3
3. Revised Project Amendments

3. Revised Project Amendments - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/AEIS/Chapter 3_CD.pdf · 3. Revised Project Description Amendments 3.1

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3. Revised Project Amendments - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/AEIS/Chapter 3_CD.pdf · 3. Revised Project Description Amendments 3.1

3. Revised Project Amendments

Page 2: 3. Revised Project Amendments - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/AEIS/Chapter 3_CD.pdf · 3. Revised Project Description Amendments 3.1

Additional Information to the EIS: New Acland Coal Mine Stage 3 Project PAGE 19

3. Revised Project Description Amendments 3.1 Rail and Road Infrastructure

NAC is in the process of conducting Front End Engineering and Design (FEED) studies for certain infrastructure components for the revised Project. The FEED phase is the pre-tender engineering work which follows the conceptual design or pre-feasibility study phases of a project. The FEED design phase focusses on the technical requirements with up to 30% design engineering completion as well as cost estimation of ± 15% accuracy. The FEED phase occurs at a stage when stakeholder input has been considered and final design can be progressed.

As a result of this phase, Figure 3.1-A depicts the revisions made to the main access to the mine, the alignment of the Jondaryan-Muldu Road and the alignment of the rail spur and balloon loop and location of the new Train Loadout Facility (TLF) for the revised Project. A description of the amendments to the revised Project is described in Table 3.1-A. In addition, the internal haul road from the Materials Handling Facility (MHF) to the new TLF will remain in place for the duration of the revised Project. Other internal haul roads used for the transportation and raw coal from the mine pit to the Run-of-Mine (RoM) Pad and light vehicle access will be periodically constructed in front of the mine path to allow for access and transportation of raw coal. These minor changes will not result in an increase in environmental nuisance or harm.

Table 3.1-A Amendments to revised Project Description

Revised Project Amendment Component

Description of Amendment to that described in draft EIS

Main Access to the revised Project

The original main access to the revised Project was along Cherry’s Road to the north of the revised Project site. Feedback from the public consultation and the Department of Transport and Main Roads raised safety concerns with this road intersection. NAC revised this access and propose to construct a new road off the Peachey-Maclagan Road which will enter into the new Mine Industrial Area (MIA). The new road will be designed to the appropriate standards to transport light vehicles into the revised Project site.

Rail Spur and Balloon Loop and TLF location

The layout of the rail spur and balloon and location of the new TLF has changed as to that presented in the draft EIS based on the FEED phase. The amendment to the original alignment will now result in the new TLF being on the western side of the balloon loop as opposed to the eastern side. There will also be a slight adjustment to the alignment at the intersection of the Jondaryan-Muldu Road and Childs Road to meet rail design requirements. For additional information regarding this matter refer to Section 5.1.3.2 of the AEIS.

Jondaryan-Muldu Road Diversion

The original alignment to the Jondaryan-Muldu Road will be slightly changed at the intersection of Cooke-McGovern Road and the Jondaryan-Muldu Road to minimise property impacts and accommodate natural drainage channels. The alignment will be moved to the east by approximately 200 m. In addition, the alignment near Muldu will join the Muldu-Plainview Road north of the revised Project site.

There are no other amendments proposed to the revised Project to that described in the draft EIS.

Page 3: 3. Revised Project Amendments - eisdocs.dsdip.qld.gov.aueisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/AEIS/Chapter 3_CD.pdf · 3. Revised Project Description Amendments 3.1

"

!(

!(

!(

ML5

0170

ML5

021 6

MLA

502 3

2

ML5

0216

Manning Vale West Pit

Willeroo Pit

Manning Vale East Pit

Muldu

Acland

Jondaryan

Doctors Creek

Lagoo

nC

reek

Spring Creek

Oak eyCreek

Cain Creek

Oa

key -

Co

oya

r R

oad

Jond

arya

n-M

uldu

Roa

d

Acl

and-

Sab

ine

Ro a

d

365000

365000

370000

370000

375000

375000

6970

000

6970

000

6975

000

6975

000

6980

000

6980

000

6985

000

6985

000

Pro

du

ced:

24

/08

/20

14

NEW ACLAND COAL MINE STAGE 3 PROJECT

Figure 3.1-A - Revised ProjectAmendment

0 1 2 3 4

Kilometres

Projection: Australian Geodetic Datum – Zone 56 (AGD84)1:90,000Scale on A4

Pa

th:

I:\Q

EN

V2

\Pro

ject

s\Q

E0

664

4\S

pa

tial\A

rcG

IS\0

1_

Fig

ure

s\0

3_

AE

IS\R

evis

ed

_P

roje

ct_

Am

en

dm

en

ts\1

40

72

2_

Ne

wH

op

e_R

evis

ed

Pro

ject

Am

en

d_

Fig

ure

3-1

-A_R

ailR

oad

Infr

ast

ruct

ure

.mxd

±LEGEND

!( Towns and Localities

" Train Loadout Facility

Revised Rail & Road Infrastructure

Internal Haulage Road

Revised Access to Mine

Revised Jondaryan-Muldu Road Diversion

Revised Rail Spur and Balloon Loop Alignment

Roads

Creeks

Mining Tenements

Stage 3 Pit Areas

EPC870