1. Executive Summary
Computer Based Learning Sdn Bhd (hereinafter referred to as CBL) has great pleasure in submitting this
Technical proposal to Lembaga Lebuhraya Malaysia (hereinafter referred to as LLM).
The proposed supply, analysis, design, development, installation, configuration, testing, commissioning,
migration, provisioning, support and maintenance for LLM is based upon our clear understanding of
LLM's requirements for Highways Asset Quality System (hereinafter referred to as HAQS). The proposal
aims to address the functional fit, technology fit; the ability of a web base application that can be
totally integrated and has future scalability capacities, as well as to ease of maintenance efforts.
CBL will provide a multi-disciplinary team with expertise in each of the areas critical to the success of
LLM project. We have skills in the areas of Rapid Software Development and sound understanding of
large scale business operations in the areas of Financial Accounting software development and
Hospitality Management . Our team have successfully developed and implemented industry standard
applications; such as the home-grown Hotel and Administration System which is marketed under the
brand name HANIS and Hanis Financial Management System.
We are also the software developers of ASSETBase, the world patented (PCT/SG/2006), award winning
accounting simulation and learning tool specially designed for education and training. The software
bridges the gap between classroom learning and accounting industry practice through the
breakthrough simulation technology. Our major client for this software is the Ministry of Education
Malaysia and it is being used in 1365 secondary schools throughout Malaysia. Secondary school
students who have passed their Principles of Accounting SPM paper, and have been formally assessed
on the use of ASSETBase, will be granted exemptions from ACCA’s Paper 1 and Paper 3 CAT syllabus,
Level 1, Level 2 and Level 3 certifications from LCCI as well as CIMA Financial Foundation Payer. The
ASSETBase also had the honour of receiving official awards and recognitions from the academia and
industry alike; among others Gold Medals at the Science, Technology and Innovation Expo for 2 years in
a row (2003 & 2004) organized by the Ministry of Science and Technology and Innovation of Malaysia;
Gold Medals for Research and Invention by Universiti Putra Malaysia (20002 & 2003), Gold Medal at the
International Invention, Innovation, Industrial Design and Technology Exhibition (I.TEX 2002), Gold
Medals at the prestigious Salon International Des Inventions in Geneva, Switzerland (2005) and the
MSC APICTA 2007 award for the Best in Education and Training Category. The local professional
accounting body, MICPA also endorsed the software which further testifies the software credibility.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 2/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
2
Our wealth of knowledge from the development of our inhouse applications similar which is in nature
to the requirement of LLM HAQS system is a great strength that CBL has to offer not only in
understanding the requirements but also in executing and recommending critical business processes in
the entire value chain of LLM operations.
For the purpose of this project, all development work will be using the existing LLMs application i.e.
running Microsoft Operating Systems, Microsoft Visual Studio 2005 application development tool,
Crystal Report 2008, Fusion Chart 3.0 and Microsoft SQL Database. By using these applications we
would also reuse most of the current invested hardware and software by LLM.
With regards to managing the project, a team of Project Management Office (PMO) shall be established
to manage and oversee the system implementation to ensure that requirement specifications
throughout the system’s implementation life-cycle are met. The team will work hand in hand with
LLM's own Project team to ensure a smooth delivery of HAQS system.
CBL will undertake to deliver the complete Software Development and Implementation of the new
HAQS LLM System in 10 months. We are confident in achieving this timeframe due to our extensive
experience as developers of award winning software applications and the fact that CBL possesses sound
knowledge of the subject matter.
The proposed total solution by CBL uses a combination of tried and tested, hardware and software
development tools, testing tools and Project Management tools. We are therefore confident that the
proposed approach will provide a reliable and efficient system, which will significantly enhance the
delivery and the processing capabilities of LLM’s that matter its mission and vision.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 3/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
3
Solution write-up
1. Understanding of Requirement
1.1 Present State and IT Infrastructure Environments
1.1.1 Present State
The current application landscape in LLM comprises of systems that were deployed in a
distributed network environment which is being used by LLM to regulate 23 concession companies
through out Malaysia to ensure the quality control of assets are of standards defined by LLM. At the
moment 20 concession companies are running their own distributed database to record Civil and
Structure(C&S) assets for pavement, bridge, slope and drainage. The remaining 3 concession companies
are recording in a sparkle system environment.
While the Mechanical and Electrical (M&E) assets for M&E services, lighting, toll, collection system,
tunnel system, traffic control surveillance system are still on manual record keeping processes.
Each of the concession companies are required to prepare periodic and routine asset maintenance
program and these schedules are submitted LLM district offices for verification, monitoring and to
ascertain the schedules effectiveness and timing. The district offices will conduct site inspections based
on the submitted and approved maintenance schedules and a Non Compliance Record (NCR) will be
issued to the concession companies for their further action based on the ratings that are giving in NCR.
The concession companies must comply to the NCR that was issued and to ensure that it is within
guidance of rectification respond time. Subsequently the concession companies are required to submit
corrective or preventive maintenance reports on jobs done based upon the NCR to respective district
LLM offices for further site visits to verify and close the NCR.
If a NCR is not closed or address to, for 3 consecutive times after it’s issuance the regulatory division of
LLM will propose the execution of the maintenance bon by the effected concession company to top
level management of LLM.
1.1.2 Present IT Infrastructure Environment
The Primary Internet Link to LLM HQ is via VPN pipes, with a bandwidth of 2Mbps and LLM branches
are link to the current environment via 1Mbps ADSL IPVPN links. This is due to the current distributed
network architecture and the Servers that were deployed for the current application environment and
the current network design at the Data Centre requires further detail analysis to address LLM’s desire to
enhance its information system delivery to achieve a state which requires less or minimal manual user
intervention, avoid overlapping transaction by different users from the business chain, functionalprocessing, timeliness of business information update, speed of transaction, accurate and quality
information capture and reporting in a highly secured manner.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 4/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
4
2. Challenges to Be Addressed
LLM is an entity with 4 distric offices and 23 concession companies currently throughout Malaysia.
For the purpose of the tender, our focus will be to ensure the following:-
i. A centralized system accessible via secured and timely existing internet and intranet
environment to record, process, analyze and produce valuable data and reports in relation to highway
asset inventory monitoring for C&S and M&E which would enable LLM to monitor the checking,
auditing, repairing and maintenance works done by entities under it.
ii. High availability system with secure security standards accessible through various channels.
iii. Manage and track the whole business process value chain of Highway Asset Inventory and
Maintenance at LLM, district offices and concession companies with the management of HAQS businessrules and conditions are centrally controlled via System Administration module. The integrated system
must be able to meet the transactional and operational needs of LLM Headquarter, branches and
external users
iv. A management reporting tool that as able to provide operational, statistical and management
reports on the fly from various level of the business chain of the LLM organisation and modules.
As can be seen from above there is no single readymade application that can cater to all the
requirements of the various business levels of LLM HAQS. As such our propose integrated solution
which will be centrally located and the new LLM HAQS System must be able handle the following:
The Table 1-1 below describes the current number of various access points.
No. Application Systems Access
Points
1 LLM Headquarter 1
2 District offices 4
3 Concession company 23
Total 28
Table 1-1
2.1 Addressing Challenges Identified
In addition to meeting the functional requirements of LLM business units, the New HAQS System that
will be implement must have the following characteristics:-
i. Web-based application that is accessible via any operating system
ii. Capable of supporting offline transactions as well as online transactions
iii. Fully integrated between all solutions
iv. Centralised control from HQ
v. Scalable not just in number of users but also in meeting future functional requirements
vi. Easy to manage and maintain
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 5/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
5
Due to the integrated HAQS system activities and locations of the various operations, the challenges
that will arise are as follows:-
i. Data accuracy and consistency
ii. Data timelines
iii. Data control
iv. Data security
v. Deployment and maintenance of solutions
vi. User control and segregation of duties
vii. Process control – in relation to work flow
viii. Accommodating for future growth in business activities and users
ix. Accommodates analysis of data using tools
Our Approach to meet the Requirements
Future Environment Guiding Principles.
The Solution that CBL will be providing for is based on assumptions and consideration of the
uniqueness of the nature of business and operations in LLM. They are centered around the
following principles as outlined in the quotation document. They are to assist in:
To monitor highway asset inventory for C&S and M&E
To monitor and analyze routine and periodic asset maintenance schedule or program
and it’s work flow and tasks must be traceable, reconcilable and done in a secure,
accurate and timeliness manner.
To produce Non Compliance Record (NCR). To monitor, check and approved maintenance and repair of assets by the concession
companies.
Speed of transaction and omnipresent access at any time from different locations to
the new HAQS system. All transactions and information flow must be accurate,
secured, and reliable and the data must be treated as single trusted source of
information.
2.2 Future Application Environment
The new HAQS system will be an integrated system. It will be able to meet the
transactional and operational need of the users at the LLM Headquarters, branches and
concession companies. Able to track the whole business process value chain of Highway
Assest Inventory management. A management reporting tool to print statiscal and
management reports. Robust and expandable to meet the business and operational needs
of LLM.
2.3 Future IT Infrastructure Environment (3.1, 3.2)
The new HAQS system must be able to seamlessly accessible from internal, external
Users. The data center has a list of Server, Operating systems and Network security related softwares.
The LLM network and applicaiton is fully equiped with the proposed hardware and software.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 6/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
6
List of Software exists in future IT infrastructure supplied by CBL
HAQS system 1
Windows Server 2008 R2 6 unit
List of Hardware exists in future IT infrastructure supplied by CBL
New Server –HP Proliant DL 380 Generation 7 (G7) 1 unit
The following diagram illustrates the future IT and Network infrastructure at LLM
Figure 1
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 7/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
7
3. The Solution (3.4)
Development, Testing and documenting of the HAQS LLM Systems, supporting modules and it's access
channels . They are : (Not limited to)
System Administration Module
HAQS Administration Module
Highway Asset Inventory Module
Highway Asset Maintenance Program Module
Highway Asset Maintenance Monitoring Module
Mobile Module
The above development activities are to be carried out in Development environment and beta tested
by our testers before deploying to test environment for users testing and acceptance upon which we
will be publishing to production environment.
The new integrated HAQS LLM HAQS system is to be developed as below:
Future HAQS LLM System Application Architecture Figure 2
Deployment of New Server, Existing servers, networking equipments, storage, backup and security
devices, tools and monitoring equipment at Central Data Centre.
Providing training, materials and reference manuals to relevant New HAQS System users and transfer of
technology to relevant IT users in LLM.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 8/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
8
Providing Support and maintenance of Software and Hardware after the New HAQS System has gone
live with clearly defined Service Level Agreement.
Providing the Project Management office that administer, monitor and report all the activities of theproject duration.
As with all integrated information systems development and implementation, the above objectives
that have been laid out by LLM are to address the uniqueness of the nature of LLM business and
operations, CBL are also required to take into consideration in our Technical Proposal the following :-
Timeliness of information access and retrieval
Accuracy of information and trusted single source of information
Reconciliation of data between modules
Transaction audit trail
Quality information processing and reporting
Seamless accessibility from the internal and external users Setting of key performance measures for all LLM operational levels
Well trained system users
Well documented user references
To have a centralised focal Data Centre.
To achieve the above objectives besides developing, and implementing the new HAQS LLM System
The characteristics of the solution that would be able address the challenges identified above are dealt
with in the following section.
3.1 Our Activities
Figure 3
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 9/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
9
3.2 Proposed Approach
We propose a three (3) stage approach, consisting of Analysis, development, testing, migration,
deployment and training and transfer of technology.
Workshops will be conducted for 1) kick-off meeting with stakeholders 2) Validate findings and agree on
the requirements 3) workshop for training
Figure 4
3.3 Requirement Study (2 Months) (1.2)
Understanding the Requirement (2 Months)
Team members: Project Management Team, Testing Team, Development Team, Quality Assurance andDocumentation Team and Hardware Technical Team.
Application Requirement and understanding
We will be liaising with LLM to have detailed understanding of the new LLM HAQS system and its
operations.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 10/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
10
Understanding existing hardware and additional hardware required
We will be studying existing hardware infrastructure, servers and analyze new options. If required.
Existing Network Infrastructure Study
We will be studying existing network infrastructure and equipment and prepare change plan and
upgrade plan. If required.
Understanding requirement Mobile device software
Scoping the mobile device operational usage and defining policies.
Preparing Project Scope
We will be getting endorsement from LLM on the overall project scope and project charter.
User requirement sign off
At the end of this stage the following are the deliverables but not limited to.
- Project Charter
- Project Management Plan
- Integrated project plan and schedule
- Data conversion and Migration Plan
- Software design document
- Database design
- Data dictionary
- Entity Relationship Diagram
- Deployment strategy plan(Development, Test and Production Environment)
- Network design diagram
- Data center layout and proposal
- Disaster recovery center layout and proposal *if required
- Prototype of the HAQS system
- Configured Servers
3.4 LLM System Development environment (New server and Existing tools will be used)
We will be getting endorsement from LLM after justifying our proposed usage of the new server which
we have done after taking into consideration the data volume, number users accessing and future
scalability of the server. This development environment will be visible to LLM HAQS project team and
development team only. The passwords will be provided to the developers only to connect to the
development environment.
LLM test & training environment (Identifying the Old servers from Current LLM infrastructure)
We will be getting endorsement from LLM after justifying our proposed usage of old LLM servers. If
required.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 11/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
11
The HAQS system will must be tested in the following browsers (Not limited to)
Internet Explorer 6 or Higher
Mozilla Firefox version 2 and higher Opera Version 9 and higher
Safari version 4 and higher
Google Chrome
LLM production environment
We will be getting endorsement from LLM after justifying our proposed usage of the application server,
database server, Device interfaces, Communication interfaces, 3rd
party system integrations, Firewall,
load balancer, Network Storage, Backup devices and Monitoring tools which we have done after taking
into consideration the data volume, number of users accessing and future scalability.
Development
We will be getting endorsement from LLM after finalizing the scope of the application, database and
various activities performed during the development process and movement of developed codes and
user interfaces to LLM test environment
Training
We will be getting endorsement from LLM after finalizing the training schedule and training plan,
location and total computers required and number of users to be trained for each module.
Deployment
We will be getting endorsement from LLM after finalizing the deployment strategies
and deployment planning. Preparation of data migration Strategy, Preparation of data migration
accuracy confirmation to LLM
Data Migration (6.0)
We will be able to migrate the data from all existing systems with 100% accuracy. This accuracy is
depends on the accuracy of the existing data in all the system (at HQ, Branches and Concession
companies).
We will prepare migration script which will export the data to Microsoft excel format for LLM
verification purposes. Once LLM approves the accuracy of the Data , then we will be able to export the
data from excel format to new HAQS system into testing database.
The migrated data will then be copied to Testing database for LLM verification purposes. Upon receipt
of the confirmation from LLM about the accuracy of the data, we will copy the final data to production
database.
The detailed migration plan will be provided upon the complete study of the existing data structure at
all sub systems at LLM.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 12/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
12
3.5 Setting up LLM test environment (3.3)
Team members: Project Management Team, Testing Team, Development Team, Quality Assurance and
Documentation Team and Hardware Technical Team.
- Configuring LLM Old servers (1 Application server and 1 Database server) and
computers to be able to test the user interface, logics, functionality and reports provided by
the development and testing team during the development process. Which includes
Upgrading the Servers, Enabling the LLM test servers will be accessible by the Development
team.
- Configuring Applications
The following diagram illustrates the LLM test environment.
Setting up Development environment
- Configuring New Development servers(1 Application and 1 Development server) at
development site which includes
Delivery of Hardware at development site
Installation of Hardware
Installing Development tools in development pcs. The development tools are
o Visual Studio. 2005
o Crystal Reports 2008
o Fusion Chart Version 3
o MS SQL
o Windows Server 2008
o Macromedia Dreamweaver CS4
After this state, the LLM test environment and Development environment will be ready.
3.6 Software Development Life Cycle (SDLC) and Software Testing Life Cycle (STLC) (8.1,8.2)
Hardware Preparation, Manual Documentation, System write-up (4 to 8
thMonth)
Based on the Project charter and scope, developers will precede with development activities at
development site.
Concurrently, Hardware team is preparing production environment, setting up of data center and
network infrastructure.
And the Documentation team is preparing the following documents (but not limited to) for all new LLM
HAQS Modules.
- User Manual
- Operations Manual
- System Manual
- Technical Manual
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 13/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
13
CBL will adopt ‘V’ Model for software development life cycle (SDLC) and software testing life cycle
(STLC).
Testing can involve some or all of the following factors. (Not limited to)
- Business requirements
- Functional design requirements
- Technical design requirements
- Regulatory requirements
- Programmer Code
- Systems administration standards and restrictions
- LLM Corporate standards
- Professional or trade association best practices
-
Hardware Configuration- Cultural issues and language differences
The following figure illustrates the ‘V’ model approach for SDLC and STLC.
Figure 5
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 14/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
14
V-Model of testing incorporates testing into the entire software development life cycle. In the above
diagram of V-Model, the V proceeds down and then up, from left to right depicting the basic sequence
of development and testing activities. The model highlights the existence of different levels of testingand depicts the way each relates to a different development phase.
At the end of the development life cycle, the finalized new LLM HAQS system will be prepared for final
deployment at production environment.
At the end of this stage the following are the deliverables but not limited to.
- HAQS Application User Manuals
- HAQS Operational Manuals(SOP)
- HAQS System Manuals
- Hardware Manuals
-
Source code and inline documentations- Diagnostic manuals
- System architecture
- System design document
- Workflow diagram
- Network diagrams
- Operations Run Book
- HAQS SYSTEM
4.0 System Overview
4.1 General Description of the Overall System Functionality
4.1.1 Development Methodology (1.0,1.1,1.2)
HAQS system will be developed using RAD(Rapid Application Development) software Methodology.
RAD involves the methods like interactive development and software prototyping.
Structured techniques and prototyping are specially used to define user requirements and to design the
final system. The development process starts with the development of preliminary data models and
business process models using structured techniques.
In the next stage requirements are verified using prototyping, eventually to refine the data and process
models. These two stages are repeated iteratively; further development results in a combined business
requirements and technical design statement to be used for constructing final system.
4.1.2 User Requirement Study (2.1 to 2.4 )
We will conduct user requirement study to study user requirements based on individual user groups
and department. The following are the key elements for our requirement study.
To record highway inventory asset by concession company in to the new HAQS system
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 15/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
15
To record periodic maintenance program for C & S and M & E assets
To record asset inspection by concession company
To record information related to monitoring asset inspection by regulatory department and mechanical
and electrical units
To record asset auditing records conducted onsite by the regional office using HAQS mobile module.
To record NCR maintenance information by Concession company.
We will review the data structure of the C & S and M & E highway inventory asset for Yearly
maintenance program.
We will study and consider the data structure for existing system “Sistem Mini Teman(C & S)” andContract Cost Analysis System (CCAS) for M & E.
We will study the inspection checklist form for C & S asset and M & E.
Upon the successful bidder, we will review the existing ICT resources available at LLM and we will
propose the best suitable enhancements needs to be done.
4.1.3 Accessing(4.3.1,5.1,5.2,5.3,3.5,3.6,5.3)
The Proposed solution is an web based application (Portal) runs under IIS web server. It will be
developed in Microsoft Visual Studio.NET 2005 using PHP as the scripting language, Java Script, AJAXTools. Crystal Web reporting Tool 2008, Fusion Chart version 3 for dash boards and SQL server and SQL
manager as the RDBS. We will use the tools existed at LLM for entire development of the HAQS system.
The nature of web based application is, it can be accessible from anywhere and anytime, using
secured SSL and authentication procedures. Based on the assigned access privileges, system will allow
only certain modules and features.
The proposed solution will support industry standard protocols like Digital Certificates, Public
Key Infrastructure, SSL(HTTPS), Transaction Layer Security, VPN.
User login must be based on the password policies and access levels defined by the HAQS
admin users integrated with Active Directory
The following figure will illustrates the application architecture of the HAQS system based on
the locations.
The system will provide the information needed by the users with less than 5 seconds response time.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 16/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
16
Figure 6
4.1.4 User Interface
The rich layouts and user friendliness of the User interfaces will be maintained throughout the system.
The standardized buttons are provided for common functionalities like “New”, ”Edit”, ”Update”, ”Save”,
”Print”, “Export”, ”Exit” .
User definable mandatory fields are provided. At any time, user may change a specific field as
compulsory field or optional field. On screen field level help system is provided for all user interfaces
throughout the system.
4.1.5 Database Design (4.1.1 to 4.1.3, 2.2.1 to 2.2.6)
We will design the new HAQS database based on the existing data structure after reviewing with the
LLM technical team and we will add new data fields as required for regular assets and asset
management routine for & S and M & E assets.
The HAQS LLM HAQS database will be installed in existing database server cluster at LLM.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 17/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
17
We will provide the data structure as follows. (Not limited to)
a. Concession company information and User information
b.
C & S periodic asset information like Slope, Drainage, Pavement, bridge etc.c. C & S routine asset information like grass, maintenance, landscaping & Miscellaneous maintenance,
slope cut / embankment maintenance, rest & service area maintenance and environment
management etc..
d. M & E asset information like Building, Tolling System, lighting system, tunnel monitoring system,
traffic control and surveillance system(TCSS) etc..
e. Information on inspection of periodic and routine asset by concession company.
f. NCR information discovered during the asset auditing conducted by the regional offices as the
inspection checklist forms provided with the tender document.
g. Correction or repairing of NCR information by Concession company.
4.1.6 Integration (5.2.11)
System will provide real time integration with other internal or external applications and can import
data formats in the following manner
1. XLS
2. PDF
4.1.7 Scalability
Vertical Scalability – Adding resource within the same logical unit to increase capacity. An example of
this would be to add CPUs to an existing server or expanding storage by adding hard drive.
We will be considering the expansion of HAQS database structure among multiple storage units. Duringsystem life time, if in case of insufficient storage space, system will allow adding new storage units.
Horizontal Scalability – Adding multiple logical units of resources and making them work as a single
unit.
4.1.8 Integration Monitoring Tool
Should the system detect a failure in communication with the HAQS system with its sub modules. A
temporary buffer file will be provided in the design structure of the overall application in order to re-
synchronize data’s between integrated modules, when the system goes online.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 18/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
18
4.1.9 System Security Monitoring
The following security protocols will be provided in HAQS system
1. SSL integration
2. 32 bit encryption of passwords
3. All password setting and management rules will be definable using HAQS
administrator
4. User Group management
5. User Access Level management
6. User Privileges management
7. Secured document retrieval authentications
8. Detailed transaction audit trails with date, time, user id, terminal id,
transaction id, module name, location id etc...
9. Unauthorized login attempts tracking and alerting will be provided
10.
Controlling multiple failed login and forcing user to get authentication forHAQS will be provided.
4.1.10 Alerts and Notifications(5.4.8,5.6)
There will be four types of alerts and notifications provided in the system.
System defined alerts
These are the prompts displayed by the system detecting wrong inputs, help messages, field validations
and Data saving / retrieval in process and completion notifications
Process completion alerts
These will be definable by the LLM to indicate certain users, on completion of certain processes. (E.g.
Program Schedule submitted by Concession Company)
Workflow alerts
These are the notifications defined from the workflow management under system administration
module. Workflow setting will enable rerouting of the documents and send notifications to the users
upon receiving the rerouted documents.
Transaction notification alerts
These are emails that will be send to LLM HQ users based on work flow on all the transactions
performed in the HAQS system.
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 19/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
19
4.1.11 Reporting(5.4.6,4.5)
We will provide static reports and also query engine to generate ad-hoc reports as per the userrequirement.
We will ensure all the data in HAQS will be searchable using a minimum of two filter conditions.
We will ensure 5 seconds response time for all screens and outputs from new HAQS system.
We will provide dash boards as per the user requirements.
Reporting tool will be provided with the system to generate ad-hoc reports.
All the related modules and reports will be produced as per the design format attached with the tender
documents Appendix 4, 5 and 6.
4.2 Main Modules in HAQS system(5.8)
Based on our understanding, the proposed solution will have the following main modules.(Not limited
to)
System Administration Module
HAQS Administration Module
Highway Asset Inventory Module
Highway Asset Maintenance Program Module
Highway Asset Maintenance Monitoring ModuleMobile Module
4.2.1 System Administration Module (4.4.1 to 4.4.2, 5.4.9,5.5,5.7)
System Administration module is used by the System Administrators to perform the following functions.
i. Creation of New Users
ii. Creation User Groups
iii. Importing the Users from Active Directory in LLM
iv. Monitoring the Audit Trails
v. Monitoring the Unauthorized login attempts.
vi.
Monitoring the network and modules, whether they are online or goes offline becauseof internet interruption.
vii. Database and application backups and restore
viii. Monitoring the disk space and data sizes.
ix. Moving the historical data to archive.
4.2.2 HAQS Administration Module
HAQS Administration module is used by the LLM HQ users to perform the following functions
Work flow Management
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 20/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
20
Defining Document Re-routing and approval processing Rules
Defining Business Rules
Assigning access privileges to the User group based on the job scope
Assigning access privileges to the individual users based on the users job scope Checking the User audit trail and transaction audit trail
4.2.3 Highway Asset Inventory Module(5.4.3,5.4.4)
The asset inventory module allows the Concession company users to record the C & S and M & E assets
and to track the asset inventory.
An unique id is allocated to each asset. All the assets are attached to a Location/Object.
An unique id is allocated to each location/Object. All the locations/Objects are attached a
Route/Highway.
An unique id is allocated to each Route/Highway. The highway information is recorded by the LLM HQ
users with district office details and concession company details.
Drill-down mechanisms will be provided in the system to zoom into the data of the asset inventories as
shown in the figure below.
Zone ->
LocationAssets
Route /
High way
Scheduling
Corrective
Maintenance
Asset Status
History of
Maintenance
works done
NCR
Produced
Figure 7
TO ILLUSTRATE OUR UNDERSTANDING OF THE REQUIRED HAQS SYSTEM AND HOW
USER FRIENDLY THE SYSTEM SHOULD PROVIDE A DASHBOARD TO MONITOR &
MAKE BUSINESS DECISSIONS.
The following figure will illustrates the asset inventory and tracking for a single Route/Highway
Concession Company. This screen represents both C & S and M & E assets of one Highway. Each
Highway is divided into zones/segments. User will be able to zoom into the segment and monitor the
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 21/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
21
asset inventory , concession company maintenance activities and District office periodic a nd routine
inspection records. The status of activities will be represented in color codes as shown in the above
figure.
The screen shows the details of all the assets within this zone and their status.
CBL proposal [Sample]
Figure 8
The following figure represents a single zone related to one highway/ Concession.
This is the second level screen in asset inventory tracking module.
Screen will show the C & S and M & E assets with their status using Ratings provided in the tender
document.
Yearl Schedule submitted
Yearl Schedule A roved
Yearl Schedule Re ected
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 22/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
22
User will be able to drill down further to get more detailed information about the C & S and M & E
asset inventory monitoring purposes.
4.2.4 Highway Asset Maintenance Program Module(5.4.2.5.4.5,5.4.7)
Concession company will use this module to enter the yearly maintenance schedule for M & E and C &
S assets. Including the resources.
Resource planning is provided in the system. System will guide the concession company to search the
available resources (Engineers/Technicians/ workers etc...) .
Work rerouting features will be provided in the system to reroute the jobs to the alternative resources
with in the same level.
Once the scheduling is completed, Concession Company will submit the schedule to district officers for
checking and monitoring of the programs and also co-ordinate the timings and to ensure the programs
are done properly and on suitable time.
CBL proposal [Sample]
Figure 9
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 23/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
23
Program schedule status will be provided in terms of status (Critical/Partial/Normal). And also the
ratings are provided as follows
Rating A Damages done that block the traffic.And for anything that blocks the traffic and for this type of
problem it has to be solved with in 24 hours.
Rating B Damages that need immediate repairs.
And the time is with in 7 days
Rating C Damages that are recommended for maintenance for the
benefit of the highway users.
Time frame is 1 month.
Rating N Routing preventive maintenance. Time frame cannot be
more than 1 month.
District offices will do inspection based on the approved schedule. And update the program status
Compliant / Non Compliant.
In-case of Non-Complaint, NCR (Non compliance record) will be produced and send to the concession
company.
Concession Company will produce the report (repair and Maintenance report) and submit to the
district office to do site visit and to ensure that they have fully comply with the NCR.
Business rules will be provided to define the total number of consecutive failures of NCR. Based on
these business rules, system will alert the regulatory department to execute the performance bond of
the concession company.
4.2.5 Highway Asset Maintenance Monitoring Module(5.4)
Maintenance Monitoring module will be used by the District offices and also LLM HQ users to monitor
the maintenance schedule performed by the concession companies.
Module allows the users to record auditing schedule for the Periodic and routine assets.
Module allows the Regulatory department users to check the assets maintenance status.
Module allows to monitor correction and action taken by concession company based on NCR
Module allows the district office users, regulatory department and top management to produce the KPI
indicators on the resources / maintenance works done by Concession companies.
Monthly KPI maintenance information will be published on the HAQS portal system.
4.2.6 Mobile Module (Inspection Checklists)
8/3/2019 3. Solutions Write Up
http://slidepdf.com/reader/full/3-solutions-write-up 24/24
Proposal for Lembaga Lebuhraya Malaysia
Computer-Based Learning Sdn Bhd Private and Confidential
24
The on-site auditing checklists are provided in Mobile Module. District officers will record the audit
data on site using mobile device(Android).
The data will then be stored in the LLM HAQS system database for it can be accessible with HAQS
system by district offices, Regulatory department and Top management.
The communication between the mobile devices to the central database is via wifi/3G/GPRS. Offline
synchronization mechanism will be provided in the system.
5.0 Maintenance (9.1.1 to 9.1.6)
The equipments and services provided will be 12 month warranty after the completion of the project.
6.0 Helpdesk(11.1 to 11.3)
Support will be provided as follows:
Support contact number
Support Skype contact
Support email contact