    Use fiber paper protection at cable break off. If using thin paper, 2 wraps

    is needed.

    Do not hesitate to cut tie wraps installed by Bechtel. We are responsible for

    the last secured position. Use white tie wraps all the time.

    CABLING

  • 8/6/2019 3206 Installation Rev F

    2/11

    Prepared by: Darwin Mar

    Harness the cables so they break off like waterfalls. As much as possible, tie

    them on top of ladder and not to the side. The RF jumpers are flexible, they

    are easy to dress.

    Avoid tying to the side.

    If cables are too short to

    be dressed as required

    upon break, note this as

    an observation in the

    RBS checklist.

    Tied on top. Follow for

    T1, RF, power, ground

  • 8/6/2019 3206 Installation Rev F

    3/11

    Prepared by: Darwin Mar

    GOOD

    Default Bechtelinstallation.

    BETTER

    After

    harnessing

  • 8/6/2019 3206 Installation Rev F

    4/11

    Prepared by: Darwin Mar

    POWER

    Strain relief clamp (3 screws)

    Torque= 0.8 Nm

    +24V DCCU Connection (8

    screws)

    Torque= 4.5 Nm

    DCCU Cover (1 screw)

    Torque= 1.5. Nm

    Install fiber papers

    Do not forget to test and trace the cables before terminating.

    Do not trust the labels!

    To do this, I suggest you measure the voltage of each pair to

    verify (+)cables and then trace physically the (-) cables.

  • 8/6/2019 3206 Installation Rev F

    5/11

    Prepared by: Darwin Mar

    Stripped length

    = about 15 mm

    No

    shiners

    Use the terminals as

    reference for length.

    Must have no shiners.

    Use thin amount of

    No-OX.

    P or D-Tags!

    Review labels to

    make sure they are

    installed to the

    intended cable. The

    print can be readfrom top to bottom.

    In this example, the

    tags were installed

    correctly, but the

    labels were not.

  • 8/6/2019 3206 Installation Rev F

    6/11

    Prepared by: Darwin Mar

    Secure T1 cables at these locations using sticky backs and small

    tie wraps. One of top most, one in the bottom between the 1st and

    2nd screw

    Tie wraps

    Attached T1 labels tothe existing flags

    T1 CABLES

  • 8/6/2019 3206 Installation Rev F

    7/11

    Prepared by: Darwin Mar

    Do not roll the cables in loop. Run them back and

    forth in the ladder rack

  • 8/6/2019 3206 Installation Rev F

    8/11

    Prepared by: Darwin Mar

    Install fiber papers when T1 cables cross/touch the edge of

    ladders or cross/touch other cables such as ground, DC and RF.

    Missing fiberpapers

    You may wrap

    either the cableor the ladder

    rack with fiber.

  • 8/6/2019 3206 Installation Rev F

    9/11

    Prepared by: Darwin Mar

    GROUNDING

    When using hand crimper, 2 crimps for standard barrel (above) and 4 crimpsfor long barrel (below). Crimps should be within the band/s.

    Torque to 15 Nm

    Ground lug should be #2 (Brown) 1 hole lug with inspection hole.

  • 8/6/2019 3206 Installation Rev F

    10/11

    Prepared by: Darwin Mar

    Conductor must reach

    and be seen at this

    inspection hole. Also,

    no excess conductor

    should protrude.

    Use a thin amount of NO-OX

    (above). Below are common

    mistakes.

    Not OK.

    No NO-OX

    Not OK.

    Excessive NO-

    OX

    OK. Must have

    no shiner

  • 8/6/2019 3206 Installation Rev F

    11/11

    Prepared by: Darwin Mar

    Fit the jumpers to the rubber slots directly above the FU.

    Torque connections to 25 Nm

    RF JUMPERS