Section 4 I Page 1 UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing Stress Control and Insulation Materials 4.1.1 Single-Core Paper Insulated Cables in Transition Joints Prepare the cable as described in section 3.2. Use a chinagraph pencil to mark 20mm onto the lead sheath and 10mm onto the insulation papers. Remove the release paper from the medium length of yellow stress control tape. Stretch the tape to about half its original width and wrap it around the lead sheath for 20mm. Remove the twine binder from the screen edge and continue with the tape over the screen papers and onto the insulation for 10mm. Use a chinagraph pencil to mark the lead sheath 20mm beyond the yellow stress control tape. Position the clear barrier tubing over the core end and over the yellow stress control tape, overlapping onto the lead sheath by 20mm. UNCONTROLLED

33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

  • Upload
    others

  • View
    45

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 1UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS

4.1 Installing Stress Control and Insulation Materials4.1.1 Single-Core Paper Insulated Cables in Transition Joints • Preparethecableasdescribedinsection3.2.Useachinagraphpenciltomark20mm

ontotheleadsheathand10mmontotheinsulationpapers.

• Removethereleasepaperfromthemediumlengthofyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.

• Useachinagraphpenciltomarktheleadsheath20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandovertheyellowstresscontroltape,overlappingontotheleadsheathby20mm.UNCONTROLL

ED

Page 2: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 2

• Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.

• Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdownstartingattheopencableendbeforeworkingtowardstheleadsheath.

4.1.2 Single-Core Polymeric Pot Ends • Preparethecablesasdescribedinsection3.1uptoandincludingthescreenremoval

point.Thedimensionforthescreenis80mm.

UNCONTROLLED

Page 3: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 3UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Removetheinsulationfor30mmfromtheendofthecable.

• Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofconductingmaterial.Alwayswipefromtheopencutendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromthescreenlayer.

• Wraptheconductivetapesuppliedinthejointingkitaroundthe30mmofexposedconductorstretchingittoabouthalfitsoriginalwidth.

• Increasetheconductordiametersufficientlysothattheinsulatingrodisasnugfitovertheconductor.Pushtheinsulatingrodontotheconductorensuringthatitbuttsagainstthecableinsulation.

UNCONTROLLED

Page 4: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 4

• Useashortstripofyellowstresscontrolmasticandremovethereleasepapersfromashortstripofyellowstresscontrolmastictape.Wrapitaroundtheedgeoftheinsulationscreenstarting20mmfromthescreenedge,beforecontinuingfor10mmontothecoreinsulation.Stretchthetapetoapproximatelyhalfitsoriginalwidthtoobtainafineedgeontotheinsulation.

• Usingalongstripofyellowstresscontrolmasticandremovethereleasepapers.Wrapitaroundthecoreinsulationstarting10mmfromtheinsulationedge,beforecontinuingontotheinsulatingrodcoveringthe'paintedarea'and10mmbeyondontotherodinsulation.

• Useonlyasmuchoftheyellowstresscontrolmastisasnecessarytofillinthestepbetweentheinsulationandtherod.

UNCONTROLLED

Page 5: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 5UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Wraponelayerofredmasticaroundtheinsulatingrod60mmfromitsendandwithawidthof10mm.

• Positiontheblackstresscontroltubingovertheinsulatingrodandbuttitupagainstthecableoversheathcut.Shrinkthetubingdownstartingattheoversheathendbeforeworkingtowardstheinsulatingrodend.

• Useonelayerofredmasticaroundeachendoftheinstalledstresscontrolledtube60mminfromeachendandwithawidtehof10mm.

UNCONTROLLED

Page 6: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage6

• Slidetheredinsulatingtubingoverthestresscontroltubebuttingitagainstthecableover-sheathandcoincidingwiththestresscontroltubingedge.

• Shrinkthetubingdownstartingattheover-sheathendandworkingtowardstheinsulatingrodend.

• Placetheblackandredscreenedinsulatingtubingovertheassemblyandpositionittocoincidewiththepreviouslyinstalledtubes.

UNCONTROLLED

Page 7: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 7UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Shrinktheblackandredtubedownstartinginthecentre.Whenthissectionisfullyshrunkitshouldbesmoothwithoutridgesandshouldnotmovewhentwistingthetubeend.

• Continuetheshrinkingprocess,workingtowardsoneendandstopping50mmfromtheend.Thenshrinktowardstheoppositeendstopping50mmfromtheend.Finallyshrinkdownthefirstremaining50mmoftubingfollowedbythesecond50mmoftubing.Thisprocessensuresthatnoairistrappedinsidethetube.

4.1.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

• Preparethecablesuptothepointasdescribedinsection3.3.

• ProtecttheCopperWovenTape(CWT)withnylontape,startingfrom20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.

UNCONTROLLED

Page 8: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage8

• Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcore,overlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.

• Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandfreefromcreasesorwrinkles.

UNCONTROLLED

Page 9: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 9UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchbeforeworkingtowardsthecoreends.

UNCONTROLLED

Page 10: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 10

• Slidethesmallyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.

• Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.

• Wrapstripsofyellowmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntila'cone'shapeisformed.

UNCONTROLLED

Page 11: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 11UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdownstartingatthecentre,beforefirstlyworkingtowardstheleadsheathandthentowardsthebreakoutfingers.

4.1.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)

• Preparethecablesuptothepointasdescribedinsection3.3.

• ProtecttheCWTwithnylontape,starting20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.

UNCONTROLLED

Page 12: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 12

• Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcoreoverlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.

• Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionbeforeworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandisfreefromcreasesorwrinkles.

UNCONTROLLED

Page 13: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 13UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchworkingtowardsthecoreends.

• Slidethesmallersuppliedyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.

UNCONTROLLED

Page 14: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 14

• Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.

• Wrapthestripsofyellowstresscontrolmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntilaconeshapeisformed.

UNCONTROLLED

Page 15: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 15UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdown,startingatthecentrebeforeworkingtowardstheleadsheathandthentowardsthebreakoutfingers.

• Positiontheshortlengthofwrap-aroundheatshrinktubeoverthepapercablesothatitcoverstheleadsheathandthethreefingerbreakout.Leaveagapofatleast100mmbetweentheendofthewraparoundandthearmoursealingsleeve.

UNCONTROLLED

Page 16: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage16

• Shrinkthewrap-aroundinplacestartinginthemiddle,untilthesurfacepaintonthetubeturnsfromgreentoblack.Thengraduallymovetoeachendusingthesameprocess.Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbeclearlyseenunderit.

• Positiontheshortsealingheatshrinktubesovertheturretsoftheheatshrinkbreakout,ensuringtheyarepushedrightintothecrutchandshrinkinplace.

4.1.5 HSL Breakout Module • Preparethecablesuptothepointasdescribedinsection3.4.1to3.4.3.

• Useachinagraphpenciltomarkeachleadsheath100mmfromthearmourcutedge.Foldashortlengthoftinnedcoppermeshinhalflengthways.

UNCONTROLLED

Page 17: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 17UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Wrapthetinnedcoppermesharoundtheleadsheathscenteredonthe100mmmark.

• Positiononeofthelengthsofbraidoverthemeshsothatthelooseendpointsawayfromthecrutchofthecable.

• Securealengthofearthbraidtoeachleadoftheleadsheathsusingoneturnoftherollspringsdirectlyontothecoppermeshwrap.

UNCONTROLLED

Page 18: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage18

• Bendthebraidsbackovertherollspringandthensecureinplacewiththeremainingturns.

• CovereachoftherollspringswithtwolayersofPVCtape.

UNCONTROLLED

Page 19: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 19UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Securethebraidendstothearmoursandthesupportringwitharolloftinnedcoppermeshsandwichingthebraidsbetweenthemeshwraps.

• Finally,securethemeshandbraidstothesupportringandarmoursusingthewormdriveclipsprovided,withoneclipeithersideofthesupportring’scentralridge.

UNCONTROLLED

Page 20: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 20

• CoverthewormdriveclipswithPVCtapetotidyuptheirlooseends.

• Slideasealingsleeveovereachleadsheathandrollspringconnectionuptowheretheearthbraidmeetsthesupportring.Shrinkthemdownstartingontheleadsheathsandcontinuingtowardsthearmourwiresarea.

• Wrapastripofblackmasticbehindthesupportringoverthearmourwires,fillingthespacebetweentheringandtheoutersheath.

UNCONTROLLED

Page 21: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 21UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Passthebreakoutovertheleadsealingsleevesandpulldownintothecrutch.Shrinkthebreakoutdownstartinginthecentrebeforemovingtowardstheover-sheathandthenshrinkthebreakoutfingers.

• Positionthecrutchsealingsleevewithoneendlevelwiththeendofthefingersonthebreakoutandshrinkintoplace.

4.1.6 HSL Cable Core Preparation • Preparethecablesasdetailedinsection4.1.5andremovetheleadsheathsasdescribed insection3.4.4.

• Useachinagraphpenciltomark20mmontotheleadsheath,and10mmontothe insulationpapers.

UNCONTROLLED

Page 22: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 22

• Removethereleasepaperfromoneofthemediumlengthsyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.

• Makeamarkontheleadsheathusingachinagraphpencil20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandtheyellowstresscontroltapeoverlappingontotheleadsheathby20mm.

• Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.

UNCONTROLLED

Page 23: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 23UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdown,startingattheopencableendbeforeworkingtowardstheleadsheath.

4.1.7 Paper Insulation 'Shim Kit' for Cable Cross Sections 70mm² & 95mm² • Forcablesbelowtheminimumsizerangespecifiedonthekitlabela'shimkit'mustbeused.

• Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.

• Applyapieceoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapeprovidedinthemainjointkit.

• Positionashortlengthofthesmallerdiameterstresscontroltubing(42/16)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.

UNCONTROLLED

Page 24: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 24

• Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.

• Wraponeoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothecore.

• Positionashortlengthofthelargerdiameterstresscontroltubing(54/24)directlyoverthepreviouslyappliedstresscontroltubeandshrinkdownfollowingthesameprocedureasbefore.

UNCONTROLLED

Page 25: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 25UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Applyoneoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothepreviouslyappliedredmastic.

4.1.8 Paper Insulation 'Shim Kit' for Cable Cross Sections 120mm² & 150mm² • Forcablesbelowtheminimumsizerangespecifiedonthekitlabel,a'shimkit'mustbe

used.

• Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.

• Applyashortlengthoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapesuppliedinthemainjointkit.

• Positionashortlengthofthestresscontroltubing(54/24)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.UNCONTROLL

ED

Page 26: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage26

• Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.

• Wraponeoftheredmasticstripsprovidedaroundeachendofthestresscontroltube30mmontothetubingand10mmontothecore.

4.1.9 Single-Core Polymeric Terminations (Indoor and Outdoor) • Followthecablepreparationproceduresforpolymericcablesasdescribedinsection3.1.

• Useachinagraphpenciltomarktheoutersheath60mmbelowthesheathcutposition.

UNCONTROLLED

Page 27: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 27UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Wraponelayerofredsealanttapeoverthecablesheathdowntothechinagraphpencilmark.

• Bendbackthecopperscreenwirescarefullyandlaythemontothemastictapetakingcarenottocrossoveranyofthewires.Securethewireswithawirebinderatthe60mmmark.

• Makeachinagraphpencilmarkontothecorescreen40mmfromthesheathcut.

UNCONTROLLED

Page 28: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage28

• Removethecorescreendowntothe40mmmarkusingtheapprovedscreenstrippingtool.

• Makeamarkwithachinagraphpencil20mmontothecorescreenand10mmontotheinsulation.

• Removethereleasepaperandwraptheyellowstresscontrolmasticaroundthescreencutbetweenthetwopencilmarks.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontotheinsulation.

UNCONTROLLED

Page 29: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 29UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Positiontheblackstresscontroltubingoverthecoresothatitislevelwiththeoutersheathcut.Shrinkthetubingdown,startingatthesheathcutendandworkingupwards.Whenfullyshrunkthetubingshouldbesmoothandwrinklefree.

• Removetheinsulationfromthecoreendaccordingtotheinnerdimensionofthecablelugbarrel.

UNCONTROLLED

Page 30: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 30

• Fitthecablelugensuringthatthelugbuttsagainsttheinsulationedgeandhandtightenthesecuringbolts.

• Shearofftheboltheadsusingtheapprovedtoolsandfillintheindentswiththegreyclayprovided.

• Wraptheredsealanttapearoundthelugbarrel,overlappingontotheinsulation.Buildupthediameterdifferencewiththeredtapesothatasmoothandevenprofileisachieved.

UNCONTROLLED

Page 31: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 31UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Removethereleasepaperfromtheredtubing.Placethetubingoverthecableend(withthesealantcoatedenddownwards),levelwiththewirebinder.

• Shrinkthetubingdownstartingattheoutersheathend,beforeworkingtowardsthecable lug.

• Cutthetubingbackontothecablelug,levelwiththetopofthemainbody,ifnecessary.

• Post-heatthepalmofthecableluguntilabeadofthesealantappearsaroundthetopof thetubing.

UNCONTROLLED

Page 32: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 32

• Useachinagraphpenciltomarkthepositionfortheshedsonthetubingatthedimensiongivenintheterminationinstruction.

• Placetwoskirtsoverthecableendandpositiononthepreviouslymademarks.Shrinkeachshedinplace.

UNCONTROLLED

Page 33: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 33UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Foroutdoorterminationstherearefourskirtstobefittedtoeachtermination.Theseshouldbeplacedandshrunkintopositionatthemeasurementsindicatedintherelevantjointinginstruction.

4.2 Installing Mechanical Connectors and Lugs4.2.1 Single-Core Polymeric Straight Joints • Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1.

• Positionthecombinedstresscontrol,screenedinsulatingtubingandoutersealingsleeveoveroneofthecableends.

• Removetheinsulationasdescribedinsection3.1.3.

UNCONTROLLED

Page 34: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 34

• Theconnectorcomeswithmetalinsertstofitsmallconductors.Iftheconductorwillnotfittheconnector,discardtheinsertandusetheconnectorwithoutit.

• Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsttheendoftheconnector.

• Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.

UNCONTROLLED

Page 35: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 35UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Continuetotightenandsheeroffalltheboltsstartingwiththeboltsateachendfollowedbythecentralbolts.

• Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.

4.2.2 Single-Core Transitional Straight Joints • Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and3.2.

• Slidethefivepiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.

Note :Itisimportantthatthefourthtube(thesecondlargest)isplacedwithinthetubeset sothattheuncoatedinneredgepointstowardsthejointcentre.

UNCONTROLLED

Page 36: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage36

• Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.2.5.

• Theconnectorisa'TwoPiece'designwiththetwohalvessecuredtogetherwithacentralshearbolt.Eachconnectorhalfhastwoconductorsecuringboltswhicharealsooftheshearofftype.

• Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsteachendoftheconnector.

UNCONTROLLED

Page 37: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 37UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.

• Continuetotightenandsheeroffalltheboltsstartingwiththoseateachendfollowedbythecentralbolt.

• Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.

UNCONTROLLED

Page 38: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage38

4.2.3 Resin Filled Three-Core Trifurcating Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

• Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1and4.1.3.

• Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.

• Slidethethreepiecetubingsetsoverthepolymericcableside.Nestingthetubesetsontheplasticbagwrappingtokeeptheinsideofthetubesclean.Thetubesetsshouldbeplacedintheordershown.

• Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors,sections3.1.3and3.3.7,totheconnectorinsertiondepth.

UNCONTROLLED

Page 39: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 39UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.

• Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.

• Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.

UNCONTROLLED

Page 40: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 40

• Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.

• Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

4.2.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)

• Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and4.1.4.

• Slidetheouterjointheatshrinksealingbreakoutoverthesingle-corecablesandpositionitawayfromthejointingarea.

UNCONTROLLED

Page 41: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 41UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Slidethefourpiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.

• Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.3.7.

• Slidethemechanicalconnectorontotheconductoronthepapersideofthejoint.Theconnectorisfittedwithaninserttoaccommodatesmallersectioncables;ifthecableconductorfitsintotheconnectorwiththeinsertinplace,useit-ifnot,removetheinsertanduseitwithout.

• Checkthattheconnectorbuttsupagainsttheinsulationandfinger-tightenthebolts.

UNCONTROLLED

Page 42: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 42

• Insertthesingle-corepolymericcablesintotheconnectorensuringthattheconnector buttsupagainsttheinsulationandfinger-tightenthebolts.

• Holdtheconnectorwiththeapprovedholdingtoolandtighteneachbolthalfaturnatatimewithasocketuntilitshearsoff.Startwiththeboltnearesttheinsulationateachendbeforemovingontotheothertwobolts,workingtowardsthemiddle.

• Smoothoffanysharpedgesfromtheboltsandthencleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

UNCONTROLLED

Page 43: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 43UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

4.2.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables) • ThecableswillhavebeenprepareduptothepointasdescribedinSection3.1and4.1.6.

• Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.

• Positionacombinedtubeset(stresscontrol,insulatingtubeandscreenedinsulating)overeachofthesingle-corepolymericcables.

• Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors(3.1.3and3.3.7)totheconnectorinsertiondepth.

UNCONTROLLED

Page 44: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 44

• Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.

• Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.

• Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.

UNCONTROLLED

Page 45: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 45UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.

• Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.

UNCONTROLLED

Page 46: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage46

4.2.6 Mechanical Lugs for Indoor and Outdoor Terminations • Followthecablepreparationproceduresforpolymericcablesinsections3.1.1to3.1.3

beforeinstallinganymechanicallugs.

• Eachkitcomeswiththecorrectsizeandtypeoflugforeachtermination.Removetheconductorinsulationtotheinsertiondepthofthelug.

• Placethelugovertheconductorsothatthebottomofthebarrelbuttsupagainstthecoreinsulation.

UNCONTROLLED

Page 47: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 47UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Tightentheboltsbyhandandcheckthatthepalmholeslineupwiththeirrespectiveconnectionpoint.

• Tightentheboltsuntiltheboltheadsshearoff.

4.3 Installing Connector Stress Control and Heatshrink Insulation4.3.1 Single-Core Polymeric Straight Joints • Fittheconnectoruptothepointasdescribedinsection4.2.1.

• Useachinagraphpenciltomarktheblackinsulationscreenofbothcables20mmfromthescreencut.

• Makeasecondchinagraphpencilmarkontheinsulation10mmfromthescreencut.

UNCONTROLLED

Page 48: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage48

• Stretchoneoftheshortyellowstresscontrolmasticsuppliedinthekittohalfitsoriginalwidth.Wrapitaroundthecorescreenandinsulationbetweenthetwochinagraphpencilmarks.Repeatfortheothercableside.

• Usethelongstripofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingthemastictoabouthalfitsoriginalwidth.Coveralltheconnectorareaandoverlaptotheinsulationoneachsideoftheconnectorby5mm.Makesurethereisasmoothtransitionfromtheconnectorontotheinsulation.

• Positiontheblackstresscontroltubecentrallyovertheconnectorarea.Eachendofthetubeshouldextendbeyondthescreenterminationpointsofeachcable.Shrinkthestresscontroltubingdown,startinginthecentreandworkingtowardseachendinturn.

UNCONTROLLED

Page 49: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 49UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Positionthescreenedinsulatingredandblacktubecentrallyoverthestresscontroltubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.

• Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisible.

• Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresthatairinsidethetubeisexpelledasthetubeshrinks.

UNCONTROLLED

Page 50: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 50

• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

4.3.2 Single-Core Transition Straight Joints • Fittheconnectoruptothepointasdescribedinsection4.2.2.

• Wrapashortpieceoftheyellowstresscontrolmasticaroundthepapercablecoreattheedgeoftheshortblackconductingsleeve.Start20mmontheconductingtube,continuingfor10mmontotheclearbarriertube.

• Wrapashorterpieceoftheyellowstresscontrolmasticaroundthepolymericscreen,starting20mmfromthescreenedgeandcontinuingfor10mmontotheinsulation.Stretchthetapetohalfitsoriginalwidthduringthetapingprocess.

UNCONTROLLED

Page 51: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 51UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Usethelongstripsofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingittoabouthalfitsoriginalwidth.Covertheconnectorareaandoverlapontotheinsulationeachsideoftheconnectorby5mm.Makesureaminimumcoverageof2mmisachievedovertheconnectorarea.

• Pulltheblackstresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea,leavinga20mmgapbetweentheoversheathandthetubingend.

UNCONTROLLED

Page 52: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 52

• Shrinkthestresscontroltubingdownstartinginthecentre,beforeworkingtowardseachendinturn.Whenfinishedthetubingshouldbefullyshrunkandwrinklefree.

• Wrapapieceofredsealantmasticaroundeachendofthestresscontroltubing.Startfrom10mmonthestresscontroltubingandextendfor10mmontothecorescreenatbothends.

• Pulltheredinsulatingtubingfrominsidethenestedtubesetandpositionitcentrallyoverthestresscontroltube.Startshrinkinginthecentrebeforeworkingtowardseachendinturn.

Note:Continueontothenextstepwhiletheredinsulatingtubingisstillhot.

UNCONTROLLED

Page 53: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 53UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Pulltheblackandredscreenedinsulatingtubingcentrallyovertheredinsulatingtubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisibleandthetubecannolongerbemoved.

• Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

UNCONTROLLED

Page 54: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 54

• Pulltheblackcompressionsealingsleeveacrossthejointtothepapercablesideandplaceitsothatatleast50mmofleadsheathisstillvisible.

• Shrinkthetubingdown,startingonthetubesetendandworkingtowardstheleadsheath.Oncecompletedthereshouldbeapproximately50mmofleadsheathstillexposed.

4.3.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric Cables)

• Fittheconnectoruptothepointasdescribedinsection4.2.3.

• Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

UNCONTROLLED

Page 55: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 55UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Repeattheexerciseonthepapercablecore,wrappingtheyellowstresscontrolmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.

• Ensurethattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile.Usealongpieceoftheyellowstresscontrolmastictofilltheendsoftheconnectorandtheinsulationcutbackcontinuing10mmontotheinsulation,and20mmontotheconnector.Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapplyyellowstresscontrolmastictoformasmooththeprofile.

• Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.

UNCONTROLLED

Page 56: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage56

• Slidethestresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea.Makesurethattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentreandworkingtowardseachendinturn.

• Removethereleasepaperfromonelengthoftheredsealanttapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

• Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.

Note:Continuewiththenextstepwhiletheredinsulatingtubingisstillhot.

UNCONTROLLED

Page 57: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 57UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Positionthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubes.Startshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofeachtubeshouldnolongerbevisibleandthetubescannolongerbemoved.

• Continuetoshrinkthetubefromthecentretowithin50mmofoneend.

• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

UNCONTROLLED

Page 58: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage58

• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

4.3.4 Heatshrink Three-Core Transition Straight Joints (Three-Core PILC to Single-Core Polymeric)

• Fittheconnectoruptothepointasdescribedinsection4.2.4.

• Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

• Repeattheexerciseonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.

UNCONTROLLED

Page 59: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 59UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Checkthattheboltholesarefilledwiththesuppliedclaytoleaveasmoothprofile.Using alongpieceoftheyellowstresscontrolmastic,filltheendsoftheconnectorsandthe insulationcutbacks,continuing10mmontotheinsulationand20mmontotheconnector. Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapply yellowstresscontrolmastictoformaprofile.

• Removethereleasepaperfromoneoftheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludetheairasitiswrapped.Whenfinishedthepatchshouldbesmoothandwrinklefree.Repeattheprocesswithallthreeconnectors.

• Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovereachconnectorensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.

UNCONTROLLED

Page 60: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage60

• Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

• Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.

Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.

• Pullthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.

UNCONTROLLED

Page 61: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage61UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.

• Removetheheatfromthatendandstartshrinkingfromthemiddletowardstheotherendofthetubes.Stop50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

UNCONTROLLED

Page 62: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage62

• Positionthethreecompressionsleevesoverthepaperendofthejoint,sothattheyequallyoverlaptheredandblackinsulationtubesandthecoretubes.Theuncoatedendofthecompressionsleeveshouldbepositionedtowardsthecentreofthejoint.Shrinkinplacestartingfromthecentreofthetubestowardsthecentreofthejointbeforefinallyshrinkingfromthecentretowardsthecrutch.

4.3.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables) • Fittheconnectoruptothepointasdescribedin4.2.5.

• Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.

• Repeatthisonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.UNCONTROLL

ED

Page 63: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage63UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Checkthattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile. Usealongpieceoftheyellowstresscontrolmastictocoverbothendsoftheconnector, 20mmontheconnectorand10mmontotheinsulation.

• Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.

• Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovertheconnectorsensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.

UNCONTROLLED

Page 64: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage64

• Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundbothendsofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.

• Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubesshouldbesmoothandwrinklefree.

Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot. • Pullthescreenedblackandredinsulatingtubescentrallyovertheredinsulatingtubes

andstartshrinkingatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.

UNCONTROLLED

Page 65: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage65UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.

• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubes.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.

• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.

UNCONTROLLED

Page 66: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage66

4.4 Installing Mechanical Earth Bonds and Associated Components4.4.1 Single-Core Polymeric Straight Joints • Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.1.

• Wrapthejointwithonelayerofthetinnedcoppermeshensuringthereisa50mmoverlapontotheoversheathofthecablesidewiththeshortshieldwires.

• Continueacrossthewholejointwiththetinnedcoppermeshata50%overlapandsecureontotheoppositejointside.

• Onthecablesidewiththelongscreenwires,bendthescreenwiresbackacrossthejointandformthemintotwoseparateconductors.Onthecablesidewiththeshortscreenwires,repeatthesameexerciseandfoldthegatheredwiresbacktowardsthejointcentre.

UNCONTROLLED

Page 67: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage67UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Gatherthewirestogetherandcutthemcentrallyabovethetinnedcoppermeshoverlappingthecablesheath.Installthecopperscreenwireconductorsintotheirrespectiveconnectorandtightentheboltsuntiltheheadsshearoff.

• Wrapasecondlayerofthecoppermesharoundthejoint,asbefore,sothatthewholeareaiscompletelycoveredincludingthemechanicalscreenconnectors.

• Cleananddegreasetheoutersheathsofbothcablesfor150mmfromthesheathcut.Slidethelargeoutersealingsleevecentrallyoverthejointarea.

UNCONTROLLED

Page 68: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage68

• Startshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.Allowtocoolbeforemovingorbackfillingthejoint.

4.4.2 Single-Core Transition Joints • Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.2.

• Wraptwolayersoftinnedcoppermeshat50%overlapoverthejointfromtheleadsheathonthepapercabletotheover-sheathcutonthepolymericcable.

• Foldbackthecopperscreenwiresoverthejointandformthemintoanearthleadexceptfortheareaovertheleadsheath.Atthispointopenupthewiresandplacethemdirectlyontothetinnedcoppermesh.Wraptherollspringoverthescreenwiresandtwistuptight.

UNCONTROLLED

Page 69: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage69UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• CompletelycovertherollspringwithtwolayersofPVCtape.

• Clean,degreaseandabradetheoutersheathsfor150mmfromthesheathcuts.Slidethelargeoutersealingsleeveoverthejointareaandstartshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.

• Allowthejointtocoolbeforemovingorbackfilling.UNCONTROLL

ED

Page 70: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 70

4.4.3 Polymeric Pot Ends • Completethestepsinsection4.1.2.

• Laythecopperscreenwiresbackoverontothescreenedblackandredinsulatingsleeveanddistributethemaroundthecircumferenceevenly.

• Wrapthetinnedtinnedcoppermeshwitha50%overlaparoundthepotend,startingattheoutersheathandcontinuingupontothecopperscreenwires,beforecoveringtheinsulatingrod.

Note:Thestresscontroltubingandtherodendmustbeincontactwiththetinnedcoppermesh.

UNCONTROLLED

Page 71: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 71UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Covertheendsofthecopperscreenwiresunderthetinnedcoppermeshwithtwolayers offabrictape.

• Placetheheatshrinkendcapoverthepotendandshrinkitintoplace.Startattheclosedendbeforeworkingtowardsthecablesheath.Duringtheshrinkingprocesscarefullypushtheclosedendofthecapagainsttheinsulatingendwithanappropriatetool.

UNCONTROLLED

Page 72: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 72

• Checkthattheover-sheathiscleananddegreased.Positiontheoutersealingsleeveover thepotendassemblysothatitlinesupwiththeendoftheendcap.

• Shrinkthetubingdown,startingatthecentreworkingtowardseachendinturn.Donotmoveorbackfilluntilthepotendhascooled.

4.4.4 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)

• Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.3.

• Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.

UNCONTROLLED

Page 73: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 73UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Laythecopperwirescreensbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthethreeearthbraidsusingthemechanicalconnectorsprovided.

• Positionthethreeearthbraidsevenlyaroundtheleadsheathareaontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.

• Wraptherollspringoverthebraidsandtwistthespringuptightly.CovertherollspringwithtwolayersofPVCtape.

• Wraptheremainingexposedleadsheathwiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.

UNCONTROLLED

Page 74: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 74

4.4.5 Heatshrink Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric)

• Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.4.

• Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.

• Laythescreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperwirescreenstothethreeearthbraidsusingthemechanicalconnectorsprovided.

• Laythethreeearthleadsevenlyaroundtheleadsheathontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.Wraptherollspringoverthebraidsandtwistthespringuptightly.CoverthespringwithtwolayersofPVCtape.UNCONTROLL

ED

Page 75: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 75UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Applyonehalflaplayerofwhitefabrictapeoverthesingle-corepolymericendofthejointforadistanceof150mmfromthecableoversheathtoprotectthetinnedcoppermeshtapefromtheheatgeneratedbyshrinkingtheThree-Corebreakout.

• Pulltheheatshrinkbreakoutbackoverthejointasfarasitwillgoandshrinkinplace,startingwiththeturretsbeforemovingontothemainbody.

UNCONTROLLED

Page 76: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage76

• Wraptheremainingexposedleadsheathwiththestripofblackmasticsealanttape.Thisisanimportantmoistureseal.Donotleaveout.

• Positionthewraparoundheatshrinkjointsleevearoundthejointandconnectthetwoendstogetherusingthemaetalchannelandthemetaljoiningclip.

• Shrinkthewraparoundsleeveinplace,startingatthemiddlebeforemovingtowardseachendinturn.Thegreenpaintonthesurfaceofthesleeveshoulddisappearwhenthetubeiscorrectlyshrunk.

UNCONTROLLED

Page 77: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 77UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbe clearlyseenunderit.

• Donotmoveorbackfilluntilthejointhascompletelycooled.

4.4.6 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables) • Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.5.

• Wraponelayeroftinnedcoppermeshwitha50%overlapovereachinsulatedcorecontinuingacrossthejointedcoresfromthesheathcutonthepolymericcables.Finish50mmontotheleadsheaths.

• Laythecopperscreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthreeearthbraidsusingmechanicalconnectorsprovidedinthekit.UNCONTROLL

ED

Page 78: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage78

• Connecttheeachearthbraidstoeachoftheindividulleadsheathsusingatwoturnsoftherollsprings.

• Turntheendoftheearthbraidsbackoverthetwoturnsoftherollspringensuringthattheyareflatandeven.Wraptheremainderofthespringlengthoverthebraidsandtwistthespringuptightly.

• CovertherollspringswithtwolayersofPVCtape.

UNCONTROLLED

Page 79: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section 4 I Page 79UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Wraptheremainingexposedleadsheathswiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.

4.4.7 Connection of Screen Wires on Indoor and Outdoor Terminations • Completetheproceduresforinstallingtheterminationsdescribedinsection4.1.8.

• ConnectthescreenwirestotheEarthingstudorpositionprovided(outdoorterminations)asapplicableforthegeometryoftheapparatus.

4.4.8 Fitting Plastic Joint Boxes (Trifurcating Joints Only) • Trimofftheendsofthejointboxsuppliedwiththekit,sothatitwillfitoverthecables

enteringthebox.

• Usingtheboxasaguide,offerituptothecableandmarkthestandoffpositionsofthemouldingswithachinagraphpencil.

UNCONTROLLED

Page 80: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage80

• Removethebackingfromtherubberpatchessuppliedinthekitandapplycentrally(overthepreviouslymademarks)withthestickysideout.

• Placethetwohalvesofthejointshelloverthejointandclipthetwohalvestogetherwiththeclipsprovided.Checkenoughclipsareusedtostoptheresinleakingoutwhenitispouredin.

UNCONTROLLED

Page 81: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage81UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• TapethejointboxtotheincomingcablewithPVCoranothersuitabletape.Iflargegapsareleftwhentheshellisfitteditmaybenecessarytopacktheendsofthejointshelloutwiththeclaypacksuppliedinsomekits.

• Forextrasecurity,runalengthofPVCtapedowntheseamsofthejointshellandfittheplasticlid.

4.4.9 Mixing and Installation of Polyurethane Resin • All33kVjointsshouldbefilledwith3-partpolyurethaneresin.Checkthatthecorrect

PersonalProtectiveEquipmentiswornatalltimesandtheresinisnotmixedinaconfinedspace.

• Checkthelabelonthebuckettoensurethattheresinhasnotpassedtheusebydate.

UNCONTROLLED

Page 82: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage82

• Emptythecontentsofthebucketandcheckforanydamagetothepackaging.

• Pickupthefoilbagcontainingtheresinandhardenerandapplypressuretothelargeresinpouchsothattheresinbreaksthesealbetweenthetwosectionsandmixeswiththehardener.

• Mixthecontentsofbagbykneadingthefoilbagforaminimumoftwominutes.

UNCONTROLLED

Page 83: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

Section4IPage83UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012

• Carefullycutoneofthecornersoffthefoilbagandpourallthecontentsintothesuppliedplasticbucket.

• Pourapproximatelyhalfofthesandsuppliedintheplasticbagintothebucketandstiruntilitisthoroughlymixedintotheresin.

• Pourtherestofthesandintothebucketandmixuntilnorawsandisvisibleandtheresinhasnolumpsinit.

UNCONTROLLED

Page 84: 33kV Jointing Manual Section 4 - Thorne and …...UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012 Section 4 I Page 1 4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS 4.1 Installing

UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage84

• Pourthemixedresinintothejointshell.

UNCONTROLLED