Technology Overview
CSP Value Chain
CSP Cost
Highlighting of MENA Manufacturing Potential
Summary
7/31/2019 3 Value Chain Morin
3/14
Fraunhofer ISE
CSP Technologies
Left: Parabolic Trough collector: 64 MWelpower plant Nevada Solar One; dimensions:collector aperture width 5 m (Morin, 2010)
Linear Fresnel Collector: 1.4 MWel plant PE1 inMurcia, Spain; dimensions: receiver height abovemirror field: 7 m (Novatec, 2010)
Solar Tower plant PS10, 11 MWel inSeville, Spain (Abgengoa, 2010)
Dish Stirling prototype plants of 10 kWel eachin Almera, Spain; diameter 8.5m (DLR, 2010)
7/31/2019 3 Value Chain Morin
4/14
Fraunhofer ISE
CSP Market Shares and Development
Parabolic Trough today over 90% market share, today
Other CSP Technologies gaining market shares 20 GW installed CSP capacity by 2020 is feasible
BUT: Reliable financial and political framework needed !
7/31/2019 3 Value Chain Morin
5/14
Fraunhofer ISE
Working Principle of Parabolic Trough Power Plant(Andasol Example)
7/31/2019 3 Value Chain Morin
6/14
Fraunhofer ISE
Components of Parabolic Trough Power Plants
7/31/2019 3 Value Chain Morin
7/14
Fraunhofer ISE
Collector: Metal Support (Examples)
Sample Collectors Flagsol Skal-ET 150
(e.g. Andasol I-III)
Solargenix SGX-2
(e.g. Nevada Solar One)
Structure Torque box design-galvanized steel
Recycled aluminum orsteel struts and geo hubs
kg/m peraperture area
~ 18.5 kg/m steel ~ 11-12 kg/m aluminum
Material quality 85% S235JRG214% S355JRG21% X5CrNi 19-10
6061 T6 aluminum(70-80% recycled content)
Materials used Equal angles (60%),Plates (10%),Square Tubes (15%),Rods, mills, profiles andfasteners (15%)
Similar parts
7/31/2019 3 Value Chain Morin
8/14
Fraunhofer ISE
Value Chain in CSP - Overview
7/31/2019 3 Value Chain Morin
9/14
Fraunhofer ISE
Value Chain in CSP Part 1
7/31/2019 3 Value Chain Morin
10/14
Fraunhofer ISE
Value Chain in CSP Part 2
7/31/2019 3 Value Chain Morin
11/14
Fraunhofer ISE
Value Chain in CSP Part 3
7/31/2019 3 Value Chain Morin
12/14
Fraunhofer ISE
Cost Structure of 50 MW PTC plant with 7.5 h storage
7/31/2019 3 Value Chain Morin
13/14
Fraunhofer ISE
Complexity versus Investment-Intensity
7/31/2019 3 Value Chain Morin
14/14
Fraunhofer ISE
Conclusion CSP Components Production in MENA
Near-term: Low-Investment and Low-Complexity Activities in MENA:
Collector Assembly
Collector Installations
Civil: Groundworks, Collector Foundations, Buildings, Infrastructure
MENA manufactoring of approximately 17% of plant invest(+ optional EPC, Proj. Management)
If sustainable MENA-CSP-Markets are given:
More investment-intensive and more complex CSP-Activities in MENA:
Mirror Production
Receiver Production
Other specialized components and processes
Local Value Creation: up to 80% of plant invest