Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
PC 903 Catalog No. 533-089 Printed in U.S.A. Form 30GTN-8SI Pg 1 704 4-99 Replaces: NewBook 2
Tab 5c
Installation Instructions
Accessory Compressor Protection Control SystemPart No. 30GB900131
50 and 60 Hz
GENERAL
Check Package Contents (Table 1) for shippingdamage. If damage is found or any part(s) is missing, file aclaim with the shipper immediately.
Table 1 Package Contents
LEGEND
CPCS Compressor Protection Control System
INSTALLATION
Units without Current Sensing Board1. Cut off all quick-connect terminals from wires connected
to compressor control relays, being careful not to cut offwire markers.
2. Remove and discard the 2 control relays (see Fig. 1).
3. Using screws provided, position the 2 compressor protec-tion control system (CPCS) boards (see Fig. 2) over thepredrilled holes in the area where the control relays wereremoved.
4. Strip back1/2 in. the wires cut in Step 1. Crimp the 1/4-inquick-connects provided to the wires.
5. Route the compressor power wires through the toroids asshown in Fig. 3, and connect toroids to terminals 23 and24 on the appropriate compressor protection boards.
6. Reconnect the compressor power wires to the circuibreakers and connect the wires to the CPCS boards. SeeFig. 4 for equivalent CPCS connections to the former CR(control relay) connections. Be sure to connect the appro-priate toroid for the proper compressor.
7. Restore power to the unit.
ITEM DESCRIPTION QTY PART NO.
1 CPCS Assembly 2 HN65KZ0272 Toroid 2 HT08DZ0253 Sheet Metal Screw; 4 AL56AU128
4No. 6B-20 x 3/4-in. long1/4-in. Quick-Connect
20 HY69DS057
ELECTRIC SHOCK HAZARD
To avoid the possibility of electrical shock,open all disconnects before installing orservicing this equipment.
30GTN,GTR,GUN,GUR040-070Compressor Protection Control System
(CPCS)50/60 Hz
Fig. 2 Compressor Protection Control System (CPCS)
CPCS-A1070 50HZ
ONLY
CPCS-B1070 50HZ
ONLY
CR-A1 CR-B1
LEGEND
Fig. 1 CPCS Installation
CPCS Compressor Protection Control SystemCR Control Relay
8/3/2019 30gtn-8si
2/42
LEGEND
CB Circuit Breaker NC Normally ClosedCOM Common NO Normally OpenCPCS Compressor Protection SN Toroid
Control System TB Terminal Block
NOTE: Power wires from terminal block TB1 to circuit breakersCB-A1 and CB-B1 must be routed through the appropriate toroids.CPCS-A1 is for compressor no. A1; CPCS-B1 is for compressorno. B1.
Fig. 3 Compressor Power Routing
8/3/2019 30gtn-8si
3/43
12
11
10
9
8
7
6
5
4
3
2
11
2
3
4
5
6
7
8
9
10
11
12
J9
MAIN BASE
BOARD
PNK
CPCS-A2
VIO
GRA
RED
S2 S1
S2 S1
CPCS-B1
3 1
S2 S1
3 1
CR-B1CPCS-A1
CR-A1
070 50HZONLY
RED
RED
3 S1 S2
R1 C
23 24
TOROID
COM NC
NO
8
9
7
C1 C2
(FAULT CURRENT)
STANDARD: 040-060 50HZ
040-070 60HZ
040-070 60HZ
CR CPCS
1
STANDARD: 070 50HZACCESSORY: 040-060 50HZ
LOGIC
A1/B1
CR
040-070 60HZ
LEGEND
COM Common
CPCS Compressor Protection Control SystemCR Control RelayNC Normally ClosedNO Normally Open
CPCS CONTROL WIRING
Fig. 4 Equivalent Connections Control Relay and Compressor Protection Board Module(Units without Current Sensing Board)
CPCS CONTROL CONNECTIONS
CPCS FEEDBACK CONNECTIONS
8/3/2019 30gtn-8si
4/4
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
PC 903 Catalog No. 533-089 Printed in U.S.A. Form 30GTN-8SI Pg 4 704 4-99 Replaces: NewBook 2
Tab 5c
Copyright 1999 Carrier Corporation
Units With Current Sensing Board
NOTE: Units with starting serial number 0204F were pro-duced with factory-installed current sensing board.
1. Cut off all quick-connect terminals from wires connectedto compressor control relays, being careful not to cut offwire markers.
2. Remove and discard the 2 control relays (see Fig. 1).
3. Using screws provided, position the 2 compressor protec-tion control system (CPCS) boards (see Fig. 2) over thepredrilled holes in the area where the control relays were
removed.4. Strip back1/2-in. the wires cut in Step 1. Crimp the 1/4-in.
quick-connects provided to the wires. Four extra quickconnects will remain.
5. Route the compressor power wires through the toroids asshown in Fig. 3, and connect toroids to terminals 23 and24 on the appropriate compressor protection boards.
6. Reconnect the compressor wires to the circuit breakersand connect wires to the CPCS boards. See Fig. 5 forequivalent connections to the former CR (control relay)connections. Be sure to connect the appropriate toroid forthe proper compressor. The feedback portion of theCPCS must not be connected to the main base board J9terminal strip because the current sensing board providesthe feedback.
7. Restore power to the unit.
TESTINGTo check the compressor protection boards for proper oper-
ation, during Test mode check COMP, CCA1, and CCB1 asdescribed in the Controls and Troubleshooting Guide.
R1 C
23 24
TOROID
COM NC
NO
8
9
7
C1 C2
(FAULT CURRENT)
STANDARD: 040-060 50HZ
040-070 60HZ
040-070 60HZ
STANDARD: 070 50HZACCESSORY: 040-060 50HZ
LOGIC
A1/B1
CR
CR CPCS
040-070 60HZ
LEGEND
COM CommonCPCS Compressor Protection Control SystemCR Control RelayNC Normally ClosedNO Normally Open
CPCS CONTROL WIRING
Fig. 5 Equivalent Connections Control Relay and Compressor Protection Board Module(Units with Current Sensing Board)
CPCS CONTROL CONNECTIONS