Section 4 I Page 1UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
4 INSTALLING HEATSHRINK MATERIALS AND COMPONENTS
4.1 Installing Stress Control and Insulation Materials4.1.1 Single-Core Paper Insulated Cables in Transition Joints • Preparethecableasdescribedinsection3.2.Useachinagraphpenciltomark20mm
ontotheleadsheathand10mmontotheinsulationpapers.
• Removethereleasepaperfromthemediumlengthofyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.
• Useachinagraphpenciltomarktheleadsheath20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandovertheyellowstresscontroltape,overlappingontotheleadsheathby20mm.UNCONTROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 2
• Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.
• Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdownstartingattheopencableendbeforeworkingtowardstheleadsheath.
4.1.2 Single-Core Polymeric Pot Ends • Preparethecablesasdescribedinsection3.1uptoandincludingthescreenremoval
point.Thedimensionforthescreenis80mm.
UNCONTROLLED
Section 4 I Page 3UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Removetheinsulationfor30mmfromtheendofthecable.
• Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesofconductingmaterial.Alwayswipefromtheopencutendtowardsthescreenwirestoavoidcontaminatingtheinsulationwithcarbonfromthescreenlayer.
• Wraptheconductivetapesuppliedinthejointingkitaroundthe30mmofexposedconductorstretchingittoabouthalfitsoriginalwidth.
• Increasetheconductordiametersufficientlysothattheinsulatingrodisasnugfitovertheconductor.Pushtheinsulatingrodontotheconductorensuringthatitbuttsagainstthecableinsulation.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 4
• Useashortstripofyellowstresscontrolmasticandremovethereleasepapersfromashortstripofyellowstresscontrolmastictape.Wrapitaroundtheedgeoftheinsulationscreenstarting20mmfromthescreenedge,beforecontinuingfor10mmontothecoreinsulation.Stretchthetapetoapproximatelyhalfitsoriginalwidthtoobtainafineedgeontotheinsulation.
• Usingalongstripofyellowstresscontrolmasticandremovethereleasepapers.Wrapitaroundthecoreinsulationstarting10mmfromtheinsulationedge,beforecontinuingontotheinsulatingrodcoveringthe'paintedarea'and10mmbeyondontotherodinsulation.
• Useonlyasmuchoftheyellowstresscontrolmastisasnecessarytofillinthestepbetweentheinsulationandtherod.
UNCONTROLLED
Section 4 I Page 5UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Wraponelayerofredmasticaroundtheinsulatingrod60mmfromitsendandwithawidthof10mm.
• Positiontheblackstresscontroltubingovertheinsulatingrodandbuttitupagainstthecableoversheathcut.Shrinkthetubingdownstartingattheoversheathendbeforeworkingtowardstheinsulatingrodend.
• Useonelayerofredmasticaroundeachendoftheinstalledstresscontrolledtube60mminfromeachendandwithawidtehof10mm.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage6
• Slidetheredinsulatingtubingoverthestresscontroltubebuttingitagainstthecableover-sheathandcoincidingwiththestresscontroltubingedge.
• Shrinkthetubingdownstartingattheover-sheathendandworkingtowardstheinsulatingrodend.
• Placetheblackandredscreenedinsulatingtubingovertheassemblyandpositionittocoincidewiththepreviouslyinstalledtubes.
UNCONTROLLED
Section 4 I Page 7UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Shrinktheblackandredtubedownstartinginthecentre.Whenthissectionisfullyshrunkitshouldbesmoothwithoutridgesandshouldnotmovewhentwistingthetubeend.
• Continuetheshrinkingprocess,workingtowardsoneendandstopping50mmfromtheend.Thenshrinktowardstheoppositeendstopping50mmfromtheend.Finallyshrinkdownthefirstremaining50mmoftubingfollowedbythesecond50mmoftubing.Thisprocessensuresthatnoairistrappedinsidethetube.
4.1.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)
• Preparethecablesuptothepointasdescribedinsection3.3.
• ProtecttheCopperWovenTape(CWT)withnylontape,startingfrom20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage8
• Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcore,overlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.
• Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandfreefromcreasesorwrinkles.
UNCONTROLLED
Section 4 I Page 9UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchbeforeworkingtowardsthecoreends.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 10
• Slidethesmallyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.
• Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.
• Wrapstripsofyellowmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntila'cone'shapeisformed.
UNCONTROLLED
Section 4 I Page 11UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdownstartingatthecentre,beforefirstlyworkingtowardstheleadsheathandthentowardsthebreakoutfingers.
4.1.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)
• Preparethecablesuptothepointasdescribedinsection3.3.
• ProtecttheCWTwithnylontape,starting20mmontotheleadsheathextending30mmontothecores.Thenylontapeshouldbeappliedwithtension.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 12
• Atthescreenterminationpositionwraponelayerofvoidfillingyellowstresscontrolmasticaroundeachcoreoverlappingthescreenpapersby20mmandtheinsulationby10mm.Removethemetalbinderfromthescreenedgeduringthetapingprocess.
• Slidetheclearbarriertubingovereachcoreandposition30mmfromtheendofthemetalsheath.Shrinkdownthetubingstartingatthecrutchpositionbeforeworkingtowardstheopencoreends.Checkthetubingisshrunkdownevenlyandisfreefromcreasesorwrinkles.
UNCONTROLLED
Section 4 I Page 13UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Slidetheblackconductingtubingoverthecoreendsandpositionthem50mmfromtheendofthemetalsheath.Shrinkthetubesdownatthispositionstartingatthecrutchworkingtowardsthecoreends.
• Slidethesmallersuppliedyellowmasticwedgeintothecrutchusingtheinstallationtoolprovided.Takethelargerwedgeandinsertitintothecrutchbehindthesmallerwedgeusingthesametool.Removethenylontapeafterinsertionofbothwedges.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 14
• Degreasethecoresusingapprovedsolventwipes.Makeachinagraphpencilmarkontheconductivetubes70mmfromtheleadsheathcutandfor20mmontotheleadsheath.
• Wrapthestripsofyellowstresscontrolmasticaroundthecrutchbetweenthetwochinagraphpencilmarks.Applysufficienttensiontostretchthetapetohalfitsoriginalwidthuntilaconeshapeisformed.
UNCONTROLLED
Section 4 I Page 15UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Passtheconductivebreakoutoverthecoresandpushitwelldownintothecrutch,usingtheyellowwedgeinstallationtool.Holdthebreakoutinplaceandshrinkitdown,startingatthecentrebeforeworkingtowardstheleadsheathandthentowardsthebreakoutfingers.
• Positiontheshortlengthofwrap-aroundheatshrinktubeoverthepapercablesothatitcoverstheleadsheathandthethreefingerbreakout.Leaveagapofatleast100mmbetweentheendofthewraparoundandthearmoursealingsleeve.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage16
• Shrinkthewrap-aroundinplacestartinginthemiddle,untilthesurfacepaintonthetubeturnsfromgreentoblack.Thengraduallymovetoeachendusingthesameprocess.Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbeclearlyseenunderit.
• Positiontheshortsealingheatshrinktubesovertheturretsoftheheatshrinkbreakout,ensuringtheyarepushedrightintothecrutchandshrinkinplace.
4.1.5 HSL Breakout Module • Preparethecablesuptothepointasdescribedinsection3.4.1to3.4.3.
• Useachinagraphpenciltomarkeachleadsheath100mmfromthearmourcutedge.Foldashortlengthoftinnedcoppermeshinhalflengthways.
UNCONTROLLED
Section 4 I Page 17UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Wrapthetinnedcoppermesharoundtheleadsheathscenteredonthe100mmmark.
• Positiononeofthelengthsofbraidoverthemeshsothatthelooseendpointsawayfromthecrutchofthecable.
• Securealengthofearthbraidtoeachleadoftheleadsheathsusingoneturnoftherollspringsdirectlyontothecoppermeshwrap.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage18
• Bendthebraidsbackovertherollspringandthensecureinplacewiththeremainingturns.
• CovereachoftherollspringswithtwolayersofPVCtape.
UNCONTROLLED
Section 4 I Page 19UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Securethebraidendstothearmoursandthesupportringwitharolloftinnedcoppermeshsandwichingthebraidsbetweenthemeshwraps.
• Finally,securethemeshandbraidstothesupportringandarmoursusingthewormdriveclipsprovided,withoneclipeithersideofthesupportring’scentralridge.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 20
• CoverthewormdriveclipswithPVCtapetotidyuptheirlooseends.
• Slideasealingsleeveovereachleadsheathandrollspringconnectionuptowheretheearthbraidmeetsthesupportring.Shrinkthemdownstartingontheleadsheathsandcontinuingtowardsthearmourwiresarea.
• Wrapastripofblackmasticbehindthesupportringoverthearmourwires,fillingthespacebetweentheringandtheoutersheath.
UNCONTROLLED
Section 4 I Page 21UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Passthebreakoutovertheleadsealingsleevesandpulldownintothecrutch.Shrinkthebreakoutdownstartinginthecentrebeforemovingtowardstheover-sheathandthenshrinkthebreakoutfingers.
• Positionthecrutchsealingsleevewithoneendlevelwiththeendofthefingersonthebreakoutandshrinkintoplace.
4.1.6 HSL Cable Core Preparation • Preparethecablesasdetailedinsection4.1.5andremovetheleadsheathsasdescribed insection3.4.4.
• Useachinagraphpenciltomark20mmontotheleadsheath,and10mmontothe insulationpapers.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 22
• Removethereleasepaperfromoneofthemediumlengthsyellowstresscontroltape.Stretchthetapetoabouthalfitsoriginalwidthandwrapitaroundtheleadsheathfor20mm.Removethetwinebinderfromthescreenedgeandcontinuewiththetapeoverthescreenpapersandontotheinsulationfor10mm.
• Makeamarkontheleadsheathusingachinagraphpencil20mmbeyondtheyellowstresscontroltape.Positiontheclearbarriertubingoverthecoreendandtheyellowstresscontroltapeoverlappingontotheleadsheathby20mm.
• Shrinkthetubingdown,startingontheleadsheathandcontinuingtowardsthecoreend.Oncecompletedthetubingshouldbefullyshrunkandhaveasmoothfinishwithoutwrinklesorcreases.
UNCONTROLLED
Section 4 I Page 23UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Positiontheshortblackconductivesleeve220mmfromthecoreendandshrinkthetubingdown,startingattheopencableendbeforeworkingtowardstheleadsheath.
4.1.7 Paper Insulation 'Shim Kit' for Cable Cross Sections 70mm² & 95mm² • Forcablesbelowtheminimumsizerangespecifiedonthekitlabela'shimkit'mustbeused.
• Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.
• Applyapieceoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapeprovidedinthemainjointkit.
• Positionashortlengthofthesmallerdiameterstresscontroltubing(42/16)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 24
• Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.
• Wraponeoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothecore.
• Positionashortlengthofthelargerdiameterstresscontroltubing(54/24)directlyoverthepreviouslyappliedstresscontroltubeandshrinkdownfollowingthesameprocedureasbefore.
UNCONTROLLED
Section 4 I Page 25UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Applyoneoftheredmasticstripsprovidedaroundtheendofthestresscontroltube30mmontothetubingand10mmontothepreviouslyappliedredmastic.
4.1.8 Paper Insulation 'Shim Kit' for Cable Cross Sections 120mm² & 150mm² • Forcablesbelowtheminimumsizerangespecifiedonthekitlabel,a'shimkit'mustbe
used.
• Thecableswillbeatthestageofpreparationdescribedinsections4.1.1,4.1.3,4.1.4or 4.1.6.
• Applyashortlengthoftheyellowstresscontroltape20mmovertheendoftheconductivetubeandontothecleartubingby10mm.Usesomeoftheyellowtapesuppliedinthemainjointkit.
• Positionashortlengthofthestresscontroltubing(54/24)overthecoreend,overlappingtheconductivetubesandtheyellowstresscontrolmasticby40mm.UNCONTROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage26
• Shrinkthestresscontroltubingdown,startingfromtheyellowmastictapeandworkingtowardstheopencoreend.
• Wraponeoftheredmasticstripsprovidedaroundeachendofthestresscontroltube30mmontothetubingand10mmontothecore.
4.1.9 Single-Core Polymeric Terminations (Indoor and Outdoor) • Followthecablepreparationproceduresforpolymericcablesasdescribedinsection3.1.
• Useachinagraphpenciltomarktheoutersheath60mmbelowthesheathcutposition.
UNCONTROLLED
Section 4 I Page 27UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Wraponelayerofredsealanttapeoverthecablesheathdowntothechinagraphpencilmark.
• Bendbackthecopperscreenwirescarefullyandlaythemontothemastictapetakingcarenottocrossoveranyofthewires.Securethewireswithawirebinderatthe60mmmark.
• Makeachinagraphpencilmarkontothecorescreen40mmfromthesheathcut.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage28
• Removethecorescreendowntothe40mmmarkusingtheapprovedscreenstrippingtool.
• Makeamarkwithachinagraphpencil20mmontothecorescreenand10mmontotheinsulation.
• Removethereleasepaperandwraptheyellowstresscontrolmasticaroundthescreencutbetweenthetwopencilmarks.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontotheinsulation.
UNCONTROLLED
Section 4 I Page 29UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Positiontheblackstresscontroltubingoverthecoresothatitislevelwiththeoutersheathcut.Shrinkthetubingdown,startingatthesheathcutendandworkingupwards.Whenfullyshrunkthetubingshouldbesmoothandwrinklefree.
• Removetheinsulationfromthecoreendaccordingtotheinnerdimensionofthecablelugbarrel.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 30
• Fitthecablelugensuringthatthelugbuttsagainsttheinsulationedgeandhandtightenthesecuringbolts.
• Shearofftheboltheadsusingtheapprovedtoolsandfillintheindentswiththegreyclayprovided.
• Wraptheredsealanttapearoundthelugbarrel,overlappingontotheinsulation.Buildupthediameterdifferencewiththeredtapesothatasmoothandevenprofileisachieved.
UNCONTROLLED
Section 4 I Page 31UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Removethereleasepaperfromtheredtubing.Placethetubingoverthecableend(withthesealantcoatedenddownwards),levelwiththewirebinder.
• Shrinkthetubingdownstartingattheoutersheathend,beforeworkingtowardsthecable lug.
• Cutthetubingbackontothecablelug,levelwiththetopofthemainbody,ifnecessary.
• Post-heatthepalmofthecableluguntilabeadofthesealantappearsaroundthetopof thetubing.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 32
• Useachinagraphpenciltomarkthepositionfortheshedsonthetubingatthedimensiongivenintheterminationinstruction.
• Placetwoskirtsoverthecableendandpositiononthepreviouslymademarks.Shrinkeachshedinplace.
UNCONTROLLED
Section 4 I Page 33UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Foroutdoorterminationstherearefourskirtstobefittedtoeachtermination.Theseshouldbeplacedandshrunkintopositionatthemeasurementsindicatedintherelevantjointinginstruction.
4.2 Installing Mechanical Connectors and Lugs4.2.1 Single-Core Polymeric Straight Joints • Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1.
• Positionthecombinedstresscontrol,screenedinsulatingtubingandoutersealingsleeveoveroneofthecableends.
• Removetheinsulationasdescribedinsection3.1.3.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 34
• Theconnectorcomeswithmetalinsertstofitsmallconductors.Iftheconductorwillnotfittheconnector,discardtheinsertandusetheconnectorwithoutit.
• Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsttheendoftheconnector.
• Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.
UNCONTROLLED
Section 4 I Page 35UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Continuetotightenandsheeroffalltheboltsstartingwiththeboltsateachendfollowedbythecentralbolts.
• Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.
4.2.2 Single-Core Transitional Straight Joints • Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and3.2.
• Slidethefivepiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.
Note :Itisimportantthatthefourthtube(thesecondlargest)isplacedwithinthetubeset sothattheuncoatedinneredgepointstowardsthejointcentre.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage36
• Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.2.5.
• Theconnectorisa'TwoPiece'designwiththetwohalvessecuredtogetherwithacentralshearbolt.Eachconnectorhalfhastwoconductorsecuringboltswhicharealsooftheshearofftype.
• Fittheconductorsintotheconnector.Theinsulationshouldbuttagainsteachendoftheconnector.
UNCONTROLLED
Section 4 I Page 37UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Usingtheapprovedinsulatedtooltoholdtheconnector,takeupthetensiononalltheboltsequallywithoutshearingthemoff.
• Continuetotightenandsheeroffalltheboltsstartingwiththoseateachendfollowedbythecentralbolt.
• Filltheboltholesintheconnectorwiththegreyclaysuppliedinthejointkit.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage38
4.2.3 Resin Filled Three-Core Trifurcating Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)
• Thecableswillhavebeenprepareduptothepointasdescribedinsection3.1and4.1.3.
• Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.
• Slidethethreepiecetubingsetsoverthepolymericcableside.Nestingthetubesetsontheplasticbagwrappingtokeeptheinsideofthetubesclean.Thetubesetsshouldbeplacedintheordershown.
• Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors,sections3.1.3and3.3.7,totheconnectorinsertiondepth.
UNCONTROLLED
Section 4 I Page 39UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.
• Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.
• Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 40
• Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.
• Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.
4.2.4 Heatshrink Three-Core Transition Straight Joint (Three-Core Paper to 3 x Single-Core Polymeric Cables)
• Thecableswillhavebeenprepareduptothepointasdescribedinsections3.1and4.1.4.
• Slidetheouterjointheatshrinksealingbreakoutoverthesingle-corecablesandpositionitawayfromthejointingarea.
UNCONTROLLED
Section 4 I Page 41UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Slidethefourpiecetubingsetoverthepolymericcableside.Nestingthetubesetontheplasticbagwrappingwillkeeptheinsideofthetubesclean.Thetubesetshouldbeplacedintheordershown.
• Removetheinsulationfrombothcablesusingthemethodsdescribedinsections3.1.3and3.3.7.
• Slidethemechanicalconnectorontotheconductoronthepapersideofthejoint.Theconnectorisfittedwithaninserttoaccommodatesmallersectioncables;ifthecableconductorfitsintotheconnectorwiththeinsertinplace,useit-ifnot,removetheinsertanduseitwithout.
• Checkthattheconnectorbuttsupagainsttheinsulationandfinger-tightenthebolts.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 42
• Insertthesingle-corepolymericcablesintotheconnectorensuringthattheconnector buttsupagainsttheinsulationandfinger-tightenthebolts.
• Holdtheconnectorwiththeapprovedholdingtoolandtighteneachbolthalfaturnatatimewithasocketuntilitshearsoff.Startwiththeboltnearesttheinsulationateachendbeforemovingontotheothertwobolts,workingtowardsthemiddle.
• Smoothoffanysharpedgesfromtheboltsandthencleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.
UNCONTROLLED
Section 4 I Page 43UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
4.2.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables) • ThecableswillhavebeenprepareduptothepointasdescribedinSection3.1and4.1.6.
• Slidetheplastictrifurcatingendoftheplasticjointboxoverthesingle-corecablesandpositionitawayfromthejointingarea.
• Positionacombinedtubeset(stresscontrol,insulatingtubeandscreenedinsulating)overeachofthesingle-corepolymericcables.
• Setthecoresintheirfinaljointingposition.Checkthattheconductorshavebeencuttoallowforanyconnectorcentralmoistureblock.Removetheinsulationfrombothconductors(3.1.3and3.3.7)totheconnectorinsertiondepth.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 44
• Inserteachendofthecoreintoitsrespective'connectorhalf'andfinger-tightenthebolts.
• Alignandpositionthetwoconnectorhalvessothatthecentralfixingboltcanbeinsertedintothecentralfixinghole.Theuseofforceforthisoperationshouldnotbenecessary.
• Holdtheconnectorwiththeapprovedholdingtoolandtightenthetwoboltsononesideuntiltheysheeroff.
UNCONTROLLED
Section 4 I Page 45UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Repeattheoperationontheothersideoftheconnector.Checkthatthecombinedtubesetislocatedoverthesingle-corecablesandsheeroffthecentralfixingbolt.
• Cleananddegreasetheconnector.Filltheboltholeswiththesuppliedgreyclaytoobtainasmoothfinish.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage46
4.2.6 Mechanical Lugs for Indoor and Outdoor Terminations • Followthecablepreparationproceduresforpolymericcablesinsections3.1.1to3.1.3
beforeinstallinganymechanicallugs.
• Eachkitcomeswiththecorrectsizeandtypeoflugforeachtermination.Removetheconductorinsulationtotheinsertiondepthofthelug.
• Placethelugovertheconductorsothatthebottomofthebarrelbuttsupagainstthecoreinsulation.
UNCONTROLLED
Section 4 I Page 47UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Tightentheboltsbyhandandcheckthatthepalmholeslineupwiththeirrespectiveconnectionpoint.
• Tightentheboltsuntiltheboltheadsshearoff.
4.3 Installing Connector Stress Control and Heatshrink Insulation4.3.1 Single-Core Polymeric Straight Joints • Fittheconnectoruptothepointasdescribedinsection4.2.1.
• Useachinagraphpenciltomarktheblackinsulationscreenofbothcables20mmfromthescreencut.
• Makeasecondchinagraphpencilmarkontheinsulation10mmfromthescreencut.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage48
• Stretchoneoftheshortyellowstresscontrolmasticsuppliedinthekittohalfitsoriginalwidth.Wrapitaroundthecorescreenandinsulationbetweenthetwochinagraphpencilmarks.Repeatfortheothercableside.
• Usethelongstripofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingthemastictoabouthalfitsoriginalwidth.Coveralltheconnectorareaandoverlaptotheinsulationoneachsideoftheconnectorby5mm.Makesurethereisasmoothtransitionfromtheconnectorontotheinsulation.
• Positiontheblackstresscontroltubecentrallyovertheconnectorarea.Eachendofthetubeshouldextendbeyondthescreenterminationpointsofeachcable.Shrinkthestresscontroltubingdown,startinginthecentreandworkingtowardseachendinturn.
UNCONTROLLED
Section 4 I Page 49UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Positionthescreenedinsulatingredandblacktubecentrallyoverthestresscontroltubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.
• Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisible.
• Continuetoshrinkthetubefromthecentretowithin50mmofoneend.
• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresthatairinsidethetubeisexpelledasthetubeshrinks.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 50
• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
4.3.2 Single-Core Transition Straight Joints • Fittheconnectoruptothepointasdescribedinsection4.2.2.
• Wrapashortpieceoftheyellowstresscontrolmasticaroundthepapercablecoreattheedgeoftheshortblackconductingsleeve.Start20mmontheconductingtube,continuingfor10mmontotheclearbarriertube.
• Wrapashorterpieceoftheyellowstresscontrolmasticaroundthepolymericscreen,starting20mmfromthescreenedgeandcontinuingfor10mmontotheinsulation.Stretchthetapetohalfitsoriginalwidthduringthetapingprocess.
UNCONTROLLED
Section 4 I Page 51UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Usethelongstripsofyellowstresscontrolmastictowrapthemasticaroundtheconnectorwitha50%overlap,stretchingittoabouthalfitsoriginalwidth.Covertheconnectorareaandoverlapontotheinsulationeachsideoftheconnectorby5mm.Makesureaminimumcoverageof2mmisachievedovertheconnectorarea.
• Pulltheblackstresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea,leavinga20mmgapbetweentheoversheathandthetubingend.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 52
• Shrinkthestresscontroltubingdownstartinginthecentre,beforeworkingtowardseachendinturn.Whenfinishedthetubingshouldbefullyshrunkandwrinklefree.
• Wrapapieceofredsealantmasticaroundeachendofthestresscontroltubing.Startfrom10mmonthestresscontroltubingandextendfor10mmontothecorescreenatbothends.
• Pulltheredinsulatingtubingfrominsidethenestedtubesetandpositionitcentrallyoverthestresscontroltube.Startshrinkinginthecentrebeforeworkingtowardseachendinturn.
Note:Continueontothenextstepwhiletheredinsulatingtubingisstillhot.
UNCONTROLLED
Section 4 I Page 53UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Pulltheblackandredscreenedinsulatingtubingcentrallyovertheredinsulatingtubeandstartshrinkingthesleeveatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofthetubeshouldnolongerbevisibleandthetubecannolongerbemoved.
• Continuetoshrinkthetubefromthecentretowithin50mmofoneend.
• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 54
• Pulltheblackcompressionsealingsleeveacrossthejointtothepapercablesideandplaceitsothatatleast50mmofleadsheathisstillvisible.
• Shrinkthetubingdown,startingonthetubesetendandworkingtowardstheleadsheath.Oncecompletedthereshouldbeapproximately50mmofleadsheathstillexposed.
4.3.3 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric Cables)
• Fittheconnectoruptothepointasdescribedinsection4.2.3.
• Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.
UNCONTROLLED
Section 4 I Page 55UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Repeattheexerciseonthepapercablecore,wrappingtheyellowstresscontrolmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.
• Ensurethattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile.Usealongpieceoftheyellowstresscontrolmastictofilltheendsoftheconnectorandtheinsulationcutbackcontinuing10mmontotheinsulation,and20mmontotheconnector.Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapplyyellowstresscontrolmastictoformasmooththeprofile.
• Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage56
• Slidethestresscontroltubingfrominsidethenestedtubesetandpositionitcentrallyovertheconnectorarea.Makesurethattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentreandworkingtowardseachendinturn.
• Removethereleasepaperfromonelengthoftheredsealanttapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.
• Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.
Note:Continuewiththenextstepwhiletheredinsulatingtubingisstillhot.
UNCONTROLLED
Section 4 I Page 57UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Positionthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubes.Startshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubingisproperlyshrunk,theridgesontheouterblacklayerofeachtubeshouldnolongerbevisibleandthetubescannolongerbemoved.
• Continuetoshrinkthetubefromthecentretowithin50mmofoneend.
• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubing.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage58
• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
4.3.4 Heatshrink Three-Core Transition Straight Joints (Three-Core PILC to Single-Core Polymeric)
• Fittheconnectoruptothepointasdescribedinsection4.2.4.
• Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.
• Repeattheexerciseonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.
UNCONTROLLED
Section 4 I Page 59UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Checkthattheboltholesarefilledwiththesuppliedclaytoleaveasmoothprofile.Using alongpieceoftheyellowstresscontrolmastic,filltheendsoftheconnectorsandthe insulationcutbacks,continuing10mmontotheinsulationand20mmontotheconnector. Ifthereisastepbetweenthebodyoftheconnectorandthecableinsulationapply yellowstresscontrolmastictoformaprofile.
• Removethereleasepaperfromoneoftheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludetheairasitiswrapped.Whenfinishedthepatchshouldbesmoothandwrinklefree.Repeattheprocesswithallthreeconnectors.
• Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovereachconnectorensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage60
• Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundtheendofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.
• Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubingstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubeshouldbesmoothandwrinklefree.
Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot.
• Pullthescreenedredandblackinsulatingtubescentrallyovertheredinsulatingtubesandstartshrinkingthesleevesatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.
UNCONTROLLED
Section4IPage61UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.
• Removetheheatfromthatendandstartshrinkingfromthemiddletowardstheotherendofthetubes.Stop50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage62
• Positionthethreecompressionsleevesoverthepaperendofthejoint,sothattheyequallyoverlaptheredandblackinsulationtubesandthecoretubes.Theuncoatedendofthecompressionsleeveshouldbepositionedtowardsthecentreofthejoint.Shrinkinplacestartingfromthecentreofthetubestowardsthecentreofthejointbeforefinallyshrinkingfromthecentretowardsthecrutch.
4.3.5 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables) • Fittheconnectoruptothepointasdescribedin4.2.5.
• Removethereleasepaperfromoneoftheshortyellowstresscontrolmasticstripsandwrapitaroundthepolymericcorescreen,starting20mmfromthescreenedgeandcontinueontotheinsulationfor10mm.Stretchthetapetohalfitsoriginalwidthtoachieveafinethinedgeontheinsulation.
• Repeatthisonthepapercablecore,wrappingtheyellowmasticaroundtheedgeoftheconductivetubing.Cover20mmoftheconductivetubingandcontinueontothecleartubingfor10mm.UNCONTROLL
ED
Section4IPage63UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Checkthattheboltholesarefilledwiththesuppliedgreyclaytoleaveasmoothprofile. Usealongpieceoftheyellowstresscontrolmastictocoverbothendsoftheconnector, 20mmontheconnectorand10mmontotheinsulation.
• Removethereleasepaperfromtheyellowstresscontrolmasticpatchandwrapitcentrallyaroundtheconnector,takingcaretoexcludeanytrappedairasitisapplied.Whenfinishedthepatchshouldbesmoothandwrinklefree.
• Slidethestresscontroltubesfrominsidethenestedtubesetsandpositionthemcentrallyovertheconnectorsensuringthattheoverlapovereachtapedscreenedgeisequal.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage64
• Removethereleasepaperfromonelengthoftheredsealantmastictapeandwrapitaroundbothendsofthestresscontroltube.Overlapthetapeontothetubeby20mmandby10mmontothecore.
• Pulltheredinsulatingtubesfromthetubesetsandcentrallypositionthemoverthestresscontroltubes.Shrinkthetubesstartinginthecentrebeforeworkingtowardseachendinturn.Whencompletethetubesshouldbesmoothandwrinklefree.
Note:Continuewiththenextstepwhiletheredinsulatingtubesarestillhot. • Pullthescreenedblackandredinsulatingtubescentrallyovertheredinsulatingtubes
andstartshrinkingatthecentrepositionusingequalheatoverthewholesurface.Whenthetubesareproperlyshrunk,theridgesontheouterblacklayerofthetubesshouldnolongerbevisibleandthetubescannolongerbemoved.
UNCONTROLLED
Section4IPage65UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Continuetoshrinkthetubesfromthecentretowithin50mmofoneend.
• Removetheheatfromthatendandstartshrinkingfromthemiddleagaintowardstheotherendofthetubes.Stopagain50mmfromtheend.Thisensuresairinsidethetubeisexpelledasthetubeshrinks.
• Returntoeachtubeendinturntocompletetheshrinkingprocesscompletely.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage66
4.4 Installing Mechanical Earth Bonds and Associated Components4.4.1 Single-Core Polymeric Straight Joints • Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.1.
• Wrapthejointwithonelayerofthetinnedcoppermeshensuringthereisa50mmoverlapontotheoversheathofthecablesidewiththeshortshieldwires.
• Continueacrossthewholejointwiththetinnedcoppermeshata50%overlapandsecureontotheoppositejointside.
• Onthecablesidewiththelongscreenwires,bendthescreenwiresbackacrossthejointandformthemintotwoseparateconductors.Onthecablesidewiththeshortscreenwires,repeatthesameexerciseandfoldthegatheredwiresbacktowardsthejointcentre.
UNCONTROLLED
Section4IPage67UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Gatherthewirestogetherandcutthemcentrallyabovethetinnedcoppermeshoverlappingthecablesheath.Installthecopperscreenwireconductorsintotheirrespectiveconnectorandtightentheboltsuntiltheheadsshearoff.
• Wrapasecondlayerofthecoppermesharoundthejoint,asbefore,sothatthewholeareaiscompletelycoveredincludingthemechanicalscreenconnectors.
• Cleananddegreasetheoutersheathsofbothcablesfor150mmfromthesheathcut.Slidethelargeoutersealingsleevecentrallyoverthejointarea.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage68
• Startshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.Allowtocoolbeforemovingorbackfillingthejoint.
4.4.2 Single-Core Transition Joints • Completetheproceduresforinsulatingtheconnectorasdescribedin4.3.2.
• Wraptwolayersoftinnedcoppermeshat50%overlapoverthejointfromtheleadsheathonthepapercabletotheover-sheathcutonthepolymericcable.
• Foldbackthecopperscreenwiresoverthejointandformthemintoanearthleadexceptfortheareaovertheleadsheath.Atthispointopenupthewiresandplacethemdirectlyontothetinnedcoppermesh.Wraptherollspringoverthescreenwiresandtwistuptight.
UNCONTROLLED
Section4IPage69UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• CompletelycovertherollspringwithtwolayersofPVCtape.
• Clean,degreaseandabradetheoutersheathsfor150mmfromthesheathcuts.Slidethelargeoutersealingsleeveoverthejointareaandstartshrinkingthetubeatthecentrebeforeworkingtowardseachendinturn.
• Allowthejointtocoolbeforemovingorbackfilling.UNCONTROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 70
4.4.3 Polymeric Pot Ends • Completethestepsinsection4.1.2.
• Laythecopperscreenwiresbackoverontothescreenedblackandredinsulatingsleeveanddistributethemaroundthecircumferenceevenly.
• Wrapthetinnedtinnedcoppermeshwitha50%overlaparoundthepotend,startingattheoutersheathandcontinuingupontothecopperscreenwires,beforecoveringtheinsulatingrod.
Note:Thestresscontroltubingandtherodendmustbeincontactwiththetinnedcoppermesh.
UNCONTROLLED
Section 4 I Page 71UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Covertheendsofthecopperscreenwiresunderthetinnedcoppermeshwithtwolayers offabrictape.
• Placetheheatshrinkendcapoverthepotendandshrinkitintoplace.Startattheclosedendbeforeworkingtowardsthecablesheath.Duringtheshrinkingprocesscarefullypushtheclosedendofthecapagainsttheinsulatingendwithanappropriatetool.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 72
• Checkthattheover-sheathiscleananddegreased.Positiontheoutersealingsleeveover thepotendassemblysothatitlinesupwiththeendoftheendcap.
• Shrinkthetubingdown,startingatthecentreworkingtowardseachendinturn.Donotmoveorbackfilluntilthepotendhascooled.
4.4.4 Resin Filled Three-Core Transition Straight Joints (Three-Core Paper to 3 x Single-Core Polymeric Cables)
• Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.3.
• Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.
UNCONTROLLED
Section 4 I Page 73UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Laythecopperwirescreensbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthethreeearthbraidsusingthemechanicalconnectorsprovided.
• Positionthethreeearthbraidsevenlyaroundtheleadsheathareaontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.
• Wraptherollspringoverthebraidsandtwistthespringuptightly.CovertherollspringwithtwolayersofPVCtape.
• Wraptheremainingexposedleadsheathwiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section 4 I Page 74
4.4.5 Heatshrink Three-Core Transition Straight Joints (Three-Core Paper to Single-Core Polymeric)
• Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.4.
• Pullthecorestogetherascloselyaspossibleandwraponelayeroftinnedcoppermesharoundthejointwitha50%overlap.Continueontotheleadsheathfor30mmanduptothescreenwiresontheoppositejointside.
• Laythescreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperwirescreenstothethreeearthbraidsusingthemechanicalconnectorsprovided.
• Laythethreeearthleadsevenlyaroundtheleadsheathontopofthetinnedcoppermesh.Connectthethreeearthbraidstotheleadsheathusingalargerollspring.Wraptherollspringoverthebraidsandtwistthespringuptightly.CoverthespringwithtwolayersofPVCtape.UNCONTROLL
ED
Section 4 I Page 75UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Applyonehalflaplayerofwhitefabrictapeoverthesingle-corepolymericendofthejointforadistanceof150mmfromthecableoversheathtoprotectthetinnedcoppermeshtapefromtheheatgeneratedbyshrinkingtheThree-Corebreakout.
• Pulltheheatshrinkbreakoutbackoverthejointasfarasitwillgoandshrinkinplace,startingwiththeturretsbeforemovingontothemainbody.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage76
• Wraptheremainingexposedleadsheathwiththestripofblackmasticsealanttape.Thisisanimportantmoistureseal.Donotleaveout.
• Positionthewraparoundheatshrinkjointsleevearoundthejointandconnectthetwoendstogetherusingthemaetalchannelandthemetaljoiningclip.
• Shrinkthewraparoundsleeveinplace,startingatthemiddlebeforemovingtowardseachendinturn.Thegreenpaintonthesurfaceofthesleeveshoulddisappearwhenthetubeiscorrectlyshrunk.
UNCONTROLLED
Section 4 I Page 77UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Extraheatshouldbeappliedtothemetalchanneluntilthewhitemarkerlinecanbe clearlyseenunderit.
• Donotmoveorbackfilluntilthejointhascompletelycooled.
4.4.6 HSL Trifurcating Joints (Three-Core HSL to 3 x Single-Core Polymeric Cables) • Completetheproceduresforinstallingtheconnectorinsulationinsection4.3.5.
• Wraponelayeroftinnedcoppermeshwitha50%overlapovereachinsulatedcorecontinuingacrossthejointedcoresfromthesheathcutonthepolymericcables.Finish50mmontotheleadsheaths.
• Laythecopperscreenwiresbackacrossthejointandformthemintothreeseparateearthconductors.Connectthecopperscreenwirestoeachofthreeearthbraidsusingmechanicalconnectorsprovidedinthekit.UNCONTROLL
ED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage78
• Connecttheeachearthbraidstoeachoftheindividulleadsheathsusingatwoturnsoftherollsprings.
• Turntheendoftheearthbraidsbackoverthetwoturnsoftherollspringensuringthattheyareflatandeven.Wraptheremainderofthespringlengthoverthebraidsandtwistthespringuptightly.
• CovertherollspringswithtwolayersofPVCtape.
UNCONTROLLED
Section 4 I Page 79UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Wraptheremainingexposedleadsheathswiththestripsofredsealanttape.This is an important moisture seal. Do not leave out.
4.4.7 Connection of Screen Wires on Indoor and Outdoor Terminations • Completetheproceduresforinstallingtheterminationsdescribedinsection4.1.8.
• ConnectthescreenwirestotheEarthingstudorpositionprovided(outdoorterminations)asapplicableforthegeometryoftheapparatus.
4.4.8 Fitting Plastic Joint Boxes (Trifurcating Joints Only) • Trimofftheendsofthejointboxsuppliedwiththekit,sothatitwillfitoverthecables
enteringthebox.
• Usingtheboxasaguide,offerituptothecableandmarkthestandoffpositionsofthemouldingswithachinagraphpencil.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage80
• Removethebackingfromtherubberpatchessuppliedinthekitandapplycentrally(overthepreviouslymademarks)withthestickysideout.
• Placethetwohalvesofthejointshelloverthejointandclipthetwohalvestogetherwiththeclipsprovided.Checkenoughclipsareusedtostoptheresinleakingoutwhenitispouredin.
UNCONTROLLED
Section4IPage81UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• TapethejointboxtotheincomingcablewithPVCoranothersuitabletape.Iflargegapsareleftwhentheshellisfitteditmaybenecessarytopacktheendsofthejointshelloutwiththeclaypacksuppliedinsomekits.
• Forextrasecurity,runalengthofPVCtapedowntheseamsofthejointshellandfittheplasticlid.
4.4.9 Mixing and Installation of Polyurethane Resin • All33kVjointsshouldbefilledwith3-partpolyurethaneresin.Checkthatthecorrect
PersonalProtectiveEquipmentiswornatalltimesandtheresinisnotmixedinaconfinedspace.
• Checkthelabelonthebuckettoensurethattheresinhasnotpassedtheusebydate.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage82
• Emptythecontentsofthebucketandcheckforanydamagetothepackaging.
• Pickupthefoilbagcontainingtheresinandhardenerandapplypressuretothelargeresinpouchsothattheresinbreaksthesealbetweenthetwosectionsandmixeswiththehardener.
• Mixthecontentsofbagbykneadingthefoilbagforaminimumoftwominutes.
UNCONTROLLED
Section4IPage83UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012
• Carefullycutoneofthecornersoffthefoilbagandpourallthecontentsintothesuppliedplasticbucket.
• Pourapproximatelyhalfofthesandsuppliedintheplasticbagintothebucketandstiruntilitisthoroughlymixedintotheresin.
• Pourtherestofthesandintothebucketandmixuntilnorawsandisvisibleandtheresinhasnolumpsinit.
UNCONTROLLED
UK POWER NETWORKS 33kV CABLE JOINTING MANUAL I 2012Section4IPage84
• Pourthemixedresinintothejointshell.
UNCONTROLLED