118
9 e FORMAPPROVED Form 3160-3 OMB NO. 1040-0136 (Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995 DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO. BUREAU OF LAND MANAGEMENT UTU-74972 6. IF INDIAN,ALLOTTEE OR TRIBE NAME APPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A TYPE OF WORK 7. UNITAGREEMENT NAME DRILL O DEEPEN O NIA TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO. O O O SINGLE O MULTIPLE OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21 2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO. QEP Uinta Basin, Inc. E-Mail: [email protected] 3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT 11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿ 4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA At Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E At proposed production zone SAME 164. 5]â4 GT 14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE 35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT 15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL PROPERTY OR LEASE LINE, FT. (also to nearest drig,unit line if any) 360 40 669' +I- 18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file completed, applied for, on this lease, ft 6850' ESBOOO24 21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration 4907.6 GR ASAP 10 DAYS 24. Attachments The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form: 1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see 2. A Drilling Plan Item 20 above). 3. A surface Use Plan (if location is on National Forest System Lands, 5. Operator certification. the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by the authorized officer. SIGNED Name (Printed) JAN NELSON 28-Nov-05 TITLE REGULATORY AFFAIRS (This space for Federal or State office use) PERMIT NO. APPROVAL DATE Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon CONDITIONS PPROV ANY: BRADLEYG. HILL APPROVED BK TITLE DATE See Instructions On Reverse Side tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction RECEIVED Federal Approval of thla Action is 9 e FORMAPPROVED Form 3160-3 OMB NO. 1040-0136 (Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995 DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO. BUREAU OF LAND MANAGEMENT UTU-74972 6. IF INDIAN,ALLOTTEE OR TRIBE NAME APPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A TYPE OF WORK 7. UNITAGREEMENT NAME DRILL O DEEPEN O NIA TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO. O O O SINGLE O MULTIPLE OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21 2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO. QEP Uinta Basin, Inc. E-Mail: [email protected] 3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT 11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿ 4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA At Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E At proposed production zone SAME 164. 5]â4 GT 14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE 35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT 15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL PROPERTY OR LEASE LINE, FT. (also to nearest drig,unit line if any) 360 40 669' +I- 18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file completed, applied for, on this lease, ft 6850' ESBOOO24 21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration 4907.6 GR ASAP 10 DAYS 24. Attachments The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form: 1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see 2. A Drilling Plan Item 20 above). 3. A surface Use Plan (if location is on National Forest System Lands, 5. Operator certification. the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by the authorized officer. SIGNED Name (Printed) JAN NELSON 28-Nov-05 TITLE REGULATORY AFFAIRS (This space for Federal or State office use) PERMIT NO. APPROVAL DATE Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon CONDITIONS PPROV ANY: BRADLEYG. HILL APPROVED BK TITLE DATE See Instructions On Reverse Side tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction RECEIVED Federal Approval of thla Action is 9 e FORMAPPROVED Form 3160-3 OMB NO. 1040-0136 (Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995 DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO. BUREAU OF LAND MANAGEMENT UTU-74972 6. IF INDIAN,ALLOTTEE OR TRIBE NAME APPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A TYPE OF WORK 7. UNITAGREEMENT NAME DRILL O DEEPEN O NIA TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO. O O O SINGLE O MULTIPLE OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21 2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO. QEP Uinta Basin, Inc. E-Mail: [email protected] 3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT 11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿ 4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA At Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E At proposed production zone SAME 164. 5]â4 GT 14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE 35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT 15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL PROPERTY OR LEASE LINE, FT. (also to nearest drig,unit line if any) 360 40 669' +I- 18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file completed, applied for, on this lease, ft 6850' ESBOOO24 21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration 4907.6 GR ASAP 10 DAYS 24. Attachments The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form: 1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see 2. A Drilling Plan Item 20 above). 3. A surface Use Plan (if location is on National Forest System Lands, 5. Operator certification. the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by the authorized officer. SIGNED Name (Printed) JAN NELSON 28-Nov-05 TITLE REGULATORY AFFAIRS (This space for Federal or State office use) PERMIT NO. APPROVAL DATE Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon CONDITIONS PPROV ANY: BRADLEYG. HILL APPROVED BK TITLE DATE See Instructions On Reverse Side tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction RECEIVED Federal Approval of thla Action is 9 e FORMAPPROVED Form 3160-3 OMB NO. 1040-0136 (Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995 DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO. BUREAU OF LAND MANAGEMENT UTU-74972 6. IF INDIAN,ALLOTTEE OR TRIBE NAME APPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A TYPE OF WORK 7. UNITAGREEMENT NAME DRILL O DEEPEN O NIA TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO. O O O SINGLE O MULTIPLE OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21 2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO. QEP Uinta Basin, Inc. E-Mail: [email protected] 3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT 11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿ 4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA At Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E At proposed production zone SAME 164. 5]â4 GT 14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE 35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT 15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL PROPERTY OR LEASE LINE, FT. (also to nearest drig,unit line if any) 360 40 669' +I- 18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file completed, applied for, on this lease, ft 6850' ESBOOO24 21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration 4907.6 GR ASAP 10 DAYS 24. Attachments The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form: 1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see 2. A Drilling Plan Item 20 above). 3. A surface Use Plan (if location is on National Forest System Lands, 5. Operator certification. the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by the authorized officer. SIGNED Name (Printed) JAN NELSON 28-Nov-05 TITLE REGULATORY AFFAIRS (This space for Federal or State office use) PERMIT NO. APPROVAL DATE Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon CONDITIONS PPROV ANY: BRADLEYG. HILL APPROVED BK TITLE DATE See Instructions On Reverse Side tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction RECEIVED Federal Approval of thla Action is

3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

9 eFORMAPPROVED

Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972

6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A

TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]

3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +I-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft

6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.

SIGNED Name (Printed) JAN NELSON 28-Nov-05

TITLE REGULATORY AFFAIRS

(This space for Federal or State office use)

PERMIT NO. APPROVAL DATE

Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon

CONDITIONS PPROV ANY:

BRADLEYG. HILLAPPROVED BK TITLE DATE

See Instructions On Reverse Side

tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction

RECEIVED

FederalApprovalofthla

Action is

9 eFORMAPPROVED

Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972

6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A

TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]

3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +I-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft

6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.

SIGNED Name (Printed) JAN NELSON 28-Nov-05

TITLE REGULATORY AFFAIRS

(This space for Federal or State office use)

PERMIT NO. APPROVAL DATE

Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon

CONDITIONS PPROV ANY:

BRADLEYG. HILLAPPROVED BK TITLE DATE

See Instructions On Reverse Side

tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction

RECEIVED

FederalApprovalofthla

Action is

9 eFORMAPPROVED

Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972

6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A

TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]

3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +I-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft

6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.

SIGNED Name (Printed) JAN NELSON 28-Nov-05

TITLE REGULATORY AFFAIRS

(This space for Federal or State office use)

PERMIT NO. APPROVAL DATE

Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon

CONDITIONS PPROV ANY:

BRADLEYG. HILLAPPROVED BK TITLE DATE

See Instructions On Reverse Side

tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction

RECEIVED

FederalApprovalofthla

Action is

9 eFORMAPPROVED

Form 3160-3 OMB NO. 1040-0136(Julyi992) UNITED STATES SUBMITINTRIPLICATE* Expires:February28,1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.BUREAU OF LAND MANAGEMENT UTU-74972

6. IF INDIAN,ALLOTTEE OR TRIBE NAMEAPPLICATION FOR PERMIT TO DRILL OR DEEPEN N/A

TYPE OF WORK 7. UNITAGREEMENT NAMEDRILL O DEEPEN O NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.O O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAMEOF OPERATOR Contact: Jan Nelson 9. API WELL NO.QEP Uinta Basin, Inc. E-Mail: [email protected]

3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 -i.iunrrieuerrn i ¿

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREAAt Surface 669' FSL 2022' FEL, SWS SECTION622, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME 164. 5]â4 GT14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT15. DISTANCE FROM PROPOSED LOCATION TO NEAREST 16.NO.OF ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +I-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on filecompleted, applied for, on this lease, ft

6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).3. A surface Use Plan (if location is on National Forest System Lands, 5. Operatorcertification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information and/or plans as may be required by theauthorized officer.

SIGNED Name (Printed) JAN NELSON 28-Nov-05

TITLE REGULATORY AFFAIRS

(This space for Federal or State office use)

PERMIT NO. APPROVAL DATE

Application approvaldoes not warrant or certifythe appilcant Id a I a r equitabletitleto those rights in the subject lease whichwould entitle the appifcant to conduct operationsthereon

CONDITIONS PPROV ANY:

BRADLEYG. HILLAPPROVED BK TITLE DATE

See Instructions On Reverse Side

tle 18 U.S.C Section 1001, makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statements or representations as to any mater within its jurisdiction

RECEIVED

FederalApprovalofthla

Action is

Page 2: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

QUESTAR EXPLR. & PROD.

T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W

- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W

- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID

- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGS IS A G.P.S. OBSERVATION.

o

1953 Brass Cap0.J' High, Moundof Stones

SCALE

CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL

BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .

REG RATION N . 319 .°

STA TAH ,•

195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i

S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W

- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=

90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT

= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &

QUESTAR EXPLR. & PROD.

T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W

- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W

- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID

- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGS IS A G.P.S. OBSERVATION.

o

1953 Brass Cap0.J' High, Moundof Stones

SCALE

CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL

BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .

REG RATION N . 319 .°

STA TAH ,•

195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i

S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W

- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=

90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT

= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILE

A = SECTION CORNERS LOCATED. LONGITUDE=109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &

QUESTAR EXPLR. & PROD.

T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W

- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W

- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID

- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGS IS A G.P.S. OBSERVATION.

o

1953 Brass Cap0.J' High, Moundof Stones

SCALE

CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL

BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .

REG RATION N . 319 .°

STA TAH ,•

195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i

S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W

- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=

90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT

= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &

QUESTAR EXPLR. & PROD.

T'7S R21E SL B.&M * " '°cation, BBS #15G-22-7-21, located as' ' ' shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.&M. Uintah County, Utah.S87°59'W

- 2651.22' (G.L.O.) BASIS OF ELEVATIONSS7°59'W

- 2658.48' (G.L.O.)BENCH MARK (43EAM) LOCATED IN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNAN BASIN,QUADRANGLE,UTAH, UINTAH COUNTY, 7.5 MINUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHED BY THE UNITED STATESDEPARTMENTOF THE INTERIOR, GEOLOGICALSURVEY. SAID

- ELEVATIONIS MARKED AS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGS IS A G.P.S. OBSERVATION.

o

1953 Brass Cap0.J' High, Moundof Stones

SCALE

CERTIFICATETHIS IS TO CERTIFYTHAT THE ABOVE PL FROMFIELD NOTES OF ACTUAL SURVEYS MASUPERVISIONAND THAT THE SAME A THEBEST OF MY KNOWLEDGEAND BEL

BBS /15G--22-7-21Elev. Ungraded Ground = 4909' 2022' REgTER L . .

REG RATION N . 319 .°

STA TAH ,•

195J Brass Cap1953 Brass CaP 0.4' High, Scattered0.5' High, Mound Ston., UINTAH ENGINEERING & NGof Stones a i

S88'15'W - 2694.12' (G.L.O.)' SBB°15'46"W

- 2696.12' (Meas.) 85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: (AUTONOMOUS NAD 83) SCALE DATE SURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000' 11-11-05 11-13-05=

90° SYMBOL LONGITUDE= 109°32'20.96" (109.539156) PARTY REFERENCES(AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.L.O. PLAT

= PROPOSED WELL HEAD LATITUDE=40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109°32'18.47" (109.538464) COOL QUESTAR EXPLR. &

Page 3: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O

Additional Operator Remarks

QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements

Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.

See Onshore Order No. 1 attached

Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR

O

Additional Operator Remarks

QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements

Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.

See Onshore Order No. 1 attached

Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR

O

Additional Operator Remarks

QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements

Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.

See Onshore Order No. 1 attached

Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR

O

Additional Operator Remarks

QEP Uinta Basin Inc. proposes to drill a well to 6850' to test the Green River. If productive,casing willbe run and the well completed. If dry, the well willbe plugged and abandoned asper BLM and State of Utah requirements

Please see QEP, Uinta Basin, Inc. Standard Operating Practices for Green River FormationWells located in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 and 24 East.

See Onshore Order No. 1 attached

Please be advised that QEP, Uinta Basin, Inc. agrees to be responsible under the termsand conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESBOOOO24. The principal isQEP,Uinta Basin, Inc. via surety as consent as provided for the 43 CFR

Page 4: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O OQEP Uinta Basin, Inc.BBS 15G-22-7-21

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.

1. Formation Tops

The estimated tops of important geologic markers are as follows:

Formation DepthUinta SurfaceGreen River 3200'TD 6850'

2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones

The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:

Substance Formation DepthOil/Gas Green River 6850'

All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.

AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.

3. Anticipated Bottom Hole Pressures

Maximum anticipated bottom hole pressure equals approximately2971.

O OQEP Uinta Basin, Inc.BBS 15G-22-7-21

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.

1. Formation Tops

The estimated tops of important geologic markers are as follows:

Formation DepthUinta SurfaceGreen River 3200'TD 6850'

2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones

The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:

Substance Formation DepthOil/Gas Green River 6850'

All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.

AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.

3. Anticipated Bottom Hole Pressures

Maximum anticipated bottom hole pressure equals approximately2971.

O OQEP Uinta Basin, Inc.BBS 15G-22-7-21

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.

1. Formation Tops

The estimated tops of important geologic markers are as follows:

Formation DepthUinta SurfaceGreen River 3200'TD 6850'

2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones

The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:

Substance Formation DepthOil/Gas Green River 6850'

All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.

AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.

3. Anticipated Bottom Hole Pressures

Maximum anticipated bottom hole pressure equals approximately2971.

O OQEP Uinta Basin, Inc.BBS 15G-22-7-21

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

AIIlease and/or unit operations will be conducted in such a manner that full compliance is madewith applicable laws, regulations (43 CFR 3100), Onshore Oil and Gas No. 1, and the approvedplan of operations. The operator is fully responsible for the actions of his subcontractors. A copyof these conditions willbe furnished the field representative to insure compliance.

1. Formation Tops

The estimated tops of important geologic markers are as follows:

Formation DepthUinta SurfaceGreen River 3200'TD 6850'

2. Anticipated Depths of Oil, Gas, Water and Other Mineral Bearinq Zones

The estimated depths at which the topand bottom of the anticipated water, oil,gas orother mineral bearing formations are expected to be encountered are as follows:

Substance Formation DepthOil/Gas Green River 6850'

All fresh water and prospectively valuable minerals encountered during drilling, willberecorded by depth and adequately protected. All oiland gas shows willbe tested todetermine commercial potential.

AIIwater shows and water-bearing sands willbe reported to the BLMin Vernal, Utah.Copies of State of Utah form OGC-8-X are acceptable. If no flows are detected,samples willbe submitted to the BLMalong withany water analyses conducted.

3. Anticipated Bottom Hole Pressures

Maximum anticipated bottom hole pressure equals approximately2971.

Page 5: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O O

QEP UINTABASIN INC.BBS 15G-22-7-21

669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E

UTU-74972UINTAH COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI- POINT SURFACE USE & OPERATIONS PLAN

An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:

Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.

1. Existing Roads:

The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.

Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.

There willbe improvements made to existing two-trackroad.

2. Planned Access Roads:

Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Refer to Topo Map B for the location of the proposed access road.

The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.

3. Location of Existinq Wells Within a 1 - Mile Radius:

Please refer to Topo Map C.

4. Location of Existinq & Proposed Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Product will be contained in tanks and transportedfrom location.

A muffler will be placed on pumping unit for noise control.

5. Location and Type of Water Supply:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24

O O

QEP UINTABASIN INC.BBS 15G-22-7-21

669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E

UTU-74972UINTAH COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI- POINT SURFACE USE & OPERATIONS PLAN

An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:

Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.

1. Existing Roads:

The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.

Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.

There willbe improvements made to existing two-trackroad.

2. Planned Access Roads:

Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Refer to Topo Map B for the location of the proposed access road.

The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.

3. Location of Existinq Wells Within a 1 - Mile Radius:

Please refer to Topo Map C.

4. Location of Existinq & Proposed Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Product will be contained in tanks and transportedfrom location.

A muffler will be placed on pumping unit for noise control.

5. Location and Type of Water Supply:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24

O O

QEP UINTABASIN INC.BBS 15G-22-7-21

669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E

UTU-74972UINTAH COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI- POINT SURFACE USE & OPERATIONS PLAN

An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:

Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.

1. Existing Roads:

The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.

Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.

There willbe improvements made to existing two-trackroad.

2. Planned Access Roads:

Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Refer to Topo Map B for the location of the proposed access road.

The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.

3. Location of Existinq Wells Within a 1 - Mile Radius:

Please refer to Topo Map C.

4. Location of Existinq & Proposed Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Product will be contained in tanks and transportedfrom location.

A muffler will be placed on pumping unit for noise control.

5. Location and Type of Water Supply:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24

O O

QEP UINTABASIN INC.BBS 15G-22-7-21

669' FSL 2022' FELSWSE, SECTION 22, T7S, R21E

UTU-74972UINTAH COUNTY, UTAH

ONSHORE ORDER NO. 1

MULTI- POINT SURFACE USE & OPERATIONS PLAN

An onsite inspection was conducted for the BBS 15G-22-7-21 on November 28, 2005.Weather conditions were clear and cold at the timeof the onsite. In attendance at the inspectionwere the following individuals:

Paul Buhler Bureau of Land ManagementAmy Torres Bureau of Land ManagementJan Nelson QEP Uinta Basin Inc.

1. Existing Roads:

The proposed well site is appro×imately 35 miles Southeast of Vernal, Utah.

Refer to Topo Maps A and B for location of access roads within a 2 - mile radius.

There willbe improvements made to existing two-trackroad.

2. Planned Access Roads:

Please see QEP Uinta Basin Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Refer to Topo Map B for the location of the proposed access road.

The part of road that travels off lease willrequire a ROW. The part of the proposed access road isapproximately 7400' in length. The new access road willbe 30' in width crowned(2 to 3%), ditched and constructed with a running surface of 18 feet and a maximum disturbed width of 30 feet.

3. Location of Existinq Wells Within a 1 - Mile Radius:

Please refer to Topo Map C.

4. Location of Existinq & Proposed Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

Product will be contained in tanks and transportedfrom location.

A muffler will be placed on pumping unit for noise control.

5. Location and Type of Water Supply:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24

Page 6: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O O

6. Source of Construction Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

7. Methods of Handlinq Waste Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

8. Ancillary Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

9. Well Site Layout: (See Location Layout Diagram)

The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).

Please see the attached diagram to describe rig orientation, parking areas, and accessroads.

A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:

Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.

Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush

11. Surface Ownership:

The well pad and access road are located on lands owned by:

Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400

12. Other Information

A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.

There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.

No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.

QEP will clean out existing

O O

6. Source of Construction Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

7. Methods of Handlinq Waste Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

8. Ancillary Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

9. Well Site Layout: (See Location Layout Diagram)

The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).

Please see the attached diagram to describe rig orientation, parking areas, and accessroads.

A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:

Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.

Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush

11. Surface Ownership:

The well pad and access road are located on lands owned by:

Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400

12. Other Information

A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.

There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.

No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.

QEP will clean out existing

O O

6. Source of Construction Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

7. Methods of Handlinq Waste Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

8. Ancillary Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

9. Well Site Layout: (See Location Layout Diagram)

The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).

Please see the attached diagram to describe rig orientation, parking areas, and accessroads.

A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:

Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.

Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush

11. Surface Ownership:

The well pad and access road are located on lands owned by:

Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400

12. Other Information

A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.

There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.

No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.

QEP will clean out existing

O O

6. Source of Construction Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

7. Methods of Handlinq Waste Materials:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

8. Ancillary Facilities:

Please see QEP Uinta Basin, Inc. Standard Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills,White River, Glen Bench, andundesignated fields in Townships 07 and 08 South, Ranges 21 to 24 East.

9. Well Site Layout: (See Location Layout Diagram)

The attached Location Layout Diagram describes drill pad cross-sections, cuts and fillsand locations of the mud tanks, reserve pit, flare pit, pipe racks, trailerparking, spoil dirtstockpile(s), and surface material stockpile(s).

Please see the attached diagram to describe rig orientation, parking areas, and accessroads.

A pit liner is required. A felt pit liner willbe required if bedrock is encountered.10. Plans for Reclamation of the Surface:

Please see QEP Uinta Basin, Inc. Standard Operating Practices for Green River Formation Wellslocated in Red Wash, Wonsits Valley, Gypsum Hills, White River, Glen Bench, andundesignated fields in Township 07 and 08 South, Ranges 21 to 24 East.

Interim Reclamation:6 Ibs Hycrest Crested Wheatgrass6 lbs Needle &Thread GrassFinal Reclamation:Seed Mix # 1 - 3 lbs. Indian Rice Grass, 1 lbs. Needle &Thread Grass, 4 Ibs. Hycrest Crested Wheat3 lbs. Fourwing Saltbush

11. Surface Ownership:

The well pad and access road are located on lands owned by:

Bureau of Land Management170 South 500 EastVernal, Utah 84078(435) 781-4400

12. Other Information

A Class Ill archaeological survey was conducted by Montgomery ArchaeologyConsultants. A copy of this report was submitted directly to the appropriate agencies byMontgomery Archaeology Consultants. Cultural resource clearance was recommendedfor this location.

There is a Burrowing Owl Stipulation from April 1st to August 15th. No construction or drillingwillcommence during this period unless otherwise determined by a wildlifebiologist that the site is inactive.

No drillingor construction willtake place during the Pronghorn season May 10 thru June 20th.

QEP will clean out existing

Page 7: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O OLessee's or Operator's Representative:

Jan NelsonRed Wash Rep.

QEP Uinta Basin, Inc.11002 East 17500 South

Vernal, Utah 84078(435) 781-4331

Certification:

All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved

plan of operations, and any applicable Notice to Lessees.

QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.

A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all

construction and drilling operations

I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently

exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe

performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is

subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.

/fl 28-Nov-05

/ Jan Nelson DateRed Wash

O OLessee's or Operator's Representative:

Jan NelsonRed Wash Rep.

QEP Uinta Basin, Inc.11002 East 17500 South

Vernal, Utah 84078(435) 781-4331

Certification:

All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved

plan of operations, and any applicable Notice to Lessees.

QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.

A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all

construction and drilling operations

I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently

exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe

performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is

subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.

/fl 28-Nov-05

/ Jan Nelson DateRed Wash

O OLessee's or Operator's Representative:

Jan NelsonRed Wash Rep.

QEP Uinta Basin, Inc.11002 East 17500 South

Vernal, Utah 84078(435) 781-4331

Certification:

All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved

plan of operations, and any applicable Notice to Lessees.

QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.

A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all

construction and drilling operations

I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently

exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe

performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is

subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.

/fl 28-Nov-05

/ Jan Nelson DateRed Wash

O OLessee's or Operator's Representative:

Jan NelsonRed Wash Rep.

QEP Uinta Basin, Inc.11002 East 17500 South

Vernal, Utah 84078(435) 781-4331

Certification:

All lease and/or unit operations will be conducted in such a manner that full complianceis made with all applicable laws, regulations, Onshore Oil&Gas Orders, the approved

plan of operations, and any applicable Notice to Lessees.

QEP Uinta Basin, Inc. willbe fully responsible for the actions of theirsubcontractors.

A complete copy of the approved Application for Permit to Drillwillbe furnished to thefield representative(s) to ensure compliance and shall be on location during all

construction and drilling operations

I hereby certifythat I, or persons under my direct supervision, have inspected theproposed drill site and access route; that I am familiar with the conditions which currently

exist; that the statements made in this plan are, to the best of my knowledge, true andcorrect; and that the work associated withthe operations proposed herein willbe

performed by QEP Uinta Basin, Inc. its' contractors and subcontractors in conformitywith this plan and the termsand conditions under which it is approved. This statement is

subject to the provisions of 18 U.S.C 1001 for the filing of a false statement.

/fl 28-Nov-05

/ Jan Nelson DateRed Wash

Page 8: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O OQUESTAR EXPLR. & PROD.

BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH

SECTION 22, T7S, R21E, S.L.B.&M.

PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY

P POSED ACC

PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY

LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR

435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:

O OQUESTAR EXPLR. & PROD.

BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH

SECTION 22, T7S, R21E, S.L.B.&M.

PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY

P POSED ACC

PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY

LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR

435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:

O OQUESTAR EXPLR. & PROD.

BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH

SECTION 22, T7S, R21E, S.L.B.&M.

PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY

P POSED ACC

PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY

LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR

435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:

O OQUESTAR EXPLR. & PROD.

BBS #15G-22-7-21LOCATED IN UINTAH COUNTY, UTAH

SECTION 22, T7S, R21E, S.L.B.&M.

PHOTO: VIEW FROM CORNER #5 TO LOCATION STAKE CAMERA ANGLE: NORTHWESTERLY

P POSED ACC

PHOTO: VIEW FROM BEGINNING OF PROPOSED ACCESS CAMERA ANGLE: NORTHEASTERLY

LOCATIONPHOTOs 1 1 14 05 PHOTO85 South 200 East Vemal, Utah 84078 MONTIl DAY YEAR

435-789-1017 [email protected] TAKENBY:DA. DRAWNBY:C.P. REVISED:

Page 9: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR

BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'

7 8

48' Sta. J+50 '

SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed

NOTE

Appr

R.Flore Pit is to be /ocated U .

Weeaor 100' from the

PIPE TUBs

Pit ES. PIPE RACKSFLARE P/T

C-J.1' i I iE/. 910. 7' - - - ;

E/. 914.7 'gg¡ --

C-19.1' c I I =E¯

48'"'°

150' Sta. 1+75Otm. p/0 70'

E0 TOILET O F-6.O'E/. 9 O1.6 '

LIGHTPLANT

BOILER-b-

- COMPRESSOR WATER -

LO PUMP HOUSE I | TANKL

¯"¯ KOBOOSTER

-- Sta. O 51 ----

Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.

= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope

E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00

at pro 4 Topsoit stockpiis

C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'

Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING

F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,

QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR

BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'

7 8

48' Sta. J+50 '

SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed

NOTE

Appr

R.Flore Pit is to be /ocated U .

Weeaor 100' from the

PIPE TUBs

Pit ES. PIPE RACKSFLARE P/T

C-J.1' i I iE/. 910. 7' - - - ;

E/. 914.7 'gg¡ --

C-19.1' c I I =E¯

48'"'°

150' Sta. 1+75Otm. p/0 70'

E0 TOILET O F-6.O'E/. 9 O1.6 '

LIGHTPLANT

BOILER-b-

- COMPRESSOR WATER -

LO PUMP HOUSE I | TANKL

¯"¯ KOBOOSTER

-- Sta. O 51 ----

Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.

= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope

E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00

at pro 4 Topsoit stockpiis

C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'

Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING

F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,

QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR

BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'

7 8

48' Sta. J+50 '

SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed

NOTE

Appr

R.Flore Pit is to be /ocated U .

Weeaor 100' from the

PIPE TUBs

Pit ES. PIPE RACKSFLARE P/T

C-J.1' i I iE/. 910. 7' - - - ;

E/. 914.7 'gg¡ --

C-19.1' c I I =E¯

48'"'°

150' Sta. 1+75Otm. p/0 70'

E0 TOILET O F-6.O'E/. 9 O1.6 '

LIGHTPLANT

BOILER-b-

- COMPRESSOR WATER -

LO PUMP HOUSE I | TANKL

¯"¯ KOBOOSTER

-- Sta. O 51 ----

Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.

= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope

E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00

at pro 4 Topsoit stockpiis

C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'

Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING

F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,

QUESTAR EXPLR. & PRO /FIGURE #iLOCATION LAYOUT FOR

BBS #15G-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC-3.4' C-1.2' Proposed Access E-4.5'E/. 911.0 E/. 908.8' Road EL 9011'

7 8

48' Sta. J+50 '

SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrawn By· D.R.B. as Needed

NOTE

Appr

R.Flore Pit is to be /ocated U .

Weeaor 100' from the

PIPE TUBs

Pit ES. PIPE RACKSFLARE P/T

C-J.1' i I iE/. 910. 7' - - - ;

E/. 914.7 'gg¡ --

C-19.1' c I I =E¯

48'"'°

150' Sta. 1+75Otm. p/0 70'

E0 TOILET O F-6.O'E/. 9 O1.6 '

LIGHTPLANT

BOILER-b-

- COMPRESSOR WATER -

LO PUMP HOUSE I | TANKL

¯"¯ KOBOOSTER

-- Sta. O 51 ----

Total Pit Capacity TR SHW/2' of Freeboard= 10,620 Bh/s. ±rotoiPit Volume ,, Approx.

= 2,870 Cu. Yds. "PROPANE TOe Of' B A STORAGE Fill Slope

E/. 914.5> C- J.7'ri. art.y . L48 Sta. 0+00

at pro 4 Topsoit stockpiis

C-4.1' C-1.7 E-4.7NO 1ES: E 911. 7' E/. 909. J' E/. 902. 9'

Elev. Ungraded Ground At Loc. Stoke = 4908.7', UINTAH ENGINEERING & LAND SURVEYING

F/N/SHED GRADE ELEV AT LOC. STAKE = 490Z6 ,, s.. 24, ,,,, . ,,,,,, e,,,, ,,oy, , ,,,,,

Page 10: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

QUESTAR EXPLR. & PROD FIGURE #2°ts

. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL

DATE 11-1D

48' 150'

Slope = 1 1/2: 1 ¯

S TA. J+50

10' 70' 48' 150'

Location Stoke

S TA. 1+ 75

10' 70 48' 150'

inished Grade

PreconstructionGrade 48 150

\ CUT

NOTE:

ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES

5% FOR COMPACT/ON

APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.

CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.

TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)

FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)

QUESTAR EXPLR. & PROD FIGURE #2°ts

. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL

DATE 11-1D

48' 150'

Slope = 1 1/2: 1 ¯

S TA. J+50

10' 70' 48' 150'

Location Stoke

S TA. 1+ 75

10' 70 48' 150'

inished Grade

PreconstructionGrade 48 150

\ CUT

NOTE:

ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES

5% FOR COMPACT/ON

APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.

CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.

TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)

FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)

QUESTAR EXPLR. & PROD FIGURE #2°ts

. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL

DATE 11-1D

48' 150'

Slope = 1 1/2: 1 ¯

S TA. J+50

10' 70' 48' 150'

Location Stoke

S TA. 1+ 75

10' 70 48' 150'

inished Grade

PreconstructionGrade 48 150

\ CUT

NOTE:

ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES

5% FOR COMPACT/ON

APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.

CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.

TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)

FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)

QUESTAR EXPLR. & PROD FIGURE #2°ts

. TYPICAL CROSS SECTIONS FORX-Sectionscale BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.1 = 50 669' FSL 2022' FEL

DATE 11-1D

48' 150'

Slope = 1 1/2: 1 ¯

S TA. J+50

10' 70' 48' 150'

Location Stoke

S TA. 1+ 75

10' 70 48' 150'

inished Grade

PreconstructionGrade 48 150

\ CUT

NOTE:

ITopsoil should ned be SM 0+ŒStripped Below Finished • * NOTE:Grade on Substructure Area. E/LL QUANT/TY/NCLUDES

5% FOR COMPACT/ON

APPROXIMATE YARDAGES EXCESS MATERIAL = 3,180 Cu. Yds.

CUT Topsoil & Pit Backfill = J,180 Cu. Yds.(6") Topsoil Stripping = 1,740 Cu. Yds (1/2 Pit Vol.)Remaining Location = 6,990 Cu. Yds. EXCESS UNBALANCE = 0 Cu. Yds.

TOTAL CUT = 8,7]O CU.YDS. (After Rehabilitation)

FILL = 5,550 CU.YDS. IIINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Vernal, Uto.h 84078 * (435)

Page 11: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR

BBS #15G-22-7-21 .-

SECTION 22, T7S, R21E, S.L.B.&M. :g.

669' FSL 2022' FELAccess

Road ••

SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.

OWLL HEAD

Production Tanks

GAS UNIT

INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)

QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR

BBS #15G-22-7-21 .-

SECTION 22, T7S, R21E, S.L.B.&M. :g.

669' FSL 2022' FELAccess

Road ••

SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.

OWLL HEAD

Production Tanks

GAS UNIT

INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)

QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR

BBS #15G-22-7-21 .-

SECTION 22, T7S, R21E, S.L.B.&M. :g.

669' FSL 2022' FELAccess

Road ••

SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.

OWLL HEAD

Production Tanks

GAS UNIT

INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)

QUESTAR EXPLR. & PRO . FI #3INTERIM RECLAMATIONPLAN FOR

BBS #15G-22-7-21 .-

SECTION 22, T7S, R21E, S.L.B.&M. :g.

669' FSL 2022' FELAccess

Road ••

SCALE: 1" = 50'DATE: 11-13-05Drawn By D.R.B.

OWLL HEAD

Production Tanks

GAS UNIT

INTERIM RECLAMATIONUINTAH ENGINEERING & LAND SURVEYING85 So. 200 East * Verruzl, Utah 84078 * (435)

Page 12: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

2R2

E E

PROPOSED LOCATION:BBS #15G-22-7-21

Bren an so m

'Joh se sorto

\ SEE TOPO B"

1

1

OURAY

WONS ALL O LD

LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00

2R2

E E

PROPOSED LOCATION:BBS #15G-22-7-21

Bren an so m

'Joh se sorto

\ SEE TOPO B"

1

1

OURAY

WONS ALL O LD

LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00

2R2

E E

PROPOSED LOCATION:BBS #15G-22-7-21

Bren an so m

'Joh se sorto

\ SEE TOPO B"

1

1

OURAY

WONS ALL O LD

LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00

2R2

E E

PROPOSED LOCATION:BBS #15G-22-7-21

Bren an so m

'Joh se sorto

\ SEE TOPO B"

1

1

OURAY

WONS ALL O LD

LEGEND: QUESTAR EXPLR. & PROD.PROPOSED N BBS #15G-22-7-21

SECTION 22, T7S, R21E, S.L.B.&M.SW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I C 11 14 05- 85 South 200 East Vernal, Utah 84078 M A P(435) 789-1017 * FAX (435) 789-1813 ONTH DAY YEARSCALE:1:100,000 DRAWNBY:C.P. ISED:00-00-00

Page 13: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

ole

PROPOSED LOCATIONS 5G 7-21

LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21

----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:

ole

PROPOSED LOCATIONS 5G 7-21

LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21

----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:

ole

PROPOSED LOCATIONS 5G 7-21

LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21

----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:

ole

PROPOSED LOCATIONS 5G 7-21

LEGEND: QUESTAR EXPLR. & PROD.EXISTING ROAD N BBS #15G-22-7-21

----------- PROPOSED ACCESS ROAD SECTION 22, T7S, R21E, S.L.B.&M---------- EXISTING 2-TRACK NEEDS UPGRADEDSW 1/4 SE 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I c 11 14 0585 South 200 East VernnE, Utah 84078 I A 10NTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"= 1000 DRAWNBY:C.P. REVISED:

Page 14: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

T

PROPOSED LOCATION:BBS #15G-22-7-21

LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4

- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E

T

PROPOSED LOCATION:BBS #15G-22-7-21

LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4

- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E

T

PROPOSED LOCATION:BBS #15G-22-7-21

LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4

- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E

T

PROPOSED LOCATION:BBS #15G-22-7-21

LEGEND: QUESTAR EXPLR. & PROD.f DISPOSAL WELLS WATER WELLS N BBS #15G-22-7-21e PRODUCING WELLS ABANDONED WELLS SECTION 22, T7S, R21E, S.L.B.&M.# SHUT IN WELLS -@- TEMPORARILY ABANDONED SW 1/4 SE 1/4

- ÜÏntahEngineering & Land Š¯urveyingTOPOGR A PH I c 11 14 0585 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR(435) 789-1017 * FAX (435) 789-1813SCALE:1"=2000 DRAWNBY:C.E

Page 15: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443

WELL NAME: BBS 15G-22-7-21

OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331

PROPOSED LOCATION:

SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL

Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL

UINTAH Engineering

WILDCAT ( 1 ) Geology

LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: UTU-74972

SURFACE OWNER: 1 - FederalLATITUDE: 40.19114

PROPOSED FORMATION: GRRV

COALBED METHANE WELL? NO LONGITUDE: -109.5385

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit

(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception(No.43-8496 )

RDCC Review (Y/N)Drilling Unit

(Date: ) Board Cause No:Eff Date:

Fee Surf Agreement (Y/N) Siting:

\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS: d i

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443

WELL NAME: BBS 15G-22-7-21

OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331

PROPOSED LOCATION:

SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL

Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL

UINTAH Engineering

WILDCAT ( 1 ) Geology

LEASE TYPE: 1 - FederalSurface

LEASE NUMBER: UTU-74972

SURFACE OWNER: 1 - FederalLATITUDE: 40.19114

PROPOSED FORMATION: GRRV

COALBED METHANE WELL? NO LONGITUDE: -109.5385

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit

(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception(No.43-8496 )

RDCC Review (Y/N)Drilling Unit

(Date: ) Board Cause No:Eff Date:

Fee Surf Agreement (Y/N) Siting:

\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS: d i

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443

WELL NAME: BBS 15G-22-7-21

OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331

PROPOSED LOCATION:

SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL

Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL

UINTAH Engineering

WILDCAT ( 1 ) Geology

LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: UTU-74972

SURFACE OWNER: 1 - FederalLATITUDE: 40.19114

PROPOSED FORMATION: GRRV

COALBED METHANE WELL? NO LONGITUDE: -109.5385

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit

(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception(No.43-8496 )

RDCC Review (Y/N)Drilling Unit

(Date: ) Board Cause No:Eff Date:

Fee Surf Agreement (Y/N) Siting:

\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS: d i

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 12/01/2005 API NO. ASSIGNED: 43-047-37443

WELL NAME: BBS 15G-22-7-21

OPERATOR: QEP UINTA BASIN, INC. ( N2460 )CONTACT: JAN NELSON PHONE NUMBER: 435-781-4331

PROPOSED LOCATION:

SWSE 22 070S 210E INSPECT LOCATN BY: / /SURFACE: 0669 FSL 2022 FEL

Tech Review Initials DateBOTTOM: 0669 FSL 2022 FEL

UINTAH Engineering

WILDCAT ( 1 ) Geology

LEASE TYPE: 1 - Federal SurfaceLEASE NUMBER: UTU-74972

SURFACE OWNER: 1 - FederalLATITUDE: 40.19114

PROPOSED FORMATION: GRRV

COALBED METHANE WELL? NO LONGITUDE: -109.5385

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

Plat R649-2-3.

Bond: Fed[1] Ind[] Sta[] Fee[]Unit

(NO.ESBOOO24 )Potash (Y/N) \/' R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

Water Permit R649-3-3. Exception(No.43-8496 )

RDCC Review (Y/N)Drilling Unit

(Date: ) Board Cause No:Eff Date:

Fee Surf Agreement (Y/N) Siting:

\18 Intent to Commingle (Y/N),R649-3-11. Directional Drill

COMMENTS:

STIPULATIONS: d i

Page 16: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

WV Sw-Ifr7-21

BB E 15G-Ifr7-21

x

T7S R21E

BBS 15G-22 7-21PEUCANLUCE UNFF2

STIRRUP UNITSU+W267-21

f.EOTA UNIT A 2 26 in

OPERATOR: QEP UITNA BASIN INC (N2460)

SEC: 22 T.7S R.21E

FIELD:WILDCAT (001)

COUNTY: UINTAH

SPACING: R649-3-2 / GENERAL SITING Wells Status

: : s¶g=GOEN Utah OilGas and Mmmyx LOCATION ABANDONED

NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED

ABANDONED EXPLORATORY ¾ PRODUCING GASACTIVE N

PS LRAGE e OD IN OILCOMBINED NF SECONDARY

• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED

PP GAS o TEST WELL

L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED

,

WV Sw-Ifr7-21

BB E 15G-Ifr7-21

x

T7S R21E

BBS 15G-22 7-21PEUCANLUCE UNFF2

STIRRUP UNITSU+W267-21

f.EOTA UNIT A 2 26 in

OPERATOR: QEP UITNA BASIN INC (N2460)

SEC: 22 T.7S R.21E

FIELD:WILDCAT (001)

COUNTY: UINTAH

SPACING: R649-3-2 / GENERAL SITING Wells Status

: : s¶g=GOEN Utah OilGas and Mmmyx LOCATION ABANDONED

NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED

ABANDONED EXPLORATORY ¾ PRODUCING GASACTIVE N

PS LRAGE e OD IN OILCOMBINED NF SECONDARY

• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED

PP GAS o TEST WELL

L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED

,

WV Sw-Ifr7-21

BB E 15G-Ifr7-21

x

T7S R21E

BBS 15G-22 7-21PEUCANLUCE UNFF2

STIRRUP UNITSU+W267-21

f.EOTA UNIT A 2 26 in

OPERATOR: QEP UITNA BASIN INC (N2460)

SEC: 22 T.7S R.21E

FIELD:WILDCAT (001)

COUNTY: UINTAH

SPACING: R649-3-2 / GENERAL SITING Wells Status

: : s¶g=GOEN Utah OilGas and MmmyX LOCATION ABANDONED

NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED

ABANDONED EXPLORATORY y PRODUCING GASACTIVE N

PS LRAGE e OD IN OILCOMBINED NF SECONDARY

• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED

PP GAS o TEST WELL

L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED

,

WV Sw-Ifr7-21

BB E 15G-Ifr7-21

x

T7S R21E

BBS 15G-22 7-21PEUCANLUCE UNFF2

STIRRUP UNITSU+W267-21

f.EOTA UNIT A 2 26 in

OPERATOR: QEP UITNA BASIN INC (N2460)

SEC: 22 T.7S R.21E

FIELD:WILDCAT (001)

COUNTY: UINTAH

SPACING: R649-3-2 / GENERAL SITING Wells Status

: : s¶g=GOEN Utah OilGas and MmmyX LOCATION ABANDONED

NEW LOCATIONField Status Unit Status g PLUGGED & ABANDONED

ABANDONED EXPLORATORY y PRODUCING GASACTIVE N

PS LRAGE e OD IN OILCOMBINED NF SECONDARY

• SHUT-IN OILINACTIVE NDLING)s( TEMP. ABANDONEDPROPOSED

PP GAS o TEST WELL

L M N TED PP GEOTHERML & WATER INJECTION SPP OIL g wATER SUPPLY PREPARED BY: DIANA WFUTNEYSECONDARY WATER DISPOSAL DATE. 5-DECEMBER-2005TERMINATED

,

Page 17: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O Oe JON M. HUNTSMAN, JR.

Governor

GARY R. HERBERT••• Lieutenant Governor

State of Utah December 5, 2005

Department ofNatural Resources

MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.

11002 E 17500 SDivision of Vernal, UT 84078Oil, Gas & MiningJOHN R. BAZADivision Director

Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.

This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Uintah County AssessorBureau of Land Management, Vernal District Office

1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458

O Oe JON M. HUNTSMAN, JR.

Governor

GARY R. HERBERT••• Lieutenant Governor

State of Utah December 5, 2005

Department ofNatural Resources

MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.

11002 E 17500 SDivision ofVernal, UT 84078Oil, Gas & Mining

JOHN R. BAZADivision Director

Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.

This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Uintah County AssessorBureau of Land Management, Vernal District Office

1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458

O Oe JON M. HUNTSMAN, JR.

Governor

GARY R. HERBERT••• Lieutenant Governor

State of Utah December 5, 2005

Department ofNatural Resources

MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.

11002 E 17500 SDivision of Vernal, UT 84078Oil, Gas & MiningJOHN R. BAZADivision Director

Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.

This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Uintah County AssessorBureau of Land Management, Vernal District Office

1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458

O Oe JON M. HUNTSMAN, JR.

Governor

GARY R. HERBERT••• Lieutenant Governor

State of Utah December 5, 2005

Department ofNatural Resources

MICHAEL R. STYLERExecutive Director QEP Uinta Basin, Inc.

11002 E 17500 SDivision of Vernal, UT 84078Oil, Gas & MiningJOHN R. BAZADivision Director

Re: BBS 15G-22-7-21 Well, 669' FSL, 2022' FEL, SW SE, Sec. 22, T. 7 South,R. 21 East, Uintah County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 etseq., Utah Administrative Code R649-3-1 et seq., and the attached Conditions ofApproval, approval to drill the referenced well is granted.

This approval shall expire one year from the above date unless substantial andcontinuous operation is underway, or a request for extension is made prior to theexpiration date. The API identification number assigned to this well is 43-047-37443.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Uintah County AssessorBureau of Land Management, Vernal District Office

1594 WestNorth Ternple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801)538-5340•facsimile (801)359-3940•TTY (801) 538-7458

Page 18: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21

API Number: 43-047-37443Lease: UTU-74972

Location: SW SE Sec._ 22_ T. 7 South R. 21 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the

O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21

API Number: 43-047-37443Lease: UTU-74972

Location: SW SE Sec._ 22_ T. 7 South R. 21 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the

O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21

API Number: 43-047-37443Lease: UTU-74972

Location: SW SE Sec._ 22_ T. 7 South R. 21 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the

O OOperator: QEP Uinta Basin, Inc.Well Name & Number BBS 15G-22-7-21

API Number: 43-047-37443Lease: UTU-74972

Location: SW SE Sec._ 22_ T. 7 South R. 21 East

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284.

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dan Jarvis at (801) 538-5338

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of tlie Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion ofits analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the

Page 19: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

NOV2 9 2005FORM APPROVED

Form 3160-3OMB NO. 1040-0136

(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.

BUREAU OF LAND MANAGEMENT UTU-74972

6. 1FINDIAN,ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA

TYPE OF WORK 7. UNITAGREEMENT NAME

DRILL DEEPEN . NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.

O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.

QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT

11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA

At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME

14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT

15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +/-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file

completed, applied for, on this lease, ft 6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration

4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:

1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).

3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the

authorized officer.

SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05

TITLE FFAIRS

ederal or State office use)

OgRECORDONLYPERMIT NO. APPROVAL DATE

Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon

CONDITIONS OF AL, IF AN

APPROVED TITLE MOTS OSS DATE

See Instructions On Reverse Side

Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction

REGEiVED ÛÑRDEggyMAYI 12WS

/S$ DIV.0FOIL,GAS&

NOV2 9 2005FORM APPROVED

Form 3160-3OMB NO. 1040-0136

(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.

BUREAU OF LAND MANAGEMENT UTU-74972

6. 1FINDIAN,ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA

TYPE OF WORK 7. UNITAGREEMENT NAME

DRILL DEEPEN . NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.

O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.

QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT

11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA

At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME

14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT

15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +/-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file

completed, applied for, on this lease, ft 6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration

4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:

1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).

3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the

authorized officer.

SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05

TITLE FFAIRS

ederal or State office use)

OgRECORDONLYPERMIT NO. APPROVAL DATE

Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon

CONDITIONS OF AL, IF AN

APPROVED TITLE MOTS OSS DATE

See Instructions On Reverse Side

Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction

REGEiVED ÛÑRDEggyMAYI 12WS

/S$ DIV.0FOIL,GAS&

NOV2 9 2005FORM APPROVED

Form 3160-3OMB NO. 1040-0136

(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.

BUREAU OF LAND MANAGEMENT UTU-74972

6. 1FINDIAN,ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA

TYPE OF WORK 7. UNITAGREEMENT NAME

DRILL DEEPEN . NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.

O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.

QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT

11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA

At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME

14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT

15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +/-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file

completed, applied for, on this lease, ft 6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration

4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:

1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).

3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the

authorized officer.

SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05

TITLE FFAIRS

ederal or State office use)

OgRECORDONLYPERMIT NO. APPROVAL DATE

Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon

CONDITIONS OF AL, IF AN

APPROVED TITLE MOTS OSS DATE

See Instructions On Reverse Side

Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction

REGEiVED ÛÑRDEggyMAYI 12WS

/S$ DIV.0FOIL,GAS&

NOV2 9 2005FORM APPROVED

Form 3160-3OMB NO. 1040-0136

(July1992) UNITED STATES SUBMITINTRIPLICATE* Ëxpires:February28.1995

DEPARTMENT OF THE INTERIOR 5. LEASE DESIGNATION AND SERIAL NO.

BUREAU OF LAND MANAGEMENT UTU-74972

6. 1FINDIAN,ALLOTTEE OR TRIBE NAME

APPLICATION FOR PERMIT TO DRILL OR DEEPEN NIA

TYPE OF WORK 7. UNITAGREEMENT NAME

DRILL DEEPEN . NIA

TYPE OF WELL 8. FARM OR LEASE NAME, WELL NO.

O O SINGLE O MULTIPLE

OIL WELL GAS WELL OTHER ZONE ZONE BBS 15G-22-7-21

2. NAME OF OPERATOR Contact: Jan Nelson 9. API WELL NO.

QEP Uinta Basin, Inc. E-Mail: [email protected] )3. ADDRESS Telphone number 10. FIELD AND POOL, OR WILDCAT

11002 E. 17500 S. Vernal, Ut 84078 Phone 435-781-4331 Fax 435-781-4323 UNDESIGNATED

4. LOCATION OF WELL (Report location clearly and in accordance with and State requirements*) 11. SEC.,T, R, M, OR BLK & SURVEY OR AREA

At Surface 669' FSL 2022' FEL, SWSE, SECTION 22, T7S, R21E SWSE, SECTION 22, T7S, R21E

At proposed production zone SAME

14. DISTANCE IN MILES FROM NEAREST TOWN OR POSTOFFICE* 12. COUNTY OR PARISH 13. STATE

35+/- MILES SOUTHEAST OF VERNAL, UT UINTAH UT

15. DISTANCE FROlvi PROPOSED LOCATIONTO NEAREST 16.NO.0F ACRES IN LEASE 17. NO. OF ACRES ASSIGNED TO THIS WELL

PROPERTY OR LEASE LINE, FT.(also to nearest drig,unit line if any) 360 40

669' +/-

18.DISTANCE FROM PROPOSED location to nearest well, drilling, 19. PROPOSED DEPTH 20. BLMIBIABond No. on file

completed, applied for, on this lease, ft 6850'ESBOOO24

21. ELEVATIONS (Show whether DF, RT, GR, ect.) 22. DATEWORK WILL START 23. Estimated duration

4907.6 GR ASAP 10 DAYS

24. Attachments

The following,completed in accordance with the requirments of Onshore Oil and Gas Order No. 1, shall be attached to this form:

1. Well plat certified by a registered surveyor. 4. Bond to cover the operations unless covered by an exisitingbond on file (see2. A Drilling Plan Item 20 above).

3. A surface Use Plan (if location is on National Forest System Lands' 5. Operator certification.

the SUPO shall be filed withthe appropriate Forest Service Office) 6. Such other site specific information andlor plans as may be required by the

authorized officer.

SIGNED Name (Printed) JAN NELSON epted by the 28-Nov-05

TITLE FFAIRS

ederal or State office use)

OgRECORDONLYPERMIT NO. APPROVAL DATE

Application approval does not warrant or cedify the applicantholds any le itable titleto those rights in the subject lease whichwouldentitle the applicant to conduct operations thereon

CONDITIONS OF AL, IF AN

APPROVED TITLE MOTS OSS DATE

See Instructions On Reverse Side

Title 18 US ection 1001. makes it a crime for any person knowingly and willfully to make to any department or agency of the

United States any false, fictitious or fraudulent statementsor representations as to any mater within its jurisdiction

REGEiVED ÛÑRDEggyMAYI 12WS

/S$ DIV.0FOIL,GAS&

Page 20: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

UNITED STATES DEPARTMENT OF THE INTERIOR S -

BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE

170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL

Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A

Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476

.

After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.

Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)

First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more

than ninety (90)

UNITED STATES DEPARTMENT OF THE INTERIOR S -

BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE

170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL

Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A

Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476

.

After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.

Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)

First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more

than ninety (90)

UNITED STATES DEPARTMENT OF THE INTERIOR S -

BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE

170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL

Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A

Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476

.

After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.

Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)

First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more

than ninety (90)

UNITED STATES DEPARTMENT OF THE INTERIOR S -

BUREAU OF LAND MANAGEMENTVERNAL FIELD OFFICE

170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TODRILL

Company: QEP UINTA BASIN INC Location: SWSE, Sec.25 , T8S, R24EWell No: BBS 15G-22-7-21 Lease No: UTU-74972API No: 43-047-37443 Agreement: N/A

Petroleum Engineer: Matt Baker Office: 435-781-4490 Cell: 435-828-4470Petroleum Engineer: Michael Lee Office: 435-781-4432 Cell: 435-828-7875Supervisory Petroleum Technician: Jamie Sparger Office: 435-781-4502 Cell: 435-828-3913Environmental Scientist: Paul Buhler Office: 435-781-4475 Cell: 435-828-4029Environmental Scientist: Karl Wright Office: 435-781-4484Natural Resource Specialist: Holly Villa Office: 435-781-4404Natural Resource Specialist: Melissa Hawk Office: 435-781-4476

.

After hours message number:.(435) 781-4513 Office Fax: (435) 781-4410

A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE

All lease and/or unit operations are to be conducted in such a manner that full compliance ismade with the applicable laws, regulations (43 CFR Part 3160), and this approved Applicationfor Permit to Drill including Surface and Downhole Conditions of Approval. The operator isconsidered fully responsible for the actions of his subcontractors. A copy of the approved APDmust be on location during construction, drilling, and completion operations. This permit isapproved for a one-year period. An additional year extension may be applied for bysundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Location Construction - Forty-Eight (48) hours prior to construction of location and(Notify Paul BuhlerES / NRS) access roads.

Location Completion - Prior to moving on the drilling rig.(Notify Paul BuhlerES / NRS)

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify PE)

Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Jamie Sparger SPT) all casing strings.

BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Jamie Sparger SPT)

First Production Notice - Within Five (5) business days after new well begins or(Notify PE) production resumes after well has been off production for more

than ninety (90)

Page 21: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

COAs: Page 2 of 6Well: BBS 15G-22-7-21

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

1. Oil well, product will be trucked. No pipeline needed at this

COAs: Page 2 of 6Well: BBS 15G-22-7-21

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

1. Oil well, product will be trucked. No pipeline needed at this

COAs: Page 2 of 6Well: BBS 15G-22-7-21

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

1. Oil well, product will be trucked. No pipeline needed at this

COAs: Page 2 of 6Well: BBS 15G-22-7-21

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

1. Oil well, product will be trucked. No pipeline needed at this

Page 22: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

COAs: Page 3 of 6Well: BBS 15G-22-7-21

DOWNHOLE CONDITIONS OF APPROVAL

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:

SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover

program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.

2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.

3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.

4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.

All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.

BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.

Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

No aggressive/fresh hard-banded drill pipe shall be used within casing.

5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.

6. No location will be constructed or moved, no well will be plugged, and no drilling

COAs: Page 3 of 6Well: BBS 15G-22-7-21

DOWNHOLE CONDITIONS OF APPROVAL

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:

SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover

program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.

2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.

3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.

4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.

All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.

BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.

Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

No aggressive/fresh hard-banded drill pipe shall be used within casing.

5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.

6. No location will be constructed or moved, no well will be plugged, and no drilling

COAs: Page 3 of 6Well: BBS 15G-22-7-21

DOWNHOLE CONDITIONS OF APPROVAL

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:

SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover

program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.

2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.

3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.

4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.

All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.

BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.

Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

No aggressive/fresh hard-banded drill pipe shall be used within casing.

5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.

6. No location will be constructed or moved, no well will be plugged, and no drilling

COAs: Page 3 of 6Well: BBS 15G-22-7-21

DOWNHOLE CONDITIONS OF APPROVAL

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictlyadhered to. The following items are emphasized:

SITE SPECIFIC DOWNHOLE CONDITIONS OF APPROVAL

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS1. There shall be no deviation from the proposed drilling, completion, and/or workover

program as approved. Safe drilling and operating practices must be observed. All wells,whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or marker with the name of the operator, leaseserial number, well number, and surveyed description of the well. Any changes inoperation must have prior approval from the BLM, Vernal Field Office PetroleumEngineers.

2. The spud date and time shall be reported orally to Vernal Field Office within 24 hours ofspudding.

3. Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least24 hours in advance of casing cementing operations and BOPE & casing pressuretests.

4. Blowout prevention equipment (BOPE) will remain in use until the well is completed orabandoned. Closing unit controls must remain unobstructed and readily accessible at alltimes. Choke manifolds must be located outside of the rig substructure.

All BOPE components will be inspected daily and those inspections shall be recorded inthe daily drilling report. Components shall be operated and tested as required by OnshoreOil & Gas Order No. 2 to insure good mechanical working order. All BOPE pressuretests must be performed by a test pump with a chart recorder and NOT_by the rig pumps.Test must be reported in the driller's log.

BOP drills must be initially conducted by each drilling crew within 24 hours of drillingout from under the surface casing and weekly thereafter as specified in Onshore Oil &Gas Order No. 2.

Casing pressure tests are required before drilling out from under all casing strings set andcemented in place.

No aggressive/fresh hard-banded drill pipe shall be used within casing.

5. All shows of fresh water and minerals will be reported and protected. A sample will betaken of any water flows and a water analysis furnished the BLM, Vernal Field Office.All oil and gas shows will be adequateÏytested for commercial possibilities, reported, andprotected.

6. No location will be constructed or moved, no well will be plugged, and no drilling

Page 23: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

COAs: Page 4 of 6Well: BBS 15G-22-7-21

workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.

7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.

Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.

Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.

In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.

Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).

9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.

All measurement points shall be identified as point of sales or allocation for

COAs: Page 4 of 6Well: BBS 15G-22-7-21

workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.

7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.

Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.

Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.

In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.

Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).

9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.

All measurement points shall be identified as point of sales or allocation for

COAs: Page 4 of 6Well: BBS 15G-22-7-21

workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.

7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.

Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.

Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.

In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.

Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).

9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.

All measurement points shall be identified as point of sales or allocation for

COAs: Page 4 of 6Well: BBS 15G-22-7-21

workover equipment will be removed from a well to be placed in a suspended statuswithout prior approval of the BLM, Vernal Field Office. If operations are to besuspended for more than 30 days, prior approval of the BLM, Vernal Field Office mustbe obtained and notification given before resumption of operations.

7. Chronologic drilling progress reports must be filed directly with the BLM, Vernal FieldOffice on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.

Any change in the program must be approved by the BLM, Vernal Field Office. "SundryNotices and Reports on Wells" (Form BLM 3160-5) must be filed for all changes of plansand other operations in accordance with 43 CFR 3162.3-2.

Emergency approval may be obtained orally, but such approval does not waive thewritten report requirement. Any additional construction, reconstruction, or alterations offacilities, including roads, gathering lines, batteries, etc., which will result in thedisturbance of new ground, will require the filing of a suitable plan pursuant to OnshoreOil & Gas Order No. 1 of 43 CFR 3164.1 and prior approval by the BLM, Vernal FieldOffice.

In accordance with 43 CFR 3162.4-3, this well must be reported on the "Monthly Reportof Operations" (Oil and Gas Operations Report ((OGOR)) starting with the month inwhich operations commence and continue each month until the well is physically pluggedand abandoned. This report shall be filed in duplicate, directly with the MineralsManagement Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

8. Whether the well is completed as a dry hole or as a producer, "Well Completion andRecompletion Report and Log" (BLM Form 3160-4) will be submitted not later than 30days after completion of the well or after completion of operations being performed, inaccordance with 43 CFR 3162.4-1. Two copies of all logs run, core descriptions, and allother surveys or data obtained and compiled during the drilling, workover, and/orcompletion operations, will be filed on BLM Form 3160-4. Submit with the wellcompletion report a geologic report including, at a minimum, formation tops, and asummary and conclusions. Also include deviation surveys, sample descriptions, striplogs, core data, drill stem test data, and results of production tests if performed. Samples(cuttings, fluid, and/or gas) will be submitted only when requested by the BLM, VernalField Office.

Please submit an electronic copy of all logs run on this well in LAS format [email protected]. This submission will supersede the requirement forsubmittal of paper logs to the BLM. The cement bond log must be submitted in rasterformat (TIF, PDF other).

9. All off-lease storage, off-lease measurement, or commingling on-lease or off-lease willhave prior written approval from the BLM, Vernal Field Office.

All measurement points shall be identified as point of sales or allocation for

Page 24: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

COAs: Page 5 of 6Well: BBS 15G-22-7-21

determination prior to the installation of facilities.

10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.

11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.

12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:

a. Operator name, address, and telephone number.

b. Well name and number.

c. Well location (¼¼,Sec., Twn, Rng, and P.M.).

d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).

e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).

f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.

g. Unit agreement and / or participating area name and number, ifapplicable.

h. Communitization agreement number, if applicable.

13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.

14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in

COAs: Page 5 of 6Well: BBS 15G-22-7-21

determination prior to the installation of facilities.

10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.

11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.

12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:

a. Operator name, address, and telephone number.

b. Well name and number.

c. Well location (¼¼,Sec., Twn, Rng, and P.M.).

d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).

e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).

f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.

g. Unit agreement and / or participating area name and number, ifapplicable.

h. Communitization agreement number, if applicable.

13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.

14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in

COAs: Page 5 of 6Well: BBS 15G-22-7-21

determination prior to the installation of facilities.

10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.

11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.

12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:

a. Operator name, address, and telephone number.

b. Well name and number.

c. Well location (¼¼,Sec., Twn, Rng, and P.M.).

d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).

e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).

f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.

g. Unit agreement and / or participating area name and number, ifapplicable.

h. Communitization agreement number, if applicable.

13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.

14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in

COAs: Page 5 of 6Well: BBS 15G-22-7-21

determination prior to the installation of facilities.

10. Oil and gas meters will be calibrated in place prior to any deliveries. The Field OfficePetroleum Engineers will be provided with a date and time for the initial metercalibration and all future meter proving schedules. A copy of the meter calibrationreports will be submitted to the BLM, Vernal Field Office. All measurement facilitieswill conform to the API standards for liquid hydrocarbons and the AGA standards fornatural gas measurement.

11. A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall besubmitted to the BLM, Vernal Field Office within 30 days of installation or firstproduction, whichever occurs first. All site security regulations as specified in OnshoreOil & Gas Order No. 3 shall be adhered to. All product lines entering and leavinghydrocarbon storage tanks will be effectively sealed in accordance with Onshore Oil &Gas Order No. 3.

12. This APD is approved subject to the requirement that, should the well be successfullycompleted for production, the BLM, Vernal Field office must be notified when it isplaced in a producing status. Such notification will be by written communication andmust be received in this office by not later than the fifth business day following the dateon which the well is placed on production. The notification shall provide, as a minimum,the following informational items:

a. Operator name, address, and telephone number.

b. Well name and number.

c. Well location (¼¼,Sec., Twn, Rng, and P.M.).

d. Date well was placed in a producing status (date of first productionfor which royalty will be paid).

e. The nature of the well's production, (i.e., crude oil, or crude oil andcasing head gas, or natural gas and entrained liquid hydrocarbons).

f. The Federal or Indian lease prefix and number on which the well islocated; otherwise the non-Federal or non-Indian land category,i.e., State or private.

g. Unit agreement and / or participating area name and number, ifapplicable.

h. Communitization agreement number, if applicable.

13. Any venting or flaring of gas will be done in accordance with Notice to Lessees (NTL)4A and needs prior approval from Field Office Petroleum Engineers.

14. All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in

Page 25: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

COAs: Page 6 of 6Well: BBS 15G-22-7-21

3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production

15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.

16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface

COAs: Page 6 of 6Well: BBS 15G-22-7-21

3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production

15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.

16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface

COAs: Page 6 of 6Well: BBS 15G-22-7-21

3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production

15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.

16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface

COAs: Page 6 of 6Well: BBS 15G-22-7-21

3A will be reported to the BLM, Vernal Field Office. Major events as defined inNTL3A, will be reported verbally within 24 hours, followed by a written report within 15days. "Other than Major Events" will be reported in writing within 15 days. "MinorEvents" will be reported on the Monthly Report of Operations and Production

15. Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of waterproduced from this well for a period of 90 days from the date of initial production. Apermanent disposal method must be approved by this office and in operation prior to theend of this 90-day period. In order to meet this deadline, an application for the proposedpermanent disposal method shall be submitted along with any necessary water analyses,as soon as possible, but no later than 45 days after the date of first production. Anymethod of disposal which has not been approved prior to the end of the authorized 90-dayperiod will be considered as an Incident of Noncompliance and will be grounds forissuing a shut-in order until an acceptable manner for disposing of said water is providedand approved by this office.

16. Unless the plugging is to take place immediately upon receipt of oral approval, tlte FieldOffice Petroleum Engineers must be notified at least 24 hours in advance of the pluggingof the well, in order that a representative may witness plugging operations. If a well issuspended or abandoned, all pits must be fenced immediately until they are backfilled.The "Subsequent Report of Abandonment" (Form BLM 3160-5) must be submittedwithin 30 days after the actual plugging of the well bore, showing location of plugs,amount of cement in each, and amount of casing left in hole, and the current status of thesurface

Page 26: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Forn 3160-5 UNITED STATES FORM APPROVED

oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: March 31, 1993

5 Lease Designation and Seria1No.

SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972

Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName

N/A

SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation

1 Type of Well N/A

11 0 0 - 00NFllEN11AL3 WellNamcandNo.

BBS 15G-22-7-21

2 Name of Operator

QEP, UINTA BASIN, INC. 9 API Well No

3 Address andTelephone No Contact: [email protected] 43-047-37443

11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area

4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED

SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State

UINTAH COUNTY, UTAH

12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

O Notice of Intent Abandonment Chwe oUlm

Recompletion New Construction

Subsequent Report Plugging Back Non-Routine Fracturing

Water Shut-Off

O Final Abandonment Notice Altering Casing C-k to Ig tion

Other SPUD Dispose Water

(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )

13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)

On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.

RECEIVEDOCT04 2006

3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e

Title Office Administrator II Date 0/0 /06

(This space for Federal or State office use)

Approved by: Title Date

Conditions of approval, if any

Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or

representations as to any matter within its jurisdiction.

*See instruction on Reverse Side

Forn 3160-5 UNITED STATES FORM APPROVED

oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: March 31, 1993

5 Lease Designation and Seria1No.

SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972

Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName

N/A

SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation

1 Type of Well N/A

11 0 0 - 00NFllEN11AL3 WellNamcandNo.

BBS 15G-22-7-21

2 Name of Operator

QEP, UINTA BASIN, INC. 9 API Well No

3 Address andTelephone No Contact: [email protected] 43-047-37443

11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area

4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED

SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State

UINTAH COUNTY, UTAH

12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

O Notice of Intent Abandonment Chwe oUlm

Recompletion New Construction

Subsequent Report Plugging Back Non-Routine Fracturing

Water Shut-Off

O Final Abandonment Notice Altering Casing C-k to Ig tion

Other SPUD Dispose Water

(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )

13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)

On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.

RECEIVEDOCT04 2006

3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e

Title Office Administrator II Date 0/0 /06

(This space for Federal or State office use)

Approved by: Title Date

Conditions of approval, if any

Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or

representations as to any matter within its jurisdiction.

*See instruction on Reverse Side

Forn 3160-5 UNITED STATES FORM APPROVED

oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: March 31, 1993

5 Lease Designation and Seria1No.

SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972

Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName

N/A

SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation

1 Type of Well N/A

11 0 0 - 00NFllEN11AL3 WellNamcandNo.

BBS 15G-22-7-21

2 Name of Operator

QEP, UINTA BASIN, INC. 9 API Well No

3 Address andTelephone No Contact: [email protected] 43-047-37443

11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area

4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED

SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State

UINTAH COUNTY, UTAH

12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

O Notice of Intent Abandonment Chwe oUlm

Recompletion New Construction

Subsequent Report Plugging Back Non-Routine Fracturing

Water Shut-Off

O Final Abandonment Notice Altering Casing C-k to Ig tion

Other SPUD Dispose Water

(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )

13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)

On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.

RECEIVEDOCT04 2006

3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e

Title Office Administrator II Date 0/0 /06

(This space for Federal or State office use)

Approved by: Title Date

Conditions of approval, if any

Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or

representations as to any matter within its jurisdiction.

*See instruction on Reverse Side

Forn 3160-5 UNITED STATES FORM APPROVED

oune1990) DEPARTMENT OF THE INTERIOR Budget Bureau No. 1004-0135

BUREAU OF LAND MANAGEMENT Expires: March 31, 1993

5 Lease Designation and Seria1No.

SUNDRY NOTICES AND REPORTS ON WELLS UTU-74972

Do not use this form for proposals to drill or to deepen or reentry to a different reservoirUse "APPLICATION FOR PERMIT---" for such proposalS 5 If Indian, Allottecor TribeName

N/A

SUBMIT IN TRIPLICA TE """"°r CA, Agreement Designation

1 Type of Well N/A

11 0 0 - 00NFllEN11AL3 WellNamcandNo.

BBS 15G-22-7-21

2 Name of Operator

QEP, UINTA BASIN, INC. 9 API Well No

3 Address andTelephone No Contact: [email protected] 43-047-37443

11002 E. 17500 S. VERNAL, UT 84078-8526 435-781-4342 Fax 435-781-4357 10. Field and Pool, or Exploratory Area

4 Location of Well (Footage, Sec., T , R., M., or Survey Description) UNDESIGNATED

SWSE, SEC22-T7S-R21E, 669' FSL, 2022' FEL 11. County or Parish, State

UINTAH COUNTY, UTAH

12 CHECK APPROPRIATE B 3X(s) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

O Notice of Intent Abandonment Chwe oUlm

Recompletion New Construction

Subsequent Report Plugging Back Non-Routine Fracturing

Water Shut-Off

O Final Abandonment Notice Altering Casing C-k to Ig tion

Other SPUD Dispose Water

(Note) Report results of multiple completion on WellCompletion or Recompletion Report andLog form )

13 Describe Proposed or Completed Operations (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled,give subsurface locations and measuredand true vertical depths for all markers and zones pertinent to this work)

On 9/29/2006 - Drilled 60' of 20" conductor hole. Ran 2 jt's 60' of 14" conductor pipe and cement w/ Ready Mix.

RECEIVEDOCT04 2006

3 - BLM, 2- Utah OG&M, 1 -- Denver, I - ille Word file-server DIV.OFOlL,GAS&MINING14. I hereby c e

Title Office Administrator II Date 0/0 /06

(This space for Federal or State office use)

Approved by: Title Date

Conditions of approval, if any

Title 18 U.S.C. Section 1001, makes it a crimefor any person knowingly and willfully to make to any departmentor agency of the UnitedStates any false,fictitious or fraudulentstatements or

representations as to any matter within its jurisdiction.

*See instruction on Reverse Side

Page 27: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.

ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300

Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.

A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---

WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:

WELL 3 COMMENTS:

WELL 4 COMMENTS:

WELL 5 COMMENTS:

ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06

Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected

Phone No. (435)781-4342

(3/89)

RECEIVED CONRDENTIALOCTO4 2006

DIV.OFOlL,GAS&

State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.

ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300

Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.

A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---

WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:

WELL 3 COMMENTS:

WELL 4 COMMENTS:

WELL 5 COMMENTS:

ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06

Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected

Phone No. (435)781-4342

(3/89)

RECEIVED CONRDENTIALOCTO4 2006

DIV.OFOlL,GAS&

State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.

ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300

Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.

A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---

WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:

WELL 3 COMMENTS:

WELL 4 COMMENTS:

WELL 5 COMMENTS:

ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06

Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected

Phone No. (435)781-4342

(3/89)

RECEIVED CONRDENTIALOCTO4 2006

DIV.OFOlL,GAS&

State of Utah OPERATOR ACCT. No. N-2460Division of Oil, Gas and Mining OPERATOR: QEP Uinta Basin, Inc.

ADDRESS: 11002 East 17500 SouthENTITY ACTIONFORM - FORM 6 Vernal, Utah 84078-8526 (435)781-4300

Action Current New Entity API Number Well Name QQ SC TP RG County Spud Date EffectiveDateCode Entity No. No.

A 99999 43-047¾ BBS 15G-22-7-21 SWSE 22 7S 21E Uintah 9/29/2006 |---

WELL 1 COMMENTS: 00NFllENTIALWELL iCOMMENTS:

WELL 3 COMMENTS:

WELL 4 COMMENTS:

WELL 5 COMMENTS:

ACTION CODES (See instructions on back of form)A - Establish new entity for new well (single wellonly)B - Add new wellto existing entity (groupor unitwell)C - Re-assign well from one existing entity to another existing entity SignatureD - Re-assign wellfrom one existing entity to a new entityE - Other (explain in comments section) OfficeAdministrator 11 10/01/06

Title DateNOTE: Use COMMENT section to explainwhy each Action Code was selected

Phone No. (435)781-4342

(3/89)

RECEIVED CONRDENTIALOCTO4 2006

DIV.OFOlL,GAS&

Page 28: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E

11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06

1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received

CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E

11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06

1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received

CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E

11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06

1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received

CONRDEQEPBBS 15G 22-7-2143-047-3744322 7S 21E

11-14-06-11-20-06Still Drilling - currently @5930 as of 11-20-06Received 11-22-06

1l-21-06-12-13-06TD @6828 on 11-22-06, Rig Released on 11-24-06Received

Page 29: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

CONFIDENR

Questar E & P Page 1 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:

Date From - To Hours Code e Description of Operations

1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.

24 Hour Forecast: Will MIRU.

1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.

24 Hour Forecast: will PU tbg.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.

24 Hour Forecast: Will run CBL log.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.

24 Hour Forecast: Will pump 5000 gal 28% acid job.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580'

1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =

.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.

24 Hour Forecast: Will flow test well.

RECE YvED Printed: 3/6/2007 12:47:21 PM

MARO6 2007DIV.0FOlL,GAS&

CONFIDENR

Questar E & P Page 1 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:

Date From - To Hours Code e Description of Operations

1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.

24 Hour Forecast: Will MIRU.

1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.

24 Hour Forecast: will PU tbg.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.

24 Hour Forecast: Will run CBL log.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.

24 Hour Forecast: Will pump 5000 gal 28% acid job.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580'

1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =

.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.

24 Hour Forecast: Will flow test well.

RECE YvED Printed: 3/6/2007 12:47:21 PM

MARO6 2007DIV.0FOlL,GAS&

CONFIDENR

Questar E & P Page 1 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:

Date From - To Hours Code e Description of Operations

1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.

24 Hour Forecast: Will MIRU.

1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.

24 Hour Forecast: will PU tbg.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.

24 Hour Forecast: Will run CBL log.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.

24 Hour Forecast: Will pump 5000 gal 28% acid job.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580'

1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =

.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.

24 Hour Forecast: Will flow test well.

RECE YvED Printed: 3/6/2007 12:47:21 PM

MARO6 2007DIV.0FOlL,GAS&

CONFIDENR

Questar E & P Page 1 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: -g Rig Number:

Date From - To Hours Code e Description of Operations

1/25/2007 06:00 - 16:00 10.00 WOT 4 On 1/24/07- INITIALCOMPLETION REPORT. On standby waitng on road graderto celar locaiton.

24 Hour Forecast: Will MIRU.

1/26/2007 06:00 - 16:00 10.00 BOP 1 On 1/25/2007 SICP=0#.MIRU Gudac Bros Well Service. ND top flange. NU BOP. SWIFN.

24 Hour Forecast: will PU tbg.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/29/2007 06:00 - 16:00 10.00 TRP 2 On 1/26/07 SICP = 0#. PU, tally& rabbit in hole w/ 4-3/4" bit, 5-1/2" csg scraper &210 jts new2-7/8" J-55 tbg to tag @6740'. Displaced hole w/ 150 bbis 2% KCLwater. LD 5 jts. POOH w/ 102 stds tbg. LD bit & scraper. Drain up. SWIFWE.

24 Hour Forecast: Will run CBL log.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

1/30/2007 06:00 - 16:00 10.00 PERF 2 On 1/29/07, SICP = 0#. MIRU Cutters WL. Run a CBL/DVLIGR log from tag @6725' to surface. Correlated the CBL to the Halliburton Open Hole log dated11/23/06. Pressure tested csg to 4000#. OK. Perforated per the Cutters CBLdated 1/29/07, H4a Lime interval 6575' - 6580' at 4 SPF w/ 90* phasing, 4" HSC csggun. RDMOCutters WL. RIH w/ Weatherford HD PKR, 1 jt 2-7/8" tbg, 2.31"XN-Nipple &2-7/8" tbg to 6500'. Poured diesel down tbg & csg. Set PKR w/ 40Kcompression. Drain up equipment. SWIFN.

24 Hour Forecast: Will pump 5000 gal 28% acid job.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580'

1/31/2007 06:00 - 16:00 10.00 STIM i On 1/30/07, SICP = 0#. Pre-job safety meeting. MIRU Halliburton acid crew.Prime & test Halliburton lines. Pumped 3 bbis 2% KCL water to load tbg. Breakdown perfs @2903# wl 2% KCL water. Pumped 5000 gals 28% HCL acid in toperfs @6575' - 80'. Pumped acid @4 BPM & 1800# pressure. Flushed tbg & csgwl 100 bbis 2% KCL water. Max pressure = 2900#.FG =

.60. ISIP = 1300#. 5minute SI = 1154#. 15 minuteSI = 997#. Total fluid pumped = 226 bbis. RDMOHalliburton acid crew. Open well, flowed back 50 bbis fluid. Well died. RU swabequipment. 1st run fluid level @surface. Made 3 runs, well 20 bbis acid, water &1% oil(heavy oil). Well died. Made 13 more swab runs. FFL = 2200'. Each swabrun recovered aicd,water & 5% oil. Had steady acid gas glow after each run. Totalrecovered today = 167 bbis. Final PH = 3. RD swab equipment. Drain up. Flushedtbg wl 40 bbis 2% KCL. SWIFN.

24 Hour Forecast: Will flow test well.

RECE YvED Printed: 3/6/2007 12:47:21 PM

MARO6 2007DIV.0FOlL,GAS&

Page 30: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 2 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.

24 Hour Forecast: Will POOH w/ PKR.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.

POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.

24 Hour Forecast: Will RIH w/ pump &rods.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

Tbg DetailKB 15.0

Printed: 3/6/2007 12:47:21

Questar E & P Page 2 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.

24 Hour Forecast: Will POOH w/ PKR.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.

POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.

24 Hour Forecast: Will RIH w/ pump &rods.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

Tbg DetailKB 15.0

Printed: 3/6/2007 12:47:21

Questar E & P Page 2 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.

24 Hour Forecast: Will POOH w/ PKR.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.

POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.

24 Hour Forecast: Will RIH w/ pump &rods.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

Tbg DetailKB 15.0

Printed: 3/6/2007 12:47:21

Questar E & P Page 2 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

1/31/2007 06:00 - 10:00 10.00 STIM iCasing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/1/2007 06:00 - 16:00 10.00 SWAB 1 1/30/07 - SICP =0#. Pre-lob safety meeting.BLLTR: 132. Pkr @6500'. Perfs @6575' - 6580'. Open well. RU swabequipment. 1st run fluid level @2000'. PF 3200'. Recovered 6 bbis fluid; 59% gascut oil. Made 18 swab runs. Recovered 109 bbis fluid. Cutting 95% oilthe last 9runs. FFL = 3300'. Total recovered today = 109 bbis. BLLTR = 23 bbis. FER = 18BPH. RD swab equipment. Drain up. Final PH = 7. SWIFN.

24 Hour Forecast: Will POOH w/ PKR.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575' - 6580' Aciidized

2/2/2007 06:00 - 16:00 10.00 TRP 2 On 2/1/07, SICP = 0#. BLLTR = 23. Pkr @6500'. Perfs @6575'- 6580'. Openwell Pumped 50 bbis 2% KCL water down tbg. Well wouldn't fillup. Released Pkr.

POOH w/ 2-7/8" tbg, laying down xn-nipple & Pkr. RIH w/ pinned NC, 1 jt tbg,PSN, 2 jts 2-78" tbg. Type "T" anchor & 204 jts 2-7/8" tbg. ND BOP. Set TAC wl17K tension. Land on B-1 adapter. NU WH. Pumped 8 bbis xyzol & 10 2% KCLwater. Drain up. SWIFN.

24 Hour Forecast: Will RIH w/ pump &rods.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

2/3/2007 06:00 - 16:00 10.00 TRP 2 On 2/2/07, SICP = 0#. RU Hot Oiler. Flushed tbg wl 45 bbis 250* 2% KCL water.Primed pump (#1466),2-1/2 x 1-3/4 16 x 19 x 20. RHACpump 16". RIH wl pump,152 plain 3/4" rods, 112 plain 7/8" rods, 1-1/2" x 26 polish rod. Filled w/ 15 galdiesel & 15 bbis 2%. Long stroked pump to 800#. OK. RDMOservice rig&equipment. BLLTR = 253 bbis.FINAL COMPLETION REPORT.

Casing size: 5 1/2" 15.5# K-55Casing depth: 6806'

PerfsH4a Lime6575'-6580' Aciidized

Tbg DetailKB 15.0

Printed: 3/6/2007 12:47:21

Page 31: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E &P Page 3 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45

Tbg Tail @ 6665.41PSN @ 6631.86

Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan

Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke

Printed: 3/6f2007 12:47 21

Questar E &P Page 3 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45

Tbg Tail @ 6665.41PSN @ 6631.86

Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan

Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke

Printed: 3/6f2007 12:47 21

Questar E &P Page 3 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45

Tbg Tail @ 6665.41PSN @ 6631.86

Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan

Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke

Printed: 3/6f2007 12:47 21

Questar E &P Page 3 of 3

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release:Rig Name: Rig Number:

Date From - To Hours Code C Description of Operations

2/3/2007 06:00 - 16:00 10.00 TRP 2 B-1 Adaptor 0.0Tension 1.50204 jts 2-7/8" J-55 6547.835-1/2" Type T TAC 2.6716 jts 2-7/8" Special Hardened Pipe 64.86PSN 1.102 jts 2-7/8" J-55 32.0Pinned Notch Collar .45

Tbg Tail @ 6665.41PSN @ 6631.86

Rod & Pump Detail1-1/2" x 25' Polish Rodno ponies152 - 7/8" Plan

Weatherford Pump2.5 x 1.75 x 16 19 20RHAC Pump # #1466161. max stroke

Printed: 3/6f2007 12:47 21

Page 32: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

' a 31604 Forn approved.

(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137

(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985

BUREAU OF LAND MANAGEMENT structions on

\SIGNA110N AND SERIAL NO

UTU-74972

L ALLOTIEE OR TRIBE NAME

WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A

la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME

WELL WELL DRY Other N/A

b TYPE OF COMPLETION

NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other

2. NAME OF OPERATOR 9. WELL NO.

QEP UINTA BASIN, INC. BBS 15G 22 7 21

3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT

1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED

At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA

At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E

At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E

I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH

43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD

9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS

HOW MANY* DRlLLED BY6828' 6767' --->

24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE

H4s Lime 6575'- 6580'NO

26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED

GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)

CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED

9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS

29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)

2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.

H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED

6575' - 6580' 5000 GALS 28% ACID JOB

33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or

.daten)

2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO

TEST PERIOD2/11/07 24 N/A 163 N/A 36

FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE

140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY

35. LISTOFATTACHMENTSWELLBORE SCHEMATIC

36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords

SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07

(See lastructions and Spaces for Additional Data on Reverse

' a 31604 Forn approved.

(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137

(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985

BUREAU OF LAND MANAGEMENT structions on

\SIGNA110N AND SERIAL NO

UTU-74972

L ALLOTIEE OR TRIBE NAME

WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A

la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME

WELL WELL DRY Other N/A

b TYPE OF COMPLETION

NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other

2. NAME OF OPERATOR 9. WELL NO.

QEP UINTA BASIN, INC. BBS 15G 22 7 21

3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT

1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED

At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA

At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E

At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E

I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH

43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD

9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS

HOW MANY* DRlLLED BY6828' 6767' --->

24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE

H4s Lime 6575'- 6580'NO

26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED

GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)

CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED

9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS

29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)

2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.

H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED

6575' - 6580' 5000 GALS 28% ACID JOB

33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or

.daten)

2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO

TEST PERIOD2/11/07 24 N/A 163 N/A 36

FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE

140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY

35. LISTOFATTACHMENTSWELLBORE SCHEMATIC

36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords

SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07

(See lastructions and Spaces for Additional Data on Reverse

' a 31604 Forn approved.

(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137

(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985

BUREAU OF LAND MANAGEMENT structions on

\SIGNA110N AND SERIAL NO

UTU-74972

L ALLOTIEE OR TRIBE NAME

WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A

la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME

WELL WELL DRY Other N/A

b TYPE OF COMPLETION

NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other

2. NAME OF OPERATOR 9. WELL NO.

QEP UINTA BASIN, INC. BBS 15G 22 7 21

3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT

1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED

At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA

At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E

At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E

I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH

43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD

9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS

HOW MANY* DRlLLED BY6828' 6767' --->

24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE

H4s Lime 6575'- 6580'NO

26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED

GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)

CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED

9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS

29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)

2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.

H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED

6575' - 6580' 5000 GALS 28% ACID JOB

33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or

.daten)

2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO

TEST PERIOD2/11/07 24 N/A 163 N/A 36

FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE

140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY

35. LISTOFATTACHMENTSWELLBORE SCHEMATIC

36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords

SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07

(See lastructions and Spaces for Additional Data on Reverse

' a 31604 Forn approved.

(November1983) UNITED STATES SUBMIT IN DUPLICATE Budget Bureau No. 1004-0137

(formerly 9-330) DEPARTMENT OF THE INTERIOR (See other in- ExpiresAugust 31, 1985

BUREAU OF LAND MANAGEMENT structions on

\SIGNA110N AND SERIAL NO

UTU-74972

L ALLOTIEE OR TRIBE NAME

WELL COMPLETION OR RECOMPLETION REPORT AND LOG * N/A

la. TYPEOFWELL OIL GAS 7. UNITAGREEMENTNAME

WELL WELL DRY Other N/A

b TYPE OF COMPLETION

NEW WORK DEEP- PLUG DIFF. 8. FARMORLEASENAMEWELL OVER EN BACK RESVR Other

2. NAME OF OPERATOR 9. WELL NO.

QEP UINTA BASIN, INC. BBS 15G 22 7 21

3. ADDRESS OF OPERATUR Contact: Dahn Caldwell 435-781-4342 10. FIELD AND POOL, OR WILDCAT

1571 East 1700 South Vernal, UT 84078 Fax # 435.781.43574. LOCATIONOFWELL(ReportiocadondearlyandinaccordancewilkanyStarereµirensema? UNDESIGNATED

At surface 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E II. SEC.,T., R., M., OR BLOCK AND SURVEYOR AREA

At top rod.interval reported below 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E SEC 22-T7S-R21E

At total depth 669' FSL, 2022' FEL, SWSE, Sec 22-T7S, R21E

I14. PERMITNO. DATEISSUED 12. COUNTYOR 13. STATEPARISH

43-047-37443 UINTAH UT15. DATE SPUDDED 16. DATE T.D. REACHED 17. DATE COMPL. (Ready to prod) 18. ELEVAT10NS (Di .RKB, RT, GR, ETC.)* 19. ELEV. CASINGHEAD

9/29/06 11/22/06 2/2/07 IB20. TOTALDEPTH, MD & TVD 21. PLUG BACK T.D., MD & TVD 22. IF MULTIPLE COMPL., 23. INTERVALS ROTARY TOOLS CABLE TOOLS

HOW MANY* DRlLLED BY6828' 6767' --->

24. PRODUCING INTERVAI/S), OF THIS COMPLETION-TOP, BOTIOM, NAME (MD AND TVD)* 25. WAS DIRECTIONALSURVEY MADE

H4s Lime 6575'- 6580'NO

26. TYPE ELECTRIC AND OTHER LOGS RUN 27. WAS WELL CORED

GR/CBL & HRI SPECTRAL DENSITY DSN NO28. CASING RECORD (Report aHstrings set in weH)

CASING SIZE WEIGHT, LB /FT DEP1H SET (MD) HOLE SIZE CEMENTING RECORD AMOUNT PULLED

9-5/8" 36# 495' 12-1/4" 300 SXS5-1/2" 15.5# 6806' 7-7/8" 640 SXS

29. LINER RECORD 30 TUBINGRECORDSIZE TOP (MD) BOTIOM (MD) SACKS CEMENT* SCREEN (MD) SIZE DEPTH SET (MD) PACKER SET (MD)

2-7/8" 8679'31. PERFORATION RECORD (Interml, size and number) 32 ACID, SHOT, FRACTURE, CEMENT SQUEEZE,ETC.

H4a Lime 6575' - 6580' DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED

6575' - 6580' 5000 GALS 28% ACID JOB

33.* PRODUCTIONDATE FIRST PRODUCTION PRODUCTION METHOD (FA>wing,gas hß, pumping,size a ofpump) AINO32007 WELL STATUS(Producing or

.daten)

2/6/07 FLOWlNG PRODUCINGDATE OF TEST HOURS TESTED CHOKE SIZE PROD'N FOR OIL-BBL r Mb GAS-OIL RATIO

TEST PERIOD2/11/07 24 N/A 163 N/A 36

FLOW. TUBINGPRESS CASlNG PRESSURE CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR.)24-HOUR RATE

140 14034. DISPOSlTION OF GAS (Soki, usedfor fuel,wnted, etc) TEST WITNESSED BY

35. LISTOFATTACHMENTSWELLBORE SCHEMATIC

36 I hereby certify that the foregoing and attached f Rion is lete and conect as d 1availablerecords

SIGNED JIM SIMONTON COMPLETION SUPERVISOR DATE 4/2/07

(See lastructions and Spaces for Additional Data on Reverse

Page 33: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS

recoveries): BBS 15G 22 7 21

FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP

UINTA SURFACE NAME MEAS. DEPTH TRUE

GRgEN RIVER 3200' VERT. DEPTH

TD 6828' UINTA SURFACEGREEN RIVER 3200'TD

37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS

recoveries): BBS 15G 22 7 21

FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP

UINTA SURFACE NAME MEAS. DEPTH TRUE

GRgEN RIVER 3200' VERT. DEPTH

TD 6828' UINTA SURFACEGREEN RIVER 3200'TD

37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS

recoveries): BBS 15G 22 7 21

FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP

UINTA SURFACE NAME MEAS. DEPTH TRUE

GRgEN RIVER 3200' VERT. DEPTH

TD 6828' UINTA SURFACEGREEN RIVER 3200'TD

37. 1 SUMMARY OF POROUS ZONES: (Show all important zones of porosityand contentsthereoft cored intervals; and alldrill-stem tests, includingdepth interval tested, cushion used, timetool open, flowingandshut-inpressures,and 38. GEOLOGIC MARKERS

recoveries): BBS 15G 22 7 21

FORMATION TOP BOTTOM DESCRIPTION, CONTENTS, ETC. TOP

UINTA SURFACE NAME MEAS. DEPTH TRUE

GRgEN RIVER 3200' VERT. DEPTH

TD 6828' UINTA SURFACEGREEN RIVER 3200'TD

Page 34: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07

Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:

Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well

location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'

WellboreSchernatlC TMbing Landing Detaih

Descttption Size Footage Depth

KB 15.00 15.00

Surface casing Hanger 0.75 15.75

Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98

Weight: 36# 2.31" XN-nipple 0.84 8,645.82

Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30

Set @ 495 Barred noiched collar 0.80 8,679.10

Cmtdw/ sk 300 EOT 0 8,679.10

Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:

i Toc e 160 ' Grade: .1-55

Weight (#|ft): 6.5#

EXCLUDEDPERFS OPENPERFS

Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K

Other:Hanger: Yes x No

SuckerRodDetall:Size #Rods Rod Type

1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112

3/4" plain rods 152

RodInformationCondition:New: x Used: Rerun:

Grade:Manufacture:

PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466

Max SbOIŒ161" RUn Date: 1-23-07

Renm: New Run:x Rebuild:

SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.

6575'-6580' H4a Ume

F-nipple O 8646EOT 0 8679

Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55

Set @ 6806 PETD@ 6767 '

H I s/ sk640

TD @ 6828 '

Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne

UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07

Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:

Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well

location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'

WellboreSchernatlC TMbing Landing Detaih

Descttption Size Footage Depth

KB 15.00 15.00

Surface casing Hanger 0.75 15.75

Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98

Weight: 36# 2.31" XN-nipple 0.84 8,645.82

Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30

Set @ 495 Barred noiched collar 0.80 8,679.10

Cmtdw/ sk 300 EOT 0 8,679.10

Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:

i Toc e 160 ' Grade: .1-55

Weight (#|ft): 6.5#

EXCLUDEDPERFS OPENPERFS

Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K

Other:Hanger: Yes x No

SuckerRodDetall:Size #Rods Rod Type

1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112

3/4" plain rods 152

RodInformationCondition:New: x Used: Rerun:

Grade:Manufacture:

PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466

Max SbOIŒ161" RUn Date: 1-23-07

Renm: New Run:x Rebuild:

SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.

6575'-6580' H4a Ume

F-nipple O 8646EOT 0 8679

Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55

Set @ 6806 PETD@ 6767 '

H I s/ sk640

TD @ 6828 '

Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne

UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07

Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:

Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well

location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'

WellboreSchernatlC TMbing Landing Detaih

Descttption Size Footage Depth

KB 15.00 15.00

Surface casing Hanger 0.75 15.75

Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98

Weight: 36# 2.31" XN-nipple 0.84 8,645.82

Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30

Set @ 495 Barred noiched collar 0.80 8,679.10

Cmtdw/ sk 300 EOT 0 8,679.10

Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:

i Toc e 160 ' Grade: .1-55

Weight (#|ft): 6.5#

EXCLUDEDPERFS OPENPERFS

Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K

Other:Hanger: Yes x No

SuckerRodDetall:Size #Rods Rod Type

1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112

3/4" plain rods 152

RodInformationCondition:New: x Used: Rerun:

Grade:Manufacture:

PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466

Max SbOIŒ161" RUn Date: 1-23-07

Renm: New Run:x Rebuild:

SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.

6575'-6580' H4a Ume

F-nipple O 8646EOT 0 8679

Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55

Set @ 6806 PETD@ 6767 '

H I s/ sk640

TD @ 6828 '

Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne

UTDSS79001FIELD: Brennan Bott0MS GL: 4,909 ' KBE: 4,924 ' Spud Date: 9-29-06 Completion date: 2-3-07

Weli: BBS 15G-22-7-21 TD: 6,828 ' PBTD: 6,767 ' Canent Well Status:

Location - surface: 669' FSL, 2022' FEt, SW/SESec. 22, T7S, R21E Reason for Pull/Workover: InHial completionof oil well

location - bottom hole:API#:43-047 37443 UIntah Mr Utah Deviation: Less than1 deg/100'

WellboreSchernatlC TMbing Landing Detaih

Descttption Size Footage Depth

KB 15.00 15.00

Surface casing Hanger 0.75 15.75

Size: 9-5/8" 15 155 2 7/8" 6.5# tbg 8,629.23 8,644.98

Weight: 36# 2.31" XN-nipple 0.84 8,645.82

Grade: J-55 1 jts 2-7/8" J-55 32.48 8,678.30

Set @ 495 Barred noiched collar 0.80 8,679.10

Cmtdw/ sk 300 EOT 0 8,679.10

Hole size: 12-1/4"Tubing Information:Condition:New: X Used: Rerun:

i Toc e 160 ' Grade: .1-55

Weight (#|ft): 6.5#

EXCLUDEDPERFS OPENPERFS

Wenhead Detan: Example: 7-1/16" 3000#4- 1/16" 10K

Other:Hanger: Yes x No

SuckerRodDetall:Size #Rods Rod Type

1 1/2" x 26' Polish Rodno ponles7/8" plain rods 112

3/4" plain rods 152

RodInformationCondition:New: x Used: Rerun:

Grade:Manufacture:

PumpInfonnation:Pumpsize 2.5x1.75x16x19x20Make&SAWeatherford RHAC #1466

Max SbOIŒ161" RUn Date: 1-23-07

Renm: New Run:x Rebuild:

SUMMARY1-30-07Zone 1 5000 gal 28% acidjob. H4a Ume 6575'-6580'1-8-07 Tumed wellover to production.

6575'-6580' H4a Ume

F-nipple O 8646EOT 0 8679

Production CasingSize: 5-1/2"Weight: 15.5#Grade: J-55

Set @ 6806 PETD@ 6767 '

H I s/ sk640

TD @ 6828 '

Prepared Br Todd Selliert Date: 2-347 NOTE: Short its cso 0 siss'-6S', (Cutters Wirenne

Page 35: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ

Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007

FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900

CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED LISTS *

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007

2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007

3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005

4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143

5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE

5b. Inspections of LA PA state/fee well sites complete on: n/a

5c. Reports current for Production/Disposition & Sundries on: n/a

6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA

7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007

8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:

9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:

DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a

BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033

3b. The FORMER operator has requested a release of liability from their bond on: n/a

LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/a

COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED

Questar E&P FORM A.xls 4/30/2007 AND

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ

Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007

FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900

CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED LISTS *

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007

2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007

3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005

4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143

5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE

5b. Inspections of LA PA state/fee well sites complete on: n/a

5c. Reports current for Production/Disposition & Sundries on: n/a

6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA

7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007

8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:

9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:

DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a

BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033

3b. The FORMER operator has requested a release of liability from their bond on: n/a

LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/a

COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED

Questar E&P FORM A.xls 4/30/2007 AND

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ

Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007

FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900

CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED LISTS *

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007

2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007

3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005

4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143

5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE

5b. Inspections of LA PA state/fee well sites complete on: n/a

5c. Reports current for Production/Disposition & Sundries on: n/a

6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA

7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007

8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:

9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:

DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a

BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033

3b. The FORMER operator has requested a release of liability from their bond on: n/a

LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/a

COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED

Questar E&P FORM A.xls 4/30/2007 AND

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET 1. DJJ

Change of Operator (Well Sold) X - Operator Name Change/MergerThe operator of the well(s) listed below has changed, effective: 1/1/2007

FROM: (Old Operator): TO: ( New Operator):N2460-QEP Uinta Basin, Inc. N5085-QuestarE&P Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 672-6900 Phone: 1 (303) 672-6900

CA No. Unit:WELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED LISTS *

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 4/19/2007

2. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 4/16/2007

3. The new company was checked on the Department of Commerce, Division of Corporations Database on: 1/31/2005

4a. Is the new operator registered in the State of Utah: Business Number: 764611-0143

5a. (R649-9-2)Waste Management Plan has been received on: IN PLACE

5b. Inspections of LA PA state/fee well sites complete on: n/a

5c. Reports current for Production/Disposition & Sundries on: n/a

6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 4/23/2007 BIA

7. Federal and Indian Units:The BLM or BIA has approved the successor of unit operator for wells listed on: 4/23/2007

8. Federal and Indian Communization Agreements ("CA"):The BLM or BIA has approved the operator for all wells listed within a CA on:

9. Underground Injection Control ("UIC") The Division has approved UIC Form 5, Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on:

DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 4/30/2007 and 5/15/20072. Changes have been entered on the Monthly Operator Change Spread Sheet on: 4/30/2007 and 5/15/20073. Bond information entered in RBDMS on: 4/30/2007 and 5/15/20074. Fee/State wells attached to bond in RBDMS on: 4/30/2007 and 5/15/20075. Injection Projects to new operator in RBDMS on: 4/30/2007 and 5/15/20076. Receipt of Acceptance of Drilling Procedures for APD/New on: n/a

BOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESB0000242. Indian well(s) covered by Bond Number: 7994463a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 965003033

3b. The FORMER operator has requested a release of liability from their bond on: n/a

LEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/a

COMMENTS: THIS IS A COMPANY NAME CHANGE.SOME WELL NAMES HAVE BEEN CHANGED AS REQUESTED

Questar E&P FORM A.xls 4/30/2007 AND

Page 36: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

no.

Q/Q

SEC

TWP

RN

GA

PII

Entit

yLe

ase

Wel

lTy

peSt

atus

FED

ERA

L2-2

9-7-

22FE

DER

AL2

-29-

7-22

|NES

W29

070S

|220

E|4

3047

1542

352

66|F

eder

al|G

WIS

UTA

HFE

DD

-1U

TAH

FED

D-1

SWSW

1407

0S|2

40E

4304

7159

3610

699

Fede

ral

GW

ISU

TAH

FED

D-2

UTA

HFE

DD

-2N

ESW

2507

0S24

0E43

0471

5937

9295

Fede

ral

GW

SPR

INC

E1

PRIN

CE

1SW

SW10

070S

240E

4304

7161

9970

35Fe

dera

lG

W.P

UTA

HFE

DD

-4U

TAH

FED

D-4

SWSE

1407

0S|2

40E

4304

7312

1592

97Fe

dera

lG

WS

FZB

B1

BR

ENN

AN

FZ-B

B1

NES

E20

070S

I21

0E43

0473

1805

1095

2Fe

dera

liG

WTA

EAST

CO

YO

TEFE

D14

-4-8

-25

EAST

CO

YO

TEFE

D14

-4-8

-25

SESW

0408

0Si

250E

4304

7324

9311

630

Fede

ral

OW

PFS

PRIN

CE

4PR

INC

E4

SWSW

0307

0S24

0E43

0473

2677

7035

'Fed

eral

OW

.PG

YPS

UM

HIL

LS21

GH

21W

GSW

SW|

2108

0S21

0E|

4304

7326

9211

819

|Fed

eral

GW

PSA

GE

GR

OU

SEFE

D6-

14-8

-22

OU

SG6

148

22SE

NW

\14

080S

220E

4304

7327

4611

944

IFed

eral

GW

PG

YPS

UM

HIL

LS22

WG

GH

22W

GSW

NW

2208

0SI

210E

4304

7328

1812

336

IFed

eral

_GW

PSA

GE

GR

OU

SE12

A-1

4-8-

22|S

AG

EG

RO

USE

12A

-14-

8-22

NW

SW14

080S

220E

4304

7331

7712

524

|Fed

eral

GW

SO

UG

B12

W-2

0-8-

22O

UG

B12

W-2

0-8-

22N

WSW

|20

080S

220E

4304

7332

4913

488

|Fed

eral

GW

PG

BU

15-1

8-8-

22O

UG

B15

188

22SW

SE|

1808

0S22

0E43

0473

3364

1269

0|F

eder

alG

WP

GLE

NB

ENC

HFE

D3W

-17-

8-22

IOU

GB

3W17

822

INEN

W17

080S

220E

4304

7335

1312

950

|Fed

eral

GW

PG

LEN

BEN

CH

FED

5W-1

7-8-

22|O

UG

B5W

178

22iS

WN

W17

080S

220E

4304

7335

1412

873

IFed

eral

GW

PW

VFE

D9W

-8-8

-22

_W

V9W

88

22N

ESE

0808

0S22

0E43

0473

3515

1339

5F

dera

lG

WP

GB

FED

9W-1

8-8-

22O

UG

B9W

188

22N

ESE

1808

0S22

0E43

0473

3516

1299

7,F

eder

alG

WP

OU

GB

3W-2

0-8-

22O

UG

B3W

-20-

8-22

NEN

WI

2008

0S22

0E43

0473

3526

1351

4iF

eder

alG

WP

GLE

NB

ENC

H12

W-3

0-8-

22O

UG

B12

W30

822

NW

SWI

3008

0S22

0E43

0473

3670

1338

0.F

eder

alG

WiP

WV

FU10

W-8

-8-2

2|W

V10

W8

822

NW

SE|

0808

0S22

0E43

0473

3814

1345

0F

dera

l|G

W|P

GH

7W-2

1-8-

21G

H7W

-21-

8-21

ISW

NE

|21

080S

210E

|430

4733

845

1305

0|F

eder

al|G

W|P

GH

9W-2

1-8-

21G

H9W

-21-

8-21

_IN

ESE

I21

080S

210E

4304

7338

4613

074

|Fed

eral

|GW

IPG

H11

W-2

1-8-

21G

H11

W-2

1-8-

21IN

ESW

I21

080S

210E

I43

0473

3847

1304

9IF

eder

al|G

WIP

GH

15W

-21-

8-21

GH

15W

-21-

8-21

SWSE

2108

0S21

0EI 4

3047

3384

813

051

Fede

ral

|GW

PW

V7W

-22-

8-21

|WV

7W-2

2-8-

21SW

NE

|22

080S

210E

|43

0473

3907

|132

30Fe

dera

l|G

WP

WV

9W-2

3-8-

21IW

V9W

-23-

8-21

NES

E23

|080

S21

0E|4

3047

3390

913

160

IFed

eral

|GW

IP

GH

U14

W-2

0-8-

21G

H14

W20

821

SESW

2008

0S21

0E|4

3047

3391

5|1

3073

|Fed

eral

GW

|PG

B4W

-30-

8-22

OU

GB

4W30

822

NW

NW

3008

0S22

0EI

4304

7339

45I

1337

2IF

eder

alG

WIP

GB

9W-1

9-8-

22O

UG

B9W

198

22IN

ESE

1908

0S22

0E43

0473

3946

i13

393

Fede

ral

GW

IP

GB

10W

-30-

8-22

OU

GB

10W

308

22|N

WSE

3008

0S22

0E|4

3047

3394

7|1

3389

Fede

ral

|GW

PG

B12

W-1

9-8-

22O

UG

B12

W19

822

|NW

SW19

080S

220E

4304

7339

4813

388

Fede

ral

IGW

PG

B9W

-25-

8-21

GB

9W-2

5-8-

21IN

ESE

I25

080S

210E

4304

7339

6013

390

Fede

ral

iGW

PW

V1W

-5-8

-22

SU1W

58

22N

ENE

0508

0S22

0E43

0473

3985

1336

9Fe

dera

lG

WP

WV

3W-5

-8-2

2SU

3W5

822

NEN

W05

080S

220E

4304

7339

8713

321

Fede

ral

IOW

SW

V7W

-5-8

-22

.SU

7W5

822

SWN

E|

0508

0SI2

20E

|430

4733

988

1323

5Fe

dera

lG

WP

WV

9W-5

-8-2

2SU

9W5

822

NES

EI

0508

0SI

220E

|43

0473

3990

1323

8Fe

dera

lG

WP

WV

11W

-5-8

-22

SU11

W5

822

NES

W\

0508

0S.

220E

4304

7339

9213

239

Fede

ral

I GW

SW

V13

W-5

-8-2

2SU

13W

58

22SW

SW|

0508

0S' 22

0E43

0473

3994

1323

6Fe

dera

lG

WS

WV

15W

-5-8

-22

SU15

W5

822

SWSE

|05

080S

220E

4304

7339

9613

240

IFed

eral

¡GW

PW

V8W

-8-8

-22

WV

8W-8

-8-2

2SE

NE

I08

080S

220E

I43

0473

4005

1332

0|F

eder

alG

W|P

WV

14W

-8-8

-22

IWV

14W

-8-8

-22

SESW

I08

080S

I22

0EI

4304

7340

0713

322

Fede

ral

iGW

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

no.

Q/Q

SEC

TWP

RN

GA

PII

Entit

yLe

ase

Wel

lTy

peSt

atus

FED

ERA

L2-2

9-7-

22FE

DER

AL2

-29-

7-22

|NES

W29

070S

|220

E|4

3047

1542

352

66|F

eder

al|G

WIS

UTA

HFE

DD

-1U

TAH

FED

D-1

SWSW

1407

0S|2

40E

4304

7159

3610

699

Fede

ral

GW

ISU

TAH

FED

D-2

UTA

HFE

DD

-2N

ESW

2507

0S24

0E43

0471

5937

9295

Fede

ral

GW

SPR

INC

E1

PRIN

CE

1SW

SW10

070S

240E

4304

7161

9970

35Fe

dera

lG

W.P

UTA

HFE

DD

-4U

TAH

FED

D-4

SWSE

1407

0S|2

40E

4304

7312

1592

97Fe

dera

lG

WS

FZB

B1

BR

ENN

AN

FZ-B

B1

NES

E20

070S

I21

0E43

0473

1805

1095

2Fe

dera

liG

WTA

EAST

CO

YO

TEFE

D14

-4-8

-25

EAST

CO

YO

TEFE

D14

-4-8

-25

SESW

0408

0Si

250E

4304

7324

9311

630

Fede

ral

OW

PFS

PRIN

CE

4PR

INC

E4

SWSW

0307

0S24

0E43

0473

2677

7035

'Fed

eral

OW

.PG

YPS

UM

HIL

LS21

GH

21W

GSW

SW|

2108

0S21

0E|

4304

7326

9211

819

|Fed

eral

GW

PSA

GE

GR

OU

SEFE

D6-

14-8

-22

OU

SG6

148

22SE

NW

\14

080S

220E

4304

7327

4611

944

IFed

eral

GW

PG

YPS

UM

HIL

LS22

WG

GH

22W

GSW

NW

2208

0SI

210E

4304

7328

1812

336

IFed

eral

_GW

PSA

GE

GR

OU

SE12

A-1

4-8-

22|S

AG

EG

RO

USE

12A

-14-

8-22

NW

SW14

080S

220E

4304

7331

7712

524

|Fed

eral

GW

SO

UG

B12

W-2

0-8-

22O

UG

B12

W-2

0-8-

22N

WSW

|20

080S

220E

4304

7332

4913

488

|Fed

eral

GW

PG

BU

15-1

8-8-

22O

UG

B15

188

22SW

SE|

1808

0S22

0E43

0473

3364

1269

0|F

eder

alG

WP

GLE

NB

ENC

HFE

D3W

-17-

8-22

IOU

GB

3W17

822

INEN

W17

080S

220E

4304

7335

1312

950

|Fed

eral

GW

PG

LEN

BEN

CH

FED

5W-1

7-8-

22|O

UG

B5W

178

22iS

WN

W17

080S

220E

4304

7335

1412

873

IFed

eral

GW

PW

VFE

D9W

-8-8

-22

_W

V9W

88

22N

ESE

0808

0S22

0E43

0473

3515

1339

5F

dera

lG

WP

GB

FED

9W-1

8-8-

22O

UG

B9W

188

22N

ESE

1808

0S22

0E43

0473

3516

1299

7,F

eder

alG

WP

OU

GB

3W-2

0-8-

22O

UG

B3W

-20-

8-22

NEN

WI

2008

0S22

0E43

0473

3526

1351

4iF

eder

alG

WP

GLE

NB

ENC

H12

W-3

0-8-

22O

UG

B12

W30

822

NW

SWI

3008

0S22

0E43

0473

3670

1338

0.F

eder

alG

WiP

WV

FU10

W-8

-8-2

2|W

V10

W8

822

NW

SE|

0808

0S22

0E43

0473

3814

1345

0F

dera

l|G

W|P

GH

7W-2

1-8-

21G

H7W

-21-

8-21

ISW

NE

|21

080S

210E

|430

4733

845

1305

0|F

eder

al|G

W|P

GH

9W-2

1-8-

21G

H9W

-21-

8-21

_IN

ESE

I21

080S

210E

4304

7338

4613

074

|Fed

eral

|GW

IPG

H11

W-2

1-8-

21G

H11

W-2

1-8-

21IN

ESW

I21

080S

210E

I43

0473

3847

1304

9IF

eder

al|G

WIP

GH

15W

-21-

8-21

GH

15W

-21-

8-21

SWSE

2108

0S21

0EI 4

3047

3384

813

051

Fede

ral

|GW

PW

V7W

-22-

8-21

|WV

7W-2

2-8-

21SW

NE

|22

080S

210E

|43

0473

3907

|132

30Fe

dera

l|G

WP

WV

9W-2

3-8-

21IW

V9W

-23-

8-21

NES

E23

|080

S21

0E|4

3047

3390

913

160

IFed

eral

|GW

IP

GH

U14

W-2

0-8-

21G

H14

W20

821

SESW

2008

0S21

0E|4

3047

3391

5|1

3073

|Fed

eral

GW

|PG

B4W

-30-

8-22

OU

GB

4W30

822

NW

NW

3008

0S22

0EI

4304

7339

45I

1337

2IF

eder

alG

WIP

GB

9W-1

9-8-

22O

UG

B9W

198

22IN

ESE

1908

0S22

0E43

0473

3946

i13

393

Fede

ral

GW

IP

GB

10W

-30-

8-22

OU

GB

10W

308

22|N

WSE

3008

0S22

0E|4

3047

3394

7|1

3389

Fede

ral

|GW

PG

B12

W-1

9-8-

22O

UG

B12

W19

822

|NW

SW19

080S

220E

4304

7339

4813

388

Fede

ral

IGW

PG

B9W

-25-

8-21

GB

9W-2

5-8-

21IN

ESE

I25

080S

210E

4304

7339

6013

390

Fede

ral

iGW

PW

V1W

-5-8

-22

SU1W

58

22N

ENE

0508

0S22

0E43

0473

3985

1336

9Fe

dera

lG

WP

WV

3W-5

-8-2

2SU

3W5

822

NEN

W05

080S

220E

4304

7339

8713

321

Fede

ral

IOW

SW

V7W

-5-8

-22

.SU

7W5

822

SWN

E|

0508

0SI2

20E

|430

4733

988

1323

5Fe

dera

lG

WP

WV

9W-5

-8-2

2SU

9W5

822

NES

EI

0508

0SI

220E

|43

0473

3990

1323

8Fe

dera

lG

WP

WV

11W

-5-8

-22

SU11

W5

822

NES

W\

0508

0S.

220E

4304

7339

9213

239

Fede

ral

I GW

SW

V13

W-5

-8-2

2SU

13W

58

22SW

SW|

0508

0S' 22

0E43

0473

3994

1323

6Fe

dera

lG

WS

WV

15W

-5-8

-22

SU15

W5

822

SWSE

|05

080S

220E

4304

7339

9613

240

IFed

eral

¡GW

PW

V8W

-8-8

-22

WV

8W-8

-8-2

2SE

NE

I08

080S

220E

I43

0473

4005

1332

0|F

eder

alG

W|P

WV

14W

-8-8

-22

IWV

14W

-8-8

-22

SESW

I08

080S

I22

0EI

4304

7340

0713

322

Fede

ral

iGW

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

no.

Q/Q

SEC

TWP

RN

GA

PII

Entit

yLe

ase

Wel

lTy

peSt

atus

FED

ERA

L2-2

9-7-

22FE

DER

AL2

-29-

7-22

|NES

W29

070S

|220

E|4

3047

1542

352

66|F

eder

al|G

WIS

UTA

HFE

DD

-1U

TAH

FED

D-1

SWSW

1407

0S|2

40E

4304

7159

3610

699

Fede

ral

GW

ISU

TAH

FED

D-2

UTA

HFE

DD

-2N

ESW

2507

0S24

0E43

0471

5937

9295

Fede

ral

GW

SPR

INC

E1

PRIN

CE

1SW

SW10

070S

240E

4304

7161

9970

35Fe

dera

lG

W.P

UTA

HFE

DD

-4U

TAH

FED

D-4

SWSE

1407

0S|2

40E

4304

7312

1592

97Fe

dera

lG

WS

FZB

B1

BR

ENN

AN

FZ-B

B1

NES

E20

070S

I21

0E43

0473

1805

1095

2Fe

dera

liG

WTA

EAST

CO

YO

TEFE

D14

-4-8

-25

EAST

CO

YO

TEFE

D14

-4-8

-25

SESW

0408

0Si

250E

4304

7324

9311

630

Fede

ral

OW

PFS

PRIN

CE

4PR

INC

E4

SWSW

0307

0S24

0E43

0473

2677

7035

'Fed

eral

OW

.PG

YPS

UM

HIL

LS21

GH

21W

GSW

SW|

2108

0S21

0E|

4304

7326

9211

819

|Fed

eral

GW

PSA

GE

GR

OU

SEFE

D6-

14-8

-22

OU

SG6

148

22SE

NW

\14

080S

220E

4304

7327

4611

944

IFed

eral

GW

PG

YPS

UM

HIL

LS22

WG

GH

22W

GSW

NW

2208

0SI

210E

4304

7328

1812

336

IFed

eral

_GW

PSA

GE

GR

OU

SE12

A-1

4-8-

22|S

AG

EG

RO

USE

12A

-14-

8-22

NW

SW14

080S

220E

4304

7331

7712

524

|Fed

eral

GW

SO

UG

B12

W-2

0-8-

22O

UG

B12

W-2

0-8-

22N

WSW

|20

080S

220E

4304

7332

4913

488

|Fed

eral

GW

PG

BU

15-1

8-8-

22O

UG

B15

188

22SW

SE|

1808

0S22

0E43

0473

3364

1269

0|F

eder

alG

WP

GLE

NB

ENC

HFE

D3W

-17-

8-22

IOU

GB

3W17

822

INEN

W17

080S

220E

4304

7335

1312

950

|Fed

eral

GW

PG

LEN

BEN

CH

FED

5W-1

7-8-

22|O

UG

B5W

178

22iS

WN

W17

080S

220E

4304

7335

1412

873

IFed

eral

GW

PW

VFE

D9W

-8-8

-22

_W

V9W

88

22N

ESE

0808

0S22

0E43

0473

3515

1339

5F

dera

lG

WP

GB

FED

9W-1

8-8-

22O

UG

B9W

188

22N

ESE

1808

0S22

0E43

0473

3516

1299

7,F

eder

alG

WP

OU

GB

3W-2

0-8-

22O

UG

B3W

-20-

8-22

NEN

WI

2008

0S22

0E43

0473

3526

1351

4iF

eder

alG

WP

GLE

NB

ENC

H12

W-3

0-8-

22O

UG

B12

W30

822

NW

SWI

3008

0S22

0E43

0473

3670

1338

0.F

eder

alG

WiP

WV

FU10

W-8

-8-2

2|W

V10

W8

822

NW

SE|

0808

0S22

0E43

0473

3814

1345

0F

dera

l|G

W|P

GH

7W-2

1-8-

21G

H7W

-21-

8-21

ISW

NE

|21

080S

210E

|430

4733

845

1305

0|F

eder

al|G

W|P

GH

9W-2

1-8-

21G

H9W

-21-

8-21

_IN

ESE

I21

080S

210E

4304

7338

4613

074

|Fed

eral

|GW

IPG

H11

W-2

1-8-

21G

H11

W-2

1-8-

21IN

ESW

I21

080S

210E

I43

0473

3847

1304

9IF

eder

al|G

WIP

GH

15W

-21-

8-21

GH

15W

-21-

8-21

SWSE

2108

0S21

0EI 4

3047

3384

813

051

Fede

ral

|GW

PW

V7W

-22-

8-21

|WV

7W-2

2-8-

21SW

NE

|22

080S

210E

|43

0473

3907

|132

30Fe

dera

l|G

WP

WV

9W-2

3-8-

21IW

V9W

-23-

8-21

NES

E23

|080

S21

0E|4

3047

3390

913

160

IFed

eral

|GW

IP

GH

U14

W-2

0-8-

21G

H14

W20

821

SESW

2008

0S21

0E|4

3047

3391

5|1

3073

|Fed

eral

GW

|PG

B4W

-30-

8-22

OU

GB

4W30

822

NW

NW

3008

0S22

0EI

4304

7339

45I

1337

2IF

eder

alG

WIP

GB

9W-1

9-8-

22O

UG

B9W

198

22IN

ESE

1908

0S22

0E43

0473

3946

i13

393

Fede

ral

GW

IP

GB

10W

-30-

8-22

OU

GB

10W

308

22|N

WSE

3008

0S22

0E|4

3047

3394

7|1

3389

Fede

ral

|GW

PG

B12

W-1

9-8-

22O

UG

B12

W19

822

|NW

SW19

080S

220E

4304

7339

4813

388

Fede

ral

IGW

PG

B9W

-25-

8-21

GB

9W-2

5-8-

21IN

ESE

I25

080S

210E

4304

7339

6013

390

Fede

ral

iGW

PW

V1W

-5-8

-22

SU1W

58

22N

ENE

0508

0S22

0E43

0473

3985

1336

9Fe

dera

lG

WP

WV

3W-5

-8-2

2SU

3W5

822

NEN

W05

080S

220E

4304

7339

8713

321

Fede

ral

IOW

SW

V7W

-5-8

-22

.SU

7W5

822

SWN

E|

0508

0SI2

20E

|430

4733

988

1323

5Fe

dera

lG

WP

WV

9W-5

-8-2

2SU

9W5

822

NES

EI

0508

0SI

220E

|43

0473

3990

1323

8Fe

dera

lG

WP

WV

11W

-5-8

-22

SU11

W5

822

NES

W\

0508

0S.

220E

4304

7339

9213

239

Fede

ral

I GW

SW

V13

W-5

-8-2

2SU

13W

58

22SW

SW|

0508

0S' 22

0E43

0473

3994

1323

6Fe

dera

lG

WS

WV

15W

-5-8

-22

SU15

W5

822

SWSE

|05

080S

220E

4304

7339

9613

240

IFed

eral

¡GW

PW

V8W

-8-8

-22

WV

8W-8

-8-2

2SE

NE

I08

080S

220E

I43

0473

4005

1332

0|F

eder

alG

W|P

WV

14W

-8-8

-22

IWV

14W

-8-8

-22

SESW

I08

080S

I22

0EI

4304

7340

0713

322

Fede

ral

iGW

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

no.

Q/Q

SEC

TWP

RN

GA

PII

Entit

yLe

ase

Wel

lTy

peSt

atus

FED

ERA

L2-2

9-7-

22FE

DER

AL2

-29-

7-22

|NES

W29

070S

|220

E|4

3047

1542

352

66|F

eder

al|G

WIS

UTA

HFE

DD

-1U

TAH

FED

D-1

SWSW

1407

0S|2

40E

4304

7159

3610

699

Fede

ral

GW

ISU

TAH

FED

D-2

UTA

HFE

DD

-2N

ESW

2507

0S24

0E43

0471

5937

9295

Fede

ral

GW

SPR

INC

E1

PRIN

CE

1SW

SW10

070S

240E

4304

7161

9970

35Fe

dera

lG

W.P

UTA

HFE

DD

-4U

TAH

FED

D-4

SWSE

1407

0S|2

40E

4304

7312

1592

97Fe

dera

lG

WS

FZB

B1

BR

ENN

AN

FZ-B

B1

NES

E20

070S

I21

0E43

0473

1805

1095

2Fe

dera

liG

WTA

EAST

CO

YO

TEFE

D14

-4-8

-25

EAST

CO

YO

TEFE

D14

-4-8

-25

SESW

0408

0Si

250E

4304

7324

9311

630

Fede

ral

OW

PFS

PRIN

CE

4PR

INC

E4

SWSW

0307

0S24

0E43

0473

2677

7035

'Fed

eral

OW

.PG

YPS

UM

HIL

LS21

GH

21W

GSW

SW|

2108

0S21

0E|

4304

7326

9211

819

|Fed

eral

GW

PSA

GE

GR

OU

SEFE

D6-

14-8

-22

OU

SG6

148

22SE

NW

\14

080S

220E

4304

7327

4611

944

IFed

eral

GW

PG

YPS

UM

HIL

LS22

WG

GH

22W

GSW

NW

2208

0SI

210E

4304

7328

1812

336

IFed

eral

_GW

PSA

GE

GR

OU

SE12

A-1

4-8-

22|S

AG

EG

RO

USE

12A

-14-

8-22

NW

SW14

080S

220E

4304

7331

7712

524

|Fed

eral

GW

SO

UG

B12

W-2

0-8-

22O

UG

B12

W-2

0-8-

22N

WSW

|20

080S

220E

4304

7332

4913

488

|Fed

eral

GW

PG

BU

15-1

8-8-

22O

UG

B15

188

22SW

SE|

1808

0S22

0E43

0473

3364

1269

0|F

eder

alG

WP

GLE

NB

ENC

HFE

D3W

-17-

8-22

IOU

GB

3W17

822

INEN

W17

080S

220E

4304

7335

1312

950

|Fed

eral

GW

PG

LEN

BEN

CH

FED

5W-1

7-8-

22|O

UG

B5W

178

22iS

WN

W17

080S

220E

4304

7335

1412

873

IFed

eral

GW

PW

VFE

D9W

-8-8

-22

_W

V9W

88

22N

ESE

0808

0S22

0E43

0473

3515

1339

5F

dera

lG

WP

GB

FED

9W-1

8-8-

22O

UG

B9W

188

22N

ESE

1808

0S22

0E43

0473

3516

1299

7,F

eder

alG

WP

OU

GB

3W-2

0-8-

22O

UG

B3W

-20-

8-22

NEN

WI

2008

0S22

0E43

0473

3526

1351

4iF

eder

alG

WP

GLE

NB

ENC

H12

W-3

0-8-

22O

UG

B12

W30

822

NW

SWI

3008

0S22

0E43

0473

3670

1338

0.F

eder

alG

WiP

WV

FU10

W-8

-8-2

2|W

V10

W8

822

NW

SE|

0808

0S22

0E43

0473

3814

1345

0F

dera

l|G

W|P

GH

7W-2

1-8-

21G

H7W

-21-

8-21

ISW

NE

|21

080S

210E

|430

4733

845

1305

0|F

eder

al|G

W|P

GH

9W-2

1-8-

21G

H9W

-21-

8-21

_IN

ESE

I21

080S

210E

4304

7338

4613

074

|Fed

eral

|GW

IPG

H11

W-2

1-8-

21G

H11

W-2

1-8-

21IN

ESW

I21

080S

210E

I43

0473

3847

1304

9IF

eder

al|G

WIP

GH

15W

-21-

8-21

GH

15W

-21-

8-21

SWSE

2108

0S21

0EI 4

3047

3384

813

051

Fede

ral

|GW

PW

V7W

-22-

8-21

|WV

7W-2

2-8-

21SW

NE

|22

080S

210E

|43

0473

3907

|132

30Fe

dera

l|G

WP

WV

9W-2

3-8-

21IW

V9W

-23-

8-21

NES

E23

|080

S21

0E|4

3047

3390

913

160

IFed

eral

|GW

IP

GH

U14

W-2

0-8-

21G

H14

W20

821

SESW

2008

0S21

0E|4

3047

3391

5|1

3073

|Fed

eral

GW

|PG

B4W

-30-

8-22

OU

GB

4W30

822

NW

NW

3008

0S22

0EI

4304

7339

45I

1337

2IF

eder

alG

WIP

GB

9W-1

9-8-

22O

UG

B9W

198

22IN

ESE

1908

0S22

0E43

0473

3946

i13

393

Fede

ral

GW

IP

GB

10W

-30-

8-22

OU

GB

10W

308

22|N

WSE

3008

0S22

0E|4

3047

3394

7|1

3389

Fede

ral

|GW

PG

B12

W-1

9-8-

22O

UG

B12

W19

822

|NW

SW19

080S

220E

4304

7339

4813

388

Fede

ral

IGW

PG

B9W

-25-

8-21

GB

9W-2

5-8-

21IN

ESE

I25

080S

210E

4304

7339

6013

390

Fede

ral

iGW

PW

V1W

-5-8

-22

SU1W

58

22N

ENE

0508

0S22

0E43

0473

3985

1336

9Fe

dera

lG

WP

WV

3W-5

-8-2

2SU

3W5

822

NEN

W05

080S

220E

4304

7339

8713

321

Fede

ral

IOW

SW

V7W

-5-8

-22

.SU

7W5

822

SWN

E|

0508

0SI2

20E

|430

4733

988

1323

5Fe

dera

lG

WP

WV

9W-5

-8-2

2SU

9W5

822

NES

EI

0508

0SI

220E

|43

0473

3990

1323

8Fe

dera

lG

WP

WV

11W

-5-8

-22

SU11

W5

822

NES

W\

0508

0S.

220E

4304

7339

9213

239

Fede

ral

I GW

SW

V13

W-5

-8-2

2SU

13W

58

22SW

SW|

0508

0S' 22

0E43

0473

3994

1323

6Fe

dera

lG

WS

WV

15W

-5-8

-22

SU15

W5

822

SWSE

|05

080S

220E

4304

7339

9613

240

IFed

eral

¡GW

PW

V8W

-8-8

-22

WV

8W-8

-8-2

2SE

NE

I08

080S

220E

I43

0473

4005

1332

0|F

eder

alG

W|P

WV

14W

-8-8

-22

IWV

14W

-8-8

-22

SESW

I08

080S

I22

0EI

4304

7340

0713

322

Fede

ral

iGW

Page 37: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

2of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

Wel

tNan

ieN

o.Q

/QSE

CTW

PR

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

GB

6W-2

0-8-

22O

UG

B6W

-20-

8-22

|SEN

W20

080S

220E

4304

7340

1813

518

Fede

ral

GW

PG

B5W

-30-

8-22

OU

GB

5W30

822

SWN

W30

080S

220E

4304

7340

25I

1350

2Fe

dera

lG

WP

GB

11W

-20-

8-22

OU

GB

11W

208

22N

ESW

2008

0S22

0E43

0473

4039

.13

413

Fede

ral

GW

PO

UG

B4W

-20-

8-22

OU

GB

4W-2

0-8-

22N

WN

W20

080S

220E

4304

7340

43i

1352

0Fe

dera

lG

WP

GH

5W-2

1-8-

21G

H5W

-21-

8-21

SWN

W21

080S

210E

4304

7341

47.

1338

7Fe

dera

lG

WP

GH

6W-2

1-8-

21G

H6W

-21-

8-21

SEN

W21

080S

210E

4304

7341

4813

371

IFed

eral

GW

GH

8W-2

1-8-

21G

H8W

-21-

8-21

SEN

E21

080S

210E

4304

7341

49i

1329

3.F

eder

alG

WP

GH

10W

-20-

8-21

GH

10W

-20-

8-21

NW

SE_

2008

0S21

0E43

0473

4151

1332

8Fe

dera

lG

WP

GH

10W

-21-

8-21

GH

10W

-21-

8-21

NW

SE21

080S

210E

4304

7341

5213

378

Fede

ral

GW

PG

H12

W-2

1-8-

21G

H12

W-2

1-8-

21N

WSW

2108

0S21

0E43

0473

4153

1329

4Fe

dera

lG

WP

GH

14W

-21-

8-21

GH

14W

-21-

8-21

SESW

2108

0S21

0E43

0473

4154

1329

2Fe

dera

lG

WP

GH

16W

-21-

8-21

GH

16W

-21-

8-21

SESE

_21

080S

210E

4304

7341

5713

329

Fede

ral

GW

PG

B5W

-20-

8-22

OU

GB

5W20

822

SWN

W20

080S

220E

4304

7342

0913

414

Fede

ral

GW

PW

V6W

-22-

8-21

WV

6W-2

2-8-

21SE

NW

2208

0S21

0E43

0473

4272

1337

9__F

eder

al__

GW

PG

H1W

-20-

8-21

GH

1W-2

0-8-

21N

ENE

I20

080S

210E

4304

7343

2713

451

Fede

ral

GW

PG

H2W

-20-

8-21

GH

2W-2

0-8-

21N

WN

E20

080S

210E

4304

7343

2813

527

Fede

ral_

_G

WP

GH

3W-2

0-8-

21G

H3W

-20-

8-21

NEN

W20

080S

210E

4304

7343

2913

728

Fede

ral

GW

.PG

H7W

-20-

8-21

GH

7W-2

0-8-

21_

SWN

E|

2008

0S21

0E43

0473

4332

1353

7Fe

dera

l|G

WP

GH

9W-2

0-8-

21G

H9W

-20-

8-21

NES

E20

080S

210E

4304

7343

3313

411

Fede

ral

IGW

PG

H11

W-2

0-8-

21G

HllW

-20-

8-21

NES

WI

2008

0S_

210E

4304

7343

3413

410

Fede

ral

GW

LPG

H15

W-2

0-8-

21G

H15

W-2

0-8-

21SW

SE20

080S

210E

4304

7343

3513

407

Fede

ral

GW

.PG

H16

W-2

0-8-

21G

H16

W-2

0-8-

21SE

SE|

2008

0S21

0E43

0473

4336

1350

1Fe

dera

lG

WP

WV

12W

-23-

8-21

WV

12W

-23-

8-21

NW

SW23

080S

210E

4304

7343

4313

430

Fede

ral

GW

PO

UG

B13

W-2

0-8-

22O

UG

B13

W-2

0-8-

22SW

SWI

2008

0S22

0E43

0473

4348

1349

5Fe

dera

lG

W.P

OU

GB

14W

-20-

8-22

OU

GB

14W

-20-

8-22

SESW

2008

0S22

0E43

0473

4349

1350

7Fe

dera

lG

W:P

OU

GB

11W

-29-

8-22

OU

GB

11W

-29-

8-22

NES

W29

080S

220E

4304

7343

5013

526

Fede

ral

GW

iPW

V11

G-5

-8-2

2W

VX

11G

58

22N

ESW

Í05

080S

220E

4304

7343

8813

422

Fede

ral

OW

ÍPW

V13

G-5

-8-2

2W

VX

13G

58

22SW

SWI

0508

0S22

0E43

0473

4389

1373

8Fe

dera

lO

WiP

WV

15G

-5-8

-22

WV

X15

G5

822

SWSE

0508

0S22

0E43

0473

4390

1345

9Fe

dera

lO

W.P

SUB

REN

NA

NW

15W

-18-

7-22

SUB

REN

NA

NW

15W

-18-

7-22

SWSE

1807

0S22

0E43

0473

4403

1344

2Fe

dera

l.G

WiT

A

STIR

RU

PU

16W

-5-8

-22

SU16

W5

822

SESE

I05

080S

220E

4304

7344

4613

654

Fede

ral

GW

PST

IRR

UP

U2W

-5-8

-22

SU2W

58

22N

WN

E05

080S

220E

4304

7344

5513

700

Fede

ral

GW

iPW

V10

W-5

-8-2

2SU

10W

58

22N

WSE

0508

0S22

0E43

0473

4456

1354

0Fe

dera

lG

WP

WV

16W

-8-8

-22

WV

16W

-8-8

-22

SESE

0808

0S22

0E43

0473

4470

1350

8Fe

dera

lG

WP

GB

16W

X-3

0-8-

22O

UG

B16

WX

308

22SE

SE30

080S

220E

4304

7345

0613

431

Fede

ral

GW

PO

UG

B1W

-19-

8-22

OU

GB

lW-1

9-8-

22N

ENE

1908

0SI2

20E

4304

7345

1213

469

IFed

eral

GW

PO

UG

B2W

-19-

8-22

OU

GB

2W-1

9-8-

22N

WN

E19

080S

I 220

E43

0473

4513

1346

1IF

eder

alG

WP

OU

GB

5W-1

9-8-

22O

UG

B5W

-19-

8-22

SWN

W19

080S

220E

4304

7345

1413

460

Fede

rilG

WP

OU

GB

7W-1

9-8-

22O

UG

B7W

-19-

8-22

SWN

E19

080S

220E

4304

7345

1513

462

Fede

ral

GW

PO

UG

B8W

-19-

8-22

OU

GB

8W-1

9-8-

22SE

NE

1908

0S22

0E43

0473

4516

1348

9Fe

dera

lG

WP

OU

GB

11W

-19-

8-22

OU

GB

11W

-19-

8-22

NES

W19

080S

220E

4304

7345

1713

467

IFed

eral

GW

iPO

UG

B16

W-1

9-8-

22O

UG

B16

W-1

9-8-

22SE

SE19

080S

220E

,43

0473

4522

1347

6IF

eder

alG

W

2of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

Wel

tNan

ieN

o.Q

/QSE

CTW

PR

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

GB

6W-2

0-8-

22O

UG

B6W

-20-

8-22

|SEN

W20

080S

220E

4304

7340

1813

518

Fede

ral

GW

PG

B5W

-30-

8-22

OU

GB

5W30

822

SWN

W30

080S

220E

4304

7340

25I

1350

2Fe

dera

lG

WP

GB

11W

-20-

8-22

OU

GB

11W

208

22N

ESW

2008

0S22

0E43

0473

4039

.13

413

Fede

ral

GW

PO

UG

B4W

-20-

8-22

OU

GB

4W-2

0-8-

22N

WN

W20

080S

220E

4304

7340

43i

1352

0Fe

dera

lG

WP

GH

5W-2

1-8-

21G

H5W

-21-

8-21

SWN

W21

080S

210E

4304

7341

47.

1338

7Fe

dera

lG

WP

GH

6W-2

1-8-

21G

H6W

-21-

8-21

SEN

W21

080S

210E

4304

7341

4813

371

IFed

eral

GW

GH

8W-2

1-8-

21G

H8W

-21-

8-21

SEN

E21

080S

210E

4304

7341

49i

1329

3.F

eder

alG

WP

GH

10W

-20-

8-21

GH

10W

-20-

8-21

NW

SE_

2008

0S21

0E43

0473

4151

1332

8Fe

dera

lG

WP

GH

10W

-21-

8-21

GH

10W

-21-

8-21

NW

SE21

080S

210E

4304

7341

5213

378

Fede

ral

GW

PG

H12

W-2

1-8-

21G

H12

W-2

1-8-

21N

WSW

2108

0S21

0E43

0473

4153

1329

4Fe

dera

lG

WP

GH

14W

-21-

8-21

GH

14W

-21-

8-21

SESW

2108

0S21

0E43

0473

4154

1329

2Fe

dera

lG

WP

GH

16W

-21-

8-21

GH

16W

-21-

8-21

SESE

_21

080S

210E

4304

7341

5713

329

Fede

ral

GW

PG

B5W

-20-

8-22

OU

GB

5W20

822

SWN

W20

080S

220E

4304

7342

0913

414

Fede

ral

GW

PW

V6W

-22-

8-21

WV

6W-2

2-8-

21SE

NW

2208

0S21

0E43

0473

4272

1337

9__F

eder

al__

GW

PG

H1W

-20-

8-21

GH

1W-2

0-8-

21N

ENE

I20

080S

210E

4304

7343

2713

451

Fede

ral

GW

PG

H2W

-20-

8-21

GH

2W-2

0-8-

21N

WN

E20

080S

210E

4304

7343

2813

527

Fede

ral_

_G

WP

GH

3W-2

0-8-

21G

H3W

-20-

8-21

NEN

W20

080S

210E

4304

7343

2913

728

Fede

ral

GW

.PG

H7W

-20-

8-21

GH

7W-2

0-8-

21_

SWN

E|

2008

0S21

0E43

0473

4332

1353

7Fe

dera

l|G

WP

GH

9W-2

0-8-

21G

H9W

-20-

8-21

NES

E20

080S

210E

4304

7343

3313

411

Fede

ral

IGW

PG

H11

W-2

0-8-

21G

HllW

-20-

8-21

NES

WI

2008

0S_

210E

4304

7343

3413

410

Fede

ral

GW

LPG

H15

W-2

0-8-

21G

H15

W-2

0-8-

21SW

SE20

080S

210E

4304

7343

3513

407

Fede

ral

GW

.PG

H16

W-2

0-8-

21G

H16

W-2

0-8-

21SE

SE|

2008

0S21

0E43

0473

4336

1350

1Fe

dera

lG

WP

WV

12W

-23-

8-21

WV

12W

-23-

8-21

NW

SW23

080S

210E

4304

7343

4313

430

Fede

ral

GW

PO

UG

B13

W-2

0-8-

22O

UG

B13

W-2

0-8-

22SW

SWI

2008

0S22

0E43

0473

4348

1349

5Fe

dera

lG

W.P

OU

GB

14W

-20-

8-22

OU

GB

14W

-20-

8-22

SESW

2008

0S22

0E43

0473

4349

1350

7Fe

dera

lG

W:P

OU

GB

11W

-29-

8-22

OU

GB

11W

-29-

8-22

NES

W29

080S

220E

4304

7343

5013

526

Fede

ral

GW

iPW

V11

G-5

-8-2

2W

VX

11G

58

22N

ESW

Í05

080S

220E

4304

7343

8813

422

Fede

ral

OW

ÍPW

V13

G-5

-8-2

2W

VX

13G

58

22SW

SWI

0508

0S22

0E43

0473

4389

1373

8Fe

dera

lO

WiP

WV

15G

-5-8

-22

WV

X15

G5

822

SWSE

0508

0S22

0E43

0473

4390

1345

9Fe

dera

lO

W.P

SUB

REN

NA

NW

15W

-18-

7-22

SUB

REN

NA

NW

15W

-18-

7-22

SWSE

1807

0S22

0E43

0473

4403

1344

2Fe

dera

l.G

WiT

A

STIR

RU

PU

16W

-5-8

-22

SU16

W5

822

SESE

I05

080S

220E

4304

7344

4613

654

Fede

ral

GW

PST

IRR

UP

U2W

-5-8

-22

SU2W

58

22N

WN

E05

080S

220E

4304

7344

5513

700

Fede

ral

GW

iPW

V10

W-5

-8-2

2SU

10W

58

22N

WSE

0508

0S22

0E43

0473

4456

1354

0Fe

dera

lG

WP

WV

16W

-8-8

-22

WV

16W

-8-8

-22

SESE

0808

0S22

0E43

0473

4470

1350

8Fe

dera

lG

WP

GB

16W

X-3

0-8-

22O

UG

B16

WX

308

22SE

SE30

080S

220E

4304

7345

0613

431

Fede

ral

GW

PO

UG

B1W

-19-

8-22

OU

GB

lW-1

9-8-

22N

ENE

1908

0SI2

20E

4304

7345

1213

469

IFed

eral

GW

PO

UG

B2W

-19-

8-22

OU

GB

2W-1

9-8-

22N

WN

E19

080S

I 220

E43

0473

4513

1346

1IF

eder

alG

WP

OU

GB

5W-1

9-8-

22O

UG

B5W

-19-

8-22

SWN

W19

080S

220E

4304

7345

1413

460

Fede

rilG

WP

OU

GB

7W-1

9-8-

22O

UG

B7W

-19-

8-22

SWN

E19

080S

220E

4304

7345

1513

462

Fede

ral

GW

PO

UG

B8W

-19-

8-22

OU

GB

8W-1

9-8-

22SE

NE

1908

0S22

0E43

0473

4516

1348

9Fe

dera

lG

WP

OU

GB

11W

-19-

8-22

OU

GB

11W

-19-

8-22

NES

W19

080S

220E

4304

7345

1713

467

IFed

eral

GW

iPO

UG

B16

W-1

9-8-

22O

UG

B16

W-1

9-8-

22SE

SE19

080S

220E

,43

0473

4522

1347

6IF

eder

alG

W

2of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

Wel

tNan

ieN

o.Q

/QSE

CTW

PR

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

GB

6W-2

0-8-

22O

UG

B6W

-20-

8-22

|SEN

W20

080S

220E

4304

7340

1813

518

Fede

ral

GW

PG

B5W

-30-

8-22

OU

GB

5W30

822

SWN

W30

080S

220E

4304

7340

25I

1350

2Fe

dera

lG

WP

GB

11W

-20-

8-22

OU

GB

11W

208

22N

ESW

2008

0S22

0E43

0473

4039

.13

413

Fede

ral

GW

PO

UG

B4W

-20-

8-22

OU

GB

4W-2

0-8-

22N

WN

W20

080S

220E

4304

7340

43i

1352

0Fe

dera

lG

WP

GH

5W-2

1-8-

21G

H5W

-21-

8-21

SWN

W21

080S

210E

4304

7341

47.

1338

7Fe

dera

lG

WP

GH

6W-2

1-8-

21G

H6W

-21-

8-21

SEN

W21

080S

210E

4304

7341

4813

371

IFed

eral

GW

GH

8W-2

1-8-

21G

H8W

-21-

8-21

SEN

E21

080S

210E

4304

7341

49i

1329

3.F

eder

alG

WP

GH

10W

-20-

8-21

GH

10W

-20-

8-21

NW

SE_

2008

0S21

0E43

0473

4151

1332

8Fe

dera

lG

WP

GH

10W

-21-

8-21

GH

10W

-21-

8-21

NW

SE21

080S

210E

4304

7341

5213

378

Fede

ral

GW

PG

H12

W-2

1-8-

21G

H12

W-2

1-8-

21N

WSW

2108

0S21

0E43

0473

4153

1329

4Fe

dera

lG

WP

GH

14W

-21-

8-21

GH

14W

-21-

8-21

SESW

2108

0S21

0E43

0473

4154

1329

2Fe

dera

lG

WP

GH

16W

-21-

8-21

GH

16W

-21-

8-21

SESE

_21

080S

210E

4304

7341

5713

329

Fede

ral

GW

PG

B5W

-20-

8-22

OU

GB

5W20

822

SWN

W20

080S

220E

4304

7342

0913

414

Fede

ral

GW

PW

V6W

-22-

8-21

WV

6W-2

2-8-

21SE

NW

2208

0S21

0E43

0473

4272

1337

9__F

eder

al__

GW

PG

H1W

-20-

8-21

GH

1W-2

0-8-

21N

ENE

I20

080S

210E

4304

7343

2713

451

Fede

ral

GW

PG

H2W

-20-

8-21

GH

2W-2

0-8-

21N

WN

E20

080S

210E

4304

7343

2813

527

Fede

ral_

_G

WP

GH

3W-2

0-8-

21G

H3W

-20-

8-21

NEN

W20

080S

210E

4304

7343

2913

728

Fede

ral

GW

.PG

H7W

-20-

8-21

GH

7W-2

0-8-

21_

SWN

E|

2008

0S21

0E43

0473

4332

1353

7Fe

dera

l|G

WP

GH

9W-2

0-8-

21G

H9W

-20-

8-21

NES

E20

080S

210E

4304

7343

3313

411

Fede

ral

IGW

PG

H11

W-2

0-8-

21G

HllW

-20-

8-21

NES

WI

2008

0S_

210E

4304

7343

3413

410

Fede

ral

GW

LPG

H15

W-2

0-8-

21G

H15

W-2

0-8-

21SW

SE20

080S

210E

4304

7343

3513

407

Fede

ral

GW

.PG

H16

W-2

0-8-

21G

H16

W-2

0-8-

21SE

SE|

2008

0S21

0E43

0473

4336

1350

1Fe

dera

lG

WP

WV

12W

-23-

8-21

WV

12W

-23-

8-21

NW

SW23

080S

210E

4304

7343

4313

430

Fede

ral

GW

PO

UG

B13

W-2

0-8-

22O

UG

B13

W-2

0-8-

22SW

SWI

2008

0S22

0E43

0473

4348

1349

5Fe

dera

lG

W.P

OU

GB

14W

-20-

8-22

OU

GB

14W

-20-

8-22

SESW

2008

0S22

0E43

0473

4349

1350

7Fe

dera

lG

W:P

OU

GB

11W

-29-

8-22

OU

GB

11W

-29-

8-22

NES

W29

080S

220E

4304

7343

5013

526

Fede

ral

GW

iPW

V11

G-5

-8-2

2W

VX

11G

58

22N

ESW

Í05

080S

220E

4304

7343

8813

422

Fede

ral

OW

ÍPW

V13

G-5

-8-2

2W

VX

13G

58

22SW

SWI

0508

0S22

0E43

0473

4389

1373

8Fe

dera

lO

WiP

WV

15G

-5-8

-22

WV

X15

G5

822

SWSE

0508

0S22

0E43

0473

4390

1345

9Fe

dera

lO

W.P

SUB

REN

NA

NW

15W

-18-

7-22

SUB

REN

NA

NW

15W

-18-

7-22

SWSE

1807

0S22

0E43

0473

4403

1344

2Fe

dera

l.G

WiT

A

STIR

RU

PU

16W

-5-8

-22

SU16

W5

822

SESE

I05

080S

220E

4304

7344

4613

654

Fede

ral

GW

PST

IRR

UP

U2W

-5-8

-22

SU2W

58

22N

WN

E05

080S

220E

4304

7344

5513

700

Fede

ral

GW

iPW

V10

W-5

-8-2

2SU

10W

58

22N

WSE

0508

0S22

0E43

0473

4456

1354

0Fe

dera

lG

WP

WV

16W

-8-8

-22

WV

16W

-8-8

-22

SESE

0808

0S22

0E43

0473

4470

1350

8Fe

dera

lG

WP

GB

16W

X-3

0-8-

22O

UG

B16

WX

308

22SE

SE30

080S

220E

4304

7345

0613

431

Fede

ral

GW

PO

UG

B1W

-19-

8-22

OU

GB

lW-1

9-8-

22N

ENE

1908

0SI2

20E

4304

7345

1213

469

IFed

eral

GW

PO

UG

B2W

-19-

8-22

OU

GB

2W-1

9-8-

22N

WN

E19

080S

I 220

E43

0473

4513

1346

1IF

eder

alG

WP

OU

GB

5W-1

9-8-

22O

UG

B5W

-19-

8-22

SWN

W19

080S

220E

4304

7345

1413

460

Fede

rilG

WP

OU

GB

7W-1

9-8-

22O

UG

B7W

-19-

8-22

SWN

E19

080S

220E

4304

7345

1513

462

Fede

ral

GW

PO

UG

B8W

-19-

8-22

OU

GB

8W-1

9-8-

22SE

NE

1908

0S22

0E43

0473

4516

1348

9Fe

dera

lG

WP

OU

GB

11W

-19-

8-22

OU

GB

11W

-19-

8-22

NES

W19

080S

220E

4304

7345

1713

467

IFed

eral

GW

iPO

UG

B16

W-1

9-8-

22O

UG

B16

W-1

9-8-

22SE

SE19

080S

220E

,43

0473

4522

1347

6IF

eder

alG

W

2of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

Wel

tNan

ieN

o.Q

/QSE

CTW

PR

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

GB

6W-2

0-8-

22O

UG

B6W

-20-

8-22

|SEN

W20

080S

220E

4304

7340

1813

518

Fede

ral

GW

PG

B5W

-30-

8-22

OU

GB

5W30

822

SWN

W30

080S

220E

4304

7340

25I

1350

2Fe

dera

lG

WP

GB

11W

-20-

8-22

OU

GB

11W

208

22N

ESW

2008

0S22

0E43

0473

4039

.13

413

Fede

ral

GW

PO

UG

B4W

-20-

8-22

OU

GB

4W-2

0-8-

22N

WN

W20

080S

220E

4304

7340

43i

1352

0Fe

dera

lG

WP

GH

5W-2

1-8-

21G

H5W

-21-

8-21

SWN

W21

080S

210E

4304

7341

47.

1338

7Fe

dera

lG

WP

GH

6W-2

1-8-

21G

H6W

-21-

8-21

SEN

W21

080S

210E

4304

7341

4813

371

IFed

eral

GW

GH

8W-2

1-8-

21G

H8W

-21-

8-21

SEN

E21

080S

210E

4304

7341

49i

1329

3.F

eder

alG

WP

GH

10W

-20-

8-21

GH

10W

-20-

8-21

NW

SE_

2008

0S21

0E43

0473

4151

1332

8Fe

dera

lG

WP

GH

10W

-21-

8-21

GH

10W

-21-

8-21

NW

SE21

080S

210E

4304

7341

5213

378

Fede

ral

GW

PG

H12

W-2

1-8-

21G

H12

W-2

1-8-

21N

WSW

2108

0S21

0E43

0473

4153

1329

4Fe

dera

lG

WP

GH

14W

-21-

8-21

GH

14W

-21-

8-21

SESW

2108

0S21

0E43

0473

4154

1329

2Fe

dera

lG

WP

GH

16W

-21-

8-21

GH

16W

-21-

8-21

SESE

_21

080S

210E

4304

7341

5713

329

Fede

ral

GW

PG

B5W

-20-

8-22

OU

GB

5W20

822

SWN

W20

080S

220E

4304

7342

0913

414

Fede

ral

GW

PW

V6W

-22-

8-21

WV

6W-2

2-8-

21SE

NW

2208

0S21

0E43

0473

4272

1337

9__F

eder

al__

GW

PG

H1W

-20-

8-21

GH

1W-2

0-8-

21N

ENE

I20

080S

210E

4304

7343

2713

451

Fede

ral

GW

PG

H2W

-20-

8-21

GH

2W-2

0-8-

21N

WN

E20

080S

210E

4304

7343

2813

527

Fede

ral_

_G

WP

GH

3W-2

0-8-

21G

H3W

-20-

8-21

NEN

W20

080S

210E

4304

7343

2913

728

Fede

ral

GW

.PG

H7W

-20-

8-21

GH

7W-2

0-8-

21_

SWN

E|

2008

0S21

0E43

0473

4332

1353

7Fe

dera

l|G

WP

GH

9W-2

0-8-

21G

H9W

-20-

8-21

NES

E20

080S

210E

4304

7343

3313

411

Fede

ral

IGW

PG

H11

W-2

0-8-

21G

HllW

-20-

8-21

NES

WI

2008

0S_

210E

4304

7343

3413

410

Fede

ral

GW

LPG

H15

W-2

0-8-

21G

H15

W-2

0-8-

21SW

SE20

080S

210E

4304

7343

3513

407

Fede

ral

GW

.PG

H16

W-2

0-8-

21G

H16

W-2

0-8-

21SE

SE|

2008

0S21

0E43

0473

4336

1350

1Fe

dera

lG

WP

WV

12W

-23-

8-21

WV

12W

-23-

8-21

NW

SW23

080S

210E

4304

7343

4313

430

Fede

ral

GW

PO

UG

B13

W-2

0-8-

22O

UG

B13

W-2

0-8-

22SW

SWI

2008

0S22

0E43

0473

4348

1349

5Fe

dera

lG

W.P

OU

GB

14W

-20-

8-22

OU

GB

14W

-20-

8-22

SESW

2008

0S22

0E43

0473

4349

1350

7Fe

dera

lG

W:P

OU

GB

11W

-29-

8-22

OU

GB

11W

-29-

8-22

NES

W29

080S

220E

4304

7343

5013

526

Fede

ral

GW

iPW

V11

G-5

-8-2

2W

VX

11G

58

22N

ESW

Í05

080S

220E

4304

7343

8813

422

Fede

ral

OW

ÍPW

V13

G-5

-8-2

2W

VX

13G

58

22SW

SWI

0508

0S22

0E43

0473

4389

1373

8Fe

dera

lO

WiP

WV

15G

-5-8

-22

WV

X15

G5

822

SWSE

0508

0S22

0E43

0473

4390

1345

9Fe

dera

lO

W.P

SUB

REN

NA

NW

15W

-18-

7-22

SUB

REN

NA

NW

15W

-18-

7-22

SWSE

1807

0S22

0E43

0473

4403

1344

2Fe

dera

l.G

WiT

A

STIR

RU

PU

16W

-5-8

-22

SU16

W5

822

SESE

I05

080S

220E

4304

7344

4613

654

Fede

ral

GW

PST

IRR

UP

U2W

-5-8

-22

SU2W

58

22N

WN

E05

080S

220E

4304

7344

5513

700

Fede

ral

GW

iPW

V10

W-5

-8-2

2SU

10W

58

22N

WSE

0508

0S22

0E43

0473

4456

1354

0Fe

dera

lG

WP

WV

16W

-8-8

-22

WV

16W

-8-8

-22

SESE

0808

0S22

0E43

0473

4470

1350

8Fe

dera

lG

WP

GB

16W

X-3

0-8-

22O

UG

B16

WX

308

22SE

SE30

080S

220E

4304

7345

0613

431

Fede

ral

GW

PO

UG

B1W

-19-

8-22

OU

GB

lW-1

9-8-

22N

ENE

1908

0SI2

20E

4304

7345

1213

469

IFed

eral

GW

PO

UG

B2W

-19-

8-22

OU

GB

2W-1

9-8-

22N

WN

E19

080S

I 220

E43

0473

4513

1346

1IF

eder

alG

WP

OU

GB

5W-1

9-8-

22O

UG

B5W

-19-

8-22

SWN

W19

080S

220E

4304

7345

1413

460

Fede

rilG

WP

OU

GB

7W-1

9-8-

22O

UG

B7W

-19-

8-22

SWN

E19

080S

220E

4304

7345

1513

462

Fede

ral

GW

PO

UG

B8W

-19-

8-22

OU

GB

8W-1

9-8-

22SE

NE

1908

0S22

0E43

0473

4516

1348

9Fe

dera

lG

WP

OU

GB

11W

-19-

8-22

OU

GB

11W

-19-

8-22

NES

W19

080S

220E

4304

7345

1713

467

IFed

eral

GW

iPO

UG

B16

W-1

9-8-

22O

UG

B16

W-1

9-8-

22SE

SE19

080S

220E

,43

0473

4522

1347

6IF

eder

alG

W

Page 38: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

ILea

seW

ell

Type

|Sta

tus

GB

lW-3

0-8-

22O

UG

B1W

308

22N

ENE

|30

080S

220E

|430

4734

528

1348

7|F

eder

aliG

WIP

GB

3W-3

0-8-

22O

UG

B3W

308

22N

ENW

I30

080S

220E

I43

0473

4529

1349

3Fe

dera

lG

WIP

GB

6W-3

0-8-

22O

UG

B6W

308

22SE

NW

I30

080S

220E

I43

0473

4530

1351

9Fe

dera

lG

WIP

GB

7W-3

0-8-

22O

UG

B7W

308

22SW

NE

3008

0S22

0E43

0473

4531

1349

4Fe

dera

lIG

W|P

GB

8W-3

0-8-

22O

UG

B8W

308

22SE

NE

|30

080S

220E

|43

0473

4532

1348

3|F

eder

alG

W|P

GB

9W-3

0-8-

22IO

UG

B9W

308

22N

ESE

I30

080S

220E

I43

0473

4533

1350

0|F

eder

al|G

WP

OU

GB

6W-1

9-8-

22IO

UG

B6W

-19-

8-22

SEN

WI

1908

0S22

0EI 4

3047

3453

413

475

IFed

eral

IGW

PO

UG

B10

W-1

9-8-

22O

UG

B10

W-1

9-8-

22N

WSE

1908

0S22

0EI

4304

7345

3513

479

Fede

ral

IGW

PO

UG

B13

W-1

9-8-

22|O

UG

B13

W-1

9-8-

22SW

SW19

080S

220E

|430

4734

536

1347

8Fe

dera

lG

WIP

OU

GB

14W

-19-

8-22

IOU

GB

14W

-19-

8-22

SESW

I19

i08

0S22

0EI

4304

7345

3713

484

|Fed

eral

iGW

IPO

UG

B15

W-1

9-8-

22O

UG

B15

W-1

9-8-

22IS

WSE

I19

I 080

S22

0EI 4

3047

3453

813

482

|Fed

eral

.GW

IPO

UG

B12

W-1

7-8-

22O

UG

B12

W-1

7-8-

22N

WSW

17|0

80S

220E

4304

7345

4213

543

Fede

ral

IGW

PO

UG

B6W

-17-

8-22

|OU

GB

6W-1

7-8-

22SE

NW

|17

|080

S22

0E43

0473

4543

1353

6|F

eder

al¡G

W|P

OU

GB

13W

-17-

8-22

|OU

GB

13W

-17-

8-22

SWSW

1708

0S22

0E|4

3047

3454

413

547

.Fed

eral

iGW

IPO

UG

B6W

-29-

8-22

IOU

GB

6W-2

9-8-

22,S

ENW

2908

0S22

0EI

4304

7345

4513

535

IFed

eral

GW

IPO

UG

B3W

-29-

8-22

OU

GB

3W-2

9-8-

22N

ENW

2908

0S22

0E|

4304

7345

4613

509

IFed

eral

GW

PO

UG

B13

W-2

9-8-

22IO

UG

B13

W-2

9-8-

22SW

SW29

080S

220E

4304

7345

4713

506

IFed

eral

GW

|PO

UG

B4W

-29-

8-22

IOU

GB

4W-2

9-8-

22N

WN

W29

080S

220E

I43

0473

4548

1353

4Fe

dera

lG

W|P

OU

GB

5W-2

9-8-

22|O

UG

B5W

-29-

8-22

SWN

W29

080S

220E

I43

0473

4549

1350

5Fe

dera

lG

WIP

OU

GB

14W

-17-

8-22

|OU

GB

14W

-17-

8-22

SESW

1708

0S22

0E43

0473

4550

1355

0IF

eder

alG

WIP

OU

GB

11W

-17-

8-22

|OU

GB

11W

-17-

8-22

NES

W17

080S

220E

4304

7345

53|1

3671

Fede

ral

GW

|PO

UG

B14

W-2

9-8-

22|O

UG

B14

W-2

9-8-

22SE

SW29

080S

220E

4304

7345

54|1

3528

Fede

ral

GW

IPO

UG

B2W

-17-

8-22

OU

GB

2W-1

7-8-

22IN

WN

E17

080S

220E

4304

7345

5913

539

Fede

ral

GW

IPO

UG

B7W

-17-

8-22

OU

GB

7W-1

7-8-

22SW

NE

1708

0S22

0E43

0473

4560

1359

9Fe

dera

l|G

WIP

OU

GB

16W

-18-

8-22

|OU

GB

16W

-18-

8-22

|SÈS

E18

080S

220E

4304

7345

6313

559

Fede

ral

|GW

IP

OU

GB

1W-2

9-8-

22O

UG

BlW

-29-

8-22

NEN

E29

|080

S22

0E43

0473

45_7

313

562

Fede

ral

IGW

IP

OU

GB

7W-2

9-8-

22O

UG

B7W

-29-

8-22

SWN

E29

|080

Si

220E

|430

4734

574

1356

4Fe

dera

lIG

WP

OU

GB

8W-2

9-8-

22O

UG

B8W

-29-

8-22

SEN

E29

|080

Si

220E

I43

0473

4575

1360

9Fe

dera

lIG

WS

OU

GB

9W-2

9-8-

22O

UG

B9W

-29-

8-22

NES

E29

080S

220E

4304

7345

7613

551

Fede

ral

.GW

IP

OU

GB

10W

-29-

8-22

|OU

GB

10W

-29-

8-22

NW

SE29

|080

S22

0E|

4304

7345

7713

594

Fede

ral

|GW

|PO

UG

B15

W-2

9-8-

22O

UG

B15

W-2

9-8-

22IS

WSE

29|0

80S

220E

|43

0473

4578

1356

9Fe

dera

l|G

W|P

OU

GB

2W-2

0-8-

22O

UG

B2W

-20-

8-22

NW

NE

20|0

80S

I 220

EI

4304

7345

9913

664

Fede

ral

|GW

IPO

UG

B2W

-29-

8-22

OU

GB

2W-2

9-8-

22N

WN

E29

|080

S22

0EI

4304

7346

0013

691

Fede

ral

GW

IPO

UG

B15

W-1

7-8-

22O

UG

B15

W-1

7-8-

22SW

SE17

|080

S22

0E43

0473

4601

1363

2Fe

dera

lG

W_

PO

UG

B16

W-1

7-8-

22O

UG

B16

W-1

7-8-

22SE

SE17

|080

S22

0E|

4304

7346

0213

639

Fede

ral

|GW

IP

OU

GB

16W

-29-

8-22

OU

GB

16W

-29-

8-22

SESE

29Í0

80S

220E

|43

0473

4603

1361

0Fe

dera

l'G

WP

OU

GB

1W-2

0-8-

22O

UG

BlW

-20-

8-22

NEN

E20

080S

I22

0EI

4304

7346

0413

612

Fede

ral

'GW

,PO

UG

B1W

-17-

8-22

OU

GB

lW-1

7-8-

22N

ENE

1708

0S22

0E43

0473

4623

1370

1Fe

dera

l' G

WP

OU

GB

9W-1

7-8-

22O

UG

B9W

-17-

8-22

NES

E17

080S

220E

|43

0473

4624

1366

3IF

eder

alG

WP

OU

GB

10W

-17-

8-22

IOU

GB

10W

-17-

8-22

NW

SE17

080S

I220

E|

4304

7346

2513

684

|Fed

eral

GW

|PO

UG

B9W

-20-

8-22

OU

GB

9W-2

0-8-

22N

ESE

2008

0SI2

20E

|430

4734

630

1363

7IF

eder

alG

WIP

OU

GB

10W

-20-

8-22

OU

GB

10W

-20-

8-22

NW

SE20

080S

I 220

EI4

3047

3463

113

682

IFed

eral

GW

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

ILea

seW

ell

Type

|Sta

tus

GB

lW-3

0-8-

22O

UG

B1W

308

22N

ENE

|30

080S

220E

|430

4734

528

1348

7|F

eder

aliG

WIP

GB

3W-3

0-8-

22O

UG

B3W

308

22N

ENW

I30

080S

220E

I43

0473

4529

1349

3Fe

dera

lG

WIP

GB

6W-3

0-8-

22O

UG

B6W

308

22SE

NW

I30

080S

220E

I43

0473

4530

1351

9Fe

dera

lG

WIP

GB

7W-3

0-8-

22O

UG

B7W

308

22SW

NE

3008

0S22

0E43

0473

4531

1349

4Fe

dera

lIG

W|P

GB

8W-3

0-8-

22O

UG

B8W

308

22SE

NE

|30

080S

220E

|43

0473

4532

1348

3|F

eder

alG

W|P

GB

9W-3

0-8-

22IO

UG

B9W

308

22N

ESE

I30

080S

220E

I43

0473

4533

1350

0|F

eder

al|G

WP

OU

GB

6W-1

9-8-

22IO

UG

B6W

-19-

8-22

SEN

WI

1908

0S22

0EI 4

3047

3453

413

475

IFed

eral

IGW

PO

UG

B10

W-1

9-8-

22O

UG

B10

W-1

9-8-

22N

WSE

1908

0S22

0EI

4304

7345

3513

479

Fede

ral

IGW

PO

UG

B13

W-1

9-8-

22|O

UG

B13

W-1

9-8-

22SW

SW19

080S

220E

|430

4734

536

1347

8Fe

dera

lG

WIP

OU

GB

14W

-19-

8-22

IOU

GB

14W

-19-

8-22

SESW

I19

i08

0S22

0EI

4304

7345

3713

484

|Fed

eral

iGW

IPO

UG

B15

W-1

9-8-

22O

UG

B15

W-1

9-8-

22IS

WSE

I19

I 080

S22

0EI 4

3047

3453

813

482

|Fed

eral

.GW

IPO

UG

B12

W-1

7-8-

22O

UG

B12

W-1

7-8-

22N

WSW

17|0

80S

220E

4304

7345

4213

543

Fede

ral

IGW

PO

UG

B6W

-17-

8-22

|OU

GB

6W-1

7-8-

22SE

NW

|17

|080

S22

0E43

0473

4543

1353

6|F

eder

al¡G

W|P

OU

GB

13W

-17-

8-22

|OU

GB

13W

-17-

8-22

SWSW

1708

0S22

0E|4

3047

3454

413

547

.Fed

eral

iGW

IPO

UG

B6W

-29-

8-22

IOU

GB

6W-2

9-8-

22,S

ENW

2908

0S22

0EI

4304

7345

4513

535

IFed

eral

GW

IPO

UG

B3W

-29-

8-22

OU

GB

3W-2

9-8-

22N

ENW

2908

0S22

0E|

4304

7345

4613

509

IFed

eral

GW

PO

UG

B13

W-2

9-8-

22IO

UG

B13

W-2

9-8-

22SW

SW29

080S

220E

4304

7345

4713

506

IFed

eral

GW

|PO

UG

B4W

-29-

8-22

IOU

GB

4W-2

9-8-

22N

WN

W29

080S

220E

I43

0473

4548

1353

4Fe

dera

lG

W|P

OU

GB

5W-2

9-8-

22|O

UG

B5W

-29-

8-22

SWN

W29

080S

220E

I43

0473

4549

1350

5Fe

dera

lG

WIP

OU

GB

14W

-17-

8-22

|OU

GB

14W

-17-

8-22

SESW

1708

0S22

0E43

0473

4550

1355

0IF

eder

alG

WIP

OU

GB

11W

-17-

8-22

|OU

GB

11W

-17-

8-22

NES

W17

080S

220E

4304

7345

53|1

3671

Fede

ral

GW

|PO

UG

B14

W-2

9-8-

22|O

UG

B14

W-2

9-8-

22SE

SW29

080S

220E

4304

7345

54|1

3528

Fede

ral

GW

IPO

UG

B2W

-17-

8-22

OU

GB

2W-1

7-8-

22IN

WN

E17

080S

220E

4304

7345

5913

539

Fede

ral

GW

IPO

UG

B7W

-17-

8-22

OU

GB

7W-1

7-8-

22SW

NE

1708

0S22

0E43

0473

4560

1359

9Fe

dera

l|G

WIP

OU

GB

16W

-18-

8-22

|OU

GB

16W

-18-

8-22

|SÈS

E18

080S

220E

4304

7345

6313

559

Fede

ral

|GW

IP

OU

GB

1W-2

9-8-

22O

UG

BlW

-29-

8-22

NEN

E29

|080

S22

0E43

0473

45_7

313

562

Fede

ral

IGW

IP

OU

GB

7W-2

9-8-

22O

UG

B7W

-29-

8-22

SWN

E29

|080

Si

220E

|430

4734

574

1356

4Fe

dera

lIG

WP

OU

GB

8W-2

9-8-

22O

UG

B8W

-29-

8-22

SEN

E29

|080

Si

220E

I43

0473

4575

1360

9Fe

dera

lIG

WS

OU

GB

9W-2

9-8-

22O

UG

B9W

-29-

8-22

NES

E29

080S

220E

4304

7345

7613

551

Fede

ral

.GW

IP

OU

GB

10W

-29-

8-22

|OU

GB

10W

-29-

8-22

NW

SE29

|080

S22

0E|

4304

7345

7713

594

Fede

ral

|GW

|PO

UG

B15

W-2

9-8-

22O

UG

B15

W-2

9-8-

22IS

WSE

29|0

80S

220E

|43

0473

4578

1356

9Fe

dera

l|G

W|P

OU

GB

2W-2

0-8-

22O

UG

B2W

-20-

8-22

NW

NE

20|0

80S

I 220

EI

4304

7345

9913

664

Fede

ral

|GW

IPO

UG

B2W

-29-

8-22

OU

GB

2W-2

9-8-

22N

WN

E29

|080

S22

0EI

4304

7346

0013

691

Fede

ral

GW

IP

OU

GB

15W

-17-

8-22

OU

GB

15W

-17-

8-22

SWSE

17|0

80S

220E

4304

7346

0113

632

Fede

ral

GW

_P

OU

GB

16W

-17-

8-22

OU

GB

16W

-17-

8-22

SESE

17|0

80S

220E

|43

0473

4602

1363

9Fe

dera

l|G

WIP

OU

GB

16W

-29-

8-22

OU

GB

16W

-29-

8-22

SESE

29Í0

80S

220E

|43

0473

4603

1361

0Fe

dera

l'G

WP

OU

GB

1W-2

0-8-

22O

UG

BlW

-20-

8-22

NEN

E20

080S

I22

0EI

4304

7346

0413

612

Fede

ral

'GW

,PO

UG

B1W

-17-

8-22

OU

GB

lW-1

7-8-

22N

ENE

1708

0S22

0E43

0473

4623

1370

1Fe

dera

l' G

WP

OU

GB

9W-1

7-8-

22O

UG

B9W

-17-

8-22

NES

E17

080S

220E

|43

0473

4624

1366

3IF

eder

alG

WP

OU

GB

10W

-17-

8-22

IOU

GB

10W

-17-

8-22

NW

SE17

080S

I220

E|

4304

7346

2513

684

|Fed

eral

GW

|PO

UG

B9W

-20-

8-22

OU

GB

9W-2

0-8-

22N

ESE

2008

0SI2

20E

|430

4734

630

1363

7IF

eder

alG

WIP

OU

GB

10W

-20-

8-22

OU

GB

10W

-20-

8-22

NW

SE20

080S

I 220

EI4

3047

3463

113

682

IFed

eral

GW

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

ILea

seW

ell

Type

|Sta

tus

GB

lW-3

0-8-

22O

UG

B1W

308

22N

ENE

|30

080S

220E

|430

4734

528

1348

7|F

eder

aliG

WIP

GB

3W-3

0-8-

22O

UG

B3W

308

22N

ENW

I30

080S

220E

I43

0473

4529

1349

3Fe

dera

lG

WIP

GB

6W-3

0-8-

22O

UG

B6W

308

22SE

NW

I30

080S

220E

I43

0473

4530

1351

9Fe

dera

lG

WIP

GB

7W-3

0-8-

22O

UG

B7W

308

22SW

NE

3008

0S22

0E43

0473

4531

1349

4Fe

dera

lIG

W|P

GB

8W-3

0-8-

22O

UG

B8W

308

22SE

NE

|30

080S

220E

|43

0473

4532

1348

3|F

eder

alG

W|P

GB

9W-3

0-8-

22IO

UG

B9W

308

22N

ESE

I30

080S

220E

I43

0473

4533

1350

0|F

eder

al|G

WP

OU

GB

6W-1

9-8-

22IO

UG

B6W

-19-

8-22

SEN

WI

1908

0S22

0EI 4

3047

3453

413

475

IFed

eral

IGW

PO

UG

B10

W-1

9-8-

22O

UG

B10

W-1

9-8-

22N

WSE

1908

0S22

0EI

4304

7345

3513

479

Fede

ral

IGW

PO

UG

B13

W-1

9-8-

22|O

UG

B13

W-1

9-8-

22SW

SW19

080S

220E

|430

4734

536

1347

8Fe

dera

lG

WIP

OU

GB

14W

-19-

8-22

IOU

GB

14W

-19-

8-22

SESW

I19

i08

0S22

0EI

4304

7345

3713

484

|Fed

eral

iGW

IPO

UG

B15

W-1

9-8-

22O

UG

B15

W-1

9-8-

22IS

WSE

I19

I 080

S22

0EI 4

3047

3453

813

482

|Fed

eral

.GW

IPO

UG

B12

W-1

7-8-

22O

UG

B12

W-1

7-8-

22N

WSW

17|0

80S

220E

4304

7345

4213

543

Fede

ral

IGW

PO

UG

B6W

-17-

8-22

|OU

GB

6W-1

7-8-

22SE

NW

|17

|080

S22

0E43

0473

4543

1353

6|F

eder

al¡G

W|P

OU

GB

13W

-17-

8-22

|OU

GB

13W

-17-

8-22

SWSW

1708

0S22

0E|4

3047

3454

413

547

.Fed

eral

iGW

IPO

UG

B6W

-29-

8-22

IOU

GB

6W-2

9-8-

22,S

ENW

2908

0S22

0EI

4304

7345

4513

535

IFed

eral

GW

IPO

UG

B3W

-29-

8-22

OU

GB

3W-2

9-8-

22N

ENW

2908

0S22

0E|

4304

7345

4613

509

IFed

eral

GW

PO

UG

B13

W-2

9-8-

22IO

UG

B13

W-2

9-8-

22SW

SW29

080S

220E

4304

7345

4713

506

IFed

eral

GW

|PO

UG

B4W

-29-

8-22

IOU

GB

4W-2

9-8-

22N

WN

W29

080S

220E

I43

0473

4548

1353

4Fe

dera

lG

W|P

OU

GB

5W-2

9-8-

22|O

UG

B5W

-29-

8-22

SWN

W29

080S

220E

I43

0473

4549

1350

5Fe

dera

lG

WIP

OU

GB

14W

-17-

8-22

|OU

GB

14W

-17-

8-22

SESW

1708

0S22

0E43

0473

4550

1355

0IF

eder

alG

WIP

OU

GB

11W

-17-

8-22

|OU

GB

11W

-17-

8-22

NES

W17

080S

220E

4304

7345

53|1

3671

Fede

ral

GW

|PO

UG

B14

W-2

9-8-

22|O

UG

B14

W-2

9-8-

22SE

SW29

080S

220E

4304

7345

54|1

3528

Fede

ral

GW

IPO

UG

B2W

-17-

8-22

OU

GB

2W-1

7-8-

22IN

WN

E17

080S

220E

4304

7345

5913

539

Fede

ral

GW

IPO

UG

B7W

-17-

8-22

OU

GB

7W-1

7-8-

22SW

NE

1708

0S22

0E43

0473

4560

1359

9Fe

dera

l|G

WIP

OU

GB

16W

-18-

8-22

|OU

GB

16W

-18-

8-22

|SÈS

E18

080S

220E

4304

7345

6313

559

Fede

ral

|GW

IP

OU

GB

1W-2

9-8-

22O

UG

BlW

-29-

8-22

NEN

E29

|080

S22

0E43

0473

45_7

313

562

Fede

ral

IGW

IP

OU

GB

7W-2

9-8-

22O

UG

B7W

-29-

8-22

SWN

E29

|080

Si

220E

|430

4734

574

1356

4Fe

dera

lIG

WP

OU

GB

8W-2

9-8-

22O

UG

B8W

-29-

8-22

SEN

E29

|080

Si

220E

I43

0473

4575

1360

9Fe

dera

lIG

WS

OU

GB

9W-2

9-8-

22O

UG

B9W

-29-

8-22

NES

E29

080S

220E

4304

7345

7613

551

Fede

ral

.GW

IP

OU

GB

10W

-29-

8-22

|OU

GB

10W

-29-

8-22

NW

SE29

|080

S22

0E|

4304

7345

7713

594

Fede

ral

|GW

|PO

UG

B15

W-2

9-8-

22O

UG

B15

W-2

9-8-

22IS

WSE

29|0

80S

220E

|43

0473

4578

1356

9Fe

dera

l|G

W|P

OU

GB

2W-2

0-8-

22O

UG

B2W

-20-

8-22

NW

NE

20|0

80S

I 220

EI

4304

7345

9913

664

Fede

ral

|GW

IPO

UG

B2W

-29-

8-22

OU

GB

2W-2

9-8-

22N

WN

E29

|080

S22

0EI

4304

7346

0013

691

Fede

ral

GW

IPO

UG

B15

W-1

7-8-

22O

UG

B15

W-1

7-8-

22SW

SE17

|080

S22

0E43

0473

4601

1363

2Fe

dera

lG

W_

PO

UG

B16

W-1

7-8-

22O

UG

B16

W-1

7-8-

22SE

SE17

|080

S22

0E|

4304

7346

0213

639

Fede

ral

|GW

IP

OU

GB

16W

-29-

8-22

OU

GB

16W

-29-

8-22

SESE

29Í0

80S

220E

|43

0473

4603

1361

0Fe

dera

l'G

WP

OU

GB

1W-2

0-8-

22O

UG

BlW

-20-

8-22

NEN

E20

080S

I22

0EI

4304

7346

0413

612

Fede

ral

'GW

,PO

UG

B1W

-17-

8-22

OU

GB

lW-1

7-8-

22N

ENE

1708

0S22

0E43

0473

4623

1370

1Fe

dera

l' G

WP

OU

GB

9W-1

7-8-

22O

UG

B9W

-17-

8-22

NES

E17

080S

220E

|43

0473

4624

1366

3IF

eder

alG

WP

OU

GB

10W

-17-

8-22

IOU

GB

10W

-17-

8-22

NW

SE17

080S

I220

E|

4304

7346

2513

684

|Fed

eral

GW

|PO

UG

B9W

-20-

8-22

OU

GB

9W-2

0-8-

22N

ESE

2008

0SI2

20E

|430

4734

630

1363

7IF

eder

alG

WIP

OU

GB

10W

-20-

8-22

OU

GB

10W

-20-

8-22

NW

SE20

080S

I 220

EI4

3047

3463

113

682

IFed

eral

GW

of8

QEP

Uin

taB

asin

(N24

60)

toQ

UES

TAR

Ean

dP

(N50

85)

4/30

/200

7an

d5/

15/2

007

Orig

inal

Wel

lN

ame

Wel

lNam

e&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

ILea

seW

ell

Type

|Sta

tus

GB

lW-3

0-8-

22O

UG

B1W

308

22N

ENE

|30

080S

220E

|430

4734

528

1348

7|F

eder

aliG

WIP

GB

3W-3

0-8-

22O

UG

B3W

308

22N

ENW

I30

080S

220E

I43

0473

4529

1349

3Fe

dera

lG

WIP

GB

6W-3

0-8-

22O

UG

B6W

308

22SE

NW

I30

080S

220E

I43

0473

4530

1351

9Fe

dera

lG

WIP

GB

7W-3

0-8-

22O

UG

B7W

308

22SW

NE

3008

0S22

0E43

0473

4531

1349

4Fe

dera

lIG

W|P

GB

8W-3

0-8-

22O

UG

B8W

308

22SE

NE

|30

080S

220E

|43

0473

4532

1348

3|F

eder

alG

W|P

GB

9W-3

0-8-

22IO

UG

B9W

308

22N

ESE

I30

080S

220E

I43

0473

4533

1350

0|F

eder

al|G

WP

OU

GB

6W-1

9-8-

22IO

UG

B6W

-19-

8-22

SEN

WI

1908

0S22

0EI 4

3047

3453

413

475

IFed

eral

IGW

PO

UG

B10

W-1

9-8-

22O

UG

B10

W-1

9-8-

22N

WSE

1908

0S22

0EI

4304

7345

3513

479

Fede

ral

IGW

PO

UG

B13

W-1

9-8-

22|O

UG

B13

W-1

9-8-

22SW

SW19

080S

220E

|430

4734

536

1347

8Fe

dera

lG

WIP

OU

GB

14W

-19-

8-22

IOU

GB

14W

-19-

8-22

SESW

I19

i08

0S22

0EI

4304

7345

3713

484

|Fed

eral

iGW

IPO

UG

B15

W-1

9-8-

22O

UG

B15

W-1

9-8-

22IS

WSE

I19

I 080

S22

0EI 4

3047

3453

813

482

|Fed

eral

.GW

IPO

UG

B12

W-1

7-8-

22O

UG

B12

W-1

7-8-

22N

WSW

17|0

80S

220E

4304

7345

4213

543

Fede

ral

IGW

PO

UG

B6W

-17-

8-22

|OU

GB

6W-1

7-8-

22SE

NW

|17

|080

S22

0E43

0473

4543

1353

6|F

eder

al¡G

W|P

OU

GB

13W

-17-

8-22

|OU

GB

13W

-17-

8-22

SWSW

1708

0S22

0E|4

3047

3454

413

547

.Fed

eral

iGW

IPO

UG

B6W

-29-

8-22

IOU

GB

6W-2

9-8-

22,S

ENW

2908

0S22

0EI

4304

7345

4513

535

IFed

eral

GW

IPO

UG

B3W

-29-

8-22

OU

GB

3W-2

9-8-

22N

ENW

2908

0S22

0E|

4304

7345

4613

509

IFed

eral

GW

PO

UG

B13

W-2

9-8-

22IO

UG

B13

W-2

9-8-

22SW

SW29

080S

220E

4304

7345

4713

506

IFed

eral

GW

|PO

UG

B4W

-29-

8-22

IOU

GB

4W-2

9-8-

22N

WN

W29

080S

220E

I43

0473

4548

1353

4Fe

dera

lG

W|P

OU

GB

5W-2

9-8-

22|O

UG

B5W

-29-

8-22

SWN

W29

080S

220E

I43

0473

4549

1350

5Fe

dera

lG

WIP

OU

GB

14W

-17-

8-22

|OU

GB

14W

-17-

8-22

SESW

1708

0S22

0E43

0473

4550

1355

0IF

eder

alG

WIP

OU

GB

11W

-17-

8-22

|OU

GB

11W

-17-

8-22

NES

W17

080S

220E

4304

7345

53|1

3671

Fede

ral

GW

|PO

UG

B14

W-2

9-8-

22|O

UG

B14

W-2

9-8-

22SE

SW29

080S

220E

4304

7345

54|1

3528

Fede

ral

GW

IPO

UG

B2W

-17-

8-22

OU

GB

2W-1

7-8-

22IN

WN

E17

080S

220E

4304

7345

5913

539

Fede

ral

GW

IPO

UG

B7W

-17-

8-22

OU

GB

7W-1

7-8-

22SW

NE

1708

0S22

0E43

0473

4560

1359

9Fe

dera

l|G

WIP

OU

GB

16W

-18-

8-22

|OU

GB

16W

-18-

8-22

|SÈS

E18

080S

220E

4304

7345

6313

559

Fede

ral

|GW

IP

OU

GB

1W-2

9-8-

22O

UG

BlW

-29-

8-22

NEN

E29

|080

S22

0E43

0473

45_7

313

562

Fede

ral

IGW

IP

OU

GB

7W-2

9-8-

22O

UG

B7W

-29-

8-22

SWN

E29

|080

Si

220E

|430

4734

574

1356

4Fe

dera

lIG

WP

OU

GB

8W-2

9-8-

22O

UG

B8W

-29-

8-22

SEN

E29

|080

Si

220E

I43

0473

4575

1360

9Fe

dera

lIG

WS

OU

GB

9W-2

9-8-

22O

UG

B9W

-29-

8-22

NES

E29

080S

220E

4304

7345

7613

551

Fede

ral

.GW

IP

OU

GB

10W

-29-

8-22

|OU

GB

10W

-29-

8-22

NW

SE29

|080

S22

0E|

4304

7345

7713

594

Fede

ral

|GW

|PO

UG

B15

W-2

9-8-

22O

UG

B15

W-2

9-8-

22IS

WSE

29|0

80S

220E

|43

0473

4578

1356

9Fe

dera

l|G

W|P

OU

GB

2W-2

0-8-

22O

UG

B2W

-20-

8-22

NW

NE

20|0

80S

I 220

EI

4304

7345

9913

664

Fede

ral

|GW

IPO

UG

B2W

-29-

8-22

OU

GB

2W-2

9-8-

22N

WN

E29

|080

S22

0EI

4304

7346

0013

691

Fede

ral

GW

IPO

UG

B15

W-1

7-8-

22O

UG

B15

W-1

7-8-

22SW

SE17

|080

S22

0E43

0473

4601

1363

2Fe

dera

lG

W_

PO

UG

B16

W-1

7-8-

22O

UG

B16

W-1

7-8-

22SE

SE17

|080

S22

0E|

4304

7346

0213

639

Fede

ral

|GW

IP

OU

GB

16W

-29-

8-22

OU

GB

16W

-29-

8-22

SESE

29Í0

80S

220E

|43

0473

4603

1361

0Fe

dera

l'G

WP

OU

GB

1W-2

0-8-

22O

UG

BlW

-20-

8-22

NEN

E20

080S

I22

0EI

4304

7346

0413

612

Fede

ral

'GW

,PO

UG

B1W

-17-

8-22

OU

GB

lW-1

7-8-

22N

ENE

1708

0S22

0E43

0473

4623

1370

1Fe

dera

l' G

WP

OU

GB

9W-1

7-8-

22O

UG

B9W

-17-

8-22

NES

E17

080S

220E

|43

0473

4624

1366

3IF

eder

alG

WP

OU

GB

10W

-17-

8-22

IOU

GB

10W

-17-

8-22

NW

SE17

080S

I220

E|

4304

7346

2513

684

|Fed

eral

GW

|PO

UG

B9W

-20-

8-22

OU

GB

9W-2

0-8-

22N

ESE

2008

0SI2

20E

|430

4734

630

1363

7IF

eder

alG

WIP

OU

GB

10W

-20-

8-22

OU

GB

10W

-20-

8-22

NW

SE20

080S

I 220

EI4

3047

3463

113

682

IFed

eral

GW

Page 39: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

4of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elÏR

ame&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

OU

GB

15W

-20-

8-22

OU

GB

15W

-20-

8-22

SWSE

Í20

080S

220E

4304

7346

32|1

3613

iFed

eral

GW

,PW

IH15

MU

-21-

8-22

OU

WIH

15M

U21

822

SWSE

i21

080S

I 220

EI

4304

7346

3413

991

Fede

ral

'GW

IPO

UW

IH13

W-2

1-8-

22O

UW

IH13

W-2

1-8-

22SW

SWI

2108

0S22

0E43

0473

4646

1374

5|F

eder

al|G

W|P

OU

GB

11W

-15-

8-22

OU

GB

11W

-15-

8-22

NES

WI

1508

0S|2

20E

|43

0473

4648

1382

2|F

eder

al|G

WIP

OU

GB

13W

-9-8

-22

OU

GB

13W

-9-8

-22

SWSW

0908

0SI2

20E

4304

7346

5413

706

IFed

eral

IGW

IPO

UW

IH14

W-2

1-8-

22O

UW

IH14

W-2

1-8-

22SE

SW21

080S

I 220

Ei

4304

7346

6413

720

IFed

eral

IGW

IPO

UG

B12

WX

-29-

8-22

OU

GB

12W

X-2

9-8-

22N

WSW

2908

0S22

0E43

0473

4668

1355

5Fe

dera

lG

WIP

OU

WIH

10W

-21-

8-22

OU

WIH

10W

-21-

8-22

NW

SE21

080S

|220

E|

4304

7346

8113

662

|Fed

eral

|GW

|PO

UG

B4G

-21-

8-22

OU

GB

4G-2

1-8-

22N

WN

W21

080S

I220

E43

0473

4685

1377

2|F

eder

alIO

W|P

OU

GB

3W-2

1-8-

22O

UG

B3W

-21-

8-22

NEN

W21

080S

I 220

E43

0473

4686

1374

6IF

eder

alIG

WIP

OU

GB

16SG

-30-

8-22

OU

GB

16SG

-30-

8-22

SESE

3008

0S22

0E43

0473

4688

1359

3IF

eder

alG

WIS

OU

WIH

7W-2

1-8-

22O

UW

IH7W

-21-

8-22

SWN

E21

080S

220E

4304

7346

8913

716

|Fed

eral

GW

iPO

UG

B5W

-21-

8-22

OU

GB

5W-2

1-8-

22SW

NW

2108

0S22

0Ei

4304

7346

9013

770

IFed

eral

GW

.PW

IH1M

U-2

1-8-

22W

IH1M

U-2

1-8-

22N

ENE

2108

0SI 2

20E

i43

0473

4693

1400

1'F

eder

alG

WIP

OU

GB

5G-1

9-8-

22O

UG

B5G

-19-

8-22

SWN

W19

| 080

S22

0E[

4304

7346

9513

786

IFed

eral

OW

PO

UG

B7W

-20-

8-22

OU

GB

7W-2

0-8-

22SW

NE

2008

0S22

0E|4

3047

3470

513

710

IFed

eral

GW

.PO

USG

14W

-15-

8-22

OU

SG14

W-1

5-8-

22SE

SW15

|080

S22

0E|4

3047

3471

013

821

Fede

ral

GW

IP

OU

SG15

W-1

5-8-

22O

USG

15W

-15-

8-22

SWSE

1508

0S22

0E43

0473

4711

1379

0Fe

dera

l|G

WIP

OU

SG16

W-1

5-8-

22O

USG

16W

-15-

8-22

SESE

1508

0S22

0E43

0473

4712

1382

0Fe

dera

lIG

WiP

OU

SG4W

-15-

8-22

OU

SG4W

-15-

8-22

NW

NW

1508

0S22

0E43

0473

4713

1377

5'F

eder

alIG

WiP

OU

SG12

W-1

5-8-

22O

USG

12W

-15-

8-22

NW

SW15

080S

220E

4304

7347

1413

838

Fede

ral

GW

PO

UG

B5M

U-1

5-8-

22O

UG

B5M

U-1

5-8-

22SW

NW

1508

0Si

220E

4304

7347

15|1

3900

Fede

ral

GW

IPO

USG

8W-1

5-8-

22O

USG

8W-1

5-8-

22SE

NE

15I 0

80S

I220

E43

0473

4717

|138

19Fe

dera

lG

WiP

OU

SG9W

-15-

8-22

OU

SG9W

-15-

8-22

NES

E15

080S

220E

4304

7347

1813

773

Fede

ral

GW

OU

SG10

W-1

5-8-

22O

USG

10W

-15-

8-22

NW

SE15

080S

220E

4304

7347

1913

722

Fede

ral

GW

PO

USG

2MU

-15-

8-22

OU

SG2M

U-1

5-8-

22N

WN

E15

|080

S|2

20E

4304

7347

2113

887

Fede

ral

GW

PO

USG

7W-1

5-8-

22O

USG

7W-1

5-8-

22SW

NE

15I

080S

|220

E43

0473

4722

1392

0IF

eder

alG

WP

OU

GB

14SG

-29-

8-22

OU

GB

14SG

-29-

8-22

SESW

2908

0SI 2

20E

4304

7347

4314

034

IFed

eral

GW

PO

UG

B16

SG-2

9-8-

22O

UG

B16

SG-2

9-8-

22SE

SE|

2908

0Si

220E

4304

7347

4413

771

|Fed

eral

GW

PO

UG

B13

W-1

0-8-

22O

UG

B13

W-1

0-8-

22SW

SW|

1008

0S|2

20E

4304

7347

5413

774

Fede

ral

G_W

_P

OU

GB

6MU

-21-

8-22

OU

GB

6MU

-21-

8-22

SEN

W21

080S

i22

0E43

0473

4755

1401

2Fe

dera

lG

WP

OU

SG10

W-1

0-8-

22O

USG

10W

-10-

8-22

NW

SE10

080S

I 220

E43

0473

4764

1375

1Fe

dera

lG

WP

OU

GB

14M

-10-

8-22

OU

GB

14M

-10-

8-22

SESW

10' 08

0Si

220E

4304

7347

6813

849

Fede

ral

ÖW

PO

USG

9W-1

0-8-

22O

USG

9W-1

0-8-

22N

ESE

10i

080S

|220

E|

4304

7347

8313

725

Fede

ral

GW

PO

USG

16W

-10-

8-22

OU

SG16

W-1

0-8-

22SE

SE10

|080

SI

220E

|430

4734

784

1378

1Fe

dera

lG

WP

GB

3M-2

7-8-

21G

B3M

-27-

8-21

NEN

W27

,08

0SI 2

10E

4304

7349

0014

614

'Fed

eral

GW

PW

VX

11D

-22-

8-21

WV

X11

D-2

2-8-

21N

ESW

22i

080S

210E

4304

7349

0214

632

Fede

ral

GW

,DR

LG

B11

M-2

7-8-

21G

B11

M-2

7-8-

21N

ESW

27' 08

0S21

0E43

0473

4952

1380

9,F

eder

alIG

WP

GB

9D-2

7-8-

21G

B9D

-27-

8-21

NES

E27

080S

|210

E43

0473

4956

|146

33|F

eder

al|G

W|D

RL

GB

1D-2

7-8-

21G

B1D

-27-

8-21

|NEN

E27

080S

I210

E43

0473

4957

i14

634

|Fed

eral

GW

DR

LW

RU

EIH

2M-3

5-8-

22W

RU

EIH

2M-3

5-8-

22[N

WN

E35

080S

I220

E43

0473

5052

1393

1Fe

dera

lIG

WIP

GY

PSU

MH

ILLS

12M

U-2

0-8-

21IG

H12

MU

2082

1IN

WSW

20- 0

80S

210E

4304

7350

69'

1412

9Fe

dera

lIG

W

4of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elÏR

ame&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

OU

GB

15W

-20-

8-22

OU

GB

15W

-20-

8-22

SWSE

Í20

080S

220E

4304

7346

32|1

3613

iFed

eral

GW

,PW

IH15

MU

-21-

8-22

OU

WIH

15M

U21

822

SWSE

i21

080S

I 220

EI

4304

7346

3413

991

Fede

ral

'GW

IPO

UW

IH13

W-2

1-8-

22O

UW

IH13

W-2

1-8-

22SW

SWI

2108

0S22

0E43

0473

4646

1374

5|F

eder

al|G

W|P

OU

GB

11W

-15-

8-22

OU

GB

11W

-15-

8-22

NES

WI

1508

0S|2

20E

|43

0473

4648

1382

2|F

eder

al|G

WIP

OU

GB

13W

-9-8

-22

OU

GB

13W

-9-8

-22

SWSW

0908

0SI2

20E

4304

7346

5413

706

IFed

eral

IGW

IPO

UW

IH14

W-2

1-8-

22O

UW

IH14

W-2

1-8-

22SE

SW21

080S

I 220

Ei

4304

7346

6413

720

IFed

eral

IGW

IPO

UG

B12

WX

-29-

8-22

OU

GB

12W

X-2

9-8-

22N

WSW

2908

0S22

0E43

0473

4668

1355

5Fe

dera

lG

WIP

OU

WIH

10W

-21-

8-22

OU

WIH

10W

-21-

8-22

NW

SE21

080S

|220

E|

4304

7346

8113

662

|Fed

eral

|GW

|PO

UG

B4G

-21-

8-22

OU

GB

4G-2

1-8-

22N

WN

W21

080S

I220

E43

0473

4685

1377

2|F

eder

alIO

W|P

OU

GB

3W-2

1-8-

22O

UG

B3W

-21-

8-22

NEN

W21

080S

I 220

E43

0473

4686

1374

6IF

eder

alIG

WIP

OU

GB

16SG

-30-

8-22

OU

GB

16SG

-30-

8-22

SESE

3008

0S22

0E43

0473

4688

1359

3IF

eder

alG

WIS

OU

WIH

7W-2

1-8-

22O

UW

IH7W

-21-

8-22

SWN

E21

080S

220E

4304

7346

8913

716

|Fed

eral

GW

iPO

UG

B5W

-21-

8-22

OU

GB

5W-2

1-8-

22SW

NW

2108

0S22

0Ei

4304

7346

9013

770

IFed

eral

GW

.PW

IH1M

U-2

1-8-

22W

IH1M

U-2

1-8-

22N

ENE

2108

0SI 2

20E

i43

0473

4693

1400

1'F

eder

alG

WIP

OU

GB

5G-1

9-8-

22O

UG

B5G

-19-

8-22

SWN

W19

| 080

S22

0E[

4304

7346

9513

786

IFed

eral

OW

PO

UG

B7W

-20-

8-22

OU

GB

7W-2

0-8-

22SW

NE

2008

0S22

0E|4

3047

3470

513

710

IFed

eral

GW

.PO

USG

14W

-15-

8-22

OU

SG14

W-1

5-8-

22SE

SW15

|080

S22

0E|4

3047

3471

013

821

Fede

ral

GW

IP

OU

SG15

W-1

5-8-

22O

USG

15W

-15-

8-22

SWSE

1508

0S22

0E43

0473

4711

1379

0Fe

dera

l|G

WIP

OU

SG16

W-1

5-8-

22O

USG

16W

-15-

8-22

SESE

1508

0S22

0E43

0473

4712

1382

0Fe

dera

lIG

WiP

OU

SG4W

-15-

8-22

OU

SG4W

-15-

8-22

NW

NW

1508

0S22

0E43

0473

4713

1377

5'F

eder

alIG

WiP

OU

SG12

W-1

5-8-

22O

USG

12W

-15-

8-22

NW

SW15

080S

220E

4304

7347

1413

838

Fede

ral

GW

PO

UG

B5M

U-1

5-8-

22O

UG

B5M

U-1

5-8-

22SW

NW

1508

0Si

220E

4304

7347

15|1

3900

Fede

ral

GW

IPO

USG

8W-1

5-8-

22O

USG

8W-1

5-8-

22SE

NE

15I 0

80S

I220

E43

0473

4717

|138

19Fe

dera

lG

WiP

OU

SG9W

-15-

8-22

OU

SG9W

-15-

8-22

NES

E15

080S

220E

4304

7347

1813

773

Fede

ral

GW

OU

SG10

W-1

5-8-

22O

USG

10W

-15-

8-22

NW

SE15

080S

220E

4304

7347

1913

722

Fede

ral

GW

PO

USG

2MU

-15-

8-22

OU

SG2M

U-1

5-8-

22N

WN

E15

|080

S|2

20E

4304

7347

2113

887

Fede

ral

GW

PO

USG

7W-1

5-8-

22O

USG

7W-1

5-8-

22SW

NE

15I

080S

|220

E43

0473

4722

1392

0IF

eder

alG

WP

OU

GB

14SG

-29-

8-22

OU

GB

14SG

-29-

8-22

SESW

2908

0SI 2

20E

4304

7347

4314

034

IFed

eral

GW

PO

UG

B16

SG-2

9-8-

22O

UG

B16

SG-2

9-8-

22SE

SE|

2908

0Si

220E

4304

7347

4413

771

|Fed

eral

GW

PO

UG

B13

W-1

0-8-

22O

UG

B13

W-1

0-8-

22SW

SW|

1008

0S|2

20E

4304

7347

5413

774

Fede

ral

G_W

_P

OU

GB

6MU

-21-

8-22

OU

GB

6MU

-21-

8-22

SEN

W21

080S

i22

0E43

0473

4755

1401

2Fe

dera

lG

WP

OU

SG10

W-1

0-8-

22O

USG

10W

-10-

8-22

NW

SE10

080S

I 220

E43

0473

4764

1375

1Fe

dera

lG

WP

OU

GB

14M

-10-

8-22

OU

GB

14M

-10-

8-22

SESW

10' 08

0Si

220E

4304

7347

6813

849

Fede

ral

ÖW

PO

USG

9W-1

0-8-

22O

USG

9W-1

0-8-

22N

ESE

10i

080S

|220

E|

4304

7347

8313

725

Fede

ral

GW

PO

USG

16W

-10-

8-22

OU

SG16

W-1

0-8-

22SE

SE10

|080

SI

220E

|430

4734

784

1378

1Fe

dera

lG

WP

GB

3M-2

7-8-

21G

B3M

-27-

8-21

NEN

W27

,08

0SI 2

10E

4304

7349

0014

614

'Fed

eral

GW

PW

VX

11D

-22-

8-21

WV

X11

D-2

2-8-

21N

ESW

22i

080S

210E

4304

7349

0214

632

Fede

ral

GW

,DR

LG

B11

M-2

7-8-

21G

B11

M-2

7-8-

21N

ESW

27' 08

0S21

0E43

0473

4952

1380

9,F

eder

alIG

WP

GB

9D-2

7-8-

21G

B9D

-27-

8-21

NES

E27

080S

|210

E43

0473

4956

|146

33|F

eder

al|G

W|D

RL

GB

1D-2

7-8-

21G

B1D

-27-

8-21

|NEN

E27

080S

I210

E43

0473

4957

i14

634

|Fed

eral

GW

DR

LW

RU

EIH

2M-3

5-8-

22W

RU

EIH

2M-3

5-8-

22[N

WN

E35

080S

I220

E43

0473

5052

1393

1Fe

dera

lIG

WIP

GY

PSU

MH

ILLS

12M

U-2

0-8-

21IG

H12

MU

2082

1IN

WSW

20- 0

80S

210E

4304

7350

69'

1412

9Fe

dera

lIG

W

4of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elÏR

ame&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

OU

GB

15W

-20-

8-22

OU

GB

15W

-20-

8-22

SWSE

Í20

080S

220E

4304

7346

32|1

3613

iFed

eral

GW

,PW

IH15

MU

-21-

8-22

OU

WIH

15M

U21

822

SWSE

i21

080S

I 220

EI

4304

7346

3413

991

Fede

ral

'GW

IPO

UW

IH13

W-2

1-8-

22O

UW

IH13

W-2

1-8-

22SW

SWI

2108

0S22

0E43

0473

4646

1374

5|F

eder

al|G

W|P

OU

GB

11W

-15-

8-22

OU

GB

11W

-15-

8-22

NES

WI

1508

0S|2

20E

|43

0473

4648

1382

2|F

eder

al|G

WIP

OU

GB

13W

-9-8

-22

OU

GB

13W

-9-8

-22

SWSW

0908

0SI2

20E

4304

7346

5413

706

IFed

eral

IGW

IPO

UW

IH14

W-2

1-8-

22O

UW

IH14

W-2

1-8-

22SE

SW21

080S

I 220

Ei

4304

7346

6413

720

IFed

eral

IGW

IPO

UG

B12

WX

-29-

8-22

OU

GB

12W

X-2

9-8-

22N

WSW

2908

0S22

0E43

0473

4668

1355

5Fe

dera

lG

WIP

OU

WIH

10W

-21-

8-22

OU

WIH

10W

-21-

8-22

NW

SE21

080S

|220

E|

4304

7346

8113

662

|Fed

eral

|GW

|PO

UG

B4G

-21-

8-22

OU

GB

4G-2

1-8-

22N

WN

W21

080S

I220

E43

0473

4685

1377

2|F

eder

alIO

W|P

OU

GB

3W-2

1-8-

22O

UG

B3W

-21-

8-22

NEN

W21

080S

I 220

E43

0473

4686

1374

6IF

eder

alIG

WIP

OU

GB

16SG

-30-

8-22

OU

GB

16SG

-30-

8-22

SESE

3008

0S22

0E43

0473

4688

1359

3IF

eder

alG

WIS

OU

WIH

7W-2

1-8-

22O

UW

IH7W

-21-

8-22

SWN

E21

080S

220E

4304

7346

8913

716

|Fed

eral

GW

iPO

UG

B5W

-21-

8-22

OU

GB

5W-2

1-8-

22SW

NW

2108

0S22

0Ei

4304

7346

9013

770

IFed

eral

GW

.PW

IH1M

U-2

1-8-

22W

IH1M

U-2

1-8-

22N

ENE

2108

0SI 2

20E

i43

0473

4693

1400

1'F

eder

alG

WIP

OU

GB

5G-1

9-8-

22O

UG

B5G

-19-

8-22

SWN

W19

| 080

S22

0E[

4304

7346

9513

786

IFed

eral

OW

PO

UG

B7W

-20-

8-22

OU

GB

7W-2

0-8-

22SW

NE

2008

0S22

0E|4

3047

3470

513

710

IFed

eral

GW

.PO

USG

14W

-15-

8-22

OU

SG14

W-1

5-8-

22SE

SW15

|080

S22

0E|4

3047

3471

013

821

Fede

ral

GW

IP

OU

SG15

W-1

5-8-

22O

USG

15W

-15-

8-22

SWSE

1508

0S22

0E43

0473

4711

1379

0Fe

dera

l|G

WIP

OU

SG16

W-1

5-8-

22O

USG

16W

-15-

8-22

SESE

1508

0S22

0E43

0473

4712

1382

0Fe

dera

lIG

WiP

OU

SG4W

-15-

8-22

OU

SG4W

-15-

8-22

NW

NW

1508

0S22

0E43

0473

4713

1377

5'F

eder

alIG

WiP

OU

SG12

W-1

5-8-

22O

USG

12W

-15-

8-22

NW

SW15

080S

220E

4304

7347

1413

838

Fede

ral

GW

PO

UG

B5M

U-1

5-8-

22O

UG

B5M

U-1

5-8-

22SW

NW

1508

0Si

220E

4304

7347

15|1

3900

Fede

ral

GW

IPO

USG

8W-1

5-8-

22O

USG

8W-1

5-8-

22SE

NE

15I 0

80S

I220

E43

0473

4717

|138

19Fe

dera

lG

WiP

OU

SG9W

-15-

8-22

OU

SG9W

-15-

8-22

NES

E15

080S

220E

4304

7347

1813

773

Fede

ral

GW

OU

SG10

W-1

5-8-

22O

USG

10W

-15-

8-22

NW

SE15

080S

220E

4304

7347

1913

722

Fede

ral

GW

PO

USG

2MU

-15-

8-22

OU

SG2M

U-1

5-8-

22N

WN

E15

|080

S|2

20E

4304

7347

2113

887

Fede

ral

GW

PO

USG

7W-1

5-8-

22O

USG

7W-1

5-8-

22SW

NE

15I

080S

|220

E43

0473

4722

1392

0IF

eder

alG

WP

OU

GB

14SG

-29-

8-22

OU

GB

14SG

-29-

8-22

SESW

2908

0SI 2

20E

4304

7347

4314

034

IFed

eral

GW

PO

UG

B16

SG-2

9-8-

22O

UG

B16

SG-2

9-8-

22SE

SE|

2908

0Si

220E

4304

7347

4413

771

|Fed

eral

GW

PO

UG

B13

W-1

0-8-

22O

UG

B13

W-1

0-8-

22SW

SW|

1008

0S|2

20E

4304

7347

5413

774

Fede

ral

G_W

_P

OU

GB

6MU

-21-

8-22

OU

GB

6MU

-21-

8-22

SEN

W21

080S

i22

0E43

0473

4755

1401

2Fe

dera

lG

WP

OU

SG10

W-1

0-8-

22O

USG

10W

-10-

8-22

NW

SE10

080S

I 220

E43

0473

4764

1375

1Fe

dera

lG

WP

OU

GB

14M

-10-

8-22

OU

GB

14M

-10-

8-22

SESW

10' 08

0Si

220E

4304

7347

6813

849

Fede

ral

ÖW

PO

USG

9W-1

0-8-

22O

USG

9W-1

0-8-

22N

ESE

10i

080S

|220

E|

4304

7347

8313

725

Fede

ral

GW

PO

USG

16W

-10-

8-22

OU

SG16

W-1

0-8-

22SE

SE10

|080

SI

220E

|430

4734

784

1378

1Fe

dera

lG

WP

GB

3M-2

7-8-

21G

B3M

-27-

8-21

NEN

W27

,08

0SI 2

10E

4304

7349

0014

614

'Fed

eral

GW

PW

VX

11D

-22-

8-21

WV

X11

D-2

2-8-

21N

ESW

22i

080S

210E

4304

7349

0214

632

Fede

ral

GW

,DR

LG

B11

M-2

7-8-

21G

B11

M-2

7-8-

21N

ESW

27' 08

0S21

0E43

0473

4952

1380

9,F

eder

alIG

WP

GB

9D-2

7-8-

21G

B9D

-27-

8-21

NES

E27

080S

|210

E43

0473

4956

|146

33|F

eder

al|G

W|D

RL

GB

1D-2

7-8-

21G

B1D

-27-

8-21

|NEN

E27

080S

I210

E43

0473

4957

i14

634

|Fed

eral

GW

DR

LW

RU

EIH

2M-3

5-8-

22W

RU

EIH

2M-3

5-8-

22[N

WN

E35

080S

I220

E43

0473

5052

1393

1Fe

dera

lIG

WIP

GY

PSU

MH

ILLS

12M

U-2

0-8-

21IG

H12

MU

2082

1IN

WSW

20- 0

80S

210E

4304

7350

69'

1412

9Fe

dera

lIG

W

4of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elÏR

ame&

No.

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

OU

GB

15W

-20-

8-22

OU

GB

15W

-20-

8-22

SWSE

Í20

080S

220E

4304

7346

32|1

3613

iFed

eral

GW

,PW

IH15

MU

-21-

8-22

OU

WIH

15M

U21

822

SWSE

i21

080S

I 220

EI

4304

7346

3413

991

Fede

ral

'GW

IPO

UW

IH13

W-2

1-8-

22O

UW

IH13

W-2

1-8-

22SW

SWI

2108

0S22

0E43

0473

4646

1374

5|F

eder

al|G

W|P

OU

GB

11W

-15-

8-22

OU

GB

11W

-15-

8-22

NES

WI

1508

0S|2

20E

|43

0473

4648

1382

2|F

eder

al|G

WIP

OU

GB

13W

-9-8

-22

OU

GB

13W

-9-8

-22

SWSW

0908

0SI2

20E

4304

7346

5413

706

IFed

eral

IGW

IPO

UW

IH14

W-2

1-8-

22O

UW

IH14

W-2

1-8-

22SE

SW21

080S

I 220

Ei

4304

7346

6413

720

IFed

eral

IGW

IPO

UG

B12

WX

-29-

8-22

OU

GB

12W

X-2

9-8-

22N

WSW

2908

0S22

0E43

0473

4668

1355

5Fe

dera

lG

WIP

OU

WIH

10W

-21-

8-22

OU

WIH

10W

-21-

8-22

NW

SE21

080S

|220

E|

4304

7346

8113

662

|Fed

eral

|GW

|PO

UG

B4G

-21-

8-22

OU

GB

4G-2

1-8-

22N

WN

W21

080S

I220

E43

0473

4685

1377

2|F

eder

alIO

W|P

OU

GB

3W-2

1-8-

22O

UG

B3W

-21-

8-22

NEN

W21

080S

I 220

E43

0473

4686

1374

6IF

eder

alIG

WIP

OU

GB

16SG

-30-

8-22

OU

GB

16SG

-30-

8-22

SESE

3008

0S22

0E43

0473

4688

1359

3IF

eder

alG

WIS

OU

WIH

7W-2

1-8-

22O

UW

IH7W

-21-

8-22

SWN

E21

080S

220E

4304

7346

8913

716

|Fed

eral

GW

iPO

UG

B5W

-21-

8-22

OU

GB

5W-2

1-8-

22SW

NW

2108

0S22

0Ei

4304

7346

9013

770

IFed

eral

GW

.PW

IH1M

U-2

1-8-

22W

IH1M

U-2

1-8-

22N

ENE

2108

0SI 2

20E

i43

0473

4693

1400

1'F

eder

alG

WIP

OU

GB

5G-1

9-8-

22O

UG

B5G

-19-

8-22

SWN

W19

| 080

S22

0E[

4304

7346

9513

786

IFed

eral

OW

PO

UG

B7W

-20-

8-22

OU

GB

7W-2

0-8-

22SW

NE

2008

0S22

0E|4

3047

3470

513

710

IFed

eral

GW

.PO

USG

14W

-15-

8-22

OU

SG14

W-1

5-8-

22SE

SW15

|080

S22

0E|4

3047

3471

013

821

Fede

ral

GW

IP

OU

SG15

W-1

5-8-

22O

USG

15W

-15-

8-22

SWSE

1508

0S22

0E43

0473

4711

1379

0Fe

dera

l|G

WIP

OU

SG16

W-1

5-8-

22O

USG

16W

-15-

8-22

SESE

1508

0S22

0E43

0473

4712

1382

0Fe

dera

lIG

WiP

OU

SG4W

-15-

8-22

OU

SG4W

-15-

8-22

NW

NW

1508

0S22

0E43

0473

4713

1377

5'F

eder

alIG

WiP

OU

SG12

W-1

5-8-

22O

USG

12W

-15-

8-22

NW

SW15

080S

220E

4304

7347

1413

838

Fede

ral

GW

PO

UG

B5M

U-1

5-8-

22O

UG

B5M

U-1

5-8-

22SW

NW

1508

0Si

220E

4304

7347

15|1

3900

Fede

ral

GW

IPO

USG

8W-1

5-8-

22O

USG

8W-1

5-8-

22SE

NE

15I 0

80S

I220

E43

0473

4717

|138

19Fe

dera

lG

WiP

OU

SG9W

-15-

8-22

OU

SG9W

-15-

8-22

NES

E15

080S

220E

4304

7347

1813

773

Fede

ral

GW

OU

SG10

W-1

5-8-

22O

USG

10W

-15-

8-22

NW

SE15

080S

220E

4304

7347

1913

722

Fede

ral

GW

PO

USG

2MU

-15-

8-22

OU

SG2M

U-1

5-8-

22N

WN

E15

|080

S|2

20E

4304

7347

2113

887

Fede

ral

GW

PO

USG

7W-1

5-8-

22O

USG

7W-1

5-8-

22SW

NE

15I

080S

|220

E43

0473

4722

1392

0IF

eder

alG

WP

OU

GB

14SG

-29-

8-22

OU

GB

14SG

-29-

8-22

SESW

2908

0SI 2

20E

4304

7347

4314

034

IFed

eral

GW

PO

UG

B16

SG-2

9-8-

22O

UG

B16

SG-2

9-8-

22SE

SE|

2908

0Si

220E

4304

7347

4413

771

|Fed

eral

GW

PO

UG

B13

W-1

0-8-

22O

UG

B13

W-1

0-8-

22SW

SW|

1008

0S|2

20E

4304

7347

5413

774

Fede

ral

G_W

_P

OU

GB

6MU

-21-

8-22

OU

GB

6MU

-21-

8-22

SEN

W21

080S

i22

0E43

0473

4755

1401

2Fe

dera

lG

WP

OU

SG10

W-1

0-8-

22O

USG

10W

-10-

8-22

NW

SE10

080S

I 220

E43

0473

4764

1375

1Fe

dera

lG

WP

OU

GB

14M

-10-

8-22

OU

GB

14M

-10-

8-22

SESW

10' 08

0Si

220E

4304

7347

6813

849

Fede

ral

ÖW

PO

USG

9W-1

0-8-

22O

USG

9W-1

0-8-

22N

ESE

10i

080S

|220

E|

4304

7347

8313

725

Fede

ral

GW

PO

USG

16W

-10-

8-22

OU

SG16

W-1

0-8-

22SE

SE10

|080

SI

220E

|430

4734

784

1378

1Fe

dera

lG

WP

GB

3M-2

7-8-

21G

B3M

-27-

8-21

NEN

W27

,08

0SI 2

10E

4304

7349

0014

614

'Fed

eral

GW

PW

VX

11D

-22-

8-21

WV

X11

D-2

2-8-

21N

ESW

22i

080S

210E

4304

7349

0214

632

Fede

ral

GW

,DR

LG

B11

M-2

7-8-

21G

B11

M-2

7-8-

21N

ESW

27' 08

0S21

0E43

0473

4952

1380

9,F

eder

alIG

WP

GB

9D-2

7-8-

21G

B9D

-27-

8-21

NES

E27

080S

|210

E43

0473

4956

|146

33|F

eder

al|G

W|D

RL

GB

1D-2

7-8-

21G

B1D

-27-

8-21

|NEN

E27

080S

I210

E43

0473

4957

i14

634

|Fed

eral

GW

DR

LW

RU

EIH

2M-3

5-8-

22W

RU

EIH

2M-3

5-8-

22[N

WN

E35

080S

I220

E43

0473

5052

1393

1Fe

dera

lIG

WIP

GY

PSU

MH

ILLS

12M

U-2

0-8-

21IG

H12

MU

2082

1IN

WSW

20- 0

80S

210E

4304

7350

69'

1412

9Fe

dera

lIG

W

Page 40: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

5of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

#Ny

Q/Q

SEC

TWP

RN

GA

PIi

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

SG4W

-11-

8-22

OU

SG4W

-11-

8-22

INW

NW

1108

0SI2

20E

4304

7350

7114

814

Fede

ral

IGW

|DR

LO

USG

5W-1

1-8-

22O

USG

5W-1

1-8-

22SW

NW

1108

0S22

0E43

0473

5072

.14

815

Fede

ral

GW

IDR

LO

USG

6W-1

1-8-

22SG

6ML

118

22_

__

SEN

W11

080S

220E

4304

7350

7314

825

Fede

ral

|GW

IPO

USG

5MU

-14-

8-22

OU

SG5M

U-1

4-8-

22SW

NW

14|0

80S

220E

4304

7350

7613

989

Fede

ral

¡GW

|PO

USG

6MU

-14-

8-22

OU

SG6M

U-1

4-8-

22SE

NW

14I0

80S

I220

E43

0473

5077

1412

8Fe

dera

lIG

WIP

SG12

MU

-14-

8-22

SG12

MU

-14-

8-22

NW

SW14

I 080

S22

0E43

0473

5078

1392

1Fe

dera

l'G

WP

OU

SG13

MU

-14-

8-22

OU

SG13

MU

-14-

8-22

SWSW

1408

0S22

0E43

0473

5079

,13

990

Fede

ral

'GW

PO

USG

9MU

-11-

8-22

OU

SG9M

U-1

1-8-

22N

ESE

1108

0S22

0E43

0473

5091

i13

967

Fede

ral

GW

PSG

11SG

-23-

8-22

SG11

SG-2

3-8-

22N

ESW

|23

|080

S22

0E43

0473

5099

|139

01Fe

dera

l_G

W_

SO

USG

14W

-11-

8-22

OU

SG14

W-1

1-8-

22SE

SW11

080S

220E

4304

7351

14|

1479

7Fe

dera

lG

WD

RL

SG5M

U-2

3-8-

22SG

5MU

-23-

8-22

SWN

W23

080S

220E

4304

7351

1514

368

Fede

ral

GW

PSG

6MU

-23-

8-22

SG6M

U-2

3-8-

22SE

NW

|23

|080

S22

0E43

0473

5116

1423

1Fe

dera

lG

WP

SG14

MU

-23-

8-22

SG14

MU

-23-

8-22

SESW

|23

|080

S22

0E43

0473

5117

|140

69IF

eder

alG

WP

SG13

MU

-23-

8-22

SG13

MU

-23-

8-22

SWSW

|23

|080

S22

0E43

0473

5190

| 141

03IF

eder

aliG

WiP

WH

7G-1

0-7-

24W

H7G

-10-

7-24

_SW

NE

I10

070S

240E

4304

7352

4114

002

Fede

ral

GW

PG

B4D

-28-

8-21

GB

4D-2

8-8-

21N

WN

W28

|080

S21

0E43

0473

5246

1464

5Fe

dera

l_

GW

PG

B7M

-28-

8-21

GB

7M-2

8-8-

21SW

NE

I28

|080

S|2

10E

|430

4735

247

1443

2|F

eder

alIG

W|P

GB

14M

-28-

8-21

GB

14M

-28-

8-21

SESW

28|0

80S

210E

I43

0473

5248

1399

2|F

eder

alG

WiP

SG11

MU

-23-

8-22

SG11

MU

-23-

8-22

NES

W.

2308

0SI 2

20E

I 430

4735

257

1397

3IF

eder

alG

WIP

SG15

MU

-14-

8-22

SG15

MU

-14-

8-22

SWSE

1408

0S22

0E43

0473

5328

1433

8Fe

dal

GW

PEI

HX

14M

U-2

5-8-

22EI

HX

14M

U-2

5-8-

22SE

SWi

2508

0S|2

20E

4304

7353

3014

501

Fede

ral

GW

PEI

HX

11M

U-2

5-8-

22EI

HX

11M

U-2

5-8-

22N

ESW

I25

080S

220E

4304

7353

3114

470

Fede

ral

GW

PN

BE

12M

L-10

-9-2

3N

BE

12M

L-10

-9-2

3N

WSW

I10

090S

I 230

E43

0473

5333

1426

0Fe

dera

lG

WP

NB

E13

ML-

17-9

-23

NB

E13

ML-

17-9

-23

SWSW

1709

0S23

0E43

0473

5_S3

414

000

Fede

ral

GW

PN

BE

4ML-

26-9

-23

NB

E4M

L-26

-9-2

3N

WN

W|

26|0

90S

|230

E43

0473

5335

1421

5Fe

dera

lG

WP

SG7M

U-1

1-8-

22SG

7MU

-ll-8

-22

SWN

E11

|080

S|2

20E

4304

7353

7414

635

iFed

eral

GW

PSG

1MU

-11-

8-22

SG1M

U-ll

-8-2

2N

ENE

1108

0SI 2

20E

4304

7353

7514

279

'Fed

eral

__G

WP

OU

SG13

W-1

1-8-

22O

USG

13W

-11-

8-22

SWSW

1108

0S22

0E43

0473

5377

1479

6Fe

dera

lG

WD

RL

SG3M

U-1

1-8-

22SG

3MU

-ll-8

-22

NEN

W11

080S

220E

4304

7353

7914

978

IFed

eral

IGW

PSG

8MU

-11-

8-22

SG8M

U-ll

-8-2

2SE

NE

1108

0S|2

20E

4304

7353

8014

616

Fede

ral

.GW

PSG

2MU

-11-

8-22

SG2M

U-ll

-8-2

2N

WN

E11

i08

0SI2

20E

4304

7353

8114

636

iFed

er1

GW

IPSG

10M

U-1

1-8-

22SG

10M

U-1

1-8-

22N

WSE

11i

080S

220E

4304

7353

8214

979

Fede

ral

GW

PO

UG

B8M

U-1

0-8-

22|O

UG

B8M

U-1

0-8-

22SE

NE

10'

080S

220E

4304

7354

2215

321

IFed

eral

GW

D¯R

Ï

EIH

X2M

U-2

5-8-

22|E

IHX

2MU

-25-

8-22

NW

NE

25|

080S

220E

4304

7354

2714

666

IFed

eral

GW

,PEI

HX

1MU

-25-

8-22

EIH

X1M

U-2

5-8-

22N

ENE

25I

080S

|220

E43

0473

54_2

8_

1470

5IF

eder

alG

W|P

EIH

X7M

U-2

5-8-

22_

EIH

X7M

U-2

5-8-

22,SW

NE

25I

080S

I220

E43

0473

5429

1468

2iF

eder

alG

W|P

EIH

X8M

U-2

5-8-

22EI

HX

8MU

-25-

8-22

SEN

E25

i08

0SI 2

20E

4304

7354

3014

706

Fede

ral

GW

IPEI

HX

9MU

-25-

8-22

|EIH

X9M

U-2

5-8-

22N

ESE

2508

0S22

0E43

0473

5433

1455

8Fe

dera

lW

PEI

HX

16M

U-2

5-8-

22|E

IHX

16M

U-2

5-8-

22|S

ESE

25|0

80S

|220

E43

0473

5434

|145

02Fe

dera

l|G

WP

EIH

X15

MU

-25-

8-22

|EIH

X15

MU

-25-

8-22

SWSE

25I0

80S

|220

E43

0473

5_43

5I

1457

1Fe

dera

l|G

WP

EIH

X10

MU

-25-

8-22

EIH

X10

MU

-25-

8-22

NW

SE25

I 080

SI 2

20E

4304

7354

3614

537

Fede

ral

IGW

PG

B3M

U-3

-8-2

2G

B3M

U-3

-8-2

2N

ENW

03I 0

80S

I 220

E43

0473

5457

1457

5Fe

dera

lIG

W

5of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

#Ny

Q/Q

SEC

TWP

RN

GA

PIi

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

SG4W

-11-

8-22

OU

SG4W

-11-

8-22

INW

NW

1108

0SI2

20E

4304

7350

7114

814

Fede

ral

IGW

|DR

LO

USG

5W-1

1-8-

22O

USG

5W-1

1-8-

22SW

NW

1108

0S22

0E43

0473

5072

.14

815

Fede

ral

GW

IDR

LO

USG

6W-1

1-8-

22SG

6ML

118

22_

__

SEN

W11

080S

220E

4304

7350

7314

825

Fede

ral

|GW

IP

OU

SG5M

U-1

4-8-

22O

USG

5MU

-14-

8-22

SWN

W14

|080

S22

0E43

0473

5076

1398

9Fe

dera

l¡G

W|P

OU

SG6M

U-1

4-8-

22O

USG

6MU

-14-

8-22

SEN

W14

I080

SI2

20E

4304

7350

7714

128

Fede

ral

IGW

IP

SG12

MU

-14-

8-22

SG12

MU

-14-

8-22

NW

SW14

I 080

S22

0E43

0473

5078

1392

1Fe

dera

l'G

WP

OU

SG13

MU

-14-

8-22

OU

SG13

MU

-14-

8-22

SWSW

1408

0S22

0E43

0473

5079

,13

990

Fede

ral

'GW

PO

USG

9MU

-11-

8-22

OU

SG9M

U-1

1-8-

22N

ESE

1108

0S22

0E43

0473

5091

i13

967

Fede

ral

GW

PSG

11SG

-23-

8-22

SG11

SG-2

3-8-

22N

ESW

|23

|080

S22

0E43

0473

5099

|139

01Fe

dera

l_G

W_

SO

USG

14W

-11-

8-22

OU

SG14

W-1

1-8-

22SE

SW11

080S

220E

4304

7351

14|

1479

7Fe

dera

lG

WD

RL

SG5M

U-2

3-8-

22SG

5MU

-23-

8-22

SWN

W23

080S

220E

4304

7351

1514

368

Fede

ral

GW

PSG

6MU

-23-

8-22

SG6M

U-2

3-8-

22SE

NW

|23

|080

S22

0E43

0473

5116

1423

1Fe

dera

lG

WP

SG14

MU

-23-

8-22

SG14

MU

-23-

8-22

SESW

|23

|080

S22

0E43

0473

5117

|140

69IF

eder

alG

WP

SG13

MU

-23-

8-22

SG13

MU

-23-

8-22

SWSW

|23

|080

S22

0E43

0473

5190

| 141

03IF

eder

aliG

WiP

WH

7G-1

0-7-

24W

H7G

-10-

7-24

_SW

NE

I10

070S

240E

4304

7352

4114

002

Fede

ral

GW

PG

B4D

-28-

8-21

GB

4D-2

8-8-

21N

WN

W28

|080

S21

0E43

0473

5246

1464

5Fe

dera

l_

GW

PG

B7M

-28-

8-21

GB

7M-2

8-8-

21SW

NE

I28

|080

S|2

10E

|430

4735

247

1443

2|F

eder

alIG

W|P

GB

14M

-28-

8-21

GB

14M

-28-

8-21

SESW

28|0

80S

210E

I43

0473

5248

1399

2|F

eder

alG

WiP

SG11

MU

-23-

8-22

SG11

MU

-23-

8-22

NES

W.

2308

0SI 2

20E

I 430

4735

257

1397

3IF

eder

alG

WIP

SG15

MU

-14-

8-22

SG15

MU

-14-

8-22

SWSE

1408

0S22

0E43

0473

5328

1433

8Fe

dal

GW

PEI

HX

14M

U-2

5-8-

22EI

HX

14M

U-2

5-8-

22SE

SWi

2508

0S|2

20E

4304

7353

3014

501

Fede

ral

GW

PEI

HX

11M

U-2

5-8-

22EI

HX

11M

U-2

5-8-

22N

ESW

I25

080S

220E

4304

7353

3114

470

Fede

ral

GW

PN

BE

12M

L-10

-9-2

3N

BE

12M

L-10

-9-2

3N

WSW

I10

090S

I 230

E43

0473

5333

1426

0Fe

dera

lG

WP

NB

E13

ML-

17-9

-23

NB

E13

ML-

17-9

-23

SWSW

1709

0S23

0E43

0473

5_S3

414

000

Fede

ral

GW

PN

BE

4ML-

26-9

-23

NB

E4M

L-26

-9-2

3N

WN

W|

26|0

90S

|230

E43

0473

5335

1421

5Fe

dera

lG

WP

SG7M

U-1

1-8-

22SG

7MU

-ll-8

-22

SWN

E11

|080

S|2

20E

4304

7353

7414

635

iFed

eral

GW

PSG

1MU

-11-

8-22

SG1M

U-ll

-8-2

2N

ENE

1108

0SI 2

20E

4304

7353

7514

279

'Fed

eral

__G

WP

OU

SG13

W-1

1-8-

22O

USG

13W

-11-

8-22

SWSW

1108

0S22

0E43

0473

5377

1479

6Fe

dera

lG

WD

RL

SG3M

U-1

1-8-

22SG

3MU

-ll-8

-22

NEN

W11

080S

220E

4304

7353

7914

978

IFed

eral

IGW

PSG

8MU

-11-

8-22

SG8M

U-ll

-8-2

2SE

NE

1108

0S|2

20E

4304

7353

8014

616

Fede

ral

.GW

PSG

2MU

-11-

8-22

SG2M

U-ll

-8-2

2N

WN

E11

i08

0SI2

20E

4304

7353

8114

636

iFed

er1

GW

IPSG

10M

U-1

1-8-

22SG

10M

U-1

1-8-

22N

WSE

11i

080S

220E

4304

7353

8214

979

Fede

ral

GW

PO

UG

B8M

U-1

0-8-

22|O

UG

B8M

U-1

0-8-

22SE

NE

10'

080S

220E

4304

7354

2215

321

IFed

eral

GW

D¯R

Ï

EIH

X2M

U-2

5-8-

22|E

IHX

2MU

-25-

8-22

NW

NE

25|

080S

220E

4304

7354

2714

666

IFed

eral

GW

,PEI

HX

1MU

-25-

8-22

EIH

X1M

U-2

5-8-

22N

ENE

25I

080S

|220

E43

0473

54_2

8_

1470

5IF

eder

alG

W|P

EIH

X7M

U-2

5-8-

22_

EIH

X7M

U-2

5-8-

22,SW

NE

25I

080S

I220

E43

0473

5429

1468

2iF

eder

alG

W|P

EIH

X8M

U-2

5-8-

22EI

HX

8MU

-25-

8-22

SEN

E25

i08

0SI 2

20E

4304

7354

3014

706

Fede

ral

GW

IPEI

HX

9MU

-25-

8-22

|EIH

X9M

U-2

5-8-

22N

ESE

2508

0S22

0E43

0473

5433

1455

8Fe

dera

lW

PEI

HX

16M

U-2

5-8-

22|E

IHX

16M

U-2

5-8-

22|S

ESE

25|0

80S

|220

E43

0473

5434

|145

02Fe

dera

l|G

WP

EIH

X15

MU

-25-

8-22

|EIH

X15

MU

-25-

8-22

SWSE

25I0

80S

|220

E43

0473

5_43

5I

1457

1Fe

dera

l|G

WP

EIH

X10

MU

-25-

8-22

EIH

X10

MU

-25-

8-22

NW

SE25

I 080

SI 2

20E

4304

7354

3614

537

Fede

ral

IGW

PG

B3M

U-3

-8-2

2G

B3M

U-3

-8-2

2N

ENW

03I 0

80S

I 220

E43

0473

5457

1457

5Fe

dera

lIG

W

5of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

#Ny

Q/Q

SEC

TWP

RN

GA

PIi

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

SG4W

-11-

8-22

OU

SG4W

-11-

8-22

INW

NW

1108

0SI2

20E

4304

7350

7114

814

Fede

ral

IGW

|DR

LO

USG

5W-1

1-8-

22O

USG

5W-1

1-8-

22SW

NW

1108

0S22

0E43

0473

5072

.14

815

Fede

ral

GW

IDR

LO

USG

6W-1

1-8-

22SG

6ML

118

22_

__

SEN

W11

080S

220E

4304

7350

7314

825

Fede

ral

|GW

IPO

USG

5MU

-14-

8-22

OU

SG5M

U-1

4-8-

22SW

NW

14|0

80S

220E

4304

7350

7613

989

Fede

ral

¡GW

|PO

USG

6MU

-14-

8-22

OU

SG6M

U-1

4-8-

22SE

NW

14I0

80S

I220

E43

0473

5077

1412

8Fe

dera

lIG

WIP

SG12

MU

-14-

8-22

SG12

MU

-14-

8-22

NW

SW14

I 080

S22

0E43

0473

5078

1392

1Fe

dera

l'G

WP

OU

SG13

MU

-14-

8-22

OU

SG13

MU

-14-

8-22

SWSW

1408

0S22

0E43

0473

5079

,13

990

Fede

ral

'GW

PO

USG

9MU

-11-

8-22

OU

SG9M

U-1

1-8-

22N

ESE

1108

0S22

0E43

0473

5091

i13

967

Fede

ral

GW

PSG

11SG

-23-

8-22

SG11

SG-2

3-8-

22N

ESW

|23

|080

S22

0E43

0473

5099

|139

01Fe

dera

l_G

W_

SO

USG

14W

-11-

8-22

OU

SG14

W-1

1-8-

22SE

SW11

080S

220E

4304

7351

14|

1479

7Fe

dera

lG

WD

RL

SG5M

U-2

3-8-

22SG

5MU

-23-

8-22

SWN

W23

080S

220E

4304

7351

1514

368

Fede

ral

GW

PSG

6MU

-23-

8-22

SG6M

U-2

3-8-

22SE

NW

|23

|080

S22

0E43

0473

5116

1423

1Fe

dera

lG

WP

SG14

MU

-23-

8-22

SG14

MU

-23-

8-22

SESW

|23

|080

S22

0E43

0473

5117

|140

69IF

eder

alG

WP

SG13

MU

-23-

8-22

SG13

MU

-23-

8-22

SWSW

|23

|080

S22

0E43

0473

5190

| 141

03IF

eder

aliG

WiP

WH

7G-1

0-7-

24W

H7G

-10-

7-24

_SW

NE

I10

070S

240E

4304

7352

4114

002

Fede

ral

GW

PG

B4D

-28-

8-21

GB

4D-2

8-8-

21N

WN

W28

|080

S21

0E43

0473

5246

1464

5Fe

dera

l_

GW

PG

B7M

-28-

8-21

GB

7M-2

8-8-

21SW

NE

I28

|080

S|2

10E

|430

4735

247

1443

2|F

eder

alIG

W|P

GB

14M

-28-

8-21

GB

14M

-28-

8-21

SESW

28|0

80S

210E

I43

0473

5248

1399

2|F

eder

alG

WiP

SG11

MU

-23-

8-22

SG11

MU

-23-

8-22

NES

W.

2308

0SI 2

20E

I 430

4735

257

1397

3IF

eder

alG

WIP

SG15

MU

-14-

8-22

SG15

MU

-14-

8-22

SWSE

1408

0S22

0E43

0473

5328

1433

8Fe

dal

GW

PEI

HX

14M

U-2

5-8-

22EI

HX

14M

U-2

5-8-

22SE

SWi

2508

0S|2

20E

4304

7353

3014

501

Fede

ral

GW

PEI

HX

11M

U-2

5-8-

22EI

HX

11M

U-2

5-8-

22N

ESW

I25

080S

220E

4304

7353

3114

470

Fede

ral

GW

PN

BE

12M

L-10

-9-2

3N

BE

12M

L-10

-9-2

3N

WSW

I10

090S

I 230

E43

0473

5333

1426

0Fe

dera

lG

WP

NB

E13

ML-

17-9

-23

NB

E13

ML-

17-9

-23

SWSW

1709

0S23

0E43

0473

5_S3

414

000

Fede

ral

GW

PN

BE

4ML-

26-9

-23

NB

E4M

L-26

-9-2

3N

WN

W|

26|0

90S

|230

E43

0473

5335

1421

5Fe

dera

lG

WP

SG7M

U-1

1-8-

22SG

7MU

-ll-8

-22

SWN

E11

|080

S|2

20E

4304

7353

7414

635

iFed

eral

GW

PSG

1MU

-11-

8-22

SG1M

U-ll

-8-2

2N

ENE

1108

0SI 2

20E

4304

7353

7514

279

'Fed

eral

__G

WP

OU

SG13

W-1

1-8-

22O

USG

13W

-11-

8-22

SWSW

1108

0S22

0E43

0473

5377

1479

6Fe

dera

lG

WD

RL

SG3M

U-1

1-8-

22SG

3MU

-ll-8

-22

NEN

W11

080S

220E

4304

7353

7914

978

IFed

eral

IGW

PSG

8MU

-11-

8-22

SG8M

U-ll

-8-2

2SE

NE

1108

0S|2

20E

4304

7353

8014

616

Fede

ral

.GW

PSG

2MU

-11-

8-22

SG2M

U-ll

-8-2

2N

WN

E11

i08

0SI2

20E

4304

7353

8114

636

iFed

er1

GW

IPSG

10M

U-1

1-8-

22SG

10M

U-1

1-8-

22N

WSE

11i

080S

220E

4304

7353

8214

979

Fede

ral

GW

PO

UG

B8M

U-1

0-8-

22|O

UG

B8M

U-1

0-8-

22SE

NE

10'

080S

220E

4304

7354

2215

321

IFed

eral

GW

D¯R

Ï

EIH

X2M

U-2

5-8-

22|E

IHX

2MU

-25-

8-22

NW

NE

25|

080S

220E

4304

7354

2714

666

IFed

eral

GW

,PEI

HX

1MU

-25-

8-22

EIH

X1M

U-2

5-8-

22N

ENE

25I

080S

|220

E43

0473

54_2

8_

1470

5IF

eder

alG

W|P

EIH

X7M

U-2

5-8-

22_

EIH

X7M

U-2

5-8-

22,SW

NE

25I

080S

I220

E43

0473

5429

1468

2iF

eder

alG

W|P

EIH

X8M

U-2

5-8-

22EI

HX

8MU

-25-

8-22

SEN

E25

i08

0SI 2

20E

4304

7354

3014

706

Fede

ral

GW

IPEI

HX

9MU

-25-

8-22

|EIH

X9M

U-2

5-8-

22N

ESE

2508

0S22

0E43

0473

5433

1455

8Fe

dera

lW

PEI

HX

16M

U-2

5-8-

22|E

IHX

16M

U-2

5-8-

22|S

ESE

25|0

80S

|220

E43

0473

5434

|145

02Fe

dera

l|G

WP

EIH

X15

MU

-25-

8-22

|EIH

X15

MU

-25-

8-22

SWSE

25I0

80S

|220

E43

0473

5_43

5I

1457

1Fe

dera

l|G

WP

EIH

X10

MU

-25-

8-22

EIH

X10

MU

-25-

8-22

NW

SE25

I 080

SI 2

20E

4304

7354

3614

537

Fede

ral

IGW

PG

B3M

U-3

-8-2

2G

B3M

U-3

-8-2

2N

ENW

03I 0

80S

I 220

E43

0473

5457

1457

5Fe

dera

lIG

W

5of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

SO85

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

#Ny

Q/Q

SEC

TWP

RN

GA

PIi

Entit

yLe

ase

Wel

lTy

peSt

atus

OU

SG4W

-11-

8-22

OU

SG4W

-11-

8-22

INW

NW

1108

0SI2

20E

4304

7350

7114

814

Fede

ral

IGW

|DR

LO

USG

5W-1

1-8-

22O

USG

5W-1

1-8-

22SW

NW

1108

0S22

0E43

0473

5072

.14

815

Fede

ral

GW

IDR

LO

USG

6W-1

1-8-

22SG

6ML

118

22_

__

SEN

W11

080S

220E

4304

7350

7314

825

Fede

ral

|GW

IPO

USG

5MU

-14-

8-22

OU

SG5M

U-1

4-8-

22SW

NW

14|0

80S

220E

4304

7350

7613

989

Fede

ral

¡GW

|PO

USG

6MU

-14-

8-22

OU

SG6M

U-1

4-8-

22SE

NW

14I0

80S

I220

E43

0473

5077

1412

8Fe

dera

lIG

WIP

SG12

MU

-14-

8-22

SG12

MU

-14-

8-22

NW

SW14

I 080

S22

0E43

0473

5078

1392

1Fe

dera

l'G

WP

OU

SG13

MU

-14-

8-22

OU

SG13

MU

-14-

8-22

SWSW

1408

0S22

0E43

0473

5079

,13

990

Fede

ral

'GW

PO

USG

9MU

-11-

8-22

OU

SG9M

U-1

1-8-

22N

ESE

1108

0S22

0E43

0473

5091

i13

967

Fede

ral

GW

PSG

11SG

-23-

8-22

SG11

SG-2

3-8-

22N

ESW

|23

|080

S22

0E43

0473

5099

|139

01Fe

dera

l_G

W_

SO

USG

14W

-11-

8-22

OU

SG14

W-1

1-8-

22SE

SW11

080S

220E

4304

7351

14|

1479

7Fe

dera

lG

WD

RL

SG5M

U-2

3-8-

22SG

5MU

-23-

8-22

SWN

W23

080S

220E

4304

7351

1514

368

Fede

ral

GW

PSG

6MU

-23-

8-22

SG6M

U-2

3-8-

22SE

NW

|23

|080

S22

0E43

0473

5116

1423

1Fe

dera

lG

WP

SG14

MU

-23-

8-22

SG14

MU

-23-

8-22

SESW

|23

|080

S22

0E43

0473

5117

|140

69IF

eder

alG

WP

SG13

MU

-23-

8-22

SG13

MU

-23-

8-22

SWSW

|23

|080

S22

0E43

0473

5190

| 141

03IF

eder

aliG

WiP

WH

7G-1

0-7-

24W

H7G

-10-

7-24

_SW

NE

I10

070S

240E

4304

7352

4114

002

Fede

ral

GW

PG

B4D

-28-

8-21

GB

4D-2

8-8-

21N

WN

W28

|080

S21

0E43

0473

5246

1464

5Fe

dera

l_

GW

PG

B7M

-28-

8-21

GB

7M-2

8-8-

21SW

NE

I28

|080

S|2

10E

|430

4735

247

1443

2|F

eder

alIG

W|P

GB

14M

-28-

8-21

GB

14M

-28-

8-21

SESW

28|0

80S

210E

I43

0473

5248

1399

2|F

eder

alG

WiP

SG11

MU

-23-

8-22

SG11

MU

-23-

8-22

NES

W.

2308

0SI 2

20E

I 430

4735

257

1397

3IF

eder

alG

WIP

SG15

MU

-14-

8-22

SG15

MU

-14-

8-22

SWSE

1408

0S22

0E43

0473

5328

1433

8Fe

dal

GW

PEI

HX

14M

U-2

5-8-

22EI

HX

14M

U-2

5-8-

22SE

SWi

2508

0S|2

20E

4304

7353

3014

501

Fede

ral

GW

PEI

HX

11M

U-2

5-8-

22EI

HX

11M

U-2

5-8-

22N

ESW

I25

080S

220E

4304

7353

3114

470

Fede

ral

GW

PN

BE

12M

L-10

-9-2

3N

BE

12M

L-10

-9-2

3N

WSW

I10

090S

I 230

E43

0473

5333

1426

0Fe

dera

lG

WP

NB

E13

ML-

17-9

-23

NB

E13

ML-

17-9

-23

SWSW

1709

0S23

0E43

0473

5_S3

414

000

Fede

ral

GW

PN

BE

4ML-

26-9

-23

NB

E4M

L-26

-9-2

3N

WN

W|

26|0

90S

|230

E43

0473

5335

1421

5Fe

dera

lG

WP

SG7M

U-1

1-8-

22SG

7MU

-ll-8

-22

SWN

E11

|080

S|2

20E

4304

7353

7414

635

iFed

eral

GW

PSG

1MU

-11-

8-22

SG1M

U-ll

-8-2

2N

ENE

1108

0SI 2

20E

4304

7353

7514

279

'Fed

eral

__G

WP

OU

SG13

W-1

1-8-

22O

USG

13W

-11-

8-22

SWSW

1108

0S22

0E43

0473

5377

1479

6Fe

dera

lG

WD

RL

SG3M

U-1

1-8-

22SG

3MU

-ll-8

-22

NEN

W11

080S

220E

4304

7353

7914

978

IFed

eral

IGW

PSG

8MU

-11-

8-22

SG8M

U-ll

-8-2

2SE

NE

1108

0S|2

20E

4304

7353

8014

616

Fede

ral

.GW

PSG

2MU

-11-

8-22

SG2M

U-ll

-8-2

2N

WN

E11

i08

0SI2

20E

4304

7353

8114

636

iFed

er1

GW

IPSG

10M

U-1

1-8-

22SG

10M

U-1

1-8-

22N

WSE

11i

080S

220E

4304

7353

8214

979

Fede

ral

GW

PO

UG

B8M

U-1

0-8-

22|O

UG

B8M

U-1

0-8-

22SE

NE

10'

080S

220E

4304

7354

2215

321

IFed

eral

GW

D¯R

Ï

EIH

X2M

U-2

5-8-

22|E

IHX

2MU

-25-

8-22

NW

NE

25|

080S

220E

4304

7354

2714

666

IFed

eral

GW

,PEI

HX

1MU

-25-

8-22

EIH

X1M

U-2

5-8-

22N

ENE

25I

080S

|220

E43

0473

54_2

8_

1470

5IF

eder

alG

W|P

EIH

X7M

U-2

5-8-

22_

EIH

X7M

U-2

5-8-

22,SW

NE

25I

080S

I220

E43

0473

5429

1468

2iF

eder

alG

W|P

EIH

X8M

U-2

5-8-

22EI

HX

8MU

-25-

8-22

SEN

E25

i08

0SI 2

20E

4304

7354

3014

706

Fede

ral

GW

IPEI

HX

9MU

-25-

8-22

|EIH

X9M

U-2

5-8-

22N

ESE

2508

0S22

0E43

0473

5433

1455

8Fe

dera

lW

PEI

HX

16M

U-2

5-8-

22|E

IHX

16M

U-2

5-8-

22|S

ESE

25|0

80S

|220

E43

0473

5434

|145

02Fe

dera

l|G

WP

EIH

X15

MU

-25-

8-22

|EIH

X15

MU

-25-

8-22

SWSE

25I0

80S

|220

E43

0473

5_43

5I

1457

1Fe

dera

l|G

WP

EIH

X10

MU

-25-

8-22

EIH

X10

MU

-25-

8-22

NW

SE25

I 080

SI 2

20E

4304

7354

3614

537

Fede

ral

IGW

PG

B3M

U-3

-8-2

2G

B3M

U-3

-8-2

2N

ENW

03I 0

80S

I 220

E43

0473

5457

1457

5Fe

dera

lIG

W

Page 41: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

6of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elln

ame

&N

o.Q

/QSE

CTW

P' R

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

NB

E15

M-1

7-9-

23N

BE

15M

-17-

9-23

SWSE

1709

0SI2

30E

_43

0473

5463

1442

3'F

eder

al'G

WIP

NB

E7M

L-17

-9-2

3N

BE

7ML-

17-9

-23

SWN

Ei

1709

0S|2

30E

·

4304

7354

6414

232

Fede

ral

IGW

PN

BE

3ML-

17-9

-23

NB

E3M

L-17

-9-2

3N

ENW

1709

0S23

0E.

4304

7354

6514

276

Fede

ral

¡GW

IPN

BE

11M

-17-

9-23

NB

E11

M-1

7-9-

23N

ESW

1709

0S23

0E43

0473

5466

1443

1Fe

dera

l|G

WP

NB

E10

ML-

10-9

-23

NB

E10

ML-

10-9

-23

NW

SE10

090S

,23

0E,

4304

7356

5014

377

Fede

ral

IGW

IPN

BE

6ML-

10-9

-23

NB

E6M

L-10

-9-2

3SE

NW

1009

0S.

230E

4304

7356

5114

422

Fede

ral

GW

NB

E12

ML-

17-9

-23

NB

E12

ML-

17-9

-23

NW

SW17

090S

I23

0E43

0473

5652

1427

8Fe

dera

lG

WIP

NB

E6M

L-26

-9-2

3N

BE

6ML-

26-9

-23

SEN

W26

090S

230E

4304

7356

6414

378

Fede

ral

GW

|PN

BE

11M

L-26

-9-2

3N

BE

11M

L-26

-9-2

3N

ESW

2609

0SI2

30E

4304

7356

6514

340

Fede

ral

GW

iPN

BE

15M

L-26

-9-2

3N

BE

15M

L-26

-9-2

3SW

SEI

2609

0SI 2

30E

.43

0473

5666

1432

6Fe

dera

lIG

WIP

SG4M

U-2

3-8-

22SG

4MU

-23-

8-22

NW

NW

2308

0S22

0E43

0473

5758

1438

0Fe

dera

l|G

W'P

RW

S8M

L-14

-9-2

4R

WS

8ML-

14-9

-24

SEN

E'

1409

0S|2

40E

4304

7358

0314

539

Fede

ral

GW

|SSG

llMU

-14-

8-22

SG11

MU

-14-

8-22

NES

W14

080S

220E

4304

7358

2914

486

Fede

ral

IGW

IPR

BD

SFE

D1G

-7-1

0-18

RB

DS

FED

1G-7

-10-

18N

ENE

I07

100S

180E

4304

7359

3214

457

Fede

ral

OW

SR

BD

SFE

D14

G-8

-10-

18R

BD

SFE

D14

G-8

-10-

18SE

SW,

0810

0S18

0E43

0473

5933

1443

3IF

eder

alIO

WIP

OU

SG14

MU

-14-

8-22

OU

SG14

MU

-14-

8-22

SESW

,14

080S

220E

.43

0473

5950

1447

9'F

eder

alIG

W|P

CO

Y10

ML-

14-8

-24

CO

Y10

ML-

14-8

-24

NW

SE1

1408

0S|2

40E

4304

7360

38Fe

dera

l¡G

W|A

PDC

OY

12M

L-24

-8-2

4C

OY

12M

L-24

-8-2

4N

WSW

|24

080S

I240

E43

0473

6039

1459

2Fe

dera

lIO

W|P

WIH

1AM

U-2

1-8-

22W

IHlA

MU

-21-

8-22

INEN

EI

2108

0SI2

20E

'43

0473

6060

1498

0Fe

dera

lIG

WIP

NB

E4M

L-10

-9-2

3N

BE

4ML-

10-9

-23

NW

NW

1009

0S23

0E.

4304

7360

9815

732

,Fed

eral

IGW

IPN

BE

8ML-

10-9

-23

NB

E8M

L-10

-9-2

3_

SEN

E10

090S

230E

4304

7360

9915

733

Fede

ral

IGW

PN

BE

16M

L-10

-9-2

3N

BE

16M

L-10

-9-2

3SE

SE10

090S

230E

4304

7361

0014

728

Fede

ral

GW

PN

BE

8ML-

12-9

-23

NB

E8M

L-12

-9-2

3SE

NE

1209

0SI 2

30E

4304

7361

4315

859

Fede

ral

GW

DR

LW

H12

G-1

1-7-

24W

H12

G-1

1-7-

24IN

WSW

.11

070S

|240

E43

0473

6195

Fede

ral

GW

APD

HC

16M

-6-7

-22

HC

16M

-6-7

-22

SESE

'06

070S

220E

4304

7361

97Fe

dera

lG

WA

PDH

C14

M-6

-7-2

2H

C14

M-6

-7-2

2SE

SW06

070S

220E

4304

7361

98Fe

dera

lG

W_

|APD

WW

T8M

L-25

-8-2

4W

WT

8ML-

25-8

-24

SEN

E.

2508

0S24

0EI

4304

7361

99II

¾de

ral

iGW

IAPD

GB

16D

-28-

8-21

GB

16D

-28-

8-21

ISES

E28

080S

210E

4304

7362

6014

981

Fede

ral

GW

IP

WH

7G-3

-7-2

4W

H7G

-3-7

-24

SWN

E03

070S

240E

4304

7363

47Fe

dera

lG

WA

PDN

BE

5ML-

10-9

-23

NB

E5M

L-10

-9-2

3SW

NW

1009

0S|2

30E

4304

7363

5315

227

Fede

ral

GW

|PN

BE

7ML-

10-9

-23

NB

E7M

L-10

-9-2

3|S

WN

E10

090S

|230

E43

0473

6355

1585

0Fe

dera

lG

WD

RL

NB

E3M

L-10

-9-2

3N

BE

3ML-

10-9

-23

NEN

W10

090S

I 230

E43

0473

6356

1539

3Fe

dera

lG

WP

WH

4G-1

0-7-

24W

H4G

-10-

7-24

NW

NW

1007

0S' 24

0E43

0473

6359

Fede

ral

GW

APD

EIH

X4M

U-3

6-8-

22EI

HX

4MU

-36-

8-22

NW

NW

|36

080S

220E

4304

7364

4414

875

Fede

ral

GW

PEI

HX

3MU

-36-

8-22

EIH

X3M

U-3

6-8-

22N

ENW

|36

080S

220E

4304

7364

4514

860

Fede

ral

|GW

PEI

HX

2MU

-36-

8-22

IEIH

X2M

U-3

6-8-

22N

WN

E36

080S

.22

0E43

0473

6446

1484

0Fe

dera

l|G

WP

EIH

X1M

U-3

6-8-

22EI

HX

1MU

-36-

8-22

NEN

E36

080S

220E

4304

7364

4714

861

Fede

ral

i GW

PW

WT

2ML-

24-8

-24

|WW

T2M

L-24

-8-2

4N

WN

E24

080S

240E

4304

7365

15Fe

dera

lG

WA

PDR

WS

1ML-

1-9-

24|R

WS

1ML-

1-9-

24N

ENE

0109

0S24

0E43

0473

6517

Fede

ral

GW

APD

RW

S3M

L-1-

9-24

IRW

S3M

L-1-

9-24

NEN

W01

090S

240E

4304

7365

18Fe

dera

liG

WA

PDR

WS

9ML-

1-9-

24|R

WS

9ML-

1-9-

24N

ESE

0109

0S24

0E43

0473

6519

IFed

eral

i GW

APD

RW

S15

ML-

1-9-

24|R

WS

15M

L-1-

9-24

SWSE

0109

0S24

0E43

0473

6521

.Fed

eral

IGW

6of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elln

ame

&N

o.Q

/QSE

CTW

P' R

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

NB

E15

M-1

7-9-

23N

BE

15M

-17-

9-23

SWSE

1709

0SI2

30E

_43

0473

5463

1442

3'F

eder

al'G

WIP

NB

E7M

L-17

-9-2

3N

BE

7ML-

17-9

-23

SWN

Ei

1709

0S|2

30E

·

4304

7354

6414

232

Fede

ral

IGW

PN

BE

3ML-

17-9

-23

NB

E3M

L-17

-9-2

3N

ENW

1709

0S23

0E.

4304

7354

6514

276

Fede

ral

¡GW

IPN

BE

11M

-17-

9-23

NB

E11

M-1

7-9-

23N

ESW

1709

0S23

0E43

0473

5466

1443

1Fe

dera

l|G

WP

NB

E10

ML-

10-9

-23

NB

E10

ML-

10-9

-23

NW

SE10

090S

,23

0E,

4304

7356

5014

377

Fede

ral

IGW

IPN

BE

6ML-

10-9

-23

NB

E6M

L-10

-9-2

3SE

NW

1009

0S.

230E

4304

7356

5114

422

Fede

ral

GW

NB

E12

ML-

17-9

-23

NB

E12

ML-

17-9

-23

NW

SW17

090S

I23

0E43

0473

5652

1427

8Fe

dera

lG

WIP

NB

E6M

L-26

-9-2

3N

BE

6ML-

26-9

-23

SEN

W26

090S

230E

4304

7356

6414

378

Fede

ral

GW

|PN

BE

11M

L-26

-9-2

3N

BE

11M

L-26

-9-2

3N

ESW

2609

0SI2

30E

4304

7356

6514

340

Fede

ral

GW

iPN

BE

15M

L-26

-9-2

3N

BE

15M

L-26

-9-2

3SW

SEI

2609

0SI 2

30E

.43

0473

5666

1432

6Fe

dera

lIG

WIP

SG4M

U-2

3-8-

22SG

4MU

-23-

8-22

NW

NW

2308

0S22

0E43

0473

5758

1438

0Fe

dera

l|G

W'P

RW

S8M

L-14

-9-2

4R

WS

8ML-

14-9

-24

SEN

E'

1409

0S|2

40E

4304

7358

0314

539

Fede

ral

GW

|SSG

llMU

-14-

8-22

SG11

MU

-14-

8-22

NES

W14

080S

220E

4304

7358

2914

486

Fede

ral

IGW

IPR

BD

SFE

D1G

-7-1

0-18

RB

DS

FED

1G-7

-10-

18N

ENE

I07

100S

180E

4304

7359

3214

457

Fede

ral

OW

SR

BD

SFE

D14

G-8

-10-

18R

BD

SFE

D14

G-8

-10-

18SE

SW,

0810

0S18

0E43

0473

5933

1443

3IF

eder

alIO

WIP

OU

SG14

MU

-14-

8-22

OU

SG14

MU

-14-

8-22

SESW

,14

080S

220E

.43

0473

5950

1447

9'F

eder

alIG

W|P

CO

Y10

ML-

14-8

-24

CO

Y10

ML-

14-8

-24

NW

SE1

1408

0S|2

40E

4304

7360

38Fe

dera

l¡G

W|A

PDC

OY

12M

L-24

-8-2

4C

OY

12M

L-24

-8-2

4N

WSW

|24

080S

I240

E43

0473

6039

1459

2Fe

dera

lIO

W|P

WIH

1AM

U-2

1-8-

22W

IHlA

MU

-21-

8-22

INEN

EI

2108

0SI2

20E

'43

0473

6060

1498

0Fe

dera

lIG

WIP

NB

E4M

L-10

-9-2

3N

BE

4ML-

10-9

-23

NW

NW

1009

0S23

0E.

4304

7360

9815

732

,Fed

eral

IGW

IPN

BE

8ML-

10-9

-23

NB

E8M

L-10

-9-2

3_

SEN

E10

090S

230E

4304

7360

9915

733

Fede

ral

IGW

PN

BE

16M

L-10

-9-2

3N

BE

16M

L-10

-9-2

3SE

SE10

090S

230E

4304

7361

0014

728

Fede

ral

GW

PN

BE

8ML-

12-9

-23

NB

E8M

L-12

-9-2

3SE

NE

1209

0SI 2

30E

4304

7361

4315

859

Fede

ral

GW

DR

LW

H12

G-1

1-7-

24W

H12

G-1

1-7-

24IN

WSW

.11

070S

|240

E43

0473

6195

Fede

ral

GW

APD

HC

16M

-6-7

-22

HC

16M

-6-7

-22

SESE

'06

070S

220E

4304

7361

97Fe

dera

lG

WA

PDH

C14

M-6

-7-2

2H

C14

M-6

-7-2

2SE

SW06

070S

220E

4304

7361

98Fe

dera

lG

W_

|APD

WW

T8M

L-25

-8-2

4W

WT

8ML-

25-8

-24

SEN

E.

2508

0S24

0EI

4304

7361

99II

¾de

ral

iGW

IAPD

GB

16D

-28-

8-21

GB

16D

-28-

8-21

ISES

E28

080S

210E

4304

7362

6014

981

Fede

ral

GW

IP

WH

7G-3

-7-2

4W

H7G

-3-7

-24

SWN

E03

070S

240E

4304

7363

47Fe

dera

lG

WA

PDN

BE

5ML-

10-9

-23

NB

E5M

L-10

-9-2

3SW

NW

1009

0S|2

30E

4304

7363

5315

227

Fede

ral

GW

|PN

BE

7ML-

10-9

-23

NB

E7M

L-10

-9-2

3|S

WN

E10

090S

|230

E43

0473

6355

1585

0Fe

dera

lG

WD

RL

NB

E3M

L-10

-9-2

3N

BE

3ML-

10-9

-23

NEN

W10

090S

I 230

E43

0473

6356

1539

3Fe

dera

lG

WP

WH

4G-1

0-7-

24W

H4G

-10-

7-24

NW

NW

1007

0S' 24

0E43

0473

6359

Fede

ral

GW

APD

EIH

X4M

U-3

6-8-

22EI

HX

4MU

-36-

8-22

NW

NW

|36

080S

220E

4304

7364

4414

875

Fede

ral

GW

PEI

HX

3MU

-36-

8-22

EIH

X3M

U-3

6-8-

22N

ENW

|36

080S

220E

4304

7364

4514

860

Fede

ral

|GW

PEI

HX

2MU

-36-

8-22

IEIH

X2M

U-3

6-8-

22N

WN

E36

080S

.22

0E43

0473

6446

1484

0Fe

dera

l|G

WP

EIH

X1M

U-3

6-8-

22EI

HX

1MU

-36-

8-22

NEN

E36

080S

220E

4304

7364

4714

861

Fede

ral

i GW

PW

WT

2ML-

24-8

-24

|WW

T2M

L-24

-8-2

4N

WN

E24

080S

240E

4304

7365

15Fe

dera

lG

WA

PDR

WS

1ML-

1-9-

24|R

WS

1ML-

1-9-

24N

ENE

0109

0S24

0E43

0473

6517

Fede

ral

GW

APD

RW

S3M

L-1-

9-24

IRW

S3M

L-1-

9-24

NEN

W01

090S

240E

4304

7365

18Fe

dera

liG

WA

PDR

WS

9ML-

1-9-

24|R

WS

9ML-

1-9-

24N

ESE

0109

0S24

0E43

0473

6519

IFed

eral

i GW

APD

RW

S15

ML-

1-9-

24|R

WS

15M

L-1-

9-24

SWSE

0109

0S24

0E43

0473

6521

.Fed

eral

IGW

6of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elln

ame

&N

o.Q

/QSE

CTW

P' R

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

NB

E15

M-1

7-9-

23N

BE

15M

-17-

9-23

SWSE

1709

0SI2

30E

_43

0473

5463

1442

3'F

eder

al'G

WIP

NB

E7M

L-17

-9-2

3N

BE

7ML-

17-9

-23

SWN

Ei

1709

0S|2

30E

·

4304

7354

6414

232

Fede

ral

IGW

PN

BE

3ML-

17-9

-23

NB

E3M

L-17

-9-2

3N

ENW

1709

0S23

0E.

4304

7354

6514

276

Fede

ral

¡GW

IPN

BE

11M

-17-

9-23

NB

E11

M-1

7-9-

23N

ESW

1709

0S23

0E43

0473

5466

1443

1Fe

dera

l|G

WP

NB

E10

ML-

10-9

-23

NB

E10

ML-

10-9

-23

NW

SE10

090S

,23

0E,

4304

7356

5014

377

Fede

ral

IGW

IPN

BE

6ML-

10-9

-23

NB

E6M

L-10

-9-2

3SE

NW

1009

0S.

230E

4304

7356

5114

422

Fede

ral

GW

NB

E12

ML-

17-9

-23

NB

E12

ML-

17-9

-23

NW

SW17

090S

I23

0E43

0473

5652

1427

8Fe

dera

lG

WIP

NB

E6M

L-26

-9-2

3N

BE

6ML-

26-9

-23

SEN

W26

090S

230E

4304

7356

6414

378

Fede

ral

GW

|PN

BE

11M

L-26

-9-2

3N

BE

11M

L-26

-9-2

3N

ESW

2609

0SI2

30E

4304

7356

6514

340

Fede

ral

GW

iPN

BE

15M

L-26

-9-2

3N

BE

15M

L-26

-9-2

3SW

SEI

2609

0SI 2

30E

.43

0473

5666

1432

6Fe

dera

lIG

WIP

SG4M

U-2

3-8-

22SG

4MU

-23-

8-22

NW

NW

2308

0S22

0E43

0473

5758

1438

0Fe

dera

l|G

W'P

RW

S8M

L-14

-9-2

4R

WS

8ML-

14-9

-24

SEN

E'

1409

0S|2

40E

4304

7358

0314

539

Fede

ral

GW

|SSG

llMU

-14-

8-22

SG11

MU

-14-

8-22

NES

W14

080S

220E

4304

7358

2914

486

Fede

ral

IGW

IPR

BD

SFE

D1G

-7-1

0-18

RB

DS

FED

1G-7

-10-

18N

ENE

I07

100S

180E

4304

7359

3214

457

Fede

ral

OW

SR

BD

SFE

D14

G-8

-10-

18R

BD

SFE

D14

G-8

-10-

18SE

SW,

0810

0S18

0E43

0473

5933

1443

3IF

eder

alIO

WIP

OU

SG14

MU

-14-

8-22

OU

SG14

MU

-14-

8-22

SESW

,14

080S

220E

.43

0473

5950

1447

9'F

eder

alIG

W|P

CO

Y10

ML-

14-8

-24

CO

Y10

ML-

14-8

-24

NW

SE1

1408

0S|2

40E

4304

7360

38Fe

dera

l¡G

W|A

PDC

OY

12M

L-24

-8-2

4C

OY

12M

L-24

-8-2

4N

WSW

|24

080S

I240

E43

0473

6039

1459

2Fe

dera

lIO

W|P

WIH

1AM

U-2

1-8-

22W

IHlA

MU

-21-

8-22

INEN

EI

2108

0SI2

20E

'43

0473

6060

1498

0Fe

dera

lIG

WIP

NB

E4M

L-10

-9-2

3N

BE

4ML-

10-9

-23

NW

NW

1009

0S23

0E.

4304

7360

9815

732

,Fed

eral

IGW

IPN

BE

8ML-

10-9

-23

NB

E8M

L-10

-9-2

3_

SEN

E10

090S

230E

4304

7360

9915

733

Fede

ral

IGW

PN

BE

16M

L-10

-9-2

3N

BE

16M

L-10

-9-2

3SE

SE10

090S

230E

4304

7361

0014

728

Fede

ral

GW

PN

BE

8ML-

12-9

-23

NB

E8M

L-12

-9-2

3SE

NE

1209

0SI 2

30E

4304

7361

4315

859

Fede

ral

GW

DR

LW

H12

G-1

1-7-

24W

H12

G-1

1-7-

24IN

WSW

.11

070S

|240

E43

0473

6195

Fede

ral

GW

APD

HC

16M

-6-7

-22

HC

16M

-6-7

-22

SESE

'06

070S

220E

4304

7361

97Fe

dera

lG

WA

PDH

C14

M-6

-7-2

2H

C14

M-6

-7-2

2SE

SW06

070S

220E

4304

7361

98Fe

dera

lG

W_

|APD

WW

T8M

L-25

-8-2

4W

WT

8ML-

25-8

-24

SEN

E.

2508

0S24

0EI

4304

7361

99II

¾de

ral

iGW

IAPD

GB

16D

-28-

8-21

GB

16D

-28-

8-21

ISES

E28

080S

210E

4304

7362

6014

981

Fede

ral

GW

IP

WH

7G-3

-7-2

4W

H7G

-3-7

-24

SWN

E03

070S

240E

4304

7363

47Fe

dera

lG

WA

PDN

BE

5ML-

10-9

-23

NB

E5M

L-10

-9-2

3SW

NW

1009

0S|2

30E

4304

7363

5315

227

Fede

ral

GW

|PN

BE

7ML-

10-9

-23

NB

E7M

L-10

-9-2

3|S

WN

E10

090S

|230

E43

0473

6355

1585

0Fe

dera

lG

WD

RL

NB

E3M

L-10

-9-2

3N

BE

3ML-

10-9

-23

NEN

W10

090S

I 230

E43

0473

6356

1539

3Fe

dera

lG

WP

WH

4G-1

0-7-

24W

H4G

-10-

7-24

NW

NW

1007

0S' 24

0E43

0473

6359

Fede

ral

GW

APD

EIH

X4M

U-3

6-8-

22EI

HX

4MU

-36-

8-22

NW

NW

|36

080S

220E

4304

7364

4414

875

Fede

ral

GW

PEI

HX

3MU

-36-

8-22

EIH

X3M

U-3

6-8-

22N

ENW

|36

080S

220E

4304

7364

4514

860

Fede

ral

|GW

PEI

HX

2MU

-36-

8-22

IEIH

X2M

U-3

6-8-

22N

WN

E36

080S

.22

0E43

0473

6446

1484

0Fe

dera

l|G

WP

EIH

X1M

U-3

6-8-

22EI

HX

1MU

-36-

8-22

NEN

E36

080S

220E

4304

7364

4714

861

Fede

ral

i GW

PW

WT

2ML-

24-8

-24

|WW

T2M

L-24

-8-2

4N

WN

E24

080S

240E

4304

7365

15Fe

dera

lG

WA

PDR

WS

1ML-

1-9-

24|R

WS

1ML-

1-9-

24N

ENE

0109

0S24

0E43

0473

6517

Fede

ral

GW

APD

RW

S3M

L-1-

9-24

IRW

S3M

L-1-

9-24

NEN

W01

090S

240E

4304

7365

18Fe

dera

liG

WA

PDR

WS

9ML-

1-9-

24|R

WS

9ML-

1-9-

24N

ESE

0109

0S24

0E43

0473

6519

IFed

eral

i GW

APD

RW

S15

ML-

1-9-

24|R

WS

15M

L-1-

9-24

SWSE

0109

0S24

0E43

0473

6521

.Fed

eral

IGW

6of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lNam

eW

elln

ame

&N

o.Q

/QSE

CTW

P' R

NG

API

Entit

yLe

ase

Wel

lTy

peSt

atus

NB

E15

M-1

7-9-

23N

BE

15M

-17-

9-23

SWSE

1709

0SI2

30E

_43

0473

5463

1442

3'F

eder

al'G

WIP

NB

E7M

L-17

-9-2

3N

BE

7ML-

17-9

-23

SWN

Ei

1709

0S|2

30E

·

4304

7354

6414

232

Fede

ral

IGW

PN

BE

3ML-

17-9

-23

NB

E3M

L-17

-9-2

3N

ENW

1709

0S23

0E.

4304

7354

6514

276

Fede

ral

¡GW

IPN

BE

11M

-17-

9-23

NB

E11

M-1

7-9-

23N

ESW

1709

0S23

0E43

0473

5466

1443

1Fe

dera

l|G

WP

NB

E10

ML-

10-9

-23

NB

E10

ML-

10-9

-23

NW

SE10

090S

,23

0E,

4304

7356

5014

377

Fede

ral

IGW

IPN

BE

6ML-

10-9

-23

NB

E6M

L-10

-9-2

3SE

NW

1009

0S.

230E

4304

7356

5114

422

Fede

ral

GW

NB

E12

ML-

17-9

-23

NB

E12

ML-

17-9

-23

NW

SW17

090S

I23

0E43

0473

5652

1427

8Fe

dera

lG

WIP

NB

E6M

L-26

-9-2

3N

BE

6ML-

26-9

-23

SEN

W26

090S

230E

4304

7356

6414

378

Fede

ral

GW

|PN

BE

11M

L-26

-9-2

3N

BE

11M

L-26

-9-2

3N

ESW

2609

0SI2

30E

4304

7356

6514

340

Fede

ral

GW

iPN

BE

15M

L-26

-9-2

3N

BE

15M

L-26

-9-2

3SW

SEI

2609

0SI 2

30E

.43

0473

5666

1432

6Fe

dera

lIG

WIP

SG4M

U-2

3-8-

22SG

4MU

-23-

8-22

NW

NW

2308

0S22

0E43

0473

5758

1438

0Fe

dera

l|G

W'P

RW

S8M

L-14

-9-2

4R

WS

8ML-

14-9

-24

SEN

E'

1409

0S|2

40E

4304

7358

0314

539

Fede

ral

GW

|SSG

llMU

-14-

8-22

SG11

MU

-14-

8-22

NES

W14

080S

220E

4304

7358

2914

486

Fede

ral

IGW

IPR

BD

SFE

D1G

-7-1

0-18

RB

DS

FED

1G-7

-10-

18N

ENE

I07

100S

180E

4304

7359

3214

457

Fede

ral

OW

SR

BD

SFE

D14

G-8

-10-

18R

BD

SFE

D14

G-8

-10-

18SE

SW,

0810

0S18

0E43

0473

5933

1443

3IF

eder

alIO

WIP

OU

SG14

MU

-14-

8-22

OU

SG14

MU

-14-

8-22

SESW

,14

080S

220E

.43

0473

5950

1447

9'F

eder

alIG

W|P

CO

Y10

ML-

14-8

-24

CO

Y10

ML-

14-8

-24

NW

SE1

1408

0S|2

40E

4304

7360

38Fe

dera

l¡G

W|A

PDC

OY

12M

L-24

-8-2

4C

OY

12M

L-24

-8-2

4N

WSW

|24

080S

I240

E43

0473

6039

1459

2Fe

dera

lIO

W|P

WIH

1AM

U-2

1-8-

22W

IHlA

MU

-21-

8-22

INEN

EI

2108

0SI2

20E

'43

0473

6060

1498

0Fe

dera

lIG

WIP

NB

E4M

L-10

-9-2

3N

BE

4ML-

10-9

-23

NW

NW

1009

0S23

0E.

4304

7360

9815

732

,Fed

eral

IGW

IPN

BE

8ML-

10-9

-23

NB

E8M

L-10

-9-2

3_

SEN

E10

090S

230E

4304

7360

9915

733

Fede

ral

IGW

PN

BE

16M

L-10

-9-2

3N

BE

16M

L-10

-9-2

3SE

SE10

090S

230E

4304

7361

0014

728

Fede

ral

GW

PN

BE

8ML-

12-9

-23

NB

E8M

L-12

-9-2

3SE

NE

1209

0SI 2

30E

4304

7361

4315

859

Fede

ral

GW

DR

LW

H12

G-1

1-7-

24W

H12

G-1

1-7-

24IN

WSW

.11

070S

|240

E43

0473

6195

Fede

ral

GW

APD

HC

16M

-6-7

-22

HC

16M

-6-7

-22

SESE

'06

070S

220E

4304

7361

97Fe

dera

lG

WA

PDH

C14

M-6

-7-2

2H

C14

M-6

-7-2

2SE

SW06

070S

220E

4304

7361

98Fe

dera

lG

W_

|APD

WW

T8M

L-25

-8-2

4W

WT

8ML-

25-8

-24

SEN

E.

2508

0S24

0EI

4304

7361

99II

¾de

ral

iGW

IAPD

GB

16D

-28-

8-21

GB

16D

-28-

8-21

ISES

E28

080S

210E

4304

7362

6014

981

Fede

ral

GW

IP

WH

7G-3

-7-2

4W

H7G

-3-7

-24

SWN

E03

070S

240E

4304

7363

47Fe

dera

lG

WA

PDN

BE

5ML-

10-9

-23

NB

E5M

L-10

-9-2

3SW

NW

1009

0S|2

30E

4304

7363

5315

227

Fede

ral

GW

|PN

BE

7ML-

10-9

-23

NB

E7M

L-10

-9-2

3|S

WN

E10

090S

|230

E43

0473

6355

1585

0Fe

dera

lG

WD

RL

NB

E3M

L-10

-9-2

3N

BE

3ML-

10-9

-23

NEN

W10

090S

I 230

E43

0473

6356

1539

3Fe

dera

lG

WP

WH

4G-1

0-7-

24W

H4G

-10-

7-24

NW

NW

1007

0S' 24

0E43

0473

6359

Fede

ral

GW

APD

EIH

X4M

U-3

6-8-

22EI

HX

4MU

-36-

8-22

NW

NW

|36

080S

220E

4304

7364

4414

875

Fede

ral

GW

PEI

HX

3MU

-36-

8-22

EIH

X3M

U-3

6-8-

22N

ENW

|36

080S

220E

4304

7364

4514

860

Fede

ral

|GW

PEI

HX

2MU

-36-

8-22

IEIH

X2M

U-3

6-8-

22N

WN

E36

080S

.22

0E43

0473

6446

1484

0Fe

dera

l|G

WP

EIH

X1M

U-3

6-8-

22EI

HX

1MU

-36-

8-22

NEN

E36

080S

220E

4304

7364

4714

861

Fede

ral

i GW

PW

WT

2ML-

24-8

-24

|WW

T2M

L-24

-8-2

4N

WN

E24

080S

240E

4304

7365

15Fe

dera

lG

WA

PDR

WS

1ML-

1-9-

24|R

WS

1ML-

1-9-

24N

ENE

0109

0S24

0E43

0473

6517

Fede

ral

GW

APD

RW

S3M

L-1-

9-24

IRW

S3M

L-1-

9-24

NEN

W01

090S

240E

4304

7365

18Fe

dera

liG

WA

PDR

WS

9ML-

1-9-

24|R

WS

9ML-

1-9-

24N

ESE

0109

0S24

0E43

0473

6519

IFed

eral

i GW

APD

RW

S15

ML-

1-9-

24|R

WS

15M

L-1-

9-24

SWSE

0109

0S24

0E43

0473

6521

.Fed

eral

IGW

Page 42: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

7of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

We1

1Nam

e&

No;

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

BSW

1ML-

12-9

-24

|BSW

1ML-

12-9

-24

|NEN

EI

12|0

90S

|240

E43

0473

6522

Fede

ral

|GW

APD

BSW

11M

L-13

-9-2

4B

SW11

ML-

13-9

-24

INES

WI

13|0

90S

i24

0E43

0473

6523

Fede

ral

|GW

APD

NB

E7M

L-26

-9-2

3N

BE

7ML-

26-9

-23

SWN

EI

26| 0

90S

230E

4304

7365

8716

008

iFed

eral

IGW

DR

LN

BE

8ML-

26-9

-23

NB

E8M

L-26

-9-2

3SE

NE

26I

090S

230E

4304

7365

8815

689

|Fed

eral

'GW

PN

BE

1ML-

26-9

-23

|NB

E1M

L-26

-9-2

3N

ENE

|26

090S

230E

|43

0473

6589

1588

0|F

eder

al|G

WD

RL

NB

E2M

L-26

-9-2

3IN

BE

2ML-

26-9

-23

NW

NE

2609

0S23

0E|4

3047

3659

015

898

|Fed

eral

|GW

NR

LN

BE

3ML-

26-9

-23

[NB

E3M

L-26

-9-2

3N

ENW

2609

0SI2

30E

I43

0473

6591

1590

6Fe

dera

lIG

WD

RL

NB

E5M

L-26

-9-2

3N

BE

5ML-

26-9

-23

ISW

NW

i26

090S

230E

4304

7365

9215

839

Fede

ral

IGW

DR

LN

BE

9ML-

10-9

-23

INB

E9M

L-10

-9-2

3IN

ESE

1009

0S23

0E|

4304

7365

9315

438

Fede

ral

|GW

|PN

BE

11M

L-10

-9-2

3[N

BE

11M

L-10

-9-2

3N

ESW

I10

090S

|230

EI

4304

7365

94|1

5228

Fede

ral

|GW

IPN

BE

15M

L-10

-9-2

3[N

BE

15M

L-10

-9-2

3SW

SE_

I10

090S

|230

EI

4304

7365

95|1

5439

Fede

ral

|GW

IPN

BE

1ML-

12-9

-23

NB

E1M

L-12

-9-2

3N

ENE

1209

0SI2

30E

4304

7366

13Fe

dera

lIG

WIA

PDN

BE

2ML-

17-9

-23

¡NB

E2M

L-17

-9-2

3|N

WN

E17

090S

|230

E43

0473

6614

1512

6Fe

dera

lIG

WP

NB

E4M

L-17

-9-2

3N

BE

4ML-

17-9

-23

|NW

NW

17|0

90S

|230

E|

4304

7366

1515

177

Fede

ral

¡GW

|PN

BE

6ML-

17-9

-23

NB

E6M

L-17

-9-2

3|S

ENW

17|0

90S

230E

I43

0473

6616

|15

127

IFed

eral

.GW

IPN

BE

10M

L-17

-9-2

3|N

BE

10M

L-17

-9-2

3|N

WSE

17| 0

90S

230E

|430

4736

617

1512

8IF

eder

alIG

WP

NB

E14

ML-

17-9

-23

|NB

E14

ML-

17-9

-23

SESW

1709

0S23

0E43

0473

6618

1508

8Fe

dera

l.G

WP

NB

E9M

L-26

-9-2

3]N

BE

9ML-

26-9

-23

|NES

E26

090S

230E

|430

4736

619

1532

2Fe

dera

l|G

W|P

NB

E10

D-2

6-9-

23IN

BE

10D

-26-

9-23

|NW

SE26

090S

230E

I43

0473

6620

1597

5Fe

dera

liG

WID

RL

NB

E12

ML-

26-9

-23

NB

E12

ML-

26-9

-23

INW

SW26

090S

230E

4304

7366

2115

840

Fede

ral

IGW

DR

LN

BE

13M

L-26

-9-2

3|N

BE

13M

L-26

-9-2

3|S

WSW

2609

0S23

0E43

0473

6622

1569

0Fe

dera

lG

WP

NB

E14

ML-

26-9

-23

NB

E14

ML-

26-9

-23

|SES

W26

090S

230E

|43

0473

6623

1526

2Fe

dera

l|G

WP

NB

E16

ML-

26-9

-23

NB

E16

ML-

26-9

-23

SESE

I26

090S

230E

I43

0473

6624

1573

5Fe

dera

lIG

WP

RW

S13

ML-

14-9

-24

RW

S13

ML-

14-9

-24

SWSW

1409

0S.2

40E

I430

4736

737

Fede

ral

[GW

'APD

RW

S12

ML-

14-9

-24

RW

S12

ML-

14-9

-24

NW

SW14

090S

240E

4304

7367

38Fe

dera

lG

WA

PDSG

3MU

-23-

8-22

SG3M

U-2

3-8-

22SE

SW|

1408

0S' 22

0E|

4304

7369

4015

100

Fede

ral

|GW

PN

BE

5ML-

17-9

-23

NB

E5M

L-17

-9-2

3SW

NW

1709

0SI2

30E

I43

0473

6941

1510

1IF

eder

aliG

WiP

WW

T2M

L-25

-8-2

4W

WT

2ML-

25-8

-24

NW

NE

2508

0SI 2

40E

4304

7373

01IF

eder

alG

WIA

PDW

WT

1ML-

25-8

-24

WW

T1M

L-25

-8-2

4N

ENE

2508

0S24

0E43

0473

7302

Fede

ral

'GW

IAPD

HK

15M

L-19

-8-2

5H

K15

ML-

19-8

-25

SWSE

1908

0S25

0E43

0473

7303

|Fed

eral

GW

APD

WT

13M

L-19

-8-2

5W

T13

ML-

19-8

-25

ISW

SW19

080S

250E

4304

7373

04|

|Fed

eral

GW

|APD

HK

3ML-

29-8

-25

HK

3ML-

29-8

-25

NEN

W_

2908

0SI2

50E

4304

7373

05|

|Fed

eral

GW

iAPD

HK

5ML-

29-8

-25

HK

5ML-

29-8

-25

SWN

W29

080S

250E

4304

7373

30|

|Fed

eral

GW

IAPD

HK

2ML-

30-8

-25

HK

2ML-

30-8

-25

NW

NE

3008

0S25

0E43

0473

7331

Fede

ral

GW

APD

HK

5ML-

30-8

-25

HK

5ML-

30-8

-25

SWN

W30

080S

|250

E43

0473

7332

|Fed

eral

GW

IAPD

HK

10M

L-30

-8-2

5H

K10

ML-

30-8

-25

NW

SE30

080S

I250

E43

0473

7333

||F

eder

alG

WIA

PD

HK

14M

L-30

-8-2

5H

K14

ML-

30-8

-25

SESW

i30

080S

I 250

E43

0473

7334

|IF

eder

alG

WIA

PDH

K6M

L-30

-8-2

5H

K6M

L-30

-8-2

5SE

NW

-30

080S

250E

4304

7373

48IF

eder

alG

W|A

PDH

K8M

L-30

-8-2

5H

K8M

L-30

-8-2

5SE

NE

)30

080S

250E

4304

7373

49Fe

dera

lIG

W|A

PDW

WT

7ML-

25-8

-24

WW

T7M

L-25

-8-2

4IS

WN

E25

080S

|240

E43

0473

7407

|IF

eder

alG

W|A

PDW

WT

9ML-

25-8

-24

WW

T9M

L-25

-8-2

4N

ESE

I25

080S

I240

E43

0473

7408

|iF

eder

alIG

W|A

PDW

WT

10M

L-25

-8-2

4W

WT

10M

L-25

-8-2

4IN

WSE

I25

080S

|240

E.

4304

7374

09I

iFed

eral

IGW

7of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

We1

1Nam

e&

No;

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

BSW

1ML-

12-9

-24

|BSW

1ML-

12-9

-24

|NEN

EI

12|0

90S

|240

E43

0473

6522

Fede

ral

|GW

APD

BSW

11M

L-13

-9-2

4B

SW11

ML-

13-9

-24

INES

WI

13|0

90S

i24

0E43

0473

6523

Fede

ral

|GW

APD

NB

E7M

L-26

-9-2

3N

BE

7ML-

26-9

-23

SWN

EI

26| 0

90S

230E

4304

7365

8716

008

iFed

eral

IGW

DR

LN

BE

8ML-

26-9

-23

NB

E8M

L-26

-9-2

3SE

NE

26I

090S

230E

4304

7365

8815

689

|Fed

eral

'GW

PN

BE

1ML-

26-9

-23

|NB

E1M

L-26

-9-2

3N

ENE

|26

090S

230E

|43

0473

6589

1588

0|F

eder

al|G

WD

RL

NB

E2M

L-26

-9-2

3IN

BE

2ML-

26-9

-23

NW

NE

2609

0S23

0E|4

3047

3659

015

898

|Fed

eral

|GW

NR

LN

BE

3ML-

26-9

-23

[NB

E3M

L-26

-9-2

3N

ENW

2609

0SI2

30E

I43

0473

6591

1590

6Fe

dera

lIG

WD

RL

NB

E5M

L-26

-9-2

3N

BE

5ML-

26-9

-23

ISW

NW

i26

090S

230E

4304

7365

9215

839

Fede

ral

IGW

DR

LN

BE

9ML-

10-9

-23

INB

E9M

L-10

-9-2

3IN

ESE

1009

0S23

0E|

4304

7365

9315

438

Fede

ral

|GW

|PN

BE

11M

L-10

-9-2

3[N

BE

11M

L-10

-9-2

3N

ESW

I10

090S

|230

EI

4304

7365

94|1

5228

Fede

ral

|GW

IPN

BE

15M

L-10

-9-2

3[N

BE

15M

L-10

-9-2

3SW

SE_

I10

090S

|230

EI

4304

7365

95|1

5439

Fede

ral

|GW

IPN

BE

1ML-

12-9

-23

NB

E1M

L-12

-9-2

3N

ENE

1209

0SI2

30E

4304

7366

13Fe

dera

lIG

WIA

PDN

BE

2ML-

17-9

-23

¡NB

E2M

L-17

-9-2

3|N

WN

E17

090S

|230

E43

0473

6614

1512

6Fe

dera

lIG

WP

NB

E4M

L-17

-9-2

3N

BE

4ML-

17-9

-23

|NW

NW

17|0

90S

|230

E|

4304

7366

1515

177

Fede

ral

¡GW

|PN

BE

6ML-

17-9

-23

NB

E6M

L-17

-9-2

3|S

ENW

17|0

90S

230E

I43

0473

6616

|15

127

IFed

eral

.GW

IPN

BE

10M

L-17

-9-2

3|N

BE

10M

L-17

-9-2

3|N

WSE

17| 0

90S

230E

|430

4736

617

1512

8IF

eder

alIG

WP

NB

E14

ML-

17-9

-23

|NB

E14

ML-

17-9

-23

SESW

1709

0S23

0E43

0473

6618

1508

8Fe

dera

l.G

WP

NB

E9M

L-26

-9-2

3]N

BE

9ML-

26-9

-23

|NES

E26

090S

230E

|430

4736

619

1532

2Fe

dera

l|G

W|P

NB

E10

D-2

6-9-

23IN

BE

10D

-26-

9-23

|NW

SE26

090S

230E

I43

0473

6620

1597

5Fe

dera

liG

WID

RL

NB

E12

ML-

26-9

-23

NB

E12

ML-

26-9

-23

INW

SW26

090S

230E

4304

7366

2115

840

Fede

ral

IGW

DR

LN

BE

13M

L-26

-9-2

3|N

BE

13M

L-26

-9-2

3|S

WSW

2609

0S23

0E43

0473

6622

1569

0Fe

dera

lG

WP

NB

E14

ML-

26-9

-23

NB

E14

ML-

26-9

-23

|SES

W26

090S

230E

|43

0473

6623

1526

2Fe

dera

l|G

WP

NB

E16

ML-

26-9

-23

NB

E16

ML-

26-9

-23

SESE

I26

090S

230E

I43

0473

6624

1573

5Fe

dera

lIG

WP

RW

S13

ML-

14-9

-24

RW

S13

ML-

14-9

-24

SWSW

1409

0S.2

40E

I430

4736

737

Fede

ral

[GW

'APD

RW

S12

ML-

14-9

-24

RW

S12

ML-

14-9

-24

NW

SW14

090S

240E

4304

7367

38Fe

dera

lG

WA

PDSG

3MU

-23-

8-22

SG3M

U-2

3-8-

22SE

SW|

1408

0S' 22

0E|

4304

7369

4015

100

Fede

ral

|GW

PN

BE

5ML-

17-9

-23

NB

E5M

L-17

-9-2

3SW

NW

1709

0SI2

30E

I43

0473

6941

1510

1IF

eder

aliG

WiP

WW

T2M

L-25

-8-2

4W

WT

2ML-

25-8

-24

NW

NE

2508

0SI 2

40E

4304

7373

01IF

eder

alG

WIA

PDW

WT

1ML-

25-8

-24

WW

T1M

L-25

-8-2

4N

ENE

2508

0S24

0E43

0473

7302

Fede

ral

'GW

IAPD

HK

15M

L-19

-8-2

5H

K15

ML-

19-8

-25

SWSE

1908

0S25

0E43

0473

7303

|Fed

eral

GW

APD

WT

13M

L-19

-8-2

5W

T13

ML-

19-8

-25

ISW

SW19

080S

250E

4304

7373

04|

|Fed

eral

GW

|APD

HK

3ML-

29-8

-25

HK

3ML-

29-8

-25

NEN

W_

2908

0SI2

50E

4304

7373

05|

|Fed

eral

GW

iAPD

HK

5ML-

29-8

-25

HK

5ML-

29-8

-25

SWN

W29

080S

250E

4304

7373

30|

|Fed

eral

GW

IAPD

HK

2ML-

30-8

-25

HK

2ML-

30-8

-25

NW

NE

3008

0S25

0E43

0473

7331

Fede

ral

GW

APD

HK

5ML-

30-8

-25

HK

5ML-

30-8

-25

SWN

W30

080S

|250

E43

0473

7332

|Fed

eral

GW

IAPD

HK

10M

L-30

-8-2

5H

K10

ML-

30-8

-25

NW

SE30

080S

I250

E43

0473

7333

||F

eder

alG

WIA

PD

HK

14M

L-30

-8-2

5H

K14

ML-

30-8

-25

SESW

i30

080S

I 250

E43

0473

7334

|IF

eder

alG

WIA

PDH

K6M

L-30

-8-2

5H

K6M

L-30

-8-2

5SE

NW

-30

080S

250E

4304

7373

48IF

eder

alG

W|A

PDH

K8M

L-30

-8-2

5H

K8M

L-30

-8-2

5SE

NE

)30

080S

250E

4304

7373

49Fe

dera

lIG

W|A

PDW

WT

7ML-

25-8

-24

WW

T7M

L-25

-8-2

4IS

WN

E25

080S

|240

E43

0473

7407

|IF

eder

alG

W|A

PDW

WT

9ML-

25-8

-24

WW

T9M

L-25

-8-2

4N

ESE

I25

080S

I240

E43

0473

7408

|iF

eder

alIG

W|A

PDW

WT

10M

L-25

-8-2

4W

WT

10M

L-25

-8-2

4IN

WSE

I25

080S

|240

E.

4304

7374

09I

iFed

eral

IGW

7of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

We1

1Nam

e&

No;

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

BSW

1ML-

12-9

-24

|BSW

1ML-

12-9

-24

|NEN

EI

12|0

90S

|240

E43

0473

6522

Fede

ral

|GW

APD

BSW

11M

L-13

-9-2

4B

SW11

ML-

13-9

-24

INES

WI

13|0

90S

i24

0E43

0473

6523

Fede

ral

|GW

APD

NB

E7M

L-26

-9-2

3N

BE

7ML-

26-9

-23

SWN

EI

26| 0

90S

230E

4304

7365

8716

008

iFed

eral

IGW

DR

LN

BE

8ML-

26-9

-23

NB

E8M

L-26

-9-2

3SE

NE

26I

090S

230E

4304

7365

8815

689

|Fed

eral

'GW

PN

BE

1ML-

26-9

-23

|NB

E1M

L-26

-9-2

3N

ENE

|26

090S

230E

|43

0473

6589

1588

0|F

eder

al|G

WD

RL

NB

E2M

L-26

-9-2

3IN

BE

2ML-

26-9

-23

NW

NE

2609

0S23

0E|4

3047

3659

015

898

|Fed

eral

|GW

NR

LN

BE

3ML-

26-9

-23

[NB

E3M

L-26

-9-2

3N

ENW

2609

0SI2

30E

I43

0473

6591

1590

6Fe

dera

lIG

WD

RL

NB

E5M

L-26

-9-2

3N

BE

5ML-

26-9

-23

ISW

NW

i26

090S

230E

4304

7365

9215

839

Fede

ral

IGW

DR

LN

BE

9ML-

10-9

-23

INB

E9M

L-10

-9-2

3IN

ESE

1009

0S23

0E|

4304

7365

9315

438

Fede

ral

|GW

|PN

BE

11M

L-10

-9-2

3[N

BE

11M

L-10

-9-2

3N

ESW

I10

090S

|230

EI

4304

7365

94|1

5228

Fede

ral

|GW

IPN

BE

15M

L-10

-9-2

3[N

BE

15M

L-10

-9-2

3SW

SE_

I10

090S

|230

EI

4304

7365

95|1

5439

Fede

ral

|GW

IPN

BE

1ML-

12-9

-23

NB

E1M

L-12

-9-2

3N

ENE

1209

0SI2

30E

4304

7366

13Fe

dera

lIG

WIA

PDN

BE

2ML-

17-9

-23

¡NB

E2M

L-17

-9-2

3|N

WN

E17

090S

|230

E43

0473

6614

1512

6Fe

dera

lIG

WP

NB

E4M

L-17

-9-2

3N

BE

4ML-

17-9

-23

|NW

NW

17|0

90S

|230

E|

4304

7366

1515

177

Fede

ral

¡GW

|PN

BE

6ML-

17-9

-23

NB

E6M

L-17

-9-2

3|S

ENW

17|0

90S

230E

I43

0473

6616

|15

127

IFed

eral

.GW

IPN

BE

10M

L-17

-9-2

3|N

BE

10M

L-17

-9-2

3|N

WSE

17| 0

90S

230E

|430

4736

617

1512

8IF

eder

alIG

WP

NB

E14

ML-

17-9

-23

|NB

E14

ML-

17-9

-23

SESW

1709

0S23

0E43

0473

6618

1508

8Fe

dera

l.G

WP

NB

E9M

L-26

-9-2

3]N

BE

9ML-

26-9

-23

|NES

E26

090S

230E

|430

4736

619

1532

2Fe

dera

l|G

W|P

NB

E10

D-2

6-9-

23IN

BE

10D

-26-

9-23

|NW

SE26

090S

230E

I43

0473

6620

1597

5Fe

dera

liG

WID

RL

NB

E12

ML-

26-9

-23

NB

E12

ML-

26-9

-23

INW

SW26

090S

230E

4304

7366

2115

840

Fede

ral

IGW

DR

LN

BE

13M

L-26

-9-2

3|N

BE

13M

L-26

-9-2

3|S

WSW

2609

0S23

0E43

0473

6622

1569

0Fe

dera

lG

WP

NB

E14

ML-

26-9

-23

NB

E14

ML-

26-9

-23

|SES

W26

090S

230E

|43

0473

6623

1526

2Fe

dera

l|G

WP

NB

E16

ML-

26-9

-23

NB

E16

ML-

26-9

-23

SESE

I26

090S

230E

I43

0473

6624

1573

5Fe

dera

lIG

WP

RW

S13

ML-

14-9

-24

RW

S13

ML-

14-9

-24

SWSW

1409

0S.2

40E

I430

4736

737

Fede

ral

[GW

'APD

RW

S12

ML-

14-9

-24

RW

S12

ML-

14-9

-24

NW

SW14

090S

240E

4304

7367

38Fe

dera

lG

WA

PDSG

3MU

-23-

8-22

SG3M

U-2

3-8-

22SE

SW|

1408

0S' 22

0E|

4304

7369

4015

100

Fede

ral

|GW

PN

BE

5ML-

17-9

-23

NB

E5M

L-17

-9-2

3SW

NW

1709

0SI2

30E

I43

0473

6941

1510

1IF

eder

aliG

WiP

WW

T2M

L-25

-8-2

4W

WT

2ML-

25-8

-24

NW

NE

2508

0SI 2

40E

4304

7373

01IF

eder

alG

WIA

PDW

WT

1ML-

25-8

-24

WW

T1M

L-25

-8-2

4N

ENE

2508

0S24

0E43

0473

7302

Fede

ral

'GW

IAPD

HK

15M

L-19

-8-2

5H

K15

ML-

19-8

-25

SWSE

1908

0S25

0E43

0473

7303

|Fed

eral

GW

APD

WT

13M

L-19

-8-2

5W

T13

ML-

19-8

-25

ISW

SW19

080S

250E

4304

7373

04|

|Fed

eral

GW

|APD

HK

3ML-

29-8

-25

HK

3ML-

29-8

-25

NEN

W_

2908

0SI2

50E

4304

7373

05|

|Fed

eral

GW

iAPD

HK

5ML-

29-8

-25

HK

5ML-

29-8

-25

SWN

W29

080S

250E

4304

7373

30|

|Fed

eral

GW

IAPD

HK

2ML-

30-8

-25

HK

2ML-

30-8

-25

NW

NE

3008

0S25

0E43

0473

7331

Fede

ral

GW

APD

HK

5ML-

30-8

-25

HK

5ML-

30-8

-25

SWN

W30

080S

|250

E43

0473

7332

|Fed

eral

GW

IAPD

HK

10M

L-30

-8-2

5H

K10

ML-

30-8

-25

NW

SE30

080S

I250

E43

0473

7333

||F

eder

alG

WIA

PD

HK

14M

L-30

-8-2

5H

K14

ML-

30-8

-25

SESW

i30

080S

I 250

E43

0473

7334

|IF

eder

alG

WIA

PDH

K6M

L-30

-8-2

5H

K6M

L-30

-8-2

5SE

NW

-30

080S

250E

4304

7373

48IF

eder

alG

W|A

PDH

K8M

L-30

-8-2

5H

K8M

L-30

-8-2

5SE

NE

)30

080S

250E

4304

7373

49Fe

dera

lIG

W|A

PDW

WT

7ML-

25-8

-24

WW

T7M

L-25

-8-2

4IS

WN

E25

080S

|240

E43

0473

7407

|IF

eder

alG

W|A

PDW

WT

9ML-

25-8

-24

WW

T9M

L-25

-8-2

4N

ESE

I25

080S

I240

E43

0473

7408

|iF

eder

alIG

W|A

PDW

WT

10M

L-25

-8-2

4W

WT

10M

L-25

-8-2

4IN

WSE

I25

080S

|240

E.

4304

7374

09I

iFed

eral

IGW

7of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

We1

1Nam

e&

No;

Q/Q

SEC

TWP

RN

GA

PIEn

tity

Leas

eW

ell

Type

Stat

us

BSW

1ML-

12-9

-24

|BSW

1ML-

12-9

-24

|NEN

EI

12|0

90S

|240

E43

0473

6522

Fede

ral

|GW

APD

BSW

11M

L-13

-9-2

4B

SW11

ML-

13-9

-24

INES

WI

13|0

90S

i24

0E43

0473

6523

Fede

ral

|GW

APD

NB

E7M

L-26

-9-2

3N

BE

7ML-

26-9

-23

SWN

EI

26| 0

90S

230E

4304

7365

8716

008

iFed

eral

IGW

DR

LN

BE

8ML-

26-9

-23

NB

E8M

L-26

-9-2

3SE

NE

26I

090S

230E

4304

7365

8815

689

|Fed

eral

'GW

PN

BE

1ML-

26-9

-23

|NB

E1M

L-26

-9-2

3N

ENE

|26

090S

230E

|43

0473

6589

1588

0|F

eder

al|G

WD

RL

NB

E2M

L-26

-9-2

3IN

BE

2ML-

26-9

-23

NW

NE

2609

0S23

0E|4

3047

3659

015

898

|Fed

eral

|GW

NR

LN

BE

3ML-

26-9

-23

[NB

E3M

L-26

-9-2

3N

ENW

2609

0SI2

30E

I43

0473

6591

1590

6Fe

dera

lIG

WD

RL

NB

E5M

L-26

-9-2

3N

BE

5ML-

26-9

-23

ISW

NW

i26

090S

230E

4304

7365

9215

839

Fede

ral

IGW

DR

LN

BE

9ML-

10-9

-23

INB

E9M

L-10

-9-2

3IN

ESE

1009

0S23

0E|

4304

7365

9315

438

Fede

ral

|GW

|PN

BE

11M

L-10

-9-2

3[N

BE

11M

L-10

-9-2

3N

ESW

I10

090S

|230

EI

4304

7365

94|1

5228

Fede

ral

|GW

IPN

BE

15M

L-10

-9-2

3[N

BE

15M

L-10

-9-2

3SW

SE_

I10

090S

|230

EI

4304

7365

95|1

5439

Fede

ral

|GW

IPN

BE

1ML-

12-9

-23

NB

E1M

L-12

-9-2

3N

ENE

1209

0SI2

30E

4304

7366

13Fe

dera

lIG

WIA

PDN

BE

2ML-

17-9

-23

¡NB

E2M

L-17

-9-2

3|N

WN

E17

090S

|230

E43

0473

6614

1512

6Fe

dera

lIG

WP

NB

E4M

L-17

-9-2

3N

BE

4ML-

17-9

-23

|NW

NW

17|0

90S

|230

E|

4304

7366

1515

177

Fede

ral

¡GW

|PN

BE

6ML-

17-9

-23

NB

E6M

L-17

-9-2

3|S

ENW

17|0

90S

230E

I43

0473

6616

|15

127

IFed

eral

.GW

IPN

BE

10M

L-17

-9-2

3|N

BE

10M

L-17

-9-2

3|N

WSE

17| 0

90S

230E

|430

4736

617

1512

8IF

eder

alIG

WP

NB

E14

ML-

17-9

-23

|NB

E14

ML-

17-9

-23

SESW

1709

0S23

0E43

0473

6618

1508

8Fe

dera

l.G

WP

NB

E9M

L-26

-9-2

3]N

BE

9ML-

26-9

-23

|NES

E26

090S

230E

|430

4736

619

1532

2Fe

dera

l|G

W|P

NB

E10

D-2

6-9-

23IN

BE

10D

-26-

9-23

|NW

SE26

090S

230E

I43

0473

6620

1597

5Fe

dera

liG

WID

RL

NB

E12

ML-

26-9

-23

NB

E12

ML-

26-9

-23

INW

SW26

090S

230E

4304

7366

2115

840

Fede

ral

IGW

DR

LN

BE

13M

L-26

-9-2

3|N

BE

13M

L-26

-9-2

3|S

WSW

2609

0S23

0E43

0473

6622

1569

0Fe

dera

lG

WP

NB

E14

ML-

26-9

-23

NB

E14

ML-

26-9

-23

|SES

W26

090S

230E

|43

0473

6623

1526

2Fe

dera

l|G

WP

NB

E16

ML-

26-9

-23

NB

E16

ML-

26-9

-23

SESE

I26

090S

230E

I43

0473

6624

1573

5Fe

dera

lIG

WP

RW

S13

ML-

14-9

-24

RW

S13

ML-

14-9

-24

SWSW

1409

0S.2

40E

I430

4736

737

Fede

ral

[GW

'APD

RW

S12

ML-

14-9

-24

RW

S12

ML-

14-9

-24

NW

SW14

090S

240E

4304

7367

38Fe

dera

lG

WA

PDSG

3MU

-23-

8-22

SG3M

U-2

3-8-

22SE

SW|

1408

0S' 22

0E|

4304

7369

4015

100

Fede

ral

|GW

PN

BE

5ML-

17-9

-23

NB

E5M

L-17

-9-2

3SW

NW

1709

0SI2

30E

I43

0473

6941

1510

1IF

eder

aliG

WiP

WW

T2M

L-25

-8-2

4W

WT

2ML-

25-8

-24

NW

NE

2508

0SI 2

40E

4304

7373

01IF

eder

alG

WIA

PDW

WT

1ML-

25-8

-24

WW

T1M

L-25

-8-2

4N

ENE

2508

0S24

0E43

0473

7302

Fede

ral

'GW

IAPD

HK

15M

L-19

-8-2

5H

K15

ML-

19-8

-25

SWSE

1908

0S25

0E43

0473

7303

|Fed

eral

GW

APD

WT

13M

L-19

-8-2

5W

T13

ML-

19-8

-25

ISW

SW19

080S

250E

4304

7373

04|

|Fed

eral

GW

|APD

HK

3ML-

29-8

-25

HK

3ML-

29-8

-25

NEN

W_

2908

0SI2

50E

4304

7373

05|

|Fed

eral

GW

iAPD

HK

5ML-

29-8

-25

HK

5ML-

29-8

-25

SWN

W29

080S

250E

4304

7373

30|

|Fed

eral

GW

IAPD

HK

2ML-

30-8

-25

HK

2ML-

30-8

-25

NW

NE

3008

0S25

0E43

0473

7331

Fede

ral

GW

APD

HK

5ML-

30-8

-25

HK

5ML-

30-8

-25

SWN

W30

080S

|250

E43

0473

7332

|Fed

eral

GW

IAPD

HK

10M

L-30

-8-2

5H

K10

ML-

30-8

-25

NW

SE30

080S

I250

E43

0473

7333

||F

eder

alG

WIA

PD

HK

14M

L-30

-8-2

5H

K14

ML-

30-8

-25

SESW

i30

080S

I 250

E43

0473

7334

|IF

eder

alG

WIA

PDH

K6M

L-30

-8-2

5H

K6M

L-30

-8-2

5SE

NW

-30

080S

250E

4304

7373

48IF

eder

alG

W|A

PDH

K8M

L-30

-8-2

5H

K8M

L-30

-8-2

5SE

NE

)30

080S

250E

4304

7373

49Fe

dera

lIG

W|A

PDW

WT

7ML-

25-8

-24

WW

T7M

L-25

-8-2

4IS

WN

E25

080S

|240

E43

0473

7407

|IF

eder

alG

W|A

PDW

WT

9ML-

25-8

-24

WW

T9M

L-25

-8-2

4N

ESE

I25

080S

I240

E43

0473

7408

|iF

eder

alIG

W|A

PDW

WT

10M

L-25

-8-2

4W

WT

10M

L-25

-8-2

4IN

WSE

I25

080S

|240

E.

4304

7374

09I

iFed

eral

IGW

Page 43: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

8of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

¶eR

$am

eg;N

oQ

iQSE

CTW

PR

NG

API

Entit

yIL

ease

Wel

lTy

peSt

atus

WW

T15

ML-

25-8

-24

WW

T15

ML-

25-8

-24

SWSE

2508

0S24

0E43

0473

7410

Fede

ral

GW

APD

BB

S15

G-2

2-7-

21B

BS

15G

-22-

7-21

SWSE

2207

0S21

0E43

0473

7443

1568

8iF

eder

alO

W|P

WW

T15

ML-

13-8

-24

WW

T15

ML-

13-8

-24

SWSE

1308

0S24

0E43

0473

7524

Fede

ral

GW

iAPD

WW

T16

ML-

13-8

-24

WW

T16

ML-

13-8

-24

SESE

1308

0S24

0EI

4304

7375

25i

IFed

eral

GW

IAPD

CO

Y6M

L-23

-8-2

4C

OY

6ML-

23-8

-24

SEN

W23

080S

240E

4304

7375

26Fe

dera

lG

WA

PDN

BZ

8ML-

23-8

-24

NB

Z8M

L-23

-8-2

4SE

NE

2308

0S24

0E.

4304

7375

27Fe

dera

lG

WA

PDC

OY

9ML-

23-8

-24

CO

Y9M

L-23

-8-2

4N

ESE

2308

0S24

0Ei

4304

7375

28Fe

dera

lG

WA

PDN

BZ

15M

L-23

-8-2

4N

BZ

15M

L-23

-8-2

4SW

SE23

080S

240E

i43

0473

7529

Fede

ral

GW

APD

CO

Y16

ML-

23-8

-24

CO

Y16

ML-

23-8

-24

SESE

2308

0S24

0E43

0473

7530

Fede

ral

GW

APD

CO

Y5M

L-24

-8-2

4C

OY

5ML-

24-8

-24

SWN

W24

080S

240E

4304

7375

31Fe

dera

lG

WA

PDC

OY

6ML-

24-8

-24

CO

Y6M

L-24

-8-2

4SE

NW

2408

0S24

0E43

0473

7532

_

Fede

ral

GW

APD

CO

Y6M

L-21

-8-2

4.C

OY

6ML-

21-8

-24

SEN

W21

080S

240E

4304

7375

84Fe

dera

lG

WA

PDC

OY

4ML-

21-8

-24

CO

Y4M

L-21

-8-2

4N

WN

W21

080S

240E

4304

7375

85Fe

dera

lG

WA

PDC

OY

14M

L-21

-8-2

4C

OY

14M

L-21

-8-2

4SE

SW21

080S

240E

4304

7375

86Fe

dera

lG

WA

PDC

OY

15M

L-21

-8-2

4C

OY

15M

L-21

-8-2

4SW

SE21

080S

240E

4304

7375

87Fe

dera

lG

WN

EWW

WT

1ML-

24-8

-24

WW

T1M

L-24

-8-2

4N

ENE

2408

0S24

0E43

0473

7590

Fede

ral

GW

APD

RW

S13

ML-

23-9

-24

RW

S13

ML-

23-9

-24

SWSW

2309

0S24

0E43

0473

7591

Fede

ral

GW

APD

WW

T8M

L-24

-8-2

4W

WT

8ML-

24-8

-24

SEN

E24

080S

240E

4304

7376

40Fe

dera

lG

WA

PDG

B16

ML-

20-8

-22

GB

16M

L-20

-8-2

2SE

SE20

080S

220E

|430

4737

664

1594

8Fe

dera

lG

WD

RL

NB

Z1M

L-29

-8-2

4N

BZ

1ML-

29-8

-24

NEN

E29

080S

240E

i43

0473

7666

_Fe

dera

lG

WA

PDW

WT

16M

L-24

-8-2

4W

WT

16M

L-24

-8-2

4SE

SE24

080S

240E

4304

7379

30Fe

dera

lG

WA

PDW

WT

15M

L-24

-8-2

4W

WT

15M

L-24

-8-2

4|S

WSE

2408

0S24

0E|

4304

7379

31Fe

dera

lG

WA

PDC

OY

14M

L-24

-8-2

4C

OY

14M

L-24

-8-2

4SE

SW24

080S

240E

4304

7379

32Fe

dera

lG

WA

PDC

OY

13M

L-24

-8-2

4C

OY

13M

L-24

-8-2

4SW

SW24

080S

240E

43_0

4737

933

Fede

ral

GW

APD

CO

Y11

ML-

24-8

-24

CO

Y11

ML-

24-8

-24

NES

W24

080S

240E

4304

7379

34Fe

dera

lG

WA

PDC

OY

15M

L-14

-8-2

4C

OY

15M

L-14

-8-2

4SW

SE14

080S

240E

4304

7379

35Fe

dera

lG

WA

PDC

OY

14M

L-14

-8-2

4C

OY

14M

L-14

-8-2

4SE

SW14

080S

240E

4304

7379

36Fe

dera

lG

WA

PDC

OY

12M

L-14

-8-2

4C

OY

12M

L-14

-8-2

4N

WSW

1408

0S24

0E43

0473

7937

Fede

ral

GW

APD

CO

Y11

ML-

14-8

-24

CO

YllM

L-14

-8-2

4N

ESW

1408

0S24

0E43

0473

7938

iFe

dera

lG

WA

PDW

VX

8ML-

5-8-

22W

VX

8ML-

5-8-

22SE

NE

0508

0S22

0E43

0473

8140

,IF

eder

alG

WA

PDW

VX

6ML-

5-8-

22W

VX

6ML-

5-8-

22SE

NW

0508

0S22

0E43

0473

8141

|Fe

dera

lG

WA

PDB

BS

5G-2

3-7-

21B

BS

5G-2

3-7-

21SW

NW

2307

0S21

0E43

0473

8471

|Fe

dera

lO

WA

PDG

B12

SG-2

9-8-

22|G

B12

SG-2

9-8-

22N

WSW

2908

0SI 2

20E

4304

7387

66|

Fede

ral

GW

APD

GB

10SG

-30-

8-22

GB

10SG

-30-

8-22

NW

SE30

080S

220E

4304

7387

67Fe

dera

lG

WA

PDN

BE

12SW

D-1

0-9-

23|N

BE

12SW

D-1

0-9-

23N

WSW

1009

0S23

0E43

0473

8875

Fede

ral

WD

APD

OP

16M

U-3

-7-2

0O

P16

MU

-3-7

-20

SESE

0307

0S20

0E43

0473

89_4

4_|

Fede

ral

OW

APD

WF

1P-1

-15-

19W

F1P

-1-1

5-19

NW

NW

0615

0S20

0EI

4304

7367

81|1

4862

.Indi

anIG

W

8of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

¶eR

$am

eg;N

oQ

iQSE

CTW

PR

NG

API

Entit

yIL

ease

Wel

lTy

peSt

atus

WW

T15

ML-

25-8

-24

WW

T15

ML-

25-8

-24

SWSE

2508

0S24

0E43

0473

7410

Fede

ral

GW

APD

BB

S15

G-2

2-7-

21B

BS

15G

-22-

7-21

SWSE

2207

0S21

0E43

0473

7443

1568

8iF

eder

alO

W|P

WW

T15

ML-

13-8

-24

WW

T15

ML-

13-8

-24

SWSE

1308

0S24

0E43

0473

7524

Fede

ral

GW

iAPD

WW

T16

ML-

13-8

-24

WW

T16

ML-

13-8

-24

SESE

1308

0S24

0EI

4304

7375

25i

IFed

eral

GW

IAPD

CO

Y6M

L-23

-8-2

4C

OY

6ML-

23-8

-24

SEN

W23

080S

240E

4304

7375

26Fe

dera

lG

WA

PDN

BZ

8ML-

23-8

-24

NB

Z8M

L-23

-8-2

4SE

NE

2308

0S24

0E.

4304

7375

27Fe

dera

lG

WA

PDC

OY

9ML-

23-8

-24

CO

Y9M

L-23

-8-2

4N

ESE

2308

0S24

0Ei

4304

7375

28Fe

dera

lG

WA

PDN

BZ

15M

L-23

-8-2

4N

BZ

15M

L-23

-8-2

4SW

SE23

080S

240E

i43

0473

7529

Fede

ral

GW

APD

CO

Y16

ML-

23-8

-24

CO

Y16

ML-

23-8

-24

SESE

2308

0S24

0E43

0473

7530

Fede

ral

GW

APD

CO

Y5M

L-24

-8-2

4C

OY

5ML-

24-8

-24

SWN

W24

080S

240E

4304

7375

31Fe

dera

lG

WA

PDC

OY

6ML-

24-8

-24

CO

Y6M

L-24

-8-2

4SE

NW

2408

0S24

0E43

0473

7532

_

Fede

ral

GW

APD

CO

Y6M

L-21

-8-2

4.C

OY

6ML-

21-8

-24

SEN

W21

080S

240E

4304

7375

84Fe

dera

lG

WA

PDC

OY

4ML-

21-8

-24

CO

Y4M

L-21

-8-2

4N

WN

W21

080S

240E

4304

7375

85Fe

dera

lG

WA

PDC

OY

14M

L-21

-8-2

4C

OY

14M

L-21

-8-2

4SE

SW21

080S

240E

4304

7375

86Fe

dera

lG

WA

PDC

OY

15M

L-21

-8-2

4C

OY

15M

L-21

-8-2

4SW

SE21

080S

240E

4304

7375

87Fe

dera

lG

WN

EWW

WT

1ML-

24-8

-24

WW

T1M

L-24

-8-2

4N

ENE

2408

0S24

0E43

0473

7590

Fede

ral

GW

APD

RW

S13

ML-

23-9

-24

RW

S13

ML-

23-9

-24

SWSW

2309

0S24

0E43

0473

7591

Fede

ral

GW

APD

WW

T8M

L-24

-8-2

4W

WT

8ML-

24-8

-24

SEN

E24

080S

240E

4304

7376

40Fe

dera

lG

WA

PDG

B16

ML-

20-8

-22

GB

16M

L-20

-8-2

2SE

SE20

080S

220E

|430

4737

664

1594

8Fe

dera

lG

WD

RL

NB

Z1M

L-29

-8-2

4N

BZ

1ML-

29-8

-24

NEN

E29

080S

240E

i43

0473

7666

_Fe

dera

lG

WA

PDW

WT

16M

L-24

-8-2

4W

WT

16M

L-24

-8-2

4SE

SE24

080S

240E

4304

7379

30Fe

dera

lG

WA

PDW

WT

15M

L-24

-8-2

4W

WT

15M

L-24

-8-2

4|S

WSE

2408

0S24

0E|

4304

7379

31Fe

dera

lG

WA

PDC

OY

14M

L-24

-8-2

4C

OY

14M

L-24

-8-2

4SE

SW24

080S

240E

4304

7379

32Fe

dera

lG

WA

PDC

OY

13M

L-24

-8-2

4C

OY

13M

L-24

-8-2

4SW

SW24

080S

240E

43_0

4737

933

Fede

ral

GW

APD

CO

Y11

ML-

24-8

-24

CO

Y11

ML-

24-8

-24

NES

W24

080S

240E

4304

7379

34Fe

dera

lG

WA

PDC

OY

15M

L-14

-8-2

4C

OY

15M

L-14

-8-2

4SW

SE14

080S

240E

4304

7379

35Fe

dera

lG

WA

PDC

OY

14M

L-14

-8-2

4C

OY

14M

L-14

-8-2

4SE

SW14

080S

240E

4304

7379

36Fe

dera

lG

WA

PDC

OY

12M

L-14

-8-2

4C

OY

12M

L-14

-8-2

4N

WSW

1408

0S24

0E43

0473

7937

Fede

ral

GW

APD

CO

Y11

ML-

14-8

-24

CO

YllM

L-14

-8-2

4N

ESW

1408

0S24

0E43

0473

7938

iFe

dera

lG

WA

PDW

VX

8ML-

5-8-

22W

VX

8ML-

5-8-

22SE

NE

0508

0S22

0E43

0473

8140

,IF

eder

alG

WA

PDW

VX

6ML-

5-8-

22W

VX

6ML-

5-8-

22SE

NW

0508

0S22

0E43

0473

8141

|Fe

dera

lG

WA

PDB

BS

5G-2

3-7-

21B

BS

5G-2

3-7-

21SW

NW

2307

0S21

0E43

0473

8471

|Fe

dera

lO

WA

PDG

B12

SG-2

9-8-

22|G

B12

SG-2

9-8-

22N

WSW

2908

0SI 2

20E

4304

7387

66|

Fede

ral

GW

APD

GB

10SG

-30-

8-22

GB

10SG

-30-

8-22

NW

SE30

080S

220E

4304

7387

67Fe

dera

lG

WA

PDN

BE

12SW

D-1

0-9-

23|N

BE

12SW

D-1

0-9-

23N

WSW

1009

0S23

0E43

0473

8875

Fede

ral

WD

APD

OP

16M

U-3

-7-2

0O

P16

MU

-3-7

-20

SESE

0307

0S20

0E43

0473

89_4

4_|

Fede

ral

OW

APD

WF

1P-1

-15-

19W

F1P

-1-1

5-19

NW

NW

0615

0S20

0EI

4304

7367

81|1

4862

.Indi

anIG

W

8of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

¶eR

$am

eg;N

oQ

iQSE

CTW

PR

NG

API

Entit

yIL

ease

Wel

lTy

peSt

atus

WW

T15

ML-

25-8

-24

WW

T15

ML-

25-8

-24

SWSE

2508

0S24

0E43

0473

7410

Fede

ral

GW

APD

BB

S15

G-2

2-7-

21B

BS

15G

-22-

7-21

SWSE

2207

0S21

0E43

0473

7443

1568

8iF

eder

alO

W|P

WW

T15

ML-

13-8

-24

WW

T15

ML-

13-8

-24

SWSE

1308

0S24

0E43

0473

7524

Fede

ral

GW

iAPD

WW

T16

ML-

13-8

-24

WW

T16

ML-

13-8

-24

SESE

1308

0S24

0EI

4304

7375

25i

IFed

eral

GW

IAPD

CO

Y6M

L-23

-8-2

4C

OY

6ML-

23-8

-24

SEN

W23

080S

240E

4304

7375

26Fe

dera

lG

WA

PDN

BZ

8ML-

23-8

-24

NB

Z8M

L-23

-8-2

4SE

NE

2308

0S24

0E.

4304

7375

27Fe

dera

lG

WA

PDC

OY

9ML-

23-8

-24

CO

Y9M

L-23

-8-2

4N

ESE

2308

0S24

0Ei

4304

7375

28Fe

dera

lG

WA

PDN

BZ

15M

L-23

-8-2

4N

BZ

15M

L-23

-8-2

4SW

SE23

080S

240E

i43

0473

7529

Fede

ral

GW

APD

CO

Y16

ML-

23-8

-24

CO

Y16

ML-

23-8

-24

SESE

2308

0S24

0E43

0473

7530

Fede

ral

GW

APD

CO

Y5M

L-24

-8-2

4C

OY

5ML-

24-8

-24

SWN

W24

080S

240E

4304

7375

31Fe

dera

lG

WA

PDC

OY

6ML-

24-8

-24

CO

Y6M

L-24

-8-2

4SE

NW

2408

0S24

0E43

0473

7532

_

Fede

ral

GW

APD

CO

Y6M

L-21

-8-2

4.C

OY

6ML-

21-8

-24

SEN

W21

080S

240E

4304

7375

84Fe

dera

lG

WA

PDC

OY

4ML-

21-8

-24

CO

Y4M

L-21

-8-2

4N

WN

W21

080S

240E

4304

7375

85Fe

dera

lG

WA

PDC

OY

14M

L-21

-8-2

4C

OY

14M

L-21

-8-2

4SE

SW21

080S

240E

4304

7375

86Fe

dera

lG

WA

PDC

OY

15M

L-21

-8-2

4C

OY

15M

L-21

-8-2

4SW

SE21

080S

240E

4304

7375

87Fe

dera

lG

WN

EWW

WT

1ML-

24-8

-24

WW

T1M

L-24

-8-2

4N

ENE

2408

0S24

0E43

0473

7590

Fede

ral

GW

APD

RW

S13

ML-

23-9

-24

RW

S13

ML-

23-9

-24

SWSW

2309

0S24

0E43

0473

7591

Fede

ral

GW

APD

WW

T8M

L-24

-8-2

4W

WT

8ML-

24-8

-24

SEN

E24

080S

240E

4304

7376

40Fe

dera

lG

WA

PDG

B16

ML-

20-8

-22

GB

16M

L-20

-8-2

2SE

SE20

080S

220E

|430

4737

664

1594

8Fe

dera

lG

WD

RL

NB

Z1M

L-29

-8-2

4N

BZ

1ML-

29-8

-24

NEN

E29

080S

240E

i43

0473

7666

_Fe

dera

lG

WA

PDW

WT

16M

L-24

-8-2

4W

WT

16M

L-24

-8-2

4SE

SE24

080S

240E

4304

7379

30Fe

dera

lG

WA

PDW

WT

15M

L-24

-8-2

4W

WT

15M

L-24

-8-2

4|S

WSE

2408

0S24

0E|

4304

7379

31Fe

dera

lG

WA

PDC

OY

14M

L-24

-8-2

4C

OY

14M

L-24

-8-2

4SE

SW24

080S

240E

4304

7379

32Fe

dera

lG

WA

PDC

OY

13M

L-24

-8-2

4C

OY

13M

L-24

-8-2

4SW

SW24

080S

240E

43_0

4737

933

Fede

ral

GW

APD

CO

Y11

ML-

24-8

-24

CO

Y11

ML-

24-8

-24

NES

W24

080S

240E

4304

7379

34Fe

dera

lG

WA

PDC

OY

15M

L-14

-8-2

4C

OY

15M

L-14

-8-2

4SW

SE14

080S

240E

4304

7379

35Fe

dera

lG

WA

PDC

OY

14M

L-14

-8-2

4C

OY

14M

L-14

-8-2

4SE

SW14

080S

240E

4304

7379

36Fe

dera

lG

WA

PDC

OY

12M

L-14

-8-2

4C

OY

12M

L-14

-8-2

4N

WSW

1408

0S24

0E43

0473

7937

Fede

ral

GW

APD

CO

Y11

ML-

14-8

-24

CO

YllM

L-14

-8-2

4N

ESW

1408

0S24

0E43

0473

7938

iFe

dera

lG

WA

PDW

VX

8ML-

5-8-

22W

VX

8ML-

5-8-

22SE

NE

0508

0S22

0E43

0473

8140

,IF

eder

alG

WA

PDW

VX

6ML-

5-8-

22W

VX

6ML-

5-8-

22SE

NW

0508

0S22

0E43

0473

8141

|Fe

dera

lG

WA

PDB

BS

5G-2

3-7-

21B

BS

5G-2

3-7-

21SW

NW

2307

0S21

0E43

0473

8471

|Fe

dera

lO

WA

PDG

B12

SG-2

9-8-

22|G

B12

SG-2

9-8-

22N

WSW

2908

0SI 2

20E

4304

7387

66|

Fede

ral

GW

APD

GB

10SG

-30-

8-22

GB

10SG

-30-

8-22

NW

SE30

080S

220E

4304

7387

67Fe

dera

lG

WA

PDN

BE

12SW

D-1

0-9-

23|N

BE

12SW

D-1

0-9-

23N

WSW

1009

0S23

0E43

0473

8875

Fede

ral

WD

APD

OP

16M

U-3

-7-2

0O

P16

MU

-3-7

-20

SESE

0307

0S20

0E43

0473

89_4

4_|

Fede

ral

OW

APD

WF

1P-1

-15-

19W

F1P

-1-1

5-19

NW

NW

0615

0S20

0EI

4304

7367

81|1

4862

.Indi

anIG

W

8of

8Q

EPU

inta

Bas

in(N

2460

)to

QU

ESTA

RE

and

P(N

5085

)4/

30/2

007

and

5/15

/200

7

Orig

inal

Wel

lN

ame

¶eR

$am

eg;N

oQ

iQSE

CTW

PR

NG

API

Entit

yIL

ease

Wel

lTy

peSt

atus

WW

T15

ML-

25-8

-24

WW

T15

ML-

25-8

-24

SWSE

2508

0S24

0E43

0473

7410

Fede

ral

GW

APD

BB

S15

G-2

2-7-

21B

BS

15G

-22-

7-21

SWSE

2207

0S21

0E43

0473

7443

1568

8iF

eder

alO

W|P

WW

T15

ML-

13-8

-24

WW

T15

ML-

13-8

-24

SWSE

1308

0S24

0E43

0473

7524

Fede

ral

GW

iAPD

WW

T16

ML-

13-8

-24

WW

T16

ML-

13-8

-24

SESE

1308

0S24

0EI

4304

7375

25i

IFed

eral

GW

IAPD

CO

Y6M

L-23

-8-2

4C

OY

6ML-

23-8

-24

SEN

W23

080S

240E

4304

7375

26Fe

dera

lG

WA

PDN

BZ

8ML-

23-8

-24

NB

Z8M

L-23

-8-2

4SE

NE

2308

0S24

0E.

4304

7375

27Fe

dera

lG

WA

PDC

OY

9ML-

23-8

-24

CO

Y9M

L-23

-8-2

4N

ESE

2308

0S24

0Ei

4304

7375

28Fe

dera

lG

WA

PDN

BZ

15M

L-23

-8-2

4N

BZ

15M

L-23

-8-2

4SW

SE23

080S

240E

i43

0473

7529

Fede

ral

GW

APD

CO

Y16

ML-

23-8

-24

CO

Y16

ML-

23-8

-24

SESE

2308

0S24

0E43

0473

7530

Fede

ral

GW

APD

CO

Y5M

L-24

-8-2

4C

OY

5ML-

24-8

-24

SWN

W24

080S

240E

4304

7375

31Fe

dera

lG

WA

PDC

OY

6ML-

24-8

-24

CO

Y6M

L-24

-8-2

4SE

NW

2408

0S24

0E43

0473

7532

_

Fede

ral

GW

APD

CO

Y6M

L-21

-8-2

4.C

OY

6ML-

21-8

-24

SEN

W21

080S

240E

4304

7375

84Fe

dera

lG

WA

PDC

OY

4ML-

21-8

-24

CO

Y4M

L-21

-8-2

4N

WN

W21

080S

240E

4304

7375

85Fe

dera

lG

WA

PDC

OY

14M

L-21

-8-2

4C

OY

14M

L-21

-8-2

4SE

SW21

080S

240E

4304

7375

86Fe

dera

lG

WA

PDC

OY

15M

L-21

-8-2

4C

OY

15M

L-21

-8-2

4SW

SE21

080S

240E

4304

7375

87Fe

dera

lG

WN

EWW

WT

1ML-

24-8

-24

WW

T1M

L-24

-8-2

4N

ENE

2408

0S24

0E43

0473

7590

Fede

ral

GW

APD

RW

S13

ML-

23-9

-24

RW

S13

ML-

23-9

-24

SWSW

2309

0S24

0E43

0473

7591

Fede

ral

GW

APD

WW

T8M

L-24

-8-2

4W

WT

8ML-

24-8

-24

SEN

E24

080S

240E

4304

7376

40Fe

dera

lG

WA

PDG

B16

ML-

20-8

-22

GB

16M

L-20

-8-2

2SE

SE20

080S

220E

|430

4737

664

1594

8Fe

dera

lG

WD

RL

NB

Z1M

L-29

-8-2

4N

BZ

1ML-

29-8

-24

NEN

E29

080S

240E

i43

0473

7666

_Fe

dera

lG

WA

PDW

WT

16M

L-24

-8-2

4W

WT

16M

L-24

-8-2

4SE

SE24

080S

240E

4304

7379

30Fe

dera

lG

WA

PDW

WT

15M

L-24

-8-2

4W

WT

15M

L-24

-8-2

4|S

WSE

2408

0S24

0E|

4304

7379

31Fe

dera

lG

WA

PDC

OY

14M

L-24

-8-2

4C

OY

14M

L-24

-8-2

4SE

SW24

080S

240E

4304

7379

32Fe

dera

lG

WA

PDC

OY

13M

L-24

-8-2

4C

OY

13M

L-24

-8-2

4SW

SW24

080S

240E

43_0

4737

933

Fede

ral

GW

APD

CO

Y11

ML-

24-8

-24

CO

Y11

ML-

24-8

-24

NES

W24

080S

240E

4304

7379

34Fe

dera

lG

WA

PDC

OY

15M

L-14

-8-2

4C

OY

15M

L-14

-8-2

4SW

SE14

080S

240E

4304

7379

35Fe

dera

lG

WA

PDC

OY

14M

L-14

-8-2

4C

OY

14M

L-14

-8-2

4SE

SW14

080S

240E

4304

7379

36Fe

dera

lG

WA

PDC

OY

12M

L-14

-8-2

4C

OY

12M

L-14

-8-2

4N

WSW

1408

0S24

0E43

0473

7937

Fede

ral

GW

APD

CO

Y11

ML-

14-8

-24

CO

YllM

L-14

-8-2

4N

ESW

1408

0S24

0E43

0473

7938

iFe

dera

lG

WA

PDW

VX

8ML-

5-8-

22W

VX

8ML-

5-8-

22SE

NE

0508

0S22

0E43

0473

8140

,IF

eder

alG

WA

PDW

VX

6ML-

5-8-

22W

VX

6ML-

5-8-

22SE

NW

0508

0S22

0E43

0473

8141

|Fe

dera

lG

WA

PDB

BS

5G-2

3-7-

21B

BS

5G-2

3-7-

21SW

NW

2307

0S21

0E43

0473

8471

|Fe

dera

lO

WA

PDG

B12

SG-2

9-8-

22|G

B12

SG-2

9-8-

22N

WSW

2908

0SI 2

20E

4304

7387

66|

Fede

ral

GW

APD

GB

10SG

-30-

8-22

GB

10SG

-30-

8-22

NW

SE30

080S

220E

4304

7387

67Fe

dera

lG

WA

PDN

BE

12SW

D-1

0-9-

23|N

BE

12SW

D-1

0-9-

23N

WSW

1009

0S23

0E43

0473

8875

Fede

ral

WD

APD

OP

16M

U-3

-7-2

0O

P16

MU

-3-7

-20

SESE

0307

0S20

0E43

0473

89_4

4_|

Fede

ral

OW

APD

WF

1P-1

-15-

19W

F1P

-1-1

5-19

NW

NW

0615

0S20

0EI

4304

7367

81|1

4862

.Indi

anIG

W

Page 44: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:

see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:

Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached

i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.

QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068

4. LOCATIONOF WELL

FOOTAGESATSURFACE: attached COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL

Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG AND ABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change

12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.

Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list

Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company

NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs

SIGNATURE ..r DATE 3/16/2007

(This space for Stato use only)

APRI S 2007(5/2000) (See Instructions on Reverse

STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:

see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:

Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached

i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.

QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068

4. LOCATIONOF WELL

FOOTAGESATSURFACE: attached COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL

Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG AND ABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change

12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.

Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list

Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company

NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs

SIGNATURE ..r DATE 3/16/2007

(This space for Stato use only)

APRI S 2007(5/2000) (See Instructions on Reverse

STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:

see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:

Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached

i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.

QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068

4. LOCATIONOF WELL

FOOTAGESATSURFACE: attached COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL

Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG AND ABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change

12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.

Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list

Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company

NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs

SIGNATURE ..r DATE 3/16/2007

(This space for Stato use only)

APRI S 2007(5/2000) (See Instructions on Reverse

STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERLALNUMBER:

see attached6. 1FINDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:

Do not use thisform for proposals todrill new wells,significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or todrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for auch proposale See attached

i TYPE OF WEL.L B. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHER see attached2. NAMEOF OPERATOR 9. API NUMBER.

QUESTAR EXPLORATIONAND PRODUCTION COMPANY attached3. ADDRESS OF OPERATOR: PHONE NUMBER 10 FIELDAND POOL, OR Wit.DCAT1050 17th Street Suite 500 Denver ,, CO as 80265 (303) 308-3068

4. LOCATIONOF WELL

FOOTAGESATSURFACE: attached COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submitin Duplicate) ALTER CASING FRACTURE TREAT SIDETRACKTO REPAIR WELL

Approximate date workwillstart CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREV10US PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG AND ABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHUT-OFFDate of workcompletion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION Change

12 DESCRIBE PROPOSED ORCOMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective January 1, 2007 operator of record, QEP Uinta Basin, Inc., willhereafter be known as QUESTAR EXPLORATIONAND PRODUCTION COMPANY. This name change involves only an internal corporate name change and no thirdpartychange of operator is involved. The same employees willcontinue to be responsible for operations of the properties describedon the attached list. Alloperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965003033Fee Land Bond Number: 965003033Current operator of record, QEP UINTABASIN, INC ereby résigns as operator of the properties as described on theattached list.

Ja ,N , Executive Vice President, QEP Uinta Basin, Inc.Successor operator of record, QUESTAR EXPLORATIO ÁND P UCTION COMPANY, hereby assumes all rights, dutiesand obligations as operator of the properties as descr ed on the ttached list

Ja Neese, Execktive Vice PresidentQ star Exploration and Production Company

NAME(PLEASEPRINT) D 'rÃK.,Stanberry TITLE Supervisor, Regulatory Affairs

SIGNATURE ..r DATE 3/16/2007

(This space for Stato use only)

APRI S 2007(5/2000) (See Instructions on Reverse

Page 45: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES

DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached

6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.

1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached

3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068

4 LOCATIONOF WELL

FOOTAGESATSURFACE attached COUNTY. Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:

COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.

NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs

(This spaco for State use only)

RECEIVED(5/2000) (See Instructions on Reverse Side)

UNOFOIL,GAS&

STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES

DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached

6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.

1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached

3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068

4 LOCATIONOF WELL

FOOTAGESATSURFACE attached COUNTY. Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:

COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.

NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs

(This spaco for State use only)

RECEIVED(5/2000) (See Instructions on Reverse Side)

UNOFOIL,GAS&

STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES

DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached

6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.

1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached

3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068

4 LOCATIONOF WELL

FOOTAGESATSURFACE attached COUNTY. Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:

COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.

NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs

(This spaco for State use only)

RECEIVED(5/2000) (See Instructions on Reverse Side)

UNOFOIL,GAS&

STATEOFUTAH FORMSDEPARTMENT OF NATURALRESOURCES

DIVISION OF OIL, GAS AND MINING 5. LEASEDEStGNATIONANDSERIALNUMBER.see attached

6. (F INDIAN,ALLOTTEEOR TRIBE NAMESUNDRY NOTICES AND REPORTS ON WELLS see attached7. UNITor CA AGREEMENTNAME:Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenterplugged wells,or to See attacheddrill horizontal laterals Use APPLICATION FOR PERMIT TO DRlLLform for such proposals.

1 TYPE OF WELL 8. WELL NAMEand NUMBEROIL WELL GAS WELL OTHER see attached2.NAMEOFOPERATOR 9 APINUMBEAQUESTAR EXPLORATION AND PRODUCTION COMPANY attached

3 ADDRESS OF OPERATOR PHONE NUMEER: 10. FFELDANDPOOL, OR WILDCAT1050 17th Street Suite 500 Denver y,p CO ,_80265 (303) 308-3068

4 LOCATIONOF WELL

FOOTAGESATSURFACE attached COUNTY. Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERlDIAN: STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATE NATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT(Submit in Duplicate) ALTER CASING FRACTURETREAT SIDETRACKTO REPAIR WELL

Approximate date work will start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

1/1/2007 CHANGE TO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGE TUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

CHANGE WELL STATUS PRODUCTION (START/RESUME) WATERSHUT-OFFDate of work completion:

COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Well Name ChangesCONVERT WELL TYPE RECOMPLETE - DIFFERENT FORMATION

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

PER THE ATTACHED LIST OF WELLS, QUESTAR EXPLORATIONAND PRODUCTION COMPANYREQUESTS THAT THEINDIVIDUAL WELL NAMES BE UPDATED INYOUR RECORDS.

NAME (PLEASE PRINT). , TITLE Supervisor, Regulatory Affairs

(This spaco for State use only)

RECEIVED(5/2000) (See Instructions on Reverse Side)

UNOFOIL,GAS&

Page 46: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

\ United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55

Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

January 23, 2008

Memorandum

To: Vernal Field Office

From: Chief, Branch of Fluid Minerals

Subject: Name Change Approval

Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.

The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.

/s/ Leslie Wilcken

Leslie WilckenLand Law ExaminerBranch of Fluid Minerals

cc: MMSState of Utah, DOGM,

bec: Dave MascarenasSusan BaumanConnie Seare

g 23

\ United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55

Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

January 23, 2008

Memorandum

To: Vernal Field Office

From: Chief, Branch of Fluid Minerals

Subject: Name Change Approval

Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.

The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.

/s/ Leslie Wilcken

Leslie WilckenLand Law ExaminerBranch of Fluid Minerals

cc: MMSState of Utah, DOGM,

bec: Dave MascarenasSusan BaumanConnie Seare

g 23

\ United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55

Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

January 23, 2008

Memorandum

To: Vernal Field Office

From: Chief, Branch of Fluid Minerals

Subject: Name Change Approval

Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.

The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.

/s/ Leslie Wilcken

Leslie WilckenLand Law ExaminerBranch of Fluid Minerals

cc: MMSState of Utah, DOGM,

bec: Dave MascarenasSusan BaumanConnie Seare

g 23

\ United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State OfficeP.O. Box45l55

Salt Lake City, UT 84145-0155http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

January 23, 2008

Memorandum

To: Vernal Field Office

From: Chief, Branch of Fluid Minerals

Subject: Name Change Approval

Attached is a certified copy of the Certificate of Name Change issued by the Texas Secretary ofState and a decision letter recognizing the merger from the Eastern States state office. We haveupdated our records to reflect the name change in the attached list of leases.

The name change from QEP Uinta Basin, Inc. into Questar Exploration and Production Co.is effective May 1, 2007, which is a correction to the effective dated stated in the decision letter.For verification of effective date, please refer to the name change certificate from the State ofTexas.

/s/ Leslie Wilcken

Leslie WilckenLand Law ExaminerBranch of Fluid Minerals

cc: MMSState of Utah, DOGM,

bec: Dave MascarenasSusan BaumanConnie Seare

g 23

Page 47: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUMBER

BBS 15G-22-7-21

2. TYPE OF WORK

DRILL NEW WELL REENTER P&A WELL DEEPEN WELL 3. FIELD OR WILDCAT

BRENNAN BOTTOM

4. TYPE OF WELLOil Well Coalbed Methane Well: NO

5. UNIT or COMMUNITIZATION AGREEMENT NAMEJOHNSON BOTTOM

6. NAME OF OPERATORQUESTAR EXPLORATION & PRODUCTION CO

7. OPERATOR PHONE435 781-4362

8. ADDRESS OF OPERATOR11002 East 17500 South, Vernal, UT, 84078

9. OPERATOR [email protected]

10. MINERAL LEASE NUMBER(FEDERAL, INDIAN, OR STATE)

UTU16551

11. MINERAL OWNERSHIP

FEDERAL INDIAN STATE FEE 12. SURFACE OWNERSHIP

FEDERAL INDIAN STATE FEE

13. NAME OF SURFACE OWNER (if box 12 = 'fee')

14. SURFACE OWNER PHONE (if box 12 = 'fee')

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee')

16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

17. INDIAN ALLOTTEE OR TRIBE NAME(if box 12 = 'INDIAN')

18. INTEND TO COMMINGLE PRODUCTION FROMMULTIPLE FORMATIONS

YES (Submit Commingling Application) NO

19. SLANT

VERTICAL DIRECTIONAL HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S

Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S

At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S

21. COUNTYUINTAH

22. DISTANCE TO NEAREST LEASE LINE (Feet)669

23. NUMBER OF ACRES IN DRILLING UNIT2320

25. DISTANCE TO NEAREST WELL IN SAME POOL(Applied For Drilling or Completed)

0

26. PROPOSED DEPTHMD: 10580 TVD: 6374

27. ELEVATION - GROUND LEVEL

4907

28. BOND NUMBER

ESB000024

29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

A36125 - 49-2153

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY

DRILLED)

TOPOGRAPHICAL MAP

NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331

SIGNATURE DATE 09/08/2009 EMAIL [email protected]

API NUMBER ASSIGNED

43047374430000

Permit Manager

APPROVAL

FORM 3

AMENDED REPORT

API Well No: 43047374430000 Received: 9/8/2009

CONFIDENTIAL

API Well No: 43047374430000 Received: 9/8/2009

FORM 3STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21

2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM

6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362

8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]

10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTA )1 FEDERAL ) INDIAN ( ) STATE I FEE FEDERAL INDIAN STATE I FEE I

13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT

(if box 12 = 'INDIAN')MULTIPLE FORMATIONS

YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONALI HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S

Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S

At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320

25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

4907 ESBOOOO24 A36125 -49-2153

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAPDRILLED)

NAME lan Nelson TITLE Permit Agent PHONE 435 781-4331

SIGNATURE DATE 09/08/2009 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL

43047374430000

Permit

API Well No: 43047374430000 Received 9/8/2009

I-ORM 3STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21

2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM

6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362

8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]

10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTU

5 1 FEDERAL INDIAN I STATE FEE FEDERAL INDIAN STATE I FEE I

13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT

(if box 12 = 'INDIAN')MULTIPLE FORMATIONS

YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONAL I HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S

Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S

At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320

25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

4907 ESBOOOO24 A36125 -49-2153

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP

DRILLED)

NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331

SIGNATURE DATE 09/08/2009 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL

43047374430000

Permit

API Well No: 43047374430000 Received 9/8/2009

I-ORM 3STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21

2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM

6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362

8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]

10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTU

5 1 FEDERAL INDIAN I STATE FEE FEDERAL INDIAN STATE I FEE I

13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT

(if box 12 = 'INDIAN')MULTIPLE FORMATIONS

YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONAL I HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S

Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S

At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320

25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

4907 ESBOOOO24 A36125 -49-2153

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP

DRILLED)

NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331

SIGNATURE DATE 09/08/2009 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL

43047374430000

Permit

API Well No: 43047374430000 Received 9/8/2009

I-ORM 3STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING

APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUSM15ER22-7-21

2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELL REENTER P&A WELL DEEPEN WELL BRENNAN BOTTOM

4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO JOHNSON BOTTOM

6. NAME OF OPERATOR 7. OPERATOR PHONEQUESTAR EXPLORATION & PRODUCTION CO 435 781-4362

8. ADDRESS OF OPERATOR 9. OPERATOR E-MAIL11002 East 17500 South, Vernal, UT, 84078 [email protected]

10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, ORUSTU

5 1 FEDERAL INDIAN I STATE FEE FEDERAL INDIAN STATE I FEE I

13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')

15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')

17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT

(if box 12 = 'INDIAN')MULTIPLE FORMATIONS

YES I (Submit Commingling Application) NO I ) VERTICALI DIRECTIONAL I HORIZONTAL

20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN

LOCATION AT SURFACE 669 FSL 2022 FEL SWSE 22 7.0 S 21.0 E S

Top of Uppermost Producing Zone 314 FSL 1900 FEL SWSE 22 7.0 S 21.0 E S

At Total Depth 2080 FSL 660 FEL NESE 27 7.0 S 21.0 E S

21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITUINTAH 669 2320

25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 10580 TVD: 63740

27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE

4907 ESBOOOO24 A36125 -49-2153

ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN

AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER

DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP

DRILLED)

NAME Jan Nelson TITLE Permit Agent PHONE 435 781-4331

SIGNATURE DATE 09/08/2009 EMAIL [email protected]

API NUMBER ASSIGNED APPROVAL

43047374430000

Permit

Page 48: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 9.625 0 495

Pipe Grade Length Weight

Grade J-55 LT&C 495 36.0

API Well No: 43047374430000 Received: 9/8/2009

CONFIDENTIAL

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 9.625 0 495

Pipe Grade Length Weight

Grade J-55 LT&C 495

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 9.625 0 495

Pipe Grade Length Weight

Grade J-55 LT&C 495

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 9.625 0 495

Pipe Grade Length Weight

Grade J-55 LT&C 495

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Surf 12.25 9.625 0 495

Pipe Grade Length Weight

Grade J-55 LT&C 495

Page 49: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 6806

Pipe Grade Length Weight

Grade J-55 LT&C 6806 15.5

API Well No: 43047374430000 Received: 9/8/2009

CONFIDENTIAL

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 6806

Pipe Grade Length Weight

Grade J-55 LT&C 6806

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 6806

Pipe Grade Length Weight

Grade J-55 LT&C 6806

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 6806

Pipe Grade Length Weight

Grade J-55 LT&C 6806

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Prod 7.875 5.5 0 6806

Pipe Grade Length Weight

Grade J-55 LT&C 6806

Page 50: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

L1 4.75 3.5 0 10580

Pipe Grade Length Weight

Grade J-55 LT&C 4418 9.2

API Well No: 43047374430000 Received: 9/8/2009

CONFIDENTIAL

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Ll 4.75 3.5 0 10580

Pipe Grade Length Weight

Grade J-55 LT&C 4418

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Ll 4.75 3.5 0 10580

Pipe Grade Length Weight

Grade J-55 LT&C 4418

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Ll 4.75 3.5 0 10580

Pipe Grade Length Weight

Grade J-55 LT&C 4418

API Well No: 43047374430000 Received: 9/8/2009

Proposed Hole, Casing, and Cement

String Hole Size Casing Size Top (MD) Bottom (MD)

Ll 4.75 3.5 0 10580

Pipe Grade Length Weight

Grade J-55 LT&C 4418

Page 51: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’API

Wel

lNo:

4304

7374

4300

00’

’API

Wel

lNo:

4304

7374

4300

00’

’API

Wel

lNo:

4304

7374

4300

00’

’API

Wel

lNo:

4304

7374

4300

00’

CONFIDEN

TIAL

QUESTAR EXPLR. & PROD.

T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.dcM. Uintah County, Utah.

SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION

BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES

- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.

BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.

Noz

of SimesNO7E·

9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE

1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°

CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13

/ vUn'g5rode2 7und

= 4909'.

2022'L

REVISED:08-14-07 L.K.

Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING

S68°15'W- 2694.12 L O.)

* S6875'46"W - 2696.12 (Mees.)¯

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=

90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES

= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=

40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &

QUESTAR EXPLR. & PROD.

T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.dcM. Uintah County, Utah.

SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION

BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES

- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.

BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.

Noz

of SimesNO7E·

9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE

1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°

CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13

/ vUn'g5rode2 7und

= 4909'.

2022'L

REVISED:08-14-07 L.K.

Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING

S68°15'W- 2694.12 L O.)

* S6875'46"W - 2696.12 (Mees.)¯

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=

90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES

= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=

40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &

QUESTAR EXPLR. & PROD.

T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.dcM. Uintah County, Utah.

SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION

BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES

- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.

BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.

Noz

of SimesNO7E·

9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE

1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°

CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13

/ vUn'g5rode2 7und

= 4909'.

2022'L

REVISED:08-14-07 L.K.

Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING

S68°15'W- 2694.12 L O.)

* S6875'46"W - 2696.12 (Mees.)¯

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=

90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES

= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=

40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &

QUESTAR EXPLR. & PROD.

T?'S R21E SL B.&M Well location, BBS #15G--22-7-21, located as' • • shown in the SW 1/4 SE 1/4 of Section 22,

T7S, R21E, S.L.B.dcM. Uintah County, Utah.

SS7°59'W- 2658.48' (G.L.O.) SBT59'W - 2651.22' (G.LO.) BASIS OF ELEVATION

BENCHMARK (43EAM) LOCATEDIN THE SE 1/4 OF SECTION21, T7S, R21E, S.L.B.&M. TAKENFROM THE BRENNANBASIN,QUADRANGLE,UTAH,UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHED BY THE UNITEDSTATES

- DEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKEDAS BEING4832 FEET.

BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATlON.

Noz

of SimesNO7E·

9 THEPROPOSED SOUTHEASTLATERALBOTTOM-! HOLEFOR THISWELLIS LOCATEDIN TNE NE SC A LE

1/4 SE 1/4 OF SECTION27. T7S, R21E,S.LB.&M. AT A DISTANCEOF 2080' FSL 660°

CERT1FICATE00 FEL IT BEARS 516°43'27"E 4131.91 FROM THE WHilligPROPOSED WELL HEAD.THISIS TO CERTIFY THAT THEABOVE OMFIELDNOTESOF ACTUALSURVEYSMSUPERVISIONANDTHATTHESAME AND CORR EBESTOF MYKNOWLEDGEANDBEU , i 13

/ vUn'g5rode2 7und

= 4909'.

2022'L

REVISED:08-14-07 L.K.

Îs wTufe " '"""" UINTAH GINEERING a LAND VEYING

S68°15'W- 2694.12 L O.)

* S6875'46"W - 2696.12 (Mees.)¯

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

bLEGEND: (AUTONOMOUSNAD 83) SCALE DATESURVEYED: DATE DRAWN:LATITUDE=

40°11'28.04" (40.191122) 1" = 1000 11-11-05 11-13-05=

90° SYMBOL LONGITUDE- 109°32'20.96° (109.539156) PARTY REFERENCES

= PROPOSED WELL HEAD (AUTONOMOUS NAD 27) D.A. C.F. D.R.B. G.LO. PLATLATITUDE=

40°11'28.17" (40.191158) WEATHER FILEA = SECTION CORNERS LOCATED. LONGITUDE= 109'32'18.47" (109.538464) COOL QUESTAR EXPLR. &

Page 52: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’API

Wel

lNo:

4304

7374

4300

00’

’API

Wel

lNo:

4304

7374

4300

00’

’API

Wel

lNo:

4304

7374

4300

00’

’API

Wel

lNo:

4304

7374

4300

00’

CONFIDEN

TIAL

QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered

stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,

S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.

BASIS OF ELEVATION

I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,

QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID

d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGSIS A G.P.S. OBSERVATION.

NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E

4131.91' FROMTHE PROPOSED WELLHEAD. N

27 (G.L.O.)o o o

BBS /15G-22- 7-21,

° '¯¯

BOTTOMHOLEC) 660 I- --

SCALE

CERTIFICATE illiLA

THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE

' No. 1

REGIS O LA D SOOR

REVISED: 08-21-09 L.K. REGISTR

REVISED: 08-14-07 L.K. STATE O 7p yO

UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05

= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT

A = SECTION CORNERS LOCATEDDNC

EDE93 140"

9041393722)WEA1NER Fl

UESTAR EXPLR. &

QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered

stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,

S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.

BASIS OF ELEVATION

I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,

QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID

d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGSIS A G.P.S. OBSERVATION.

NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E

4131.91' FROMTHE PROPOSED WELLHEAD. N

27 (G.L.O.)o o o

BBS /15G-22- 7-21,

° '¯¯

BOTTOMHOLEC) 660 I- --

SCALE

CERTIFICATE illiLA

THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE

' No. 1

REGIS O LA D SOOR

REVISED: 08-21-09 L.K. REGISTR

REVISED: 08-14-07 L.K. STATE O 7p yO

UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05

= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT

A = SECTION CORNERS LOCATEDDNC

EDE93 140"

9041393722)WEA1NER Fl

UESTAR EXPLR. &

QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered

stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,

S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.

BASIS OF ELEVATION

I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,

QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID

d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGSIS A G.P.S. OBSERVATION.

NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E

4131.91' FROMTHE PROPOSED WELLHEAD. N

27 (G.L.O.)o o o

BBS /15G-22- 7-21,

° '¯¯

BOTTOMHOLEC) 660 I- --

SCALE

CERTIFICATE illiLA

THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE

' No. 1

REGIS O LA D SOOR

REVISED: 08-21-09 L.K. REGISTR

REVISED: 08-14-07 L.K. STATE O 7p yO

UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05

= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT

A = SECTION CORNERS LOCATEDDNC

EDE93 140"

9041393722)WEA1NER Fl

UESTAR EXPLR. &

QUESTAR EXPLR. & PROD.Well location, BBS #15G-22-7-21 (BOTTOM HOLE),T7S R21E S.L.B.&M. 1963***CP located as shown in the NE 1/4 SE 1/4 of0.4' H/gh, Scattered

stones Section 27, T7S, R21E, S.L.B.&M. Uintah County,

S8815'w - 2694.12' (GL.O.)58875'46"W- 2696.12'(Me¤s.) Utah.

BASIS OF ELEVATION

I 9 "|"g 87'09' BENCH MARK (43EAM) LOCATEDIN THE SE 1/4 OF SECT10Nor semes (G.L.O.) 21, T7S, R21E, S.L.B.&M. TAKEN FROM THE BRENNANBASIN,

QUADRANGLE,UTAH, UINTAHCOUNTY,7.5 MINUTEQUAD.(TOPOGRAPHICMAP) PUBLISHEDBY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAID

d ELEVATIONIS MARKEDAS BEING 4832 FEET.BASIS OF BEARINGS

BASIS OF BEARINGSIS A G.P.S. OBSERVATION.

NOTE:THE PROPOSED SOUTHEASTLATERALBOTTOMHOLEFOR THIS WELLBEARS S18°43°27°E

4131.91' FROMTHE PROPOSED WELLHEAD. N

27 (G.L.O.)o o o

BBS /15G-22- 7-21,

° '¯¯

BOTTOMHOLEC) 660 I- --

SCALE

CERTIFICATE illiLA

THIS IS TO CERT1FYTHAT THE ABOVE REPFIELDNOTES OF ACTUALSURVEYSMA MSUPERVISIONAND THAT THE SAME A AND CBEST OF MY KNOWLEDGEAND BEUE

' No. 1

REGIS O LA D SOOR

REVISED: 08-21-09 L.K. REGISTR

REVISED: 08-14-07 L.K. STATE O 7p yO

UINTAH SGINEERING & IAND SJRVEYING5304.42' (G.L.O.)

85 SOUTH 200 EAST - VERNAL, UTAH 84078(435) 789-1017

LEGEND: SCALE DATE SURVEYED: DA7E DRAWN:1" = 1000' 11-11-05 11-13-05

= 90 SYMBOL NAD 83 (TARGET BOTTOM HOLE) rARTY REFERENCE5LA71TUDE= 4010'49.38" (40.180383)= PROPOSED WELLHEAD. LONGITUDE = 109'32'03.88" (109.534411) D.A. C.F. D.R.B. G.L.O. PLAT

A = SECTION CORNERS LOCATEDDNC

EDE93 140"

9041393722)WEA1NER Fl

UESTAR EXPLR. &

Page 53: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

DRILLING PROGRAM

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.

1. Formation Tops

The estimated top of important geologic markers are as follows:

Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'

2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones

The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:

Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'

All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.

All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.

Page 1 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

DRILLING PROGRAM

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.

1. Formation Tops

The estimated top of important geologic markers are as follows:

Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'

2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones

The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:

Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'

All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.

All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.

Page 1 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

DRILLING PROGRAM

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.

1. Formation Tops

The estimated top of important geologic markers are as follows:

Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'

2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones

The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:

Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'

All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.

All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.

Page 1 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

DRILLING PROGRAM

ONSHORE OIL & GAS ORDER NO. 1Approval of Operations on Onshore

Federal Oil and Gas Leases

All lease and/or unit operations will be conducted in such a manner that full compliance ismade with applicable laws, regulations (43 CFR 3100), Onshore Oil & Gas No. 1, and theapproved plan of operations. The operator is fully responsible for the actions of itssubcontractors. A copy of these conditions will be furnished the field representative to insurecompliance.

1. Formation Tops

The estimated top of important geologic markers are as follows:

Formation Depth, TVD Depth, MDGreen River 3,200' 3,200'Kick Off Point 6,202' 6,202'Green River (H4a Lime) 6,560' 6,782'TD 6,374' l0,580'

2. Anticipated Depths of Oil, Gas, Water, and Other Mineral Bearing Zones

The estimated depths at which the top an bottom of the anticipated water, oil, gas, orother mineral bearing formations are expected to be encountered as follows:

Substance Formation Depth, TVD Depth, MDOil/Gas Green River (H4a Lime) 6,560' - 6,374' 6,782' - 10,580'

All fresh water and prospectively valuable minerals encountered during drilling willbe recorded by depth and adequately protected. All oil and gas shows will be testedto determine commercial potential.

All water shows and water-bearing sands will be reported to the BLM in Vernal,Utah. Copies of State of Utah form OGC-8-X are acceptable. If flows are detected,samples will be submitted to the BLM along with any water analyses conducted.Fresh water will be obtained from Wonsits Valley water right A36125 (which wasfiled on May 7, 1964) or Red Wash water right # 49-2153 (which was filed on March25, 1960). It was determined by the Fish and Wildlife Service that any water rightnumber filed before 1989 is not depleting to the Upper Colorado River System, tosupply fresh water for drilling purposes. All water resulting from drilling operationswill be disposed of at Red Wash Central Battery Disposal site; SWSE, Section 27,T7S, R23E or Wonsits Valley Disposal Site; SWNW, Section 12, T8S, R21E.

Page 1 of

Page 54: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

3. Operator's Specification for Pressure Control Equipment

A. 3,000 psi double gate, 3,000 psi annular (schematic attached)

B. Function test daily.

C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.

D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.

4. Casing Program

As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.

Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55

The lateral portion of this wellbore will be cased with a slotted liner.

Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55

Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.

5. Auxilliary Eauipment

A. Kelly Cock - Yes

B. Float at the bit - No

C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow

D. Fully opening safety valve on the rig floor - Yes

E. Rotating Head - Yes

Page 2 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

3. Operator's Specification for Pressure Control Equipment

A. 3,000 psi double gate, 3,000 psi annular (schematic attached)

B. Function test daily.

C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.

D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.

4. Casing Program

As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.

Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55

The lateral portion of this wellbore will be cased with a slotted liner.

Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55

Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.

5. Auxilliary Eauipment

A. Kelly Cock - Yes

B. Float at the bit - No

C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow

D. Fully opening safety valve on the rig floor - Yes

E. Rotating Head - Yes

Page 2 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

3. Operator's Specification for Pressure Control Equipment

A. 3,000 psi double gate, 3,000 psi annular (schematic attached)

B. Function test daily.

C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.

D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.

4. Casing Program

As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.

Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55

The lateral portion of this wellbore will be cased with a slotted liner.

Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55

Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.

5. Auxilliary Eauipment

A. Kelly Cock - Yes

B. Float at the bit - No

C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow

D. Fully opening safety valve on the rig floor - Yes

E. Rotating Head - Yes

Page 2 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

3. Operator's Specification for Pressure Control Equipment

A. 3,000 psi double gate, 3,000 psi annular (schematic attached)

B. Function test daily.

C. All casing strings shall be pressure tested (0.22psi/ft or 1,500 psi, whicheveris greater) prior to drilling the plug after cementing; test pressure shall notexceed the internal yield of the casing.

D. Ram type preventers and associated equipment shall be tested to ratedworking pressure if isolated by a test plug or to 50% of the internal yieldpressure of casing, whichever is less. BOP and related equipment shall meetthe minimum requirements of Onshore Oil & Gas Order No. 2 for equipmentand testing requirements, procedures, etc..., for a 3M system and individualcomponents shall be operable as designed.

4. Casing Program

As this well is a re-entry of an existing well the surface and production casing stringsare already in place as detailed below.

Hole Size Casing Size Depth, MD Weight Grade12 ¼" 9 5/8" 495' 36.0 J-557 7/8" 5 ½" 6,806' 15.5 J-55

The lateral portion of this wellbore will be cased with a slotted liner.

Hole Size Casing Size Top,MD Bottom, MD Weight Grade4 3/4" 3 1/2" Flush 6,162' 10,580' 9.2 J-55

Please refer to the attached wellbore diagram and re-entry procedure for furtherdetails.

5. Auxilliary Eauipment

A. Kelly Cock - Yes

B. Float at the bit - No

C. Monitoring equipment on the mud system - visually and/or PVT or FlowShow

D. Fully opening safety valve on the rig floor - Yes

E. Rotating Head - Yes

Page 2 of

Page 55: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

If drilling with air the following will be used:

F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.

G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')

H. Compressor shall be tied directly to the blooie line through a manifold

I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.

Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.

No minimum quantity of weight material will be required to be kept on location.

PVT/Flow show will be used upon exit of existing production casing to TD.

Gas detector will be used upon exit of existing production casing to TD.

6. Testing. Loening, and Coring Program

A. Cores - None Anticipated

B. DST -None Anticipated

C. Logging:i. Mud logging from casing exit to TD

ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.

D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.

Page 3 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

If drilling with air the following will be used:

F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.

G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')

H. Compressor shall be tied directly to the blooie line through a manifold

I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.

Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.

No minimum quantity of weight material will be required to be kept on location.

PVT/Flow show will be used upon exit of existing production casing to TD.

Gas detector will be used upon exit of existing production casing to TD.

6. Testing. Loening, and Coring Program

A. Cores - None Anticipated

B. DST -None Anticipated

C. Logging:i. Mud logging from casing exit to TD

ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.

D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.

Page 3 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

If drilling with air the following will be used:

F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.

G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')

H. Compressor shall be tied directly to the blooie line through a manifold

I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.

Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.

No minimum quantity of weight material will be required to be kept on location.

PVT/Flow show will be used upon exit of existing production casing to TD.

Gas detector will be used upon exit of existing production casing to TD.

6. Testing. Loening, and Coring Program

A. Cores - None Anticipated

B. DST -None Anticipated

C. Logging:i. Mud logging from casing exit to TD

ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.

D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.

Page 3 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

If drilling with air the following will be used:

F. The blooie line shall be at least 6" in diameter and extend at least 100' fromthe wellbore into the reserve/blooie pit.

G. Blooie line ignition shall be provided by a continuous pilot (ignited whendrilling below 500')

H. Compressor shall be tied directly to the blooie line through a manifold

I. A mister with a continuous stream of water shall be installed near the end ofthe blooie lines for dust suppression.

Drilling of the lateral will be done with water based mud systems consisting primarilyof fresh water, bentonite, lignite, caustic, lime, soda ash, and polymers. Nochromates will be used. It is not intended to use oil in the mud, however, in the eventit is used the concentration will be less than 4% by volume. Maximum anticipatedmud weight is 9.0 ppg.

No minimum quantity of weight material will be required to be kept on location.

PVT/Flow show will be used upon exit of existing production casing to TD.

Gas detector will be used upon exit of existing production casing to TD.

6. Testing. Loening, and Coring Program

A. Cores - None Anticipated

B. DST -None Anticipated

C. Logging:i. Mud logging from casing exit to TD

ii. MWD-GR will be utilized during drilling operations to aid in landingthe curve and maintaining the lateral within the desired zone.

D. Formation and completion interval: H4a Lime interval, final determination ofcompletion will be made by analysis of mud logging data. Stimulation:stimulation will be designed for the particular area of interest encountered.

Page 3 of

Page 56: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

7. Cementing Program

As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.

8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards

No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.

Page 4 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

7. Cementing Program

As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.

8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards

No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.

Page 4 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

7. Cementing Program

As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.

8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards

No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.

Page 4 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.BBS 15G-22-7-21 Re-Entry

7. Cementing Program

As this is a re-entry well and a slotted liner will be run in the newly drilled lateralthere will be no cement required to drill this well. Please refer to the attachedwellbore diagram for existing casing and cement conditions.

8. Anticipated Abnormal Pressures and Temperatures, Other Potential Hazards

No abnormal temperatures or pressures are anticipated. No H2S has beenencountered or is known to exist from previous wells drilled to similar depths in thegeneral area. Maximum anticipated bottom-hole pressure equals approximately 3,250psi. Maximum anticipated bottom hole temperature is approximately 160°F.

Page 4 of

Page 57: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3MBOPSTACK

FlowlineRotatingHead

SpacerSpool

I

3MAnnular

3MDoubleRam

Mill Line 3"ChokeLine

2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_1

I I

3Mx 3MMulti-BowlHead

9 5/8"3MCasingHead

Page 1

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3MBOPSTACK

FlowlineRotatingHead

SpacerSpool

I

3MAnnular

3MDoubleRam

Mill Line 3"ChokeLine

2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_1

I I

3Mx 3MMulti-BowlHead

9 5/8"3MCasingHead

Page 1

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3MBOPSTACK

FlowlineRotatingHead

SpacerSpool

I

3MAnnular

3MDoubleRam

Mill Line 3"ChokeLine

2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_1

I I

3Mx 3MMulti-BowlHead

9 5/8"3MCasingHead

Page 1

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3MBOPSTACK

FlowlineRotatingHead

SpacerSpool

I

3MAnnular

3MDoubleRam

Mill Line 3"ChokeLine

2" 3M 2"3M 3"3M 3"3M y,s, ..., lG.L Cluck Manual gggg jÇ g. .... .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_1

I I

3Mx 3MMulti-BowlHead

9 5/8"3MCasingHead

Page 1

Page 58: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3M CHOKE MANIFOLD

omsmemenom

ADNTABLE CHONE

3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBSMAY VARYß4 m 39528. Bepr.27. 1989)

Page 2 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3M CHOKE MANIFOLD

omsmemenom

ADNTABLE CHONE

3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBSMAY VARYß4 m 39528. Bepr.27. 1989)

Page 2 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3M CHOKE MANIFOLD

omsmemenom

ADNTABLE CHONE

3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBS MAY VARYß4 m 39528. Bepr.27. 1989)

Page 2 of

'APIWellNo:43047374430000'

ONSHORE OIL & GAS ORDER NO. 1QUESTAR EXPLORATION & PRODUCTION, CO.

3M CHOKE MANIFOLD

omsmemenom

ADNTABLE CHONE

3M CHOKB MANIFOLD EQUIPMENT - CONFIOURATIONOF CHOKBS MAY VARYß4 m 39528. Bepr.27. 1989)

Page 2 of

Page 59: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR

BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /

48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg

REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope

N 613 c

Flore Pit is to be /ocateda min. of 100' from theWell Head

9107

E/. 914. 's.

Û- ÍÛ. 48 150' Sta. 1+75

L 901.6'

Sta. 0 SI ----

7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.

- 2,870 Cu- Yds Toe ofFill Slope

EL 914s :- a st; 48 Sto. O 00 .C-1E.9

(htm. pit, Topsoi/ Stockpile ..:. .. 4.

C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7

E/ev Ungraded Ground AtL.oc/

Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING

FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>

'APIWellNo:43047374430000'

QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR

BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /

48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg

REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope

N 613 c

Flore Pit is to be /ocateda min. of 100' from theWell Head

9107

E/. 914. 's.

Û- ÍÛ. 48 150' Sta. 1+75

L 901.6'

Sta. 0 SI ----

7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.

- 2,870 Cu- Yds Toe ofFill Slope

EL 914s :- a st; 48 Sto. O 00 .C-1E.9

(htm. pit, Topsoi/ Stockpile ..:. .. 4.

C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7

E/ev Ungraded Ground AtL.oc/

Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING

FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>

'APIWellNo:43047374430000'

QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR

BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /

48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg

REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope

N 613 c

Flore Pit is to be /ocateda min. of 100' from theWell Head

9107

E/. 914. 's.

Û- ÍÛ. 48 150' Sta. 1+75

L 901.6'

Sta. 0 SI ----

7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.

- 2,870 Cu- Yds Toe ofFill Slope

EL 914s :- a st; 48 Sto. O 00 .C-1E.9

(htm. pit, Topsoi/ Stockpile ..:. .. 4.

C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7

E/ev Ungraded Ground AtL.oc/

Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING

FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>

'APIWellNo:43047374430000'

QUESTAR EXPLR & PROD. FIGURE #iLOCATION LAYOUT FOR

BBS #150-22-7-21SECTION 22, T7S, R21E, S.L.B.&M.

669' FSL 2022' FELC- J.4' C-1.2' Proposed Access o F-4.58 911.0' B. 908.8' Road 8. 901 /

48' Sta. J+50SCALE: 1" = 50'DATE: 11-13-05 Round CornersDrown By: D.R.B. as Needed gg

REVISED: 08- 21-09 L.K Approx. / . ANDTop ofCut Slope

N 613 c

Flore Pit is to be /ocateda min. of 100' from theWell Head

9107

E/. 914. 's.

Û- ÍÛ. 48 150' Sta. 1+75

L 901.6'

Sta. 0 SI ----

7etal Pit Capac/fy--W/2' of Freeboard- 10,620 Ðb/s. ±Total Pit Vdume ApprOX.

- 2,870 Cu- Yds Toe ofFill Slope

EL 914s :- a st; 48 Sto. O 00 .C-1E.9

(htm. pit, Topsoi/ Stockpile ..:. .. 4.

C- 4. 1 C- 1 7 F- 4. 7'NOŒS " *"·7

E/ev Ungraded Ground AtL.oc/

Stoke = 4908.7UINTAH ENclNEERING & LAND SURVEYING

FINISHED GRADE ELEV A T LOC. STAKE = 490Z6 ,, s. 2 o s.,, . v.,.... es., 4447, .<<4e>

Page 60: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR

BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO

669' FSL 2022' FELNo. 161316

RO

SCALE: 1" =50° NAN

DATE: 11-13-05Drawn By· D.R.B.

REVISED: 08--21-09 L.K.

NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.

PIPE TUSS

PIPE RACKS

150'

TOILET O

'¯ ¯ LICHTPLANT

BOILER

PUMP HOUSECOM SOR WANTER

BOOSTER

Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume

- 2, 870 Cu. Yds.PROPANESTORAGE

UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)

'APIWellNo:43047374430000'

QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR

BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO

669' FSL 2022' FELNo. 161316

RO

SCALE: 1" =50° NAN

DATE: 11-13-05Drawn By· D.R.B.

REVISED: 08--21-09 L.K.

NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.

PIPE TUSS

PIPE RACKS

150'

TOILET O

'¯ ¯ LICHTPLANT

BOILER

PUMP HOUSECOM SOR WANTER

BOOSTER

Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume

- 2, 870 Cu. Yds.PROPANESTORAGE

UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)

'APIWellNo:43047374430000'

QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR

BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO

669' FSL 2022' FELNo. 161316

RO

SCALE: 1" =50° NAN

DATE: 11-13-05Drawn By· D.R.B.

REVISED: 08--21-09 L.K.

NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.

PIPE TUSS

PIPE RACKS

150'

TOILET O

'¯ ¯ LICHTPLANT

BOILER

PUMP HOUSECOM SOR WANTER

BOOSTER

Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume

- 2, 870 Cu. Yds.PROPANESTORAGE

UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)

'APIWellNo:43047374430000'

QUESTAR EXPLR. & PROD. FIGURE #TYPICAL RIG LAYOUTFOR

BBS #15G-22-7-21 gggySECTION 22, T7S, R21E, S.L.B.&M. o L ANO

669' FSL 2022' FELNo. 161316

RO

SCALE: 1" =50° NAN

DATE: 11-13-05Drawn By· D.R.B.

REVISED: 08--21-09 L.K.

NO7E:Elare P/t /s to be locateda min. of 100' from theWell Head.

PIPE TUSS

PIPE RACKS

150'

TOILET O

'¯ ¯ LICHTPLANT

BOILER

PUMP HOUSECOM SOR WANTER

BOOSTER

Sto O 51Total P/t Cqpacity TR SHW/2' of Freeboard= 10,620 Bb/s. ±Total P/t Volume

- 2, 870 Cu. Yds.PROPANESTORAGE

UINTAH ENGINEERING & LAND SURVEYING85 So, ß00 East * Vernal. UtaA 84078 * (435)

Page 61: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000' - -

oros .o

SEE TOPO "iͶ .

LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,

SECTION 22, T7S, R21E, S.L B.& M.

'APIWellNo:43047374430000' - -

oros .o

SEE TOPO "iͶ .

LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,

SECTION 22, T7S, R21E, S.L B.& M.

'APIWellNo:43047374430000' - -

oros .o

SEE TOPO "iͶ .

LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,

SECTION 22, T7S, R21E, S.L B.& M.

'APIWellNo:43047374430000' - -

oros .o

SEE TOPO "iͶ .

LEGEND: QUESTAR CXPLR, & PROD.PROPOSED I CATION N gas y se.227.2,

SECTION 22, T7S, R21E, S.L B.& M.

Page 62: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

21

POSED LOCATIONBS #15G-22-7-21 23 ,

loso

I. .d i t pË . .

LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21

-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD

SW 1/4 SE I/4

E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:

'APIWellNo:43047374430000'

21

POSED LOCATIONBS #15G-22-7-21 23 ,

loso

I. .d i t pË . .

LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21

-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD

SW 1/4 SE I/4

E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:

'APIWellNo:43047374430000'

21

POSED LOCATIONBS #15G-22-7-21 23 ,

loso

I. .d i t pË . .

LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21

-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD

SW 1/4 SE I/4

E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:

'APIWellNo:43047374430000'

21

POSED LOCATIONBS #15G-22-7-21 23 ,

loso

I. .d i t pË . .

LEGEND: QUESTAR EXPLR. & PROD.Extstrocuomo N Bus #15G-22-7-21

-------- -- ruorosen.weyss now' SECTION 22, T7S, R21E, S.I .ß.&M.-------•-- EXi%itNG 2-TRA( K NEEI)N t l'URADVD

SW 1/4 SE I/4

E Cintah Engineering & Land Surveying I POGR A P II I fl i t4 05SCAI E: I" - 2000 IlRAWNßV:C.P. REVlSED:

Page 63: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

POSED I Cxl'l N -

BS #L - 2-7 21

LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4

- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.

'APIWellNo:43047374430000'

POSED I Cxl'l N -

BS #L - 2-7 21

LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4

- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.

'APIWellNo:43047374430000'

POSED I Cxl'l N -

BS #L - 2-7 21

LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4

- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.

'APIWellNo:43047374430000'

POSED I Cxl'l N -

BS #L - 2-7 21

LEGEND: QUESTAR EX PLR. & PROD.p'oisrtsAi.wEx.ts waiEuwELLs N gnagiso.22.7.2ie ruunuciNc wr·:r.I s AnAsno.NED wi·:I ts SECTION 22, T7S, R21 E, S.I,.B.& M.# surT is wi·:i-is TEwonAuli.vAsANoose:o SW 1/4 SE 1/4

- Uiutah Engineering & l.and Surveying TOPOGR A P II I f i ll 4 0585 Natalia 200 14ssst Ves*asati. fittait 8 5078 A Ÿ ypp | pg ig·ARyt35) 780-1017 * 5+'A% (*635) 189-1813SCALE:[" = 2000 DRAWNBY:C.P.

Page 64: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski

CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft

StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL

Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°

SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°

GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005

LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°

GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead

Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace

(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M

6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G

6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G

Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G

Survev Tvne: Non-Def Proposal

Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:

MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-

WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of

'APIWellNo:43047374430000'

BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski

CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft

StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL

Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°

SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°

GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005

LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°

GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead

Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace

(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M

6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G

6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G

Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G

Survev Tvne: Non-Def Proposal

Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:

MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-

WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of

'APIWellNo:43047374430000'

BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski

CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft

StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL

Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°

SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°

GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005

LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°

GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead

Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace

(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M

6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G

6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G

Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G

Survev Tvne: Non-Def Proposal

Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:

MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-

WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of

'APIWellNo:43047374430000'

BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-09 ProposalReportDate: September1, 2009 SurveylDLSComputationMethod: MinimumCurvature/ Lubinski

CIIent: VerilcalSectionAzimuth: 161.000°Field: Uinia VerlicalSectionOrigin: N0.000 ft,E 0.000ft

StructureISlot: BBS/ BBS15G-22-7-21 TVDReferenceDatum: KBWell: BBS15G-22-7-21 TVDReferenceElevation: 4925.0ftrelativetoMSL

Borehole: I.ateral 1 Sea BedIGround LevelElevation: 4909.000 ftrelativetoMSLUWIIAPI#: MagneticDeclination: 11.353°

SurveyNamel Date: BBS15G-22.7-21Lateral1 DrillingPlanCJL7-6-09/ July6,2009 TotalFieldStrength: 52649.826nTTortIAHDI DDII ERDratio: 92.800°/ 4169.06ft/ S.795/ 0.636 MagneticDip: 66.076°

GridCoordinateSystem: NADO3UtahStatePlanes, CentralZone, USFeet DeclinationDate: July06, 2009LocallonLat/Long: N40 1128.040,W109 32 20.960 MagneticDecilnallonModel: IGRF2005

LocationGridNIEYlX: N7244345.810 ftUS,E 2188149.353 ftUS NorthReference: GridNorthGrldConvergenceAngle: +1.25607498° TotalCorrMagNorth+ GridNorth: +10.097°

GridScale Factor: 0.99991810 LocalCoordinatesReferencedTo: WellHead

Comments md IncIlnation Azimuth TVD c NS EW Closure DLS ToolFace

(it) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (dog) (deg/100ft) (deg)Tie-In 0.00 0.00 161.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00MKOP 6202.00 0.00 161.00 6202.00 0.00 0.00 0.00 0.00 0.00 0.00 161.00M

6300.00 15.68 161.00 6298.78 13.33 -12.60 4.34 13.33 161.00 16.00 0.00G6400.00 31.68 161.00 6390.06 53.36 -50.45 17.37 53.36 161.00 16.00 0.00G6500.00 47.68 161.00 6466.78 117.00 -110.63 38.09 117.00 161.00 16.00 0.00G

6600.00 63.68 161.00 6522.98 199.32 -188.46 64.89 199.32 161.00 16.00 0.00G6700.00 79.68 161.00 6554.31 293.95 -277.93 95.70 293.95 161.00 16.00 0.00G

Enter H4 Lime 6782.00 92.80 161.00 6559.67 375.59 -355.13 122.28 375.59 161.00 16.00 0.00GTD 10580.00 92.80 161.00 6374.14 4169.06 -3941.92 1357.31 4169.06 161.00 0.00 0.00G

Survev Tvne: Non-Def Proposal

Survev Error Model: NONE version *** 3-D 95.00% Confidence 2.7955 sigmaSurveyinq Proa:

MD From ( ft ) MDTo ( ft ) EOU Freq Survev Tool Tvoe Borehole -> Survey0.00 10580.00 1/100.00 NULL_ZERO(default toolused) Lateral 1 -> BBS 15G-22-7-21 Lateral 1 DrillingPlan CJL 7-6-

WelIDesign Ver Bld(doc40x_37 ) BBS 15G-22-7-21\BBS 15G-22-7-21\Lateral 1\BBS 15G-22-7-21 Lateral 1 Drilling Plan CJL 7-6-Œhnerated 9/1/2009 9:22 AM Page 1 of

Page 65: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•&lt13trim Sav0ms Af¢00.3W

«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000

KOP

Enter H4 Ume

AA

1500

-1500 8

3000

-3000

vVv

TD

fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500

Ile

Gr ur6000Tot Carr (M->G +10 09ti99

KOP

1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989

Entse H4 Litrie

7500

SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)

9000

0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W

Nonhmg:72443455li Emring:215814935R

TargetBucription Grid Caeni Larmi cuerd

Legend

RNCrilemilblnk

Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00

Q lily Conilol

Dumn:1heo9:25AMSepleuiler01,

Ihawn by: Cunmi UserChokerl by:

'APIWellNo:43047374430000'

Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•&lt13trim Sav0ms Af¢00.3W

«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000

KOP

Enter H4 Ume

AA

1500

-1500 8

3000

-3000

vVv

TD

fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500

Ile

Gr ur6000Tot Carr (M->G +10 09ti99

KOP

1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989

Entse H4 Litrie

7500

SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)

9000

0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W

Nonhmg:72443455li Emring:215814935R

TargetBucription Grid Caeni Larmi cuerd

Legend

RNCrilemilblnk

Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00

Q lily Conilol

Dumn:1heo9:25AMSepleuiler01,

Ihawn by: Cunmi UserChokerl by:

'APIWellNo:43047374430000'

Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•&lt13trim Sav0ms Af¢00.3W

«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000

KOP

Enter H4 Ume

AA

1500

-1500 8

3000

-3000

vVv

TD

fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500

Ile

Gr ur6000Tot Carr (M->G +10 09ti99

KOP

1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989

Entse H4 Litrie

7500

SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)

9000

0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W

Nonhmg:72443455li Emring:215814935R

TargetBucription Grid Caeni Larmi cuerd

Legend

RNCrilemilblnk

Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00

Q lily Conilol

Dumn:1heo9:25AMSepleuiler01,

Ihawn by: Cunmi UserChokerl by:

'APIWellNo:43047374430000'

Schluinberger~ BBS 15G-22-7-21 UInta " ' BMh47etcParmarm. O alosures T(A052Lili!S:taPLrwaGuerg2weUBfu MicermenWad trutF2005 Op 40076' Dah skardbä¾if9 L Stell?66tc Feiflyg 7444)Assinut GralÖ¡rrr wirtsgytm Sinc $$$15[172721 TVOAgr AF(ikimasinta Llimigg 451M- in fasc§ënT I IWNSDS6G Ent.sp 29mkae½avs 6embrFat epsWipm Pim OBS1•&lt13trim Sav0ms Af¢00.3W

«< W Scale = 1(in):1500(ft) E »>-1500 0 1500 3000

KOP

Enter H4 Ume

AA

1500

-1500 8

3000

-3000

vVv

TD

fis 15G-22-721 Lateral 1 Drillinji Plan E JL 7-6494500

Ile

Gr ur6000Tot Carr (M->G +10 09ti99

KOP

1 G-22-7-21Lateral 1 Drilling Plan CJL7-6-09 G (+ 4989

Entse H4 Litrie

7500

SHL: 669' FSL & 2,022' FEL (Sec 22 T7S R21E)BHL:2,080' FSL & 660' FEL (Sec 27 T7S R21E)

9000

0 1500 3000 4500Vertical Section (ft)Azim = 161 ale = 1(in):1500(ft) Origin = 0 N/-S, OEl-W

Nonhmg:72443455li Emring:215814935R

TargetBucription Grid Caeni Larmi cuerd

Legend

RNCrilemilblnk

Priikmilaint Ril INCL AzlM T.Eli XIIEC IgúLJIG) E(±)DE§§ DLEllelu o 00 0 00 161 00 0 00 0.00 o 00 0 00KOP 6202 00 0 00 161 00 6202 00 0.00 0 00 0 00 0.00Enlar]M IJme 6182 00 92 50 161 00 6559 67 375.39 -355 13 122 28 16.001Ð 1055000 9280 16100 637414 4169.06 -394192 135131 0.00

Q lily Conilol

Dumn:1heo9:25AMSepleuiler01,

Ihawn by: Cunmi UserChokerl by:

Page 66: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to test the Green River. If productive, casing will be run and the well completed. If dry, the well will be plugged and abandoned as per BLM and State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under the terms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is Questar Exploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell, Questar Drilling Engineer at 303-308-3628.

Additional Operator Remarks

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

Page 67: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

QUESTAR EXPLORATION AND PRODUCTION BBS 15G-22-7-21 API: 43-047-37443 Summarized Re-Entry Procedure 1. Rig down pumping unit, clear location of all unnecessary equipment. 2. MIRU pulling unit. 3. ND tubing head, NU BOP’s (3M). 4. Kill well if necessary. 5. Pull out of hole with 264 rods (112 - 7/8” plain, & 152 - ¾” plain) and 2 ½” x 1 ¾”

x 16 x 19 x 20’ RHAC pump. 6. Unseat tubing anchor and POOH with 208 jts 2 7/8” 6.5# J-55 tubing, TAC, PSN,

T-Anchor. 7. PU bit and 5 ½” casing scraper, RIH to 6,500’. 8. Roll hole with KCl water, TOOH with bit and scraper. 9. RU wireline truck and RIH with CIBP. 10. Set top of CIBP @ +/- 6,206’, 2’ above nearest collar @ 6,208’. 11. ND BOP’s 12. RD pulling unit, move off location. 13. MIRU drilling rig. 14. NU rig’s 3,000 WP rated BOP. 15. RIH with whipstock, set and orient whipstock.. 16. TIH with milling BHA, mill window in 5 ½” casing @ 6,192’ top, 6,202’ bottom. 17. TOOH, PU directional BHA, TIH. 18. Drill well at a 161° azimuth with 16°/100’ build rates to land in H4a Lime

formation at a TVD of +/- 6,560’. 19. Drill +/- 3,798’ of lateral in H4a Lime.

a. Mud system to be water based mud, weights are expected to be in the 8.4 – 8.8 ppg range.

20. Circulate and condition hole, TOOH, LD 4,000’ DP. a. PU slotted liner, blank liner and liner dropping tool. b. RIH w/ liner and dropping tool, drop liner 2’ outside window. c. TOOH, LD remainder of DP.

21. RIH and set RBP @ +/- 4,500’ to isolate lateral. 22. ND BOP’s. 23. RDMOL.

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

QUESTAR EXPLORATION AND PRODUCTION

BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure

1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.

3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.

5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.

6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.

7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.

14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..

16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime

formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.

a. Mud system to be water based mud, weights are expected to be in the 8.4 -

8.8 ppg range.

20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.

c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.

'APIWellNo:43047374430000'

QUESTAR EXPLORATION AND PRODUCTION

BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure

1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.

3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.

5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.

6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.

7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.

14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..

16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime

formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.

a. Mud system to be water based mud, weights are expected to be in the 8.4 -

8.8 ppg range.

20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.

c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.

'APIWellNo:43047374430000'

QUESTAR EXPLORATION AND PRODUCTION

BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure

1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.

3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.

5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.

6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.

7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.

14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..

16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime

formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.

a. Mud system to be water based mud, weights are expected to be in the 8.4 -

8.8 ppg range.

20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.

c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.

'APIWellNo:43047374430000'

QUESTAR EXPLORATION AND PRODUCTION

BBS 15G-22-7-21API: 43-047-37443Summarized Re-Entry Procedure

1. Rig down pumping unit, clear location of all unnecessary equipment.2. MIRU pulling unit.

3. ND tubing head, NU BOP's (3M).4. Kill well if necessary.

5. Pull out of hole with 264 rods (112 - '/s"plain, & 152 - ¾" plain) and 2 ½" xl ¾"x 16 x 19 x 20' RHAC pump.

6. Unseat tubing anchor and POOH with 208 jts 2 '/8"6.5# J-55 tubing, TAC, PSN,T-Anchor.

7. PU bit and 5 ½" casing scraper, RIH to 6,500'.8. Roll hole with KCl water, TOOH with bit and scraper.9. RU wireline truck and RIH with CIBP.10. Set top of CIBP @+/- 6,206', 2' above nearest collar @6,208'.11. ND BOP's12. RD pulling unit, move off location.13. MIRU drilling rig.

14. NU rig's 3,000 WP rated BOP.15. RIH with whipstock, set and orient whipstock..

16. TIH with milling BHA, mill window in 5 ½" casing @6,192' top, 6,202' bottom.17. TOOH, PU directional BHA, TIH.18. Drill well at a 161° azimuth with 16°/100' build rates to land in H4a Lime

formation at a TVD of+/- 6,560'.19. Drill +/- 3,798' of lateral in H4a Lime.

a. Mud system to be water based mud, weights are expected to be in the 8.4 -

8.8 ppg range.

20. Circulate and condition hole, TOOH, LD 4,000' DP.a. PU slotted liner, blank liner and liner dropping tool.b. RIH w/ liner and dropping tool, drop liner 2' outside window.

c. TOOH, LD remainder of DP.21. RIH and set RBP @+/- 4,500' to isolate lateral.22. ND BOP's.23.

Page 68: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

BBS 15G-22-7-21 Re-Entry Horizontal Well

Whipstock

3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted lin

16o Dogleg

9-5/8", 36#, J-55casing set @ 495'

Perfs 6,575' - 6,580'

Top of cement @ 1,166'

CIBP set @ 6,206'

Top of window @ 6,192'

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell

9-5/8", 36#, J-55casing set @495'

Top of cement @ 1,166'

Top of window @6,192'

Whipstock16° Dogleg

CIBP set @6,206' +

Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted

'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell

9-5/8", 36#, J-55casing set @495'

Top of cement @ 1,166'

Top of window @6,192'

Whipstock16° Dogleg

CIBP set @6,206'

Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted

'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell

9-5/8", 36#, J-55casing set @495'

Top of cement @ 1,166'

Top of window @6,192'

Whipstock16° Dogleg

CIBP set @6,206'

Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted

'APIWellNo:43047374430000'BBS15G-22-7-21Re-EntryHorizontalWell

9-5/8", 36#, J-55casing set @495'

Top of cement @ 1,166'

Top of window @6,192'

Whipstock16° Dogleg

CIBP set @6,206'

Perfs 6,575' - 6,580' ::: :::: 3,798' of 4-3/4" lateral hole w/ 3 1/2" slotted

Page 69: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to test the Green River. If productive, casing will be run and the well completed. If dry, the well will be plugged and abandoned as per BLM and State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under the terms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is Questar Exploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell, Questar Drilling Engineer at 303-308-3628.

Additional Operator Remarks

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

'APIWellNo:43047374430000'

Additional Operator Remarks

Questar Exploration & Production Co. proposes to drill a re-entry horizontal oil well to 10,580' to testthe Green River. If productive, casing will be run and the well completed. If dry, the well will beplugged and abandoned as per BLMand State of Utah requirement.

See Onshore Order No. 1 attached

Please be advised that Questar Exploration & Production Co. agrees to be responsible under theterms and conditions of the lease for the operations conducted upon the lease lands.

Bond coverage for this well is provided by Bond No. ESB000024. The principal is QuestarExploration & Production Co. via surety as consent as provided for the 43 CFR 3104.2.

PLEASE FIND ATTACHED:

1. Re-Entry Procedure

2. Drilling Proposal

3. 8-point Program

4. Proposed Well Bore Diagram

5. Legal Plats / Map Prepared by UELS

6. Location Layout Refering to Reserve Pit

If additional Technical Information is required, Please contact Chris Longwell,Questar Drilling Engineer at

Page 70: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

(09/14/2009) Diana Mason - Johnson Bottom.doc Page 1

United States Department of the InteriorBUREAU OF LAND MANAGEMENT

Utah State OfficeP.O. Box 45155

Salt Lake City, Utah 84145-0155

IN REPLY REFER TO:3160(UT-922)

September 11, 2009

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Johnson Bottom, Uintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas and Mining, and Mickey Coulthard, Utah State Office, Bureau of Land Management, the following horizontal well is planned for calendar year 2008 within the Johnson Bottom Unit, Uintah County, Utah

API # WELL NAME LOCATION

(Proposed PZ Green River)

43-047-37443 BBS 15G-22-7-21 Sec 22 T07S R21E 0669 FSL 2022 FEL Lateral 1 Sec 27 T07S R21E 2080 FSL 0660 FEL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File – Johnson Bottom UnitDivision of Oil Gas and MiningCentral Files Agr. Sec. ChronFluid Chron

MCoulthard:mc:9-11-09

’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’’APIWellNo:43047374430000’

CONFIDENTIAL

(09¾ygggagd4ggg4gggn Bottom.doc Page 1

United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State Office

P.O. Box 45155Salt Lake City, Utah 84145-0155

IN REPLY REFER TO:3160(UT-922)

September 11, 2009

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

(09¾ygggagd4ggg4gggn Bottom.doc Page 1

United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State Office

P.O. Box 45155Salt Lake City, Utah 84145-0155

IN REPLY REFER TO:3160(UT-922)

September 11, 2009

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

(09¾ygggagd4ggg4gggn Bottom.doc Page 1

United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State Office

P.O. Box 45155Salt Lake City, Utah 84145-0155

IN REPLY REFER TO:3160(UT-922)

September 11, 2009

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

(09¾ygggagd4ggg4gggn Bottom.doc Page 1

United States Department of the Interior

BUREAU OF LAND MANAGEMENTUtah State Office

P.O. Box 45155Salt Lake City, Utah 84145-0155

IN REPLY REFER TO:3160(UT-922)

September 11, 2009

Memorandum

To: Assistant District Manager Minerals, Vernal District

From: Michael Coulthard, Petroleum Engineer

Subject: 2008 Plan of Development Johnson Bottom,Uintah County, Utah.

Pursuant to email between Diana Whitney, Division of Oil, Gas andMining, and Mickey coulthard, Utah State Office, Bureau of LandManagement, the following horizontal well is planned for calendaryear 2008 within the Johnson Bottom Unit, Uintah County, Utah

API# WELLNAME LOCATION

(Proposed PZ Green River)

43-047-37443 BBS 15G-22-7-21 Sec 22 TO7S R21E 0669 FSL 2022 FELLateral 1 Sec 27 TO7S R21E 2080 FSL 0660 FEL

This office has no objection to permitting the well at this time.

/s/ Michael L. Coulthard

bcc: File - Johnson Bottom UnitDivision of Oil Gas and MiningCentral FilesAgr. Sec. ChronFluid Chron

Page 71: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

â

ª

N

N

N

'

N

B R E N N A N B O T T O M F I E L DB R E N N A N B O T T O M F I E L D

T A P A D E R OT A P A D E R O

22

27

23

26

21

28

1516

4304734408SU 4W-26-7-21

4304738471BBS 5G-23-7-21

4304734383WV 10W-26-7-21

4304737443BBS 15G-22-7-21

4304739180SU PURDY 4G-27-7-21

4304710875PELICAN LAKE UNIT 2

4304739181SU PURDY 10G-27-7-21

4304731117LEOTA UNIT A-2-26-1D

Map Produced by Diana MasonMap Prepared:

Well Name: BBS 15G-22-7-21API Number: 4304737443

Township 07.0 S Section 22Range 21.0 EMeridian: SLBM

F1,200 0 1,200600 Feet

1:11,790

UnitsSTATUS

ACTIVE

EXPLORATORY

GAS STORAGE

NF PP OIL

NF SECONDARY

PI OIL

PP GAS

PP GEOTHERML

PP OIL

SECONDARY

TERMINATED

FieldsSTATUS

ACTIVE

COMBINED

Sections

Wells Query Events

D <all other values>

GIS_STAT_TYPE

" <Null>

APD

H DRL

4 GI

!* GS

N LA

G NEW

7 OPS

ª PA

* PGW

' POW

O RET

¸ SGW

· SOW

6 TA

" TW

¸ WD

¸ WI

=* WS

Tooele

Millard

Iron

San Juan

Kane

Juab

Uintah

Box Elder

Emery

Garfield

Grand

Utah

Beaver Wayne

Duchesne

Sevier

Summit

Rich

Washington

Carbon

Sanpete

Cache

Piute

Davis

Wasatch

Weber

DaggettSalt Lake

Morgan

Location Map

Operator: QUESTAR EXPLORATION & PRODUCTION CO

’APIW

ellNo:43047374430000’

’APIW

ellNo:43047374430000’

’APIW

ellNo:43047374430000’

’APIW

ellNo:43047374430000’

CONFIDENTIAL

16 API Number: 4304737443Well Name: BBS 15G-22-7-21

Township 07.0 S Range 21.0 E Section 22Meridian: SLBM

Operator: QUESTAR EXPLORATION & PRODUCTION CO

Map Prepared:Map Produced by Diana Mason

22

Fields PA

sTAluscTrve

BRENNAN BOTTOM FIELD

43047374434304710875 BBS 15G-22-7-21

PELICAN LAKE UNIT

O ws

CacheBox Elder Rich Location Map

4304734408 / Weber

4304739180SU 4W-26-7-21

avisAor -

SummitSU PURDY 4G-27-7-21

Tooeleat Lak

Utah

sate DuchesnU ah

JuabCarbon

4304731117LEOTAUNITA-2-26-1D

MillardEmery Grand

26 362 6r

TAPADERO 2728 Beaver Wayne

Garfeld

/ San Juan

Washington Kane

SU PU13

7-7-21 W1004

2 21 .y

200 600

16 API Number: 4304737443Well Name: BBS 15G-22-7-21

Township 07.0 S Range 21.0 E Section 22

Meridian: SLBMOperator: QUESTAR EXPLORATION & PRODUCTION CO

Map Prepared:Map Produced by Diana Mason

Fields PA

sTAluscTrve

BRENNAN BOTTOM FIELD "" esar

43047374434304710875 BBS 15G-22-7-21

PELICAN LAKE UNIT

O ws

CacheBox Elder Rich Location Map

4304734408 / Weber

4304739180SU 4W-26-7-21

avisAor -

SummitSU PURDY 4G-27-7-21

Tooeleat Lak

Utah

sate DuchesnU ah

JuabCarbon

4304731117LEOTAUNITA-2-26-1D

MillardEmery Grand

26 362 6r

TAPADERO 2728 Beaver Wayne

Garfeld

/ San Juan

Washington Kane

SU PU13

7-7-21 W1004

2 21 .y

200 600

16 API Number: 4304737443Well Name: BBS 15G-22-7-21

Township 07.0 S Range 21.0 E Section 22Meridian: SLBM

Operator: QUESTAR EXPLORATION & PRODUCTION CO

Map Prepared:Map Produced by Diana Mason

Fields PA

sTAluscTrve

BRENNAN BOTTOM FIELD "" esar

43047374434304710875 BBS 15G-22-7-21

PELICAN LAKE UNIT

O ws

CacheBox Elder Rich Location Map

4304734408 / Weber

4304739180SU 4W-26-7-21

avisAor -

SummitSU PURDY 4G-27-7-21

Tooeleat Lak

Utah

sate DuchesnU ah

JuabCarbon

4304731117LEOTAUNITA-2-26-1D

MillardEmery Grand

26 362 6r

TAPADERO 2728 Beaver Wayne

Garfeld

/ San Juan

Washington Kane

SU PU13

7-7-21 W1004

2 21 .y

200 600

16 API Number: 4304737443Well Name: BBS 15G-22-7-21

Township 07.0 S Range 21.0 E Section 22Meridian: SLBM

Operator: QUESTAR EXPLORATION & PRODUCTION CO

Map Prepared:Map Produced by Diana Mason

Fields PA

sTAluscTrve

BRENNAN BOTTOM FIELD "" esar

43047374434304710875 BBS 15G-22-7-21

PELICAN LAKE UNIT

O ws

CacheBox Elder Rich Location Map

4304734408 / Weber

4304739180SU 4W-26-7-21

avisAor -

SummitSU PURDY 4G-27-7-21

Tooeleat Lak

Utah

sate DuchesnU ah

JuabCarbon

4304731117LEOTAUNITA-2-26-1D

MillardEmery Grand

26 362 6r

TAPADERO 2728 Beaver Wayne

Garfeld

/ San Juan

Washington Kane

SU PU13

7-7-21 W1004

2 21 .y

200 600

Page 72: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000

WELL NAME: BBS 15G-22-7-21

OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331

CONTACT: Jan Nelson

PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:

SURFACE: 0669 FSL 2022 FEL Engineering Review:

BOTTOM: 2080 FSL 0660 FEL Geology Review:

COUNTY: UINTAH

LATITUDE: 40.19114 LONGITUDE: -109.53847

UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00

FIELD NAME: BRENNAN BOTTOM

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 1 - Federal COALBED METHANE: NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: FEDERAL - ESB000024 Unit: JOHNSON BOTTOM

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

Comments: Presite Completed 070430 FR N2460:9/30/09 Original off conf date 3/2/08:

Stipulations: 4 - Federal Approval - bhill 15 - Directional - bhill

CONFIDENTIAL

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000

WELL NAME: BBS 15G-22-7-21

OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331

CONTACT: Jan Nelson

PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:

SURFACE: 0669 FSL 2022 FEL Engineering Review:

BOTTOM: 2080 FSL 0660 FEL Geology Review:

COUNTY: UINTAH

LATITUDE: 40.19114 LONGITUDE: -109.53847

UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00

FIELD NAME: BRENNAN BOTTOM

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 1 - Federal COALBED METHANE: NO

I

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I

Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:

Stipulations: 4 - Federal Approval - bhill15 - Directional -

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000

WELL NAME: BBS 15G-22-7-21

OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331

CONTACT: Jan Nelson

PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:

SURFACE: 0669 FSL 2022 FEL Engineering Review:

BOTTOM: 2080 FSL 0660 FEL Geology Review:

COUNTY: UINTAH

LATITUDE: 40.19114 LONGITUDE: -109.53847

UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00

FIELD NAME: BRENNAN BOTTOM

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 1 - Federal COALBED METHANE: NO

I

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I

Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:

Stipulations: 4 - Federal Approval - bhill15 - Directional -

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000

WELL NAME: BBS 15G-22-7-21

OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331

CONTACT: Jan Nelson

PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:

SURFACE: 0669 FSL 2022 FEL Engineering Review:

BOTTOM: 2080 FSL 0660 FEL Geology Review:

COUNTY: UINTAH

LATITUDE: 40.19114 LONGITUDE: -109.53847

UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00

FIELD NAME: BRENNAN BOTTOM

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 1 - Federal COALBED METHANE: NO

I

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I

Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:

Stipulations: 4 - Federal Approval - bhill15 - Directional -

WORKSHEETAPPLICATION FOR PERMIT TO DRILL

I

I

APD RECEIVED: 9/8/2009 API NO. ASSIGNED: 43047374430000

WELL NAME: BBS 15G-22-7-21

OPERATOR: QUESTAR EXPLORATION & PRODUCTION CO (N5085) PHONE NUMBER: 435 781-4331

CONTACT: Jan Nelson

PROPOSED LOCATION: SWSE 22 070S 210E Permit Tech Review:

SURFACE: 0669 FSL 2022 FEL Engineering Review:

BOTTOM: 2080 FSL 0660 FEL Geology Review:

COUNTY: UINTAH

LATITUDE: 40.19114 LONGITUDE: -109.53847

UTM SURF EASTINGS: 624413.00 NORTHINGS: 4449786.00

FIELD NAME: BRENNAN BOTTOM

LEASE TYPE: 1 - Federal

LEASE NUMBER: UTU16551 PROPOSED PRODUCING FORMATION(S): GREEN RIVER

SURFACE OWNER: 1 - Federal COALBED METHANE: NO

I

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

PLAT R649-2-3.

Bond: FEDERAL - ESBOOOO24 Unit: JOHNSON BOTTOM

Potash R649-3-2. General

Oil Shale 190-5

Oil Shale 190-3 R649-3-3. Exception

Oil Shale 190-13 Drilling Unit

Water Permit: A36125 - 49-2153 Board Cause No: R649-3-2

RDCC Review: Effective Date:

Fee Surface Agreement Siting:

Intent to Commingle R649-3-11. Directional Drill

Commingling Approved

I

Comments: Presite Completed070430 FR N2460:9/30/09 Original off conf date 3/2/08:

Stipulations: 4 - Federal Approval - bhill15 - Directional -

Page 73: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Permit To Drill

******************Well Name:  BBS 15G-22-7-21

API Well Number:  43047374430000

Lease Number:  UTU16551

Surface Owner:   FEDERAL 

Approval Date:  10/1/2009

Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078

Authority:Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling. 

In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well. 

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:   • Within 24 hours following the spudding of the well – contact Carol Daniels at 801-538-5284     (please leave a voicemail message if not available)     OR     submit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas website     at https://oilgas.ogm.utah.gov

Reporting Requirements:

API Well No: 43047374430000API Well No: 43047374430000

State of UtahDEPARTMENT OF NATURAL RESOURCES

'- MICHAEL R. STYLER

GARY R. HERBERT Excutiw Drotor

comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor

Permit To Drillkkkkkkkkkkkkkkkkkk

Well Name: BBS 15G-22-7-21API Well Number: 43047374430000

Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009

Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078

Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.

In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:

• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov

Reporting

API Well No: 43047374430000

State of UtahDEPARTMENT OF NATURAL RESOURCES

'- MICHAEL R. STYLER

GARY R. HERBERT Excutiw Drotor

comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor

Permit To Drillkkkkkkkkkkkkkkkkkk

Well Name: BBS 15G-22-7-21API Well Number: 43047374430000

Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009

Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078

Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.

In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:

• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov

Reporting

API Well No: 43047374430000

State of UtahDEPARTMENT OF NATURAL RESOURCES

'- MICHAEL R. STYLER

GARY R. HERBERT Excutiw Drotor

comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor

Permit To Drillkkkkkkkkkkkkkkkkkk

Well Name: BBS 15G-22-7-21API Well Number: 43047374430000

Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009

Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078

Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.

In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:

• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov

Reporting

API Well No: 43047374430000

State of UtahDEPARTMENT OF NATURAL RESOURCES

'- MICHAEL R. STYLER

GARY R. HERBERT Excutiw Drotor

comrwr Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BA2ALieuterard Gowrver Dusion Dmctor

Permit To Drillkkkkkkkkkkkkkkkkkk

Well Name: BBS 15G-22-7-21API Well Number: 43047374430000

Lease Number: UTUl6551Surface Owner: FEDERALApproval Date: 10/1/2009

Issued to:QUESTAR EXPLORATION & PRODUCTION CO , 11002 East 17500 South, Vernal, UT 84078

Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.

Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date

General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.

Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.

In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submit acomplete angular deviation and directional survey report to the Division within 30 days followingcompletion of the well.

Notification Requirements:The operator is required to notify the Division of Oil, Gas and Mining of the following actions duringdrilling of this well:

• Within 24 hours following the spudding of the well - contact Carol Daniels at 801-538-5284(please leave a voicemail message if not available)ORsubmit an electronic sundry notice (pre-registration required) via the Utah Oil & Gas websiteat https://oilgas.ogm.utah.gov

Reporting

Page 74: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:   • Entity Action Form (Form 6) – due within 5 days of spudding the well   • Monthly Status Report (Form 9) – due by 5th day of the following calendar month   • Requests to Change Plans (Form 9) – due prior to implementation   • Written Notice of Emergency Changes (Form 9) – due within 5 days   • Notice of Operations Suspension or Resumption (Form 9) – due prior to implementation   • Report of Water Encountered (Form 7) – due within 30 days after completion   • Well Completion Report (Form 8) – due within 30 days after completion or plugging

Approved By:

For Gil HuntAssociate Director, Oil & Gas 

API Well No: 43047374430000API Well No: 43047374430000

All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:

• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

For Gil HuntAssociate Director, Oil &

API Well No: 43047374430000

All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:

• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

For Gil HuntAssociate Director, Oil &

API Well No: 43047374430000

All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:

• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

For Gil HuntAssociate Director, Oil &

API Well No: 43047374430000

All reports, forms and submittals as required by the Utah Oil and Gas Conservation General Ruleswill be promptly filed with the Division of Oil, Gas and Mining, including but not limited to:

• Entity Action Form (Form 6) - due within 5 days of spudding the well• Monthly Status Report (Form 9) - due by 5th day of the following calendar month• Requests to Change Plans (Form 9) - due prior to implementation• Written Notice of Emergency Changes (Form 9) - due within 5 days• Notice of Operations Suspension or Resumption (Form 9) - due prior to implementation• Report of Water Encountered (Form 7) - due within 30 days after completion• Well Completion Report (Form 8) - due within 30 days after completion or plugging

Approved By:

For Gil HuntAssociate Director, Oil &

Page 75: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)

DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972

6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A

ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM

b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N

LHL ENEEP-

RYF

R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:

QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT

11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,

ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22

7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL

12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH

14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB

18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD

TVD æ d4M Tvo oC ¥f PLUG SET:TVD

22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.

WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASINGAND LINERRECORD (Report all strings set in well)

HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS

KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED

4.875 2-7/8 10.4 6,181 10,054 n/a 0

26. TUBINGRECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154

28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS

(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed

(B) Open Squeezed

(C) Open Squeezed

(D) Open Squeezed

ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL

6795' - 8440' 23,000 gals 15% HCL

29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:

O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:

(5/2000) RECEIVED (CONTINUEDON BACK)

DEC3 1 2009DIV.0FOIL,GAS&MINING

STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)

DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972

6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A

ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM

b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N

LHL ENEEP-

RYF

R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:

QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT

11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,

ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22

7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL

12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH

14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB

18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD

TVD æ d4M Tvo oC ¥f PLUG SET:TVD

22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.

WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASINGAND LINERRECORD (Report all strings set in well)

HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS

KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED

4.875 2-7/8 10.4 6,181 10,054 n/a 0

26. TUBINGRECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154

28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS

(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed

(B) Open Squeezed

(C) Open Squeezed

(D) Open Squeezed

ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL

6795' - 8440' 23,000 gals 15% HCL

29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:

O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:

(5/2000) RECEIVED (CONTINUEDON BACK)

DEC3 1 2009DIV.0FOIL,GAS&MINING

STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)

DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972

6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A

ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM

b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N

LHL ENEEP-

RYF

R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:

QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT

11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,

ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22

7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL

12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH

14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB

18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD

TVD æ d4M Tvo oC ¥f PLUG SET:TVD

22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.

WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASINGAND LINERRECORD (Report all strings set in well)

HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS

KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED

4.875 2-7/8 10.4 6,181 10,054 n/a 0

26. TUBINGRECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154

28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS

(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed

(B) Open Squeezed

(C) Open Squeezed

(D) Open Squeezed

ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL

6795' - 8440' 23,000 gals 15% HCL

29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:

O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:

(5/2000) RECEIVED (CONTINUEDON BACK)

DEC3 1 2009DIV.0FOIL,GAS&MINING

STATE OF UTAH AMENDEDREPORT O FORM 8DEPARTMENTOF NATURALRESOURCES (highlight changes)

DIVISIONOF OIL,GAS AND MINING 5. LEASE DES1GNATIONANDSERIALNUMBER:UTU-74972

6. IF INDIAN,ALLOTTEEOR TRIBENAMEWELL COMPLETION 011 RECOMPLETIONREPORT AND LOG N/A

ia. TYPE OF WELL: OIL GAS DRY OTHER 7. UNITor CA AGREEMENTNAMEWELL WELL JOHNSON BOTTOM

b. TYPE OF WORK: 8. WELLNAMEand NUMBER:N

LHL ENEEP-

RYF

R. OTHER Horizontal BBS 15G 22-7-212. NAMEOF OPERATOR: 9. API NUMBER:

QUESTAR EXPLORATION & PRODUCTIONCOMPANY 43047374433. ADDRESS OF OPERATOR: PHONE NUMBER: 10 FIELDAND POOL, OR WILDCAT

11002 E. 17500 S. on y VERNAL STATE UT zie 84078 (435) 781-4342 BRENNAN BOTTOM4. LOCATIONOF WELL(FOOTAGES) 11. QTR/QTR, SECTION, TOWNSHIP,RANGE,

ATSURFACE: 669' FSL 2022 FEL MERIDIAN:22

7SATTOP PRODUCING INTERVALREPORTED BELOW: 669' FSL 2022 FEL

12. COUNTY 13. STATEATTOTAL DEPTH: 2539 FSE 591 FEL NE EC 27-7S-R21EUINTAH UTAH

14. DATESPUDDED: 15 DATET.D. REACHED: 16. DATECOMPLETED: 17. ELEVATIONS(DF, RKB,RT, GL):12/2/2009 12/17/2009 ABANDONED READYTOPRODUCE 2 15' KB

18. TOTALDEFTH: MD 10 054 19. PLUG BACKT.D.: MD 8,480 20. IF MULTlPLECOMPLETlONS, HOW MANY?* 21. DEPTH BRIDGE MD

TVD æ d4M Tvo oC ¥f PLUG SET:TVD

22. TYPE ELECTRICANDOTHER MECHANICALLOGS RUN (Submit copy of each) 23.

WAS WELLCORED? NO YES (Submit analysis)NO LOGSWAS DST RUN? NO YES (Submit report)DIRECTIONALSURVEY? NO YES (Submit copy)

24. CASINGAND LINERRECORD (Report all strings set in well)

HOLESIZE SIZE/GRADE WEIGHT (#lft) TOP (MD) BOTTOM(MD) STAGEDCEMHENTERCNEMEONFS

KES VOLSUBBL) CEMENTTOP ** AMOUNTPULLED

4.875 2-7/8 10.4 6,181 10,054 n/a 0

26. TUBINGRECORD

SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKER SET (MD) SIZE DEPTH SET (MD) PACKERSET (MD)2.875 6,154

28. PRODUCINGINTERVALS 27. PERFORATION RECORDFORMATIONNAME TOP (MD) BOTTOM(MD) TOP (TVD) BOTTOM(TVD) INTERVAL(ToplBot - MD) SIZE NO HOLES PERFORATIONSTATUS

(A) GREEN RIVER 6,795 8,300 6,795 8,300 open Squeezed

(B) Open Squeezed

(C) Open Squeezed

(D) Open Squeezed

ž8. ACID, FRACTURE, TREATMENT,CEMENT SQUEEZE, ETC.

DEPTH INTERVAL AMOUNTANDTYPE OF MATERIAL

6795' - 8440' 23,000 gals 15% HCL

29. ENCLOSEDATTACHMENTS: 30. WELL STATUS:

O ELECTRICAL/MECHANICALLOGS GEOLOGIC REPORT DST REPORT DIRECTIONALSURVEY CompletedO SUNDRY NOTICE FOR PLUGGINGANDCEMENTVERIFICATION CORE ANALYSIS OTHER:

(5/2000) RECEIVED (CONTINUEDON BACK)

DEC3 1 2009DIV.0FOIL,GAS&MINING

Page 76: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

31. INITIALPRODUCTION INTERVALA (As shown In Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:

12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:

75 22 RATES: ProducingINTERVALB (As shown in Item #28)

DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALC (As shown In item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*

CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALD (As shown in Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->

32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)

SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:

Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.

Formation o o m Descriptions, Contents, etc. Name(Measu

edpDepth)

36. ADDITIONALREMARK: (include plugg ig procedure)

Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.

36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.

NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator

SIGNATURE DATE 12/29/2009

This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests

* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940

(5/2000)

Salt Lake City, Utah 84114-5801

DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&

31. INITIALPRODUCTION INTERVALA (As shown In Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:

12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:

75 22 RATES: ProducingINTERVALB (As shown in Item #28)

DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALC (As shown In item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*

CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALD (As shown in Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->

32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)

SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:

Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.

Formation o o m Descriptions, Contents, etc. Name(Measu

edpDepth)

36. ADDITIONALREMARK: (include plugg ig procedure)

Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.

36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.

NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator

SIGNATURE DATE 12/29/2009

This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests

* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940

(5/2000)

Salt Lake City, Utah 84114-5801

DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&

31. INITIALPRODUCTION INTERVALA (As shown In Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:

12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:

75 22 RATES: ProducingINTERVALB (As shown in Item #28)

DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALC (As shown In item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*

CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALD (As shown in Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->

32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)

SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:

Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.

Formation o o m Descriptions, Contents, etc. Name(Measu

edpDepth)

36. ADDITIONALREMARK: (include plugg ig procedure)

Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.

36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.

NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator

SIGNATURE DATE 12/29/2009

This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests

* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940

(5/2000)

Salt Lake City, Utah 84114-5801

DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&

31. INITIALPRODUCTION INTERVALA (As shown In Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:

12/18/2009 12/21/2009 24 R^TES - 142 0 77 PumpingCHOKESIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU-GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:

75 22 RATES: ProducingINTERVALB (As shown in Item #28)

DATEFIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: PROD. METHOD:RATES: -+

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOILRATIO 24 HR PRODUCTION OIL - BBL: GAS- MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALC (As shown In item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: TEST PRODUCTION OIL - BBL: GAS- MCF: WATER- BBL: PROD. METHOD:RATES: -*

CHOKESIZE: TBG.PRESS. CSG. PRESS. API GRAVITY BTU - GAS GASIOlLRATIO 24 HR PRODUCTION OIL - BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:RATES: ->

INTERVALD (As shown in Item #28)

DATE FIRST PRODUCED: TEST DATE: HOURS TESTED: EST PRODUCTION OlL - BBL: GAS - MCF: WATER - BBL: PROD. METHOD:ATES: ->

CHOKE SIZE: TBG. PRESS. CSG. PRESS. API GRAVITY BTU- GAS GASIOILRATIO 4 HR PRODUCTION OIL- BBL: GAS - MCF: WATER - BBL: INTERVALSTATUS:TES: ->

32. DISPOSITIONOF GAS (Sold, Used for Fuel, Vented, Etc.)

SOLD33. SUMMARYOF POROUS ZONES (include Aquifers): 34. FORMAT10N(Log) MARKERS:

Show allimportant zones of porosity and contentsthereof:Cored Intervals and alldrill-stem tests, including deptit intervaltested, cushionused, timetool open, flowingand shut-in pressures and recoveries.

Formation o o m Descriptions, Contents, etc. Name(Measu

edpDepth)

36. ADDITIONALREMARK: (include plugg ig procedure)

Perfs 6795' - 8300' 4 spf -8 shots in every jointof liner. Stuck while drilling - left BHAin hole, used 2-7/8" drill pipe as liner.

36. I hereby certify that the foregoing and attached Information is completeand correct as determined from all availablerecords.

NAME(PLEASE PR ahn Caldwell TITLE OfficeAdministrator

SIGNATURE DATE 12/29/2009

This report must be submitted within 30 days of• completing or plugging a new well e reentering a previously plugged and abandoned well• drillinghorizontal laterals from an existing well bore • significantlydeepening an existing well bore below the previous bottom-hole depth• recompleting to a different producing formation • drillinghydrocarbon exploratoryholes, such as core samples and stratigraphic tests

* ITEM20: Show thenumber of completions if production is measured separatelyfrom twoor more formations." ITEM24:Cement Top-Show how reported top(s)of cement were determined (circulated (CIR),calculated (CAL),cement bond log (CBL),temperaturesurvey (TS)).

Send to: Utah Division of Oil, Gas and Mining Phone: 801-538-53401594 West North Temple, Suite 1210Box 145801 Fax: 801-359-3940

(5/2000)

Salt Lake City, Utah 84114-5801

DEC3 1 2009 CONRDENTIADIV.OFOIL,GAS&

Page 77: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

CONFIDENTIAL

Weatherford'Drilling Services

END OF WELL REPORT

ONESHRQUESTAR EXPLORATION AND PRODUCTION

QUESTAR_BBS-15G-22-7-21

UlNTAH COUNTY, UT

DECEMBER 3, 2009

Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax

CONFIDENTIAL

Weatherford'Drilling Services

END OF WELL REPORT

ONESHRQUESTAR EXPLORATION AND PRODUCTION

QUESTAR_BBS-15G-22-7-21

UlNTAH COUNTY, UT

DECEMBER 3, 2009

Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax

CONFIDENTIAL

Weatherford'Drilling Services

END OF WELL REPORT

ONESHRQUESTAR EXPLORATION AND PRODUCTION

QUESTAR_BBS-15G-22-7-21

UlNTAH COUNTY, UT

DECEMBER 3, 2009

Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax

CONFIDENTIAL

Weatherford'Drilling Services

END OF WELL REPORT

ONESHRQUESTAR EXPLORATION AND PRODUCTION

QUESTAR_BBS-15G-22-7-21

UlNTAH COUNTY, UT

DECEMBER 3, 2009

Weatherford International Ltd.2000 Oil DriveCasper, Wyoming 82604+1.307.265.1413 Main+1.307.235.3958 Fax

Page 78: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Weatherford'

OOOFINAL SURVEYS......................SEC.1

DAYSvs DEPTH.......................SEC.2

DAILYACTIVITY.......................SEC.3

BHA REPORTS........................SEC.4

MOTOR REPORTS ...................SEC.5

SLIDE REPORT........................SEC.6

DrillingServices-Casper,

Weatherford'

OOOFINAL SURVEYS......................SEC.1

DAYSvs DEPTH.......................SEC.2

DAILYACTIVITY.......................SEC.3

BHA REPORTS........................SEC.4

MOTOR REPORTS ...................SEC.5

SLIDE REPORT........................SEC.6

DrillingServices-Casper,

Weatherford'

OOOFINAL SURVEYS......................SEC.1

DAYSvs DEPTH.......................SEC.2

DAILYACTIVITY.......................SEC.3

BHA REPORTS........................SEC.4

MOTOR REPORTS ...................SEC.5

SLIDE REPORT........................SEC.6

DrillingServices-Casper,

Weatherford'

OOOFINAL SURVEYS......................SEC.1

DAYSvs DEPTH.......................SEC.2

DAILYACTIVITY.......................SEC.3

BHA REPORTS........................SEC.4

MOTOR REPORTS ...................SEC.5

SLIDE REPORT........................SEC.6

DrillingServices-Casper,

Page 79: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

FINALFINALFINALFINAL

Page 80: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21

Ot/ES TAR ·ññë

Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)

SHLSECTION 22 669 FSL 2022'FEL

SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)

Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point

I Tiso:sis- I500- -

WELL DETAILS: BBS 15G-22-7-21 SECTION UNE

Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W

ISECTION DETAILS

MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07

6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93

I o

TMAzimulhs to True North

Lue Elio / \ Magnelic North: 11.36"

- 88515542.741 BBS1B22·T41 Designg1vo Magnetic Field- BBS 1¾22-741 Strangth: 52601 3srs I- sumayassT: Dip Angle: 66.08 LM Svs

Date: 10/28 2000Model: BGGM2009

|

-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E

SECTlON 27

198ŒMRO UNE FS1

::: SECTlON 27

-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)

Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)

CreatedBy: TRACYWILUAMS Date:

Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21

Ot/ES TAR ·ññë

Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)

SHLSECTION 22 669 FSL 2022'FEL

SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)

Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point

I Tiso:sis- I500- -

WELL DETAILS: BBS 15G-22-7-21 SECTION UNE

Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W

ISECTION DETAILS

MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07

6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93

I o

TMAzimulhs to True North

Lue Elio / \ Magnelic North: 11.36"

- 88515542.741 BBS1B22·T41 Designg1vo Magnetic Field- BBS 1¾22-741 Strangth: 52601 3srs I- sumayassT: Dip Angle: 66.08 LM Svs

Date: 10/28 2000Model: BGGM2009

|

-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E

SECTlON 27

198ŒMRO UNE FS1

::: SECTlON 27

-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)

Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)

CreatedBy: TRACYWILUAMS Date:

Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21

Ot/ES TAR ·ññë

Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)

SHLSECTION 22 669 FSL 2022'FEL

SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)

Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point

I Tiso:sis- I500- -

WELL DETAILS: BBS 15G-22-7-21 SECTION UNE

Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W

ISECTION DETAILS

MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07

6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93

I o

TMAzimulhs to True North

Lue Elio / \ Magnelic North: 11.36"

- Besium-naal ses9soneel onsionsivo Magnetic Field- Bas 1s>22441 Strangth: 52601 3srs I- sumayassT2 Dip Angle: 66.08 LM Svs

Date: 10/28 2000Model: BGGM2009

|

-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E

SECTlON 27

198ŒMRO UNE FS1

::: SECTlON 27

-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)

Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)

CreatedBy: TRACYWILUAMS Date:

Project: UINTAH COUNTY, UTAHSite: BBS 15G-22-7-21

Ot/ES TAR ·ññë

Longitude: 109° 32' 20.960 WGL: 4909.00KB: [email protected] (AZTEC777)

SHLSECTION 22 669 FSL 2022'FEL

SECTION 22 T7S R21E oWELLBORE TARGET DETAILS(LATILONG)

Name TVD +NI-S +El-W Latitude Longitude Shape iPBHL BBS 15G-22-7-21 6379.61 -3911.80 1325.61 40* 10' 49.380 N 109° 32" 3.880 W Point

I Tiso:sis- I500- -

WELL DETAILS: BBS 15G-22-7-21 SECTION UNE

Ground Level: 4909.00+NI-S +El-W Northing Easting Latittude Longitude Slot0.00 0.00 7244345.81 2188149.36 40" 11' 28.040 N 109" 32' 20.960 W

ISECTION DETAILS

MD Inc Azi TVD +NI-S +El-W DLeg TFace VSec Annotation6160,00 2.67 176.67 6157.68 -139.89 1.25 0.00 0.00 13190 Start 42.00 hold at 6160.00 MD6202.00 2.67 176.67 6199.64 -141.85 1.37 0.00 0.00 134,78 Start DLS 15.34 TFO -16.07

6790.24 92.80 160.58 6565.95 -512.56 126.96 15.34 -16.07 526.20 Start 3608.70 hold at 6790.24 MD10398.93 92.80 160.58 6379.81 -3911.80 1325.61 0.00 0.00 4130,31 TD at 10398.93

I o

TMAzimulhs to True North

Lue Elio / \ Magnelic North: 11.36"

- Besium-naal ses9soneel onsionsivo Magnetic Field- Bas 1s>22441 Strangth: 52601 3srs I- sumayassT2 Dip Angle: 66.08 LM Svs

Date: 10/28 2000Model: BGGM2009

|

-36 0-- PBHL2080' FSL 6806FEL3911.80° S, 1325.61' E

SECTlON 27

198ŒMRO UNE FS1

::: SECTlON 27

-1000 ·500 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000Vertical Section at 179 39° (1000 ftlin)

Survey: Survey #3 ST2 (BBS 15G-22-7-21/BBS 15G-22-7-21)

CreatedBy: TRACYWILUAMS Date:

Page 81: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

00NFIDERL necev oDFP3 1 2009

Questar E & PDROFO\L,GAS&MNNG Page 1 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04

OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37

OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14

OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03

OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD

OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD

OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD

OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD

OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD

OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD

OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWDOH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD

OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD

OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD

OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD

OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD

OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWDOH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWDOH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD

00NRDENBarinted:12.28/2009 11:59:11

00NFIDERL necev oDFP3 1 2009

Questar E & PDROFO\L,GAS&MNNG Page 1 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04

OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37

OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14

OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03

OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD

OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD

OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD

OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD

OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD

OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD

OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWD

OH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD

OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD

OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD

OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD

OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD

OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD

OH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWD

OH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD

01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD

00NRDENBarinted:12.28/2009 11:59:11

00NFIDERL necev oDFP3 1 2009

Questar E & PDROFO\L,GAS&MNNG Page 1 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04

OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37

OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14

OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03

OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD

OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD

OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD

OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD

OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD

OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD

OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWDOH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD

OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD

OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD

OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD

OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD

OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWDOH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWDOH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD

00NRDENBarinted:12.28/2009 11:59:11

00NFIDERL necev oDFP3 1 2009

Questar E & PDROFO\L,GAS&MNNG Page 1 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (*)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 . OH 161.00Closure Distance: 3,698g(ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (*) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

OH 6,160.0 2.67 176.70 NYN 6,157.68 -139.89 1.25 132.89 0.04 0.04

OH 6,211.0 6.94 160.00 YNN 6,208.49 -143.97 2.37 136.90 8.72 8.37

OH 6,247.0 13.83 148.60 YNN 6,243.88 -149.70 5.36 143.29 19.88 19.14

OH 6,279.0 19.60 151.39 YNN 6,274.52 -157.68 9.93 152.32 18.20 18.03

OH 6,310.0 24.44 154.86 YNN 6,303.25 -168.06 15.15 163.83 16.16 15.61 MWD

OH 6,342.0 29.30 157.91 YNN 6,331.79 -181.31 20.91 178.24 15.78 15.19 MWD

OH 6,374.0 33.69 161.36 YNN 6,359.07 -196.99 26.69 194.95 14.83 13.72 MWD

OH 6,405.0 37.56 160.74 YNN 6,384.26 -214.06 32.56 213.00 12.54 12.48 MWD

OH 6,437.0 41.88 161.49 YNN 6,408.87 -233.41 39.17 233.44 13.58 13.50 MWD

OH 6,468.0 44.94 161.49 YNN 6,431.39 -253.61 45.93 254.74 9.87 9.87 MWD

OH 6,496.0 49.44 162.79 YNN 6,450.41 -273.15 52.22 275.27 16.43 16.07 MWDOH 6,527.0 53.56 164.24 YNN 6,469.71 -296.41 59.10 299.50 13.78 13.29 MWD

OH 6,559.0 56.88 165.24 YNN 6,487.96 -321.77 66.01 325.73 10.69 10.38 MWD

OH 6,591.0 60.00 164.36 YNN 6,504.70 -348.08 73.16 352.93 10.03 9.75 MWD

OH 6,622.0 65.17 163.53 YNN 6,518.97 -374.51 80.77 380.40 16.85 16.68 MWD

OH 6,653.0 71.00 164.74 YNN 6,530.54 -402.16 88.63 409.11 19.15 18.81 MWD

OH 6,687.0 76.08 166.54 YNN 6,540.17 -433.74 96.70 441.59 15.78 14.94 MWDOH 6,719.0 78.92 167.09 YNN 6,547.10 -464.16 103.83 472.67 9.03 8.88 MWDOH 6,750.0 82.88 166.49 YNN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWDOH 6,782.0 85.31 165.24 YNN 6,555.29 -524.81 118.59 534.83 8.53 7.59 MWDOH 6,813.0 88.56 165.86 YNN 6,556.95 -554.79 126.32 565.69 10.67 10.48 MWDOH 6,845.0 88.63 166.86 YNN 6,557.73 -585.87 133.86 597.54 3.13 0.22 MWDOH 6,876.0 91.43 167.30 YNN 6,557.72 -616.09 140.79 628.36 9.14 9.03 MWDOH 6,908.0 91.88 165.86 YNN 6,556.79 -647.20 148.22 660.19 4.71 1.41 MWDOH 6,940.0 92.50 168.11 YNN 6,555.57 -678.35 155.42 691.99 7.29 1.94 MWD01 6,750.0 82.88 166.49 NYN 6,552.00 -493.95 110.82 503.12 12.92 12.77 MWD01 6,782.0 83.29 167.17 YNN 6,555.85 -524.88 118.06 534.72 2.47 1.28 MWD01 6,844.0 93.00 169.99 YNN 6,557.86 -585.54 130.31 596.07 16.31 15.66 MWD01 6,876.0 89.50 170.11 YNN 6,557.16 -617.05 135.83 627.66 10.94 -10.94 MWD01 6,907.0 82.88 169.86 YNN 6,559.22 -647.49 141.21 658.19 21.37 -21.35 MWD01 6,939.0 86.30 169.22 YNN 6,562.24 -678.82 146.99 689.69 10.87 10.69 MWD01 6,971.0 93.50 167.49 YNN 6,562.29 -710.14 153.45 721.40 23.14 22.50 MWD01 7,002.0 90.88 165.86 YNN 6,561.11 -740.28 160.59 752.23 9.95 -8.45 MWD

00NRDENBarinted:12.28/2009 11:59:11

Page 82: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

RECElVED

Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)

01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16

03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56

Printed: 12r28/2009 11:59:11

RECElVED

Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)

01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16

03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56

Printed: 12r28/2009 11:59:11

RECElVED

Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)

01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16

03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56

Printed: 12r28/2009 11:59:11

RECElVED

Questar E & P DIV.0FOIL,GAS&MENGPage 2 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Ct rvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°l100ft) (°/100ft)

01 7,034.0 94.19 164.49 YNN 6,559.69 -771.18 168.77 784.11 11.19 10.34 MWD01 7,065.0 101.06 163.49 YNN 6,555.58 -800.69 177.23 814.77 22.39 22.16 MWD02 6,782.0 83.29 167.17 NYN 6,555.85 -524.87 118.04 534.26 0.00 0.00 MWD03 6,719.0 78.92 167.09 NYN 6,547.10 -464.00 103.81 472.77 0.00 0.00 MWD03 6,722.0 79.40 167.13 YNN 6,547.66 -466.87 104.47 475.45 16.05 16.00 MWD03 6,754.0 78.60 170.07 YNN 6,553.77 -497.66 110.68 506.58 9.36 -2.50 MWD03 6,786.0 83.62 168.34 YNN 6,558.72 -528.70 116.60 537.86 16.57 15.69 MWD03 6,817.0 85.22 168.49 YNN 6,561.73 -558.93 122.79 568.46 5.18 5.16 MWD03 6,848.0 90.20 168.18 YNN 6,562.97 -589.25 129.06 599.17 16.10 16.06 MWD03 6,879.0 92.55 169.34 YNN 6,562.22 -619.65 135.10 629.87 8.45 7.58 MWD03 6,911.0 91.06 168.40 YNN 6,561.22 -651.03 141.27 661.55 5.50 -4.66 MWD03 6,943.0 90.66 167.89 YNN 6,560.74 -682.34 147.84 693.30 2.03 -1.25 MWD03 6,974.0 92.15 167.62 YNN 6,559.98 -712.63 154.42 724.08 4.88 4.81 MWD03 7,006.0 93.86 167.90 YNN 6,558.30 -743.86 161.19 755.81 5.41 5.34 MWD03 7,037.0 93.05 167.91 YNN 6,556.43 -774.11 167.67 786.53 2.61 -2.61 MWD03 7,069.0 91.57 167.12 YNN 6,555.14 -805.33 174.59 818.29 5.24 -4.63 MWD03 7,100.0 90.71 167.20 YNN 6,554.52 -835.55 181.47 849.11 2.79 -2.77 MWD03 7,132.0 92.77 165.98 YNN 6,553.55 -866.66 188.89 880.94 7.48 6.44 MWD03 7,164.0 91.23 165.94 YNN 6,552.44 -897.68 196.65 912.80 4.81 -4.81 MWD03 7,195.0 94.71 165.12 YNN 6,550.83 -927.65 204.38 943.66 11.53 11.23 MWD03 7,226.0 95.47 165.97 YNN 6,548.08 -957.55 212.09 974.44 3.67 2.45 MWD03 7,258.0 92.49 164.84 YNN 6,545.86 -988.44 220.13 1,006.26 9.96 -9.31 MWD03 7,289.0 93.57 164.34 YNN 6,544.22 -1,018.29 228.36 1,037.16 3.84 3.48 MWD03 7,321.0 95.81 163.98 YNN 6,541.60 -1,048.97 237.07 1,069.00 7.09 7.00 MWD03 7,353.0 92.03 164.18 YNN 6,539.42 -1,079.66 245.82 1,100.87 11.83 -11.81 MWD03 7,384.0 89.74 162.71 YNN 6,538.94 -1,109.37 254.65 1,131.84 8.78 -7.39 MWD03 7,416.0 93.36 163.89 YNN 6,538.07 -1,140.00 263.84 1,163.79 11.90 11.31 MWD03 7,447.0 94.20 162.54 YNN 6,536.03 -1,169.62 272.77 1,194.70 5.12 2.71 MWD03 7,479.0 91.28 162.11 YNN 6,534.50 -1,200.07 282.48 1,226.65 9.22 -9.13 MWD03 7,497.0 91.51 161.82 YNN 6,534.06 -1,217.18 288.05 1,244.64 2.06 1.28 MWD03 7,528.0 91.46 161.45 YNN 6,533.26 -1,246.59 297.81 1,275.63 1.20 -0.16

03 7,560.0 92.60 161.60 YNN 6,532.12 -1,276.92 307.95 1,307.61 3.59 3.5603 7,592.0 93.34 162.16 YNN 6,530.46 -1,307.29 317.89 1,339.56

Printed: 12r28/2009 11:59:11

Page 83: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77

03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44

03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19

03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97

03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72

03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42

03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56

03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54

03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34

03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '

-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34

03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90

03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09

03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD

rinted: 12,28/2009 11;59:11

DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77

03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44

03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19

03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97

03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72

03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42

03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56

03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54

03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34

03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '

-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34

03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90

03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09

03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD

rinted: 12,28/2009 11;59:11

DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77

03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44

03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19

03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97

03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72

03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42

03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56

03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54

03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34

03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '

-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34

03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90

03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09

03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD

rinted: 12,28/2009 11;59:11

DEC3 i USQuestar E & P Div.0FOIL,GAS&MONG Page 3 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.80 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direc ion: 157.23 (°) Calculation Method: Minimum Curvature 01 101.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert.Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 7,623.0 91.86 161.93 YNN 6,529.06 -1,336.75 327.43 1,370.53 4.83 -4.77

03 7,655.0 91.40 161.37 YNN 6,528.15 -1,367.11 337.50 1,402.51 2.26 -1.44

03 7,686.0 92.60 160.66 YNN 6,527.07 -1,396.41 347.58 1,433.49 4.50 3.8703 7,718.0 95.17 160.98 YNN 6,524.90 -1,426.56 358.07 1,465.41 8.09 8.0303 7,749.0 95.11 160.87 YNN 6,522.12 -1,455.74 368.16 1,496.29 0.40 -0.19

03 7,781.0 94.48 159.85 YNN 6,519.45 -1,485.77 378.88 1,528.17 3.74 -1.97

03 7,813.0 93.29 161.10 YNN 6,517.28 -1,515.86 389.55 1,560.10 5.39 -3.72

03 7,844.0 92.54 159.08 YNN 6,515.70 -1,544.97 400.09 1,591.05 6.94 -2.42

03 7,876.0 91.40 156.90 YNN 6,514.60 -1,574.62 412.07 1,622.99 7.68 -3.56

03 7,907.0 92.94 155.36 YNN 6,513.43 -1,602.94 424.61 1,653.85 7.02 4.97 MWD03 7,970.0 90.71 152.00 YNN 6,511.42 -1,659.37 452.52 1,716.29 6.40 -3.54

03 8,033.0 91.85 150.28 YNN 6,510.01 -1,714.53 482.92 1,778.34 3.27 1.8103 8,065.0 93.52 149.18 YNN 6,508.51 -1,742.14 499.03 1,809.69 6.25 5.2203 8,096.0 94.09 149.71 YNN 6,506.46 -1,768.77 514.76 1,840.00 2.51 1.8403 8,128.0 91.74 149.87 YNN 6,504.83 -1,796.39 530.84 1,871.34 7.36 -7.34

03 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 5.29 2.9703 8,159.0 92.66 151.23 YNN 6,503.64 -1,823.36 546.07 1,901.80 0.00 0.00 MWD03 8,190.0 91.74 151.11 YNN 6,502.45 -1,850.50 561.01 I 1,932.33 2.99 -2.97 MWD03 8.222.0 91.57 151.37 YNN 6,501.53 -1,878.54 576.40 1,963.85 0.97 -0.53 MWD03 8,253.0 92.66 152.52 YNN 6,500.38 -1,905.88 590.96 1,994.44 5.11 3.52 MWD03 8,285.0 93.57 152.84 YNN 6,498.64 -1,934.27 605.63 2,026.06 3.01 2.84 MWD03 8,316.0 93.05 153.01 YNN 6,496.85 -1,961.82 619.72 2,056.70 1.76 -1.68 MWD03 8,348.0 95.06 154.92 YNN 6,494.59 -1,990.50 633.73 2,088.38 8.65 6.28 MWD03 8,380.0 91.57 154.94 YNN 6,492.74 -2,019.43 647.26 2,120.14 10.91 -10.91 MWD03 8,411.0 92.03 156.38 YNN 6,491.77 -2,047.66 660.03 2,150.99 4.87 1.48 MWD03 8,443.0 93.92 158.21 YNN 6,495 '

-2,077.14 672.36 2,182.87 8.22 5.9103 8,f75.0 91.57 159.83 YNN 6,488.57 -2,106.98 683.81 2,214.82 8.92 -7.34

03 8,506.0 89.12 161.93 YNN 6,488.39 -2,136.27 693.96 2,245.81 10.41 -7.90

03 8,538.0 88.77 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 1.12 -1.09

03 8,538.0 88.87 162.01 YNN 6,488.98 -2,166.69 703.86 2,277.80 0.00 0.00 MWD03 8,601.0 94.25 160.14 YNN 6,487.26 -2,226.24 724.28 2,340.75 9.04 8.54 MWD03 8,632.0 95.86 157.84 YNN 6,484.53 -2,255.06 735.35 2,371.61 9.03 5.19 MWD03 8,664.0 94.02 157.50 YNN 6,481.77 -2,284.55 747.46 2,403.43 5.85 -5.75 MWD

rinted: 12,28/2009 11;59:11

Page 84: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

RECEIVED

DEC31 2009Questar E & P Page 4 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61

03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63

03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10

03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31

03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42

03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD

MDENTIALPrinted: 12,28/2009 11:59:11

RECEIVED

DEC31 2009Questar E & P Page 4 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61

03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63

03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10

03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31

03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42

03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD

MDENTIALPrinted: 12,28/2009 11:59:11

RECEIVED

DEC31 2009Questar E & P Page 4 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61

03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63

03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10

03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31

03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42

03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD

MDENTIALPrinted: 12,28/2009 11:59:11

RECEIVED

DEC31 2009Questar E & P Page 4 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T# V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161 00S/T # TMD Angle Azimuth CTM TVD N/-S E/-W Vert. Section DLS BUR Type

(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 8,696.0 91.51 158.25 YNN 6,480.23 -2,314.16 759.50 2,435.35 8.19 -7.84 MWD03 8,727.0 92.59 157.34 YNN 6,479.12 -2,342.84 771.20 2,466.28 4.55 3.48 MWD03 8,759.0 92.43 156.55 YNN 6,477.72 -2,372.26 783.72 2,498.17 2.52 -0.50 MWD03 8,790.0 93.22 154.60 YNN 6,476.19 -2,400.45 796.53 2,528.99 6.78 2.55 MWD03 8,822.0 94.15 154.35 YNN 6,474.13 -2,429.26 810.29 2,560.72 3.01 2.91 MWD03 8,854.0 94.20 153.75 YNN 6,471.81 -2,457.96 824.25 2,592.40 1.88 0.16 MWD03 8,886.0 93.63 154.12 YNN 6,469.62 -2,486.64 838.28 2,624.08 2.12 -1.78 MWD03 8,917.0 93.46 154.26 YNN 6,467.70 -2,514.49 851.75 2,654.80 0.71 -0.55 MWD03 8,949.0 93.10 153.79 YNN 6,465.87 -2,543.21 865.74 2,686.51 1.85 -1.13 MWD03 8,990.0 92.65 154.67 YNN 6,463.82 -2,580.09 883.54 2,727.17 2.41 -1.10 MWD03 9,036.0 91.94 156.49 YNN 6,461.97 -2,621.94 902.55 2,772.93 4.24 -1.54 MWD03 9,068.0 91.50 157.74 YNN 6,461.01 -2,651.40 914.98 2,804.84 4.14 -1.38 MWD03 9,100.0 92.38 157.37 YNN 6,459.93 -2,680.96 927.19 2,836.76 2.98 2.75 MWD03 9,131.0 91.31 157.74 YNN 6,458.93 -2,709.60 939.02 2,867.69 3.65 -3.45 MWD03 9,163.0 90.75 157.99 YNN 6,458.36 -2,739.24 951.08 2,899.64 1.92 -1.75 MWD03 9,194.0 90.91 157.30 YNN 6,457.91 -2,767.90 962.87 2,930.58 2.28 0.52 MWD03 9,226.0 94.44 157.61 YNN 6,456.41 -2,797.42 975.12 2,962.48 11.07 11.03 MWD03 9,257.0 94.25 156.49 YNN 6,454.07 -2,825.88 987.18 2,993.32 3.65 -0.61 MWD03 9,289.0 93.06 155.74 YNN 6,452.03 -2,855.08 1,000.11 3,025.14 4.39 -3.72 MWD03 9,320.0 92.56 155.49 YNN 6,450.51 -2,883.28 1,012.89 3,055.96 1.80 -1.61

03 9,352.0 91.40 153.76 YNN 6,449.40 -2,912.18 1,026.59 3,087.74 6.51 -3.63

03 9,383.0 90.44 151.99 YNN 6,448.90 -2,939.76 1,040.73 3,118.43 6.49 -3.10

03 9,415.0 90.56 150.99 YNN 6,448.62 -2,967.88 1,056.00 3,149.99 3 15 0.3803 9,447.0 92.69 150.36 YNN 6,447.72 -2,995.77 1,071.66 3,181.45 6.94 6.6603 9,478.0 94.38 150.74 YNN 6,445.80 -3,022.71 1,086.88 3,211.88 5.59 5.4503 9,510.0 93.00 149.61 YNN 6,443.75 -3,050.41 1,102.76 3,243.24 5.57 -4.31

03 9,541.0 91.63 147.74 YNN 6,442.49 -3,076.87 1,118.86 3,273.50 7.47 -4.42

03 9,573.0 92.50 146.49 YNN 6,441.34 -3,103.72 1,136.22 3,304.55 4.76 2.7203 9,605.0 91.63 144.24 YNN 6,440.19 -3,130.03 1,154.40 3,335.34 7.53 -2.72 MWD03 9,636.0 93.13 142.61 YNN 6,438.90 -3,154.91 1,172.85 3,364.87 7.14 4.84 MWD03 9,668.0 92.63 141.61 YNN 6,437.29 -3,180.13 1,192.48 3,395.10 3.49 -1.56 MWD03 9,699.0 91.89 140.74 YNN 6,436.07 -3,204.26 1,211.90 3,424.24 3.68 -2.39 MWD03 9,731.0 92.19 138.24 YNN 6,434.93 -3,228.57 1,232.67 3,453.99 7.86 0.94 MWD

MDENTIALPrinted: 12,28/2009 11:59:11

Page 85: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 5 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR

. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD

Printed: 12/28/2009 11:59:11

Questar E & P Page 5 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR

. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD

Printed: 12/28/2009 11:59:11

Questar E & P Page 5 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR

. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD

Printed: 12/28/2009 11:59:11

Questar E & P Page 5 of 5

Deviation SummaryWell Name: BBS 15G-22-7-21 Location: 22- 7-S 21-E 26 S/T # V.S. AZI (°)TMD: 10,001.0 (ft) TVD: 6,422.88 (ft) Spud Date: 9/29/2006 OH 161.00Closure Distance: 3,698.6 (ft) Closure Direction: 157.23 (°) Calculation Method: Minimum Curvature 01 161.00S/T # TMD Angle Azimuth CTM TVD N/-S El-W Vert. Section DLS BUR

. Type(ft) (°) (°) (ft) (ft) (ft) (ft) (°/100ft) (°/100ft)

03 9,762.0 93.00 135.74 YNN 6,433.53 -3,251.21 1,253.79 3,482.28 8.47 2.61 MWD03 9,794.0 91.19 132.99 YNN 6,432.36 -3,273.57 1,276.65 3,510.86 10.28 -5.66 MWD03 9,825.0 94.00 133.61 YNN 6,430.95 -3,294.81 1,299.19 3,538.28 9.28 9.06 MWD03 9,857.0 93.88 132.49 YNN 6,428.75 -3,316.60 1,322.52 3,566.48 3.51 -0.38i MWD03 9,888.0 91.50 132.11 YNN 6,427.30 -3,337.44 1,345.42 3,593.64 7.77 -7.68 MWD03 9,920.0 91.31 132.36 YNN 6,426.51 -3,358.94 1,369.10 3,621.68 0.98 -0.59 MWD03 9,951.0 92.06 129.86 YNN 6,425.60 -3,379.31 1,392.45 3,648.54 8.42 2.42 MWD03 9,983.0 93.31 127.74 YNN 6,424.10 -3,399.34 1,417.36 3,675.59 7.68 3.91 MWD03 10,001.0 94.50 126.99 YNN 6,422.88 -3,410,24 1,431.63 3,690.54 7.81 6.61 MWD

Printed: 12/28/2009 11:59:11

Page 86: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 1 of 8

00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.

WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP

11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &

TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME

02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.

06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE

10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN

11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE

SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE

SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN

WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE

WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9

11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION

11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480

11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130

11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470

DIV.OFOIL,GAS&

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 1 of 8

00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.

WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP

11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &

TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME

02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.

06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE

10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN

11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE

SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE

SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN

WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE

WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9

11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION

11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480

11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130

11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470

DIV.OFOIL,GAS&

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 1 of 8

00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.

WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP

11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &

TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME

02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.

06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE

10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN

11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE

SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE

SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN

WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE

WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9

11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION

11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480

11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130

11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470

DIV.OFOIL,GAS&

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 1 of 8

00NFllENTIALop.,,,,onsso...,,s.,,,, _ omeousWell Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

10/31/2009 06:00 - 16:30 10.50 LOC 3 MOVE 15 MILESWITH WEST ROC TRUCKING16:30 -06:00 13.50 LOC 4 GENERAL RIG UP BY HAND, WATER FUEL AND AIR SYSTEMS RIGGED UP.

WINTERIZING RAILS WELDED ON DERRICK BOARD. REPAIR GENERATORS,DERRICK NOT RAISED. RIG 100% MOVED AND 45% RIGGED UP

11/1/2009 06:00 -21:00 15.00 LOC 4 RIG UP AND PREPARE TO PICK UP B.H.A.21:00 -23:00 2.00 BOP 1 NIPPLE UP BOPE23:00 -02:00 3.00 BOP 2 TEST B.O.P ( PIPE RAMS, BLINDRAMS ALLKILLVALVES&CHOKE VALVES &

TOP DRIVE VALVES TO 250PSI LOW/ 5 MINUTES AND 3000 PSI HIGH / 10MINUTES ANNULAR250 LOW AND 1500 HIGH SAME TIME

02:00 -06:00 4.00 TRP 1 SET WEAR BUSHING AND LAYOUT AND STRAP WEIGHT PIPE( B.H.A.) ANDDRILLINGJARS,CASING SCRAPER, AND X.O. SUBS.HOLD PREJOB SAFETYMEETING RIG UP LAYDOWN MACHINEAND PICK UP B.H.A.

06:00 - SET TIME BACK@0200 FOR TIME CHANGE11/2/2009 06:00 -10:00 4.00 TRP i CONT TO PICK UP DRILLPIPE

10:00 -11:30 1.50 OTH RIG UP THE HOT OIL TRUCK AND HEAT THE WATER AND CIRC THE WELLCLEAN

11:30 - 12:00 0.50 RIG 1 RIG SERVICE ( CHECK THE BREAKS AND BREAK LINKAGE12:00 -15:00 3.00 TRP 2 TRIP OUT WITH THE CASING SCRAPER15:00-15:30 0.50 OTH HOLD PREJOB SAFETY MEETING WITH GYRO & KNIGHT PEOPLE15:30 -16:00 0.50 RIG 1 RIG SERVICE ( TROUBLE SHOOT THE RIGHT ANGLE DRIVE)16:00 -17:00 1.00 RIG 2 WORK ON THE RIGHT ANGLE DRIVE17:00 -18:00 1.00 TRP 1 PICK UP AND MAKE UP THE WHIPSTOCK ASSEMBLY & ORINATE THE MULE

SHOE FOR THE GYRO18:00 - 21:30 3.50 TRP 2 TRIP IN THE HOLE WITH THE WHIPSTOC ASSEMBLY21:30 -23:00 1.50 OTH HOLD PREJOB SAFETY MEETING AND TRIP INWITH CASED HOLE

SOLUTIONS WIRELINE23:00 -23:30 0.50 OTH ORINATE AND SET WHIP STOCK @ 162/163 DEGREES AND RIG DOWN

WIRELINE TRUCK23:30 -00:00 0.50 OTH SET DRILLINGTORQUE ON TOP DRIVE TO 1000-1400 FT. LBS TO MILLTHE

WINDOW00:00 -06:00 6.00 DRL 7 CUT THE WINDOW @6200.9

11/3/2009 06:00 -13:00 7.00 DRL 7 CONT TO CUT WINDOW FROM 6200.35 FEET TO 6209.85 FEET13:00 -14:00 1.00 CIRC 1 PUMP A HIGH VIS SWEEP AND A TRIP SLUG14:00 -16:00 2.00 TRP 10 TRIP OUT WITH THE MILLINGASSEMBLY16:00 -17:00 1.00 TRP 1 LAYDOWN AND LOAD OUT MILLINGASSEMBLY17:00 -17:30 0.50 RIG 1 RIG SERVICE17:30 -19:30 2.00 TRP i PICK UP WEATHERFORD DIRECTIONAL TOOLS & ORINATE TOOLS19:30 - 20:00 0.50 OTH SURFACE TEST MUD MOTOR20:00 -23:00 3.00 TRP 2 TRIP IN THE HOLE WITH DIRECTIONAL TOOLS23:00-00:00 1.00 OTH RIG UP PUMP IN SUB AND WIRELINE TRUCK, HANG SHIEVE IN THE DERRICK00:00 -01:00 1.00 DRL 3 RUN IN THE HOLE WITH THE GYRO AND WIRELINE ORINATE GYRO01:00 -06:00 5.00 DRL 2 TIME DRILLTO GET OUT OF THE WINDOW AND START THE BUILD SECTION

11/4/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILL FROM 6245 FEET TO 6249 FEET08:00-10:00 2.00 OTH TRIP OUT WITH WIRE LINEAND GYRO TOOLS RIG DOWN WIRE LINETRUCK10:00 -18:00 8.00 DRL 2 DIRECTIONAL DRILL FROM 6249 FEET TO 6363 FEET18:00 -06:00 12.00 DRL 2 DIRECTIONAL DRILL FROM 6363 FEET TO 6480

11/5/2009 06:00 -11:30 5.50 DRL 2 DIRECTIONAL DRILL F/6480 T/6517 3T 6.T/HRWOB 12/14 RPM 202/235 GPM 130

11:30-12:00 0.50 CIRC 1 CIRCULATE AND BUILDTRIP SLUG12:00-14:30 2.50 TRP 10 TRIPOUTOFHOLEWITHBIT#2 RECEIVED14:30 -15:00 0.50 TRP 1 CHANGE OUT BIT AND CHECK MOTOR AND MWD15:00-15:30 0.50 RIG 1 RIG SERVICE DEC3 1 20"915:30 - 18:30 3.00 TRP 10 TIH WITH BIT #3 TO 6470

DIV.OFOIL,GAS&

Printed: 12/28/2009 11:59:15 AM

Page 87: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 2 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR

WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'

ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH

LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS

11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'

ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'

ROP-10.9'lHR WOB-10/20 GPM-129

23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT

DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE

11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'

ROP-6.5'lHR WOB-10/20 GPM-12911/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'

08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT

AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'

ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'

ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'

ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'

ROP - T/HR WOB 10-20 GPM - 129

01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV

ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107

DIV.0FOIL,GU

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 2 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR

WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'

ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH

LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS

11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'

ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'

ROP-10.9'lHR WOB-10/20 GPM-129

23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT

DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE

11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'

ROP-6.5'lHR WOB-10/20 GPM-129

11/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT

AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'

ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'

ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'

ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'

ROP - T/HR WOB 10-20 GPM - 129

01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV

ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107

DIV.0FOIL,GU

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 2 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR

WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'

ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH

LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS

11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'

ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'

ROP-10.9'lHR WOB-10/20 GPM-129

23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT

DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE

11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'

ROP-6.5'lHR WOB-10/20 GPM-12911/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'

08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT

AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'

ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'

ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'

ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'

ROP - T/HR WOB 10-20 GPM - 129

01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV

ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107

DIV.0FOIL,GU

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 2 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/5/2009 18:30 - 19:00 0.50 REAM i WASH AND REAM 4T F/6470 Tl651719:00-06:00 11.00 DRL 2 DIRECTIONALDRILLF/6517T/6645 128' 11.6'/HR

WOB 12/14 RPM 257 GPM 12911/6/2009 06:00 -15:30 9.50 DRL 2 DIRECTIONAL DRILLF/6645 T/6721 76'

ROP-8'lHR GPM-129 WOB-10/1315:30-16:00 0.50 OTH TROUBLE SHOOT PRESSURE LOSS PROBLEMS16:00 - 19:00 3.00 TRP 13 T.O.O.H., TWISTED OFF AT X/O BETWEEN MONEL AND HWDP, 78.0T OF FISH

LEFT IN THE HOLE19:00 - 23:00 4.00 OTH WAIT ON FISHING TOOLS23:00 -02:00 3.00 TRP 13 STRAP AND P/U FISHING TOOLS02:00 -06:00 4.00 TRP 13 TRIP IN THE HOLE WITH FISHING TOOLS

11/7/2009 06:00 -11:30 5.50 TRP 13 SPEAR INTO FISH AND TRIP OUT OF HOLE WITH FISH.11:30 -14:30 3.00 TRP 1 LAYDOWN FISHING AND DIRECTIONAL TOOLS14:30 - 15:30 1.00 RIG 6 CUT DRILLINGLINE15:30 - 19:00 3.50 TRP 1 STRAP AND PICK UP DIRECTIONAL TOOLS , ORIENT AND TEST19:00 - 22:30 3.50 TRP 2 TRIP IN THE HOLE22:30 -23:00 0.50 REAM i WASH AND REAM 59' TO BOTTOM23:00 -06:00 7.00 DRL 2 DIRECTIONAL DRILLFROM 6721' TO 6803' 82'

ROP - 11.7'lHR WOB - 10/19 GPM - 12911/8/2009 06:00 - 23:00 17.00 DRL 2 DIRECTIONAL DRILLFROM 6803 TO 6989 186'

ROP-10.9'lHR WOB-10/20 GPM-129

23:00 -23:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG23:30 -02:30 3.00 TRP 10 TRIP OUT OF THE HOLE FOR BIT #502:30 -03:30 1.00 TRP 1 C/O BITS, CHECKOTOR, C/O FLOAT SUB, RE-SCRIBE AND ORIENT

DIRECTINALTOOLS03:30 -06:00 2.50 TRP 10 TRIP IN THE HOLE

11/9/2009 06:00 -10:00 4.00 DRL 7 TROUGH WELLBORE FROM 6760' TO 6770'10:00 - 20:00 10.00 DRL 7 TIME DRILLFROM 6770' TO 6786'20:00 -06:00 10.00 DRL 2 DIRECTIONAL DRILLFROM 6786' TO 6851' 65'

ROP-6.5'lHR WOB-10/20 GPM-12911/10/2009 06:00 -08:30 2.50 DRL 2 DIRECTIONAL DRILLF/6851 T/6861 10'

08:30 -09:30 1.00 CIRC 1 CIRCULATE SAMPLES AND PUMP TRIP SLUG09:30 -12:00 2.50 TRP 10 TRIP OUT OF HOLE FOR BIT12:00 -14:00 2.00 TRP 1 CHANGE OUT BIT, MOTOR, AND MULE SHOE SUB(WASHED OUT) ORIENT

AND TEST TOOLS14:00 - 17:00 3.00 TRP 10 TRIP IN HOLE WITH BIT#617:00 - 18:00 1.00 DRL 2 TROUGH WELL BORE FROM 6842 TO 686218:00 - 22:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 6862 TO 6898 (100% SLIDE) 36'

ROP-9'lHR WOB-18 GPM-12922:00 -22:30 0.50 CIRC 1 CIRCULATE UP SAMPLES - NO ZONE CONFIRMATION22:30 -06:00 7.50 DRL 2 DIRECTIONAL DRILLFROM 6898 TO 6966 68'

ROP-9.1 WOB-10/20 GPM-12911/11/2009 06:00 -22:30 16.50 DRL 2 DIRECTIONAL DRILLFROM 6966 TO 7078' 112'

ROP-6.8 WOB-18/20 GPM-12922:30 -23:30 1.00 CIRC 1 CIRCULATE SAMPLE, IN ZONE CONFIRMATION 75% LIMESTONE23:30 -01:30 2.00 DRL 2 DIRECTIONAL DRILLFROM 7078' TO 7092' 14'

ROP - T/HR WOB 10-20 GPM - 129

01:30 - 02:30 1.00 OTH TROUBLE SHOOT E-MAG PROBLEMS02:30-03:30 1.00 DRL 2 DIRECTIONALDRILLFROM7092'TO7104' 12 RECElV

ROP-12'lHR WOB-20-22 GPM-12903:30-04:30 1.00 CIRC 1 CIRCULATESAMPLES DEC3 1 20304:30 - 06:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 7104 TO 7107

DIV.0FOIL,GU

Printed: 12/28/2009 11:59:15 AM

Page 88: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 3 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Su Description of Operations

11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'

DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861

17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH

11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945

ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR

09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.

18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)

11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124

13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'

11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS

DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215

11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'

16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T

GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'

SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'

SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'

SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'

11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009

DN.0FOlk GM &EM

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 3 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Su Description of Operations

11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'

DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861

17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH

11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945

ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR

09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.

18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)

11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124

13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'

11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS

DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215

11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'

16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T

GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'

SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'

SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'

SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'

11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009

DN.0FOlk GM &EM

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 3 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Su Description of Operations

11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'

DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861

17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH

11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945

ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR

09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.

18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)

11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124

13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'

11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS

DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215

11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'

16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T

GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'

SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'

SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'

SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'

11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009

DN.0FOlk GM &EM

Printed: 12/28/2009 11:59:15 AM

Questar E & P Page 3 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Su Description of Operations

11/12/2009 06:00 -06:30 0.50 TRP 10 TRIP OUT OF THE HOLE TO 685206:30 -07:30 1.00 REAM 1 WASH AND REAM FROM 6852 TO 688307:30-08:00 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG08:00 -12:00 4.00 TRP 10 TRIP OUT OF THE HOLE, C/O DRILLINGJARS, FUNCTIONED BLINDRAMS12:00-16:00 4.00 TRP 1 C/O BIT, MOTOR, MUELSHOE SUB, MONELS, ORIENT AND TEST16:00 -16:30 0.50 RIG i RIG SERVICE16:30 - 19:30 3.00 TRP 10 TRIP IN THE HOLE WITH BIT#719:30 - 21:30 2.00 DRL 7 TROUGH WELLBORE FROM 6810' TO 6825'21:30 -06:00 8.50 DRL 7 TIME DRILLFROM 6825 TO 6838'

DRILLINGAT 5 MIN/INCH11/13/2009 06:00 -17:00 11.00 DRL 2 TIME DRILLINGF/6838 Tl6861

17:00 - 17:30 0.50 TRP 2 TRIP OUT OF HOLE TO 674417:30 - 20:30 3.00 REAM 1 WASH AND REAM HOLE FROM 6744 TO 680720:30 -00:00 3.50 TRP 2 PULL UP TO 6720 AND TROUGH Fl 6720 T/673500:00 -06:00 6.00 DRL 7 TIME DRILLFROM 6735 TO 6740 @5 MIN/INCH

11/14/2009 06:00 -09:30 3.50 DRL 7 TIME DRILLFROM 6740 TO 675009:30 -06:00 20.50 DRL 2 DIRECTIONAL DRILLFROM 6750 TO 6945

ENTERED ZONE AT 6821 MD, 6562 TVD11/15/2009 06:00 - 09:30 3.50 DRL 2 DIRECTIONAL DRILLF/6945 T/6981 36' 10.2'lHR

09:30 - 12:00 2.50 OTH WORK ON MWD AND PUMP PRESSURE PROBLEMS12:00 -16:00 4.00 TRP 13 TRIP OUT OF HOLE (TIGHT F/6935 T/6780)16:00 - 18:00 2.00 TRP 1 C/O BIT, MOTOR REMOVE MWD, INSPECT DIR. TOOLS FOR PACK-OFF.

18:00 - 18:30 0.50 RIG 1 RIG SERVICE18:30-19:00 0.50 RIG 2 WORK ON TOP DRIVE ROTARY GAGE19:00 -20:30 1.50 TRP 1 INSTALLMWD TOOL, ORIENT AND TEST20:30 - 23:30 3.00 TRP 2 TRIP IN THE HOLE23:30 - 01:30 2.00 REAM 1 WASH AND REAM F/ 6838 T/698101:30 - 06:00 4.50 DRL 2 DIRECTIONAL DRILLF/6981 T/6985 4' (SLIDING)

11/16/2009 06:00 - 13:30 7.50 DRL 2 DIRECTIONAL DRILLFROM 6985' TO 7083' 98'13.1 FT/HR WOB 15-22 GPM - 124

13:30-14:00 0.50 RIG i RIGSERVICE14:00 - 23:00 9.00 DRL 2 DIRECTIONAL DRILLFROM 7083' TO 7183' 100'

11.1 FTlHR WOB 15-22 GPM - 12423:00 - 00:00 1.00 OTH TROUBLE SHOOT MWD/PRESSURE PROBLEMS, RESET MWD WITH PUMPS

DOWN FOR 7 MINUTES TO RE-ACQUIRE MWD PULSE00:00 - DRL 2 DIRECTIONAL DRILLFROM 7183' TO 7215

11/17/2009 06:00 - 16:30 10.50 DRL 2 DIRECTIONAL DRILLFROM 7215' TO 7342' 12T12.1 FTlHR WOB - 15-22 GPM - 136DIFICULT TO SLIDE DOWN AT 7342'

16:30 - 17:30 1.00 DRL 2 TROUGH FROM 7327' TO 7342'17:30 - 18:00 0.50 DRL 2 DIRECTIONAL DRILLFROM 7342' TO 735T

GEOLOGY SAMPLE AT 7345' SHOWED 30% SHALE18:00 - 19:00 1.00 DRL 2 TROUGH FROM 7342' TO 735T19:00 -00:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 735T TO 7380'

SLID TO A PROJECTED ANGLE AT THE BIT OF90.5-91.O00:00-01:00 1.00 CIRC i CIRCULATE UP SAMPLE FROM7380'

SHOWED INZONE LIMESTONE WITH A TRACE OF SHALE01:00 -06:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 7380' TO 7420'

SLIDING TO DIP AS NEEDED )11/18/2009 06:00 - 11:00 5.00 DRL 1 DIRECTION DRILLF/7420' T/7496'

11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 - 13:00 1.50 DRL 2 DIRECTIONAL DRILLF/7496' T/7523, DEC3 1 2009

DN.0FOlk GM &EM

Printed: 12/28/2009 11:59:15 AM

Page 89: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 4 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM

FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST

11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE

SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500

FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET

11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO

11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE

FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE

11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY

DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW

MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO

11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET

07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET

DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM

DN.0FOIL,GAS&

Questar E & P Page 4 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM

FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST

11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE

SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500

FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET

11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO

11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE

FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE

11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY

DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW

MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO

11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET

07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET

DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM

DN.0FOIL,GAS&

Questar E & P Page 4 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM

FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST

11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE

SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500

FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET

11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO

11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE

FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE

11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY

DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW

MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO

11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET

07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET

DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM

DN.0FOIL,GAS&

Questar E & P Page 4 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

11/18/2009 13:00 -13:30 0.50 CIRC 1 CIRCULATE AND PUMP TRIP SLUG13:30 -16:30 3.00 TRP 10 TRIP OUT OF HOLE, TIGHT FROM 7523' TO 6965'16:30 -17:30 1.00 OTH CIRCULATE, WORK ON PASON AND PUMP SECOND TRIP SLUG17:30 - 18:30 1.00 TRP 10 TRIP OUT OF THE HOLE18:30 - 04:00 9.50 TRIP CHECK BHA , L/D 1 JOINT HWDP - BAD PIN NEEDS REFACED, C/O JARS04:00 -06:00 2.00 TRP 1 C/O BIT AND MOTOR, (MOTOR BENT AT 1.5), L/D MWD AND RE-PROGRAM

FOR ADJITATOR,ORIENT DIRRECTIONAL TOOLS AND TEST

11/19/2009 06:00 -07:00 1.00 OTH WORK ON MWD, WOULD NOT PULSE ON SURFACE TEST07:00 -08:00 1.00 TRP 1 FINISH PICKING UP B.H.A. ( TEST MOTOR & MW.D. O.K.)08:00 -12:00 4.00 TRP 2 TRIP IN THE HOLE TO 6692 FEET12:00 -13:00 1.00 TRP 2 TRIP INTO OLD HOLE (CONFORMED)13:00-14:00 1.00 TRP 2 TRIP OUT AND ORIENTATE MOTOR AND TRIP BACK INTO THE NEW HOLE

SURVEY TO CONFORM BACK IN THE NEW HOLE14:00 - 15:30 1.50 REAM i WASH & REAM FROM 7240 FEET TO 7500 FEET RELOG GAMA FROM 7500

FEET TO 7523 FEET15:30 -16:00 0.50 DRL 2 ESTABLISH DRILLINGRATES & DRILLFROM 7523 TO 7538 FEET16:00 - 17:30 1.50 OTH TROUBLE SHOOT M.W.D. TOOLS17:30 -00:00 6.50 TRP 13 TRIP OUT FOR M.W.D. TOOLS00:00 -01:00 1.00 OTH WORK ON M.W.D. TOOLS PICK UP TOOLS AND SURFACE TEST (O.K.)01:00 -06:00 5.00 TRP 2 TRIP IN THE HOLE AND TEST M.W.D. TOOLS @ 1635 FEET , 3981 FEET

11/20/2009 06:00 -08:00 2.00 REAM i WASH AND REAM FROM 7203 TO 7538 FEET08:00 -06:00 22.00 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7538 FEET TO

11/21/2009 06:00 - 22:30 16.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 7920 FEET TO 8212 FEET22:30 -23:00 0.50 CIRC 1 CIRC SWEEPS OUT OF THE HOLE23:00 -03:00 4.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE BACK REAM & PUMP OUT OF THE HOLE

FROM 8212 FEET TO 7476 FEET ( TIGHT FROM 7853 TO 7801 FEET)03:00-06:00 3.00 TRP 14 TRIP OUT TO MOVE PUSH PIPE

11/22/2009 06:00 -11:00 5.00 TRP 2 TRIP IN THE HOLE TO 8022 FEET11:00 - 11:30 0.50 REAM i WASH & REAM FROM 8022 FEET TO 5212 FEET11:30 - 12:30 1.00 DRL 2 ESTABLISH FLOW RATES AND TRY TO DRILLCOULD NOT GET ANY

DIFFERENTAL PRES.12:30 -14:00 1.50 TRP 13 TRIP OUT BACK REAM FROM 8212 FEET TO 8022 FEET ( PUMP TRIP SLUG)14:00 -17:00 3.00 TRP 13 TRIP OUT OF THE HOLE17:00 - 18:00 1.00 TRP 12 BREAK OUT AND LAYDOWN DAMAGEDMOTOR AND BIT PICK UP NEW

MOTOR AND NEW BIT #10 & ORIENATE TOOLS18:00 -19:00 1.00 OTH TEST MWD TOOLS AND MUD MOTOR @SURFACE19:00 -22:30 3.50 TRP 2 TRIP IN THE HOLE & TEST MWD TOOLS @ 1380 & 4675 FEET22:30 - 23:30 1.00 SUR 1 ORINATE TOOL FACE TO 170* TO GET PAST SIDE TRACK@6696 FEET23:30 -00:00 0.50 TRP 2 TRIP IN 6 STANDS STOPED @7110 FEET TRIP OUT 6 STANDS TO 6696 FEET00:00-01:00 1.00 SUR 1 REORINATE TOOL FACE & TRIP INTHE HOLE01:00 -02:00 1.00 TRP 2 TRIP IN THE HOLE TO 7612 FEET02:00 -04:00 2.00 REAM 1 WASH & REAM FROM 7612 FEET TO 8212 FEET04:00 -06:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO

11/23/2009 06:00 -06:00 24.00 DRL 2 DIRECTIONAL DRILLFROM 8212 FEET TO 844511/24/2009 06:00 -07:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8453 FEET TO 8461 FEET

07:00 -07:30 0.50 OTH TROUGH HOLE FROM 8486 FEET TO 8461 FEET07:30 - 10:30 3.00 DRL 2 DIRECTIONAL DRILLFROM 8461 FEET TO 8473 FEET10:30 - 11:00 0.50 CIRC 1 CIRC UP SAMPLES @8473 FEET11:00 - 12:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8473 FEET TO 8483 FEET12:00 - 13:00 1.00 CIRC 1 CIRC. UP SAMPLES @8473 FEET13:00 -18:00 5.00 DRL 2 DIRECTIONAL DRILLFROM 8483 FEET TO 8528 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8528 FEET TO 8591 FEET

DEC3 1 2009 ÛÛ$¶gn : 12/28/2009 11:59:15AM

DN.0FOIL,GAS&

Page 90: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 5 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO

11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870

11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET

11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)

ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO

CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR

(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)

11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP

WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)

21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE

00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP

PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN

WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS

11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS

RECOVEDDEC3 1 2009 Printed: 12/28/2009

Questar E & P Page 5 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO

11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET

13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870

11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET

11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)

ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO

CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR

(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)

11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP

WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)

21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE

00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP

PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN

WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS

11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS

RECOVEDDEC3 1 2009 Printed: 12/28/2009

Questar E & P Page 5 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO

11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870

11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET

11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)

ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO

CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR

(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)

11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP

WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)

21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE

00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP

PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN

WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS

11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS

RECOVEDDEC3 1 2009 Printed: 12/28/2009

Questar E & P Page 5 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

11/24/2009 02:00 -02:30 0.50 CIRC 1 CIRC UP SAMPLES @8591 FEET02:30 -06:00 3.50 DRL 2 DIRECTIONAL DRILLFROM 8591 FEET TO

11/25/2009 06:00 -13:30 7.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 8606 FEET TO 8680 FEET13:30 - 14:00 0.50 CIRC 1 CIRC UP SAMPLES14:00 -18:00 4.00 DRL 2 DRILLLFROM 8680 FEET TO 8777 FEET18:00 -18:30 0.50 CIRC 1 CIRC 2 HIGH VIS SWEEPS TO SURFACE18:30 - 20:30 2.00 TRP 14 SHORT TRIP 11 STANDS FROM 8777 FEET TO 8085 FEET20:30 -21:00 0.50 TRP 14 TRIP IN THE HOLE TO 8275 FEET21:00 -22:00 1.00 REAM 1 WASH & REAM FROM 8275 FEET TO 8777 FEET22:00 -06:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8777 FEET TO 8870

11/26/2009 06:00 - 14:30 8.50 DRL 2 DIRECTIONAL DRILLFROM 8866 FEET TO 8939 FEET14:30 - 15:00 0.50 CIRC 1 CIRC SAMPLE @8937 FEET15:00 - 16:00 1.00 DRL 2 DIRECTIONAL DRILLFROM 8939 FEET TO 8967 FEET16:00-16:30 0.50 RIG 1 RIGSERVICE16:30 -18:00 1.50 DRL 2 DIRECTIONAL DRILLFROM 8967 FEET TO 8977 FEET18:00 -02:00 8.00 DRL 2 DIRECTIONAL DRILLFROM 8977 FEET TO 906802:00 -03:00 1.00 SUR 1 REBOOT M.W.D. TOOLS03:00 -06:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9068 FEET TO 9090 FEET

11/27/2009 06:00 -11:00 5.00 TRP 10 TRIP OUT FOR BIT & MUD MOTOR11:00 -12:30 1.50 OTH TROUGH HOLE FROM 6728 FEET TO 6755 FEET (SIDE TRACK)12:30 -14:00 1.50 RIG 6 CUT 495 FEET OF DRILLINGLINE14:00 - 14:30 0.50 RIG 1 RIG SERVICE14:30 - 17:30 3.00 TRP 10 TRIP OUT FOR BIT & MOTOR17:30 -18:00 0.50 TRP 1 LAYOUT BIT, MOTOR, ADJITATOR,SHOCK SUB18:00-20:00 2.00 TRP 1 PICK UP NEW MUD MOTOR, BIT, ADJIATOR & SHOCH SUB TRIP IN THE HOLE20:00 - 22:30 2.50 TRP 2 TRIP IN THE HOLE TO 5433 FEET22:30 - 23:30 1.00 CIRC 1 FILLTHE PIPE (PRESURED UP TO 3000 PSI WITH VERY LITTLERETURNES)

ATTEMPT TO CIRC WITH BAD RESULTS23:30 -03:30 4.00 TRP 2 TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THE ADJlTATOR TRY TO

CIRC COULD NOT ! TRIP OUT TO THE BIT03:30-06:00 2.50 DRL 2 TROUBLE SHOOT PRESURE INCREASE AT THE MWD TOOLS &THE MOTOR

(PULLED THE MWD TOOLS OUT AND WE COULD CIRC THE MOTOR AND THEMONELS (MWD FAILURE)

11/28/2009 06:00 -07:00 1.00 DRL 2 REPROGRAM M.W.D. TOOLS07:00 - 08:30 1.50 DRL 2 SURFACE TEST MWD TOOLS = 80 SPM= 953 PSI08:30 - 10:30 2.00 TRP 2 TRIP IN THE HOLE TESTING MWD TOOLS10:30 - 11:00 0.50 RIG 2 REPLACE TOP DRIVE SWIVEL PACKING11:00 - 11:30 0.50 RIG i RIG SERVICE11:30 -18:00 6.50 TRP 2 TRIP IN THE HOLE TO 7509 FEET18:00-21:00 3.00 REAM i WASH AND REAM FROM 7501 FEET TO 8619 FEET. STRING PRESURED UP

WE WERE UNABLETO GET HIGH STAND PIPE PRESURE BACK DOWN (77STKS= 2450 TO 3500 PSI)

21:00 -00:00 3.00 REAM 1 BACK REAM OUT OF THE HOLE FROM 8619 FEET TO 7907 FEET TRIP OUTOF THE HOLE

00:00 -00:30 0.50 OTH LOAD OUT DIRECTIONAL TOOLS00:30 -03:00 2.50 TRP 2 TRIP OUT FOR MWD FAILURE. SURFACE TEST TOOLS WITH #2 PUMP

PRESURE WENT TO 2500 + PSI03:00 -04:00 1.00 TRP 2 CONT TO TRIP OUT TO THE MWD TOOLS04:00 -04:30 0.50 TRP 2 SURFACE TEST MWD TOOL @2PUMP PSI= 900 FOR 34 MINUTED THEN

WENT UP TO 2000 PSI04:30 -05:00 0.50 TRP 1 TRIP OUT TO THE M.W.D. TOOLS05:00 -06:00 1.00 DRL 2 EVALUATEMWD TOOLS

11/29/2009 06:00 -11:00 5.00 DRL 3 PICK UP NEW DIRECTIONAL TOOLS AND SURFACE TEST TOOLS

RECOVEDDEC3 1 2009 Printed: 12/28/2009

Page 91: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 6 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC

(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.

03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT

ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)

07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &

TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250

12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET

12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO

12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9

12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10

BBLS ACID LEFT IN PIPE)

RECEi EDDK jj 2009 Printed: 12/28/2009

Questar E & P Page 6 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC

(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.

03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT

ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)

07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &

TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250

12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET

12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO

12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9

12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10

BBLS ACID LEFT IN PIPE)

RECEi EDDK jj 2009 Printed: 12/28/2009

Questar E & P Page 6 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC

(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.

03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT

ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)

07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &

TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250

12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET

12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO

12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9

12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10

BBLS ACID LEFT IN PIPE)

RECEi EDDK jj 2009 Printed: 12/28/2009

Questar E & P Page 6 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

11/29/2009 11:00 - 15:30 4.50 TRP 2 TRIP IN THE HOLE, ORIENT INTO SIDE TRACK AT 671515:30 - 19:30 4.00 REAM 1 WASH AND REAM FROM 7900 FEET TO 9080 FEET19:30 - 20:00 0.50 CIRC 1 CIRC AND COND HOLE FOR SURVEY20:00 -20:30 0.50 SUR 1 SURVEY AND CIRC. FOR TOOL FACE20:30 -03:00 6.50 TRP 2 BRIDGE OFF AND PRESURE SPIKE TO 3500/3600 PSI COULD NOT CIRC

(PLUGED PIPE) TRIP OUT OF THE HOLE TO THE SHOCK SUB AND THEAGITATOR LAYTHEM DOWN TRY TO PUMP ON THE STRING COULD NOTCIRC.

03:00-03:30 0.50 TRP 1 LAYDOWN SHOCK SUB AND AGITATOR INTHE V DOOR03:30 -04:00 0.50 TRP 2 TRIP OUT OF THE HOLE TO THE MOTOR04:00 -06:00 2.00 DRL 3 CHANGE OUT, ADJUST AND ORIENT MOTOR. (MUD MOTOR WOULD NOT

ROTATE TO DRAIN)11/30/2009 06:00-07:00 1.00 TRP i CHANGE OUT ADJITATOR AND SURFACE TEST (O.K.)

07:00 -08:30 1.50 TRP 2 TRIP IN THE HOLE08:30 -09:00 0.50 RIG 1 RIG SERVICE AND REMOVE MIDDLELSUCTION VAVLEFROM #2 MUD PUMP09:00 - 11:30 2.50 TRP 2 TRIP IN THE HOLE TO 7964 FEET11:30 - 16:30 5.00 REAM i WASH AND REAM FROM 7964 FEET TO 9080 FEET16:30 - 18:00 1.50 SUR 1 SURVEY & MIX2 SX OF SUN BEADS ON BOTTOM TO REDUCE DRAG &

TORQUE18:00 - 20:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9080 FEET TO 9131 FEET20:00 - 20:30 0.50 CIRC 1 PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING20:30 -01:00 4.50 DRL 2 DIRECTIONAL DRILLFROM 9131 FEET TO 9163 FEET01:00-01:30 0.50 CIRC i PUMP A SUN BEAD SWEEP AND DISPLACE FOR SLIDE DRILLING01:30 -06:00 4.50 DRL 2 DIRECTIONAL DRILL4.75" HOLE FROM 9163 FEET TO 9250

12/1/2009 06:00 -08:00 2.00 DRL 2 DIRECTIONAL DRILLFROM 9269 FEET TO 9300 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & TOP DRIVE (PUMP HIGH VIS SWEEP AROUND THE PIPE08:30 - 15:00 6.50 DRL 2 DIRECTIONAL DRILLFROM 9300 FEET TO 9412 FEET15:00 - 15:30 0.50 CIRC i PUMP 30 BBL'S OF SUN BEAD SWEEP AND DISPLACE15:30 - 18:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9412 FEET TO 9441 FEET18:00 -20:30 2.50 DRL 2 DIRECTIONAL DRILLFROM 9441 FEET TO 9505 FEET20:30 -21:00 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEAD FOR AN SWEEP AROUND THE PIPE21:00 -03:00 6.00 DRL 2 DIRECTIONAL DRILLFROM 9505 FEET TO 963003:00-03:30 0.50 CIRC 1 PUMP 30 BBL'S OF SUN BEADS FOR A SWEEP AROUND THE PlPE03:30 - 06:00 2.50 DRL 2 DIRECTIONAL DRILLFROM 9630 FEET TO 9650 FEET

12/2/2009 06:00 - 08:00 2.00 TRP 14 SHORT TRIP FROM9645 FEET TO 9060 FEET08:00 -08:30 0.50 RIG 1 RIG SERVICE & FIX HYDRO LEAK08:30 -09:00 0.50 TRP 14 FINISH TRIP OUT TO 9060 FEET09:00 - 12:30 3.50 REAM 1 WASH & REAM FROM 9060 FEET TO 9645 FEET12:30 - 13:30 1.00 DRL 2 DIRECTIONAL DRILLFROM 9645 TO 968013:30-14:00 0.50 CIRC 1 PUMP AND DISPLACE A SUN BEAD SWEEP14:00 - 18:00 4.00 DRL 2 DIRECTIONAL DRILLFROM 9680 TO 9788 FEET18:00 - 21:00 3.00 DRL 2 DIRECTIONAL DRILLFROM 9788 TO 9880 FEET21:00 - 21:30 0.50 CIRC 1 CIRC AND PUMP A SUN BEAD SWEEP21:30 -06:00 8.50 DRL 2 DIRECTIONAL DRILLFROM 9880 FEET TO

12/3/2009 06:00 - 09:00 3.00 DRL 2 DIRECTIONAL DRILLF/10005 T/10054 - TD09:00 - 10:00 1.00 CIRC 1 CIRCULATE AND CONDITION HOLE FOR SHORT TRIP10:00 - 16:00 6.00 FISH 6 WORK TIGHT HOLE F/9985 T/9965,16:00 - 17:30 1.50 CIRC 1 CIRCULATE AND CONDITION, RAISE MUD WT TO 9 .6 PPG17:30 -06:00 12.50 FISH 6 WORK TIGHT HOLE FROM 9742 TO 9711 AND RAISE MUD WT TO 9.9

12/4/2009 06:00 -06:30 0.50 FISH 6 HOLD SAFETY MEETING, RIG UP HALLIBURTONAND TEST LINES TO 3000 PSI06:30 -07:30 1.00 FISH 6 PUMP 35 BBLS OF ACID WITH HALLIBURTONAND DISPLACE07:30 -10:00 2.50 FISH 6 WORK TIGHT HOLE @9711, STRING PARTED @ 175,000 STRING WEIGHT. (10

BBLS ACID LEFT IN PIPE)

RECEi EDDK jj 2009 Printed: 12/28/2009

Page 92: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 7 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'

OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER

STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS

12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-

UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK

21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT

02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB

03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE

10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO

3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN

03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID

12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO

3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB

02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT

@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE

AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'

RECEIVEDPrinted: 12/28/2009 11:59:15 AM

DIV.0F0lL,GAS&MINING

Questar E & P Page 7 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'

OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER

STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS

12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-

UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK

21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT

02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB

03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE

10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO

3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN

03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID

12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO

3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB

02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT

@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE

AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'

RECEIVEDPrinted: 12/28/2009 11:59:15 AM

DIV.0F0lL,GAS&MINING

Questar E & P Page 7 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'

OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER

STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS

12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-

UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK

21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT

02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB

03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE

10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO

3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN

03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID

12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO

3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB

02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT

@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE

AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'

RECEIVEDPrinted: 12/28/2009 11:59:15 AM

DIV.0F0lL,GAS&MINING

Questar E & P Page 7 of 8

Operations Summary Report

Well Name:BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Description of Operations

12/4/2009 10:00 -11:00 1.00 OTH INSPECT RIG AND FIX HYDRAULICLINES ON TOP DRIVE11:00 -14:00 3.00 TRP 2 TRIP OUT OF HOLE. STRING PULLED APART AT BOTTOM OF JARS. LEFT 7.00'

OF JARS IN HOLE, TOTAL FISH LENGTH = 4621', TOP OF FISH AT 5075'14:00 -18:00 4.00 TRP 1 LAYDOWN JARS, PICK UP FISHING TOOLS18:00 - 22:00 4.00 TRP 2 T.I.H. TO 5075'22:00 -23:00 1.00 FISH 5 LATCH ONTO FISH, ESTABLISH CIRCULATION, LOST FISH @25K OVER

STRING WT, UNABLETO RE-ENGAGE FISH23:00-03:00 4.00 TRP 2 T.O.O.H. TO CHANGE OUT GRAPPLE03:00 -04:00 1.00 OTH BREAK DOWN OVERSHOT AND EVALUATE04:00 -06:00 2.00 WOT 4 WAIT ON FISHING TOOLS - OVERSHOT EXTENSIONS

12/5/2009 06:00 -10:30 4.50 TRP 2 TRIP IN THE HOLE WITH FISHING TOOLS10:30 - 12:30 2.00 OTH THAW OUT TOP DRIVE12:30 -13:00 0.50 FISH 5 WORK TOOLS ON TOP OF FISH, LATCH ONTO FISH, WORK STUCK PIPE13:00 - 16:00 3.00 FISH 3 JARRING FROM 120K TO 175K, WORK FISH, CIRCULATE OUT ACID16:00 -17:00 1.00 FISH 4 HOLD SAFETY MEETING AND RIGUP WIRELINE TRUCK17:00 - 21:00 4.00 FISH 4 RUN IN THE HOLE WITH WIRELINE, ATTEMPT TO BACK OFF AT 5786'-

UNSUCSESSFUL, POOH AND RIG UP NEW SHOT, RUN INTHE HOLE TO 5755AND BACKOFF FISH, P.O.O.H., RIG DOWN WIRELINE TRUCK

21:00 -02:00 5.00 TRP 2 TRIP OUT OF THE HOLE, C/O 1 HWDP - PULLED THREADS, RETRIEVED 22JOINTS HWDP FROM FISH, L/D BOTTOM JOINT

02:00 -03:30 1.50 TRP 4 L/D OVERSHOT, PARTED JAR AND X/O SUB, P/U FISHING ASSEMBLY WITHSCREW IN SUB

03:30-06:00 2.50 TRP 2 TRIP IN THE HOLE WITH SCREW IN SUB12/6/2009 06:00 -10:00 4.00 TRP 2 TRIP IN THE HOLE

10:00 -10:30 0.50 FISH 5 BREAK CIRCULATIONAND SCREW INTO FISH10:30 -00:00 13.50 FISH 6 WORK STUCK PIPE00:00 -03:30 3.50 FISH 5 HOLD SAFETY MEETING, RIG UP HALLIBURTON,PRESURE TEST LINES TO

3000 PSI, PUMP 5000 GALONS OF 15% HCL ACID AND DISPLACE WITH 33BBLS OF MUD TO 6800' AT 2 BBLS/MIN

03:30 -05:30 2.00 FISH 6 WORK STUCK PIPE05:30 -06:00 0.50 CIRC i CIRCULATE OUT ACID

12/7/2009 06:00 -08:00 2.00 CIRC 1 CIRCULATE OUT ACID08:00-08:30 0.50 RIG 1 RIG SERVICE, INSPECT BREAKS AND TOP DRIVE TRACK08:30-10:00 1.50 FISH 4 HELD SAFETY MEETING, RIG UP WIRELINE, RUN INAND BACK OFF AT 601310:00 - 13:00 3.00 TRP 2 TRIP OUT OF THE HOLE13:00 -15:00 2.00 TRP 1 LAYDOWN FISHING BHA15:00-16:00 1.00 RIG 6 SLIP AND CUT DRILLINGLINE16:00-17:00 1.00 RIG 2 CHANGESWlVELPACKING17:00 - 20:00 3.00 TRP 2 TRIP IN THE HOLE TO 601320:00 -20:30 0.50 FISH 5 WASH ON TOP OF AND SCREW INTO FISH20:30 - 21:30 1.00 RIG 1 WORK ON SWIVEL PACKING21:30 -22:30 1.00 FISH 6 BREAK CIRCULATIONAND WORK STUCK PIPE22:30-02:00 3.50 FISH 5 HELD SAFETY MEETING, RIG UP HALLIBURTON, PRESSURE TEST LINES TO

3500 PSI, PUMP 4000 GALONS 15% HCL ACID, DISPLACE TO 6800' WITH 33BBLS OF MUD, LOST 95 BBLS DURING ACID JOB

02:00 -06:00 4.00 FISH 6 WORK STUCK PIPE12/8/2009 06:00 -09:30 3.50 FISH 4 RIG UP WlRELINE TRUCK AND RUN IN WITH FREE POINT, 70% MOVEMENT

@6865'09:30 - 12:30 3.00 FISH 4 RUN IN WlHT PERF GUN AND SHOOT PIPE FROM 8402' TO8408'12:30 - 14:00 1.50 FISH 4 RUN IN WITH RCT AND CUT PIPE @8404'14:00 -00:30 10.50 FISH 6 WORK STUCK PIPE00:30 -06:00 5.50 PERF 2 RIG UP WIRELINE TRUCK, PICK UP 12 -2' PERF GUNS, RUN IN THE HOLE

AND PERFORATE THE MIDDLE OF EVERY JOINT FROM 8300' TO 7655'

RECEIVEDPrinted: 12/28/2009 11:59:15 AM

DIV.0F0lL,GAS&MINING

Page 93: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 8 of 8

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Cb Description of Operations

12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190

RECEivED

DEC3 i 2003

D\v.0FOL U

Printed: 12/28/2009 11:59:15

Questar E & P Page 8 of 8

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Cb Description of Operations

12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190

RECEivED

DEC3 i 2003

D\v.0FOL U

Printed: 12/28/2009 11:59:15

Questar E & P Page 8 of 8

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Cb Description of Operations

12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190

RECEivED

DEC3 i 2003

D\v.0FOL U

Printed: 12/28/2009 11:59:15

Questar E & P Page 8 of 8

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code Cb Description of Operations

12/8/2009 00:30 -06:00 5.50 PERF 2 PERFORATIONS @WIRELINE DEPTHS OF:FROM 8298 TO 7190

RECEivED

DEC3 i 2003

D\v.0FOL U

Printed: 12/28/2009 11:59:15

Page 94: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 1 of 2

00NF\DEN11ALOperafons Summag Repod - N

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB

12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL

WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.

17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'

01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE

05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING

08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'

11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009

14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.

On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.

24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.

12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.

24 Hour Forecast: Will land production string & RIH w/ rods & pump.

12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.

24 Hour Forecast: Will run rods.

12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.

REC VEDI I

rinted: 12/28/2009 11:59:24 AM

CONRDENTlÁLDIV.0FOIL,GASå

Questar E & P Page 1 of 2

00NF\DEN11ALOperafons Summag Repod - N

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB

12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL

WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.

17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'

01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE

05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING

08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'

11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009

14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.

On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.

24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.

12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.

24 Hour Forecast: Will land production string & RIH w/ rods & pump.

12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.

24 Hour Forecast: Will run rods.

12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.

REC VEDI I

rinted: 12/28/2009 11:59:24 AM

CONRDENTlÁLDIV.0FOIL,GASå

Questar E & P Page 1 of 2

00NF\DEN11ALOperafons Summag Repod - N

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB

12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL

WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.

17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'

01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE

05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING

08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'

11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009

14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.

On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.

24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.

12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.

24 Hour Forecast: Will land production string & RIH w/ rods & pump.

12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.

24 Hour Forecast: Will run rods.

12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.

REC VEDI I

rinted: 12/28/2009 11:59:24 AM

CONRDENTlÁLDIV.0FOIL,GASå

Questar E & P Page 1 of 2

00NF\DEN11ALOperafons Summag Repod - N

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

SubDate From - To Hours Code Code Description of Operations

12/9/2009 06:00 - 12:30 6.50 PERF 2 PERFERATE DRILLPIPE FROM 7170 TO 679512:30 -06:00 17.50 OTH WIAT ON HALLIBURTONTO DO ACID JOB

12/10/2009 06:00 -13:00 7.00 WOT 4 WAIT ON HALLIBURTONTO DO ACID JOB13:00 -15:00 2.00 STIM 1 HOLD SAFETY MEETING AND RIG UP HALLIBURTON15:00 - 17:30 2.50 STIM i PUMP 357 BBLS OF 15% HCL ACID AND FLUSH WITH 40 BBLS 2% KCL

WATER. MAXPUMP RATE WAS 7 BPM @3700 PSI, AVERAGE PUMP RATEWAS 5.4 BPM @2500 PSI.

17:30 -01:30 8.00 LOG 4 RIG UP WIRELINE TRUCK AND RUN INTHE HOLE TO BACK OFF DRILLPIPEAT 6181', 3 ATTEMPTS UNSUCCESFULL, RUN INWITH FREE POINT, FREE @BACK OFF POINT, RUN INWIHT DRY PIPE ROLL SHOT - UNSUCCESSFUL,RUN IN WITH SEVERING TOOL AND PART DRILLSTRING @6181'

01:30 -05:00 3.50 TRP 3 HOLD SAFETY MEETING, RIG UP LAYDOWN MACHINEAND LAY DOWN DRILLPIPE

05:00 -06:00 1.00 RIG 2 WORK ON TOP DRIVE12/11/2009 06:00 -08:30 2.50 TRP 3 LAYDOWN DRILLSTRING

08:30- 11:00 2.50 LOG 4 HOLD SAFETY MEETING, RIG UP WIRE LINEAND RUN GAUGE RING ANDJUNK BASKET. 2 ND RUN SET RETRIEVABLE BRIDGE PLUG @5700'

11:00 - 14:00 3.00 BOP 1 NIPPLE DOWN BOPRIG RELEASED @ 14:00 HRS ON 12/10/2009

14:00-06:00 16.00 LOC 4 RIGDOWN12/15/2009 06:00 - 17:00 11.00 BOP 1 This is to finish the completion that was started by Drilling.

On 12/14/09 MIRU Basin WS to finish the completion of this well. NU BOP's. Tallytop row of tbg trailer& SIFN.

24 Hour Forecast: Willtally& rabbit in the hole w/ ret head &2-7/8" tbg &attempt topull RBP @5700'.

12/16/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/15/09 SITP & SICP = 0#. Tally & rabbit & RIH wl ret head & 2-7/8" tbg &tag &latch onto & release RBP @5700'. Well went on a vacuum. POOH w/ plug & tbg.RIH w/ production string to 6145' & SIFN.

24 Hour Forecast: Will land production string & RIH w/ rods & pump.

12/17/2009 06:00 - 17:00 11.00 TRP 5 This is to finish the completion that was started by Drilling.On 12/16/09 SITP & SICP = 20#. Bled off. ND BOP's. Attempt to set tbg anchor andanchor would not set @6118'. Attempt to set @6088' & 6060' &would not set.POOH wl tbg & anchor catcher. Anchor was locked up. RIH w/ new anchor catcher &production string. ND BOP's. Set anchor wl 14M# tension@6118'; tbg tail@6154'& SN @6120'. Change over to rod equipment.

24 Hour Forecast: Will run rods.

12/18/2009 06:00 - 17:00 11.00 TRP 18 This is to finish the completion that was started by Drilling.On 12/17/09 SITP & SICP = 0#. RU hot oiler & flush tbg w/ 60 bbis of productionwater w/ snake oil. Bucket test new pump & RIH wl pump & rods as listed below. Seatpump after loading water w/ 21 bbis of production waterw/ snake oil. Pressure testpump & tbg to 700# & held OK. Clamp off polish rod& RDMO Basin Well Service.Tum wellover to production department.

REC VEDI I

rinted: 12/28/2009 11:59:24 AM

CONRDENTlÁLDIV.0FOIL,GASå

Page 95: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar E & P Page 2 of 2

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.

LLTR: 81 BBLS

Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'

Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.

Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod

RECEIVEDDEC3 1 2009

Div.0FOIL,GA3&T

CONRDENTIAËnted:12/28/2009

Questar E & P Page 2 of 2

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.

LLTR: 81 BBLS

Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'

Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.

Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod

RECEIVED

DEC3 1 2009

Div.0FOIL,GA3&T

CONRDENTIAËnted:12/28/2009

Questar E & P Page 2 of 2

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.

LLTR: 81 BBLS

Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'

Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.

Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod

RECEIVEDDEC3 1 2009

Div.0FOIL,GA3&T

CONRDENTIAËnted:12/28/2009

Questar E & P Page 2 of 2

Operations Summary Report

Well Name: BBS 15G-22-7-21 Spud Date: 9/29/2006Location: 22- 7-S 21-E 26 Rig Release: 12/10/2009Rig Name: AZTEC Rig Number: 777

Date From - To Hours Code CSu Description of Operations

12/18/2009 06:00 -17:00 11.00 TRP 18 FINAL REPORT OF WELL WORK.

LLTR: 81 BBLS

Tbg Detail (12/16/09):Pinned NC = 0.44'i jt of tbg = 31.98'SN = 1.10'B-2 Anchor Catcher = 2.69'190 jts of 2-7/8" tbg ='6102.01'

Stretch = 1.25'KB = 15'Tbg Tail @6154.47'; SN @6120.95'.B-2 Anchor Catcher w/ 14M# Tension @6118.28'. AIItbg is 2-7/8" EUE 8RD J-55,6.5#.

Rod & Pump Detail (12/17/09):Pump = 2-1/2" x 1-3/4" x 20 x 20-1/2 x 21' RHAC Weatherford #2545Rods:150 - 3/4" Plain 'D'92 - 7/8" Plain 'D'1-8'; 1-6'; 1-2' x 7/8" Ponies1-1/2" x 26' Polish Rod

RECEIVEDDEC3 1 2009

Div.0FOIL,GA3&T

CONRDENTIAËnted:12/28/2009

Page 96: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

CONFilENTIR

UESER

QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21

BBS 15G-22-7-21

Survey: Survey #3 ST2

Standard Survey Report03 December, 2009

RECEIVEDJAN26 2010

DIV.0FOIL,GAS&MINING

CONFilENTIR

UESER

QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21

BBS 15G-22-7-21

Survey: Survey #3 ST2

Standard Survey Report03 December, 2009

RECEIVEDJAN26 2010

DIV.0FOIL,GAS&MINING

CONFilENTIR

UESER

QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21

BBS 15G-22-7-21

Survey: Survey #3 ST2

Standard Survey Report03 December, 2009

RECEIVEDJAN26 2010

DIV.0FOIL,GAS&MINING

CONFilENTIR

UESER

QUESTAR EXPLORATION ANDPRODUCTIONUINTAH COUNTY, UTAHBBS 15G-22-7-21BBS 15G-22-7-21

BBS 15G-22-7-21

Survey: Survey #3 ST2

Standard Survey Report03 December, 2009

RECEIVEDJAN26 2010

DIV.0FOIL,GAS&MINING

Page 97: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford

Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone

UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21

Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °

Well BBS 15G-22-7-21

Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W

Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft

Wellbore BBS 15G-22-7-21

Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)BGGM2009 10/28/2009 11.36 66.08 52,601

Design BBS 15G-22-7-21

Audit Notes:

Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)

0.00 0.00 0.00 179.39

Survey Program Date 12/3/2009From To

(ft) (ft) Survey (Wellbore) Tool Name Description

100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)

TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41

6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48

6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00

6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94

6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59

6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87

12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build

CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford

Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone

UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21

Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °

Well BBS 15G-22-7-21

Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W

Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft

Wellbore BBS 15G-22-7-21

Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)

BGGM2009 10/28/2009 11.36 66.08 52,601

Design BBS 15G-22-7-21

Audit Notes:

Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)

0.00 0.00 0.00 179.39

Survey Program Date 12/3/2009

From To(ft) (ft) Survey (Wellbore) Tool Name Description

100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)

TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41

6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48

6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00

6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94

6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59

6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87

12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build

CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford

Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone

UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21

Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °

Well BBS 15G-22-7-21

Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W

Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft

Wellbore BBS 15G-22-7-21

Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)BGGM2009 10/28/2009 11.36 66.08 52,601

Design BBS 15G-22-7-21

Audit Notes:

Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)

0.00 0.00 0.00 179.39

Survey Program Date 12/3/2009From To

(ft) (ft) Survey (Wellbore) Tool Name Description

100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)

TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41

6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48

6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00

6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94

6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59

6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87

12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build

CONFilENTIALWeatherford International Ltd. gONEMAR Survey Report Weatherford

Company: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAHCOUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Project UINTAH COUNTY, UTAH RECEIVEDMap System: US State Plane 1983 System Datum: Mean Sea Level ¡ 4 e gaggGeo Datum: North American Datum 1983 J (-0 LUIUMap Zone: Utah Central Zone

UMOFOlL,GM ã MlllllKSite BBS 1SG-22-7-21

Site Position: Northing: 7,244,345.81ft Latitude: 40° 11'28.040 NFrom: Lat/Long Easting: 2,188,149.35ft Longitude: 109° 32' 20.960 WPosition Uncertainty: 0.00 ft Slot Radius: " Grid Convergence: 1.26 °

Well BBS 15G-22-7-21

Well Position +NI-S 0.00 ft Northing: 7,244,345.81 ft Latitude: 40° 11' 28.040 N+El-W 0.00 ft Easting: 2,188,149.35 ft Longitude: 109° 32' 20.960 W

Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 4,909.00ft

Wellbore BBS 15G-22-7-21

Magnetics Model Name Sample Date Declination Dip Angle Field Strength(°) (*) (nT)BGGM2009 10/28/2009 11.36 66.08 52,601

Design BBS 15G-22-7-21

Audit Notes:

Version: 1.0 Phase: ACTUAL Tie On Depth: 0.00

Vertical Section: Depth From (TVD) +NI-S +El-W Direction(ft) (ft) (ft) (*)

0.00 0.00 0.00 179.39

Survey Program Date 12/3/2009From To

(ft) (ft) Survey (Wellbore) Tool Name Description

100.00 6,160.00 Survey#1 (BBS15G-22-7-21) NS-GYRO-MS North sensing gyrocompassing m/s6,211.00 6,653.00 Survey #2 (BBS15G-22-7-21) MWD MWD - Standard6,687.00 7,065.00 Survey #3 ST1 (BBS15G-22-7-21) MWD MWD - Standard

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(ft) (°) (°) (It) (ft) (ft) (ft) (°l100ft) (°I100ft) (°l100ft)

TIE ON ST#26,719.00 78.92 167.09 6,547.10 -464.15 103.81 465.24 0.00 0.00 0.006,722.00 79.40 167.13 6,547.66 -467.02 104.47 468.11 16.05 16.00 1.336,754.00 78.60 170.07 6,553.77 -497.81 110.68 498.97 9.36 -2.50 9.196,786.00 83.62 168.34 6,558.72 -528.85 116.60 530.07 16.57 15.69 -5.41

6,817.00 85.22 168.49 6,561.73 -559.08 122.79 560.36 5.18 5.16 0.48

6,848.00 90.20 168.18 6,562.97 -589.40 129.06 590.75 16.10 16.06 -1.00

6,879.00 92.55 169.34 6,562.22 -619.80 135.10 621.21 8.45 7.58 3.746,911.00 91.06 168.40 6,561.22 -651.18 141.27 652.66 5.50 -4.66 -2.94

6,943.00 90.66 167.89 6,560.74 -682.49 147.84 684.04 2.03 -1.25 -1.59

6,974.00 92.15 167.62 6,559.98 -712.78 154.42 714.39 4.88 4.81 -0.87

12/3/2009 8:26:32AM Page 2 COMPASS 2003.21 Build

Page 98: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)

7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47

7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81

7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13

7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65

7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53

7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61

7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13

7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74

7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35

7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34

7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61

7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19

7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75

7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74

7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75

7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29

7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35

7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19

7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52

7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81

7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97

7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33

8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73

8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44

8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39

8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00

8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72

8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03

8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42

8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06

8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94

12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build

Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)

7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47

7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81

7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13

7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65

7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53

7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61

7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13

7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74

7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35

7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34

7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61

7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19

7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75

7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74

7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75

7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29

7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35

7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19

7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52

7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81

7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97

7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33

8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73

8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44

8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39

8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00

8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72

8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03

8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42

8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06

8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94

12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build

Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)

7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47

7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81

7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13

7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65

7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53

7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61

7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13

7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74

7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35

7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34

7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61

7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19

7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75

7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74

7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75

7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29

7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35

7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19

7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52

7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81

7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97

7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33

8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73

8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44

8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39

8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00

8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72

8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03

8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42

8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06

8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94

12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build

Weatherford International Ltd. gUEXAR Survey Report .WeatherlordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVDReference: WELL @4924.00ft (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth Inclination Azimuth Depth +N/-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°ITOOft) (°I100ft) (*Ii00ft)

7,006.00 93.86 167.90 6,558.30 -744.01 161.19 745.69 5.41 5.34 0.887,037.00 93.05 167.91 6,556.43 -774.26 167.67 776.02 2.61 -2.61 0.037,069.00 91.57 167.12 6,555.14 -805.48 174.59 807.30 5.24 -4.63 -2.47

7,100.00 90.71 167.20 6,554.52 -835.70 181.47 837.59 2.79 -2.77 0.267,132.00 92.77 165.98 6,553.55 -866.81 188.89 868.78 7.48 6.44 -3.81

7,164.00 91.23 165.94 6,552.44 -897.83 196.65 899.89 4.81 -4.81 -0.13

7,195.00 94.71 165.12 6,550.83 -927.80 204.38 929.94 11.53 11.23 -2.65

7,226.00 95.47 165.97 6,548.08 -957.70 212.09 959.92 3.67 2.45 2.747,258.00 92.49 164.84 6,545.86 -988.59 220.13 990.90 9.96 -9.31 -3.53

7,289.00 93.57 164.34 6,544.22 -1,018.44 228.36 1,020.83 3.84 3.48 -1.61

7,321.00 95.81 163.98 6,541.60 -1,049.12 237.07 1,051.60 7.09 7.00 -1.13

7,353.00 92.03 164.18 6,539.42 -1,079.81 245.82 1,082.38 11.83 -11.81 0.637,384.00 89.74 162.71 6,538.94 -1,109.52 254.65 1,112.19 8.78 -7.39 -4.74

7,416.00 93.46 163.89 6,538.04 -1,140.15 263.84 1,142.91 12.20 11.63 3.697,447.00 94.20 162.54 6,535.97 -1,169.76 272.77 1,172.62 4.96 2.39 -4.35

7,479.00 91.28 162.11 6,534.44 -1,200.22 282.48 1,203.17 9.22 -9.13 -1.34

7,497.00 91.51 161.82 6,534.00 -1,217.33 288.05 1,220.34 2.06 1.28 -1.61

7,528.00 91.46 161.45 6,533.20 -1,246.74 297.81 1,249.86 1.20 -0.16 -1.19

7,560.00 92.60 161.60 6,532.07 -1,277.07 307.95 1,280.30 3.59 3.56 0.477,592.00 93.34 162.16 6,530.41 -1,307.44 317.89 1,310.77 2.90 2.31 1.75

7,623.00 91.86 161.93 6,529.00 -1,336.90 327.43 1,340.33 4.83 -4.77 -0.74

7,655.00 91.40 161.37 6,528.09 -1,367.26 337.50 1,370.80 2.26 -1.44 -1.75

7,686.00 92.60 160.66 6,527.01 -1,396.55 347.58 1,400.20 4.50 3.87 -2.29

7,718.00 95.17 160.98 6,524.84 -1,426.71 358.07 1,430.46 8.09 8.03 1.007,749.00 95.11 160.87 6,522.07 -1,455.89 368.16 1,459.75 0.40 -0.19 -0.35

7,781.00 94.48 159.85 6,519.39 -1,485.92 378.88 1,489.89 3.74 -1.97 -3.19

7,813.00 93.29 161.10 6,517.22 -1,516.01 389.55 1,520.10 5.39 -3.72 3.917,844.00 92.54 159.08 6,515.65 -1,545.12 400.09 1,549.31 6.94 -2.42 -6.52

7,876.00 91.40 156.90 6,514.55 -1,574.76 412.07 1,579.09 7.68 -3.56 -6.81

7,907.00 92.94 155.36 6,513.37 -1,603.09 424.61 1,607.55 7.02 4.97 -4.97

7,970.00 90.71 152.00 6,511.37 -1,659.52 452.52 1,664.27 6.40 -3.54 -5.33

8,033.00 91.85 150.28 6,509.96 -1,714.68 482.92 1,719.75 3.27 1.81 -2.73

8,065.00 93.52 149.18 6,508.46 -1,742.28 499.03 1,747.53 6.25 5.22 -3.44

8,096.00 94.09 149.71 6,506.40 -1,768.92 514.76 1,774.33 2.51 1.84 1.718,128.00 91.74 149.87 6,504.78 -1,796.54 530.84 1,802.12 7.36 -7.34 0.508,159.00 92.66 151.23 6,503.59 -1,823.51 546.07 1,829.26 5.29 2.97 4.398,190.00 91.74 151.11 6,502.39 -1,850.65 561.00 1,856.55 2.99 -2.97 -0.39

8,222.00 91.57 151.37 6,501.47 -1,878.69 576.39 1,884.76 0.97 -0.53 0.818,253.00 92.66 152.52 6,500.33 -1,906.02 590.96 1,912.25 5.11 3.52 3.718,285.00 93.57 152.84 6,498.59 -1,934.41 605.63 1,940.79 3.01 2.84 1.00

8,316.00 93.05 153.01 6,496.80 -1,961.97 619.72 1,968.50 1.76 -1.68 0.558,348.00 95.06 154.92 6,494.54 -1,990.65 633.72 1,997.32 8.65 6.28 5.978,380.00 91.57 154.94 6,492.68 -2,019.58 647.26 2,026.40 10.91 -10.91 0.068,411.00 92.03 156.38 6,491.71 -2,047.81 660.03 2,054.77 4.87 1.48 4.658,443.00 93.92 158.21 6,490.05 -2,077.29 672.36 2,084.37 8.22 5.91 5.72

8,475.00 91.57 159.83 6,488.52 -2,107.13 683.81 2,114.34 8.92 -7.34 5.068,506.00 89.12 161.93 6,488.33 -2,136.41 693.96 2,143.73 10.41 -7.90 6.778,538.00 88.77 162.01 6,488.92 -2,166.84 703.86 2,174.26 1.12 -1.09 0.258,569.00 90.94 159.83 6,489.00 -2,196.13 713.99 2,203.66 9.92 7.00 -7.03

8,601.00 94.25 160.14 6,487.55 -2,226.16 724.93 2,233.80 10.39 10.34 0.978,632.00 95.86 157.84 6,484.82 -2,254.99 736.00 2,262.74 9.03 5.19 -7.42

8,664.00 94.02 157.50 6,482.06 -2,284.48 748.12 2,292.36 5.85 -5.75 -1.06

8,696.00 91.51 158.25 6,480.52 -2,314.08 760.15 2,322.10 8.19 -7.84 2.348,727.00 92.59 157.34 6,479.41 -2,342.76 771.86 2,350.90 4.55 3.48 -2.94

12/3/2009 8:26:32AM Page 3 COMPASS 2003.21 Build

Page 99: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)

8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47

8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29

8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78

8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88

8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45

8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47

8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13

9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91

9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16

9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23

9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97

9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61

9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34

9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81

9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41

9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71

9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13

9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97

9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53

9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03

9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91

9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03

9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26

9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13

9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81

9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81

9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06

9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59

9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50

9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23

9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06

9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63

LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68

PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00

12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build

Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)

8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47

8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29

8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78

8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88

8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45

8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47

8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13

9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91

9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16

9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23

9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97

9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61

9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34

9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81

9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41

9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71

9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13

9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97

9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53

9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03

9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91

9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03

9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26

9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13

9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81

9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81

9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06

9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59

9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50

9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23

9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06

9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63

LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68

PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00

12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build

Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)

8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47

8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29

8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78

8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88

8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45

8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47

8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13

9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91

9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16

9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23

9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97

9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61

9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34

9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81

9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41

9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71

9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13

9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97

9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53

9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03

9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91

9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03

9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26

9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13

9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81

9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81

9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06

9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59

9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50

9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23

9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06

9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63

LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68

PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00

12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build

Weatherford International Ltd. gOt/ESHR Sume Report WeatherlortCompany: QUESTAR EXPLORATIONAND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC 777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC 777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM2003.21 Single User Db

Survey

Measured Vertical Vertical Dogleg Build TurnDepth inclination Azimuth Depth +NI-S +El-W Section Rate Rate Rate

(II) (°) (°) (II) (ft) (ft) (ft) (°I100ft) (*Ii00ft) (*Ii00ft)

8,759.00 92.43 156.55 6,478.01 -2,372.18 784.38 2,380.45 2.52 -0.50 -2.47

8,790.00 93.22 154.60 6,476.48 -2,400.37 797.18 2,408.77 6.78 2.55 -6.29

8,822.00 94.15 154.35 6,474.42 -2,429.19 810.94 2,437.74 3.01 2.91 -0.78

8,854.00 94.20 153.75 6,472.09 -2,457.88 824.91 2,466.58 1.88 0.16 -1.88

8,886.00 93.63 154.12 6,469.91 -2,486.56 838.93 2,495.41 2.12 -1.78 1.168,917.00 93.46 154.26 6,467.99 -2,514.42 852.41 2,523.41 0.71 -0.55 0.45

8,949.00 93.10 153.79 6,466.16 -2,543.14 866.40 2,552.27 1.85 -1.13 -1.47

8,980.00 92.65 154.67 6,464.61 -2,571.02 879.86 2,580.30 3.19 -1.45 2.849,012.00 92.71 157.24 6,463.11 -2,600.21 892.88 2,609.63 8.02 0.19 8.039,036.00 91.94 156.49 6,462.14 -2,622.26 902.30 2,631.78 4.48 -3.21 -3.13

9,068.00 91.50 157.74 6,461.18 -2,651.73 914.74 2,661.38 4.14 -1.38 3.91

9,100.00 92.38 157.37 6,460.09 -2,681.28 926.95 2,691.06 2.98 2.75 -1.16

9,131.00 91.31 157.74 6,459.10 -2,709.92 938.78 2,719.82 3.65 -3.45 1.199,163.00 90.75 157.99 6,458.52 -2,739.56 950.84 2,749.59 1.92 -1.75 0.789,194.00 90.91 157.30 6,458.07 -2,768.22 962.63 2,778.38 2.28 0.52 -2.23

9,226.00 94.44 157.61 6,456.58 -2,797.74 974.88 2,808.03 11.07 11.03 0.97

9,257.00 94.25 156.49 6,454.23 -2,826.21 986.93 2,836.62 3.65 -0.61 -3.61

9,289.00 93.06 155.74 6,452.19 -2,855.40 999.86 2,865.96 4.39 -3.72 -2.34

9,320.00 92.56 155.49 6,450.67 -2,883.60 1,012.65 2,894.29 1.80 -1.61 -0.81

9,352.00 91.40 153.76 6,449.56 -2,912.50 1,026.35 2,923.33 6.51 -3.63 -5.41

9,383.00 90.44 151.99 6,449.07 -2,940.08 1,040.48 2,951.07 6.49 -3.10 -5.71

9,415.00 90.56 150.99 6,448.79 -2,968.20 1,055.76 2,979.35 3.15 0.38 -3.13

9,447.00 92.69 150.36 6,447.88 -2,996.09 1,071.42 3,007.40 6.94 6.66 -1.97

9,478.00 94.38 150.74 6,445.97 -3,023.03 1,086.63 3,034.50 5.59 5.45 1.239,510.00 93.00 149.61 6,443.91 -3,050.73 1,102.51 3,062.37 5.57 -4.31 -3.53

9,541.00 91.63 147.74 6,442.66 -3,077.19 1,118.62 3,089.00 7.47 -4.42 -6.03

9,573.00 92.50 146.49 6,441.50 -3,104.05 1,135.98 3,116.04 4.76 2.72 -3.91

9,605.00 91.63 144.24 6,440.35 -3,130.36 1,154.15 3,142.54 7.53 -2.72 -7.03

9,636.00 93.13 142.61 6,439.06 -3,155.23 1,172.61 3,167.61 7.14 4.84 -5.26

9,668.00 92.63 141.61 6,437.45 -3,180.45 1,192.24 3,193.04 3.49 -1.56 -3.13

9,699.00 91.89 140.74 6,436.23 -3,204.58 1,211.66 3,217.38 3.68 -2.39 -2.81

9,731.00 92.19 138.24 6,435.09 -3,228.89 1,232.43 3,241.91 7.86 0.94 -7.81

9,762.00 93.00 135.74 6,433.69 -3,251.54 1,253.55 3,264.78 8.47 2.61 -8.06

9,794.00 91.19 132.99 6,432.52 -3,273.89 1,276.41 3,287.38 10.28 -5.66 -8.59

9,825.00 94.00 133.61 6,431.12 -3,295.13 1,298.94 3,308.86 9.28 9.06 2.009,857.00 93.88 132.49 6,428.92 -3,316.92 1,322.27 3,330.90 3.51 -0.38 -3.50

9,888.00 91.50 132.11 6,427.46 -3,337.76 1,345.17 3,351.98 7.77 -7.68 -1.23

9,920.00 91.31 132.36 6,426.68 -3,359.26 1,368.86 3,373.74 0.98 -0.59 0.789,951.00 92.06 129.86 6,425.77 -3,379.64 1,392.21 3,394.36 8.42 2.42 -8.06

9,983.00 93.31 127.74 6,424.27 -3,399.66 1,417.11 3,414.65 7.68 3.91 -6.63

LAST SVY10,011.00 94.50 126.99 6,422.36 -3,416.62 1,439.32 3,431.85 5.02 4.25 -2.68

PROJ SVY - PBHL BBS 15G-22-7-2110,054.00 94.50 126.99 6,418.99 -3,442.41 1,473.56 3,458.00 0.00 0.00 0.00

12/3/2009 8:26:32AM Page 4 COMPASS 2003.21 Build

Page 100: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Wellbore Targets

Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude

PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point

Survey Annotations

Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W

(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2

10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY

Checked By: Approved By: Date:

12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build

Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Wellbore Targets

Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude

PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point

Survey Annotations

Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W

(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2

10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY

Checked By: Approved By: Date:

12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build

Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Wellbore Targets

Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude

PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point

Survey Annotations

Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W

(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2

10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY

Checked By: Approved By: Date:

12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build

Weatherford International Ltd. gGUEMAR Survey Report WeatherfordCompany: QUESTAR EXPLORATION AND PRODUCTION Local Co-ordinate Reference: Well BBS15G-22-7-21Project: UINTAH COUNTY, UTAH TVD Reference: [email protected] (AZTEC777)Site: BBS 15G-22-7-21 MD Reference: WELL @4924.00ft (AZTEC777)Well: BBS 15G-22-7-21 North Reference: TrueWellbore: BBS 15G-22-7-21 Survey Calculation Method: Minimum CurvatureDesign: BBS 15G-22-7-21 Database: EDM 2003.21 Single User Db

Wellbore Targets

Target Name- hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting- Shape (°) (*) (ft) (ft) (ft) (ft) (ft) Latitude Longitude

PBHL BBS 15G-22-7- 0.00 0.00 6,379.61 -3,911.80 1,325.61 7,240,464.01 2,189,560.39 40° 10' 49.380 N 109° 32' 3.880 W- survey misses target center by 493.73ft at 10054.00ft MD (6418.99 TVD, -3442.41 N, 1473.56 E)- Point

Survey Annotations

Measured Vertical Local CoordinatesDepth Depth +N/-S +El-W

(ft) (ft) (ft) (ft) Comment6,719.00 6,547.10 -464.15 103.81 TIE ON ST#2

10,011.00 6,422.36 -3,416.62 1,439.32 LAST SVY10,054.00 6,418.99 -3,442.41 1,473.56 PROJ SVY

Checked By: Approved By: Date:

12/3/2009 8:26:32AM Page 5 COMPASS 2003 21 Build

Page 101: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

DAYS vsDAYS vsDAYS vsDAYS vs

Page 102: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar Exploration_BBS-15G-22-7-21 Uintah County, UT

CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS

600 ,

500 i I || |

0 400 ------- - - ------ ----r ------- -----< \I- i

300 -- --- --- --

1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY

DAYS VS DEPTH

5000

6000I H

I I I i

I- 7000 -

8000 - --- --

9000 -- --

10000

110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435

Questar Exploration_BBS-15G-22-7-21 Uintah County, UT

CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS

600 ,

500 i I || |

0 400 ------- - - ------ ----r ------- -----< \I- i

300 -- --- --- --

1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY

DAYS VS DEPTH

5000

6000I H

I I I i

I- 7000 -

8000 - --- --

9000 -- --

10000

110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435

Questar Exploration_BBS-15G-22-7-21 Uintah County, UT

CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS

600 ,

500 i I || |

0 400 ------- - - ------ ----r ------- -----< \I- i

300 -- --- --- --

1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY

DAYS VS DEPTH

5000

6000I H

I I I i

I- 7000 -

8000 - --- --

9000 -- --

10000

110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435

Questar Exploration_BBS-15G-22-7-21 Uintah County, UT

CONFilEGL w..n.n.nrDAYSVS FEET DRILLED I24 HOURS

600 ,

500 i I || |

0 400 ------- - - ------ ----r ------- -----< \I- i

300 -- --- --- --

1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334DAY

DAYS VS DEPTH

5000

6000I H

I I I i

I- 7000 -

8000 - --- --

9000 -- --

10000

110001 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435

Page 103: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW

Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010

FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048

CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:

The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):

The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:

QEP Energy (Johnson Bottom) FORM A.xls

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW

Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010

FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048

CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:

The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):

The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:

QEP Energy (Johnson Bottom) FORM A.xls

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW

Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010

FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048

CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:

The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):

The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:

QEP Energy (Johnson Bottom) FORM A.xls

Division of Oil, Gas and Mining ROUTINGOPERATOR CHANGE WORKSHEET (for state use only) CDW

Change of Operator (Well Sold) X - Operator Name ChangeThe operator of the well(s) listed below has changed, effective: 6/14/2010

FROM: (Old Operator): TO: ( New Operator):N5085-QuestarExploration and Production Company N3700-QEP Energy Company

1050 17th St, Suite 500 1050 17th St, Suite 500Denver, CO 80265 Denver, CO 80265

Phone: 1 (303) 308-3048 Phone: 1 (303) 308-3048

CA No. Unit: JOHNSON BOTTOMWELL NAME SEC TWN RNG API NO ENTITY LEASE TYPE WELL WELL

NO TYPE STATUSSEE ATTACHED

OPERATOR CHANGES DOCUMENTATIONEnter date after each listed item is completed1. (R649-8-10) Sundry or legal documentation was received from the FORMER operator on: 6/28/20102. (R649-8-10) Sundry or legal documentation was received from the NEW operator on: 6/28/20103. The new company was checked on the Department of Commerce, Division of Corporations Database on: 6/24/20104a. Is the new operator registered in the State of Utah: Business Number: 764611-01435a. (R649-9-2)Waste Management Plan has been received on: Requested5b. Inspections of LA PA state/fee well sites complete on: n/a5c. Reports current for Production/Disposition & Sundries on: ok6. Federal and Indian Lease Wells: The BLM and or the BIA has approved the merger, name change,

or operator change for all wells listed on Federal or Indian leases on: BLM 8/16/2010 BIA not yet7. Federal and Indian Units:

The BLM or BIA has approved the successor of unit operator for wells listed on: 8/16/20108. Federal and Indian Communization Agreements ("CA"):

The BLM or BIA has approved the operator for all wells listed within a CA on: N/A9. Underground Injection Control ("UIC") Division has approved UIC Form 5 Transfer of Authority to

Inject, for the enhanced/secondary recovery unit/project for the water disposal well(s) listed on: 6/29/2010DATA ENTRY:1. Changes entered in the Oil and Gas Database on: 6/30/20102. Changes have been entered on the Monthly Operator Change Spread Sheet on: 6/30/20103. Bond information entered in RBDMS on: 6/30/20104. Fee/State wells attached to bond in RBDMS on: 6/30/20105. Injection Projects to new operator in RBDMS on: 6/30/20106. Receipt of Acceptance of Drilling Procedures for APD/New on: n/aBOND VERIFICATION:1. Federal well(s) covered by Bond Number: ESBOOOO242. Indian well(s) covered by Bond Number: 9650106933a. (R649-3-1) The NEW operator of any state/fee well(s) listed covered by Bond Number 9650106953b. The FORMER operator has requested a release of liability from their bond on: n/aLEASE INTEREST OWNER NOTIFICATION:4. (R649-2-10) The NEW operator of the fee wells has been contacted and informed by a letter from the Division

of their responsibility to notify all interest owners of this change on: n/aCOMMENTS:

QEP Energy (Johnson Bottom) FORM A.xls

Page 104: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES

DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER

See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.

1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached

2 NAeMEOF O ERp

o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached

4 LOCATION OF WELL

FOOTAGES AT SURFACE: See attached COUNTY: Attached

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL

Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list

NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst

SIGNATUR DATE 6/23/2010

(This space for State use only)

RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)

DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering

STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES

DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER

See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.

1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached

2 NAeMEOF O ERp

o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached

4 LOCATION OF WELL

FOOTAGES AT SURFACE: See attached COUNTY: Attached

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL

Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list

NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst

SIGNATUR DATE 6/23/2010

(This space for State use only)

RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)

DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering

STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES

DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER

See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.

1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached

2 NAeMEOF O ERp

o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached

4 LOCATION OF WELL

FOOTAGES AT SURFACE: See attached COUNTY: Attached

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL

Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list

NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst

SIGNATUR DATE 6/23/2010

(This space for State use only)

RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)

DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering

STATE OF UTAH FORM 9DEPARTMENTOF NATURALRESOURCES

DIVISION OF OIL,GAS ANDMINING 5. LEASEDESIGNATIONANDSERIALNUMBER

See attached6. IF INDIAN,ALLOTTEEOR TRIBE NAME:SUNDRY NOTICESAND REPORTS ON WELLS See attached7. UNIT or CA AGREEMENT NAME:Do not use this form for proposals to drill newwells, significantlydeepen existing wells below current bottom-hole depth, reenterplugged wells, or t° See attacheddriff horizontal laterais. Use APPLICATIONFOR PERMIT TO DRILLform for suchproposats.

1 TYPE OF WELL 8. WELLNAMEand NUMBER:OIL WELL GAS WELL OTHERSee attached

2 NAeMEOF O ERp

o tionand Production Company ÑÊÊ$ Att che3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDANDPOOL, OR WILDCAT:1050 17th Street, Suite 500 Denver CO z,80265 (303) 672-6900 See attached

4 LOCATION OF WELL

FOOTAGES AT SURFACE: See attached COUNTY: Attached

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:UTAH

n CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

O ACIDIZE DEEPEN REPERFORATECURRENT FORMATIONNOTICEOF INTENT(Submit in Duplicate) ALTERCASING FRACTURETREAT SIDETRACKTO REPAIRWELL

Approximate date work willstart: CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

6/14/2010 CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPAIR

CHANGETUBING PLUG AND ABANDON VENTOR FLAREO SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATERDISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(STARTIRESUME) WATERSHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Operator NameCONVERT WELLTYPE RECOMPLETE - DIFFERENTFORMATION Change

12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

Effective June 14, 2010 Questar Exploration and Production Company changed its name to QEP Energy Company. This namechange involves only an internal corporate name change and no thirdparty change of operator is involved. The sameemployees will continue to be responsible for operations of the properties described on the attached list. AIIoperations willcontinue to be covered by bond numbers:Federal Bond Number: 965002976 (BLMReference No. ESBOOOO24)Utah State Bond Number: 965008638Fee Land Bond Number:BIA Bond Number: 79944€r Ñ# 0/O (o 3The attached document is an all inclusive list of the wells operated by Questar Exploration and Production Company. As ofJune 14, 2010 QEP Energy Company assumes all rights, duties and obligations as operator of the properties as described onthe list

NAME(PLEASE P Morgan AndersonTITLE Regulatory AffairsAnalyst

SIGNATUR DATE 6/23/2010

(This space for State use only)

RECElVED APPROVED /2/ gJUN2 8 2010(5/2000) (See Instructionson Reverse Side)

DÎVÎSÎOH Of Oil,GasandMining'DIV.0F0lL,GAS&MINING EarleneRussell, Engineering

Page 105: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM

effective June 14, 2010

well_name sec twp rng api entity mineral type stat Clease

LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S

. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C

Bonds: BLM = ESBOOOO24BIA = 956010693

State = 965010695 1 of

Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM

effective June 14, 2010

well_name sec twp rng api entity mineral type stat Clease

LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S

. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C

Bonds: BLM = ESBOOOO24BIA = 956010693

State = 965010695 1 of

Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM

effective June 14, 2010

well_name sec twp rng api entity mineral type stat Clease

LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S

. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C

Bonds: BLM = ESBOOOO24BIA = 956010693

State = 965010695 1 of

Questar Exploration Production Company (N5085) to QEP Energy Company (N3700)JOHNSON BOTTOM

effective June 14, 2010

well_name sec twp rng api entity mineral type stat Clease

LEOTA 1-34-2B 34 070S 210E 4304730879 5420 Federal OW PWV 7W-36-7-21 36 070S 210E 4304734065 13334 State D PAWV 9W-36-7-21 36 070S 210E 4304734066 13331 State D PAWV 11W-36-7-21 36 070S 210E 4304734067 13678 State GW PAWV 5W-36-7-21 36 070S 210E 4304734099 13807 State GW OPS CWV 13W-36-7-21 36 070S 210E 4304734100 13678 State GW PSU PURDY 7W-34-7-21 34 070S 210E 4304734380 13679 Federal GW PBBE 15G-16-7-21 16 070S 210E 4304735408 14070 State OW PBBS 15G-22-7-21 22 070S 210E 4304737443 15688 Federal OW P CTU 3-35-7-21 35 070S 210E 4304738995 16512 Federal GW PSU PURDY 3M-25-7-21 25 070S

. 210E 4304739179 Federal OW APD CJB 4G-27-7-21 27 070S 210E 4304739180 Federal OW APD CSU PURDY 10G-27-7-21 27 070S 210E 4304739181 Federal OW APD CJB 8G-21-7-21 21 070S 210E 4304740613 17595 Federal OW DRL CJB 12G-27-7-21 27 070S 210E 4304740614 Federal OW APD CJB 1G-28-7-21 28 070S 210E 4304740615 Federal OW APD CJB 15G-34-7-21 34 070S. 210E 4304740616 Federal OW APD C

Bonds: BLM = ESBOOOO24BIA = 956010693

State = 965010695 1 of

Page 106: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

'a United States Department of the Interior

. BUREAU OF LAND MANAGEMENTTAKE PatcE*

CH # Utah State Office IN M ERICAP.O. Box 45155

Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

JUL2 8 2010

Memorandum

Fr m:

1FrieldOffice PriaceFie ce Mo Fi

Subject: Name Change Recognized

Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.

The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.

cc: MMSUDOGM

RECEIVEDAUGl 6 2:

'a United States Department of the Interior

. BUREAU OF LAND MANAGEMENTTAKE PatcE*

CH # Utah State Office IN M ERICAP.O. Box 45155

Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

JUL2 8 2010

Memorandum

Fr m:

1FrieldOffice PriaceFie ce Mo Fi

Subject: Name Change Recognized

Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.

The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.

cc: MMSUDOGM

RECEIVEDAUGl 6 2:

'a United States Department of the Interior

. BUREAU OF LAND MANAGEMENTTAKE PatcE*

CH # Utah State Office IN M ERICAP.O. Box 45155

Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

JUL2 8 2010

Memorandum

Fr m:

1FrieldOffice PriaceFie ce Mo Fi

Subject: Name Change Recognized

Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.

The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.

cc: MMSUDOGM

RECEIVEDAUGl 6 2:

'a United States Department of the Interior

. BUREAU OF LAND MANAGEMENTTAKE PatcE*

CH # Utah State Office IN M ERICAP.O. Box 45155

Salt Lake City, UT 84145-0155http://www.b1m.gov/ut/st/en.html

IN REPLY REFER TO:3100(UT-922)

JUL2 8 2010

Memorandum

Fr m:

1FrieldOffice PriaceFie ce Mo Fi

Subject: Name Change Recognized

Attached is a copy of the Certificate of Name Change issued by the Texas Secretary of State anda decision letter recognizing the name change from the Eastern States Office. We have updatedour records to reflect the name change in the attached list of leases.

The name change from QuestarExploration and Production Company into QEP EnergyCompany is effective June 8, 2010.

cc: MMSUDOGM

RECEIVEDAUGl 6 2:

Page 107: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*

hoH Utah State Office Û ""ÀMERICA

P.O. Box 45155Salt Lake City, UT 84145-0155

http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011

Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265

Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah

Dear Mr. Koeniger:

The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.

The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.

For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.

A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective

United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*

hoH Utah State Office Û ""ÀMERICA

P.O. Box 45155Salt Lake City, UT 84145-0155

http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011

Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265

Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah

Dear Mr. Koeniger:

The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.

The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.

For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.

A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective

United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*

hoH Utah State Office Û ""ÀMERICA

P.O. Box 45155Salt Lake City, UT 84145-0155

http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011

Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265

Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah

Dear Mr. Koeniger:

The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.

The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.

For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.

A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective

United States Department of the InteriorBUREAU OF LAND MANAGEMENT TAKE Pynor*

hoH Utah State Office Û ""ÀMERICA

P.O. Box 45155Salt Lake City, UT 84145-0155

http://www.blm.gov/ut/st/en.html

IN REPLY REFER TO g QFÛ3180 (UTU86617A)UT-922 DEC0 5 2011

Nathan C. KoenigerQEP Energy Company1050 17 Street, Suite 500Denver, Colorado 80265

Re: Initial PA "A"Johnson Bottom (GR) UnitUintah County, Utah

Dear Mr. Koeniger:

The Initial Participating Area "A", Johnson Bottom (GR) Unit, UTU86617A, is hereby approvedeffective as of December 17, 2009, pursuant to Section 11 of the Johnson Bottom (GR) UnitAgreement, Uintah County, Utah.

The Initial Participating Area "A"results in 320.00 acres and is based upon the completion of WellNo. BBS 15G-22-7-21, API No. 43-047,37443, surface located in the SW¼SE¼, of Section 22,Township 7 South, Range 21 East, SLB&M, Federal UnitTract No. 10, Lease No. UTU74972, withthe horizontal lateral terminatingin the NE¼SE¼ ofSection 27, Township 7 South, Range 21 East,SLB&M, Federal Unit Tract No. 3, Lease No. UTU16551, as being a well capable of producingunitized substances in paying quantities.

For production and accouriting reporting purposes, all submissions pertaining to the InitialParticipating Area "A"shall refer to UTU86617A.

A Copy of the approved request is being distributed to the appropriate agencies and one copy isreturned herewith. Please advise all interested parties of the establishment of the InitialParticipating Area "A",Johnson Bottom (GR) Unit, and the effective

Page 108: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

RECEIVED: Nov. 25, 2014

                           FEDERAL APPROVAL OF THIS ACTION IS NECESSARY

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9 

5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-16551

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: 

7.UNIT or CA AGREEMENT NAME: JOHNSON BOTTOM

1. TYPE OF WELL  Oil Well

8. WELL NAME and NUMBER: BBS 15G-22-7-21

2. NAME OF OPERATOR: QEP ENERGY COMPANY

9. API NUMBER: 43047374430000

3. ADDRESS OF OPERATOR: PHONE NUMBER:  11002 East 17500 South , Vernal, Ut, 84078 303 308-3068  Ext

9. FIELD and POOL or WILDCAT: BRENNAN BOTTOM

4. LOCATION OF WELL  FOOTAGES AT SURFACE:     0669 FSL 2022 FEL   QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:     Qtr/Qtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S

COUNTY: UINTAH

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

 

    NOTICE OF INTENTApproximate date work will start:

11/25 /2014

    SUBSEQUENT REPORTDate of Work Completion:

 

    SPUD REPORTDate of Spud:

 

    DRILLING REPORTReport Date:

 

    ACIDIZE      ALTER CASING      CASING REPAIR 

    CHANGE TO PREVIOUS PLANS      CHANGE TUBING      CHANGE WELL NAME 

    CHANGE WELL STATUS      COMMINGLE PRODUCING FORMATIONS      CONVERT WELL TYPE  

    DEEPEN      FRACTURE TREAT      NEW CONSTRUCTION 

    OPERATOR CHANGE      PLUG AND ABANDON      PLUG BACK 

    PRODUCTION START OR RESUME      RECLAMATION OF WELL SITE      RECOMPLETE DIFFERENT FORMATION 

    REPERFORATE CURRENT FORMATION      SIDETRACK TO REPAIR WELL      TEMPORARY ABANDON 

    TUBING REPAIR      VENT OR FLARE       WATER DISPOSAL 

    WATER SHUTOFF      SI TA STATUS EXTENSION      APD EXTENSION 

    WILDCAT WELL DETERMINATION      OTHER  OTHER: 

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

QEP ENERGY COMPANY REQUESTS APPROVAL TO RECOMPLETE THE BBS15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN

RIVER FORMATION. SEE ATTACHED PROCEDURES.

NAME (PLEASE PRINT) PHONE NUMBER  Benna Muth 435 781-4320

TITLE Regulatory Assistant

SIGNATURE N/A

DATE 11/25/2014

December 30, 2014

Sundry Number: 58225 API Well Number: 43047374430000Sundry Number: 58225 API Well Number: 43047374430000FEDERAL APPROVAL OF THIS ACTION IS NECESSARY

FORM 9STATE OF UTAH

DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-16551

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. JOHNSON BOTTOM

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well BBS 15G-22-7-21

2. NAME OF OPERATOR: 9. API NUMBER:QEP ENERGY COMPANY 43047374430000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext BRENNAN BOTTOM

4. LOCATION OF WELL COUNTY:FOOTAGESAT SURFACE: UINTAH

0669 FSL 2022 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

QtrlQtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT

Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

11/25/2014CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT

Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCATWELLDETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

QEP ENERGYCOMPANYREQUESTS APPROVALTO RECOMPLETETHE BBS Accepted by the15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN utah Division of

RIVER FORMATION.SEE ATTACHEDPROCEDURES. Oil, Gas and Mining

Date:

NAME (PLEASE PRINT) PHONE NUMBER TITLEBenna Muth 435 781-4320 Regulatory Assistant

SIGNATURE DATEN/A 11/25/2014

RECEIVED: Nov. 25,

Sundry Number: 58225 API Well Number: 43047374430000FEDERAL APPROVAL OF THIS ACTION IS NECESSARY

FORM 9STATE OF UTAH

DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-16551

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. JOHNSON BOTTOM

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well BBS 15G-22-7-21

2. NAME OF OPERATOR: 9. API NUMBER:QEP ENERGY COMPANY 43047374430000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext BRENNAN BOTTOM

4. LOCATION OF WELL COUNTY:FOOTAGESAT SURFACE: UINTAH

0669 FSL 2022 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

QtrlQtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT

Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

11/25/2014CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT

Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCATWELLDETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

QEP ENERGYCOMPANYREQUESTS APPROVALTO RECOMPLETETHE BBS Accepted by the15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN utah Division of

RIVER FORMATION.SEE ATTACHEDPROCEDURES. Oil, Gas and Mining

Date:

NAME (PLEASE PRINT) PHONE NUMBER TITLEBenna Muth 435 781-4320 Regulatory Assistant

SIGNATURE DATEN/A 11/25/2014

RECEIVED: Nov. 25,

Sundry Number: 58225 API Well Number: 43047374430000FEDERAL APPROVAL OF THIS ACTION IS NECESSARY

FORM 9STATE OF UTAH

DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-16551

SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:

FOR PERMIT TO DRILL form for such proposals. JOHNSON BOTTOM

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well BBS 15G-22-7-21

2. NAME OF OPERATOR: 9. API NUMBER:QEP ENERGY COMPANY 43047374430000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:11002 East 17500 South , Vernal, Ut, 84078 303 308-3068 Ext BRENNAN BOTTOM

4. LOCATION OF WELL COUNTY:FOOTAGESAT SURFACE: UINTAH

0669 FSL 2022 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

QtrlQtr: SWSE Section: 22 Township: 07.0S Range: 21.0E Meridian: S UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT

Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

11/25/2014CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT

Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCATWELLDETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

QEP ENERGYCOMPANYREQUESTS APPROVALTO RECOMPLETETHE BBS Accepted by the15G-22-7-21 BY ADDING ADDITIONAL PERFORATIONS TO THE GREEN utah Division of

RIVER FORMATION.SEE ATTACHEDPROCEDURES. Oil, Gas and Mining

Date:

NAME (PLEASE PRINT) PHONE NUMBER TITLEBenna Muth 435 781-4320 Regulatory Assistant

SIGNATURE DATEN/A 11/25/2014

RECEIVED: Nov. 25,

Page 109: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

RECEIVED: Nov. 25, 2014

QEP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations to the Green River Formation as follows:

1. Set a CFP at 6180’. 2. Stage 1:

a. 6139’-6143’, 3spf, frac with crosslink fluid. b. 6104’-6105’, 3spf, frac with crosslink fluid. c. 6055’-6056’, 3spf, frac with crosslink fluid. d. 6021’-6023’, 3spf, frac with crosslink fluid. e. 5973’-5974’, 3spf, frac with crosslink fluid. f. 5923’-5924’, 3spf, frac with crosslink fluid. g. 5896’-5897’, 3spf, frac with crosslink fluid. h. 5857’-5860’, 3spf, frac with crosslink fluid. i. 5828’-5830’, 3spf, frac with crosslink fluid.

3. Set a CFP at 5750’. 4. Stage 2:

a. 5710’-5712’, 3spf, frac with crosslink fluid. b. 5692’-5694’, 3spf, frac with crosslink fluid. c. 5660’-5661’, 3spf, frac with crosslink fluid. d. 5651’-5653’, 3spf, frac with crosslink fluid. e. 5595’-5597’, 3spf, frac with crosslink fluid. f. 5583’-5585’, 3spf, frac with crosslink fluid. g. 5561’-5563’, 3spf, frac with crosslink fluid. h. 5509’-5511’, 3spf, frac with crosslink fluid. i. 5499’-5500’, 3spf, frac with crosslink fluid.

5. Drill up both plugs and return well to production.

Sundry Number: 58225 API Well Number: 43047374430000Sundry Number: 58225 API Well Number: 43047374430000

O.EP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations tothe Green River Formation as follows:

1. Set a CFP at 6180'.2. Stage 1:

a. 6139'-6143', 3spf, frac with crosslink fluid.b. 6104'-6105', 3spf, frac with crosslink fluid.c. 6055'-6056', 3spf, frac with crosslink fluid.d. 6021'-6023', 3spf, frac with crosslink fluid.e. 5973'-5974', 3spf, frac with crosslink fluid.f. 5923'-5924', 3spf, frac with crosslink fluid.g. 5896'-5897', 3spf, frac with crosslink fluid.h. 5857'-5860', 3spf, frac with crosslink fluid.i. 5828'-5830', 3spf, frac with crosslink fluid.

3. Set a CFP at 5750'.4. Stage 2:

a. 5710'-5712', 3spf, frac with crosslink fluid.b. 5692'-5694', 3spf, frac with crosslink fluid.c. 5660'-5661', 3spf, frac with crosslink fluid.d. 5651'-5653', 3spf, frac with crosslink fluid.e. 5595'-5597', 3spf, frac with crosslink fluid.f. 5583'-5585', 3spf, frac with crosslink fluid.g. 5561'-5563', 3spf, frac with crosslink fluid.h. 5509'-5511', 3spf, frac with crosslink fluid.i. 5499'-5500', 3spf, frac with crosslink fluid.

5. Drill up both plugs and return well to production.

RECEIVED: Nov. 25,

Sundry Number: 58225 API Well Number: 43047374430000

O.EP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations tothe Green River Formation as follows:

1. Set a CFP at 6180'.2. Stage 1:

a. 6139'-6143', 3spf, frac with crosslink fluid.b. 6104'-6105', 3spf, frac with crosslink fluid.c. 6055'-6056', 3spf, frac with crosslink fluid.d. 6021'-6023', 3spf, frac with crosslink fluid.e. 5973'-5974', 3spf, frac with crosslink fluid.f. 5923'-5924', 3spf, frac with crosslink fluid.g. 5896'-5897', 3spf, frac with crosslink fluid.h. 5857'-5860', 3spf, frac with crosslink fluid.i. 5828'-5830', 3spf, frac with crosslink fluid.

3. Set a CFP at 5750'.4. Stage 2:

a. 5710'-5712', 3spf, frac with crosslink fluid.b. 5692'-5694', 3spf, frac with crosslink fluid.c. 5660'-5661', 3spf, frac with crosslink fluid.d. 5651'-5653', 3spf, frac with crosslink fluid.e. 5595'-5597', 3spf, frac with crosslink fluid.f. 5583'-5585', 3spf, frac with crosslink fluid.g. 5561'-5563', 3spf, frac with crosslink fluid.h. 5509'-5511', 3spf, frac with crosslink fluid.i. 5499'-5500', 3spf, frac with crosslink fluid.

5. Drill up both plugs and return well to production.

RECEIVED: Nov. 25,

Sundry Number: 58225 API Well Number: 43047374430000

O.EP Energy requests approval to recomplete the BB 15G-22-7-21 by adding additional perforations tothe Green River Formation as follows:

1. Set a CFP at 6180'.2. Stage 1:

a. 6139'-6143', 3spf, frac with crosslink fluid.b. 6104'-6105', 3spf, frac with crosslink fluid.c. 6055'-6056', 3spf, frac with crosslink fluid.d. 6021'-6023', 3spf, frac with crosslink fluid.e. 5973'-5974', 3spf, frac with crosslink fluid.f. 5923'-5924', 3spf, frac with crosslink fluid.g. 5896'-5897', 3spf, frac with crosslink fluid.h. 5857'-5860', 3spf, frac with crosslink fluid.i. 5828'-5830', 3spf, frac with crosslink fluid.

3. Set a CFP at 5750'.4. Stage 2:

a. 5710'-5712', 3spf, frac with crosslink fluid.b. 5692'-5694', 3spf, frac with crosslink fluid.c. 5660'-5661', 3spf, frac with crosslink fluid.d. 5651'-5653', 3spf, frac with crosslink fluid.e. 5595'-5597', 3spf, frac with crosslink fluid.f. 5583'-5585', 3spf, frac with crosslink fluid.g. 5561'-5563', 3spf, frac with crosslink fluid.h. 5509'-5511', 3spf, frac with crosslink fluid.i. 5499'-5500', 3spf, frac with crosslink fluid.

5. Drill up both plugs and return well to production.

RECEIVED: Nov. 25,

Page 110: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Division of Oil, Gas and MiningOperator Change/Name Change Worksheet-for State use only

Effective Date: 9/6t2017FORMER OPERATOR: NEW OPERATOR:QEP Energy Company1050 17th Street, Suite 800

Denver, CO 80265

Finley Resources, Inc.PO Box 2200Fort Worth, T){76113

Bottom-E0R

WELL INFOR]VIATION:Well Name Sec IWN RNG API Entitv Mineral Surface Type StatusSee Attached List

OPERATOR CHANGES DOCUMENTATION:L Sundry or legal documentation was received from the FORIVIER operator on:2. Sundry or legal documentation was received from the NEW operator on:3. New operator Division of corporations Business Number: 740glsl-0146

9lt8/2017

9l18/20179tr8tzafi

N/A

REVIEW:Receipt of Acceptance of Drilling Procedures for APD on:Reports current for Production/Disposition & Sundries:OPS/SI/TA well(s) reviewed for full cost bonding:UIC5 on all disposal/injection/storage well(s) approved on:

Surface Facility(s) included in operator change: Nonelnspections of PA state/fee well sites complete on (only upon operators request):

9lt8l20t7N/AComing

NEW OPERATOR BOND VERIFICATION:State/fee well(s) covered by Bond Number(s):

DATA ENTRY:Well(s) update in the RBDMS on:

Group(s) update in RDBMS on:

Surface Facilities update in RBDMS on:

RLBooI 1264

t0lt3t20l7N/AN/A

COMMENTS:Injection wells will be moved in another operator change when UIC 5's are submitted and approved.

LOl7612077

Division of Oil, Gas and MiningOperator Change/Name Change Worksheet-for State use only

Effective Date: 9/6/2017FORMER OPERATOR: NEW OPERATOR:QEP Energy Company Finley Resources, Inc.1050 17th Street, Suite 800 PO Box 2200Denver, CO 80265 Fort Worth, TX 76113

Groups:Brennan Bottom-EOR

WELL INFORMATION:Well Name See TWN RNG API Entity Mineral Surface Type StatusSee Attached List

OPERATOR CHANGES DOCUMENTATION:1. Sundry or legal documentation was received from the FORMER operator on: 9/18/20172. Sundry or legal documentation was received from the NEW operator on: 9/18/20173. New operator Division of Corporations Business Number: 7409151-0146

REVIEW:Receipt of Acceptance of Drilling Procedures for APD on: 9/18/2017Reports current for Production/Disposition & Sundries: 9/18/2017OPS/SI/TA well(s) reviewed for full cost bonding: N/AUIC5 on all disposal/injection/storage well(s) approved on: ComingSurface Facility(s) included in operator change: NoneInspections of PA state/fee well sites complete on (only upon operators request): N/A

NEW OPERATOR BOND VERIFICATION:State/fee well(s) covered by Bond Number(s): RLB0011264

DATA ENTRY:Well(s) update in the RBDMS on: 10/13/2017Group(s) update in RDBMS on: N/ASurface Facilities update in RBDMS on: N/A

COMMENTS:Injection wells will be moved in another operator change when UIC 5's are submitted and approved.

Division of Oil, Gas and MiningOperator Change/Name Change Worksheet-for State use only

Effective Date: 9/6/2017FORMER OPERATOR: NEW OPERATOR:QEP Energy Company Finley Resources, Inc.1050 17th Street, Suite 800 PO Box 2200Denver, CO 80265 Fort Worth, TX 76113

Groups:Brennan Bottom-EOR

WELL INFORMATION:Well Name See TWN RNG API Entity Mineral Surface Type StatusSee Attached List

OPERATOR CHANGES DOCUMENTATION:1. Sundry or legal documentation was received from the FORMER operator on: 9/18/20172. Sundry or legal documentation was received from the NEW operator on: 9/18/20173. New operator Division of Corporations Business Number: 7409151-0146

REVIEW:Receipt of Acceptance of Drilling Procedures for APD on: 9/18/2017Reports current for Production/Disposition & Sundries: 9/18/2017OPS/SI/TA well(s) reviewed for full cost bonding: N/AUIC5 on all disposal/injection/storage well(s) approved on: ComingSurface Facility(s) included in operator change: NoneInspections of PA state/fee well sites complete on (only upon operators request): N/A

NEW OPERATOR BOND VERIFICATION:State/fee well(s) covered by Bond Number(s): RLB0011264

DATA ENTRY:Well(s) update in the RBDMS on: 10/13/2017Group(s) update in RDBMS on: N/ASurface Facilities update in RBDMS on: N/A

COMMENTS:Injection wells will be moved in another operator change when UIC 5's are submitted and approved.

Page 111: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

From: QEP Energy CompanyTo: Finley Resources, lnc.

WellName _ APIBRENNAN 2R -43U740125gl2cag.z-zo - r49q{qqqsoP 2G-3-7-20 i43O4754?70oP 4G-1-7-20 4304754371OP 6G-1'l-720 Wu{tzqPAqf. A - @q-usnoP 13G-1-7-20 ';4304754374oP't6G-1-7-20 i43%7il3756p ac:ti-t-zo 43o4tus76qLLG--!r"q---laso4rs43?8oP 5G-3-7-20oP 9G-14-7-20otr'15G{-720

lrtrytr7TF7

J7

V-a7E77-7

TWl.r D

Elql9iS+

lsS

ESS

EtrSgSSS

RNG21Ininw20lzoInwPqtralzo20)zo

,rueE Eecle i!lg 10E3E-_ IElrlE 1E- irlE lrE12

PermitPermit

PermitiE

trlEle

l3tq114

3oP 10G-1-7-20

"43047il3827 20 E 1

oP 1G-1-7-20 43U7il3% 7 20 E 1

oP 14G-12-7-20 43047il385 7 20 E 12 OilWell Approved Permit)P'l6G-11-7-20 14304754386 7 S 20E11 OilWell Approved Permit)P 4G-3-7-20 ,43047U387 7 S 20E3 OilWell Aooroved PermiloP 6G-3-7-20 4304754388 7 S )zoes OilWell Aooroved PermitoP 1G-12-7-20 4304754389 7 S 20 E 12 OilWell Aooroved PermitoP 13G-11-7-20 i43c475/;625 7 S 20 E 11

-,-ffiApproved Permit

oP 1c-10-7-20 43447il894 7 S 20 E 10 OilWell Aooroved PermitoP 7G-2-7-20 4304754909 7 S 20 E 2 OilWell Aooroved PermitoP 16G-2-t-20 ,4304754910oP 5ci2-7-iooP 9c-2-720 i4gri54g12oP 11G-2-7-20 4304754913OP 3G-2-7-20 Wusuoe tse+-t-zo -$oa7sas,ts

oP 13C2-7-n :4sc/rs4s1?

20

@@,@20

trq-izo206

2-22

2222

T:11

Approved PermitApproved PermitApproved PermitAooroved PermitApproved PermitApproved PermitAooroved Permit

oP 1G-2-7-20 430475,4i927 Approved PermitoP 15G-11-7-20 430/.755162 Aooroved PermitoP 9G-11-7-20 4304755163oe tzett-t--zo 430475518gP 2G-11-7-n -- l€0475s169oP 3c-11-720 - ?rrrr,ss1?o

7771

sIqS

2020

420

E

E--E-E

11

11

1L

OilWell]e{wq!l

OilWell

Approved PermitApproved Permit

{pproved PermitApproved Permit

E 11 Oil WelloP 8G-11-7-20 4304755174 7 S 20 E 11 OilWell Aooroved PermitcP 4G-11-7-20 )4304755175 7 S 20 E 11 OilWell Approved PermitSU PURDY 1Oc-27-7-21 'A30p739181 S 21 E 27 18256 OilWell Drillino Ooerations SusoendedBRENNAN 1 4304715417 7 S 20 E 3 5261 lOilWell Producing3RENNAN 3 4304715419 S 21 E 17 5261 iOilWell Producino3RENNAN 6 ,4304730109 7 S 21 E 9 5261 OilWell ProducinoLEOTA 1-U-28 4304730879 7 S 1 E 34 il2o lOilWellBRENNAN FED 15€ 4304731272 7 S 21

1121

E 8 84055261526',1

OilWellBRENNAN 9 4304732477BRENNAN 10 4304732771

7 S E 118E19S

BRENNAN 14 4304732774BREttNAt',t 12 4n4n277g

BBW 11G-20-7-21 ,4304736516BBS 15G-22-7-21 11444q3741ru 3-35-7-21 _EgAqlqgg!JB 4G-27-7-21 14304739180BRENNAN 15BRENNAN 15 i4304740198oP 16G-12-7-20 $;,O474U81oP 16G-12-7-20 430474cp,81oP 4c-1r-t-?o :4so4t4o4},JB 8G-21-7-21 t4304740613

\ ru 13\ /€G7-X l43o47341oolsu PURDY 7W-U-7-21 4304734380BBE 15G-16-7-21 4304735408

77'1il7,7l7

21 !21 I

^121 I2',t I

2121

L

21

^i^l20 120i

^-

5261 OilWell5261 OitWeq17UO _- ]Gas Well13Q29 Gas Well14O7O OilWell5261 OilWell

16512 Gas Well

17948 iOilWell17595 OilWell

Produging

ryqqeee[

Producing .

?rolqg4g'roducing .)roducing)roducing

)rod-ucingrroducino

352?-l13i12

1

12

E 1

oP 16G-3-7-20 4304751 7 S 20 E 3 9553 OilWell )roducinooP 7G-11-7-20 4304751504B ac-26-t-21 4304752468ffisaatBRENNANffi3RENNAN 7R 4go474o1|gl

S 20 E 1 9554 OilWell I8755 OilWell ,Lr _t19555 OilWell5261 - -oitl /eil5261 OilWell

1tIt'lr

,rgduq!ng)roduci49)roducing

ihut-in;nut-in

S 21 E 26Ss_- 20

21EhE-1 17

13

F om: QEP Energy CompanyT3: Finley Resources, IncEffective 9/6/2017Well Name API TWN TWN D RNG RNG_D Sec Entity Number Well Type Well StatusBRENNAN 2R 4304740125 7 S 21 E Oil Well Approved PermitOP 2G-10-7-20 304754369 7 S E 10 Oil Well Approved PermitOP 2G-3-7-20 4304754370 7 S 20 3 Oil Well Approved PermitOP 4G-1-7-20 4304754371 7 S O E 1 Oil Well roved PermitOP 6G-11-7-20 4304754372 7 S 20 E 1 ÖilWe11 roved PermitOP 6G-1-7-20 4304754373 7 S 20 E 1 Oil Well roved PermitOP 13G-1-7-20 4304754374 7 Oil Well Approved PermitOP 16G-1-7-20 4304754375 7 20 1 Oil Well Approved PermitOP 6G-12-7-20 4304754376 7 S 20 E 12 Oil Well Approved PermitOP 7G-3-7-20 4304754378 7 20 Oil Well d PermitOP 5G-3-7-20 4304754379 7 S 20 E OilWell Approved PermitOP 9G-14-7-20 4304754380 7 S 20 E 14 Oil Well Approved PermitOP 15G-3-7-20 4304754381 7 S 20 E 3 Oil Well Approved PermitOP 10G-1-7-20 4304754382 7 S E 1 Oil Well Approved PermitOP 1G-1-7-20 4304754384 7 S 20 E 1 Oil Well Approved PermitOP 14G-12-7-20 4304754385 7 S 20 E 12 Oil Well Approved PermitOP 16G-11-7-20 4304754386 7 S 20 E 11 Oil Well Approved PermitOP 4G-3-7-20 4304754387 7 S 20 E 3 Oil Well Approved PermitOP 6G-3-7-20 4304754388 7 S 20 E 3 Oil Well Approved PermitOP 1G-12-7-20 4304754389 7 S 20 E 12 Oil Well Approved PermitOP 13G-11-7-20 4304754625 7 S 20 E 11 Oil Well Approved PermitOP 1G-10-7-20 4304754894 7 S 20 E 10 Oil Well Approved PermitOP 7G-2-7-20 4304754909 7 S 20 E 2 Oil Well Approved PermitOP 16G-2-7-20 4304754910 7 20 E 2 Oil Well Approved PermitOP 5G-2-7-20 4304754911 7 S 20 E 2 Oil Well Approved PermitOP 9G-2-7-20 4304754912 7 S E 2 Oil Well Approved PermitOP 11G-2-7-20 304754913 7 S 20 E 2 Oil Well Approved PermitOP 3G-2-7-20 4304754914 7 S 20 E 2 Oil Well Approved PermitOP 15G-2-7-20 4304754915 7 S 20 E Oil We11 Approved PermitOP 13G-2-7-20 4304754917 7 S 20 E 2 Oil Well Approved PermitOP 1G-2-7-20 4304754927 7 S 20 E 2 Oil Well pproved PermitOP 15G-11-7-20 4304755162 7 S 20 E 11 Oil Well pproved PermitOP 9G-11-7-20 4304755163 7 S 20 E 11 Oil Well pproved PermitOP 12G-11-7-20 4304755164 7 20 E 11 Oil Well pproved PermitOP 2G-11-7-20 43047 S 20 E 11 Oil Approved PermitOP 3G-11-7-20 4304755170 7 S 20 _ E 11 Oil Well Approved PermitOP 10G-11-7-20 4304755172 7 S 20 E 11 Oil Well Approved PermitOP SG-11-7-20 4304755174 7 S 20 E 11 Oil Well Approved PermitOP 4G-11-7-20 4304755175 7 S 20 E 11 Oil Well Approved PermitSU PURDY 10G-27-7-2i 4304739181 7 S 21 E 27 18256 Oil Well DrillingOperations SuspendedBRENNAN 1 4304715417 7 S 20 E 13 5261 Oil Well ProducingBRENNAN 3 304715419 7 S 21 E 17 5261 Oil Well ProducingBRENNAN 6 4304730109 7 S 21 E 19 5261 Oil Well ProducingLEOTA 1-34-2B 4304730879 7 S 21 E 34 5420 Oil Well ProducingBRENNAN FED 15-8 4304731272 7 S 21 E 8 8405 Oil Well ProducingBRENNAN 9 4304732477 7 S 21 i E 18 5261 Oil Well ProducingBRENNAN 10 4304732771 7 S 21 E 19 5261 Oil Well ProducingBRENNAN 14 4304732774 7 S 21 _ E_ 5261 Oil Well ProducingBRENNAN 12 4304732779 7 S 21 IE 18 5261 Oil Well ProducingWV 13W-36-7-21 4304734100 7 S 21 E N 17646 Gas Well ProducingSU PURDY 7W-34-7-21 4304734380 7 S 21 E 34 13679 Gas Well ProducingBBE 15G-16-7-21 4304735408 7 21 E 16 14070 Oil Well ProducingBBW 11G-20-7-21 4304736516 7 S_ 21 E 5261 Oil Well ProducingBBS 15G-22-7-21 4304737443 7 S 21 E 22 15688 Oil Well ProducingTU 3-35-7-21 4304738995 7 21 E 35 16512 Gas Well ProducingJB 4G-27-7-21 4304739180 7 S 21 E 27 18255 Oil Well ProducingBRENNAN 15 4304740198 7 S 20 E 13 5261 Oil Well ProducingOP 16G-12-7-20 4304740481 7 S 20 E 12 17527 Oil Well POP 4G-12-7-20 4304740482 7 S 20 E 12 17948 Oil Well ProducingJB 8G-21-7-21 04740613 7 S 21 E 17595 Oil Well ProducingOP 16G-3-7-20 4304751503 7 S 20 E 19553 Oil Well ProducingOP 7G-11-7-20 4304751504 7 S 20 E 11 19554 Oil Well ProducingJB 4G-26-7-21 4304752468 7 S 21 E 26 18755 Oil Well ProducingOP 4G-2-7-20 4304753641 7 S 20 19555 ilWell ProducingBRENNAN 8 4304731509 7 S 21 E 17 5261 Oil Well Shut-inBRENNAN 7R 4304740197 7 S |20 E 13 5261 Oil Well

F om: QEP Energy CompanyT3: Finley Resources, IncEffective 9/6/2017Well Name API TWN TWN D RNG RNG_D Sec Entity Number Well Type Well StatusBRENNAN 2R 4304740125 7 S 21 E Oil Well Approved PermitOP 2G-10-7-20 304754369 7 S E 10 Oil Well Approved PermitOP 2G-3-7-20 4304754370 7 S 20 3 Oil Well Approved PermitOP 4G-1-7-20 4304754371 7 S O E 1 Oil Well roved PermitOP 6G-11-7-20 4304754372 7 S 20 E 1 ÖilWe11 roved PermitOP 6G-1-7-20 4304754373 7 S 20 E 1 Oil Well roved PermitOP 13G-1-7-20 4304754374 7 Oil Well Approved PermitOP 16G-1-7-20 4304754375 7 20 1 Oil Well Approved PermitOP 6G-12-7-20 4304754376 7 S 20 E 12 Oil Well Approved PermitOP 7G-3-7-20 4304754378 7 20 Oil Well d PermitOP 5G-3-7-20 4304754379 7 S 20 E OilWell Approved PermitOP 9G-14-7-20 4304754380 7 S 20 E 14 Oil Well Approved PermitOP 15G-3-7-20 4304754381 7 S 20 E 3 Oil Well Approved PermitOP 10G-1-7-20 4304754382 7 S E 1 Oil Well Approved PermitOP 1G-1-7-20 4304754384 7 S 20 E 1 Oil Well Approved PermitOP 14G-12-7-20 4304754385 7 S 20 E 12 Oil Well Approved PermitOP 16G-11-7-20 4304754386 7 S 20 E 11 Oil Well Approved PermitOP 4G-3-7-20 4304754387 7 S 20 E 3 Oil Well Approved PermitOP 6G-3-7-20 4304754388 7 S 20 E 3 Oil Well Approved PermitOP 1G-12-7-20 4304754389 7 S 20 E 12 Oil Well Approved PermitOP 13G-11-7-20 4304754625 7 S 20 E 11 Oil Well Approved PermitOP 1G-10-7-20 4304754894 7 S 20 E 10 Oil Well Approved PermitOP 7G-2-7-20 4304754909 7 S 20 E 2 Oil Well Approved PermitOP 16G-2-7-20 4304754910 7 20 E 2 Oil Well Approved PermitOP 5G-2-7-20 4304754911 7 S 20 E 2 Oil Well Approved PermitOP 9G-2-7-20 4304754912 7 S E 2 Oil Well Approved PermitOP 11G-2-7-20 304754913 7 S 20 E 2 Oil Well Approved PermitOP 3G-2-7-20 4304754914 7 S 20 E 2 Oil Well Approved PermitOP 15G-2-7-20 4304754915 7 S 20 E Oil We11 Approved PermitOP 13G-2-7-20 4304754917 7 S 20 E 2 Oil Well Approved PermitOP 1G-2-7-20 4304754927 7 S 20 E 2 Oil Well pproved PermitOP 15G-11-7-20 4304755162 7 S 20 E 11 Oil Well pproved PermitOP 9G-11-7-20 4304755163 7 S 20 E 11 Oil Well pproved PermitOP 12G-11-7-20 4304755164 7 20 E 11 Oil Well pproved PermitOP 2G-11-7-20 43047 S 20 E 11 Oil Approved PermitOP 3G-11-7-20 4304755170 7 S 20 _ E 11 Oil Well Approved PermitOP 10G-11-7-20 4304755172 7 S 20 E 11 Oil Well Approved PermitOP SG-11-7-20 4304755174 7 S 20 E 11 Oil Well Approved PermitOP 4G-11-7-20 4304755175 7 S 20 E 11 Oil Well Approved PermitSU PURDY 10G-27-7-2i 4304739181 7 S 21 E 27 18256 Oil Well DrillingOperations SuspendedBRENNAN 1 4304715417 7 S 20 E 13 5261 Oil Well ProducingBRENNAN 3 304715419 7 S 21 E 17 5261 Oil Well ProducingBRENNAN 6 4304730109 7 S 21 E 19 5261 Oil Well ProducingLEOTA 1-34-2B 4304730879 7 S 21 E 34 5420 Oil Well ProducingBRENNAN FED 15-8 4304731272 7 S 21 E 8 8405 Oil Well ProducingBRENNAN 9 4304732477 7 S 21 i E 18 5261 Oil Well ProducingBRENNAN 10 4304732771 7 S 21 E 19 5261 Oil Well ProducingBRENNAN 14 4304732774 7 S 21 _ E_ 5261 Oil Well ProducingBRENNAN 12 4304732779 7 S 21 IE 18 5261 Oil Well ProducingWV 13W-36-7-21 4304734100 7 S 21 E N 17646 Gas Well ProducingSU PURDY 7W-34-7-21 4304734380 7 S 21 E 34 13679 Gas Well ProducingBBE 15G-16-7-21 4304735408 7 21 E 16 14070 Oil Well ProducingBBW 11G-20-7-21 4304736516 7 S_ 21 E 5261 Oil Well ProducingBBS 15G-22-7-21 4304737443 7 S 21 E 22 15688 Oil Well ProducingTU 3-35-7-21 4304738995 7 21 E 35 16512 Gas Well ProducingJB 4G-27-7-21 4304739180 7 S 21 E 27 18255 Oil Well ProducingBRENNAN 15 4304740198 7 S 20 E 13 5261 Oil Well ProducingOP 16G-12-7-20 4304740481 7 S 20 E 12 17527 Oil Well POP 4G-12-7-20 4304740482 7 S 20 E 12 17948 Oil Well ProducingJB 8G-21-7-21 04740613 7 S 21 E 17595 Oil Well ProducingOP 16G-3-7-20 4304751503 7 S 20 E 19553 Oil Well ProducingOP 7G-11-7-20 4304751504 7 S 20 E 11 19554 Oil Well ProducingJB 4G-26-7-21 4304752468 7 S 21 E 26 18755 Oil Well ProducingOP 4G-2-7-20 4304753641 7 S 20 19555 ilWell ProducingBRENNAN 8 4304731509 7 S 21 E 17 5261 Oil Well Shut-inBRENNAN 7R 4304740197 7 S |20 E 13 5261 Oil Well

Page 112: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS AND MINING

SUNDRY NOTICES AND REPORTS ON WELLS

Do not use this form for proposals to dritl nsw wells, signilicantly deepen existing wells belorv clnent bottom-hole depth, retrter plugged w6lls, ortodriil horizontat tatarals. USeAPPLICATION FOR PERMIT TO DRILL form for such ProPosals.

OILWELL E GASWELL Z OTHER X

Finley Resources lnc.

FORM 9

2

3.

5. LEASE DESIGNATION AND

See Attachment AALLOTTEE OR TRIBE MME:

See Attachment A8. WELL

See Attachment A9. API NUMBER:

See Attachment A10. FIELDANO

Brennan Boftom

COUNTY: UiNtAh

STATE:

P.O. Box 2200 FortWorth

4. LOGATIONOFWELL

FOOTAGES AT SURFACE: SCE AftAChMENt A

QTRTOrR, sEcTloN, TOVVNSHIP, MNGE, MERIDIAN: See AftaChmgnt A

TX 76113

CHECKAPPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

aTYPE OF SUBMISSION

NOTICE OF INTENT(submit in DuPli€te)

Apprcximata date work wlll start:

tr SUBSEQUENTREPORT(Submit Original Fom Only)

Oate of wqk comPletion:

! nr-ren cnsnc

n cesrHcRepetn

I crnuoeroeREvrousPLANs

fl cneuceruatrc

I cnnruoeweu-ueue

I cxeruceweLLSTATUS

l-l conaurncle pRoDUcrNG FoRMATtoNS

n convenrweuwpe

TYPE OF ACTION

n rmcrunerneer

! r.rewcorsrRucroN

I oeeneroncnar'ree

I eluceruoaartoott

l-l pr-uo eAcx

! enooucloN (sTARTiRESUME)

n nEcr-nuartoNoFwELLsrrE

l-l necouplerE - DTFFERENT FoRMATIoN

REPERFOMTE CURRENT FORMATION

SIDETRACK TO REPAIR VIELL

TEMPOMRILY ABANDON

TUBING REPAIR

VENT OR FLARE

WATER DISPOSAL

WATER SHUTOFF

orHER: Transfer of operator

trtruutrtra

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

eEp Energy Company respectfully requests that the operator be transfened to Finley Resources lnc. for all wells referenced

on Aftachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.

Finley Resources lnc. will operate the wells under Federal Bond No. RLB001 1262 or State Bond No. RLB001 1264 and will

comptywithalltheConditionsof ApprovalwithintheoriginallyapprovedApplicationsforPermittoDrill. ';{[[]Fiil,tli ,

stP 1 e ?017

L' i,lil.,it r/\1l

Vice President, Land

Brent D. Talbot PresidentNAME (PLEASE PRINT)

oor. 9-13- taSIGNATURE

(Ihb space for State use only)

ocl I 3 2ol7

DIV. UIL. GAS & iVitNtNG

(5/2000) (See lnsfudons on Reverse Side)

BY QrtahJtq fnr'rti.na'

STATEOFUTAH FORM9

DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER:

See Attachment A6. IF INDIAN,ALLOTTEEOR TRIBE NAME

SUNDRY NOTICES AND REPORTS ON WELLS7. UNITorCA AGREEMENT NAME:

Do not use thisform for proposals to drillnewwells, significantlydeepen existingwells below currentbottom-hole depth, reenterplugged wells,ort° See Attachment Adrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for such proposals.

1. TYPE OF WELL v 8. WELL NAMEand NUMBER:OIL WELL / GAS WELL / OTHER ^ See Attachment A

2. NAMEOF OPERATOR: 9. API NUMBER:

Finley Resources Inc. See Attachment A3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, OR WILDCAT:

P.O. Box 2200 ce Fort Worth STATE TX ZIP76113 (817) 231-8732 Brennan Bottom4 LOCATIONOF WELL

FOOTAGESATSURFACE: See Attachment A COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: See Attachment A STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT

(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL

Approximate date work wlli start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

CHANGETO PREVIOUSPLANS OPERATOR CHANGE TUBING REPAIR

O CHANGETUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

O CHANGE WELL STATUS PRODUCTION (STARTIRESUME) WATER SHUT-OFF

Date ofworkcompletion:COMMINGLE PRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Transfer of OperatorCONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referencedon Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.

Finley Resources Inc. willoperate the wells under Federal Bond No. RLBOO11262or State Bond No. RLBOO11264and willcomply with all the Conditions of Approval within the originally approved Applications for Permit to Drill.

SEP 19 20

Michael K. Watanabe Brent D. TalbotVice President, Land President

Brent D. Talbot PresidentSNAME(PULREEASEPRIN TITLEE

OCT13 2017Div IL GAS & MINING

(5/2000) (See Instructions on Reverse

STATEOFUTAH FORM9

DEPARTMENTOF NATURALRESOURCESDIVISIONOF OIL, GAS AND MINING 5. LEASEDESIGNATIONANDSERIALNUMBER:

See Attachment A6. IF INDIAN,ALLOTTEEOR TRIBE NAME

SUNDRY NOTICES AND REPORTS ON WELLS7. UNITorCA AGREEMENT NAME:

Do not use thisform for proposals to drillnewwells, significantlydeepen existingwells below currentbottom-hole depth, reenterplugged wells,ort° See Attachment Adrill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILLform for such proposals.

1. TYPE OF WELL v 8. WELL NAMEand NUMBER:OIL WELL / GAS WELL / OTHER ^ See Attachment A

2. NAMEOF OPERATOR: 9. API NUMBER:

Finley Resources Inc. See Attachment A3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, OR WILDCAT:

P.O. Box 2200 ce Fort Worth STATE TX ZIP76113 (817) 231-8732 Brennan Bottom4 LOCATIONOF WELL

FOOTAGESATSURFACE: See Attachment A COUNTY: Uintah

QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: See Attachment A STATE:UTAH

CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT

(Submit in Duplicate) ALTER CASING FRACTURE TREAT SIDETRACK TO REPAIR WELL

Approximate date work wlli start CASING REPAIR NEW CONSTRUCTION TEMPORARILYABANDON

CHANGETO PREVIOUSPLANS OPERATOR CHANGE TUBING REPAIR

O CHANGETUBING PLUG ANDABANDON VENT OR FLARE

SUBSEQUENT REPORT CHANGE WELL NAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

O CHANGE WELL STATUS PRODUCTION (STARTIRESUME) WATER SHUT-OFF

Date ofworkcompletion:COMMINGLE PRODUCING FORMATIONS RECLAMATIONOF WELLSITE OTHER: Transfer of OperatorCONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referencedon Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.

Finley Resources Inc. willoperate the wells under Federal Bond No. RLBOO11262or State Bond No. RLBOO11264and willcomply with all the Conditions of Approval within the originally approved Applications for Permit to Drill.

SEP 19 20

Michael K. Watanabe Brent D. TalbotVice President, Land President

Brent D. Talbot PresidentSNAME(PULREEASEPRIN TITLEE

OCT13 2017Div IL GAS & MINING

(5/2000) (See Instructions on Reverse

Page 113: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Attachment A - Well Transfer of Operator - Brennan Bottom Field09l06l20l7

Federal WellsAPI No. Well Name Lease No, Section Townshlp Range County

43-047-34380 SU PURDY 7W-34-7-21 uTU15551 34 7S ztE Uintah

43-047-39181 SU PURDY TOG.27-7-2L uru16551 21 7S 2tE Uintah

43-047-32477 BRENNAN 9 uTs1071745 18 7S ztE Uintah

43-047-32779 BRENNAN 12 UTUO45 18 7S 2IE Uintah

43-047-t5419 BRENNAN 3 uTsL056409A L7 7S zLE Uintah

43-047-L5417 BRENNAN 1 uTsL06s342 13 7S 20E Uintah

43-047-32774 BRENNAN 14 UTU046 18 7S zLE Uintah

43-047-31509 BRENNAN 8 UTSLO664O9A t7 7S 2LE Uintah

43-047-30479 LEOTA 1-34-28 uru15551 34 7S zLE Uintah

43-047-38995 TU 3-3s-7-21 (ML) uTU73681 35 7S 2tE Uintah

43-047-36516 BBW 11G-2G7-21 vru74479 20 7S zLE Uintah

43-047-39L80 JB4G-27-7-27 uTU16551 27 7S 21E Uintah

43-047-40673 JBAG-27-7-27 uTU30290 2t 7S 21E Uintah

4?-047-37272 BRENNAN FEDERAL 1',8-7.21 uTU49656 8 7S 21E Uintah

43-047-40482 oP 4G-12-7-20 uTU88140 t2 7S 20E Uintah

43-047-40L97 BRENNAN BOTTOM 7R uTs1055342 13 7S 20E Uintah

43-047-40t98 BRENNAN 15 uTs1065342 13 7S 20E Uintah

43-047-40487 oP t6G-L2-7-20 uTU88140 t2 7S 20E Uintah

43-047-37443 BBSLSG-22-7-2L uTUl4972 22 7S zrE Uintah

43-047-52468 JB 4G-26-7-21 uru73680 26 7S 2LE Uintah

43-047-51503 oP 16G-3-7-20 (GR) uTU90216 3 7S 20E Uintah

43-047-5L504 oP 7G-1t-7-20 uTU86331 LL 7S 20E Uintah

43-047-32772 BRENNAN 11 (iniection) uTs1071745 18 7S 21E Uintah

43-047-t5420 BRENNAN 5 (iniectionI uTs1071745 18 7S 21E Uintah

43-047-40L25 BRENNAN 2R uTs1071745 18 7S 20E Uintah

43-047-54382 oP 10G-1-7-20 uTU88140 1 7S 20E Uintah

43-047-54375 oP 16G-1-7-20 uTU88140 1 7S 20E Uintah

43-047-54344 oP rc-r-7-20 uTU88140 1 7S 20E Uintah

43-047-54383 oP 2G-1-7-20 uTU88140 1 7S 20E Uintah

43-047-54371 oP 4G-t-7-20 uru88140 1 7S 20E Uintah

43-047-54373 oP 6G-1-7-20 uTU88140 t 7S 20E Uintah

43-047-54625 oP 7?G-Lt-7-20 uru86331 t1 7S 20E Uintah

43-047-54386 oP 16G-11-7-20 uru86331 17 7S 20E Uintah

43-047-54372 oP 6c-tt-7-20 uTU86331 11 7S 20E Uintah

43-047-54380 oP 9G-t4-7-20 uTU86331 t4 7S 20E Uintah

43-047-55172 oP LOG-tl-7-20 uTU85331 11 7S 20E Uintah

43:047-55164 oP 12G-LL-7-20 uTU86331 TL 7S 20E Uintah

43-047-55162 oP 15G-11-7-20 uTU86331 11 7S 20E Uintah

43-047-55169 oP 2G-Lt-7-20 uru86331 11 7S 20E Uintah

43-047-55L70 oP 3G-11-7-20 uru86331 11 7S 20E Uintah

43-047-55L75 oP 4G-LL-7-20 uTU86331 11 7S 20E Uintah

43-047-55t74 oP 8G-11-7-20 uTU86331 11 7S 20E Uintah

43-047-55L63 oP 9G-11-7-20 uTU86331 tt 7S 20E Uintah

43-047-54345 oP 14G-72-7-20 uru86331 L2 7S 20E Uintah

43-047-54374 oP 73G-t-7-20 uTU88140 1 7S 20E Uintah

43-047-54349 oP 7G-72-7-20 uTU88140 t2 7S 20E Uintah

43-047-54376 oP 6G-t2-7-20 uru88140 t2 7S 20E Uintah

43-047-54381 oP 15G-3-7-20 uTU14639 3 7S 20E Uintah

43-047-54894 oP 1G-1G.7-20 uTU86331 10 7S 20E Uintah

43-047-54369 oP 2G-7G'7-20 uTU86331 10 7S 20E Uintah

43-047-s4370 oP 2G-3-7-20 uTU14639 3 7S 20E Uintah

Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017

Federal WellsAPI No. Well Name Lease No. Section Township Range County

43-047-34380 SU PURDY7W-34-7-21 UTU16551 34 7S 21E Uintah

43-047-39181 SU PURDY10G-27-7-21 UTU16551 27 7S 21E Uintah

43-047-32477 BRENNAN9 UTSLO71745 18 7S 21E Uintah

43-047-32779 BRENNAN12 UTUO46 18 75 21E Uintah

43-047-15419 BRENNAN3 UTSLO66409A 17 7S 21E Uintah

43-047-15417 BRENNAN1 UTSLO65342 13 7S 20E Uintah

43-047-32774 BRENNAN14 UTUO46 18 7S 21E Uintah43-047-31509 BRENNAN8 UTSLO66409A 17 7S 21E Uintah

43-047-30879 LEOTA1-34-2B UTU16551 34 7S 21E Uintah

43-047-38995 TU 3-35-7-21(ML) UTU73681 35 7S 21E Uintah

43-047-36516 BBW 11G-20-7-21 UTU74419 20 7S 21E Uintah

43-047-39180 JB 4G-27-7-21 UTU16551 27 7S 21E Uintah

43-047-40613 JB 8G-21-7-21 UTU30290 21 7S 21E Uintah43-047-31272 BRENNANFEDERAL15-8-7-21 UTU49656 8 7S 21E Uintah

43-047-40482 OP 4G-12-7-20 UTU88140 12 7S 20E Uintah43-047-40197 BRENNANBOTTOM 7R UTSLO65342 13 7S 20E Uintah

43-047-40198 BRENNAN15 UTSLO65342 13 7S 20E Uintah

43-047-40481 OP 16G-12-7-20 UTU88140 12 7S 20E Uintah

43-047-37443 BBS 15G-22-7-21 UTU74972 22 75 21E Uintah

43-047-52468 JB 4G-26-7-21 UTU73680 26 7S 21E Uintah43-047-51503 OP 16G-3-7-20 (GR) UTU90216 3 7S 20E Uintah43-047-51504 OP 7G-11-7-20 UTU86331 11 7S 20E Uintah43-047-32772 BRENNAN11(injection) UTSLO71745 18 7S 21E Uintah

43-047-15420 BRENNAN5 (injection) UTSLO71745 18 75 21E Uintah

43-047-40125 BRENNAN2R UTSLO71745 18 7S 20E Uintah43-047-54382 OP 10G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54375 OP 16G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54384 OP 1G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54383 OP 2G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54371 OP 4G-1-7-20 UTU88140 1 7S 20E Uintah

43-047-54373 OP 6G-1-7-20 UTU88140 1 7S 20E Uintah

43-047-54625 OP 13G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-54386 OP 16G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-54372 OP 6G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-54380 OP 9G-14-7-20 UTU86331 14 7S 20E Uintah

43-047-55172 OP 10G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55164 OP 12G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-55162 OP 15G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55169 OP 2G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55170 OP 3G-11-7-20 UTU86331 11 75 20E Uintah43-047-55175 OP 4G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55174 OP 8G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55163 OP 9G-11-7-20 UTU86331 11 7S 20E Uintah43-047-54385 OP 14G-12-7-20 UTU86331 12 75 20E Uintah43-047-54374 OP 13G-1-7-20 UTU88140 1 75 20E Uintah43-047-54389 OP 1G-12-7-20 UTU88140 12 75 20E Uintah

43-047-54376 OP 6G-12-7-20 UTU88140 12 7S 20E Uintah

43-047-54381 OP 15G-3-7-20 UTU14639 3 7S 20E Uintah

43-047-54894 OP 1G-10-7-20 UTU86331 10 7S 20E Uintah

43-047-54369 OP 2G-10-7-20 UTU86331 10 7S 20E Uintah

43-047-54370 OP 2G-3-7-20 UTU14639 3 7S 20E

Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017

Federal WellsAPI No. Well Name Lease No. Section Township Range County

43-047-34380 SU PURDY7W-34-7-21 UTU16551 34 7S 21E Uintah

43-047-39181 SU PURDY10G-27-7-21 UTU16551 27 7S 21E Uintah

43-047-32477 BRENNAN9 UTSLO71745 18 7S 21E Uintah

43-047-32779 BRENNAN12 UTUO46 18 75 21E Uintah

43-047-15419 BRENNAN3 UTSLO66409A 17 7S 21E Uintah

43-047-15417 BRENNAN1 UTSLO65342 13 7S 20E Uintah

43-047-32774 BRENNAN14 UTUO46 18 7S 21E Uintah43-047-31509 BRENNAN8 UTSLO66409A 17 7S 21E Uintah

43-047-30879 LEOTA1-34-2B UTU16551 34 7S 21E Uintah

43-047-38995 TU 3-35-7-21(ML) UTU73681 35 7S 21E Uintah

43-047-36516 BBW 11G-20-7-21 UTU74419 20 7S 21E Uintah

43-047-39180 JB 4G-27-7-21 UTU16551 27 7S 21E Uintah

43-047-40613 JB 8G-21-7-21 UTU30290 21 7S 21E Uintah43-047-31272 BRENNANFEDERAL15-8-7-21 UTU49656 8 7S 21E Uintah

43-047-40482 OP 4G-12-7-20 UTU88140 12 7S 20E Uintah43-047-40197 BRENNANBOTTOM 7R UTSLO65342 13 7S 20E Uintah

43-047-40198 BRENNAN15 UTSLO65342 13 7S 20E Uintah

43-047-40481 OP 16G-12-7-20 UTU88140 12 7S 20E Uintah

43-047-37443 BBS 15G-22-7-21 UTU74972 22 75 21E Uintah

43-047-52468 JB 4G-26-7-21 UTU73680 26 7S 21E Uintah43-047-51503 OP 16G-3-7-20 (GR) UTU90216 3 7S 20E Uintah43-047-51504 OP 7G-11-7-20 UTU86331 11 7S 20E Uintah43-047-32772 BRENNAN11(injection) UTSLO71745 18 7S 21E Uintah

43-047-15420 BRENNAN5 (injection) UTSLO71745 18 75 21E Uintah

43-047-40125 BRENNAN2R UTSLO71745 18 7S 20E Uintah43-047-54382 OP 10G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54375 OP 16G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54384 OP 1G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54383 OP 2G-1-7-20 UTU88140 1 7S 20E Uintah43-047-54371 OP 4G-1-7-20 UTU88140 1 7S 20E Uintah

43-047-54373 OP 6G-1-7-20 UTU88140 1 7S 20E Uintah

43-047-54625 OP 13G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-54386 OP 16G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-54372 OP 6G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-54380 OP 9G-14-7-20 UTU86331 14 7S 20E Uintah

43-047-55172 OP 10G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55164 OP 12G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-55162 OP 15G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55169 OP 2G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55170 OP 3G-11-7-20 UTU86331 11 75 20E Uintah43-047-55175 OP 4G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55174 OP 8G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55163 OP 9G-11-7-20 UTU86331 11 7S 20E Uintah43-047-54385 OP 14G-12-7-20 UTU86331 12 75 20E Uintah43-047-54374 OP 13G-1-7-20 UTU88140 1 75 20E Uintah43-047-54389 OP 1G-12-7-20 UTU88140 12 75 20E Uintah

43-047-54376 OP 6G-12-7-20 UTU88140 12 7S 20E Uintah

43-047-54381 OP 15G-3-7-20 UTU14639 3 7S 20E Uintah

43-047-54894 OP 1G-10-7-20 UTU86331 10 7S 20E Uintah

43-047-54369 OP 2G-10-7-20 UTU86331 10 7S 20E Uintah

43-047-54370 OP 2G-3-7-20 UTU14639 3 7S 20E

Page 114: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

43-047-54387 oP 4G-3-7-20 uru14639 3 7S 20E Uintah

43-047-54379 oP 5G-3-7-20 uTU14639 3 7S 20E Uintah

43-047-54388 oP 6G-3-7-20 uTU14639 3 7S 20E Uintah

43-047-54378 oP 7G-3-7-20 uTU14539 3 7S 20E Uintah

State and FEE WellsAPI No. Well Name Lease No. Section Townshlp Range County

43-047-5364L oP 4G-2-7-20 M149758 2 7S 20E Uintah

43-047-3277L BRENNAN 10 M[]068 L9 7S zLE Uintah

43-047-34t@ wv 13w-36-7-21 M147040 36 7S zLE Uintah

43-O47-35408 BBE 15G-1G7-21 ML46292 16 7S ztE Uintah

43-047-54912 oP 9G-2-7-20 M149758 2 7S 20E Uintah

43-047-54913 oP ttc-2-7-20 ML497s8 2 7S 20E Uintah

43-047-54917 oP t3G-2-7-20 M149758 2 7S 20E Uintah

43-047-s49ts oP LsG-2-7-20 M149758 2 7S 20E Uintah

43-047-54970 oP 16G-2-7-20 M149758 2 7S 20E Uintah

43-047-54927 oP tG-2-7-20 M149758 2 7S 20E LJintah

43-047-54914 oP 3G-2-7-20 M149758 2 7S 20E Uintah

43-047-549!L oP 5G-2-7-20 M149758 2 7S 20E Uintah

43-047-54909 oP 7G-2-7-20 M149758 2 7S 20E Uintah

43-047-30109 BRENNAN 6 FEE 19 7S zTE Uintah

43-047-54387 OP 4G-3-7-20 UTU14639 3 75 20E Uintah43-047-54379 OP 5G-3-7-20 UTU14639 3 7S 20E Uintah

43-047-54388 OP 6G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54378 OP 7G-3-7-20 UTU14639 3 7S 20E Uintah

State and FEl WellsAPI No. Well Name Lease No. Section Township Range County

43-047-53641 OP 4G-2-7-20 ML49758 2 75 20E Uintah43-047-32771 BRENNAN10 ML3068 19 7S 21E Uintah43-047-34100 WV 13W-36-7-21 ML47040 36 7S 21E Uintah

43-047-35408 BBE15G-16-7-21 ML46292 16 7S 21E Uintah43-047-54912 OP 9G-2-7-20 ML49758 2 7S 20E Uintah43-047-54913 OP 11G-2-7-20 ML49758 2 7S 20E Uintah43-047-54917 OP 13G-2-7-20 ML49758 2 7S 20E Uintah43-047-54915 OP 15G-2-7-20 ML49758 2 7S 20E Uintah43-047-54910 OP 16G-2-7-20 ML49758 2 7S 20E Uintah43-047-54927 OP 1G-2-7-20 ML49758 2 7S 20E Uintah43-047-54914 OP 3G-2-7-20 ML49758 2 7S 20E Uintah43-047-54911 OP 5G-2-7-20 ML49758 2 7S 20E Uintah43-047-54909 OP 7G-2-7-20 ML49758 2 75 20E Uintah43-047-30109 BRENNAN6 FEE 19 7S 21E

43-047-54387 OP 4G-3-7-20 UTU14639 3 75 20E Uintah43-047-54379 OP 5G-3-7-20 UTU14639 3 7S 20E Uintah

43-047-54388 OP 6G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54378 OP 7G-3-7-20 UTU14639 3 7S 20E Uintah

State and FEl WellsAPI No. Well Name Lease No. Section Township Range County

43-047-53641 OP 4G-2-7-20 ML49758 2 75 20E Uintah43-047-32771 BRENNAN10 ML3068 19 7S 21E Uintah43-047-34100 WV 13W-36-7-21 ML47040 36 7S 21E Uintah

43-047-35408 BBE15G-16-7-21 ML46292 16 7S 21E Uintah43-047-54912 OP 9G-2-7-20 ML49758 2 7S 20E Uintah43-047-54913 OP 11G-2-7-20 ML49758 2 7S 20E Uintah43-047-54917 OP 13G-2-7-20 ML49758 2 7S 20E Uintah43-047-54915 OP 15G-2-7-20 ML49758 2 7S 20E Uintah43-047-54910 OP 16G-2-7-20 ML49758 2 7S 20E Uintah43-047-54927 OP 1G-2-7-20 ML49758 2 7S 20E Uintah43-047-54914 OP 3G-2-7-20 ML49758 2 7S 20E Uintah43-047-54911 OP 5G-2-7-20 ML49758 2 7S 20E Uintah43-047-54909 OP 7G-2-7-20 ML49758 2 75 20E Uintah43-047-30109 BRENNAN6 FEE 19 7S 21E

Page 115: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

STATE OF UTAHDEPARTMENT OF NATUML RESOURCES

DIVISION OF O!1, GASAND MINING

Request to Transfer Application or Permit to Drill

Well name: BBS15G-22-7-21

API number: 4304737443

Location: Qtr-Qtr: SWSE Section: 22 Township:75 Range: 21E

Gompany that filed original appllcation: QEP Uinta Basin, lnc.

Date original permitwas issued: 12t0512005

Company that permitwas issued to: QEP Uinta Basin, lnc.

(l'his form should accompany a Sundry Notice, Form g, requesting APD transfer)

Any desired or necessary changes to either a pending or approved Application for Permit to Drillthat is being transfened,should be filed on a Sundry Notice, Form 9, or amended Application for Permit to Drill, Form 3, as appropriate, withne,cessary supportin g i nformation as requ i red.

Signature

Title

Date

Representing (company name) Finlev Resources lnc'

The person signing this form must have legal authority to represent the company or individual(s) to be listed as the new operator on the Application forPermitto Drill.

(3t20Ml

017

Transfer pending (unapproved) Application for Permit to Drill to new operator GAS &

The undersigned as ownerwith legal rights to drill on the propefi, hereby verifies that the info"nh.ation assubmitted in the pending Application for Permit to Drill, remains valid and does not require revision. The newowner of the application accepts and agrees to the information and procedures as stated in the application.

Transfer approved Application for Permit to Drill to new operator

The undersigned as orner with legal rights to drill on the property as permitted, hereby verifies that theinformation as submitted in the previously approved application to drill, remains valid and does not requirerevision.

Following is a checklist of some items related to the application, whlch should be verified.

lf located on private land, has the ownership changed?

lf so, has the surface agreement been updated?

Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or siting

Have there been any unit or other agreements put in place that could affect the permitting or operation of thisproposed well?

Have there been any changes to the access route including ownership or right-of-way, which could affect the

Has the approved source of water for drilling changed?

Have there been any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation?

ts bonding still in place, which covers this proposed well? Bond 1e. RLB0011262

STATE OF UTAHDEPARTMENT OF NATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING

Request to Transfer Application or Permit to Drill

(This form should accompanya Sundry Notice, Form 9, requestingAPD transfer)

Well name: BBS 15G-22-7-21

API number: 4304737443

Location: Qtr-Qtr:SWSE Section: 22 Township: 7S Range: 21E

Company that filed original application: QEP Uinta Basin, Inc.

Date original permit was issued: 12/05/2005

Company that permit was issued to: QEP Uinta Basin, Inc.

Transfer pending (unapproved) Application for Permit to Drill to new operator QF0\L, GASThe undersigned as ownerwith legal rightsto drillon the property, hereby verifies that the information assubmitted in the pending Application for Permit to Drill,remains valid and does not require revision. The newownerof the applicationaccepts and agrees to the information and procedures as stated in the application.

/ Transfer approved Application for Permit to Drill to new operator

The undersigned as ownerwith legal rightsto drillon the property as permitted, hereby verifies thattheinformation as submitted in the previously approved applicationto drill, remains valid and does not requirerevision.

Following is a checklist of some items related to the application, which should be verified. Yes No

If located on private land, has the ownershipchanged?

Ifso, has the surface agreement been updated?Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirementsfor this location?Have therebeen any unitor other agreements put in place thatcouldaffectthe permitting or operation of thisproposed well?Have therebeen any changes to the access route including ownershipor right-of-way, which could affecttheproposed location?

Has theapproved source ofwater for drilling changed7Have therebeen any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation?Is bonding stillin place, which covers thisproposed well? Bond No. RLBOO11262

Any desired or necessary changes to either a pending or approved Application for Permit to Drillthat is being transferred,should be filed on a Sundry Notice, Form 9, or amended Application for Permit to Drill,Form 3, as appropriate,withnecessary supporting information as required.

ame ( ease pr alb Datee Presi t

Representing (companyname) Finley Resources Inc.

The person signingthisform must have legal authorityto represent thecompanyor individual(s) tobe listed as thenew operator on theApplication forPermit toDrill.

STATE OF UTAHDEPARTMENT OF NATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING

Request to Transfer Application or Permit to Drill

(This form should accompanya Sundry Notice, Form 9, requestingAPD transfer)

Well name: BBS 15G-22-7-21

API number: 4304737443

Location: Qtr-Qtr:SWSE Section: 22 Township: 7S Range: 21E

Company that filed original application: QEP Uinta Basin, Inc.

Date original permit was issued: 12/05/2005

Company that permit was issued to: QEP Uinta Basin, Inc.

Transfer pending (unapproved) Application for Permit to Drill to new operator QF0\L, GASThe undersigned as ownerwith legal rightsto drillon the property, hereby verifies that the information assubmitted in the pending Application for Permit to Drill,remains valid and does not require revision. The newownerof the applicationaccepts and agrees to the information and procedures as stated in the application.

/ Transfer approved Application for Permit to Drill to new operator

The undersigned as ownerwith legal rightsto drillon the property as permitted, hereby verifies thattheinformation as submitted in the previously approved applicationto drill, remains valid and does not requirerevision.

Following is a checklist of some items related to the application, which should be verified. Yes No

If located on private land, has the ownershipchanged?

Ifso, has the surface agreement been updated?Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirementsfor this location?Have therebeen any unitor other agreements put in place thatcouldaffectthe permitting or operation of thisproposed well?Have therebeen any changes to the access route including ownershipor right-of-way, which could affecttheproposed location?

Has theapproved source ofwater for drilling changed7Have therebeen any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation?Is bonding stillin place, which covers thisproposed well? Bond No. RLBOO11262

Any desired or necessary changes to either a pending or approved Application for Permit to Drillthat is being transferred,should be filed on a Sundry Notice, Form 9, or amended Application for Permit to Drill,Form 3, as appropriate,withnecessary supporting information as required.

ame ( ease pr alb Datee Presi t

Representing (companyname) Finley Resources Inc.

The person signingthisform must have legal authorityto represent thecompanyor individual(s) tobe listed as thenew operator on theApplication forPermit toDrill.

Page 116: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

Ii. _ . ... Form316~S UNITED STATES FORM APPROVED

OMB No. 1004-0137 (June 201S>' DEPARTMENT OF THE INTERIOR Expires: January 31, 2018

BUREAU OF LAND MANAGEMENT s. Lease Serial No. See Attachmeat A

6. If Indian, Allottee or tribe 'Name SUNDRY NOTICES AND REPORTS ON WELL~ECEWED Do not use this form for proposals to drill or to re-e ter an 9 L \J \ ~

abandoned well. Use Form 316()-3 (APD) for such proPJ#A/i

SUBMIT IN TRlPUCATE - Other Instructions on page 2 ,...\\ C;(>..S & ~\l(1.\ltIiPOfCAfA~ Name and/or No.

I. Type of Well D\\/. V, v ,

~ Attaehmeat A

f.i]OilWeIl rnOasWell [IDOther 8. Well Name ind No. See Attachment A

2. Name of Operator 9. API Well No. Finley Resources Inc. See Attachment A 3a.Address I ~b. Phone No. (include area code) 10. Field and Pool or Exploratory Arca P.O. Box 2200, Fort Worth, TX 76113 (817) 231-8732

BreilIWI Bottom 4. Location of Well (Footage. Sec .• T..R..M.. or Survey Description) II. Country or Parish, State

See. A Uintab Conaty, UT

12. CHECK THE APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

IXINoticeofIntent o Acidize o Deepen o Production (StartlReswne) o Water Shut-Off o Alter Casing 0 Hydraulic Fracturing 0 Reclamation 0 Well Integrity

o Subsequent Report 0 Casing Repair 0 New Construction 0 Recomplete (X] Other o Change Plans 0 Plug and Abandon 0 Temporarily Abandon Transfer of

o Final Abandonment Notice 0 Convert to Injection 0 Plug Back 0 Water Disposal 0 erator

13. Describe Proposed or Completed Operation: Clearly state all pertinent details, including estimated starting date of any proposed work and approximate duration thereof. If the proposal is to deepen directionally or recomplete horizontally, give subsurface Ipcations and measured and true vertical depths of all pertinent markers and zones. Attach the Bond under which the work will be performed or provide the Bond No. on tile with BLMlBIA. Required subsequent reports must be filed within 30 days following completion of the involved operations. If the operation results in a multiple completion or recompletion in a new interval, a Form 316~ must be filed once testing has been completed. Final Abandonment Notices must be tiled only after all requirements, including reclamation, have been completed and the operator has determined that the site is ready for final inspection.)

QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referenced on Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.

Finley Resources Inc. will operate the wells under Federal Bond No. RLBOOl1262 or State Bond No. RLBOOl1264 and will comply with all Conditions of Approval within the originally approved Applications for Pennit to Drill.

g;:£DC/Q2 Michael K. Watanabe Vice President, Land

Signature

President Title

Date -\/ THE SPACE FOR FEDERAL OR STATE OFFICE USE

Acting Assistant Field Manager Tttllnds & Mineral Resources Date lEe 2 9 2017

val. if MY, are attached. Approval of this notice does not warrant or certify that plicant holds legal or equitable title to those rights in the subject lease which wou Otitle the applicant to conduct operations thereon.

Office VERNAL FIELD OFFICE

Title 18 U.S.C Section 1001 and Title 43 U.S.C Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the United States

:.:::::~"::_,,_~ro~~';fum~_m •

Form 3160-5 UNITED STATES(June 2015) DEPARTMENTOF THE INTERIOR Expires: January31,2018

BUREAU OF LAND MANAGEMENT 3.LeaseSerialNo. See Atlachment A

SUNDRYNOTICESAND REPORTS ONWELLg1 6. If indian,Attoilee or TribeNameDo not use this form for proposals to cirillor to re-enter an

abandoned welL Use Form 3160-3 (AÞD)for suchpropplSUBMITIN TRIPLICATE - Otherinstrucfons onpage 2 oÈCA/Agreement, Nameand/or No.

1.Type of Well g ,y 0 ,,,,

Oil Well Gas Well Other 8.WeliNameanttachmentA

i. Nameof Operator 9. API WellNo.Finley Resources Inc. See Attachment A3a.Address 3b.PhoneNo. (include area co ) 10.Fieldandfool orËxploratoryAreaP.O. Box 2200, Fort Worth, TX 76113 (817) 231-8732

Breanan Bottom4. I»eationof Well(Footage, Sec., T,R,M, or SwveyDescription) 11.Coimtryor Parish,State

See AttaflimentA Uintah County, UT

12. CHECK THE APPROPRIATEBOX(ES) TO INDICATENATUREOF NOTICE,REPORTOROTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

Notice of Intent Acidize Deepen Produedon(StardResume) WaterShm-Off

O anerc=ins O Hydraulic Fracturing Reclamation WeßIntegrity

Subsequent Report Casing Repair New Construction Recomplete Other

O Change Plans Plug and Abandon TemporarilyAbandon Transfer ofO FinalAbandonmentNotice Convert toInjection Plug Back WaterDisposal Operator

13. Describe Proposedor Completed Operation: Clearly state allpertinentdetails,includingestimatedstartingdateof anyproposed work andapproximatedurationthereof.Iftheproposalisto deependirectionallyor recomplete horizontally, give subsurface (peations andmeasured andtruevertical depthsof all pertinentmarkersand zones.AttachtheBond underwhich thework will be performed or provide theBond No. on filewithBLM/BIA. Required subsequent reportsmust be filed within 30 days followingcompletion of theinvolvedoperations.If theoperation results in a multiple completion or recompletion in a new interval,a Form 3160-4 must be filedonce testinghasbeencompleted. Final Abandonment Notices must be filed onlyafter all requirements, includingreclamation, havebeencompleted and theoperator hasdetermined thatthe siteis ready forfinal inspection.)

QEP Energy Company respectfully requests that the operator be transferred to Finley Resources Inc. for all wells referenced onAttachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017.

Finley Resources Inc. will operate the wells under Federal Bond No. RLB0011262 or State Bond No. RLBOOll264 and will comply withall in ly approved Application

iccee et

aanbderes d ENt:t /2/21// c

GEOLE.8.

14.I herebycertifythattheforegoingis trueand correct.Brent D. Talbot President

Signature Date

THE SPACE FOR FEDERALOR STATEOFFICE USEApproved

ActingAssistantFieldManageraq TMands&MineralResourceS Date

C of val, if any,are attached.Approvalof thisnotice does not warrant orcertify that plicant holdslegal or equitabletitleto thoserights in the subject lease Omce VERNALRELD0FRCEwhich wou atitletheapplicant toconduct operationsthereon.

Title18 U.S.C Section 1001and Title43 0.8.0 Šection1212,make it a crime for any personknowingly and willfully to make to any departmènioragencyof theUnited Statesanyfalse,fictitiousor fraudulentstatementsor representations astoanymatterwithin itsjurisdiction.

(Instructions onpage

Page 117: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

• .I ... .• "'t

Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017

Federal Wells API No. Well Name Lease No. Section Township Range County

43-047-34380 5U PURDY 7W-34-7-21 UTU16551 34 75 21E Uintah

43-047-39181 5U PURDY 10G-27-7-21 UTU16551 27 75 21E Uintah

43-047-32477 BRENNAN 9 UT5L071745 18 75 21E Uintah

43-047-32779 BRENNAN 12 UTU046 18 75 21E Uintah

43-047-15419 BRENNAN 3 UT5L066409A 17 75 21E Uintah

43-047-15417 BRENNAN 1 UT5L065342 13 75 20E Uintah

43-047-32774 BRENNAN 14 UTU046 18 75 21E Uintah

43-047-31509 BRENNAN 8 UT5L066409A 17 75 21E Uintah

43-047-30879 LEOTA 1-34-2B UTU16551 34 75 21E Uintah

43-047-38995 TU 3-35-7-21 (ML) UTU73681 35 75 21E Uintah

43-047-36516 BBW 11G-20-7-21 UTU74419 20 75 21E Uintah

43-047-39180 JB 4G-27-7-21 UTU16551 27 75 21E Uintah

43-047-40613 JB 8G-21-7-21 UTU30290 21 75 21E Uintah

43-047-31272 BRENNAN FEDERAL 15-8-7-21 UTU49656 8 75 21E Uintah

43-047-40482 OP 4G-12-7-20 UTU88140 12 75 20E Uintah

43-047-40197 BRENNAN BOTTOM 7R UT5L065342 13 75 20E Uintah

43-047-40198 BRENNAN 15 UT5L065342 13 75 20E Uintah

43-047-40481 OP 16G-12-7-20 UTU88140 12 75 20E Uintah

43-047-37443 BBS 15G-22-7-21 UTU74972 22 75 21E Uintah

43-047-5246.8 JB 4G-26-7-21 UTU73680 26 75 21E Uintah

43-047-51503 OP 16G-3-7-20 (GR) UTU90216 3 75 20E Uintah

43-047-51504 OP 7G-11-7-20 UTU86331 11 75 20E Uintah

43-047-32772 BRENNAN 11 (injection) UTSL071745 18 75 21E Uintah

43-047-15420 BRENNAN 5 (injection) UT5L071745 18 75 21E Uintah

43-.047-40125 BRENNAN 2R UT5L071745 18 75 20E Uintah

43-047-54382 OP 10G-1-7-20 UTU88140 1 75 20E Uintah

43-047-54375 OP 16G-1-7-20 UTU88140 1 75 20E Uintah

43-047-54384 OP 1G-1-7-20 UTU88140 1 75 20E Uintah

43-047-54383 OP 2G-1-7-20 UTU88140 1 75 20E Uintah

43-047-54371 OP 4G-1-7-20 UTU88140 1 75 20E Uintah

. 43-047-54373 OP 6G-1-7-20 UTU88140 1 75 20E Uintah

43-047-54625 OP 13G-11-7-20 UTU86331 11 75 20E Uintah

43-047-54386 OP 16G-11-7-20 UTU86331 11 75 20E Uintah

43-047-54372 OP 6G-11-7-20 UTU86331 11 75 20E Uintah

43-047-54380 OP 9G-14-7-20 UTU86331 14 75 20E Uintah

43-047-55172 OP 10G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55164 OP 12G-11-7-20 UTU86331 11 75 20E Uintah

.·43-047-55162 OP 15G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55169 OP 2G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55170 OP 3G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55175 OP 4G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55174 OP 8G-11-7-20 UTU86331 11 75 20E Uintah

43-047-55163 OP 9G-11-7-20 UTU86331 11 75 20E Uintah

43-047-54385 OP 14G-12-7-20 UTU86331 12 75 20E Uintah

43-047-54374 OP 13G-1-7-20 UTU88140 1 75 20E Uintah

43-047-54389 OP 1G-12-7-20 UTU88140 12 75 20E Uintah

43-047-54376 OP 6G-12c7-20 UTU88140 12 75 20E Uintah

43-047-54381 OP 15G-3-7-20 UTU14639 3 75 20E Uintah

43-047-54894 OP 1G-10-7-20 UTU86331 10 75 20E Uintah

43-047-54369 OP 2G-10-7-20 UTU86331 10 75 20E Uintah

43-047-54370 OP 2G-3-7-20 UTU14639 3 75 20E Uintah

Attachment A - Well Transfer of Operator - Brennan Bottom Field 09/06/2017

Federal WellsAPI No. Well Name Lease No. Section Township Range County

43-047-34380 SUPURDY7W-34-7-21 UTU16551 34 7S 21E Uintah43-047-39181 SU PURDY10G-27-7-21 UTU16551 27 7S 21E Uintah

43-047-32477 BRENNAN9 UTSLO71745 18 7S 21E Uintah

43-047-32779 BRENNAN12 UTUO46 18 7S 21E Uintah43-047-15419 BRENNAN3 UTSLO66409A 17 7S 21E Uintah43-047-15417 BRENNAN 1 UTSLO65342 13 7S 20E Uintah43-047-32774 BRENNAN14 UTUO46 18 7S 21E Uintah43-047-31509 BRENNAN8 UTSLO66409A 17 7S 21E Uintah

43-047-30879 LEOTA1-34-28 UTU16551 34 7S 21E Uintah43-047-38995 TU 3-35-7-21 (ML) UTU73681 35 75 21E Uintah43-047-36516 BBW 11G-20-7-21 UTU74419 20 75 21E Uintah43-047-39180 JB 4G-27-7-21 UTU16551 27 75 21E Uintah43-047-40613 JB 8G-21-7-21 UTU30290 21 7S 21E Uintah43-047-31272 BRENNANFEDERAL15-8-7-21 UTU49656 8 7S 21E Uintah43-047-40482 OP 4G-12-7-20 UTU88140 12 7S 20E Uintah43-047-40197 BRENNANBOTTOM 7R UTSLO65342 13 7S 20E Uintah

43-047-40198 BRENNAN15 UTSLO65342 13 7S 20E Uintah43-047-40481 OP 16G-12-7-20 UTU88140 12 7S 20E Uintah43-Q47-37443 BBSi5G-22-7-21 UTU74972 22 7S 21E Uintah43-047-52468 JB 4G-26-7-21 UTU73680 26 7S 21E Uintah43-047-51503 OP 16G-3-7-20(GR) UTU90216 3 75 20E Uintah43-047-51504 OP7G-11-7-20 UTU86331 11 7S 20E Uintah43-047-32772 BRENNAN11(injection) UTSLO71745 18 7S 21E Uintah43-047-15420 BRENNAN5 (InJection) UTSLO71745 18 7S 21E Uintah

43-047-40125 BRENNAN2R UTSLO71745 18 7S 20E Dintah43-047-54382 OP 10G-1-7-20 UTU88140 1 7S 20E Uintah43-047 54375 OP 16G-1-7720 UTU88140 1 7S 20E Uintah43-047-54384 OP 1G-1-7-20 UTU88140 1 75 20E Uintah43-047-54383 OP 2G-1-7-20 UTU88140 1 75 20E Uintàh43-047-54371 OP 4G-1-7-20 UTU88140 1 7S 20E Uintah

43 047-54373 OP 6G-1-7-20 UTU88140 1 7S 20E Uintah

43 047-54625 OP 13G-i1-7-20 UTU86331 11 7S 20E Uintah43-047-54386 OP 16G 11-7-20 UTUS6331 11 7S 20E Uintah43-047-54372 OP 6G-11-7-20 UTU86331 11 7S 20E Uintah43-047-54380 OP 90-14-7-20 UTU86331 14 7S 20E Uintah43-047-55172 OP 10G-11-7-20 UTU86331 11 75 20E Uintah43-047-55164

. OP 12G-11-7-20 UTUS6331 11 7S 20E Uintab43-047-55162 OP 15G-11-7-20 UTUS6331 11 7S 20E Uintah

43-047-55169 OP 2G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55170 OP3G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55175 OP 4G-11-7-20 UTU86331 11 7S 20E Uintah

43-047-55174 OP 8G-11-7-20 UTU86331 11 7S 20E Uintah43-047-55163 OP 9G-11-7 20 UTUS6331 11 7S 20E Uintah43-047-54385 OP 14G-12-7-20 UTU86331 12 7S 20E Uintah43-047-54374 OP13G-1-7-20 UTU88140 1 7S 20E Uintah

4 047:54389 OP 1G-12-7 20 UTU88140 12 7S 20E Uintah43-047-54376 OP 6G-12-7-20 UTU88140 12 7S 20E Uintah43-047-54381 OP 15G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54894 OP 1G-10-7-20 UTU86331 10 7S 20E Uintah43447-54369 OP 2G-10-7-20 UTU86331 10 7S 20E Uintah43-047-54370 OP 2G-3-7,20 UTU14639 3 7S 20E

Page 118: 3160-3 UNITED STATES - Utah · United States anyfalse, fictitious or fraudulent statements or representations as to mater within its jurisdiction RECEIVED Federal Approval of thla

43-047-54387 OP 4G-3-7-20 UTU14639 3 75 20E Uintah

43-047-54379 OP 5G-3-7-20 UTU14639 3 75 20E Uintah

43-047-54388 OP 6G-3-7-20 UTU14639 3 75 20E Uintah

43-047-54378 OP 7G-3-7-20 UTU14639 3 75 20E Uintah

St ate an d FEE W II 'th' th 0 e SWI ill e uray P kF d IU't ar e era DI

API No. Well Name Lease No. Section Township Range County

43-047-53641 OP 4G-2-7-20 ML49758 2 75 20E Uintah

43-047-32771 BRENNAN 10 ML3068 19 75 21E Uintah

43-047-34100 WV 13W-36-7-21 ML47040 36 75 21E Uintah

43-047-35408 BBE 15G-16-7-21 ML46292 16 75 21E Uintah

43-047-54912 OP 9G-2-7-20 ML49758 2 75 20E Uintah

43-047-54913 OP 11G-2-7-20 ML49758 2 75 20E Uintah

43-047-54917 OP 13G-2-7-20 ML49758 2 75 20E Uintah

43-047-54915 OP 15G-2-7-20 ML49758 2 75 20E Uintah

43-047-54910 OP 16G-2-7-20 ML49758 2 75 20E Uintah

43-047-54927 OP 1G-2-7-20 ML49758 2 75 20E Uintah

43-047-54914 OP 3G-2-7-20 ML49758 2 75 20E Uintah

43-047-54911 OP 5G-2-7-20 ML49758 2 75 20E Uintah

43-047-54909 OP 7G-2-7-20 ML49758 2 75 20E Uintah

43-047-30109 BRENNAN 6 FEE 19 75 21E Uintah

43-047-54387 OP 4G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54379 OP 5G-3-7-20 UTU14639 3 7S 20E Uintah43-047-54388 OP 6G-3-7-20 UTU14639 3 7S 20E Ulntah43-047-54378 OP 7G-3-7-20 UTU14639 3 7S 20E Uintah

State and FEL Wells within the Ouray l'ark Federal UnitAPI No. Well Name Lease No. Section Township Range County

43-047-53641 OP 4G-2-7-20 ML49758 2 7S 20E Uintah43-047-32771 BRENNAN 10 ML3068 19 7S 21E Uintah43-047-34100 WV 13W-36-7-21 ML47040 36 7S 21E Uintah

43-047-35408 BBE15G-16,7-21 ML46292 16 75 21E Uintah43-047-54912 OP9G-2-7-20 ML49758 2 7S 20E Uintah43-047-54913 OP 11G-2-7-20 ML49758 2 7S 20E Uintah43-047-54917 OP 13G-2-7-20 ML49758 2 7S 20E Uintah43-047-54915 OP 15G-2-7-20 ML49758 2 7S 20E Uintah43-047-54910 OP 16G-2-7-20 ML49758 2 7S 20E Uintah43-047-54927 OP 1G-2-7-20 ML49758 2 7S 20E Uintah43-047-54914 OP 3G-2-7-20 ML49758 2 7S 20E Uintah43-047-54911 OP 5G-2-7-20 ML49758 2 7S 20E Uintah43-047-54909 OP 7G-2-7-20 ML49758 2 7S 20E Uintah43-047-30109 BRENNAN6 FEE 19 7S 21E