3.3 Examples of Large Disturbances

Embed Size (px)

Citation preview

  • 8/14/2019 3.3 Examples of Large Disturbances

    1/12

    Date and Time Country Affectedload

    Customers Causal Factors

    Sept. 28, 2003 03:01 Italy ~28.000 MW ~ 60 Mio High imports of Italy;

    transmission line faults inSwitzerland

    Aug. 14, 2003 16:13 USA/Canada

    61.800 MW ~ 50 Mio Transmission line faults;errors in SCADA/EMSsystem

    Aug. 10, 1996 15:42 USA 28.000 MW 7.5 Mio Transmission line faults;

    system oscillationsJuly 2, 1996 13:24 USA 11.800 MW 2.0 Mio Transmission line faults;

    errors in relay system

    July 23, 1987 13:19 Japan 8.200 MW 2.8 Mio Steep raise in systemload; voltage collapse

    Dec. 27, 1983 12:57 Sweden 11.400 MW ~ 4 Mio Busbar fault

    Dec. 12, 1978 08:26 France ~29.000 MW 15.6 Mio Unexpected high load

    Nov. 9, 1965 17:16 USA ~20.000 MW ~30.0 Mio Incorrect relay settings

    3.3.1

    Major blackouts in recent years

    3.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    2/12

    Europe by night

    Europe by night

    Sunday, 28.09.2003, 3:30

  • 8/14/2019 3.3 Examples of Large Disturbances

    3/12

    Situation before outage

    Impacts on Italy

    Impacts on UCTE

    3.3.3

    Content

    3.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    4/12

    Scheduled import to Italy 03:00 04:00: 6408 MW

    Scheduled exchange programs 03:00 04:00

    Switzerland Italy : 3068 MW

    France Italy : 2650 MW

    Slovenia Italy : 467 MW

    Austria Italy : 223 MW

    Situation before outage

    3.3.43.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    5/12

    Physical import to Italy at 03:00: 6651 MW

    Physical power flows at the border with Italy at 03:00

    Switzerland Italy : 3610 MW

    France Italy : 2212 MW

    Slovenia Italy : 638 MW

    Austria Italy : 191 MW

    Situation before outage

    3.3.53.3 Examples of large disturbances

    Load in Italy at 03:00

    Customer load 24064 MW

    Load pump storage 3638 MWTotal load 27702 MW

  • 8/14/2019 3.3 Examples of Large Disturbances

    6/12

    SloveniaSloveniaSlovenia

    SwitzerlandSwitzerlandSwitzerland

    AustriaAustriaAustria

    Albertville

    Rondissone

    Villarodin Venaus

    Gorduno

    Airolo

    Ponte

    Pallan.

    Mrel

    Riddes

    AviseValpelline

    CamporossoLe Broc-Carros

    Soazza

    BulciagoMusig.

    Sondrio

    Robbia

    Mese

    Lienz

    Soverzene

    RedipugliaDivaca

    Padriciano

    Mettlen Sils

    Lavorgo

    Praz

    La Coche

    FranceFranceFranceCislago

    3.3.63.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    7/12

    03:01:42 First line tripping: Lavorgo-Mettlen 400 kV;

    Single phase to ground fault

    3.3.7

    03:10:47 Phone conversation between ETRANS and GRTN

    to Request to reduce the Italian import03:21:00

    03:25:21 Second line tripping: Sils-Soazza 400 kV;

    Single phase to ground fault

    03:25:25 Third line tripping: Airolo-Mettlen 220 kV

    Overcurrent protection 03:25:27 Fourth and fifth line trippings: Riddes-Avise-Valpelline 220 kV

    and Sondrio-Cislago 220 kV

    03:25:30 Sixth line tripping: Albertville-Rondissone; No. 1; 400 kV

    03:25:32 Seventh line tripping: Praz-La Coche 400 kV

    03:25:33 Eighth line tripping: Albertville-Rondissone; No. 2; 400 kV

    03:25:33 Ninth line tripping: Le Broc-Carros-Camporosso 220 kV

    03:25:34 Tenth line tripping: Lienz-Soverzene 220 kV

    Complete separation of the Italian grid

    Sequence of events

    3.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    8/12

    47,50

    45.500

    46.000

    46.500

    47.000

    47.500

    48.000

    48.500

    49.000

    49.500

    50.000

    50.500

    03:24:00

    03:24:07

    03:24:14

    03:24:21

    03:24:28

    03:24:35

    03:24:42

    03:24:49

    03:24:56

    03:25:03

    03:25:10

    03:25:17

    03:25:24

    03:25:31

    03:25:38

    03:25:45

    03:25:52

    03:25:59

    03:26:06

    03:26:13

    03:26:20

    03:26:27

    03:26:34

    03:26:41

    03:26:48

    03:26:55

    03:27:02

    03:27:09

    03:27:16

    03:27:23

    03:27:30

    03:27:37

    03:27:44

    03:27:51

    03:27:58

    hour

    H

    z

    Soazza-Sils

    Outage

    Separation from

    European gridLoss of all power

    plants operating at

    distribution grid

    ~1.700 MW

    Loss of 21 out of 50 main units before

    the critical threshold ~3.700 MW

    Load shedding (EAC) equal to ~600 MW

    each (0,1 Hz) frequency loss; ~7.000 MW

    automatic pumping

    shedding ~3500 MW

    critical

    thresholdDefinitiv

    Black-out

    3:25 3:28~2,5 minutes

    frequency

    (Rome)

    3.3.8

    Frequency in Italy (09/28/2003)

    3.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    9/12

    -2000

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    time

    MW

    differenceplanned

    actual value

    Not supplied

    Energy ~ 37 GWh

    3.3.9

    Restoration North Italy

    3.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    10/12

    -1000

    0

    1000

    2000

    3000

    4000

    5000

    6000

    1 3 5 7 9 11 13 15 17 19 21 23 time

    MW

    Not supplied

    Energy ~ 42 GWh

    difference

    planned

    actual value

    3.3.10

    Restoration Middle Italy

  • 8/14/2019 3.3 Examples of Large Disturbances

    11/12

    -1000

    0

    1000

    2000

    3000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    time

    MW

    Not supplied

    Energy ~ 21 GWh

    difference

    planned

    actual value

    3.3.11

    Restoration South Italy

    3.3 Examples of large disturbances

  • 8/14/2019 3.3 Examples of Large Disturbances

    12/12

    49.95

    50

    50.05

    50.1

    50.15

    50.2

    Hz

    50.3

    03:00:00 03:14:24 03:28:48 03:43:12 03:57:36 04:12:00 04:26:24 04:40:48 04:55:12

    Frequency in UCTE system on Su 28-09-2003 03:00 - 05:00

    3.3.123.3 Examples of large disturbances