10
Equipment Manufacturer 350-1736

350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

Equipment Manufacturer350-1736

Page 2: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

Equipment Manufacturer350-1736

Page 3: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

48"

1,22M

TRANSFER

STATION

W/ STEP

90° GLIDE

SLIDE

RIBBON

CLIMBER

TWIST-N-SHOUT

SLIDE

ROCK

CLIMBER

28'-11"

[8.82M]

26'-5"

[8.06M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-3"

[1.91M]

6'-3"

[1.90M]

6'-2"

[1.88M]

PIPEWALL

W/ WHEEL

(deck)

STOREFRONT

(ground)

ADA

STAIR

POST

MOUNT

BELL

ASSORTED

LOLLITOPS

SMALL (Qty. 1)

MEDIUM (Qty. 1)

LARGE (Qty. 2)

6'-2"

[1.89M]

6'-3"

[1.90M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 5

3

5

2

2

2

2

2

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

1736

SA

LE

S

TR

UC

TU

RE

350-1736A 1/4"=1'-0"

M. MERTZ

20-DEC-17

16'7" x 14'1" x 12'6"5,05M x 4,29M x 3,81M

28'11" x 26'5"8,82M X 8,06M

614 SqFt.57,04 SqM.

90 Ft.27,43M

4 Ft.1,22M

26 2-12

17

Page 4: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

48"

1,22M

28'-11"

[8.82M]

26'-5"

[8.06M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-3"

[1.91M]

6'-3"

[1.90M]

6'-2"

[1.88M]

8

9

10

11

13

14

15

16

17

20

20

21

18

19

12

6'-2"

[1.89M]

6'-3"

[1.90M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 5

3

5

2

2

2

2

2

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

1736

SA

LE

S

TR

UC

TU

RE

350-1736A 1/4"=1'-0"

M. MERTZ

20-DEC-17

16'7" x 14'1" x 12'6"5,05M x 4,29M x 3,81M

28'11" x 26'5"8,82M X 8,06M

614 SqFt.57,04 SqM.

90 Ft.27,43M

4 Ft.1,22M

26 2-12

17

Page 5: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

DATE:

SCALE:

DRAWN BY:

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

(112"

(144"

Page 6: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

1

3

6

"

1

3

6

"

1

4

8

"

1

6

0

"

1

2

4

"

1

2

4

"

1

7

2

"

1

6

0

"

TRANSFER

STATION

W/ STEP

90° GLIDE

SLIDE

RIBBON

CLIMBER

TWIST-N-SHOUT

SLIDE

ROCK

CLIMBER

ADA

STAIR

36"36"15"

16"

21"

7"

17"

37"

18"

16"

19"

41"

16"

32"

18"

37"

64"

21"

13"

36"

36"

48"

36"

8"

47"

128"

133"

149"

121"

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

FOOTING LEGEND

1

1

2

"

1

8

5

0

Z

Z

C

H

1

4

4

"

G

Z

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

350-

1736

SA

LE

S

TR

UC

TU

RE

350-1736A 1/4"=1'-0"

M. MERTZ

20-DEC-17

Page 7: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

Posts

ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP

ZZCH0028 22 3.5in OD x 136in STEEL POST W/ RIVETED CAP

ZZCH0039 13 3.5in OD x 148in STEEL POST W/O CAP

ZZCH0049 24 3.5in OD x 160in STEEL POST W/O CAP

ZZCH0059 15 3.5in OD x 172in STEEL POST W/O CAP

Decks & Kick Plates

ZZCH0616 16 SQUARE COATED DECK ASSEMBLY

ZZCH0636 17 DOUBLE SLIDE COATED DECK ASSEMBLY

ADA Items

ZZCH2006 18 TRANSFER STATION (36in DECK)

ZZUN2019 19 APPROACH STEP FOR TRANSFER STATION

Slides

ZZCH2727 110 TWIST AND SHOUT (48in DECK)

ZZCH3129 111 90 DEGREE GLIDE SLIDE (36in DECK)

Activity Panels

ZZCH4646 112 STORE FRONT PANEL

ZZUN4299 113 STEERING WHEEL (CH/EX PIPE WALL MOUNT FOR 4in CENTERS)

Barriers

ZZCH4095 114 CENTERLINE PIPE WALL BARRIER

Climbers

ZZCH7439 115 ROCK CLIMBER (48in DECK)

ZZCH8289 116 RIBBON CLIMBER (36in DECK)

Audible Activities

ZZCH4556 117 7in BELL (POST MOUNT)

Roofs & Arches

ZZCH9847 118 SMALL LOLLITOPS

ZZCH9848 119 MEDIUM LOLLITOPS

ZZCH9849 220 LARGE LOLLITOPS

Stairs and Ladders

ZZCH9168 121 12in ACCESS STEPPED PLATFORM (DECK TO DECK)

Additional Tool & Maintenance Kits

ZZUN1471 122 INSTALLER HARDWARE KIT

ZZUN9910 123 SURFACING WARNING LABEL KIT

ZZUN9930 124 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

ZZXX0678 125 LABEL KIT- COMPOSITE STRUCTURE - ASTM

ZZXXGNGUID 126 GENERAL INSTALLERS GUIDE

Part No. Description

Design Number: 350-1736A - Bill Of Material

350-1736

Ref.No. Quantity

Wednesday, April 29, 2020 Page of1 1 Playworld.com

Page 8: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP

2 77.82 108 0 2.00 0.25 0

CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP

2 87.02 117 0 2.00 0.25 0

CertifiedZZCH00393 3.5in OD x 148in STEEL POST W/O CAP1 46.21 59 0 1.00 0.13 0

CertifiedZZCH00494 3.5in OD x 160in STEEL POST W/O CAP2 99.82 127 0 2.00 0.25 0

CertifiedZZCH00595 3.5in OD x 172in STEEL POST W/O CAP1 51.61 68 0 1.00 0.13 0

CertifiedZZCH06166 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0

CertifiedZZCH06367 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0

CertifiedZZCH20068 TRANSFER STATION (36in DECK) 1 145.80 308 2 2.00 0.09 0

CertifiedZZUN20199 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0

CertifiedZZCH272710 TWIST AND SHOUT (48in DECK)1 183.86 656 4 3.00 0.06 1

CertifiedZZCH312911 90 DEGREE GLIDE SLIDE (36in DECK)1 96.73 418 2 2.00 0.03 1

CertifiedZZCH464612 STORE FRONT PANEL 1 33.98 243 3 1.00 0.00 1

CertifiedZZUN429913 STEERING WHEEL (CH/EX PIPE WALL MOUNT FOR 4in CENTERS)

1 5.29 27 1 0.25 0.00 1

CertifiedZZCH409514 CENTERLINE PIPE WALL BARRIER 1 28.74 71 0 0.50 0.00 0

CertifiedZZCH743915 ROCK CLIMBER (48in DECK) 1 136.38 555 3 2.00 0.03 1

CertifiedZZCH828916 RIBBON CLIMBER (36in DECK)1 35.02 101 2 1.50 0.06 1

CertifiedZZCH455617 7in BELL (POST MOUNT) 1 4.61 41 1 0.25 0.00 1

CertifiedZZCH984718 SMALL LOLLITOPS 1 15.04 89 0 0.25 0.00 0

CertifiedZZCH984819 MEDIUM LOLLITOPS 1 29.04 143 0 0.25 0.00 0

CertifiedZZCH984920 LARGE LOLLITOPS 2 100.08 452 0 0.50 0.00 0

CertifiedZZCH916821 12in ACCESS STEPPED PLATFORM (DECK TO DECK)

1 70.28 277 1 2.00 0.00 0

N/AZZUN147122 INSTALLER HARDWARE KIT 1 57

CertifiedZZUN991023 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993024 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 90

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1736A - Compliance and Technical Data

350-1736

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

Wednesday, April 29, 2020 Page of1 3 Playworld.com

Page 9: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

N/AZZXX067825 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0

N/AZZXXGNGUID26 GENERAL INSTALLERS GUIDE 1 1

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1736A - Compliance and Technical Data

350-1736

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

139 296 4,438 26 26.83 1.311,401.97 7Totals:

4 Metric Tons133 Kg63 Kg630.89 Kg 1.00 m3

Wednesday, April 29, 2020 Page of2 3 Playworld.com

Page 10: 350-1736 Equipment Manufacturer · ada schedule 5 3 5 2 2 2 2 2 playworld systems, inc. 1000 buffalo road lewisburg, pa 17837-9795 usa b paper size date: project no: scale: *playground

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1736A - Compliance and Technical Data

350-1736

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-1736A, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Wednesday, April 29, 2020 Page of3 3 Playworld.com