Ries Engineering Shares Company 1
3516 EnginesElectrical system- engine &
generator
Ries Engineering Shares Company 2
Product Information Welding on engines with electronic controls.
1\ Turn Off the engine -ECS off 2\ Open disconnect switch or disconnect
the –ve battery terminal. 3\ Clamp the ground cable to the
component that will be welded. 4\ Protect the wiring harness from welding
debris.
Note: do not ground the welder to electrical components such as ECM or sensors
Ries Engineering Shares Company 3
Product Description A complete self-contained unit for
generating electrical power. Transportable. Utilized for prime or standby power
generation.
SDLC
Ries Engineering Shares Company 4
Power Module Components Engine :- -3500B genset engine. -Electronically controlled diesel
engine. -MEUI. -Equipped with jacket water after
cooling or SCAC. -Offered in 8,12,16 cylinder
engines. SDLC
Ries Engineering Shares Company 5
Power Module Components Generator :- SR4B brushless generator. Used for mixed loads of motors and lights,
SCR controlled equipment, computer centers…etc.
SR4B are utilized in 3 phase full wave excitation and regulation.
4 pole of 6 pole design with 6 lead configuration or 12 depending on frame size.
50 HZ or 60 HZ.
SDLC
Ries Engineering Shares Company 6
Power Module Enclosure
SDLC
Ries Engineering Shares Company 7
Basic Container
SDLC
Ries Engineering Shares Company 8
Load Cable Access Door
SDLC
Ries Engineering Shares Company 9
Vertical Discharge PanelInstalled in PM equipped with vertical radiators.Directs hot air from radiator and exhaust through an opening in the roof.
SDLC
Ries Engineering Shares Company 10
Fire Extinguishers & Louvers
SDLC
Ries Engineering Shares Company 11
Fuel Storage /Delivery system1250 US gallon mounted in the front of the PM.Supply engine for 10 hrs at full continuous load.
SDLC
Ries Engineering Shares Company 12
Fuel Transfer System & Fuel/Water separator
Option.Fill automatically the tank during operation.Pump driven by electric motor.
SDLC
Connected in parallel .Provide primary filtration.
Ries Engineering Shares Company 13
Power Module Enclosure WiringBatteries :- -Mounted in racks. -24V for engine and interior lighting . -connected to a battery charger and to the alternator. -Disconnect switch.
SDLC
Ries Engineering Shares Company 14
Auxiliary AC power distributionC.B available for 120/240.Interior lightening:- -24V. -Mounted on engine area & operator area. -Wired to a timer switch.Outlets:- -Option.
SDLC
Ries Engineering Shares Company 15
Switchgear For proper control & protection of Genset.Include :- -EMCPII. -Paralleling switch. -C.B. -Load sharing module. -Transformers. -Voltage for auxiliary power. -Bus bar(3 phase fully rated).
SDLC
Ries Engineering Shares Company 16
T1T1
T2T2T3T3
T4T4
T5T5T6T6
T7T7
T8T8
T9T9
T10T10T11T11
T12T12
Coil numbering
Ries Engineering Shares Company 17
Electrical Measurements Measure the insulation resistance if the
generator was exposed to:- -Rapid change in temperature. -Freezing. -Wet climate during storage.
SDLC
Ries Engineering Shares Company 18
Engine feature & controlsProgrammable system parameters.Configuration parameters.
SDLC
Parameter programmability
ECM serial number
No
Low idle speed
Yes
Engine cool-down duration
yes
Crank duration
yes
Ries Engineering Shares Company 19
Caterpillar Monitoring system ECM monitors operating parameters of
the engine and initiate response if any parameter exceeds an acceptable range.
-Warning. -Derate. -Shutdown.
SDLC
Ries Engineering Shares Company 20
Caterpillar Monitoring systemET is used to:-Select the available response.Program the level for monitoring.Program delay times for each response.
SDLC
Ries Engineering Shares Company 21
Default setting for CAT monitoring system
Derate.Set point.Hysteresis.50 rpm below low idle, ECM check parameters.Failure of a sensor will result in active diagnostic code.
SDLC
Parameter Default setting
Warning setpoint
20V
Warning delay
10 sec
Hysteresis 2V
Voltage monitoring
Ries Engineering Shares Company 22
Data link featuresCAT data link flash -Provide the capability to flash the software for the engine control with CAT data link.
Secondary CAT data link -Connect ECMs of the engine and of other engines (2-8 generators). -Used with switch gear , remote monitoring and control systems
SDLC
MACHINE INTERFACE CONNECTOR
120 Ohm TERMINATINGRESISTOR
120 Ohm TERMINATINGRESISTOR
5261
GEARBOXECM
Address 3
INSTRUMENT PANEL
Address 23
ENGINEECM
Address 0
HAND HELDSERVICE TOOL
Address 249 DATA BUS
NODE
NODE
Ries Engineering Shares Company 23
Engine starting
SDLC
Before engine starting:- -Perform daily maintenance and other
periodic maintenance. -Walk around inspection -Leak Max service life.
Ries Engineering Shares Company 24
Air inlet system Ensure that the air inlet piping and air
filters are in place. Ensure that all clamps and connections
are secure. Observe the air cleaner service
indicator.
SDLC
Ries Engineering Shares Company 25
Cooling system Inspect the cooling system for leaks or
loose connections. Inspect the cooling system hoses for
cracks an loose clamps. Inspect the water pump for evidence of
leaks. Inspect the fan drive belts for cracks. Check the coolant level.
SDLC
Ries Engineering Shares Company 26
Generator Perform any maintenance that is
required for generator. Ensure that the main C.B is open.
SDLC
Ries Engineering Shares Company 27
Electrical system Inspect the wiring for the following:- -Loose connection. -Worn wire. Inspect the alternator belt. Ensure that the grounds are secured.
SDLC
Ries Engineering Shares Company 28
Fuel system Inspect the fuel lines for loose fitting
and leaks. Ensure the fuel lines are properly
clamped. Ensure that the fuel is supplied to the
engine. Prime the fuel system – as required.
SDLC
Ries Engineering Shares Company 29
Lubrication system Check the engine crank case oil level. Check for leaks; crank shaft seal,
crankcase, oil filters, plugs, sensors. Inspect the tubes, tee pieces and
clamps on the crank case breathers.
SDLC
Ries Engineering Shares Company 30
Starting system Disconnect any battery charger that are
not protected against the high current drain that is created when the electric starting motor is engaged.
Inspect the battery cables. Inspect the gauges and the control
panel for good connection. Reset the shutoff and alarm
components.
SDLC
Ries Engineering Shares Company 31
Engaging the Generator Ensure that gauges are in the normal
range. Increase the engine speed to rated rpm. Adjust voltage and frequency. Close C.B. Continue to check the gauges.
SDLC
Ries Engineering Shares Company 32
Engine stoppingEmergency stop.Manual stop -Open main C.B. -Turn ECS to off/reset. -Or stop for engine with EMCP panel.
SDLC
Ries Engineering Shares Company 33
Generator OperationLoading of the generator:- -Check for load total current/phase. -Share the load between phases.
SDLC
Ries Engineering Shares Company 34
Block Loading Depends on:- Engine transient response. Voltage regulator response. Type of voltage regulator. Altitude of operation. Type of load. The amount of load that is already
present.
SDLC
Ries Engineering Shares Company 35
Power Factor Represent the efficiency of the load. Ratio; apparent power : total power. KW=KVA x P.F. CAT genset p.f = 0.8 lag
Apparent power (2)
Real power (1)
Reactive power (3)
SDLC
Ries Engineering Shares Company 36
Excitation system Self excited generators. Permanent Magnet pilot excited
generators (PMPE).
SDLC
Ries Engineering Shares Company 37
Low Idle adjustment 900 rpm. 60 HZ 66% 50HZ 80% For electronic governor, no idle stop For mechanical governor, low idle is set
at the factory.
Of full load
speed
SDLC
Ries Engineering Shares Company 38
Standby Gensets Most of them are automatic. Perform: start, pickup load, run and
stop.
SDLC
Ries Engineering Shares Company 39
Parallel Operation
-1-
RequirementRequirement
I n order to operate alternators in parallel, I n order to operate alternators in parallel, several conditions MUST be metseveral conditions MUST be met
The 3 first fundamental conditions are :The 3 first fundamental conditions are :
* Same Frequency* Same Frequency* Same Voltage* Same Voltage* Same Phase Rotation* Same Phase Rotation
SDLC
Ries Engineering Shares Company 40
Maintenance interval schedule To determine the maintenance interval
use the fuel consumption, service hours or calendar time…..which ever comes first.
Daily. Every week. Every 100 Hrs. Every 250Hrs. etc.
SDLC
Ries Engineering Shares Company 41
Annunciator panel – inspect Lamp test.Alarm sound.Gauges condition.Frequently monitor:- -Fuel filter differential pressure. -Inlet air restriction. -Oil filter differential pressure.
SDLC
Ries Engineering Shares Company 42
Electrical connections – check
Tightness and physical damage. Transformers. Fuses. Capacitors. Lightening arrestors.
SDLC
Ries Engineering Shares Company 43
Starting motor – inspect Pinion & flywheel ring gear.Proper operation. -Listen for grinding.Problems of starter motor caused by:- -Solenoid malfunction. -Loose connections. -Corrosion or worn wires.
SDLC
Ries Engineering Shares Company 44
Electronic control system
InputControlOutput
SDLC
Ries Engineering Shares Company 45
Fuel system
SDLC
Ries Engineering Shares Company 46
System operation ECM
SDLC
Ries Engineering Shares Company 47
Temp. sensorsPressure sensorsSpeed sensorsECMWiring harnessSoftware
Electronic system components
SDLC
Ries Engineering Shares Company 48
Cold cylinder cutout During cold start or extended period of
low idle. Activated when Programmed enable Engine speed equal to or below high
idle speed. Fuel rack is below 13 mm Jacket water temp below 63 degree c.
SDLC
Ries Engineering Shares Company 49
Engine monitoring system ECM monitors parameters. Select an action (warning, derate,
shutdown). -Can be set by ET
SDLC
Ries Engineering Shares Company 50
100 hour free configuration on engine start up
Provide the ability to change any configuration parameters via ET with out a password.
SDLC
Ries Engineering Shares Company 51
Electronic control system operation
SDLC
52Web-Ex Presentation
53Web-Ex Presentation
54Web-Ex Presentation
55Web-Ex Presentation
56Web-Ex Presentation
57Web-Ex Presentation
58Web-Ex Presentation
59Web-Ex Presentation
60Web-Ex Presentation
61Web-Ex Presentation
62Web-Ex Presentation
63Web-Ex Presentation
64Web-Ex Presentation
65Web-Ex Presentation
66Web-Ex Presentation
67Web-Ex Presentation
68Web-Ex Presentation
69
2004A Version,ECM test mode not availablePressure Sensor Calibration available
70
2004B Version,ECM test mode availablePressure Sensor Calibration no available
71Web-Ex Presentation
72
Test ECM Cheat Sheet• Flash the new ECM• Return to ET• Click Service, a window will appear. Click Test ECM mode• Click Activate in lower left corner• ET will give a warning that it will reconnect• Click OK• ET will connect, a window will appear and says ECM is in
test mode with how much time is left• Program all customer parameters. Including Engine
Serial Number• Always reactive a test mode when being used in another
engine
SUTRAC Development & learning centre
Ries Engineering Shares Company 73
Electronic control circuit for the fuel system
SDLC
Ries Engineering Shares Company 74
Testing & Adjusting Electronic control system Calibration -Calibration for electronic injection
timing with the electronic service tool Monitoring system parameters -ECM initiate an action if a specific
parameter exceeds an acceptable range -Log codes and events
SDLC
Ries Engineering Shares Company 75
Engine speed/timing sensor remove and install
Inspect the sensor connector.Remove sensor from fly wheel.Examine the plastic end of the sensor.Pry the plastic sensor end to the fully extended position (appr.4.75 mm).Grasp the plastic end of the sensor. Wiggle the sensor from one side to the other to check for play.Gently push in on the plastic end of the sensor.Examine the O-ring seal at the base of the sensor thread.Install the sensor into the fly wheel housing.Connect the sensor connector.
SDLC