2
READY BUILDING BROCHURE NORTHERN STACKS VIII, FRIDLEY, MN 5101 INDUSTRIAL BLVD. CORPORATE ECONOMIC DEVELOPMENT GENERAL SITE INFORMATION Location 5101 Industrial Blvd, Fridley MN Owner Representative Eric Batiza (952) 837-3007, [email protected] Size Total 176,650 SF, including 15,196 SF Office, 164,992 SF Warehouse Zoning M-2: Heavy Industrial Asking Price Base Rent: $6.72 PSF with 2.5% annual increases Highway Access 1.1 miles from I-694 interchange at East River Road & I-694 to head East or West Air Access 21.9 miles to Minneapolis St. Paul Internat ional Airport Rail Served Yes. BNSF: Justin Pearson (701) 667-7425 UTILITY INFORMATION Xcel Energy. Underground three phase services, 13.8 kV feeder (looped) CenterPoint Energy. 2" plastic, 603' gas service City of Fridley Public Works. 12" water main City of Fridley Public Works. 6" water main Comcast Business Internet 1 Gig provides 1000 mbps upload, and 35 mbps download speeds. CenturyLink Business Advanced provides 20 mbps upload/download speeds, with some areas able to get Business Gig service with 1000 mbps upload/download speed Electric Power Natural Gas Water Sewer Telecom/Fiber

380 28 Road - Xcel Energy...Eric Batiza (952) 837-3007, [email protected] Size : Total 176,650 SF, including 15,196 SF Office, 164,992 SF Warehouse Zoning: M-2: Heavy Industrial

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 380 28 Road - Xcel Energy...Eric Batiza (952) 837-3007, eric.batiza@colliers.com Size : Total 176,650 SF, including 15,196 SF Office, 164,992 SF Warehouse Zoning: M-2: Heavy Industrial

READY BUILDING BROCHURE

NORTHERN STACKS VIII, FRIDLEY, MN5101 INDUSTRIAL BLVD. CORPORATE ECONOMIC DEVELOPMENT

GENERAL SITE INFORMATIONLocation 5101 Industrial Blvd, Fridley MN

OwnerRepresentative

Eric Batiza (952) 837-3007, [email protected]

Size Total 176,650 SF, including 15,196 SF Office, 164,992 SF Warehouse

Zoning M-2: Heavy Industrial

Asking Price Base Rent: $6.72 PSF with 2.5% annual increases

Highway Access 1.1 miles from I-694 interchange at East River Road & I-694 to head East or West

Air Access 21.9 miles to Minneapolis St. Paul International Airport

Rail Served Yes. BNSF: Justin Pearson (701) 667-7425

UTILITY INFORMATIONXcel Energy. Underground three phase services, 13.8 kV feeder (looped)

CenterPoint Energy. 2" plastic, 603' gas service

City of Fridley Public Works. 12" water main

City of Fridley Public Works. 6" water main

Comcast Business Internet 1 Gig provides 1000 mbps upload, and 35 mbps download speeds. CenturyLink Business Advanced provides 20 mbps upload/download speeds, with some areas able to get Business Gig service with 1000 mbps upload/download speed

Electric Power

Natural Gas

Water

Sewer

Telecom/Fiber

380 28 Road

380 28 Road, Grand Junction, ColoradoRay Rickard, Broker Associate, 970.683.257325,200 square feet on 5-acre lotZoned 1-2 (Industrial, Manufacturing)$11 per square foot NNN, or $2,772,000~5 miles to I-70; ~2.5 miles to Highway 50; ~5.5 miles to Highway 1417.5 miles to Grand Junction Regional Airport

No rail access

LocationOwner Representative

Size Zoning Asking Price Highway Access Air Access

Rail Access

Natural GasWaterSewerTelecom/Fiber

Xcel Energy. 3-phase overhead service 2 ACSR on a pole Xcel Energy. 1 ¼” diameter 400’ to mainUte Water Conservation District. 12" main line, 4" line serving siteCity of Grand Junction. 8" main lineCenturyLink (via Networks Unlimited). 174' to nearest fiber manhole, minimum of 200 MB to 1 GB / second.

Ready Building Brochure

General Site Information

Utility InformationElectric Power

Page 2: 380 28 Road - Xcel Energy...Eric Batiza (952) 837-3007, eric.batiza@colliers.com Size : Total 176,650 SF, including 15,196 SF Office, 164,992 SF Warehouse Zoning: M-2: Heavy Industrial

xcelenergy.com | © 2019 Xcel Energy Inc. | Xcel Energy is a registered trademark of Xcel Energy Inc. | 19-12-312

READY BUILDING BROCHURE

5101 INDUSTRIAL BLVD.

SITE DUE DILIGENCE DOCUMENTATION AVAILABLE (REPORTS AND DETAIL AVAILABLE)Title Commitment S Archeological and Historic Use

Assessments

Aerial Site Views and Maps Park Covenants and Restrictions

Park Master Plan Transportation Access Maps S

Utility Service Maps S Geotechnical Study / Soil Survey

Site Dimensions and Configuration FEMA Flood Plain Designation with map

lands DelineaWet tion and Map Air Attainment Status S

se 1 Environmental AssessmentPha Endangered Species Assessment Not required

GENERAL COMMUNITY INFORMATIONCommunity Profile and Demographics

S Letters of Support Not required

State and Local Incentives Overview Business and Industrial Support Services and Amenities Profile

S

Economic Development Contact:

Name:Scott HickokCommunity Development Director

Address:City of Fridley7101 University Avenue NEFridley, MN 55432

Email:

[email protected]: 763.572.3590

Xcel Energy Contact:

Name:

Ryan Bruers Manager Corporate Economic Development

Address:

Xcel Energy 401 Nicollet Mall 07 Minneapolis, MN 55401

Email:[email protected] P: 612.321.3186

XCEL ENERGY MAKES NO WARRANTY OR REPRESENTATION AS TO THE ACCURACY, QUALITY, AVAILABILITY, COMPLETENESS, OR SUITABILITY OF ANY INFORMATION CONTAINED HEREIN. ALL INFORMATION MUST BE INDEPENDENTLY VERIFIED. THE USER SHALL NOT RELY ON ANY OF THE INFORMATION CONTAINED HEREIN AND SHALL ASSUME ALL RISK AND RESPONSIBILITY ARISING FROM ITS USE.

xcelenergy.com | © 2018 Xcel Energy Inc. | Xcel Energy is a registered trademarkof Xcel Energy Inc. | 18-03-220

380 28 Road

Archeological and Historic Use Assessments

Park Covenants and Restrictions

Transportation Access Maps S

S Geotechnical Study / Soil Survey

S FEMA Flood Plain Designation with Map

Air Attainment Status S

Title Commitment

Aerial Site Views and Maps

Park Master Plan

Utility Service Maps

Site Dimensions and Configuration

Wetlands Map

Phase 1 Environmental Assessment Endangered Species Assessment

Letters of SupportCommunity Profile and Demographics S

State and Local Incentives Overview S Business and Industrial Support Services and Amenities Profile S

XCEL ENERGY MAKES NO WARRANTY OR REPRESENTATION AS TO THE ACCURACY, QUALITY, AVAILABILITY, COMPLETENESS, OR SUITABILITY OF ANY INFORMATION CONTAINEDHEREIN. All information must be independently verified. The user shall not rely on any of the information contained herein and shall assume all risk and responsibility arising from its use.

Xcel Energy Contact:

Name:Henley

Address:

, Suite 800

Email:Henley

P:

Contact:

Name:Steve JozefczykDeputy Director

Address: Grand Junction Economic Partnership 122 N. 6th StreetGrand Junction, CO 81501

Email: [email protected]: 970.245.4332 ext. 4

N/A

N/A

Ready Building Brochure

N/A

Site Due Diligence Documentation Available (reports and detail available)

General Community Information

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S