3. Revised Project Amendments
Additional Information to the EIS: New Acland Coal Mine Stage 3 Project PAGE 19
3. Revised Project Description Amendments 3.1 Rail and Road Infrastructure
NAC is in the process of conducting Front End Engineering and Design (FEED) studies for certain infrastructure components for the revised Project. The FEED phase is the pre-tender engineering work which follows the conceptual design or pre-feasibility study phases of a project. The FEED design phase focusses on the technical requirements with up to 30% design engineering completion as well as cost estimation of ± 15% accuracy. The FEED phase occurs at a stage when stakeholder input has been considered and final design can be progressed.
As a result of this phase, Figure 3.1-A depicts the revisions made to the main access to the mine, the alignment of the Jondaryan-Muldu Road and the alignment of the rail spur and balloon loop and location of the new Train Loadout Facility (TLF) for the revised Project. A description of the amendments to the revised Project is described in Table 3.1-A. In addition, the internal haul road from the Materials Handling Facility (MHF) to the new TLF will remain in place for the duration of the revised Project. Other internal haul roads used for the transportation and raw coal from the mine pit to the Run-of-Mine (RoM) Pad and light vehicle access will be periodically constructed in front of the mine path to allow for access and transportation of raw coal. These minor changes will not result in an increase in environmental nuisance or harm.
Table 3.1-A Amendments to revised Project Description
Revised Project Amendment Component
Description of Amendment to that described in draft EIS
Main Access to the revised Project
The original main access to the revised Project was along Cherry’s Road to the north of the revised Project site. Feedback from the public consultation and the Department of Transport and Main Roads raised safety concerns with this road intersection. NAC revised this access and propose to construct a new road off the Peachey-Maclagan Road which will enter into the new Mine Industrial Area (MIA). The new road will be designed to the appropriate standards to transport light vehicles into the revised Project site.
Rail Spur and Balloon Loop and TLF location
The layout of the rail spur and balloon and location of the new TLF has changed as to that presented in the draft EIS based on the FEED phase. The amendment to the original alignment will now result in the new TLF being on the western side of the balloon loop as opposed to the eastern side. There will also be a slight adjustment to the alignment at the intersection of the Jondaryan-Muldu Road and Childs Road to meet rail design requirements. For additional information regarding this matter refer to Section 5.1.3.2 of the AEIS.
Jondaryan-Muldu Road Diversion
The original alignment to the Jondaryan-Muldu Road will be slightly changed at the intersection of Cooke-McGovern Road and the Jondaryan-Muldu Road to minimise property impacts and accommodate natural drainage channels. The alignment will be moved to the east by approximately 200 m. In addition, the alignment near Muldu will join the Muldu-Plainview Road north of the revised Project site.
There are no other amendments proposed to the revised Project to that described in the draft EIS.
"
!(
!(
!(
ML5
0170
ML5
021 6
MLA
502 3
2
ML5
0216
Manning Vale West Pit
Willeroo Pit
Manning Vale East Pit
Muldu
Acland
Jondaryan
Doctors Creek
Lagoo
nC
reek
Spring Creek
Oak eyCreek
Cain Creek
Oa
key -
Co
oya
r R
oad
Jond
arya
n-M
uldu
Roa
d
Acl
and-
Sab
ine
Ro a
d
365000
365000
370000
370000
375000
375000
6970
000
6970
000
6975
000
6975
000
6980
000
6980
000
6985
000
6985
000
Pro
du
ced:
24
/08
/20
14
NEW ACLAND COAL MINE STAGE 3 PROJECT
Figure 3.1-A - Revised ProjectAmendment
0 1 2 3 4
Kilometres
Projection: Australian Geodetic Datum – Zone 56 (AGD84)1:90,000Scale on A4
Pa
th:
I:\Q
EN
V2
\Pro
ject
s\Q
E0
664
4\S
pa
tial\A
rcG
IS\0
1_
Fig
ure
s\0
3_
AE
IS\R
evis
ed
_P
roje
ct_
Am
en
dm
en
ts\1
40
72
2_
Ne
wH
op
e_R
evis
ed
Pro
ject
Am
en
d_
Fig
ure
3-1
-A_R
ailR
oad
Infr
ast
ruct
ure
.mxd
±LEGEND
!( Towns and Localities
" Train Loadout Facility
Revised Rail & Road Infrastructure
Internal Haulage Road
Revised Access to Mine
Revised Jondaryan-Muldu Road Diversion
Revised Rail Spur and Balloon Loop Alignment
Roads
Creeks
Mining Tenements
Stage 3 Pit Areas
EPC870