. Yes N/A 8 Check local position indication. Yes N/A
ONLY FOR GROUND SWITCHES
3. HIGH VOLTAGE TEST (10 kV AC)
PHASE TEST VOLTAGE DURATION TIME
LEAKAGECURRENT
Limits
A—TO EARTH 10 kV 60 Hz 1 min No flashover B—TO EARTH 10 kV 60 Hz 1 min No flashover C—TO EARTH 10 kV 60 Hz 1 min No flashover
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 20 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
10: LOCAL CONTROL PANEL
1. MECHANICAL CHECK AND VISUAL INSPECTION (tick if verified)
Item Description Checked1 Inspect for physical damage / defects. Yes N/A 2 Check nameplate information for correctness. Yes N/A 3 Check tightness of all connections. Yes N/A 4 Check apparatus mounted as per approved drawings Yes N/A 5 Check for proper labels. Yes N/A
2. CHECK FOR ELECTRICAL (tick if verified)
Item Description Checked1 Check for Local Breaker operation. Yes N/A 2 Check for Local Disconnector operation. Yes N/A 3 Check for Local Earth Switch operation. Yes N/A 4 Check for Local Position Indication Yes N/A
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 21 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
3. CHECK FOR LOCAL ALARMS (tick if verified)
Item Description Checked1 DC supply fail Yes N/A 2 AC Supply Fail Yes N/A 3 SF6 Low Yes N/A 4 SF6 Low Low Yes N/A 5 Circuit Breaker Pump Exceeded Yes N/A 6 Circuit Breaker trip blocking Yes N/A 7 Circuit breaker trip Circuit 1 Faulty Yes N/A 8 Circuit breaker Lockout Yes N/A
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 22 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
11. CHECK FOR INTERLOCKS (tick if verified)
O = Open C = Close Empty = Not Relevant EP = End position ( O or C )
APPARATUS OPERATIONCLOSE/OPEN
Checked
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Tested by: Witnessed by:
Date: Designation no.:
SITE INSPECTION AND TEST RECORD abbDescription: Order no.: Record No.:
380KV GAS INSULATED SWITCH GEAR 30631078/00 TR-3.20.02Customer: Customer ref.: Sheet:
Cont:SEC-EOA 23 of 21-Site: Drawing ref.: Project no.:
380kV Qurayyah-2 S/S
Yes
Yes
Tested by: Witnessed by:
Date: Designation no.: