INFUSING GREATER EFFICIENCY IN THE
PROCUREMENT PROCESS AND
STRENGTHENING DEFENCE MANUFACTURING
BASE IN THE COUNTRY.
8/11/2019 (310842542) Col. Dipendra Rawat
4/28
EXPEDITIOUS PROCUREMENT FOR ARMED
FORCES TO MAINTAIN OPERATIONAL
READINESS
8/11/2019 (310842542) Col. Dipendra Rawat
5/28
playing processingPROCUREMENTS
Indigenizatio
n
Level SPEEDY Reduced
field timelines
Simplification
of procedures
Clearly structured Appx F (Payment terms recast as
Commercial clauses) and Appx G (Commercial offer recast as
Evaluation Criteria of Price Bid Format).
RFP format for shipbuilding included.
8/11/2019 (310842542) Col. Dipendra Rawat
6/28
8/11/2019 (310842542) Col. Dipendra Rawat
7/28
CHAPTERI :BUYAND BUY& MAKECATEGORIES
Preferred order of categorisation (P 20a).
Inclusion of addit ional inform ation in SoC submitted to
DAC/DPB (P 20b).
SQR & AoN Validity (P 17, P 20).
Indian entities for MToT (P 28).
Ind igenous content 30% for Buy (Indian) and 50% for Buy &
Make (Indian)categories has been defined clearly. (4a, 4c).
A method for assessment of indigenous content, based on
self certification by vendors, has been given at Appendix F
to Chapter I (P 7). 8
8/11/2019 (310842542) Col. Dipendra Rawat
8/28
Indigenization
Indigenous content requirement will now extend all
the way to lowest t ier of sub vendor. (P4 Appx F, Ch I).
Provision for audit by MoD/MoD nominated agency
has been made, if found necessary (P5 Appx F, Ch I).
Penalt ies for not achieving stipulated indigenouscontent levels at each stage with a scope to make up for
the deficiency at a later stage (P 8,10,11,12).
9
8/11/2019 (310842542) Col. Dipendra Rawat
9/28
CHAPTERII : MAKE CATEGORY
Proposed advance planning and consultation (Para 10(a)).
CHAPTER III : SHIP BUILDING PROCEDURE
Base and depot spares cost in offsets.
Provision of modification cost up to 4% of basic cost of
vessel permitted in competitive bidding (Addition of Para59(k) to Chapter III).
Provisions for procurement of OBS and B&D spares defined
(OBS-MRLS with sufficiency clause, and B&D15% of the
Basic cost of the vessel).
Model RFP format of Shipbuilding included.
Applicability of Offset obligations in shipbuilding cases.
Contract cost defined in Model RFP.
10
8/11/2019 (310842542) Col. Dipendra Rawat
10/28
8/11/2019 (310842542) Col. Dipendra Rawat
11/28
Preferred categorisationin the following order :
Buy (Indian)
Buy & Make(Indian)
Make(Indian) Buy &
Make Buy(Global)
While seeking AoN, necessary to give justification for notconsidering other higher preference categories.
8/11/2019 (310842542) Col. Dipendra Rawat
12/28
Min 30% indigenous content on cost basis.
Overall indigenous content at least 30% of the total contract
value. Min 30% indigenous content also required in :
Basic cost of equipment.
Cost of MRLS.
Cost of SMT and STE taken together ;
Provided min 30% indigenous content is ensured in Basic
cost of equipment at all stages of contract, including the FET
stage.
8/11/2019 (310842542) Col. Dipendra Rawat
13/28
Purchase from an Indian vendor (including JV /production
arrangement with OEM).
Min 50% indigenous content on cost basis. Implies indigenous
content in the total of
Basic cost of equipment,
Cost of MRLS,
Cost of SMT and STE.
Must be at least 50% of the total contract value.
Min 30% indigenous Indian content in the first basic equipment
made/assembled in India and in subsequent deliveries thereof.
8/11/2019 (310842542) Col. Dipendra Rawat
14/28
Would include high technology complex systems or
critical components/equipment for any weapon
system to be designed, developed and produced
indigenously.
A minimum 30% indigenous content on cost basis
shall be required in such cases in the successful
prototype.
8/11/2019 (310842542) Col. Dipendra Rawat
15/28
8/11/2019 (310842542) Col. Dipendra Rawat
16/28
Finalization of SQRs before seeking AoN (Para
17Chapter 1).
Reducing validity of AoN from 2 years to one year exceptBuy and Make (Indian).
Request for extension of the bid submission date - at least
two weeks prior to the bid submission date with adequatejustification (Para 33).
8/11/2019 (310842542) Col. Dipendra Rawat
17/28
Enhanced delegation of financial powers
Financial powers of DPB for according AON enhanced
from Rs 100 crores to Rs 300 crores.
DAC has tripled financial powers of SHQs from current
Rs 50 crores to Rs 150 crores.
8/11/2019 (310842542) Col. Dipendra Rawat
18/28
Indigenous content has been clarified.
Doing away with requirement of short-listing vendors through
the PAC- Buy and Make (Indian) procedure simplified.
Instead of PAC, after accord of AoN, SHQ, shall hold
consultations along with DDP and DRDO Reps with the 1st
stage short-listed vendors. These consultations may relate to
PSQRs, delivery timelines and technology absorption aspects.
(Para 25a).
Simplification of the Make procedure is underway and isexpected to be completed in few months. FTP is also being
revised.
8/11/2019 (310842542) Col. Dipendra Rawat
19/28
Payment Terms and Commercial Offer
Appendix F and G to the RFP have been modified as :
Commercial Clauses- updated and rationalised to create a
level playing field.
Evaluation Criteria of Price Bid Format- made more
elaborate to reduce subjectivity.
8/11/2019 (310842542) Col. Dipendra Rawat
20/28
MToT hitherto reserved for OFB and DPSUs through the
nomination process.
Provision of ToT to Indian Public/Private entity, for providingMaintenance Infrastructure, would be applicable for BUY
(Global).
Decision would be debated in SCAPCHC and approved by
DAC.
8/11/2019 (310842542) Col. Dipendra Rawat
21/28
To utilize the expertise gained by the industry in the lastdecade in defence sector.
Industry to get meshed in the supply chain for sourcing by
major Global defence OEMs.
To progressively reach a stage where the industry could, on
its own and through its own R&D efforts, start manufacturing
the defence equipment required by the armed forces.
Finally, the Indian industry must aim at acquiring thecapability to develop futuristic technologies. That will be the
real coming of age for the Indian industry.
8/11/2019 (310842542) Col. Dipendra Rawat
22/28
Offsets and multipliers for MSMEs.
Preferred Order of Categorization Major industries may
form JV for indigenous production. Opportunity for
participation as IOPs, provision of components, spares and
SMTs/STEs. Indigenous Content extended to lowest tier of sub
vendors. Opportunity for vendors making components to
compete against cheaper foreign components.
Percentage Indigenization includes MRLS andSMTs/STEs.
Ultimately, Industry to provide bulk of defence requirements
as also get meshed in the global supply chain.
8/11/2019 (310842542) Col. Dipendra Rawat
23/28
8/11/2019 (310842542) Col. Dipendra Rawat
24/28
Indigenous content in Buy & Make(Indian) -50% .
Rationalization of Taxes and Duties.
Difficult to hold price for long duration infinalization of cases .
Calculation of Discounted Cash Flow (DCF) to
select L1.
Chapter III: Shipbuilding - totally aligned to
Govt Shipyards and does not recognize
shipyards in private sector.
8/11/2019 (310842542) Col. Dipendra Rawat
25/28
Buy Global as a categorization be abolished. In
extreme cases FTP may be employed for
procurement.
Indigenization only 30% in Buy & Make (Indian)
cases. ERV has to be extended for all categories of
current and ongoing procurements/ contracts.
Progressive Milestone Payments through Letterof Credit.
Changes in Payment terms wrt excise & taxes.
Issue of public version of LTIPP.
8/11/2019 (310842542) Col. Dipendra Rawat
26/28
TECHNOLOGYPARTNERSFORTECHNOLOGIES REQUIRED
TO CASE BASIS FOR CRITICALINDUSTRY
ENABLE INDUSTRY TO SEEKPROMOTE INDUCTION OF KEY
FUTURE PROGRAMS
Public Version of
LTIPP
INVESTMENT PLANNING BY JV FORMATION (FDI ON CASE
TECH)
8/11/2019 (310842542) Col. Dipendra Rawat
27/28
THOSE WHO ARE NOT HAPPY WITH DPP-2013 MAY READ
AND COMPARE WITH DPP-2002.
THE INDIAN INDUSTRY HAS AN OPPORTUNITY. GRAB IT.
8/11/2019 (310842542) Col. Dipendra Rawat
28/28
We hope that the defence industry as well as the
procurement agencies will find DPP-2013 to be a
progressive step aimed at giving impetus to indigenisation,
creating level playing field between private and public sector
and expediting the procurement process as a whole. We willcontinue in our endeavour to refine and improve the
procedure and welcome and suggestions for improvement.
- HONBLE RM SHRI AK ANTONY