McGraw-Hill/Irwin The McGraw-Hill Companies, Inc. 2007, All Rights Reserved
Materials Requirements Materials Requirements PlanningPlanning
Chapter 16Chapter 16
16-16-22
Chapter 16 OutlineChapter 16 Outline
Definition of MRP SystemsDefinition of MRP Systems
MRP versus Order-Point SystemsMRP versus Order-Point Systems
MRP ExampleMRP Example
MRP ElementsMRP Elements
Operating an MRP SystemOperating an MRP System
The Successful MRP SystemThe Successful MRP System
16-16-33
Introduction to MRPIntroduction to MRPUsed to manage dependent demand itemsUsed to manage dependent demand items– Raw materials and purchased partsRaw materials and purchased parts– Work in process (WIP)Work in process (WIP)
Driven by the master schedule (which is Driven by the master schedule (which is driven by S&OP).driven by S&OP).End items ‘exploded’ into all components End items ‘exploded’ into all components using bill of materials (BOM)using bill of materials (BOM)Schedule offset based on lead timesSchedule offset based on lead timesIs the heart of a larger ERP systemIs the heart of a larger ERP system
16-16-44
Definitions of MRP SystemsDefinitions of MRP Systems
Developed by Joe Orlicky at IBM, 1975.Developed by Joe Orlicky at IBM, 1975.– IBM 370 was the first computer with the IBM 370 was the first computer with the
capacity to handle MRP calculationscapacity to handle MRP calculations
Types of MRP:Types of MRP:– Type I. An inventory control system (MRP)Type I. An inventory control system (MRP)
– Type II. Manufacturing Resource Planning system Type II. Manufacturing Resource Planning system (MRPII)(MRPII)
– Type III. Enterprise Resource Planning (ERP) systemType III. Enterprise Resource Planning (ERP) system
16-16-55
Definitions of MRP SystemsDefinitions of MRP SystemsThree principal functions of MRP (Orlicky):Three principal functions of MRP (Orlicky):
InventoryInventory– Order the right partOrder the right part– Order in the right quantityOrder in the right quantity– Order at the right timeOrder at the right time
PrioritiesPriorities– Order with the right due dateOrder with the right due date– Keep the due date validKeep the due date valid
CapacityCapacity– A complete loadA complete load– An accurate (valid) loadAn accurate (valid) load– An adequate time span for visibility of future loadAn adequate time span for visibility of future load
TR 4-6
Firm orders from Customers Sister plants Stock replenishment
Engineering Design changes
BOM
Forecast of Demand
Purchase Orders
Vendors
MRP Parts Explosion
Rough-cutcapacity planning
Capacity planning
Shop Orders
Shop-floor control
Master schedule
S & OP
Closed Loop MRP System
Operations ProductRaw Materials
Inventory Records
Inv. Transactions
16-16-66
16-16-77
Attribute MRP Order Point
Demand Dependent Independent
Order philosophy Requirements Replenishment
Forecast Based on master schedule Based on past demand
Control concept Control all items ABC
Objectives Meet manufacturing needs Meet customer needs
Lot sizing Discrete EOQ
Demand pattern Lumpy but predictable Random
Types of inventory Work in process and rawmaterials
Finished goods and spareparts
Attribute MRP Order Point
Demand Dependent Independent
Order philosophy Requirements Replenishment
Forecast Based on master schedule Based on past demand
Control concept Control all items ABC
Objectives Meet manufacturing needs Meet customer needs
Lot sizing Discrete EOQ
Demand pattern Lumpy but predictable Random
Types of inventory Work in process and rawmaterials
Finished goods and spareparts
Comparison of MRP & Order-Point Systems
16-16-88
MRP ElementsMRP Elements
InputsInputs1.1. Master ScheduleMaster Schedule
2.2. Bill of Materials (BOM)Bill of Materials (BOM)
3.3. Inventory RecordsInventory Records
Capacity Planning (feasibility)Capacity Planning (feasibility)
Planned Order Releases (Planned Order Releases (outputsoutputs))– Purchasing (buy)Purchasing (buy)– Shop Floor Control (make)Shop Floor Control (make)
MRP InputsMRP Inputs
1.1. Master scheduleMaster schedule
2.2. Product structure file (bill of materials or Product structure file (bill of materials or BOM)BOM)1.1. Parts & subassemblies contained in productParts & subassemblies contained in product
2.2. Sequence of operationsSequence of operations
3.3. Inventory master fileInventory master file1.1. Item master informationItem master information
2.2. Balances & ordering informationBalances & ordering information
16-16-99
11. Master Schedule. Master Schedule
Quantities derived from S&OP production plan Quantities derived from S&OP production plan (product groups) [input](product groups) [input]
Drives MRP process with a schedule of finished Drives MRP process with a schedule of finished products (actual items by week) [output]products (actual items by week) [output]
Quantities may consist of a combination of Quantities may consist of a combination of customer orders & demand forecastscustomer orders & demand forecasts
Quantities represent what needs to be produced, Quantities represent what needs to be produced, not what can be produced (infinite capacity not what can be produced (infinite capacity planning)planning)
16-16-1010
16-16-1111
2. MRP Example of BOM
Top
Leg
Long Rail
Short Rail
16-16-1212
BOM (Product Structure)BOM (Product Structure)
Short Rails (2)1 week
Table (End Item)1 week
Long Rails (2)1 week
Legs (4)1 week
Top (1)2 weeks
Leg Assembly (1)1 week
16-16-1313
Indented BOMIndented BOMLevel CodeLevel Code ComponentComponent
00 Table (end-item)Table (end-item)
11 Leg assembly (1)Leg assembly (1)
22 Short rails (2)Short rails (2)
22 Long rails (2)Long rails (2)
22 Legs (4)Legs (4)
11 Top(1)Top(1)
16-16-1414
3. Inventory (item master) File3. Inventory (item master) File
– DescriptionDescription– Part numberPart number– Part namePart name– Safety stockSafety stock– Item classificationItem classification– CostCost– YieldYield– Lead timeLead time– Group to which item Group to which item
belongsbelongs
– Assemblies in which Assemblies in which item is useditem is used
– Shelf lifeShelf life– Batch control Batch control
requirementsrequirements– SubstitutesSubstitutes– Suppliers and their Suppliers and their
ratingsratings– Unit of measure (SKU)Unit of measure (SKU)
“Permanent” information may include:
16-16-1515
Inventory Status FileInventory Status File
QuantitiesQuantities OrderedOrdered ReceivedReceived IssuedIssued AllocatedAllocated Previously allocated that have been issuedPreviously allocated that have been issued
Dates ordered, received, issued, and allocatedDates ordered, received, issued, and allocated
Shipping, production, and purchase numbersShipping, production, and purchase numbers
On-hand balance & Available balanceOn-hand balance & Available balance
Batch identification (e.g. lot number)Batch identification (e.g. lot number)
Changing information includes:
MRP ExampleMRP ExampleThe Alpha Beta CompanyThe Alpha Beta Company
Inventory Position
Item On Hand Scheduled Receipts Lot Size MPS
A 10 0 1 100, period 8
B 5 0 1 200, period 6
C 140 0 150 - - -
D 200 250, period 2 250 - - -
ALT=3
C(3)LT=4
D(2)LT=2
D(3)LT=2
BLT=2
Level (LLC)=0
Level (LLC)=1
BOM
16-16-1616
MRP Matrices For A & BMRP Matrices For A & BItem: A LLC: 0 PeriodLot size: 1 LT: 3 PD 1 2 3 4 5 6 7 8Gross requirements 100Scheduled receiptsProjected on hand 10 10 10 10 10 10 10 10 0Net requirements 90Planned order receipts 90Planned order releases 90
Item: B LLC: 0 PeriodLot size: 1 LT: 2 PD 1 2 3 4 5 6 7 8Gross requirements 200Scheduled receiptsProjected on hand 5 5 5 5 5 5 0 0 0Net requirements 195Planned order receipts 195Planned order releases 195
16-16-1717
16-16-1818
Origin of RequirementsOrigin of Requirements
At Level Zero: gross requirements come At Level Zero: gross requirements come from the master production schedule (MPS)from the master production schedule (MPS)
Below level zero: gross requirements come Below level zero: gross requirements come from planned order releases for the next from planned order releases for the next level above.level above.
Net requirements are gross requirements Net requirements are gross requirements plus scheduled receipts minus inventory on-plus scheduled receipts minus inventory on-handhand
MRP Matrices For C & DMRP Matrices For C & DItem: C LLC: 1 PeriodLot size: 150 LT: 4 PD 1 2 3 4 5 6 7 8Gross requirements 270Scheduled receiptsProjected on hand 140 140 140 140 140 20 20 20 20Net requirements 130Planned order receipts 150Planned order releases 150
Item: D LLC: 1 PeriodLot size: 250 LT: 2 PD 1 2 3 4 5 6 7 8Gross requirements 585 180Scheduled receipts 250Projected on hand 200 200 450 450 115 185 185 185 185Net requirements 135 65Planned order receipts 250 250Planned order releases 250 250
16-16-1919
Alpha Beta Planned Order Alpha Beta Planned Order Release ReportRelease Report
PeriodPeriod Item Item QuantityQuantity
11 CC 150150
22 DD 250250
33 DD 250250
44 BB 195195
55 AA 9090
16-16-2020
16-16-2121
Operating an MRP SystemOperating an MRP System
Should MRP carry “safety stock”?Should MRP carry “safety stock”?
How much “safety stock” should be carried?How much “safety stock” should be carried?
Issue of “safety lead time”Issue of “safety lead time”
Danger of “informal” system driving out the “formal” Danger of “informal” system driving out the “formal” systemsystem
Expansion of MRP to other functions (finance, HRM, Expansion of MRP to other functions (finance, HRM, etc.) of businessetc.) of business
16-16-2222
Operating a Successful MRP Operating a Successful MRP SystemSystem
Accurate Inventory RecordsAccurate Inventory Records
Stable master production scheduleStable master production schedule
Realistic master production scheduleRealistic master production schedule
Good control of engineering change orders Good control of engineering change orders (impacts BOM)(impacts BOM)
Good interface with capacity planning (CRP)Good interface with capacity planning (CRP)
Reports that are usefulReports that are useful
16-16-2323
Elements of Successful MRP Elements of Successful MRP ImplementationImplementation
Allow enough time (18 months minimum)Allow enough time (18 months minimum)
Put materials people in charge of cross-Put materials people in charge of cross-functional team (not IS or accountants)functional team (not IS or accountants)
Train everyone and train them again!Train everyone and train them again!
Top Management supportTop Management support
Accurate recordsAccurate records
16-16-2424
SummarySummary
Definition of MRP SystemsDefinition of MRP Systems
MRP versus Order-Point SystemsMRP versus Order-Point Systems
MRP ExampleMRP Example
MRP ElementsMRP Elements
Operating an MRP SystemOperating an MRP System
The Successful MRP SystemThe Successful MRP System
16-16-2525
End of Chapter Sixteen