35880 Mast Unit 25April, 2016 Until 3inchLIB Run OverviewRpt

Embed Size (px)

Citation preview

  • 8/18/2019 35880 Mast Unit 25April, 2016 Until 3inchLIB Run OverviewRpt

    1/2

    Tubing String Report

    Weld Type Legend - Production Bias - Production Butt - Field - Manual Butt - Field - Orbital Butt

    - Slipmark(s)Whip End Reel End Strip Min. Inside

    Max. Inside

    Depth Thickness Depth Thickness Length Diame ter Diameter Weld Type Taperm i n m i n m i n i n

    0.125 in 6906088-1A 3,170.84 0.125 3,650.47 0.125 479.63 1.362 1.537 Production Bias None 0.125 in 6612081-5 2,334.16 0.125 3,170.84 0.125 836.68 1.362 1.537 Production Bias None 0.125 in 6612081-4 1,479.20 0.125 2,334.16 0.125 854.96 1.362 1.537 Production Bias None 0.125 in 6524106-8 823.88 0.125 1,479.20 0.125 655.32 1.362 1.537 Production Bias None 0.125 in 6524106-7

    170.08 0.125 823.88 0.125 653.80 1.362 1.537 Production Bias None 0.125 in 6524106-6 0.00 0.125 170.08 0.125 170.08 1.362 1.537 - -

    Run History ReportLength Max. Depth

    Max.Date Well Number Service Type Reel Number

    Cut Off Run To Pressure Operat ion Base Acid Calc.m m psi

    21-Aug-15 Bhag 156-7 Circ.out fill with N2 3120 499.98 941.06 None Yes25-Aug-15 Bhag 29-2 Circ.out fill with fluids 3120 1,207.57 798.17 None Yes26-Aug-15 Bhag 29-2 CaCO3 Pill Squeezing 3120 1,207.04 673.59 None Yes28-Aug-15 Mang 275-6 Matrix Acid treatment 3120 1,127.29 3,578.91 Acid Yes31-Aug-15 Mang-261-13 Circ.out fill with N2 3120 800.04 889.47 Barmer None Yes01-Sep-15 Mang-261-13 Circ.out fill with N2 3120 800.09 897.99 Barmer None Yes03-Sep-15 Mang 255-13 Circ.out fill with N2 3120 999.73 1,105.35 None Yes05-Sep-15 Mang 57-12 Circ.out fill with fluids 3120 963.39 3,607.25 Acid Yes12-Sep-15 Mangala-182 3120 1,250.11 3,514.69 Barmer Acid Yes15-Sep-15 Mangala-255 Wellbore Cleanout & Tubing Pickling 3120 1,379.32 3,332.55 Barmer Acid Yes18-Sep-15 Mangala-269 3120 1,280.20 3,523.80 Barmer Acid Yes20-Sep-15 Mang 261-13 WBCO 3120 1,359.09 3,581.64 Barmer None Yes23-Sep-15 Mang 19 WBCO 3120 30.00 1,038.22 3,614.45 Barmer None Yes26-Sep-15 Mang 25-06 Circ.out fill with fluids 3120 1,260.03 3,293.75 None Yes30-Sep-15 Mang-172-3 3%KCL WBCO 3120 1,358.56 2,521.91 None Yes03-Oct-15 Mang 280-07 Matrix Acid spotting and treatment 3120 1,190.30 3,180.93 Acid Yes06-Oct-15 Mang 283-7 Circ.out fill with fluids 3120 1,429.29 3,187.50 Acid Yes08-Oct-15 Mang 285-7 WBCO 3120 120.00 1,315.23 3,177.33 Acid Yes14-Oct-15 Mang 129-4 Sand Clean out 3120 1,203.65 3,850.27 None Yes17-Oct-15 Mang 94-4 WBCO and Tubing Pickle 3120 50.00 1,219.33 3,425.87 Acid Yes20-Oct-15 Mang 189-16 WBCO and Tubing pickling 3120 1,240.10 3,463.96 Barmer Acid Yes23-Oct-15 Mang 192-14 WBCO and Tubing Pickle 3120 1,055.09 3,466.03 Unknown Acid Yes

    24-Oct-15 Mang-194 Roto-Jet 3120 1,140.67 3,491.22 Barmer Acid Yes25-Oct-15 Mang 250-14 Rotojet and Tubing pickle 3120 50.00 1,195.00 3,031.72 Barmer Acid Yes28-Oct-15 Mang 99-4 Matrix Acid treatment 3120 1,370.22 4,206.88 Barmer Acid Yes31-Mar-16 GMIT Circ.out fill with foam 3120 1,830.00 3,014.70 Barmer None Yes04-Apr-16 GMMH Initial WBCO 3120 2,217.09 4,519.00 Barmer Acid Yes06-Apr-16 GMMH Dummy TCP Run 3120 1,210.03 14.70 Barmer None Yes07-Apr-16 GMMH Main TCP- Stage 1 3120 55.00 2,228.74 14.70 Barmer None Yes08-Apr-16 GMMH Post Frac Cleanout-Stage 1 3120 2,221.10 4,724.00 Barmer None Yes09-Apr-16 GMMH Plug Setting-Stage 1 3120 53.00 2,184.05 972.00 Barmer None Yes09-Apr-16 GMMH Stage 2 TCP 3120 2,172.77 14.70 Barmer None Yes10-Apr-16 GMMH Stage 2 Post Frac Cleanout 3120 2,160.39 4,940.00 Barmer None Yes11-Apr-16 GMMH Stage 2 Plug Setting 3120 100.00 2,105.40 913.00 Barmer None Yes12-Apr-16 GMMH Zone 3 TCP 3120 2,102.11 14.70 Barmer None Yes12-Apr-16 GMMH Zone 3 Cleanout Post Frac 3120 2,077.76 4,350.00 Barmer None Yes13-Apr-16 GMMH Zone 3 Frac Plug 3120 1,950.97 1 ,140.00 Barmer None Yes

  • 8/18/2019 35880 Mast Unit 25April, 2016 Until 3inchLIB Run OverviewRpt

    2/2

    13-Apr-16 GMMH Zone 4 TCP 3120 54.00 1,936.18 14.70 Barmer None Yes14-Apr-16 GMMH Zone 4 Post frac cleanout 3120 1,934.28 4,720.00 Barmer None Yes15-Apr-16 GMMH Zone 4 Frac Plug 3120 1,849.78 848.00 Barmer None Yes16-Apr-16 GMMH Zone 5 TCP 3120 55.00 1,839.60 503.00 Barmer None Yes16-Apr-16 GMMH Zone 5 WBCO 3120 1,839.37 5,144.00 Barmer None Yes17-Apr-16 GMMH Zone 5 Frac Plug 3120 1,750.83 937.00 Barmer None Yes17-Apr-16 GMMH Zone 6 TCP 3120 1,733.45 14.70 Barmer None Yes19-Apr-16 GMMH Zone 6 WBCO 3120 1,732.00 4,630.00 Barmer None Yes20-Apr-16 GMMH Zone 6 Frac Plug 3120 100.00 1,645.95 962.00 Barmer None Yes20-Apr-16 GMMH Zone 7 TCP 3120 1,627.05 14.70 Barmer None Yes21-Apr-16 GMMH Zone 7 WBCO 3120 1,629.32 5,267.00 Barmer None Yes22-Apr-16 GMMH Zone 7 Frac Plug 3120 1,521.21 896.00 Barmer None Yes22-Apr-16 GMMH Zone 8 TCP 3120 84.00 1,505.58 14.70 Barmer None Yes23-Apr-16 GMMH Zone 8 WBCO 3120 1,514.10 4,971.00 Barmer None Yes24-Apr-16 GMMH Zone 7 Milling 3120 1,627.76 3,101.00 Barmer None Yes24-Apr-16 GMMH LIB Run 3120 100.00 1,628.36 14.70 Barmer None Yes

    851.00Maintenance History Report

    Date Descript ion Added Shortened Operat ion Base Calc.m m

    17-Aug-15 Move to Reel - reverse 5.00 Unknown Yes22-Apr-16 Pipe Inspection - don't reverse Barmer Yes

    5.00