ANNEX 7
COMMERCIALLY SENSITIVE INFORMATION
This table should be used to record the sections of the bid which containcommercially sensitive information.
CPA Number : CPA13
CPA Name (Please state in full) : Wales
Question
number
Commercially Sensitive Information
4.1 The whole (all parts) of Annex 1 (process map showing theproposed end to end customer journey(s)).
The following parts of the answer:
“Customer needs - Our planning assumptions (avg life of contract) for referrals across the customer groups are: JSA25+, 39% of caseload; JSA 18-24, 16%; JSA EA, 7%; JSA ex-IB, 4%; ESA Flow, 11%; ESA ex-IB, 11%; and ESA VOL,11%.”
“Our assumptions by customer group are as follows:
Customer Group
JSA25+
JSA18-24
JSAEarly
JSAEx-IB
ESAVol
ESAFlow
ESAEx-IB
Job Ready 40% 40% 20% 30% 35% 20% 8%
ModerateBarriers
40% 40% 54% 47% 44% 54% 62%
SignificantBarriers
20% 20% 26% 23% 21% 26% 30%
4.1(a) The following parts of the answer:
“These principles have been thoroughly tested in our ModelOffice during 2010 where we have realised a productivityincrease of 16% and a performance uplift of 40% from thestarting baseline.”
5.1 The whole of Annex 2 (supply chain structure) and all Annex 3s(sub-contractor declarations).
The following parts of the answer:
“Our End to End supply chain will operate as follows:• WL Tier 2 delivering 78.6% of customer flows within North
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 2/11
Wales (Conwy, Denbighshire, Wrexham, Flintshire); SouthWest Wales (Ceredigion, Swansea, Carmarthenshire,Bridgend, Rhondda Cynon Taff); South East Wales (Vale of Glamorgan, Cardiff, Newport).
• Five Tier 2 partners: Neath Port Talbot CBC (delivering
5.2% across NPT); Pembrokeshire College (delivering 3.2%across Pembs); Torfaen Training (delivering 5.2% acrossTorfaen and Monmouthshire); Powys Training (delivering 2.5% across Powys); Agoriad (delivering 5.3% acrossGwynedd and Anglesey).”
“ Each is currently delivering an employability programme intheir area and deeply understand local needs, eg, Agoriad is awell established third sector organisation with ambition toexpand. We will provide the opportunity and support for themto do so.”
“At Tier 3 level, we have developed an extensive Support Catalogue of call-off provision including UK wide third sector providers eg, Gingerbread and CAB.”
“Capacity Build- organisations that bring employability expertise and deep local insight, but will require a full range of delivery and infrastructure support and cash flow investment:Torfaen Training, Powys Training, Pembrokeshire College, Agoriad, Neath Port Talbot CBC.”
“To help our 3 new suppliers mature, we will provide them andour more established delivery partners, (Neath Port TalbotCBC and voluntary organisation Agoriad), with support throughaccess to technology, products, services, training and directmanagement support through our Partnership Managementcapability.”
5.2 The whole of Annex 4 (organisation chart).
The following parts of the answer:
“NPT Ops Manager , Gavin Hughes has over 10 yearsexperience of contract management and delivery of employability programmes; Pembrokeshire College OpsManager Janet Davies has 17 years experience in community based adult learning;”
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 3/11
5.4 The following parts of the answer:
“K EY DELIVERY LOCATIONS FOR W ALES
Region Delivery Locations
NORTH WALES
Anglesey
Gwynedd
Agoriad Cyf [Existing Premises]
Town Hall, Holyhead LL65 1HN
Ground Floor, Swyddfeydd NFU,Dolgellau LL40 1DH
42 High Street, Pwllheli, LL53 5RT
Porth Penrhyn, Bangor , LL57 4HN
NORTH WALES
Conwy
Denbighshire
Flintshire
Wrexham
Working Links [Target locations; premises being sourced]
Conwy – Colwyn Bay, LL29 7AU
Denbighshire – Rhyl, LL18 1UU
Flintshire – Mold, CH7 1LH
Wrexham – Wrexham, LL11 4HN
MIDWALES
Powys
Powys Training [Existing Premises]
The Library, Ship Street, Brecon, LD39AE
Tudor Lane, Llandrindod Wells, LD15UL
St Davids House, New Road, Newtown,SY161RB
Canolfan Hyddgen, Bank Street,
Machynlleth, SY20 8DR Ty Derwen Road, Ystradgynlais, SA91HL
Union Street, Welshpool , SY21 7PG
Torfaen Training [Existing Premises]
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 4/11
S WALES VALLEYS
Torfaen
Monmouthshire
Springvale Ind Est, Cwmbran, NP445BA
Trosnant Street, Pontypool , NP4 8AT
Ivor Street, Blaenavon, NP4 9NA
Blenheim Road, St Dials, Cwmbran,NP44 4SY
The Highway , Croesyceiliog, NP442HF
The Life Station, Folly Road , Trevethin,NP4 8JD
Shire Hall Agincourt Square,Monmouth NP25 3DY
One Stop Shop, Market Hall, Priory Street, Monmouth NP25 3XA
Caldicot One stop shop Woodstock
Way, Caldicot NP26 4XBOne Stop Shop, Cross Street, Abergavenny NP7 5HD
One Stop Shop Manor Way Chepstow NP16 5HZ
S EAST WALES
Cardiff
Newport
Working Links [Target locations; premises being sourced]
Cardiff – Cardiff, CF10 2GS
Newport – Newport, NP20 1JR
Day Centre, 43 The Precinct,Bettws,NP20 7TN(Flex outreach)
Vale of Glamorgan
Working Links [OutreachCommunity Centres]
Barry – CF63 4HA
S WALES VALLEYS
BlaenauGwent
Caerphilly
Merthyr Tydfil
Working Links [Existing Premises]
Crown Buildings, Civic Centre, Ebbw Vale, NP23 6XG
Crown Building, Portland Street, Abertillery , NP13 1YF
1-2 Commercial Street, Tredegar ,NP22 3DH
Ty Cennydd, Castle Street,Caerphilly , CF83 1 NZ Grays Gardens, Graig-y-Rhacca,Caerphilly CF83 8TQ (flexibleoutreach)
Park Villas, Park Road, Bargoed ,CF81 8SP
Glebeland Street, Merthyr Tydfil ,CE47 8AT
S WEST WALES
Working Links [Target locations; premises being sourced]
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 5/11
RCT
Bridgend
Carmarthenshire
Ceredigion
Swansea
Pennant House, St Catherine’s Corner Pontypridd CF37 2TB
Treorchy CF42 6TE
Maesteg CF34 9DF
Bridgend CF33 6BH
Aberdare CF44 7HU
Working Links [Existing Premises]
54 Stepney Street, Llanelli , SA15 3TG
10 Penuel Street, Carmarthen, SA311NH
7 Hall Street, Ammanford , SA18 3BW
16 Eastgate, Aberystwyth, SY23 2AR
36, The Pendre, Cardigan, SA43 1JS
Alexandra House, Alexandra Road,Swansea, SA1 5ED
S WEST WALES
Neath Port Talbot
Neath Port Talbot CBC [Existing Premises]
Unit A, Milland Road Ind Est NeathSA11 1NJ
Margam Road, Taibach, SA13 2BN
1 High Street, Pontardawe, SA8 4HU
Pembrokeshire
Pembrokeshire College [Existing Premises]
Main Campus, Merlin’s Bridge,
Haverfordwest , SA61 1SZ MITEC Centre, The Docks, Milford Haven, SA73 3AASt John’s, Church Street, PembrokeDock , SA72 6AR Letterston Memorial Hall, LetterstonSA62 5RZ Bloomfield Community Centre,Narberth SA66 7NP
5.5 The following parts of the answer:
“As part of our Supplier Development Programme we haveidentified Tier 3 voluntary sector partners who have theambition and the potential to become Tier 2, eg RathboneCymru who have aspirations to be a Tier 2 in West Wales. Wewill provide investment, test their ability to perform and support them to begin delivering Tier 2 services as volumes increase.”
6.1 The whole of Annex 5 (resource plan).
8.1 The whole of the Pricing Proposal Document (also named the
Work Programme Pricing Proposal).
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 6/11
The following parts of the answer:
“ The table below summarises our performance proposals in Wales for
each client group and clearly illustrates Job Outcomes (given as a %
of Referrals). The National Benchmark for Job Outcomes is also
provided (as a % of Referrals).Yr 1 Yr 2 Yr 3 Yr 4 Yr 5-
7 Total
JSA 25+
JobOutcomesOffer 5% 39% 46% 49% 92% 43%
National Benchmark * 2% 25% 33% 33% 71% 30%
JSA 18-24
JobOutcomesOffer 6% 41% 54% 54%
101% 48%
National Benchmark * 3% 29% 44% 44% 95% 40%
JSA Early Access
JobOutcomes
Offer 6% 19% 24% 25% 47% 24%National Benchmark * 3% 15% 19% 19% 37% 18%
JSA Ex-IB
JobOutcomesOffer 5% 19% 25% 76% 0% 25%
National Benchmark * 2% 9% 12% 39% 0% 13%
ESA Flow JobOutcomesOffer 7% 21% 28% 30% 60% 30%
National Benchmark * 4% 15% 17% 17% 36% 18%
ESA Ex-IB
JobOutcomes
Offer 1% 6% 13% 35%
362
% 15%National 1% 5% 7% 18% 119 8%
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 7/11
Benchmark * %
ESAVolunteers
Job
OutcomesOffer 9% 33% 50% 86%
100 % 43%
National Benchmark * 7% 28% 45% 74% 99% 38%
We will exceed the national benchmark levels for sustainability across all customer groups as follows:
JSA25+
JSA 18- 24
JSAEarly
Access
JSAEx- IB
ESAVolun
ESAFlow
ESAEx- IB
Sustainability 34wks 34 wks 38 wks
53wks
60 wks 68 wks
76 wks
Benchmark 28 wks 22 wks 26 wks
44wks
60 wks 68 wks
76 wks
Our proposal shows that overall we will exceed the national benchmark performance levels by 10 percentage points over the life of the contract. We will exceed the benchmark levels of performance in every year for every customer group, and exceed the Minimum Performance Levels for JSA 25+, JSA18-24 and ESA Flow. We will reach the incentive payment threshold in years 4, 5 & 6. The performance proposal builds inservice improvements that allow us, year on year, to exceed the benchmarks by more as the contract proceeds, assummarised below:
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5-7
Performanceabovebenchmark 2% 9% 10%
15 % 18%
8.1(a) The following parts of the answer:
“O UR PERFORMANCE R ATIONALE – BUILDING ON H IGH P ERFORMANCE
The following outlines our underpinning rationale across all customer groups: An analysis of the highest consistent contract performance benchmarked from 150+ WL and supply chaincontracts, offering the service to equivalent customer groups,and covering urban/rural locations, across a range of economies. This allowed us to establish a benchmark for eachcustomer group based on actual levels of performance; An uplift in job entries for the second year on programme,
based on contracts we have delivered to very long termclaimants we are confident we can find work for 30% of JSA
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 8/11
and 20% of ESA/IB customers entering year 2. For JobOutcome Rate (JOR) we have applied our existing jobsustainability run rate, added 10% based on 2 factors: 1) anenhanced in work support offer; and 2) a focus on flexibleworking for some customers, allowing us to achieve the JOR
over the allotted time on programme.Enhanced sustainability for all customer groups – wesurveyed 500 customers across all groups who entered work through our programmes two years ago, 66% were still inemployment at the two year marker, with no meaningful InWork Support – of whom 50% had had multiple jobs. We haveused this real time data to calculate accurate dropout rates for all customer groups.This has informed our rationale by customer group as follows. All WP JORs shown are average life of contract rates. Section8.1 shows how we will build up performance over the life of the
contract, based on experience of how programmes developand improve over time, evidenced efficiency improvements,and the OBR economic forecast. In year 1 we have based our performance on a baseline of what we have proven can bedelivered using current knowledge and approaches. For eachcustomer group we know:
• JSA 25: We achieved performance levels of 47% acrossour PSL, FND and EZ contracts, and job sustainability of 70%, giving a JOR of 33%. Two years on programme, withthe support we outline below, including enhanced In Work
Support, will enable us to achieve average life of programme performance of 43% JOR.
• JSA 18-24: Similarly for 18 to 24 year olds, we delivered aJob Entry Rate (JER) of 52%, and sustainability rate of 70%, across our PSL contracts. We are very confident that though opportunities presented from our Flex Desk, offering flexible work opportunities, and investment in pre- and post-employment training, we can achieve an average life of contract JOR of 48%.
• JSA Ex-IB: An estimated 39% of ESA claims (sourceDWP) in 2009 were assessed as fit for work and moved
onto JSA, so we have worked with this comparablecustomer group through our New Deal and Employment Zone contracts. Our JER rates for this group are 29%, and sustained outcomes at 78%. With enhancements due toimproved engagement, on-site specialist support and dedicated In Work Support we believe our life of contract JOR of 25% is realistic.JSA Early Access: We have a wealth of relevant experience to draw upon for this group and have used comparable data from Progress2Work/LinkUP and 15 ESF contracts working with the most disadvantaged. The group
is highly varied but we achieved between 28% and 36%JER and 82-87% sustainability at 13 or 26 weeks. With the
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 9/11
flexibility to work with customers for an additional year,targeted specialist support, the increase in performance toachieve a JOR of 24% is realistic.
• ESA Volunteers: Our Pathways and NDDP customersachieved on average 44% JER with approximately 80%
sustainability at 26 weeks – giving a JOR of 35%. We haveimproved our understanding of this customer group and our Pathways performance is very strong, so we are confident that we can achieve a JOR of 43% through our enhanced employer offer to identify jobs with sympathetic employers.
• ESA Flow: Our recent best performance with a comparablegroup (Pathways “mandatory” customers) has steadily increased from 22% JER to over 30% JER. Sustainability for this group is 82%, giving a JOR of 25%. We believe wecan increase performance to 30% JOR by enhanced diagnostic tools, ensuring we accurately diagnose acustomer’s real barrier to work, which is often not healthrelated, and offer rapid interventions.
• ESA Ex-IB: We consulted with practitioners, experienced Operations Managers and stakeholders (incl. our Work Choice supply chain) to establish a baseline of 14% JER, of whom 85% will sustain in work for 13 weeks, giving acurrent JOR of 12%. We have significantly enhanced our CMP provision, ensuring it is work focussed and accessibleacross the CPA, and are confident we can achieve performance of 15% JOR.”
“We have agreements in place with Randstad and Manpower that will deliver circa 14,000 vacancies in year 1 across theUK.”
9.1 The whole of Annex 6 (implementation plan).
The following parts of the answer:
“Below, we set out the top risks identified to date by our Risk Committee. Clearly, due to the dynamic nature of our risk
management process, these risks will change and progress asthe Work Programme rolls out and events develop; some riskswill not transpire while others may evolve into live issues withactive contingencies.
• Winning multiple Work Programme contracts. Our Implementation strategy, resources and plans assume wewill be successful in winning 9 WP contracts and our implementation team is resourced accordingly with 84 people from across our WL professional disciplines – 11Project Managers, 32 IT, 15 HR, 15 Finance and 11 Supply
Chain resources. There is no overlap of people across CPAteams, and each CPA team mirrors the disciplines of the
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 10/11
National Team.
• Withdrawal of key suppliers- addressed in full in question9.2
• Security Plan not being signed off . We are already working in partnership with the DWP security team to ensure
we refresh our Security Plan in parallel with systemupgrades to ensure sign-off is achieved well in advance of 21 days before go-live.
• Key suppliers not being ready for go live. We haveundertaken full verification assessments against eachsupplier mirroring the DWP process, assessing their implementation plans, offices, resource plans, IT Security Plans. Partners will be supported through theimplementation process by our Wales CIPS trained Commissioning team and relevant strand leads. Operationsmanagers from all key delivery partners will be members of our Welsh Implementation Team.
• Delay in announcement of preferred bidder or contract signing – Our target full go live date of 1st July 2011 is 4weeks earlier that the DWP published target of 31st July 2011. Therefore, delays in contract signing of up to 3 weekscan be absorbed.
• Shortage of the right people with the right skills- Jobdesigns have been signed off, Assessment Centre datesbooked and training courses, which will be offered to teamsacross our supply chain, are planned for the three weeks
prior to go-live.• Insufficient time to carry out reasonable consultation
risking legal challenge by individuals- TUPE consultationcommenced on 7 th February with all Working Links staff that may be impacted by transfer. We are working with themarket (via ERSA) to encourage all providers to put measures in place for collective consultation by 15 th April.Our HR team has trained TUPE ‘super-user’ leads in every CPA.
• IT Upgrade Delays – Our systems are based on provenFND PRaP interface processes. Upgrades are underway to
complete, fully tested, by 25 th April 2011.• Premises Delays- existing sites will all be quality assessed
during March and plans are in place across our supply chainto commence lease negotiations for identified sitesimmediately preferred bidder status is announced.”
9.2 The following parts of the answer:
“Specific contingency options identified for each of the deliverypartners are:
•
Agoriad - WL will deliver in both Gwynedd and Anglesey,where we have successfully delivered numerous contracts
8/3/2019 302. CPA13: Working Links - Annex 7
http://slidepdf.com/reader/full/302-cpa13-working-links-annex-7 11/11
for DWP in the past.
• Powys Training - [REDACTED] are an alternative option,delivering extensive IAG provision across Wales, with theinfrastructure to cover this area.
• Pembrokeshire College - We will sub-contract with
[REDACTED], who currently deliver skills and employabilityprovision and have an extensive infrastructure
• Neath Port Talbot CBC - WL will deliver, as we alreadyhave a NOMS contract in the area, and will initially utiliselocal authority premises.
• Torfaen Training [REDACTED] Training have successfullydelivered DWP programmes in the area before and wouldtherefore step in and deliver utilising existing premises.”
General The whole of the Security Plan.