22
3 keys to unlocking substantial long-term energy savings at large C&I facilities 3 keys to unlocking substantial long 3 keys to unlocking substantial long - - term term energy savings at large C&I facilities energy savings at large C&I facilities Presenter: Dominic Kennedy Product Portfolio Manager, Xcel Energy Authors: Lori Nielsen, Chandan Rao, Nikhila Rao, Stuart Moulder and Dominic Kennedy

3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

3 keys to unlocking substantial long-term energy savings at large C&I facilities

3 keys to unlocking substantial long3 keys to unlocking substantial long--term term energy savings at large C&I facilitiesenergy savings at large C&I facilities

Presenter: Dominic Kennedy

Product Portfolio Manager, Xcel Energy

Authors: Lori Nielsen, Chandan Rao, Nikhila Rao,

Stuart Moulder and Dominic Kennedy

Page 2: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

2

Customer Quotes

“This report told me things

I didn’t already know. Engineering firms ask me questions and then

regurgitate what I tell them into a report

Engineering Services Leader for large glass bottle manufacturing company

Page 3: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

3

Customer Quotes

“[The analysis] was significant in the decision making because it allowed us to verify with upper management

the payback associated with investment.”

Anonymous customer – taken from product evaluation report

Page 4: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

4

The 3 keys…

� Senior executive engagement

� Long term performance incentives

� Energy data mining

Page 5: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

55

Leveraging…

1. Senior executive engagement

2. Long term performance incentives and

3. Energy data mining

To Achieve

1. Significant savings and

2. Sustainable energy management practices

For large customers

Page 6: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

6

Traditional approach

� Technical audits

� Technology incentives

� Outcomes

� What’s missing

�Executive engagement

� In-depth data

�Utility focused vs customer focused

6

Page 7: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

7

Sustainable Energy Management Practices

Page 8: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

88

Phase 1. Identification / Executive engagement

� Memorandum of Understanding

� Executive workshop

�Who participates

�Value of key stakeholder participation

�Outcomes/output

�Checkpoint

Page 9: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

9

Engagement – EnVinta One2Five

Page 10: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

10

Identifies weaknesses

in your current practices

Highlights current

strengths

Identifies priority areas

for immediate

improvement

Sample Report

Page 11: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

1111

Phase 2. Scoping - Data mining

� Definition...Transforming energy data through analytics and visualization to present useful insights to drive change

� Establishes:

�Common language and understanding for sustainable results

�Support needed to present the “story”effectively

�Credibility for solutions proposed

Page 12: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

12

Data Driven versus Anecdotal

http://pactiss.org/2011/09/15/anecdotal-evidence-cartoon/

Posted on September 15, 2011 by Peter Ellerton

Page 13: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

13

Data Mining

Page 14: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

14

Chiller Plant – 3D plot

Page 15: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

15

Chiller Plant - Histogram

Page 16: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

16

Chiller Plant – Scatter Plot

Page 17: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

17

Phase 3. Implementation

� Preapproval for projects

� Bundling of projects

� Vendor proposal support

� Pre and post-monitoring

� Xcel Energy rebates & bonuses

� Repeat One-2-Five diagnostic

17

Page 18: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

18

Phase 3. Implement – Case study

18

Practices Major Research Campus

Improve Management Effectiveness

Complex and interconnected energy systems Engaged all (16) stakeholders in decision making

Set Energy GoalsFirst tier begun in 2008, second in 2011 and third tier scope now in development.

Achieve Sustainable Energy Conservation

Implemented savings of 12.5% (6.8 GWh) of the annual electric energy consumption (implemented a further 4.6 GWh since paper was written)

Review Energy Performance

Increased focus and momentum with enhanced monitoring resources for review of performance and rebate incentives for implementing additional measures

Page 19: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

19

Achieve Significant Energy Savings

Page 20: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

20

Cost Effectiveness

Page 21: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

2121

Conclusion

� Adjustable offering

� Executive level engagement

� Energy team

� Data Driven analysis

� Cost = 0.5 - 0.7 cents per life-time kWh saved (2012)

� 75% less than National average (2-4 cents per life-time kWh National Action Plan report -US EPA, et al. 2006).

Page 22: 3 keys to unlocking substantial long -term 3 keys to ......Executive level engagement Energy team Data Driven analysis Cost = 0.5 - 0.7 cents per life-time kWh saved (2012) 75% less

22

QuestionsQuestionsQuestions